HomeMy WebLinkAboutLION'S PARK (GRANT) PROJECT AGREEMENT
Project Titl.e Lionls Park Project t!umber 4KTP-70-OllD
1. Nature of .A_g_reement. This instrument, in 8 pages, of which
this is the first, is intended to set out the terms and conditions, not
otherwise appearing in statutes or regulations, of a grant of mone7 from
the Outdoor Recreation Accoun.~ of the General Fund oF the State of Wash-
' ington to a state a~ency or local public body, herein cai]ed the Contract-
ing Party, in aid of ~n outdoor recreation project. The state e~ency
~dmlnisterinB the grant ~s the I~teragency Committee for Outdoor Recreation,
herei~ called the In~eragencv Committee.
2. Assent of Contrectlnq Part~. The Contrac~in9 Party by the
signature of its authorized repr~sen~atlve below a~rees to be bound
by this instrument:
City of 8remerton
~nt ract lng Party
Approved as to form
~ ~ ~ .day
Title
~. Assent of Interaqencv Committee. The signeture of the Adminis-
trator of the IntereDancy Co~ttee be]ow w~nassas that the Insara3ancy
Co~ittee egreas to be bound by th~s instrument:
Approved as to form STATE OF WASHINGTON
This ..?,,9~ _day Interagenoy Co.~nittee for
Outdoor Recreation
SLADE GORTON
Attorney General
· - ~inist rotor
Date:
Ass istant At~ey G~I
4. Te~s_o.f Aqr~e.e_~e~,t_. This ~9~'eement shall be in effect for the
period frol.~ March 3 , 19 70 until _. December 31 _, 1971
5. P__r.o_~ec_~___A~sis.t_e~d.. The outdoor ...... project to be assisted
is th~ one set out i~ t?.e Contractln9 Party's Application to the Inter-
agency Comml.ttee, dated Janua_r~v_8, 19.69 __. as approved for fund-
in9 by the Interagency ¢oi~mittee at its meet]n9 on the ~rd day of
March ., 19__70 . For identification purposes it is entitled
Lion's Park and briefly described as follows:
This project agreement is for the development of recreational facilities ~t
Lion's Park, a 14 acre park located in north Bremerton, Kitsap County, Washington.
The following units of work will be accomplished:
1. Construction of tennis courts (4) including concrete curbln9;
rubberized asphalt playing surface, perimeter fencing, net
post, and drinkin9 fountain.
2. Turfing approximately four acres of main athletic field including
site preparation, top soil, fertilizer, seed.
3. Irrigation of approximately four acres of main athletic field
including under9round, fully automatic rotary pop-up type heads.
6. Fundlnq of Proiect. (a) The total cost of the project
covered by this a9re~ment is $ 50~000
(b) The Intere3ency Committee a9rees to pay $ 2~,000
or 50 percen~ of the total project cost, whichever amount is
Ies~, from m~nles available in the Outdoo~ Recreation Account of the
State General Fund.
(c) In addition, the lntera9ency Commlttee agrees to recommend
to the Bureau of Outdoor Recreation, United States Department of :nterlor,
that federal matching funds in the amount of $_ N.A.
or N.A.__ percent of the estimated cost, whichever anount is less,
be approved for this pro~ect, and the I~teragency Committee agrees to
pay to the Contracting Party any federal matching money made available
to the State of Washington for the outdoor recreation project covered
by this agreement.
7.' ContlnAencles. The duty of the Interagency Committee to approve
disbursement of funds pursuant to this agreement is contlngent upon strict
compliance by the Contracting Party with the terms of this a~ree:~ent.
The duty of the State of ~4ashington to disburse funds is contingent on
the funds being available in the Outdoor Recreation Account of the State
General Fund.
8. .Re.quirements of Bureau of Outdoor Recreation. If application
has been made to the Bureau of Outdoor Recreation, United States Depart-
ment of Interior, for assistance from the United States Land and \4ater
Conservation Fund (see paragraph 6 (c)) then a copy of Attachment 1 to
Form BOR 8-92, Land and ~/ater Conservation Fund Project Agreement, General
Provisions, is attached to this agreement and marked "Attachment A". If
United States Land and Water Conservation Fund money is made available
for this project, the Interagency Committee will be required to sign an
agreement with the Bureau of Outdoor Recreation and the State of Wash-
ington and the recipient public body will be bound by the attached pro-
visions. Therefore, if Land and ¥!ater Conservation Fund money is in-
volved in this project, then the Contracting Party agrees to faithfully
comply with all the requirements of Attachment A.
9. Project Performance. The Contracting Party shall execute and
complete the approved project in accordance with the time schedule set
forth in the project application. Unless a different schedule appears
in the application or in this agreement, the contractor's performance
shall commence not later than sixty days after the date this agreement
has been signed by the Administrator. Unless otherwise agreed in writing,
the Contracting Party's performance shall be completed by the end of the
period covered by this agreeme~t.
10. Proiect Administration. (a) The Contracting Party shall promptly
submit such reports as the Administrator of the Interagency Committee may
request.
(b) Property and facilities acquired or developed pursuant to this
agreement shall be available for inspection by the Administrator upon
request.
(c) The Contracting Party shall submit a final report when the project
is completed or prematurely terminated, or project assistance is terminated.
The report shall include a final accounting of all expenditures and a
description of the work accomplished. If the project is not completed, the
report shall contain an estimate of the percentage of completion, and shall
indicate the degree of usefulness of the completed project, if not previously
reported. The report shall contain a final accounting summarizing all ex-
penditures not previously reported and shall include an overall summary
for the entire project.
ll. P__roiect Termination. All obligations of the Interagency Co[~mittee
under this agreement may be suspended or canceled, at the option of the
Interagency Committee, if any of the following has occurred:
(a) The Contracting Party has failed to make satisfactory progress
to complete the project, or will be unable to complete the project, or
any portion of it.
