HomeMy WebLinkAbout3106165 Page: 1 0~ t~
~?/~?/155883: 44P
Filed for Record at Request Of: BR£11[RTON CITY OF £S~1T $13. Ki[sap Co, t4f~
When Recorded Return to:
Name city cle, rk,,
Address 239 4th Street
Bremerton~ WA 98337
Document Title: Easement
Reference Number of Document Assigned or Released:
Grantor's Name: United States of America
Grantee's Name: City of Bremerton
Abbreviated Legal Description: Federal owned land in the SEC. 22, SEC. 27,
SEC. 28 AND SEC 33, of T24N, R1E, W.M.
(Additional legal on pages 2 and 3 of the easement document)
Assessor's Property Tax Parcel I Account Number: Federal owned land
EXCI~ TAX EXEMPT JUL 2 ~ 1998
N4425598RP00T09
GRANT OF EASEMENT
THIS INDENTURE, made the (0~tay of ,~)r;l 1998 between the United States of
America, herein called the Government, acting through the Department of the Navy, and
the City of Bremerton, Washington, herein called the Grantee,
WHEREAS, the Government owns that certain real property identified as the
Puget Sound Naval Shipyard, Shelton - Bremerton Railroad Right of Way, Bremerton,
Washington, herein called the Station; and
WHEREAS, the Grantee has requested an easement for the construction,
installation, operation, maintenance, repair, and replacement of 36 inch water pipeline
under and over those portions of the Station hereinafter described; and
WHEREAS, the Secretary of the Navy has found that the grant of such easement
on the terms and conditions hereinafter stated is not incompatible with the public
interest;
N4425598RP00T09
N4425598RP00T09
NOW THEREFORE, this indenture witnesseth that, in consideration of THIRTEEN
THOUSAND FOUR HUNDRED AND NO/100 DOLLARS ($13,400.00) paid by the
Grantee to the Government, the Government hereby grants to said City of Bremerton
and its successors and assigns in perpetuity, an easement for the construction,
installation, operation, maintenance, repair, and replacement of water pipeline. Such
easement being under and over that portion of the Station hereafter called the
Premises, delineated on Naval Facilities Engineering Command Drawings, Numbered
A-101144 through A-101151. Said drawings are on file with the Naval Facilities
Engineering Command, Engineering Field Activity Northwest and are described as
follows:
A strip of land over a portion of the NW 1/4, of Section 33, the S 1/2 and the NE
1/4, of Section 28 and the NW 1/4, of Section 27, Township 24 North, Range 1 East, of
the Willamette Meridian, in Kitsap County, Washington, being a strip of land 10 feet
wide lying 5 feet on each side of the following described centerline:
Commencing at the northwest corner of said Section 33; thence S01o64'54'~A/
along the west line of the NW 1/4 thereof, 1527.24 feet to a point lying 9.7 feet, more or
less, southeast of the southeasterly right of way line of SR 3, MP 34.83; thence
N51o49'54"E parallel to said right of way line, 174.13 feet to Plan Station 11+17.03, the
true point of beginning of the herein described centerline, said point lies on the
approximate southwesterly right of way line of the U.S. Navy Railroad at Plan Station
10+69.1, as shown on Puget Sound Naval Shipyard Public Works Drawing No. 54142;
thence continuing N51o49'54"E, 172.21 feet to an angle point, Plan Station 12+37.2,
lying 59.6 feet, more or less, left and northeasterly of the centerline of the existing
railroad tracks of said U.S. Navy Railroad; thence S85o36'26"E, 194.76 feet to an angle
point, Plan Station 14+40.4, lying 49.2 feet, more or less, left and northerly of said
centerline of tracks; thence N81o14'26"E, 231.59 feet to an angle point, Plan Station
16+81.6, lying 50.2 feet, more or less, left and northerly of said centerline of tracks;
thence N73o04'00"E, 197.68 feet to an angle point, Plan Station 18+87, lying 45.1 feet,
more or less, left and northwesterly of said centerline of tracks; thence N63o12'31"E,
97.29 feet to an angle point, Plan Station 19+87.9, lying 47.8 feet, more or less, left and
northwesterly of said centerline of said tracks; thence N68o09'46"E, 194.71 feet to an
angle point, Plan Station 21+84, lying 15 feet, more or less, northwesterly of said
centerline of tracks; thence continuing along a line lying parallel with and 15 feet
northwesterly and westerly of said centerline of tracks the following courses and
