HomeMy WebLinkAboutWALL PUBLIC UTrLITIES CONSTRUCTION
The City of Bremerton, a first class municipal corporation of the State of Washington, (hereinafter
"City") and Darren and H. allie Wa~ husband and wife, (hereinafter "Owner") in consideration of the
mutual covenants herein defined, enter into this agreement for the construction and public dedication of
a sewer main (lmreinat~er '~roject") in accordance with the following t~ms and conditions. The
Owner will retain a licensed Professional Engineer registered in the State of Washington (hereinafter
"Design Engineer") who shall design the Projectl -
I. DESCRIPTION OF TldK PROJECT: The project to be constructed by the Owner and
dedicated to the City for public use, consists of.
Appro-imately 12.6 feet orS" SDR 3~ 30~4 PVC sewer pipe, one manhole assembly, one
dean out assembley and miscellaneous appurtenances.
The Project is more fully described in the plans and specifications incorporated by
reference herein.
2. FEES AND EXPENSES:
A. The Owner agrees to pay in advance the following fees and expenses associated with
the project and required by the Bremerton Municipal Code:
· Design and construction engineering services $. N/A
· Plan check and inspection fees inspection $450 plan check $154 $. 604.00
· Connection fees $. 271.36'
· Recording fees
· Total parcel FFF $ N/A
· Other: lateralinspection $ 60.00*
*Payment of General Facilities Fees and impection fees will not be accepted until the main is
accepted by the City. be required prior to recieving utility service fi.om the City.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -1-
B. The Owner shall be responsible for obtaining and paying for necessary permits fi.om
other governmental agencies and shall be responsible for any additional costs for
inspection billed to the City by any government agency, including but not limited to the
City ofBremenon, Kitsap County, or the State of WashingtorL
C. The Owner shall pay all costs associated with easement acquisition and insuring title to
the properties.
D. The Owner shall post with the City Treasurer a Performance Bond prior to
construction and a Warranty Bond upon completion of the work. The bonds shall be
posted in the amounts as follows:
Performance Bond
1. One hundred and fff~ percent (150% ) of the Design Engineer's estimated cost
of construction for all work occurring within public fight-of-way or on City
Property.
2. Twenty percent (20%) of the Design Engineer's estimated cost of cons~uction
for all work occurring on Private Property.
Warranty Bond
1. Twenty percent (20%) of the actual cost of construction.
E. The bonds shall provide, as a minimum, the following:
1. The Owner shall complete the project in accordance with good and accepted
engineering and construction practice.
2.The Owner shall comply with all the terms of this agreement.
3. The Owner shall fully comply with all requirements of law in carrying out the
project, and shall comply with all lawful requiremems imposed by any agency
with jurisdiction relating to the project.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -2-
4. The Warranty Bond shall be effective for at least two years after completion of
construction unless affn'matively released sooner by the City, and shall
guarantee the completed projects against defects in workmanship and
materials.
5. The bond must be approved by the City's Risk Manager and may include one or more
surety bonds issued by any surety company licensed to do business in the State
of Washington. The Surety bond may be substituted by a cash deposit in the
full required amount deposited with the City Treasurer or an assignment of
funds on deposit in a licensed bank or credit union, in the full required amount.
3. REPRESENTATIVES: The Owner hereby names the following person as the representative
of the Owner for all puiposes required by this agreement:
The Owner warrants that the Owner's representative has full authority to bind the Owner in all
respects required by this agreement, and all applicable government requirements imposed by
any agency with jurisdiction. The City hereby designates Ned Lever~ P.E., of its Department
of Public Works and Utilities as its Project Manager and warrants that the Project Manager has
full authority to exercise such discretion as does the Director of Public Works and Utilities
under the ordinance of the City for purpose of canying out the terms of this agreement.
4. PROJECT I)ESIGN: The Owner will retain a licensed Professional Engineer who shall
design the project, prepare the necessary plans, and provide construction engineering to the
extent reasonably necessary.
Owner shall use the following standards for design and construction of the project. Deviation
fi.om standard plans will not be accepted.
· Standard plans and specification provided by the City.
· Bremerton Utilities Development and Construction Standards.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -3-
Washington State Department of Ecology's Stormwater Management Manual for the
Puget Sound Basin.
· American Waterworks Association Standards.
· Washington State Department of Transportation's Standard Specifications for Road,
Bridge, and Municipal Construction.
5. PUBLIC WORKS PROJECT PERMIT: The City's Project Manager will review the
project design, plans, and specifications, and when satisfied the work is in accordance with City
standards, shall approve the plans by stamping and signing four (4) copies of the plan sheets.
The City reserves the right to require modification of the plans in the event of errors or
mistakes in the drawings, or if new information becomes available which requires a change in
the plans to properly accomplish the project. Plan changes initiated by the Owner must be
approved in writing by the City prior to commencemem or alteration of the work.
The City will issue a Public Works Project Permit upon submittal or completion of the
following:
A. Construction Plans and Specifications have been approved by the City's Project
Manager.
B. Deposit of advance cash deposits as stated in this agreement with the City Treasurer.
C. Approved bonds posted with the City Clerk.
D. Proof of insurance approved by the Risk Manager.
E A copy of the City or County right-of-way permit submitted to the Utility.
