+ CHANGE Contract Transactions +
+ Contract Number 4428 +
+ +
+vendor Name C A CAREY CORPORATION +
+Subject SR304 TIP - DOWNTOWN PHASE - STAGE IE +
+Department ENGINEERING +
+Status Code CON +
+ Amount $1429967.54 +
+ Begin Date 04/22/2004 +
+ Insurance End Date 11/20/2004 +
+ Type Amount Review Date 02/15/2008 +
+ GL $2000000.00 +
+ AL $1000000.00 +
+ +
+ Insurance Total $3000000.00 +
+ Insurance Review Date 09/01/2006 +
+ +
+ Comments CHANGE ORDER #1-8/04 #2-10/04 #3-10/04 #4-12/04 #5 1/05 +
+ #6 1/06 VAULT 01/01/2008 +
+ +
+--------------------------------------------------------------------------+
~~~'DR?~:~ti@
BC Traffic, LLC.
P.O. Box 1670
Port Orchard, WA 98366
Tel 360.895.1000
Fax 360.895.9400
January 30, 2006
City Of Bremerton
Paula Johnson, City Clerk
345 6th Street, Suite 600
Bremerton, WA 98337
"
AFFIDAVIT OF PUBLICATION
Account #42742/ Ad #100184736
STATE OF WASHINGTON
COUNTY OF KITSAP
I, Robin Alexander, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers anq publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of a legal advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following dates, to wit: ,
January 16,2006 and that such newspaper was regularly distributed to its subscribers during all of said
period. That the full amount of the fee charged for the foregoing publication is the sum of $28.15 which
amount has not been paid in full.
~()k AJud}-
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of January 31, 2006.
Notary Public in and for the State of Washington, Kitsap County.
OFFICIAL SEAL
DAWN BLATT
NOTARY PUBLIC - STATE OF WASHINGTON
My Commission Expires July 30, 2006
NOTICE OF COMPLETION'
Notice of Completion has been issued to CA Carey Corporation, Contract No. T A 2687, for the SR 304
Transportation Improvement Project - Downtown Stage IE. Any parties having a claim for material, labor
or damages related to this Contract have forty five (45) days from the date of first publication of this notice
to file a claim.-
Paula Johnston, City Clerk-
345 6th Street, Suite 600-
Bremerton, Washington 9833T
January 16,2006"#100184736-
. _:t.l.: '-,
0"'.' ,
, .,:;
':li It.
~fIih
i
II
II
r
I
I
I
I
I._..-=~..",",.
Public Works and Utilities Department - Administration
3027 Olympus Drive. Bremerton, WA 98310 . (360) 473-2327 . FAX (360) 473-5018
March 9,2006
Key Bank Commercial Banking
Attn: Laura Lovera
1301 5th Avenue, 23rd Floor
Seattle, W A 98101
RE: Release of Retainage for Public Works Contract
C.A. Carey Corp. Escrow #61494521-McDonald Investments
Dear Ms. Lovera,
C.A. Carey Corp. has completed all work required under contract for the SR 304 Transportation
Improvement Project - Downtown Stage IE.
Please release the retainage you are holding in escrow #61494521 to the contractor.
Thank you for your services and your prompt attention to this matter.
Sincerely,
J;(lI V ~
Mildred H. Vellegas, CPA
PW & U Financial Manager
cc: Melody Shew, C.A. Carey Corp.
Paula Johnston, City Clerk
Lynn Price, Project Manager
Eduardo Aban, Project Manager
Contract file
!"m.' ......1Ii
II t Ii,
IL-----.---..,-----Jil
II II
!i~~ _.",~_.,_~ _~:_,c__;.
Key Bank
Attn: Escrow Department
MS WA-31-10-AR7
700 Fifth Ave
Seattle, WA S
Public Works & Utilities
3027 Olympus Drive
Bremerton, WA 98310
-::;:.;;. '; :-..... .:~:l"; .....0::" ..
.J -S:A';;:ild6j.,;,....:,.e;. ,....
.r. -, ( .ilS'
TACO H/\ Vv'/\984
():~~~ r-~/\!::". '~~n':">~~.C.N. ".' of" "W,'
,...., ~,,,.,,..-....,)....,,..-r y--~' ,J" f:'
N1.:XXE:
".eo
i
NCJ'r J"~;'~!:!RN TO
end...J: v t;;:RAE~l_F.~
UN,<"'Il~I..E: TO
E~C: ,..$.;9;l 04 '''',i'Jj;JS9
() 1 c)~3/ ()t:>/ 06
S;E:NOFFi'
'"~:s ~~Dt)RE~~""'E'C)
F()RU~:lF"t;) _.>,.>:"
*2S2a'-;lOS:11--0~2'-'4"~
)),II'),')II1)),II1)))JIlIl)llli,'li),III)", II ) I ) 1'/ -
, II I I) , /I,) ,
-z
0
f. " -+-
~ <; (\
If> (\
C
.,
(\ <)
-+- c
c i'
:7
t'l i'\
(L -t'
+
r
"i
i Public Works and Utilities Department - Administration
3027 Olympus Drive. Bremerton. WA 98310 . (360) 473-2327 . FAX (360) 473-5018
March 1, 2006
Key Bank
Attn: Escrow Department
MS W A-31-10-467
700 Fifth Avenue, 46th Floor
Seattle, W A 98104
RE: Release of Retainage for Public Works Contract
C.A. Carey Corp. Escrow #61494521-McDonald Investments
C.A. Carey Corp. has completed all work required under contract for the SR 304 Transportation
Improvement Project - Downtown Stage 1 E.
Please release the retainage you are holding in the amount of Sixty-Eight Thousand One
Hundred Thirteen dollars and 49/100 ($68,113.49) to the contractor.
Thank you for your services and your prompt attention to this matter.
Sincerely,
);f IJ~
Mildred H. Vellegas, CPA
PW & U Financial Manager
cc: Melody Shew, C.A. Carey Corp.
Paula Johnston, City Clerk
Lynn Price, Project Manager
Eduardo Aban, Project Manager
Contract file
Washington State
Department of Revenue
PO Box 47474
Olympia, WA 98504-7474
q
600 303 497
Certificate of Payment of State Excise
Taxes by Public Works Contractor
C A CAREY CORP
POBOX 1006
ISSAQUAH WA 98027 0038
CITY OF BREMERTON
DEPT OF PUBLIC WORKS & UTILITIES
3027 OLYMPUS DR
BREMERTON WA 98310
We hereby certify that taxes, increases and penalties due or to become due from the above-named
contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works
contract:
CITY OF BREMERTON
SR 304 TIP DOWNTOWN STAGE 1E
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in the Department's opinIon, readily collectible without recourse to the state's lien on the retained
percentage.