(b) The Contracting Par~y is failin9 to mal<e satisfactory progress
to complete any other project assisted with funds from the Outdoor Rec-
reation ACcount of ti~e State General Fund, or will be unable to complete
another such project, or any portion of it.
(c) The Contracting Party has made misrepresentation in its
application or in any other information furnished to the Interagency
Committee in connection with this project.
12. Remedies. Because the benefit to be derived from the fulT
compliance with the terms of this agreement is the preservation, pro-
tection, and the net increase in the quantity and quality of public
outdoor recreation facilities and resources which are available to
the people of the state and of the United States, and because such
benefit exceeds to an immeasurable and unascertainable extent the
amount of money furnished under the terms of this agreement, the Con-
tracting Party agrees that repayment of an amount equal to the amount
of assistance extended under this agreement by the state of Washington
would be inadequate compensation for any fa'ilure to comply with the
terms of this agreement. The Contracting Party agrees, therefore, that
in the event of a breach of this agreement by it, specific performance
shall be an appropriate remedy.
13. Restriction on Conversion of Facility to Other Uses. The
Contracting Party shall not at any time convert any property or facility
acquired or developed pursuant to this agreement to uses other than those
for which state assistance was originally approved without the prior
approval of the Interagency Committee, in the manner provided by
RCW 49.99.100 for marine recreation land, whether or not the property
was acquired with Initiative 215 funds.
14. Use and Maintenance of Assisted Facility. The Contracting
Party shall operate and maintain, or cause to be operated and maintained,
the property or facilities which are the subject matter of this agreement,
as follows:
(a) The property or facilities shall be maintained so as to appear
attractive and inviting to the public.
(b) Sanitation and sanitary facilities shall be maintained in accord-
ance with applicable state and local public health standards.
(c) The property or facilities shall be kept reasonably safe for
public use.
(d) Buildings, roads, trails, and other structures and improvements
shall be kept in reasonable repair throughout their estimated lifetime,
so as to prevent undue deterioration that would discourage public use.
(e) The facility shall be kept open for public use at reasonable.
hours and times of the year, according to the type of area or' facility.
15. ~eportin_~. Once a year, the Contracting Party shall certify to
the Adminlstrator that the project and all assisted facilities are being
retained, operated, maintained, and used in accordance with the terms oF
this agreement. A report and certification will be partially prepared
by the Interagency Committee and will be sent to the Contracting Party
for completion. The Contracting Party shall also report on specific
matters whenever requested to do so by the Administrator.
16. No Waiver b~ Int~raflq~y Committee° The Contracting Party
agrees that failure by the Interagency Committee to insist upon the
strict performance of any provision of this project agreement or to
exercise any right based upon a breach thereof, or acceptance by it
of performance d~rlng such breach, shall not constitute a waiver of
any of its rights under this project agreement.
17. IdentifY_Lnq Flarkers. The tnteragency Committee reserves
the right to display, during the period covered by this agreement
and after project completion, appropriate signs or markers identifying
the roles of the state and federal agencies participating financially
in this project.
18. Disbursement of Assistance. Disbursement of the grant-in.-aid
shall be made in accordance with ~IAC 286-24-040, after the Contracting
Party has furnished the Administrator such information as he shall deem
necessary to show compliance with applicable statutes and rules and this
ag reemen t.
19. Provisiops Applyin9 0nly to ~cqu_isition Proiects. The following
provisions shall be in force if the project covered by this agreement is
for the acquisition of outdoor recreation land or facilities, but shall
not apply when the project is for development only:
(a) Evidence of Land Value. Prior to disbursement of the assistance
~rovided for in thls agreement, the Contracting Party shall supply evidence
establishin9 to the satisfaction of the Administrator that the land acquis-
ition cost represents a fair and reasonable price for the land in question.
(b) Evidence of Title. The Contracting Party shall be responsible
for providing satisfactory evidence of title or ability to acquire title
for each parcel prior to disbursement of funds provided by this agreement.
Such evidence may include title insurance policies, Torrens certificates,
or abstracts, and attorneys' opinions establishing that the land is free
from any impediment, lien, or claim which would impair the uses contemplated
by this agreement.
(c) Recital in Deeds. The Contracting Party shall require that
every deed or other instrument of conveyance of land acquired for this
project with state assistance shall contain the following provision:
"This conveyance is made in consideration of money
coming in whole or in part from the Outdoor Recreation
Account of the General Fund of the State of W~shington.
The purchaser takes subject to the obligations of the
project agreement contract between it and the Washington
State Interagency Committee for Outdoor Recreation dated
(insert date of this agreement), copies of which are in
possession of the purchaser and the Interagency Committee.
qhe project agreement contract provides, among other
5
things, that the purchaser shall not at any time
convert this property to uses other than for which
state assistance was originally granted unless it
has obtained prior approval of the Interagency
Committee for Outdoor Recreation in the manner
required by RCW 43:99.100 for marine recreation
land, whether or not the property is marine rec-
reation land.'~
20. Provisions App]yinq Only to Developme~ ProieCtSo The
following provisions shall be in force if the project covered by this
agreement is for development of outdoor recreation land or facilities,
but shall not apply when the project is for acquisition only:
(a) ~_ompliance with the Law. The Contracting Par~y shall comply
with all laws and regulations applicable to the development project
and to contracts for work done to carry it out.
(b) Compliance with Application. Unless othemvlse agreed to in
writing by the Administrator, the project shall be carried out according
to the plans and proposals submitted by the Contracting Party in, or in
connection with, its application for assistance for the project.