6. INSURANCE AND INDEMNITY: The Owner shall provide liability and property damage
insurance covering all work under this agreement for construction within the public fight-of-
way, including all work provided by the Owner and its Contractors. Said insurance shall name
the City of Bremerton as additional insured and provide the following limits:
- Bodily injury, $1,000,000.00 each person;
- $1,000,000.00 each accident;
- Property damage, $500,000.00
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -4-
Evidence of such insurance shall be provided to the Risk Manager prior to issuance of the
Public Works Project Permit. The Owner shall hold harmless the City of Bremerton, its elected
officials, employees, and agents, for all liabilities and claims arising out of or related to
performance of the work identified in this agreement.
7. PROSECUTION OF WORK:
A. Construction of the project shall be initiated within one (1) year of execution of this
agreement by the Owner and within 30 days of issuance of the Project Permit. Failure
to begin work within the one year limit shall result in forfeiture of all Owner's fights
under the agreement regardless of any other provisions of this agreement.
B. Owner agrees to continuously pursue work and complete the project within six (6)
months of permit issuance.
g. ADDmONAL CONSTRUCTION WORK REQUIREMENTS: The Owner in addition
to other duties included in this agreement shall comply with the following:
A. Schedule system connections with the Project Manager and meet all requirements for
the connection and testing of their improvements in the presence of the City's
authorized representative. Major system connections to the City's system shall not be
authorized on Fridays. Subsequent operation of system valves must be performed by
City personnel.
B. No work shall be performed by the Owner other than Monday through Friday between
7:30 a.m. and 6:00 p.m., exclusive of City holidays, except with written prior consent
of the City. If consent is given by the City for work on Saturday, Sunday or holidays
or before or at~er the nomaal working hours above, the Owner shall pay to the City the
reasonable cost of furnishing the required inspection and supervision during said
periods.
C. Remove and correct at the expense of the Owner any improvements not authorized or
constructed in compliance with the Utilities Development and Construction Standards.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -5-
D. Restore all public and private property disrupted by the installation of the project to its
original condition upon completion. The entire job site will be maintained in a neat and
workman like appearance. The Owner will provide landscape restoration including
sodding, seeding or barking as may be required by the City's Project Manager.
Landscape restoration shall follow installation of the various segments of the project as
closely as is practicable. When, in the opinion of the City's Project Manager, landscape
restoration has fallen behind installation of the segments of the project, the Project
Manager may halt all construction work until restoration catches up.
E. Notify the City when the project is ready for final inspection and approval by the
U~ty.
9. INSPECTION AND FINAL ACCEPTANCE:
A. The City will provide periodic inspection during construction to ensure that the work
complies with plans and City Utilities and Construction Standards for the City.
Inspections by the City shall not relieve the Owner of its responsibility to construct the
project in full accord with the standards of the City. Nor shall inspection be deemed to
be supervision of the project, methods or means of performance, compliance with
construction site safety requirements, or the Owners subcontractors or employees.
B. Sewer acceptance requires an initial television inspection of all lines. This inspection
maybe conducted by the City for the cost of time and materials or by a private agency.
Costs incurred for this inspection shall be paid by the Owner following thirty (30) days
written notice.
C. All easements necessary for the project have been obtained in the name of the City,
accepted by the Project Manager, and recorded with the County Auditor.
D. Within thirty (30) days of frei inspection, furnish a complete set of mylar record
drawings of the project improvements which have been prepared and stamped by the
Design Engineer.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -6-
E. Upon final approval of project construction by the City's Project Manager, the City
shall accept and approve a Deed of Conveyance of the project improvements for the
Owner on a form approved by the City Attorney. Approval of the deed shall constitute
completion of the project for the purposes of.'
1. Computing the guarantee period requked by this agreement for bonding.
2. Commencement by the City of its usual and customary maintenance of the
project improvements.
3.Commencemem of sewer or water services upon payment of service fees.
10. REIMBURSEMENT AGREEMENT: If this agreemem is for the construction of either
water or sewer line, the City agrees to anange for a partial reimbursement to be made to the
Owner for the cost of the line as permitted by state law and the municipal code.
Reimbursement shall be subject to reasonable charges by the City for administration and shall
be payable only if the Owner executes a City Reimbursement Agreement and files the same
with the County Auditor as a lien on properties to be served in the future by the water or sewer
line.
11. NON-COMPLIANCE: Failure to comply with the terms of this agreement within 60 days
following written notice by the Project Manager shall automatically result in the termination of
service and forfeiture of bonds and shall not relieve the Owner of the duty to comply with all
the terms of this agreement, paying all sums due thereunder together with reasonable attorney%
fees incurred by the City in enforcing the terms of this agreement.
& Z dY
Mailing Address: 2534 Stone Way
Bremerton, Wa. 98310
Telephone Number. 373-9556
Ex cumr day ,
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -7-
CITY OF BREMERTON:
LYNN HORTON, Mayor
W. EUGENE SAMPLEY, Director of Public Works and Utilities
ATTEST:
KATHLFEN McCLUSKEY, Clerk
APPROVED AS TO FORM:
GLENNA MALANCA, City Attorney
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -8-