This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the
sole purpose of informing 'the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor.
This certificate does not release said contractor from liability for additional tax that may be later
determined to be due with respect to the above-mentioned contract or other activities.
Dated e- . ~ :l6,Ob
\
at Olympia, Washington,
State of Washington
Department of Revenue
~
Certifying o~
. . . \ ." ~.
To inquir~ abo'ut the availability of this document in an alternate format for the visually impaired or in a language other than English, please call (360) 486-2342,
TrY users 'may call 1-800-451-7985.
REV 310028 (10-01-02) ROUTING: Disbursing Officer, Contractor, File, Special File
PUBLIC WORKS AND UTILITIES
3027 Olympus Drive * Bremerton, WA 98310-4799 * (360) 478-5318 * FAX (360) 478-5018
MEMORANDUM
ENGINEERING DIVISION
TO:
Paula Johnston
FROM:
Eduardo Aban *'
DATE:
February 24,2006
SUBJ:
SR 304 TIP - Downtown Stage IE, CA Carey Corporation
I have received all the releases from the State of Washington and completed the necessary
procedures for project closeout.
The following original documentation is attached for your files:
Project Release signed by Contractor
Advertisement of "Notice of Final Completion"
Certificate of Payment of State Excise Taxes by Public Works Contractor
Department of Labor and Industries Release
Certificate of Payment from Employment Security Department
BC Traffic Consent for Release of Retain age
Ifrelease of retain age for this project is acceptable to you, please indicate by signing below then
return this to me. I will see that the necessary accounting paperwork is processed to release the
retainage. Please call me if you have any questions at X231 7.
ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS
SR 304 T.I.P. - Downtown Stage IE
Project No. 1105 - Contract No. T A-2687
CA Carey Corporation, hereby indicates agreement with, and acceptance of, the final
Contract Payment of $28,151.92, the total Contract Price of $1,362,269.62 including
Washington State sales and/or use taxes, and the final Contract Time of 148 calendar
days, as full and final compensation for all Work performed in connection with Contract
Number T A-2687, and does hereby release the City of Bremerton from all claims,
liability, demands, damages and actions of any kind whatsoever, arising from
performance of that Contract.
CA Carey Corporation
By:
S:~,~
'-
V?
Date:
V"LI "L~r or
Title:
Certificate of Notarv ~~~~
Subscribed and sworn to before me this ?tfE....."-~ day of\:jCC~~~<€'" ~
/~--
~ OOY S""'-..
,~",<c,..\),,"""'.~~J.. 't.
, ~/~ss\ON ~"~ ~1.
# : ~ ~'"
: !g ~OTARy~"" ,
I ." 00' ~
~ :~ .-.-- : 2
~ ' . iJJ
~ (j\ ", PUBLIC .: ~ J
'" :,.>. ". ." 0 ~
'f"7..>: ....J.29-0~/ &-;
ff ~ .......... ~ :
1'1, OF WAS""" _---
l\\\\"'-,,,"'...,........-
AFFIDAVIT OF PUBLICATION
'{'-
Account #42742/ Ad #100184563
ST ATE OF WASHINGTON
COUNTY OF KITSAP
I, Robin Alexander, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of a legal advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following dates, to wit: ,
January 14, 2006 and that such newspaper was regularly distributed to its subscribers during all of said
period. That the full amount of the fee charged for the foregoing publication is the sum of $29.86 which
amount has not been paid in full.
cRoL--~~
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of January 31, 2006.
Notary Public in and for the State of Washington, Kitsap County.
OFFICIAL SEAL
WN BLATT
NOTARY PUBLIC - STATE OF WASHINGTON
My Commission Expires July 30, 2006
NOTICE OF COMPLETION'
Notice of Completion has been issued toCA Carey Corporation, Contract No. TA 2687, for the SR 304
Transportation Improvement Project - Downtown Stage IE. Any parties having a claim for material, labor
or damages related to this Contract have forty-five (45) days from the date of first publication of this notice
to file a claim.-
Paula Johnston-
City Clerk-
345 6th StreeC
Bremerton, Washington 9833T
January 14,2006"#100184563-
02/24/2006 08:04 FAX 360 586 7152
WA DOR-OUT OF STATE
III 002
TtEPAKrMFNr
OF RE'vENuE
w_lllIIsym
Washington Stale
Department of Revenue
PO Box 47474
Olympia, WA 98504-7474
600 303 497
Certificate of Payment of State Excise
Taxes by Public Works Contractor
C A CAREY CORP
POBOX 1006
ISSAQUAH WA 98027 0038
CITY OF BREMERTON
DEPT OF PUBLIC WORKS & UTILITIES
3027 OLYMPUS DR
BREMERTON WA 98310
We hereby certify that taxes, increases and penalties due or to become due from the above-named
contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works
contract
CITY OF BREMERTON
SR 304 TIP DOWNTOWN STAGE 1E
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in the Department's opinion, readily collectible without recourse tothe state's lien on the retained
percentage.
This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the
sole purpose of infoiming the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor.
This certificate does not release said contni.ctor from liability for additional tax that may be later
determined to be due with respect to the above-mentioned contract or other activities.
Dated ~ . ~ .:23)Ob
at Olympia, Washington,
State of Wasliington
Department of Revenue
~
Certifying ~
To inquire about the availability of this document in an alternate format for the visually impaired or in a language other than English, please call (360) 486-2342.
TTY users may ea.IIl-800-45l-7985.
REV 310028 (10-01-{)2) ROUTING: Disbursing Officer, Contractor, File, Spe<;ial File
Verify Workers' Comp Premium Status - Tracking Request Confirmation
Page 1 of 1
Washington State Department of
Labor and Industries
Contractor Tracking
Request Confirmation
Department of Labor and Industries
Contractor Tracking Request Confirmation
Date: 01/19/2006
Contractor To Be Tracked
Business Name: C A CAREY CORPORATION
UBI #: 600 303 497
Account #: 399,764-00
Account Status: Account in Good Standing
Premium Status Tracking Confirmation
Tracking Number: T0000026558
Starting: 1/19/20061 :49:02 PM
Ending: 1/19/2007 1 :49:02 PM
** You will be notified by letter if this account is no longer in good standing. **
https://fortress.wa.gov /lni/ crpsi/ContractorConfirmationPrint.aspx? AccountId=3 997 6400&BusinessId=60... 1/19/2006
~c~~~
~, 1"\7' 'J
~ . \) I."J
~t..~ \ ...~~O~
~\G ~\."