distances:
N56o05'00"E, 1451.76 feet to Plan Station 36+35.76 (Railroad Station 128+86.89), the
beginning of a curve to the left having a radius of 1417.39 feet; thence northeasterly
N4425598RP00T09
Page: 2 0£ ~
~ 87/277198583: 44P
BR£tlERTON CITY OF £SMT $I3.ee Kitsap Co, WA
N4425598RP00T09
393.55 feet along said curve through a central angle of 15o54'31'' to Plan Station
40+33.47 (Railroad Station 132+80.64); thence N40o10'30"E 240.65 feet to Plan
Station 42+74.12 (Railroad Station 135+28.45), the beginning of a curve to the right
having a radius of 1447.39 feet; thence northeasterly 605.00 feet along said curve
through a central angle of 23o56'58'' to Plan Station 48+72.85 (Railroad Station
141+24.70); thence N64o07'27"E, 1041.15 feet to Plan Station 59+13.99 (Railroad
Station 151+63.24), the beginning of a curve to the left having a radius of 1004.09 feet;
thence northeasterly and northerly 1197.75 feet along said curve through a central
angle of 68o20'47'' to Plan Station 71+29.64 (Railroad Station 163+82.52); thence
NO4O13'20'~/V 508.72 feet to Plan Station 76+38.36 (Railroad Station 168+84.50); to the
beginning of a curve to the right having a radius of 1154.55 feet; thence northerly and
northwesterly 709.56 feet along said curve through a central angle of 35012'46'' to Plan
Station 83+38.70 (Railroad Station 175+97.83); thence N30o59'26"E, 338.39 feet to
Plan Station 86+77.09 (Railroad Station 179+36.22), the beginning of a curve to the left
having a radius of 2606.01 feet; thence northeasterly 390.85 feet along said curve
through a central angle of 08035'35" to Plan Station 90+70.19 (Railroad Station
183+20.54); thence N22o23'50"E, 436.93 feet to Plan Station 95+07.12 (Railroad
Station 187+60.41), the beginning of a curve to the right having a radius of 934.20 feet;
thence northeasterly 835.36 feet along said curve through a central angle of 51o14'01''
to Plan Station 103+29.07 (Railroad Station 195+80.14); thence N73o37'51"E, 351.50
feet to Plan Station 106+80.57 (Railroad Station 199+31.21); the beginning of a curve to
the left having a radius of 1479.71 feet; thence northeasterly 459.53 feet along said
curve through a central angle of 17o47'37'' to Plan Station 111+44.76 (Railroad Station
203+95.97); thence N55os0'14"E, 11.52 feet to Plan Station 111+56.28 (Railroad
Station 204+07.49); thence departing from a line lying parallel with and 15 feet
northwesterly and westerly of said centerline of U.S. Navy Railroad tracks
N33o49'22'~/V, 15.00 feet to Plan Station 111+56.37, 30' LT, a point on the
northwesterly right of way line of said U.S. Navy Railroad and the termination of the
herein described centerline of easement.
Said Easement contains 1.48 acres
THIS EASEMENT is granted subject to the following terms and conditions:
1. All work in connection with the construction, installation, operation, repair,
and replacement of the underground utilities shall be done without cost or expense to
the Government, and in accordance with plans previously approved by the
Commanding Officer, Engineering Field Activity, Northwest, Naval Facilities Engineering
Command.
N4425598RP00T09
t lllll[lllllll IIII Il ll Ill I Ill II
Pacje: 3 of 8
3 87727/199883= 44P
BREMERTON CITY OF ESMT $t3,S8 KitsalO Co, 14R
N4425598RP00T09
2. The Grantee shall maintain the Premises and the underground utilities in
good condition at all times and Shall promptly make all repairs thereto that may be
necessary for the preservation of the condition of the Premises and the continued
operation and maintenance of the underground utilities.
3. The Grantee's rights hereunder shall be subject to such reasonable rules
and regulations as may be prescribed by the Government to assure that the exercise of
such rights will not interfere with the Government activities at the Station.
4. Upon the termination of this easement, the Grantee, at its expense, shall
remove, to the extent requested by the Government, improvements installed or
constructed hereunder, and shall restore the Premises to the same or as good a
condition as that which existed prior to the exercise by the Grantee of its rights
hereunder. Such restoration shall be done in a manner satisfactory to the Commanding
Officer, Engineering Field Activity, Northwest, Naval Facilities Engineering Command.