(c) Installment Payments. Assistance provided by this agreement
for development may be remitted to the Contracting Party in installments,
after receipt of billings, and upon satisfactory proof of completior, of
each sLage of construction or development. Determination of appropriate
stages for installment payments shall be made by the Administrator, after
consultation with the Contracting Party and with the approval of the Bureau
of Outdoor Recreation, if United States Land and Water Conservation Funds
are involved. Installment payments shall in no event be made more frequently
than monthly. An amount equal to 10% of the funding assistance provided
the Contracting Party by this agreement for eligible development costs may
be withheld until final inspection and certification of project completion
is made by the Interagency Committee and approved by the Bureau of Outdoor
Recreation.
(d) Contracts for Construction. Contracts for construction shall
be awarded through a process of competitive bidding if required by state
law. No contract required to be let after competitive bidding shall be
awarded until approved by the Admi~istrator. Copies of all bids and
contracts awarded shall be retained for inspection by the Administrator
upon request. Where all bids are substantlal]y in excess of project
estimates, the A6~inistrator may, by notice in writing, suspend the
project and refer the matter to the Interagency Committee for deter-
mination of appropriate action, which may include termination of
assistance for development of the project.
(e) Chanqe Orders. Any change orders shall be in writing and
shall be made a part of the project file and kept available for in-
spection or audit upon request.
(f) Nondiscrimination Clauses. Except where a non-discrimination
clause required by the United States is used, the Contracting Party shall
insert the foliowin9' nondiscrimination clause in each contract for con~
struction of this project:
"During the performance of this contract, the Contractor
a9rees as follows:
"(1) The Contractor will not discriminate against
any employee or applicant for employment be-
cause of race, creed, color, or natlona] origin.
The Contractor will take affirmative action to
ensure that applicants are employed, and that
employees are treated during employment, with-
out regard to their race, creed, color, or
national origin. Such action shall include,
but not be limited to, the following:
ployment, upgradin9, demotion or transfer;
recruitment or recrult~ent advertislng;
layoff or termination; rates of pay or other
forms of compensation; and selection for
training, includln9 apprenticeship. The
Contractor agrees to post in conspicuous
places, available to employees and applicants
for employment, notices to be provided by
the contracting officer setting forth the
provisions of this nondiscrimination clause.
"(2) The Contractor will, in all solicitations or
advertisements for employees placed by or on
behalf of the Contractor, state that all quali-
fied applicants will receive consideration for
employment without re9ard to race, creed,
color, or national origin.
"(3) The Contractor will send to each labor union or
representative of workers with which he has a
collective bargaining agreement or other con-
tract or understanding, a notice, to be provided
by the agency contracting officer, advising the
said labor union or workers~ representative of
the Contractor's commitments under this section,
and shall post copies of the notice in conspicuous
places available to employees and applicants for
employment.
7
"(4) The Contractor will include the provisions of the
foregoing paragraphs in every sub-co~tract exceeding
$5,000, so that such provisions will be binding upon
each such subcontractor or vendor. The Contractor
will take such action with respect to any subcontract
or purchase order as the lnteragency Committee may
direct as a means of enforcing such provisions, in-
cluding sanctions for noncompliance; Provided, how-
ever, that in the event the Contractor becomes in-
volved in, or is threate~ed with, litigation witb
a subcontractor or vendor as a result of such dir-
ection by the contracting agency, the Contractor
may request the State of Washington to enter into
such litigation to protect its interests."
21. Notices. Ail notices, demands, requests, consents, approvals,
and other communications which may or are required to be given by either
party to the other under this agreement shall be in writing and shall
be deemed to have been sufficiently given for all purposes when delivered
or mailed by first class postage or certified mail, postage prepaid,
addressed as follows:
(a) Notice to tile State
To: Interagency Committee for Outdoor Recreation
P. O. Box 1489
Olympia, Washington 98501
or at such address as the Interagency Committee shall have furnished
to the.Contracting Party in writing.
(b) Notice to the Contracti~ Party
To ., who serves in
the capacity of for the Contracting
Party, and who has been designated as the Contracting Party's liason
officer for the purposes of this agreement, or to such other officer
or address as the Contracting Party shall have furnished to the
Administrator in writing.
22. Additional Provisions~ or Hodifications of Standard Provisions.
STATE OF WASHINGTON ~:
Phon~ {2061 7S3 7140 J~'ebruary 'lg
,,..,,c,^,,.,~*~,.,:,~* Hr. Andrew Pendergas~.
o., ~.,. o~.~, City of Bremerron
~..~. ...... ,~.~,.~ Po O.'Box 2016 I~e: City of ~remer%on
'"~ ~" ~ ~'~'~ She~:id'~n Park Station Lions t'ark
~,p~,t,~e~ of Fisher;e, Bremerton, Washington 9r~310 IAC ~70-OllD
~, .....,o,.,~, We are enclosing a w~rrmt in the ~o,~nt of g1+04.03 represen[-
-- '3'' ~ ' ~''~'~W~ ~'r~'O' ing the final pa~ent for the City oF Bremerton's Lions Park
~, .....,~,~,.,-, development pro ect TbSs payment completes *he project wi(h-
~'r' [ CO}~r C ....... ~ *~ in~ the terms of the agreement.
Clqr:c~d U~' ~}~r'~ O '~tO' the ~ea is being utSlized, operated and maintained, or in lieu
cm~,~s of a report~ will conduct an inspection of the project. Your
~,~ ~,~ office will be notified when the re~ort is due or when the in-
~,, ;~.,~,~ ..... spection will be made.
Congratulations on tho complo~ion of this project.
SSncere~7,
STAN~Y E~ F~NCIS
A~inis~rator ~
SEF:GWM:pf
Enclosure
FEB 1 9 1972
PARK & REC. DEPT.
