HomeMy WebLinkAboutB & P ASSOC. Pt. Washington Park
P.U.D Phase I
PUBLIC UTILITIES CONSTRUCTION AGREEMENT
The City of Bremerton' a first class municipal corporation of the State of Washington, (hereinafter
"City") and B & P Associates (hereinafter "Constructor"), in consideration of the mutual covenants
herein defined, emerimo this agreement for the construction and public dedication of water and
sewer mains (hereinafter "Prc~iect") in accordance with the following terms and conditions. The
Constructor will retain a licensed Professional Engineer registered in the State of Washington
(hereinafter "Design Engineer") who shall design the Project.
I. DESCRIPTION OF THE PROJECT: The project to be constructed by the Constructor
and dedicated to the City for public use, consists ot~
Approximately 880 linear feet of 8" class 52 ductile iron water pipe, two fire hydrant
assemblies, and miscellaneous appurtenances
and
Approximately 441 linear feet of 8" class 52 ductile iron sewer pipe, 709 linear feet of 8"
class SDR35 3034 PVC sewer pipe, eight manhole assemblies, and miscellaneous
appurtenances
The Project is more fi~lly described in the plans and specifications incoroorated by reference
herein.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -1-
Pt. Washington Park
P.U.D Phase I
2. FEES AND EXPENSES:
A. The Constructor agrees to pay in advance the following fees and expenses associated
with the project and required by the Bremerton Municipal Code:
· Design and construction engineering services $ N/A
· Plan check and inspection fees- water plan check -$254 insp. $ 990.00 $ 3,598.00
· sewer plan check- $169.00 inspection- $2,185.00
· Connection fees water main taps ~ $3,268 ea. $ 3,268.00
· Recording fees $ 11.00
· Total parcel IFF- Water- deferred Sewer-S711.52(offroad rate) $ 711.52
· Other $
Payment of appropriate General Facilities Fees and connection charges will be required prior to
recieving utility service fi-om the City.
B. The Constructor shall be responsible for obtaining and paying for necessary permits
fi-om other govemmemal agencies and shall be responsible for any additional costs for
inspection billed to the City by any government agency, including bm not limited to the
City ofBremerton, Kitsap County, or the State of Washington.
C. The constructor shall pay all costs associated with easement acquisition and insuring
title to the properties.
D. The constructor shall post with the City Treasurer a Performance Bond prior to
construction and a Warranty Bond upon completion of the work. The bonds shall be
posted in the mounts as follows:
Performance Bond
I. One hundred and fit~y percent (150o/o) of the Design Engineer's estimated cost
of construction for all work occurring within public right-of-way or on City
Property.
2. Twenty percent (20%) of the Design Engineer's estimated cost of construction
for all work occurring on Private Property.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -2-
Pt. Washington Park
P.U.D Phase I
Warranty Bond
I. Twenty percent (20%) of the actual cost of construction.
E The bonds shall provide, as a minimum, the following:
1. The Constructor shall complete the project in ac~cordance with good and
accepted engineering and construction practice.
2. The Constructor shall comply with all the terms of this agreement.
3. The Constructor shall fully comply with all requirements of law in carrying out
the project, and shall comply with all lawful requirements imposed by any
agency with.jurisdiction relating to the pro. iect.
4. The Warranty Bond shall be effective for at least two years al~er completion of
construction uniess affirmatively released sooner by the City, and shall
guarantee the completed prgiects against defects in workmanship and
materials.
5. The bond must be approved by the City's Risk Manager and may include one or more
surety bonds issued by any surety company licensed to do business in the State
of Washington. The Surety bond may be substituted by a cash deposit in the
fifll required amount deposited with the City Treasurer or an assignment of
funds on deposit in a licensed bank or credit union, in the full required amount.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -3-
Pt. Washington Park
P.U.D Phase I
3. REPRESENTATIVES: The Constructor hereby names the following person as the
represemative of the Constructor for all purposes required by this agreement:
The Constructor warrants that the Constructors representative has full authority to bind the
Constructor in all respects required by this agreement, and all applicable government
requirements imposed by any agency with jurisdiction. The City hereby designates Ned
Lever~ P.E., of its Department of Public Works and Utilities as its Project Manager and
warrants that the Project Manager has full authority to exercise such discretion as does the
Director of Public Works and Utilities under the ordinance of the City for purpose of caring
out the terms of this agreement.