5. If at any future time, the Government determines that the utilities or any
portion thereof, unduly interferes with any of its activities, it shall have the right to
terminate this easement, in whole or in part, or THAT, unless the Government shall
have determined that relocation is not feasible, it shall convey to the Grantee, without
charge, a substitute easement permitting the Grantee to relocate the utilities and/or
portion thereof, on adjacent Government property, at the Grantee's cost and expense.
The substitute easement shall contain the same terms and conditions as those of this
easement, and shall bear the same expiration date, if any.
6. All or any part of this easement may be terminated upon failure by the
Grantee to comply with any of its terms and conditions; upon abandonment of the rights
granted herein; or nonuse of such rights for a period of two consecutive years.
7. The Government may use the Premises of this easement for any purpose
that does not unreasonably interfere with the use and enjoyment by the Grantee of the
rights granted by this easement.
8. The Grantee must give Burlington Northern Railroad and the Activity's
Public Works Officer written notification, and receive written acknowledgment of that
notification, prior to the start of any and all construction, maintenance and repair work
excluding emergency repairs, so that no interference with the operation of the railroad
will occur. Every effort will be made to coordinate such emergency repairs with
Burlington Northern Railroad so as not to interfere with the operation of the railroad.
9. The Grantee must pay any fees deemed appropriate by Burlington
Northern Railroad for their efforts in the administration of this easement.
N4425598RP00T09
Page: 4 of 6
877~77t$9863= 44P
4
BREII£RTON CITY OF ES~IT $t3,8~ Kit~ap Co~ ~
N4425598RP00T09
10. Burlington Northern Railroad may require that some or all of the work be
completed by Burlington Northern Railroad at the sole cost and expense of the Grantee.
11. To preserve the structural and drainage integrity of the railroad
embankment, repair and/or replacement of all catch basins and storm drains between
the railroad and the highway will be required,
12. The City of Bremerton will be liable for all washouts and damage during
construction, and for the life of the easement. Stability of the railroad slopes must be
ensured during construction. Operation of trains must not be restricted.
13. The City of Bremerton must indicate pipe material and strength
classifications.
14. Burlington Northern Railroad flagmen will be required during construction.
15. The project involves soil excavation to a depth of ten feet below ground
surface. The City of Bremerton will be responsible for all excess soil characterization
and disposal. Soil that is acceptable for backfill will be used as such and returned to the
excavation.
16. Soil tobe encountered during the excavation has not been sampled by the
Navy for environmental contamination. There is no reason to suspect gross
contamination from operation of the tracks. However experience at the Navy controlled
tracks at Jackson Park Housing Complex revealed Iow levels of arsenic, PAH's
(primarily pentachlorophenol from railroad ties)' and petroleum products. Excess soil to
be disposed of from the project must be sampled by the City of Bremerton at its sole
cost and expense, to determine appropriate disposal method. All disposal of soil will
need to be coordinated with Puget Sound Naval Shipyard personnel. The grantee must
comply at its sole cost and expense, with ail applicable Federal, State, and local laws,
including, but not limited to environmental laws and regulations.
17. If ground water is encountered that requires dewatering, Puget Sound
Naval Shipyard requirements for discharge must be followed.
Page: 5 0~ 8
87/~7/155883= 44P
8R£M£RTON CITY 0F ESMT $t3.88 Kitsap Co, WA
N4425598RPOOT09
N4425598RP00T09
IN WITNESS WHEREOF, the Government, acting through the Department of the
Navy, has caused this instrument to be executed the month, day and year written first
above.
UNITED STATES OF AMERICA
By M~
Real Estate Technical Lead
Real Estate Contracting Officer
Engineering Field Activity, Northwest
State of Washington
County of Kitsap
I certify that I know or have satisfactory evidence that Michael D. Brady is the person
who appeared before me, and said person acknowledged that he signed this
instrument, on oath stated that he was authorized to execute the instrument and
acknowledged it as the Real Estate Technical Lead, Real Estate Contracting Officer,
Engineering Field Activity, Northwest, United States Department of Navy to be the free
and voluntary act of such party for the uses and purposes mentioned in the instrument.
Dated: 1o ~orll
,-: Signature:
·" Title: Nof.r~ Joe b ~ iu
'~'>~ , My appointment expires:
Legal Description Approved:
Page= 8 o£ 6
87/87/159883 = 44P
BREt~ERTON CITY OF ES~IT $13.88 Kitsap Co, WR
N4425598RP00T09
6