CiTY OF BREM.
Oecembe~ 2~ 1~71
O. ~xl~
01~p4a~ ~shtnet~ ~
also ~ld lth ~ ~ ~s 0~t~
~ fl~ ~tt~ gtm our ~t. k 1~
STATE OF Tq(ASHINGTON
INTERAGENCY cO~h~LTTEE FOR OUTDOOR RECREATI0fl
VOUCHER FO~ - LOCAL AGENCY USE
Agency C~ ~ ~ PROJECT &~,m,~. ~ lAC NO.__ ;,
Voucher No. 3 Period covered by This Voucher: From ~r 1
PaTient is hereby requested for expenditures by the above listed project agency for the period
indicated.
~ ~xpendltures Total
Since ~pendltures For lAC
~ost C~teqories Last Dillin~' to Date Use
O~er Con.acta1 ~tm ~,32 43,~3.14
~ppltes and Ha~rlils 331~Z~ ~,107.7e
Eflut~t S.~S
Rett~t and ~s~s ~.~ ~2 ,
Total
,808__,05 ,
49~679.04
I certify that the.above is correct and just and ls based upon actual payment(s) of record.
Dec. 3, 1971
Signature Date Title
............................ FOR lAC USE ONLY BELOW THIS LINE ...................................
FUNDING FO?J~ULA Voucher Total
Participant: % Amount Less Loca) Contribution
Federal: % Amount Subtotal
State: Fund % Amount Less Federal Contribution
Fund % Amount Subtotal
TOTAL: State Contribution
CERTIFICATION FOR PAYMENT
Proj .Officer Date __Asst. Admin. Date
PAYMENT RECORD
VD. t State Share j CUmulative
No. Local' Federal Fund "~ Fund '" Fund Total
REMARKS:
INTEItA(;IqNCt' CO,d), I£Tk.I,~ FOR O UTDOOI~ ItLCI,,EATION
~ 1.'IN:M~ Pi~OGI~I;SS lli;l'Ol~T ON DEVEI~Oi'MENT :~
A~,,~.c:, CITY OF BR~ION Project ' '. I~ ~P.~IO.Olla ....................
Project l'czicd ~rch 3, lgYO.~r 31.71 Projeet Title LIOn'S PA~ DEV[~ ...........
Work h'eimrr: Descril , x;or'k :.ccompl~;hcd, major dcviatiozas from proposal, etc.
The klon's Parr develo~nt pmJect ts comple~d as planned. Unde~mund
au~ttc Irrigation syst~ has been tns~11~ ~nd ~s functioning sat~sf~c~rlly.
App~x~mately four acres h~ve been tu~. This pMse of the p~Ject ,1so
enteiled ~e application of approxtmtely s~x inches of topsoil.
Four n~ tennis courts of the Laykold type have been constructed including all
accessories -,. cmplete chain link fencing, spect~r benches and landscaping.
The project, tn our estimation is complete in everg detail and the entire
project ~ill be available for public use on april 1, 1972. The tennis court
portion of the project has been in use since duly 28, 1971. All cost esttmtes
for the project ~ere accurate and the to~l p~Ject cost ~as within the esttmat~
f~sure of $50,000. M1 vouchers along w~th subs~ntl~ttn~ details have been
su~dtted for pa~nent.
Post C,,,.,crt, c'rir,* Ccz;.;cct;ou.', ~o bc s.~,, .~, by. A~cne.y~ Representative for devcloDment project.
I }u:~,L,~ certify t}:'~ c.,nstructic, p of Pro,ecl Number I~ ~.~0.~beencompleted in accordance
with '*[. , . co~,~ ~f tL~' !roj,:ct apl)~ovcd by the interagency Co~ni~['e f~
Su~rtntenden~ of Parks a~Recreatto~ ...
Title
D~r 1, lg71
TOTALS
+t~%
TOTAL
Detail, Individual ttme slips, time cards, and payrolls on ¢fle
Park and Recreation Department office.
January 18, lg72
Mr. Ken Cole
Accounts Officer
Xnteragency Committee for Outdoor Recreation
4800 Capitol Boulevard
Olympia, Washington 98504
Dear Mr. Cole:
Enclosed is the information you requested in your
letter of January 12. I have enclosed th~ individual
time slips for the forced labor salaries paid to our
e~loyees for the period of October 1 through November
30, lg71. Would a~prectate if these could be returned
after your review. Also enclosed is a code sheet showtng
how we identify the e~q~loyee's time on the various
duties involved.
Warrant numbers for all of the purchase orders you
requested have been written in on the respective general
claim and the two invoices that were missing are attached;-
one for the Raecolith purchase order t2086B, and one for
the Classic Construction Co. ~2016g. Sorry we missed
these details when submitting voucher f3 and hope the
enclosed material is satisfactory.
Sincerely,
Andrew Pendergast
Superintendent
AP/lbd
cc: Gerald Yeaden, City Clerk
STATE OF WASHINGTON
4800 Capitol Blvd. ~ :
Olympia, Washington98501 " January 14, 1971
Mail Address: P.O,Box 1489 ~
Phone; (206) 753-7140
D ............ ,c ............... ~ Mr. Andrew Pendergast, Superintendent
Parks
and
Recreation
............ ...... ,,~,,,, Sheridan Park P.O. Box 2016
r,,,, ,,,, ~ ....... Bremerton, Washington 98310
~., ......... ,,.,,~....,~ ~e ar~ findino_ ~n~t as the number of projects which have b~en
~,,uco,~c,,,. ......... apprcve~ by :he Interagency Committee increases we are also bring'-
,~,~,~u~,,~ trig an increased number o~ projects to completion in making
c~,,,~;~., payments ~o cori~:;~bn~t~es, ~ ?ess release ts prepared by [his
c,,,,,~..o.,,~,,~.,~,~,.~, office and dir'~ct~ ~o '?our office and to the local r, ewspaper or
M~.~,~,~,:~.,~,. O~r problem lies in the f~ct that ~ome ne'~spapers do not
~'"~ any credit to the Interaoencv Commit~ee or to the ~ureeu o~ Out-
,. _ ___Recreation for ~rants to cer,~munities. We realiz~ ~h~t
door
s.~,,,,~e~,~.,,~ many cases where BOR funds ~re par~ cf the lAC gra~t dir~c~ ~_ ~s~
rele~.ses fr~rn ~4ashlngton, D.C., are qulte often m~de by me~ber~
Congress representing the district. No mention ~s ever m,~dc in
these instances concerning any other funds except federal.