\...~\~~
\~G\\~
STATE OF WASHINGTON
EMPLOYMENT SECURITY DEPARTMENT
CONTRACTOR: CA CAREY CORP.
PO BOX 1006
ISSAQUAH, W A 98027
) CERTIFICATE OF
) PAYMENT OF CONTRIBUTIONS
) PENAL TIES AND INTEREST ON
) PUBLIC WORKS CONTRACT
ES Reference No.
446672-00 9
TO:
CITY OF BREMERTON PUBLIC WORKS
3027 OL YMPUS DR
BREMERTON, WA 98310
RECEIVED
Fr=Q
()
~~ I.
"~h ~ 1 C<' D h b . ,. ENGINCCDI~C DM~lnMd '
1 e bmp oyment Secunty epartment ere y certlhes tHose con'ri-'mbYi~}fs, pMJMI~lab mterest
due from the above named contractor under the Employment Security Act have been paid in full or
provided for with respect to the following public works contract:
SR 304 T.LP.; DOWNTOWN STAGE IE
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50.24.130 against the public body named above for tax attributable to service performed for said public
body by the above named contractor on the above described contract. The Employment Security
Department releases its lien on the retained percentage, which is provided by RCW 60.28.040 for
contributions, penalties and interest due from said contractor.
This certificate does not release said contractor from liability for additional contributions,
penalties and interest which may be later determined to be due with respect to the above mentioned
contract.
Dated at Olympia, Washington on February 8, 2006.
COMMISSIONER
EMPLOYMENT SECURITY DEPARTMENT
'. By
) 360-902-9620
Original-Disbursing Officer
Duplicate-Employer
Triplicate-Central Office Files
EMS 8449760 R3-98
@~~~)18
F~h 17 200612:56PM HP LASERJET FAX
Feb 17.2006 11124AM FROM
425.392.6916
TO 14~53928295
p.2
P.02
Be TRAFFIC w..c
P. O. Box: 1670
Purt Orc:lulrd, W A 98366
F;bruory 17, 2006
RECEIVED
~..dllarclo A ban
City (If BremertOn
3027 Olympus Drive
Bremerton, W A 98310
Dear Eduardo:
FEB 22 Lu
ENGINEERING DMSION
Rc: Rtlention R.elease (Rcl<<lSe of Funds)
Pursuant 1(1 the teleconference on Fehroary 14, betwee.n ':.dnarrlo A nan of the City of
Brcmerton; Assisiant CilyAUomey. Kenneth W. &gwel1. and Yao Budiman. Managing
Member for Be Traffic L1,.C, thb letter will serve tll..'Uperscde: the January 30th, 2006,
correspondence from Be Traffic LLC rclatin~ 1.0 unpajd retention (copy attached) and will
[1]50 outline the amount ohnd terinS under which C. A. Carey will release the retention it
currently holds to Be 'fratlic LLC.
It Is h\:reby agrucLl ~lwt\en C. A. C;rn:y Corporation and DC Traffie LtC that C. A. Carey
C()Tporation owes Be Tra.ffi~ LLC $9,603.28 in retention from the SR 304 Transportation
Im.prov~rncn\ Project The Downtown Phas~ . Stnge I E Contm~.t #T A2687 Project bui It fi'l1' the
City of Bremerton. It is further agreed that C. A. Carey will pa)' this amount to Be Traffic
u..(' on the ~amr:: d~y M the retention IS received from the Cil)' of Bremerton and released to
C. A. Carey Corporation from the bank. The paymen1 will be made to Yao Budiman at the C.
A. Curey Corporation office!! at 537 NW Locust St., Issaquah, W A. C. A. Carey Corporation
will notify Yao Budiman at (360) 340-5528, Qr John M. Davis,. Jr., Mr. Budlman's Attorney,
at (360) 871-0926, on the <lay of lht rueipt of the fund'! hy the C. A. Carey Corporlltion.
Finally it is agreed thlll in exchange for the .$9,6{)3.28 In US Dollar:.l, Be Tram~ LLC fon~vcl'
releases all c1ll.ims afany kind against C. A. Carey Corporation and/or the City ofBreme~n
fur the SR 304 Tran~por\.ULioll ImproVement Project l'hc Downtown Phnsc ~ Stage 1 E
Contract # T A 26H7 Project.
<:~ ...-~
~/"",.-".. ..-
~.-. ~- -:--...... _...~
. . ...-..'~ .J'- '.,.~....
1---' ",,-/.g:,. 't ..:;;;C.-~_..-;
Chris Carey ;Ptesi<knt . . //
for C. A,. Carey Corporatrtm
RECEIVED
RECENED
tt,\3 2. 2. 1\.:\.-.1
~RG~~~~\RG OMS\ON
FEB 22 20n:.
ENGINEERING DMSION
...
TOTAL P. 02
Page 1 of 1
Paula Johnston
Pf:2t
Paula Johnston
Thursday, January 12, 200611:14 AM
'Nora Russell'
Eduardo Aban
Final Notice of Completion - SR 304 Transportation Improvement Project - Downtown Stage
1E
Attachments: Final Advertisement 304 TIP.doc
From:
Sent:
To:
Cc:
Subject:
Hello Nora,
Please publish the attached Notice of Completion as soon as possible and send me two affidavits of
publication. Thanks. pj
Paula Johnston, City Clerk
345 6th Street, Suite 600
Bremerton WA 98337
360-473-5323
360-473-5200 fax
Pau la .Johnston@ci.bremerton.wa.us
ill'ill:(JfJtJ
NOTICE OF COMPLETION
Notice of Completion has been issued to CA Carey Corporation, Contract No. T A 2687, for the
SR 304 Transportation Improvement Project - Downtown Stage IE. Any parties having a claim
for material, labor or damages related to this Contract have forty five (45) days from the date of
first publication of this notice to file a claim.
Paula Johnston, City Clerk
345 6th Street, Suite 600
Bremerton, Washington 98337
CITY OF BREMERTON
CHANGE ORDER
.....~
.:..... t"'"
PROJECT NAME:
CONTRACT CHANGE ORDER NO: 6
SR 304 TIP - Downtown Stage 1 E
PROJECT NO:
1105
CONTRACTOR: CA Carey Corporation
$1,348,817.00 DAYS: 130
$52,998.62 DAYS: 18
$28,151.92 DAYS: 0
$1,429,967.54 DAYS: 148
ORIGINAL CONTRACT AMOUNT:
PREVIOUSLY APPROVED CHANGES:
THIS CHANGE:
REVISED CONTRACT AMOUNT:
This Change Order covers changes to-the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The
increase or decrease in contract price shown below includes any applicable taxes.
DESCRIPTION OF CHANGES
INCREASE IN
CONTRACT
AMOUNT
($)
(DECREASE) IN
CONTRACT
AMOUNT
($)
CONTRACT
TIME
EXTENSION
(DAYS:)
o T"'
I"- l"-
T"' T"'
CD CD
"3 "3
c::: c:::
x The amount of$28,151.92 will be. full payment for work $28,151.92
done on the contract item "Concrete Paver Crosswalk" that
included labor, tools and equipment, and materials. The
work was to re-install jointing sand between the concrete
unit pavers, and the re-application of the "Surebond" joint
stabilizing sealer.
Measurement and Payment
The item above shall be full pay for all labor, materials,
tools and equipment required to perform the work, in
accordance with the Specifications and as described in this
change order. A new lump sum bid item #83, Re-install
Jointing Sand and Re-seal shall be created.
NET CHANGE IN CONTRACT AMOUNT $28,151.92
INCREASE OR (DECREASE)
". .
CONTRACT CHANGE ORDER NO: 6
PR0JECT NAME: SR 304 TIP - Downtown Stage 1 E
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or
nature arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order
shall limit the City's right to bring a claim for past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price
specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in
work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order.
This document will become a supplement of the contract and ,all provisions will apply hereto'. It is understood that this
Change Order shall be effective when approved by the' City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on
the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall
take appropriate action to modify any bonds required under the contract to address this change.
RECOMMENDED:
, P~~EER
NLfr
/2/21( 2,00S-
Date
CITY ENGINEER I DIRECTOR OF PUBLIC WORKS
/~~d/
/ Date
RECOMMENDED:
ACCEPTED:
~,.
APPROVED:
,
I-"'-ptp
Date
C
Page 2 of2
+--------------------------------------------------------------------------+
TEnter Search Criteria, Press Ese Key to Transmit
+Press Del Key to Terminate Delete Mode
+ CHANGE
+ Contract Number
+
+Vendor Name
+Subject
+Department
tStatus Code
+
+
+
+
+
+
+
+
+
+
+
+
Contract Transactions
+
t
t
+
t
+
$1401815.62 +
04/22/2004 +
11/20/2004 +
02/15/2007 +
+
+
+
+
+
+
+
+
+
4428
C A CAREY CORPORATION
SR304 TIP - DOWNTOWN PHASE
ENGINEERING
CON
- STAGE IE
Insurance
Type Amount
GL $2000000.00
AL $1000000.00
Amount
Begin Date
End Date
Review Date
Insurance Total
Insurance Review Date
$3000000.00
09/01/2005
Comments
CHANGE ORDER #1-8/04 #2-10/04 #3-10/04 #4-12/04 #5 1/05
VAULT 01/01/2007
+--------------------------------------------------------------------------+
CITY OF BREMERTON
CHANGE ORDER
PROJECT NAME:
CONTRACT CHANGE ORDER NO: 5
SR 304 TIP - Downtown Stage 1 E
PROJECT NO:
1105
CONTRACTOR: CA Carey Corporation
$1,348,817,00 DAYS: 130
$33,375,85 DAYS: 13
$19,622.77 DAYS: 5
$1,401,815,62 DAYS: 148
ORIGINAL CONTRACT AMOUNT:
PREVIOUSLY APPROVED CHANGES:
THIS CHANGE:
REVISED CONTRACT AMOUNT:
This Change Order covers changes to the subject contract as described herein, The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order Items, The
increase or decrease in contract price shown below includes any applicable taxes,
DESCRIPTION OF CHANGES
INCREASE IN
CONTRACT
AMOUNT
($)
(DECREASE) IN
CONTRACT
AMOUNT
($)
CONTRACT
TIME
EXTENSION
(DAYS:)
~ ~
~ ~
" "
"S "S
0:: 0::
X Crosswalk Concrete Gntters
With the installation of concrete unit pavers in the crosswalk area, the
long term maintenance of the sand in the joints between the pavers has
become a concern in the immediate vicinity of the gutter line. The
joints located in the gutter line will be subjected to constant erosion of
the sand. To minimize this high maintenance requirement, it is
deemed necessary to install concrete gutters in the immediate vicinity
of the gutter line,
There are 12 concrete gutters that will be installed, The concrete
gutters will be installed flush with the bottom of the curb ramp to meet
ADA requirements, Each concrete gutter will be IS-inch wide and the
length between the concrete curb edges (approximately 7' - 6" long)
of the crosswalk pavers, Dowels using #4 rebar with a 90-degree bend
will be drilled 4 inches into the belly pan at 16 inches on center. The
concrete strength will be 3000 psi,
The agreed upon cost for this revision is $910 per gutter. The lump
sum price for the additional work of installing 12 gutters is $10,920, $10,920,00 5
Construction
Requirements for construction of this additional bid item shall be in
accordance with the scope of work described above.
Measurement and Payment
The item above shall be full pay for all labor, materials, tools and
equipment required to perform the work, in accordance with the
Standard Specifications and as described in this change order. A new
lump sum bid item #S2, Installation of Crosswalk Concrete Gutters
shall be created.
PROJECT NAME:
CONTRACT CHANGE ORDER NO: 5
SR 304 TIP - Downtown Stage 1 E
Material Sales Tax
The Contractor relied on the first sentence of the Contract's Special
Provision Section 1-07,2 in preparing its bid, This Section states: "The
work on this contract is to be performed upon lands whose ownership
obligates the Contractor to collect State sales tax from the Contracting
Agency, The provisions of Section 1-07,2(2) apply, "
The fIrst sentence created inconsistency with the second sentence
which references the terms of Section 1-07,2(2) of the APWA
Supplement to the 2004 Standard Specifications, The APW A Section
states in part: "WAC 458-20-171, and its related rules, apply to
building, repairing, or improving streets, roads, etc., which are owned
by a municipal corporation" ,and which are used primarily for foot or
vehicular traffic.... For work performed in such cases, the Contractor
shall include Washington State Retail Sales Taxes in the various unit
bid item prices, or other contract amounts, including those that the
Contractor pays on the purchase of the materials, equipment, or
supplies used or consumed in doing the work."
The City's intent was to apply WAC 458-20-171. To correct the
situation, the City shall pay the sales tax on the materials used in the
contract as originally bid which does not include materials used in
change orders. The total material cost where sales tax is applied is $8.702,77
$101,195, and the sales tax amounted to $8,702,77
NET CHANGE IN CONTRACT AMOUNT $19,622,77 5
INCREASE OR (DECREASE)
Page 2 of3
CONTRACT CHANGE ORDER NO: 5
PROJECT NAME: SR 304 TIP - Downtown Stage 1 E
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or
nature arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, on-site or home office overhead, or lost profits, Nothing in this Change Order
shall limit the City's right to bring a claim for past performance,
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price
specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in
work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order,
This document will become a supplement of the contract and all provisions will appiy hereto, It is understood that this
Change Order shall be effective when approved by the City of Bremerton,
The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on
the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall
take appropriate action to modify any bonds required under the contract to address this change,
RECOMMENDED:
a'Mf~~-r~"""'"
PROJECT ENGINEER
RECOMMENDED:
ACCEPTED:
APPROVED:
MAYOR
ATTEST:
Page3of3
/2-/13 J::z.r;,,-7/;---
Date
Date
Date
+--------------------------------------------------------------------------+
+Browse: Next Previous First Last Update Delete Restart X - Exit +
+Retrieve the Next record +
+Found: 1 Record(s) MAINTAIN Contract Transactions +
+ Contract Number 4428 +
+ +
+Vendor Name C A CAREY CORPORATION +
+Subject SR304 TIP - DOWNTOWN PHASE - STAGE 1E +
+Department ENGINEERING +
tStatus Code CON +
T Amount $1366538.04 +
t Begin Date 04/22/2004 +
T Insurance End Date 11/15/2004 +
t Type Amount Review Date 02/15/2007 +
T GL $2000000.00 +
+ AL $1000000.00 +
+ +
t Insurance Total $3000000.00 +
T Insurance Review Date 09/01/2005 +
+ +
+ Comments CHANGE ORDER #1 - 8/04 #2 - 10/04 #3 - 10/04 #4 - 12/04 +
+ VAULT 01/01/2007 +
+ +
+--------------------------------------------------------------------------+
CITY OF BREMERTON
CHANGE ORDER
~
PROJECT NAME:
CONTRACT CHANGE ORDER NO: 4
SR 304 TIP - Downtown Stage 1E
PROJECT NO:
1105
CONTRACTOR: CA Carey Corporation
ORIGINAL CONTRACT AMOUNT:
$1,348,817,00 DAYS:
130
PREVIOUSLY APPROVED CHANGES:
$17,721,04 DAYS:
10
THIS CHANGE:
$15,654,81 DAYS:
3
REVISED CONTRACT AMOUNT:
$1,382,192,85 DAYS:
143
This Change Order covers changes to the subject contract as described herein, The Contractor shall construct. furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order Items, The
increase or decrease in contract price shown below includes any applicable taxes,
DESCRIPTION OF CHANGES
INCREASE IN
CONTRACT
AMOUNT
($)
(DECREASE) IN
CONTRACT
AMOUNT
($)
CONTRACT
TIME
EXTENSION
(DAYS:)
~ r::
" "
"S "S
rr: rr:
X Due to the unforeseen conflict of the proposed storm sewer with the
existing 12-inch water main, the vertical and horizontal alignments of
the proposed storm sewer were revised, The realignment required
some changes to be implemented, 3
These changes were to existing unit bid item quantities and are listed
as follows:
Item #14, Catchbasin Type I-I added (12 total) $t,ISO,OO
Item #16, Catchbasin Type II 48" - I added (6 total) $3,800,00
Item #25, 15" PVCPipe-43 If added (741 If total) $1,93S,OO
Item #5, Remove Conc, Sidewalk- 127 sy added (1907,39 sy total) $1,143,00
Item #8, Remove Conc, Curb - 98 If added (1966,9S If total) $490,00
Item #11, Remove Asp, over Conc. Pave. - 9.8 sy added (779,02 sy
total) $88,20
Item #30, Shoring - 277,2 sf added (S480.99 sf total) $4IS.80
Item #38, CSTC - 3S.9 tons added (1993,86 tons total) $718.00
Item #29, Structure Excavation - 37,S cy added (730.23 cy total) $937,SO
Item #60, Temporary Traffic Control - This was accounted through
force account that totaled $3,109.31 ($119,109.31 lump sum total) $3,109,31
Item #28, Abandon Catchbasin Type II - I added (6 total) $800,00
Item #31, Plug Existing Pipe - 1 added (7 total) $300,00
Item #12, Roadway Exc. Incl. Haul- 12 cy added (16,74 cy total) $396,00
Item #13, Embankment Compaction - 12 cy added (12 cy total) $72.00
Construction
Requirements for construction of the additional bid item quantities
above shall be in accordance with contract requirements.
Measurement and Payment
All the items above shall be full pay for all labor, materials, tools and
equipment required to perform the work, in accordance with the
Standard Specifications and as described in this change order.
The change that was not a bid item quantity was the installation of the
7' ductile iron pipe, supplied by the City, from SD2-4 to SD2-S, A
new bid item #81, Installation of City Supplied 12" DI Pipe will be
CONTRACT CHANGE OFillER NO: 4
PROJECT NAME: SR 304 TIP - Downtown Stage 1 E
created, The Contractor's price proposal to this installation was a
lump sum of $300, $300,00
Construction
Requirements for installation of the 7' ductile iron pipe shall be in
accordance with contract requirements.
Measurement and Payment
This new item #81, Installation a/City Supplied 12" DI Pipe shall be
full pay for all labor, materials, tools and equipment required to
perform the work, in accordance with the Standard Specifications and
as described in this chanoe order.
NET CHANGE IN CONTRACT AMOUNT $15,654.81 3
INCREASE OR (DECREASE)
Contraclor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or
nature arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, on-site or home office overhead, or lost profits, Nothing in this Change Order
shall limit the City's right to bring a claim for past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price
specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in
work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto, It is understood that this
Change Order shall be effective when approved by the City of Bremerton,
The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on
the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall
take appropriate action to modify any bonds required under the contract to address this change,
RECOMMENDED:
tdvv-~ ak~
PROJECT ENGINEER
JJ/JB)20l)Lj-
Date
RECOMMENDED:
APPROVED:
I.
ACCEPTED:
MAYOR
APPROVED AS TO FORM:
~
ATTEST:
Page 2 of2
+--------------------------------------------------------------------------+
TEnter Search Criteria, Press Esc Key to Transmit
TPress Del Key to Terminate Delete Mode
T CHANGE
t Contract Number
Tvendor Name C A CAREY CORPORATION
TSubject SR304 TIP - DOWNTOWN PHASE - STAGE IE
TDepartment ENGINEERING
TStatus Code CON
T
T
T
t
T
t
T
T
T
T
T
Contract Transactions
t
t
T
T
t
$1366538.04 T
04/22/2004 T
11/15/2004
02/15/2007
4428
Insurance
Type Amount
GL $2000000.00
AL $1000000.00
Amount
Begin Date
End Date
Review Date
Insurance Total
Insurance Review Date
$3000000.00
09/01/2004
T
t
T
+--------------------------------------------------------------------------+
Comments
CHANGE ORDER #1 - 8/04 #2 - 10/04 #3 - 10/04
VAULT 01/01/2007
CITY OF BREMERTON
CHANGE ORDER
PROJECT NAME:
CONTRACT CHANGE ORDER NO: 3
SR 304 TIP - Downtown Stage 1 E
PROJECT NO:
1105
CONTRACTOR: CA Carey Corporation
$1,348,817,00 DAYS: 130
$6,518,00 DAYS: 10
$11,203,04 DAYS: 0
$1,366,538,04 DAYS: 140
ORIGINAL CONTRACT AMOUNT:
PREVIOUSLY APPROVED CHANGES:
THIS CHANGE:
REVISED CONTRACT AMOUNT:
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to compiete the Change Order Items, The
increase or decrease in contract price shown below includes any applicable taxes,
DESCRIPTION OF CHANGES
INCREASE IN
CONTRACT
AMOUNT
($)
(DECREASE) IN
CONTRACT
AMOUNT
($)
CONTRACT
TIME
EXTENSION
(DAYS:)
~ ~
~
" "
"S "S
a:: a::
X The project was designed with the service connection for
the illumination and sic\lnal s~stems to be at approximately
mid-block between 2" and urwell Streets on the east side
of the roadway, This point of service was revised by Puget
Sound Energy to the northwest corner of the intersection of
Burwell Street and Washington Avenue, This revised the
distance to the service connection from 237 feet to 535
feet, and required two street crossings, The City directed
the Contractor to revise the services with Work Change
Directive #1, This change order compensates the
Contractor for the additional work and materials required to
complete this change,
DescriDtion
The Item #56, Illumination System Complete, shall be
revised, The point of service for the system shall be at the
northwest corner of Burwell Street and Washington
Avenue,
Construction
Requirements for construction of the additional length of
service shall be in accordance with contract requirements.
Measurement and Payment
Item #56, lIIummatlon System Complete, shall be fuli pay
for all labor, materials, tools and equipment required to $11,800,00
perform the work, in accordance with the Standard
Specifications and as described in this change order, The
cost for this change shall be a lump sum cost of $11 ,800.
The project was designed with a separate poie for the
pedestrian pushbutton at the northwest corner of Burwell
Street and Washington Avenue, Concern was raised for
the piacement of the pole with the close proximity to the
adjacent brick building, The City revised the signal system
to incorporate the pushbutton to a signal pole and eliminate
the pedestrian pole with Work Change Directive #4.
DescriDtion
The Item #59, Traffic Signal, Complete, shall be revised,
The signal pole #5 shall be deleted and the pedestrian
CONTRACT CHANGE ORDER NO: 3
PROJECT NAME: SR 304 TIP- Downtown Stage 1E
pushbutton be moved to signal pole
Construction
Requirements for construction shall be in accordance with
contract requirements.
Measurement and Payment
Item #59, Traffic $i~7nal, Complete, shall be full pay for all
labor, materials, tools and equipment required to pe~orm
the work, in accordance with the ~tandard ~pecifications
and as described in this change order. The cost for this
change shall be a lump sum credit of $596.96. ($596.96)
NET CHANGE IN CONTACT AMOUNT $11,203.04
INCREASE OR (DECREASE)
Contractor acknowledges and accepts that this Change Order constitutes final se~lement of all claims of any kind or
nature arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order
shall limit the City's right to bring a claim for past pedormance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price
specified for each item, including any and all supe~ision costs and other miscellaneous costs relating to the change in
work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this
Change Order shall be effective when approved by the City of Bremedon.
The padies whose names appear below warrant that they are authorized to enter into a change order that is binding on
the padies of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall
take appropriate action to modify any bonds required under the contract to address this change.
RECOMMENDED: ~~~~
PROJECT ENGINEER Date
/ Date-
APPROVED AS TO FORM: ATTEST:
~on~ttoFn$)
/
Page 2 of 2
+Enter Search Criteria, Press EEc Key to Transmit
Press Del Key to Terminate Delete Mode
CHANGE Contract Transactions
Contract Number 4428
~Vendor Name C A CAREY CORPORATION
ISubject SR304 TIP - DOWNTOWN PHASE - STAGE 1E
Department ENGINEERING
Status Code CON
Amount $1355335.00
Begin Date 04/22/2004
Insurance End Date 11/15/2004
Type Amount Review Date 02/15/2007
GL $2000000.00
AL $1000000.00
+
Insurance Total $3000000.00
Insurance Review Date 09/01/2004
Comments CHANGE ORDER ~1 - 8/04 #2 - 10/04
VAULT 01/01/2007
+
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO: 2
PROJECT NAME: SR 304 TIP - Downtown Stage 1E
PROJECT NO: 1105 CONTRACTOR: CA Carey Corporation
ORIGINAL CONTRACT AMOUNT: $1,348,817.00 DAYS: 130
PREVIOUSLY APPROVED CHANGES: $24,848.00 DAYS: 10
THIS CHANGE: ($18,330.00) DAYS: 0
REVISED CONTRACT AMOUNT: $1,355,335.00 DAYS: 140
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The
increase or decrease in contract price shown below includes any applicable taxes.