4. PROJECT DESIGN: The Constructor will retain a licensed Professional Engineer who shall
design the project, prepare the necessary plans, and provide construction engineering to the
extent reasonably necessary
Constructor shall use the following standards for design and construction of the project.
Deviation fi.om standard plans will not be accepted.
* Standard plans and specification provided by the City.
· Bremerton Utilities Developmem and Construction Standards.
· Washington State Department of Ecology's Stormwater Management Manual for the
Puget Sound Basin.
· American Waterworks Association Standards.
· Washington State Department of Transportation's Standard Specifications for Road, Bridge,
and Municipal Construction.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -4-
Pt. Washington Park
P.U.D Phase I
5. PUBLIC WORKS PROJECT PERMIT: The City's Project Manager will review the
proiect design, plans, and specifications, and when satisfied the work is in accordance with City
standards, shall approve the plans by stamping and signing four (4) copies of the plan sheets.
The City reserves the right to require modification of the plans in the event of errors or
mistakes in the drawings, or if new information becomes available which requires a change in
the plans to properly accomplish the project. Plan changes initiated by the Constructor must be
approved in writing by the City prior to commencement or alteration of the work.
The City will issue a Public Works Project Permit upon submittal or completion of the
following:
A. Construction Plans and Specifications have been approved by the City's Project
Manager.
B. Deposit of advance cash deposits as stated in this agreement with the City Treasurer.
C. Approved bonds posted with the City Clerk.
D Proof of insurance approved by the Risk Manager.
E A copy &the City or County fight-of-way permit submitted to the Utility.
6. INSURANCE AND INDEMNITY: The Constructor shall provide liability and property
damage insurance covering all work under this agreement for construction within the public
right-of-way, including all work provided by the Constructor and its Contractors. Said
insurance shall name the Cit3, of Bremerton as additional insured and provide the following
limits:
- Bodily injury, $1,000,000.00 each person;
- $I,000,000.00 ~aeh accident;
- Property damage, $500,000.00
Evidence of such insurance shall be provided to the Risk Manager prior to issuance of the
Public Works Project Permit. The Constructor shall hold harmless the City of Bremerton, its
elected officials, employees, and agents, for all liabilities and claims arising out of or related to
performance o£the work identified in this agreemem.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -5-
Pt. Washington Park
P.U.D Phase I
7. PROSECUTION OF WORK:
A. Construction of the project shall be initiated within one (1) year of execution of this
agreement by the Constructor and within 30 days of issuance of the Project Permit.
Failure to begin work within the one year limit shall result in forfeiture of all
Constructors rights under the agreement regardless of any other provisions of this
agreement.
B. Constructor agrees to continuously pursue work and complete the project within six
(6) months of permit issuance.
8. ADI)mONAL CONSTRUCTION WORK REQUIREMENTS: The Constructor in
addition to other duties included in this agreement shall comply with the following:
A, Schedule system connections with the Project Manager and meet all requirements for
the connection and testing of their improvements in the presence of the City's
authorized representative. Major system connections to the City's system shall not be
authorized on Fridays. Subsequent operation of system valves must be performed by
City personnel.
B. No work shall be performed by the Constructor other than Monday through Friday
between 7:30 a.m. and 6:00 p.m., exclusive of City holidays, except with written prior
consent of the City. If consent is given by the City for work on Saturday, Sunday or
holldavs or before or after the normal working hours above, the Constructor shall pay
to the City the reasonable cost of thrmshing the required inspection and supervision
during said periods.
C. Remove and correct at the e~nnse of the Constructor any improvements not
authorized or constructed in compliance with the Utilities Development and
Construction Standards.
D. Restore all public and private prope~, disrupted by the installation of the project to its
original condition upon completion. The entire job site will be maintained in a neat and
workman like appearance. The Constructor will provide landscape restoration
including sodding seeding or barking as may be required by the City's Proiect
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -6-
Pt. Washington Park
P.U.D Phase I
Manager. Landscape restoration shaft follow installation of the various segments of the
project as closely as is practicable. When, in the opinion of the City's Project Manager,
landscape restoration has fallen behind installation of the segments of the project, the
Project Manager may halt all construction work until restoration catches up.
E. Notify the City when the project is ready for final inspection and approval by the
Utility.
9. INSPECTION AND FINAL ACCEPTANCE:
A. The City will provide periodic inspection during eonstnietion to ensure that the work
complies with plans and City Utilities and Construction Standards for the City.
Inspections by the City shall not relieve the Constructor of its responsibility to
construct the project in Cull accord with the standards of the City. Nor shall inspection
be deemed to be supervision of the project, methods or means of performance,
compliance with construction site safety requirements, or the Constructor's
subcontractors or employees.
B. Sewer acceptance requires an initial television inspection of all lines. This inspection
may be conducted by the City for the cost of time and materials or by a private agency.
Costs incurred for this inspection sh~ be paid by the Constructor following thirty (30)
days written notice.
C. All easements necessary ~'or the project have been obtained in the name of the City,
acceptetl by the project Manager, and recorded with the County Auditor.
D. Within thirty (30) days of final inspection, furnish a complete set of mylar record
drawings of the project improvements which have been prepared and stamped by the
Design En~fineer.
E. Upon final approval of' project construction by the Ci .ty's Project Manager, the City
shall accept and approve a Deed of Conveyance of the project improvements for the
Constructor on a form approved by the City Attorney. Approval of the deed shall
constitute completion oftbe project for the purposes of.'
1. Computing the guarantee period required by this agreement for bonding.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -7-
Pt. Washington Park
P.U.D Phase I
2. Commencement by the City of its usual and customary maintenance of the
"project improvements.
3. Commencement of sewer or water services upon payment of service fees.
10. REIMBURSEMENT AGREEMENT: If this agreement is for the construction of either
water or sewer line, the City agrees to arrange for a partial reimbursement to be made to the
Constructor for the cost of the line as permitted by state law and the municipal code.
Reimbursement shall be subject to reasonable charges by the City for administration and shall
be payable only if the Constructor executes a City Reimbursement Agreement and files the
same with the County Auditor as a lien on properties to be served in the future by the water or
sewer line.
11. NON-COMPLIANCE: Failure to comply with the terms of this agreement within 60 days
following written notice by the Project Manager shall automatically result in the termination of
service and forfeiture of bonds and shall not relieve the Constructor of the duty to comply with
all the terms of this agreement, paying all sums due thereunder together with reasonable
attorney's fees incurred by the City in enforcing the terms of this agreement.
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -8-
Pt. Washington Park
P.U.D Phase I
3; A Sso o--o .
CONSTRUCTOR: William Broughton ~'t ~'/ ~'/.~o..~'/~. ~~
M~ng Adaess: -. 9230 Bayshore Drive ~ ~. fl~. ~
S~v~e, Wa. 98383
Telephone Numbe~ 6924880
CITY OF BREMERTON:
ORTON Mayor
DEPARTMENTAL APPROVAL:
W. EUGENE SAMPLEY, Director of Public Works and Utilities
ATYES~: ~ /
KATHLEENflcCLUSKEY, Clerk
APPROVED AS TO FORM:
lan Sievcrs, City Attorney
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -9-
JU~-27-97 FRI 12:36 PAPE & SONS OHS? INO, FA× NO, 206 851 3290 P, O1
PAPE & ~EINS BEINBTRUl3TIDN, INB,
9512. Slate Hwy, 16, NW
Gig Harbor, WA 98332
PlJone (206) 851-6040. Fax (206) 851-3290
Conlreclo[s Regislrallon # ~APESI'204DIE
FAX TRANSMISSTON COVER SHEET
DATm t_ 6~'~- ~ ?' ? ~
TXMB BENT~
REF3._~
This tra~smiesion includes . 7__. _ pages, tnclu6tng cover
sheet. If there ere any problems, pla&em telephone or fax at
number listed above.
Thank you,
Pape & eons Construction~ Ino,
JU[~-.27-97 FRI 12:36 PAPE & SONS ONST iNC, FAX NO, 206 851 3290 ?,02
Pt. washington Park P,U.D Phase I
CONSTRUCTOR~
Telephone Ntanber: .6924880 .
EXE, CUTED thi%2..~.day of'._~,./,~4~ ,1997
CITY OF BRF-,MERTON:
LYNN HORTON, Mmyor
DEPARTMF, NTAL APPROVAL:
W. EUGENE SAMPLEY, Director of Public Works and Utilities
ATTEST:
KATHI,E ,~ McCLIJ'SKEY, Clerk
APPROVED AS TO FORM:
lan $~evm'% City Attom~
PUBLIC UTILITIES CONSTRUCTION AGREEMENT -9-