Whot we ~ould l~ke to ask you to do ~s to use your cons~der~b!e
~nfluence w~th t~e med~a through which you release y~c
t~ o~ve ~roper credit to the Interagency Committee and ~o whatever
federal agency is involved in match~ng grants for yoer prcject.
It is most important as you know that the people who vo~eo for
the funds ~hat we dlsburse be kept informed of their ~isposltlon.
We know that ~ press release coming from your agency is much more
likely to ~e used locally than one origlnati~g from our office.
~-:-Whatever yo~ can do to assist us will be very much aporecia~ed,
~ ,'~ SincereiT,
E.V. PUTNA?~
Adr,lin istrator
EVP
STATE OF WASHINGTON
.j~0R~,~, PARK & L C. DEPT.
CiTY OF £REM.
,u,:;! ;,~u ....... o t~,~, ~,~,~,, October 8, 1971
Mr. Andrew Pendergast, Supt. RE: City of Bremerton
Parks and Recreation Department Lion's Park
P. O, Box 2016 lAC #4KTP-70--011D
Sheridan Park Station
Bremerton, Washington 98310
Dear Andy:
I received your letter today (with the three copies of Voucher #2
for our accountant) advising me of the completion of the Lion's
Park project in Bremerton.
It is most heartening to receive this type of information on a
project and to know that alt has progressed so satisfactorily.
Ed informs me that you and your people have done an outstanding
construction job and have handled all transactions between our
two agencies in an exemplary manner. You are to be congratulated,
Andy, not only on this project but the golf course as well. Would
that other communities followed the fine example set by the city
of Bremerton in the completion of projects with such high calibre.
I wish that it had been possible for me to attend the dedication.
I do intend to come up one of these days and visit the project
with you. Thanks for the invitation!
Sincerely,
STANLEY E. FRANCIS
Administrator
SEF:mmf
cc: R. S. Lemcke
t~ our LIo,',,'s C,.xm,unity Pl~tyfleld Project, IAC ~4~PL70,-GItD. This
i,~ ,~ffecL, ls t'ut fl~l ~ouch r ~p~senttna all ~'des spent by th~
Cf: l,.',.; .Jl 9,~(w~'~l cla!~;s cove~.g p~nt for c~tract~J set'-
,~...'..r su~plf~:J by trm Po~ ~par~t to the ~ject. A ~taiiad
~, :~,::r.,)m,~c~ .'itq thc ~mt~4tnal plans p~vlo~sly $u~tttnd to
~' ~Ly ~:fficta~s i~cluding ~e ;~yor end ~m of the ctt~ council
~t7 ~:'er'~ · ' ot;)~.,,~ local dignitaries. ~e Interapency
~i r'~pr(~sente, d by [4r Ed Putn~. ~ a ~tnt o~ interest i
~x~tior that U~e trite1 m~unt ex~n~ ~ the p~Je~ was
..... ~ti t~ our Lion's ~ity Pla~telU ~ ~ald like to
th~! lnteragency C~dttee and ~ ~ a~ ~rS~ for the splen~fd
Ll,:m :~ C~;{fty Playfteld p~Ject. ~ a~ 11 w ~r daily
Mr. Stanley £, FP~nc~s
October. ~ 1971
Page 2
~re betn~ gs~d heavily The b~rfed ~ w111 be officially ~ned ~n
We s'lncer~ely h:¥~e that ~u pers~lty wil) he ~h)e t~ ~tn,i t()~' In the
Aqdrew F.'ende~ gast,
Enc. l~
C ~ a~ k, .omni S s Jcner nf Finance ~
fro! Sch~r, er~an, C~m~:~lssioner of P~ltc Works
IN[EP~V:?Y?Y ~, I'IFEE ~0', 0~1[ ..... R~C~'J,,
4 KTP-70-OllD
Ac~.c,; _ .... C_.i_~, o~.R!_,?m~rt:~n _ _ [,c:i~,c~, ........ LiOn'S ?ark ........ l^c Ko.
,,~,,~r.~,~r ~:~. ..... P~,i ,i c .'..r.., L.~ ;Lis vu,,ch~,': 7,'o_ ~lov. I, 1970 . tn...Sepgember.~.~9~_
loewi ¢~ 2?7 41
............... :-;z ; .; -;.:~':
Si ,r~a; .,~,' Date
....................... Fhft I&L USF OHL.'~ BELOW TqlS
State CO~IL i J~'LI( JO11
L(~c.,~, i ;eder,tt i FLit,ct L[:~ ;~ [ rU~o . Tot.:']
"~ .............. ~ .............. ! ................. ¢ ............ ~ ..........................
: ' ......... ~ ............... i;; i;:Z~--]E_i_ _ZTJZLZ~
,; I ~ ~ 7 ~ il ~ Z._LZLZ~ ~ ~CZ;~ ........... J .............. J ................ ~ .................