DESCRIPTION OF CHANGES INCREASE IN (DECREASE} IN CONTRACT
o -- CONTRACT CONTRACT TIME
· ,- ,- AMOUNT AMOUNT EXTENSION
o~ ~ ($) ($) (DAYS:)
X With the redevelopment of the downtown area, the City of
Bremerton has developed new design standards on street
signage. They are as follows:
1) Sign posts shall be painted Long Beach Blue as the
street light poles.
2) Decorative tops with a similar design as the street light
finial top shall be mounted on each sign post.
3) Street name signs shall have specific font size and type
on blue background.
With all the above changes to be implemented on Bid Item
#55, Permanent Signing, the City finds it necessary to
procure the materials needed and have City forces install in
order not to affect the contract duration or effect delays to
the contract.
Prior to the decision to implement the new sign standards,
six bases for signs were installed. These sign bases will be
paid to complete the deletion of the work from this bid item.
The amount to be paid is $1,670. The remaining balance
on this bid item will become $18,330. This amount will be ($18,330.00)
the total decrease in contract amount.
NET CHANGE IN CONTRACT AMOUNT ($18,330.00)
INCREASE OR (DECREASE)
CONTRACT CHANGE ORDER NO: 2
PROJECT NAME: SR 304 TIP- Downtown Stage 1E
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or
nature arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order
shall limit the City's right to bring a claim for past performance,
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price
specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in
work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this
Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on
the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall
take appropriate action to modify any bonds required under the contract to address this change.
PROJECT ENGINEER Date
RECOMMENDED:
CITY ENGINEER / DIRECTO~OF PUBLIC WORKS Date
MAYOR ~ / ' g Dat~
~medon City Atiorney Cit~Cl~
/
Page 2 of 2
tEnter Search Criteria, Press Esc Key to Transmit
Press Del Key to Terminate Delete Mode
CHANGE Contract Transactions
Contract Number 4428
+
~Vendor Name C A CAREY CORPORATION
ISubject SR304 TIP - DOWNTOWN PHASE - STAGE 1E
Department ENGINEERING
Status Code CON
Amount $1373665.00
Begin Date 04/22/2004
Insurance End Date 11/15/2004
Type Amount Review Date 02/15/2007
GL $2000000.00
AL $1000000.00
+
Insurance Total $3000000.00
Insurance Review Date 09/01/2004
Comments CHANGE ORDER ~1 - 8/04
VAULT 01/01/2007
+
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO: 1
PROJECT NAME: SR 304 TIP - Downtown Stage 1E
PROJECT NO: 1105 CONTRACTOR: CA Carey Corporation
ORIGINAL CONTRACT AMOUNT: $1,348,817.00 DAYS: 130
PREVIOUSLY APPROVED CHANGES: $0.00 DAYS: 0
THIS CHANGE: $24,848.00 DAYS: 10
REVISED CONTRACT AMOUNT: $1,373,665.00 DAYS: 140
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The
increase or decrease in contract price shown below includes any applicable taxes.
DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT
o ,- CONTRACT CONTRACT TIME
~- ,- AMOUNT AMOUNT EXTENSION
= = ($) ($) (DAYS:)
n,'
In design of the project, the City proposed using stamped
concrete crosswalks, similar to those in use for the
Gateway and Missouri Gate portions of the project. With
the redevelopment of the downtown area, the City of
Bremerton has implemented new design standards for the
crosswalks downtown. Instead of stamped concrete,
crosswalks are to use concrete unit pavers.
#68, Stamped Concrete Crosswalk, shall be
modified. The crosswalk shall include the use of concrete
unit pavers. The original contract price installed for the
crosswalk was $220.00 per square yard. The new unit bid
contract price for the crosswalk using concrete pavers shall
be $272.00 per square yard.
Construction
The crosswalk shall be constructed as shown in Work
Change Directive #2. All materials incorporated into the
project by this change order shall be approved by the
Engineer.
Measurement and Payment
The bid item #68, Stamped Concrete Crosswalk, shall be
full pay for all labor, materials, tools and equipment
required to perform the work, in accordance with the
Standard Specifications and as described in this change
order. The cost for this change shall be per square yard of
crosswalk installed. $15,548.00 10
The detail for the tree planting included with the contract
documents did not sufficiently detail the City's intentions.
The detail provided for the planting, root barrier, cultivation
and excavation in an area twice the size of the football. It
was the City's intention to use the entire tree well area,
which increased the amount of excavation, preparation,
topsoil, root barrier and etc..
s #62, PSIPE, Acer Rubrum "Karpick' and #63,
PSIPE, Acer Platanoides "Crimson Sentry", shall be
CONTRACT CHANGE ORDER NO: 1
PROJECT NAME: SR 304 TIP- Downtown Stage 1E
modified. The planting detail shall include the entire tree
well area. The original contract price installed for the two
tree species was $125.00 per each. The new unit bid
contract price for the trees using the entire tree well shall
be $275.00 per each.
Construction
The tree planting shall be completed as shown in Work
Change Directive #5. There shall be no change to the
materials per this change order.
Measurement and Payment
The bid items #62, PSIPE, Acer Rubrum "Karpick" and #63,
PSIPE, Acer Platanoides "Crimson Sentry", shall be full pay
for all labor, materials, tools and equipment required to
perform the work, in accordance with the Standard
Specifications and as described in this change order $9,300.00 0
NET CHANGE IN CONTRACT AMOUNT $24,848.00 0 10
INCREASE OR (DECREASE)
Contractor acknowledges and accepts that this Change Order constitutes final settrement of all claims of any kind or
nature arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order
shall limit the City's right to bring a ciaim for past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price
specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in
work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this
Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on
the parties of this contract, in addition, Contractor warrants that it has or will inform the surety of this change, and shall
take appropriate action to modify any bonds required under the contract to address this change.