. %i, for work don/
- , ,[:~fle,d. IAC P~oject 4 KTP-70..O]I[):
)ave Siliven, Park c .... ~,~, o., ~
!5%
TOTAL
tinJe slips, time cards, and pay,,'c, lls
Department office,
Mr. Andrew Penderqast Re: City of Bremerton
Supt. of Parl<s and Recreation Municipal Goll C~ur~e
P. 0. Box 2016 lAC
[~remecior~, Wasbington 98310
l ions Park
lAC //70-01 lO
Dear Mr. Pendergast:
We are enclosinq a warrant in the amount of $L8,427.11. ~
~35 (~5.32
represents payment of bi 1 lin9 voucher nunlber five for' tile
' Golf Course Development project. This is the Final paymenE
~ Golf Course pFojecl and completes t:he project within the terms o1: the
, From time to ~ime the lAC may request a status report on how [:h~: ar~a
is being uLilized, operated and maintained, or in lieu of a
will conduct ah insi)ec~ion of the project. Your office w~ll
when the reporl is due or when [he inspecEion w[]l be
The balance of lhe vJal'rallt, $7,771.79,is in paymen~ of billing
voucher number one for the Lions Park Developmen~ projecl~
Sincereiy,
STANLEY E. FRANCIS
Admini s Lrator
SEF:RSL.:bc
Enclosure
~lt~ Auditor
STATE OF WASHINGTON
4800 Capitol 81vd. ~ ~; ~ ~ecembe r 1 5, 1 ~70
Olympia, Washington 98501 (~ ~ ; ~ ~
Mail Addre~: P.O.Box 1~9
Phone: (206) 753 7140
Mr. Andrew Pendergast RE: City of Bremerton
Superintendent Lions Park
Department of Parks and Recreation lAC 4KTP-70-OllD
P.O. #2016
Bremerton, Washington 98310
Dear Hr. Pendergast:
Within two or three weeks you will be receiving a State Warrant
in the amount of $7,771.79 as reimbursement of the lAC share of the
costs claimed on Voucher No. 1 for subject project.
During the processing of this voucher we took note that certain
requirements relative to the billing process were not being met;
specifically, regarding the "proof of payment" and the "receipt
dates". We realize that in the past we have allowed payment to be
made on projects with your agency without insisting that all of the
supporting documentation contain all of the required information;
however, now that the Procedural Guidelines which include detailed
instructions on this matter are published and distributed, there
can no longer be any excuse on our part for overlooking the over-
sights!
An acceptable method of establishing "proof of payment" is to sub-
mit a copy of the General Claim on which the Warrant No. appears.
If it is inconvenient to obtain a copy of the form on which this
number has been entered by the fiscal office, you can continue to
hand-post it as you have done on some of the supporting General
Claims recelved with Voucher No. i~ It will not be necessary to
furnish these warrant numbers for the documentation already re-
ceived.
On page (26) of the Guidelines, paragraph 2, Proof of Payment,
explains that the supporting documentation must show among other
things, "the date or dates of receipt of services or commodities
.... " This information does not usually appear on the General
Claims we have at hand for t~is project. Sometimes, but not often,
the date (or inclusive dates, if a span of time is involved) of
receipt of the goods or services may be shown on the invoice rendered
by the vendor; but this. significant information is infrequently
transferred to the General Claim. Some agencies have a "receiving
copy" of their paying document on which they require this information,
Mr. Andrew Pendergast
Bremerton, Washington - 2 - December 15, 1970
but even if they do employ such a desirable tool of accounting control, the
copy ts filed away and the information does not flnd its way to the documents
we are sent. At any rate, the time of receipt Ts required information and
the evidence of this must be furnished as part of the documentation support-
ing the vouchers submitted ~n the future. We will not require this receipt
information for the General Claims applicable to Voucher No. 1 except for
the payment of $262.50 made by General Claim dated May 4, 1970, to Orlin
Tharaldson on Purchase Order NO. 16580. Please furnish us a copy of the docu-
mentation showing date or dates of receipt of the services described on that
General Claim for inclusion in our records establishing the audit tra~l.
Finally, we would like an explanation of how your agency determined the use
of 15 percent as the rate applied to salaries as a charge for employer con-
tributions to Retirement and Pensions. It is our experience that expenditures
in this cost category, for State employees, would seldom exceed twelve percent,
and fluctuate from pay period to pay period depending upon a variety of factors.
Sincerely,
KENN ~COLE
Fiscal Officer
KC :mmf ~.~
ge~mber ~0, 1970
Ym~y Ceemtttee for ~r ~e~t~ ~ Cl~ ~f ~n
~.0. ~ ~ ~ ~
A~ of tb ~ ~o~ for b p~, i.e., re~q~ ~ ~n ~,
~ ~11 ~ ~ ~ ~ for ~e ~ ~te~ A~ ~, 1~1.
Depe~mf~t of PM~ and Ree~eatl~n
April 9, 1970
Mr. Stanley E. Francis, A~4~iltrator
Interagency Committee for Outdoor Recreation
P.O. Box 1~9 Re: City of Bremerton
Olympia, ~ashington 98501 Lion~ Park
lAC #~KTP-70-OllD
Dear Mr. Francis:
Enclosed is one copy of the Interagency Committee's Project Agreement that ~aa
received by our Department on March 27, 1970, for the develo~aent of Lions Park.
The Project Agreement has been signed by our Mayor and City Attorney, and we
have retained the second copy for our file. We underlta~ that the Project
Agreement is for the period of March 3, 1970 until December 31, 1971.
Project develo~nt will proceed exactly as outlined in our original application
dated January 8, 1969.
You may be assured that all major phases of the project to be contracted for w~ll
be advertised for bid. Plans and specifications, advertieement for bide, instruc-
tion to bidders, hid docents, cor~truction contracts, and any other s~m~l,~
doctmentB relating to the project will Be cleared through your office prior to
proceeding with actual cor~truction.
All material purchases necessary to the project under $500 in value will be
handled in a routine manner by our City Purchae~_e Department by approved requisi-
tion and official City purchase orders ~Jsued to the vendorl. All Park Department
forced labor colts will be charged at the current Park Department scale and
recorded on the official Depax~aent payroll on a hi-monthl~ basis.
Overall project supervision will be under the direction of the Superintendent
of Parks and Recreation, inspection of all conltrnction w~l~ be handled in the
usual manner through the City's Buildir~ ?~a~eetion Department. All e~ine®ring
will be cleared through the City,s Engineering Department.
Progress reports will he submitted to your office from time to time in order
that you be kept u~-to-date. Actual work on the project will get under ~y
approximately August 1, 1~70. Completion date has been scheduled for May 15,
1971.
I sincerely B~pe the above information meets with your approval. Please infor~
us if a~ further information i~ needed.
Sincerely,
Andrew Pendergalt, Superintendent
AP:gf Department of Parka and Recreation
Enclosure: ProJ. A~nt. #~KTP-?0-OllD
Mayor Glenn Jarstad
City Council
~ City Clerk
Interagency Committee
STA~T~ ~ ~l ~
~ ~= ~ ~ for Outdoor Recreation
r.C 'I, March 10, 1970
Mr. A~r~
Su~. of Parks a~ Recreation Re: City of Bre~rton
P. 0. ~x Z016 Lion's Park
Sheri48n Park S~a~ion lAC ~KTP-70-Oi
Br~r~on, Washington 98110
At ~he ~rch ~rd ~Jing in Vancouver, the I~eragency Co~it~e for Outdoor
Recreation ~;~r~ved ~he a~ve ~roject for a ~o~al cost of SS0,000.
The fu~ s~Ir~s ~nd percentsge ~wlll b~ 8s foll~s:
$ z5,000 (50) $ ~5,000 (50)
Presently, ~he lAC agre~n~ is bei~ written. As s~n as m~re~ent ~dministration
has been c~pieted, i~ wili ~ fo~arded to your offi~ for ~ecution. Further
infor~ion and instructions will
PJ~se no~e ~ha~ with ~he ~c~ti~n
construction costs ~y ~e in~r~d ~rior ~o ~uJy J, 1970.
I~-you h~ve tony questions concernl~ ~ a~ve ~ints, please con~act this
of f i ce.
~mlnl~tr*tor
Interagency Committee
for Outdoor Recreation
114 North Columbia, Olympia I~non~ ~206) 753-7140
March 24, 1970
Andrew Pendergast RE: City of Bremerton
Supt. of Parks & Recreation Lion's Park
P.. O. Box 2016 lAC #4KTP-70-OllD
Sheridan Park Station
Bremerton, ~4ashlngton 98310
Dear Mr. Pendergast:
A letter from this office recently notified you of lAC approval for
funding assistance on the above project. That letter stipulated that
no construction costs could be incurred prior to July 1, 1970, due
to the fact that a deferment had been placed on construction pro3ects
within the State.
Governor Evans has recently lifted this restriction, paving the way
for an earlier starting date on your project.
It will still be necessary to execute a project agreement, which is
presently being prepared, before formal permission to proceed will
be given. This, however, should not be long in comlh9, and you will
now be able to schedule your work program much earlier than anticipated.
If you have any questions on this matter, please feel free to call
our office.
Sincerely,
Admln i st rator
SEF:RSL:sj
CllY C)i-
STATE OF WASNINSTON i Interagency Commit. tee
for Outdoor Recreation
114 No~'th Columbia, O~ympia P~on, 1206) 7S3-7140
Mail address: P. O. Box 1489, Olympia, Washington 98501
March 26, 1970
gndr,~ ~d~r~ast : City of 8r~erton
Supt. of Park and Recreation MA 71970 L;o~,~ P,~k
P. 0. Box 2016 IRC ~KTP-70-OllD
:Sheridan Park Station
Br~erton, ~ashlngton ~8310 ~'~ ~ ~ ~ "' ~T.
CITY O~' ~:F(~M.
0ear Mr Pendergast:
At t~ ~rch 3, 1970 meeting in Vancouver the Interag~cy C~ittee
for Outer Recreation approv~ the above p~ject. ~ t~ share &f
this project ~ill be ~25,000.
Enclosed are t~ copies of the Interagen~ Co~ittee Project Agree-
m~t. Both copies have been slgn~ by the State, and if acceptable,
please have th~ executed by your agency's appropriate authorities
and return one copy to our office.
The only eligible costs for services performed prior to tee date of pr~
ject approval, ~rch 3, 1970, are those for planning which ~re necessary
for the preparation of the lAC application. These may ~nclude ~n-
sultant fees or contributed staff services for such ~rk as site
~ planning, feasibility studies, architectural or engineering drawings
and/or similar ~rk. Any other costs incurred or services perfo~ed
prior to that date are ineliglble. ~e ~uld suggest that the c~struc-
tion plans and specifications be c~pleted and bids called for as
q~n as ~ssible. Construction costs are rapidly rising and the Inter-
agency ~lttee will not author ze increased ~;tate assistance In the
evene bids or other costs are higher than ~pected, nor will we be
willing to extend the project period except for unforeseen clrcu~
stances. ~ request ~at qne copy ~ch of the plans and specifications,
a.~vertis~n~' for b[~, insfruct~ to bfdde~T~ ocuments, Con- '~
..s~Fuctlonr cmtra~s' an~"a~"ot~er sim~aF ~ , - T~'~'
~[oj_ec~ ~e su~ tted for our rev~ and peman~t f~Te. Please sen~
~ zn~se o~C~n~'~'"'to ~u'r-ott'i~' tof rev~eto~ p~ceeding~'th con-
struction., ~ w~l ~evie~ th~ ~ the'y c~ l'n ~n:d .......... any ques~ons~w~
b '
e raised ~d~ately. Further, ~ r~uire that construction plans and
specifications meet all appli~ble codes and current engineering practices;
that health, safety, durability.and the econ~y receive consideration
~ith the scope and objectives ef the project; that the design is in g~d
taste; that the p~posed develo~ent is suitable for the enrichment
and will not unduly detract from the esthetic value of the area; and
that provisions have been made to insure adequate supervision by c~
petent personnel.