RECOMMENDED:
PROJECT ENGINEER Date
RECOMMENDED:
CITY ENGINEER / ~IRECTOR OF PUBLIC WORKS
~OR /~ Date
MAYOR Date
APPROVED AS TO FORM: A~EST:
Page 2 of 2
+Enter Search Criteria, Press ESC Key to Transmit
~Press Del Key to Terminate Delete Mode
CHANGE Contract Transactions
Contract Number 4428
Vendor Name C A CAREY CORPORATION
+Subject SR304 TIP - DOWNTOWN PHASE - STAGE 1E
~Department ENGINEERING
+Status Code CON
Amount $1348817.00
Begin Date 04/22/2004
Insurance End Date 10/28/2004
Type Amount Review Date 02/15/2007
GL $2000000.00
+ AL 51000000.00
+
Insurance Total $3000000.00
Insurance Review Date 09/01/2004
+
Comments VAULT 01/01/2007
+
+
CONTRACT
CITY OF BREMERTON, KITSAP COUNTY, WASHINGTON
THIS AGREEMENT, made and entered into this ~ day of l~<~x_'x.x., ,2004,
between the City of Bremerton under and by virtue of Title 35 RCW (cities) as amended, and
hereinafter called the Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made
a part of this agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials and equipment for the
SR 304 Transportation Improvement Project, The Downtown Phase - Stage 1E, in accordance
with and as described in the attached Plans and Specifications, and the Standard Specifications of
the Washington State Department of Transportation which are by this reference incorporated
herein and made part hereof and shall perform any changes in the work in accord with the
Contract Documents.
The Contractor shall provide and bear the expense of all equipment, work, and labor, of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing
the work provided for in these Contract Documents except those items mentioned therein to be
furnished by the City of Bremerton.
II. The City of Bremerton hereby contracts with Contractor and Contractor hereby agrees
to provide the materials and to do and cause to be done the above described work and to complete
and finish the same in accord with the attached Plans and Specifications and the terms and
hereby Contracts to pay for the same according to the attached
conditions
herein
contained
and
specifications and the schedule of unit or itemized prices at the time and in the manner and upon
the conditions provided for in this Contract.
III. The Contractor is and shall be at all times acting as an independent contractor and
not as an employee of the City. ~l~ae Contractor shall secure at its expense, and shall be
responsible for ail payments of income tax, social security, state industrial insurance
compensation, unemployment compensation, and all other payroll deductions for the Contractor,
officer, agents, employees and sub-contractors. The Contractor shall also secure ali applicable
business licenses, if required, in connection with the contract services, including all required
licenses for Contractor's officers, agents, employees and subcontractors.
IV. The Contractor for himself/herself, and for his/her heirs, executors, administrators,
successors, assigns, does hereby agree to the full performance of ail the covenants herein
contained upon the part of the Contractor.
V. It is further provided that no liability shall attach to the City of Bremerton by reason
of entering into this Contract, except as provided herein.
City of Bremerton
SR 304 TIP LD-16
Stage 1E Downtown Phase March 2004
VI. INDEMNIFICATION. Contractor shall defend, indemnify and hold !he Qit~, i!s
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits including all legal cost and attorney fees, arising out of or in connection
with the performance of this agreement, except for injuries and damages solely caused by the
City's negligence.
The City's inspection or acceptance of any of Contractor's work when completed shall not be
grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor
and the City, its officials, employees, agents and volunteers, the Contractor's liability
hereunder shall be only to the extent of the Contractor's negligence.
IT IS FURTHER SPECI]?ICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
INDEMNIFICATION CONSITUTES THE CONTRACTOR'S WA1VER OF IMMUNITY
UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF
THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE
MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration of termination of this agreement.
IN WITNESS WHEKEOF, the Contractor has executed this instrument, on the day and year first
below written and the Local Agency Approving Authority has caused this instrument to be executed
by and in the name of said City of Bremerton the day and year first above written.
Executed by the Contractor this ~ day of ~<K_\_',- ,20
Contractor
Executed by the Local Agency this _ 24~ +k- day of
Ci~--~o'~reme~on~Approving Authority
zz~remerton Atto~-''~
Cily of Bremerton
SR 304 TIP LD-.17
Stage 1E Downtown Phase March 2004
CONTRACT BOND
CITY OF BREMERTON, KITSAP COUNTY, WASHINGTON
KNOW ALL MEN BY THESE PRESENTS:
That ~./--].C(xd'~t~ O£P.l~nF~.~C~ ,of '~r"'~-%~Qc:~t.LO.~, ta.)~ ,as
Principal, and~ta,~_q~'gq~c~'{-&Ca~uu-a~ ~mDar~q,_a~Surerv are Jointly and °e' '-allv %ld,
and bound unto THE CITY OF BP~MERTON, the'penal s{~m o
~$~~, fo[ the payment of winch we jointly and se;~r~s, e/x~eecutor~,
mrmmsrrators, anu asmgns, and successors and assigns, £mnly by these presents.
~ The condition of tins bond is such that WHEREAS, on the ~rxr~-X-x~, day of
.X~,X~ .., ~A.D., 20 .~., the said I~.~. f'(,C~,i ~l)r~ra~.m~ , PrinciPal herein,
execmeu a certain contract witi~ the City of Bremerton, by the terms, conditions and provisions of winch
Contract the said ~Prmcipal herewith, agrees to furnish all materials and do
certain work, to-wiu. That th~ slid P/-incipal herein will undertake and complete the followin~ described
the County ofKitsap, Wasinngtrfn, as per maps, plans and specifications made a part of said Contract,
which Contract as so executed, is hereunto attached, and is now referred to and by tins reference is
incorporated herein and made a part hereof as full for all purposes as if here set forth at length.
NOW THEREFORE, if the Principal herein shall faithfully and truly observe and comply with the
terms, conditions and provisions of said Contract, in all respects and shall well and truly and fully do and
perform all matters and things by the said Principal undertaken to be performed under said Contract, upon
the tern proposed therein, and within the time prescribed therein, and until the same is accepted, and shall
pay all laborers, mechanics, subcontractors and materialmen, and all persons who shall supply such
Con~-actor or subcontractor with provisions and supplies for the carrying on of such work, and shall in all
respects faithfully perform said Contract according to law, then tins obligation to be void, otherwise to
remain m fi~ll force and effect.
WITNESS our hands thi~-~'x)O ~,-~O'X'~ C"~R.~_~%~X-'~ day of q~SC~:~X_N_. ,20~L~.
Principal
By: ~5~_~O~-q'-/o~uretyC°mpany By:
¥*~1 ~Ca.~r~ At t brae y-in - fact
APPROVED AS TO FORM this -]';~.;,5~D'b,. ~l)~'J~. dayof Afl;';] ,20£~
Address of local office and agent of Surety~ompany? '
City,l~remerton Atto~ne~
City of Bremerton
SR 304 TIP LD-18
Stage 1E Downtown Phase
March 2004