Mr. Andrew Pendergast -2- March 26, 1970
Please set forth in detail in a letter to our office exactly how
construction inspection and overall project supervision and adminis-
tration will be undertaken. This should include assignments of
specific personnel to specific tasks so that we can obtain a clear
understanding of the City's administration of the project.
You may not deviate from I;l~e scope of the project without the written
concurrence of the Administrator, and any changes that would materially
alter the purpose, use, or form of the end product will have to be
approved by th~ Interagency Committee. The Committee may not agree to
the deviation if it Is so material as to render the project a signifi-
cantly different one from that originally approved.
Also enclosed with this letter are the instructions for billing for
reimbursement costs incurred on the project. Billing may be submitted
as desired, but not more often than every thirty days.
· I trust that the above sets forth %he information necessary for you
to proceed with the project. Please keep in mind that any problems
or questions you may have are best hartdled with a call to our office
right away. We will be available to provide whatever assistance
available.
Sincerely,
, STANLE~E. FRANCIS
Administrator
SEF:RSL:sj
Enclosure
Interagenc¥ Committee
' [ for Outdoor Recreation
~.~ ~ ~-,'~O. QS~'I' ~rch 10, 1970
Hr. Andr~ Pendergast
Supt. of P~rks ~ Recr~tlon R~: City of Bremerton
P. O. ~x 2016 Lion~s Park
Sheridan Park St~tton lAC ~KTP-70-OllD
Br~rton, ~shington ~8]10
D~r Hr. Pendergast:
At the ~rch ~d ~tin9 In V~ncouver, the I~ter~9~ncy C~itte for Outd~r
Recr~tlon ~pproved the a~ve project for ~ total cost of $~0,000.
The fu~ shares a~ p~rcentage ;will be as foll~s:
lAC Share (%) Local Share
$ 2~,000 (s0) S 2s,000 (S0)
Presently, the lAC agre~ent is bei~ written. As soon as agre~ent ~dmlnistr~tion
has be~n c~pleted, it ~ill be fo~arded to your office for execution. Further
Infor~tion and instructions ~ill be fo~arded at that tlm~.
Please ~t~ that with the exception of planning ~nd engineerin9 costs, n~
construction costs ~y be incurred, prior to July I, 1970,
office.
gdmlnist rotor
SEF:RLP:bc
i Interagency Committee
for Outdoor Recreation
~ ~'T, ~rch 10, 1970
Hr. A~r~ Pend~rgast
Su~t. of Parks ~nd Recr~tion Re: City of Bremerton
P. O. Box 2016 Lion's Park
Sheridan Park Station lAC ~KTP-70-OIID
Br~rton, Washington 58310
D~r Hr. Pend~r~ast:
At the ~rch 3~d ~eting in Vancouver, the Int~rsg~ncy C~itl~ for Outd~r
R~cr~ation approved the a~ve project For & tot81 cost of $50,000.
The ~und shar~s snd percentage ~wlll be as eoll~s:
lAC Share (~) Local Share (%)
$ ~5,000 (s0) $ 2S,000 (50)
Presently, the lAC agre~ent is being written. As s~n as agre~ent administration
h$~ been c~pleted, it will be fo~rded to your office for e~ecution. Further
lnfor~tion and instructions will be fo~arded 8t that time.
PI~s~ note that with the exception of pl&nning and engineering costs, ~
construction costs ~y be incurred prior to July 1, 1~70.
If you have any questions concerning the above ~ints, please contact this
of~ I
Sificer~ly,
~RANC I S Admlnist rato~
SEF:RLP:bc
' / STA,,TE ~F
: IN1EI~AGENCY CI)tiFill'~ E FOP, OU1DOOA RECEi:A'I'ION
U ,uche;' i~k). __..~_ PeFiod Covered by lh~s Voucher; Fr,x,~ ~rch }, 1970 Io ,,c~..~ >i:. iL ,
Expend it utes ~ota
Since Expcr;(litu~as Fei' I~C
Salarias and Wages ..............
T I-~ v c ]
r~etlFeh,en[ a,,cl P.:nsleqs _ .....................
Land
Bu i 1 d i
ImpFOVCq:~?:S otheF than Buildings
I ~er~fy that the ob~.coFrect and ~nst and is based upon actn&] ~),ni'm:;nl (:~) of record
....................................... FOP, lAC USE ONLY BELOW'v~"
F..,S LINE
0~
FU~qD I NG [ ~,~N/JLA Voucher To~I
PaFeicip~r,t: ',~ ........ Amount ....... Less Locel ContFJbuLior~
Federa]: '7~, Amount
S~a~,:. FunJ o/ Amount Less Fed.:ral Cone
Fuhd ....... '~ Amount .............. Subtota,
TOTAL State Cont ribuL
gER'[IFICATiON FOI~ PAYHENT
Proj. O~fice(. ............ Pale ......... Assr, Admin.~ .................. Data
F'AY/.! ENT RECOFID
' ,']o, Local lFede,'~l J l Fund I Fund [Fcnd
REt A~ ~S: