HomeMy WebLinkAbout4456
+--------------------------------------------------------------------------+
+Enter Search Criteria, Press Esc Key to Transmit +
+press Del Key to Terminate Delete Mode +
+ CHANGE Contract Transactions +
+ Contract Number 4456 +
+ +
+vendor Name PEASE & SONS INC +
+Subject MODIFICATIONS - EB-6 PUMP STATION +
+Department ENGINEERING +
+Status Code CON +
+ Amount $386432.04 +
+ Begin Date 09/20/2004 +
+ Insurance End Date 06/30/2005 +
+ Type Amount Review Date 02/15/2008 +
+ GL $2000000.00 +
+ AL $1000000.00 +
+ +
+ Insurance Total $3000000.00 +
+ Insurance Review Date 09/01/2005 +
+ +
+ Comments CHANGE ORDER #1-9/05 +
+ VAULT 01/01/2008 +
+ +
+--------------------------------------------------------------------------+
Public Works and Utilities Department -:- Administration
3027 Olympus Drive. Bremerton, WA 98310 . (360) 473-2327 . FAX (360) 473-5018
February 6, 2006
~(Q)[P)W
Union Bank of California
Attn: Cindy De Kruyf
900 4th Avenue, Suite 1200
Seattle, W A 98164
RE: Release of Retainage for Public Works Contract
Pease & Sons, Inc.
Account #9140037955
Escrow #00021774
Dear Ms. De Kruyf:
Pease & Sons, Inc. has completed all work required under contract for the Bremerton EB-6
Pump Station Modifications.
Please release the retainage you are holding in the amount of Nineteen Thousand Three Hundred
Twenty One and 601100 ($19,321.60) to the contractor.
Thank you for your services and your prompt attention to this matter.
Sincerely,
~~~
Michael C. Mecham
City Engineer
cc: Anne Wagner, Controller, Pease & Sons, Inc.
Paula Johnston, City Clerk
Mildred H. Vellegas, Financial Manager Public Works & Utilities
Ned Lever, Project Manager
Contract file
ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS
EB-6 Pump Station Modifications
General Construction
Pro,ject Number 592 - Contract Number 4440
Pease and Sons Inc. hereby indicates agreement with, and acceptance of, the final
Contract Payment of $3,258.28, total retainage of $19,321.60, the total Contract Price of
$419,665.19, including Washington State sales and/or use taxes, and the final Contract
Time of 270 days, as full and final compensation for all Work performed in connection
with Contract Number 4456, and does hereby release the City of Bremerton from all
claims, liability, demands, damages and actions of any kind whatsoever, arising from
performance of that Contract.
Pease and Sons Inc.
a'?-
By:
II hf' jar
, ,
Date:
Title: V/U ~,
Certificate of Notarv
Subscribed and sworn to before me this iHt'\ day of 'f) h}-.
, -200S-
\' , ' ., , i 1, I
\1' W I,
'\'\\~ C. A .....';;;._
c""~...,, ".....'11" u~ .......
~~~,~~Sl-ON F-Jf""" ~ "
~-~-l# _ ~"'<J"" "P -:,.
g ; f ~OTARY ~ ~
- - ....... . ..
~tA\ PUBUC/~ ~
~ ~ ...... J ..&... ,,' J..::.. "
~"^"" '1.\J':,,~c., ,
.......... .. (:-_ ",,,,'111 ~~ ,,'
"" OF W~~'(\ ""
," ",
11111111,1'
~(f,!o~
~'..' '
AFFIDA VIT OF PUBLICATION
Account #42742 / Ad # 100180661
ST ATE OF WASHINGTON
COUNTY OF KITSAP
I, Sarah Weller, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is. a true text of a legal advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following dates, to wit: ,
December 2 ,2005 and that such newspaper was regularly distributed to its subscribers during all of said
period. That the full amount of the fee charged for the foregoing publication is the sum of $28.15, which
amount has been not paid in full.
~e~_'))-e~-.
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of December 8, 2005.
OFFICIAL SEAL
o BLATT
NOTARY PUBLIC - STATE OF WASHINGTON
My Commission Expires July 30, 2006
Notary Public in and for the State of Washington, Kitsap County.
NOTICE OF COMPLETION'
Notice of Completion has been issued to Pease and Sons Inc., on Contract No. 4456, for the EB-6 Pump
Station Modifications project. Any parties having a claim for material, labor or damages related to this
Contract have forty-five (45) days from the date of first publication of this notice to file a c1aim.-
Paula Johnston-
City Clerk-
345 6th StreeC
Bremerton, Washington 9833T
December 2, 2005"#lOOlS066r
545 5ih Sireei . PO. Box 259
Bremerton, Washington 98337
(360) 377-3711
1-888-377-3711
Fed. I.D. # 31-1260530
BREMERTON
CURRENT NET AMOUNT DUE
DVE TIS CLlEN AM
. TERMS'OF PAYMENT
Due Upon Receipt
60 DAYS
OVER 90 DAYS
==~--kits~;ll-~.~-;;;;;~--
ADVERTISING INVOICE and STATEMENT
II PAGE # 151 BILLING DATE 181
11
BILLED ACCOUNT NUMBER
BILLED ACCOUNT NAME AND ADDRESS
191 REMITTANCE ADDRESS
THE SUN NEWSPAPER
PO BOX 34688
SEATTLE, WA 98124-1688
12/04/05
ATTN: ADMIN SERVICES
CITY OF BREMERTON
345 6TH ST STE 600
BREMERTON WA 98337
42742
'I ADVERTISER/CLIENT NUMBER
020043345500000028158
AD NUMBER/EXP. DATE
DESCRIPTION-OTHER COMMENTS/CHARGES
100180661
12/02
2
f':JET A~OUN:r
12/0
NOTICEOFCOMPLETION
3310 100180661
PAULA JOHNSTON
2x1
28.15
Project #
Initials
'712.
REC
DEe \ 4 2005
Date Ok'd
ENGINEE ING D1VI~~ON
28.15
~. K 't ''0\\:,..jjJ.l&i~0.'.... .
~_ xsat:t0un
, kitsapsun.com
545 5th Street. P.O. Box 259
Bremerton, Washington 98337
(360) 377-3711
1-888-377-3711
Fed.l.D. # 31-1260530
.UNAPPlIED AMOUNTS ARE INCLUDED IN TOTAL AMOUNT DUE
All accounts are due upon receipt.
ALL MAJOR CREDIT CARDS ACCEPTED
43345
12/01
ADVERTISER/CLIENT NAME" .
INVOICE NUMBER
25
1
BilLING INQUIRIES: (360) 792-3333
01/24/2006 10:09 FAX 360 586 7152
WA DOR-OUT OF STATE
I4J 002
~EPAJlTMENT
OF REvENUE
__lOll STAn!
Washington Slale
Departmenl of Revenue
PO Box 47474
Olympia. WA 98504-7474
278 040 964
Certificate of Payment of State Excise
Taxes by Public Works Contractor
PEASE & SONS INC
POBOX 44100
TACOMA WA 98444 0100
CITY OF BREMERTON
DEPT OF PUBLIC WORKS & UTILITIES
3027 OLYMPUS DR
BREMERTON WA 98310
We hereby certify that taxes, increases and penalties due or to become due from the above-named
contractor under Chapter 180, Laws of 1935, as amended, with respect to the followin~ public works
contract:
CITY OF BREMERTON
EB-6 PUMP STATION MODIFS
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in theODepartment's opinion, readily collectible without recourse to the state's lien on the retained
percentage. .
This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the
sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor.
This certificate does not release said contractor from liability for additional tax that may be later
determined to be due with peet to the above-mentioned contract or other activities.
Dated
State of Washington
Dep ent of Revenue
To inquire about the availability of this document in an alternate formal fO! the visually impaired or in a language other than English. please call (360) 486-234Z.
TrY users may call1-BOO-4S1-79BS.
REV 310028 (10-01..02) ROUTING: Disbursing Officer. Contractor. Fil&~
.;:--
-~
Employment Security Department
WASHINGTON STATE
PO Box 9046 0 Olympia, W A 98507-9046
CONTRACTOR: PEASE AND SONS
PO BOX 44100
TACOMA, WA 98444
) CERTIFICATE OF
_)- PAYMENT OF CONTRIBUTIONS
) PENAL TIES AND INTEREST ON
) PUBLIC WORKS CONTRACT
ES Reference No.
251924-00 4
TO: CITY OF BREMERTON PUBLIC WORKS
3027 OL YMPUS DR
BREMERTON, WA 98310
The Employment Security Department hereby certifies those contributions, penalties and interest
due from the above named contractor under the Employment Security Act have been paid in full or
provided for with respect to the following public works contract:
EB-6 PUMP STATION MODIFICATIONS
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50.24.130 against the public body named above for tax attributable to service performed for said public
body by the above named contractor on the above described contract. The Employment Security
Department releases its lien on the retained percentage, which is provided by RCW 60.28.040 for
contributions, penalties and interest due from said contractor.
This certificate does not release said contractor from liability for additional contributions,
penalties and interest which may be later determined to be due with respect to the above mentioned
contract.
Datedat Olympia, Washington on December 9,2005.
COMMISSIONER
EMPLOYMENT SECURITY DEPARTMENT
By
Original-Disbursing Officer
Duplicate-Employer
Triplicate-Central Office Files
EMS 8449 760 R3-98
-
-
IEtmIIII
Received:
02/23/2005
Affidavit of Wages Paid
Prevailing Wage Section
Department of labor &
Industries
PO Box 44540
Olympia, WA 98504-4540
Affidavit Id:
58895
Status:
Approved on 02/23/2005
COMPANY
Company PEASE PIPING INC
Information: PEASEPI055KQ
601 630 697
License History 889,471-00
PO BOX 44870
Industrial Insurance TACOMA, WA 98444
Premium Status
(253) 539-0467
Payment Type: Electronic
Company Signature: Electronic
Public Agency:
County:
City:
Project Name:
Contract Number:
Date Intent Filed:
Bid Due Date:
A ward Date:
Date Work
Completed:
Prime Contractor:
Did YourCompany
Hire Subcontractors
To Perform All Work? No
Did Your Company
Hire Any
Subcontractors?
$ Amount:
Number of Owners:
Filed by:
PROJECT
BREMERTON, CITY OF/PUBLIC WORKS
3027 OL YMPUS DRIVE
BREMERTON, WA 98310
KITSAP Multiple Counties? No
BREMERTON
EB-6 PUMP STATION MODIFICATIONS
10/04/2004
09/01/2004
09/16/2004
02/13/2005
PEASE/SONSINC
PEASES*302PO
(253) 531-7700
$10,000.00
o
ANNE WAGNER
EMPLOYEES' WAGES
Journey Level Trades/Occupations
County Trade Occupation Wage Fringe # Hou
Wor
KITSAP PLUMBERS & PIPEFITTERS JOURNEY LEVEL $31 . 1 0 $13.82 3 133
Apprentice Trades/Occupations
Trade Occupation App Program Stag % Stan End County
PLUMBERS & PIPEFITTERS NONE 8 85% 7001 8000 KITSAP
ORIID Apprentice Name Reg # First Day Last Day ARTS Wage Fringe
on Proj. on Proj. Trade
DROZD, RICKY A 131463 12/06/2004 02/13/2005 Plumber $27.44 $12.88
Received:
02/23/2005
Company
Information:
License History
Industrial Insurance
Premium Status
Payment Type:
Company Signature:
Public Agency:
County:
City:
Project Name:
Contract Number:
Date Intent Filed:
Bid Due Date:
Award Date:
Date Work
Completed:
Prime Contractor:
Did Your Company
Hire Subcontractors
To Perform All Work? No
Did Your Company
Hire Any
Subcontractors?
$ Amount:
Number of Owners:
Filed by:
Affidavit of Wages Paid
Prevailing Wage Section
Department of Labor &
Industries
PO Box 44540
Olympia, WA 98504-4540
Affidavit Id:
58890
Status:
Approved on 02/23/2005
COMPANY
PEASE / SONS INC
PEASES*302PO
278 040 964
120,413-00
PO BOX 44100
TACOMA, WA 98444
(253) 531-7700
Electronic
Electronic
PROJECT
BREMERTON, CITY OF/PUBLIC WORKS
3027 OL YMPUS DRIVE
BREMERTON, WA 98310
KITTITAS Multiple Counties? No
BREMERTON
EB-6 PUMP STATION MODIFICATIONS
10/04/2004
09/01/2004
09/16/2004
02/13/2005
PEASE / SONS INC
PEASES*302PO
(253) 531-7700
$413,687.00
o
ANNE WAGNER
EMPLOYEES' WAGES
Journey Level Trades/Occupauons
County Trade Occupation Wage Fringe # Hou
Worl
KITTITAS CARPENTERS CARPENTER $28.40 $10.55 2 32
KITTITAS LABORERS GENERAL LABORER $24.96 $7.70 1 292
Apprentice Trades/Occupations
Trade Occupation App Program Stag % Starl End County
LABORERS NONE 2 70% 1001 2000 KITTITAS
OR/ID Apprentice Name Reg # First Day Last Day ARTS Wage Fringe
on Proj. on Proj. Trade
Heavyrunner, Julian C 141839 01/12/2005 02/13/2005 Laborer $17.47 $7.70
mmmmm
EII!mIS!1
-
Received:
02/15/2005
Company
Information:
License History
Search for Industrial
Insurance Premium Status
Payment Type:
Company Signature:
Affidavit of Wages Paid
Prevailing Wage Section
Department of Labor &
Industries
PO Box 44540
Olympia, WA 98504-4540
Affidavit Id:
57963
Status:
Approved on 02/15/2005
COMPANY
BAINBRIDGE ISLAND ELECTRIC
BAINBIE256JA
600 198 053
PO BOX 10066
BAINBRIDGE ISLAN, WA 98110
(206) 842-4200
Electronic
Electronic
Public Agency:
County:
City:
Project Name:
Contract Number:
Date Intent Filed:
Bid Due Date:
Award Date:
Date Work
Completed:
Prime Contractor:
Did Your Company
Hire Subcontractors
To Perform All Work? No
Did Your Company
Hire Any
Subcontractors?
$ Amount:
Number of Owners:
Filed by:
PROJECT
BREiviERTON, CiTY' OF/iviUNiCiPAL UTiliTiES
3027 OL YMPUS DRIVE
BREMERTON, WA 983104799
KITSAP Multiple Counties? No
Bremerton
EB-6 Pump Station Modifications
11/29/2004
09/01/2004
09/16/2004
02/08/2005
PEASE / SONS INC
PEASES*302PO
(253) 531-7700
$36,935.00
3
RON E LUBOVICH
EMPLOYEES' WAGES
Journey Level Trades/Occupations
County Trade Occupation Wage Fringe # HoUl
Wor
KITSAP ELECTRICIANS - INSIDE JOURNEY LEVEL $46.06 $0.00 2 255.5
Apprentice Trades/Occupations
Received:
03/08/2005
Affidavit of Wages Paid
Prevailing Wage Section
Department of Labor &
Industries
PO Box 44540
Olympia, WA 98504-4540
Affidavit Id:
60374
Status:
Approved on 03/11/2005
COMPANY
Company GROUP CONCEPTS CONSULTANTS INC
Information: GROUPCC962RC
602 032 299
License History 10316 BRIDGEPORT WAY SW
Search for Industrial LAKEWOOD, WA 98499
Insurance Premium Status (253) 606-8105
Check Number: 3026
Company Signature: Yes
PubHc Agency:
County:
City:
Project Name:
Contract Number:
Date Intent Filed:
Bid Due Date:
Award Date:
Date Work
Completed:
Prime Contractor:
PROJECT
BREMERTON, CITY OF
KITSAP Multiple Counties? No
BREMERTON
EB-6 PUMP STATION MODS
NA
12/22/2004
09/01/2004
09/16/2004
02/11/2005
PEASE I SONS INC
PEASES*302PO
(253) 531-7700
Did Your Company
Hire Subcontractors
To Perform All Work? No
Did Your Company
Hire Any
Subcontractors?
$ Amount: $2,500.00
Number of Owners: 0
EMPLOYEES' WAGES
Journey Level Trades/Occupations
County Trade Occupation Wage Fringe # Hou
Warl
KITSAP POWER EQUIPMENT OPERATORS BACKHOE, EXCAVATOR, SHOVEL (3 $39.88 $0.00 1 4
YD & UNDER)
KITSAP POWER EQUIPMENT OPERATORS BACKHOES, (75 HP & UNDER) $39.49 $0.00 3 66
KITSAP TRUCK DRIVERS DUMP TRUCK $19.60 $0.00 1 2
Apprentice Trades/Occupations
+--------------------------------------------------------------------------+
.~nter Search Criteria, Press Esc Key to Transmit +
.~Press Del Key to Terminate Delete Mode +
+ CHANGE Contract Transactions 1=
+ Contract Number 4456 - -
+ --
1oVendor Name PEASE & SONS INC =1=
10Subject MODIFICATIONS - EB-6 PUMP STATION 1=
1=Department ENGINEERING - -
10Status Code CON - -
+ Amount $386432.04 ..
+ Begin Date 09/20/2004 =1=
+ Insurance End Date 06/30/2005 +
+ Type Amount Review Date 02/15/2007 +
+ Press F1 for GL $2000000.00 =1=
. = valid insuranceAL $1000000.00 1=
.= type codes --
=1= Insurance Total $3000000.00 =.
1= Insurance Review Date 09/01/2005 =1=
1= 1=
1= Comments CHANGE ORDER #1-9/05 +
+ VAULT 01/01/2007 +
+ +
+--------------------------------------------------------------------------+
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO: One
PROJECT NAME: EB-6 Pump Station
PROJECT NO:
592
CONTRACTOR: Pease and Sons
PREVIOUSLY APPROVED CHANGES:
380,927.00 DAYS:
0.00 DAYS:
o
ORIGINAL CONTRACT AMOUNT:
o
5,505.04 DAYS:
386,432.04 DAYS:
o
THIS CHANGE:
REVISED CONTRACT AMOUNT:
o
This Change Order covers changes to the subject contract as described herein. The Contractor shall
construct, furnish equipment and materials, and perform all work as necessary or required to
complete the Change Order Items. The increase or decrease in contract price shown below includes
any applicable taxes.
DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT
0 ..... CONTRACT CONTRACT TIME
r-- r-- AMOUNT AMOUNT EXTENSION
..... .....
Q) Q) ($) ($) (DAYS:)
'S 'S
0::: 0:::
X Work Change Directive #1: Provide a sump and piping in the 290.00 0
valve vault. lump Sum
Work Change Directive #2: Provide two Flygt flush valves and 4,568.82 0
two 45 degree bends to revise pump spacing. Force Account
Work Change Directive #3: Delete the channeling in the (290.00) 0
existing wetwell as shown on sheet M-1. lump Sum
Work Change Directive #4: Relocate the MCC pad and 2896.25 0
Generator pad and extend the duct bank to accommodate the
new location. lump Sum
Work Change Directive #5: Extend Conduit to Potelco's 7057.80 0
service drop power pole for the pump station, parking lot lights
and the telephone service. Relocate lighting controls to existing
panel. Force Account (
Work Change Directive #6: Provide additional fittings and 1516.17 0
piping as required to modify the header assembly for the force
. main cut-in. Force Account.
Modify generator emergency stop and generator fail alarms. 1701.00 0
Lump Sum
Bid Item 4 - Electrical Service (Credit): Credit contract for (12,235.00) 0
unused amount of bid item. lump Sum /--0
NET CHANGE IN CONTRACT AMOUNT 5,505.04
INCREASE OR (DECREASE) I
CONTRACT CHANGE ORDER NO: 1
PROJECT NAME: EB-6 Pump Station
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims
of any kind or nature arising from or connected with any work either covered or affected by this
Change Order, including, without limitation, claims related to contract time, on-site or home office
overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for
past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item, including any and all supervision costs and other miscellaneous
costs relating to the change in work, and as to the extension of time allowed, if any, for completion of
the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is
understood that this Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order
that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform
the surety of this change, and shall take appropriate action to modify any bonds required under the
contract to address this change.
RECOMMENDED: ~ /' /
PROJE~GINEER
/
~fr~r
Date
""'-;
RECOMMENDED: ~
CITY ENGINEE I DIRECTOR OF PUBLIC WORKS
ACCEPTED: S'-~ )~.(7S-
Date
-,
9-;J.,,()S
Date
APPROVED:
AS TO FORM:
Bremerton City Attorney
Page 2 of2
1"/3U/U4 'l'nU l\};~" r'J\A ~a"a"'o~~"
r.l::.l\.:n:. '" o')Vl,a
'I!:IYV\J
crrv OF BREMERTON
WORK CHANGE DIRECTIVE
WCO#: One
Page 1 Of 1
PROJECT' ES-G Pump Station Modificiillions
Project #' 592
Date: October 22, 2004
CONTRACTOR: P(!3SC ~nd Sons
~ --- '-"~";I....'''''~:;-. - '.__ .=--~ __
""""'0;;' ....
. _-"'::"~"""'_.'._~a_----"
,.--, ..),2~ .~_~~ DIRECTED TO PROCEED PROMPTL V WITH THE r:.qllQ~ING CHANGE(S):
Provide a SUr.1P in the valve vault as Shown on the an aChed sketch, Delete the 4" drain pipe between tne vstve vault and
.the wel well and provicfe CJ , ,5" Sc~ ,~o_~'!.~ ~i!i,~~a~~.!,~~~:._:rhe_f!ty.~~,prE"i<:Ie and inMall a sump pu':1P ~t_~.!3te~ date:.
AnACHMENT(S):
Valve Va ult Sk~,~h.
ii ;-~I~';;; 'i;~;;de tl'\at lhe";;;;e- c::hsnge(S) h;:;-~d Contritcip;j~;;;c~i'':a~';-Ti;;;e;'~ny ci;;;-io;a=-ch"';nge 'Order
is based thereon will involve one or more 01 the following methods of del(~rmjning the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications. or Anicle 10 Of
the General Conditions.
Method of delerrnining change in Contract Price:
Method of determining change in Contract Times:
o
18J
o
o
Unit Price
o
o
Ctlnlriilcto(s Records
Engineer's Re::ords
Lum~' SLIm
T'Ime & f'Aatenals
o
Other:
Negotiated
OUle:':
E$timate~~decrease) in Contract Price:
f 25JD~
Estimated increase (decrease) in Contract Times:
Substantial Completion:
o
days:
If the change il'lvolves an increase. the e'itimaled
amount IS net to De exceeded wilhovl flJrther
authorization
Ready for final payment: 0 daY$;
If the change involves an increase. the estimated tImes
are nollo be exceeded without further authorization
RECOMMENDED'
])U1\1II C. ..'~ PresIdent
AUTHORIZED:
yt
::~~
By:
.rJ. J.!ORMS. VV"'ft Ct\MII"'" njllmllur~. 3.nn
---/Z-
II
f-8"
INFLUENT
11__11 ....
.. {L,JA _ - toll
-0___ I 0
L 'I
N
.
.
,~ l"~'
w
z
o
z
I \r~--
8" OVERFLOW ~ I to
+
!I
.
Vi'
S-
o::
x
"".'."
~-,:. ...
CAST IN PLACE CONCRETE
CURB, SEE DETAIL W
C2
F
0::
~
~
:1
:g
U1
o
F"
a
"'
'"
"
o
/'
:::;;
o
z
3'
/'
(j
~
-0:
a.
~
~
'"
a
W
:::;;
<=
--J
.
.
8" INFLUENT
EL 125.62
0---"
-P- - ;;:q-
.'i~=.
,.....~:
.
"':r:":..-'
III
III
.
'OJ-
a
......
...,
'-
<0
a
W
I-
c5 CHANNEL BOTTOM OF .
EXISTING WET WELL I
TO 24" CORE OPENING--1LJ
Jl i
1'-6", TYP
~
-0:
U
Ul
I-
3
Q.
'\..
",,,,l
~ '~l .""
. !1i1~
~ HIDR IElngoln~~wilng, ~i'DC.
~
en
w
~
,TAP PIPING W/ 3/4"
I PIPE AND BALL VALVE
6" SWING CHECK
VALVE, TYP
LADDER
o
I"
o
..
~1
~~
4" DClA,u
~ f )t" PE VA V'-\ F~orL "\b ~\J tl1 P,
I/Z" NPW)
PLAN
ACCESS HATCH j4" VENrll'lTAKE wi
(PER SPECIFICATION 1/2" MESH GALV SCREEN
SECTION 08315 OVER OPENING
---0
in
I
1'-5"
I ---. ~~
-----.... Me CSLOPE ACCESS LID TO
----- ~...". _ EXISTING SURFACE
=~...~-
'~ ~ ~ - -- .~""~~~~
.~
l~- t----~----- ----- "-- '''"CEO ""
~'='1 SUPPORT, TYP <150901
~ 4" D L(1 1/2" NPW) ~ SLOPE BOTTOM TO DRAIN
6" FLEX
COUPLING, TYP
WALL PENETRATION <01800U003)
t : === __ TIP
,
I _OFFSET PIPE SUPPORT Q 5090M02Z)
r ..11 @ 5' OC
"""-"\_~ TERMINATE 4" D 2'
1 ABOVE FLOOR AND
, PROVIDE TIDE VALVE
ON END OF PIPE
I
(6"-SS-FM0 j
, '"
,r
I
cIL EL 127.72
.-+=-;:= .
I~I
___ I
;; ; = -====--
rA\ SECTION
SCALE: 3/8"=1'-0"
REVISIONS
DESCRIPTION
"
Z"
I
FIELD BOOK
DATE
NO.
BY
$
lWO INCHES AT FULL SCALE
IF NOT SCALE ACCORDINGLY
DRAWING NO. DRAWN BY: S[
EB6M1.dwQ DATE I;
SCALE
HORIL J/B" ~ 1',-0"
VERT.
'l!:JVU'l
1~/3U/U4
'1l1U l,!;_:)~_t'.::'~ "~3~tt.~~1:'"",...r-l ng
rr.J\;:'r. '" ;:'V1'I::I
lJIV1510n
~bU-47n-539a
p.4
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
WCD#: Two
Page 1 Of 1
PROJECT: EB--6 Pump Station Modifications
Project #: 592
CONTRACTOR Pease and Sons
Date: October 22, 2004
:;:"__..e.:~.~_"-'._- ~., - '-":'~:":".:'..-_-'::-~"'~ ":"'..-,
., ''''''.i:I ~&..;tI!!I'.
M....__.M .. 'M'_ ._~__
YOl!~~~_~IR~~TEO TO PROCEED PROMPTLY W'TH THE FOLLO~'NG CHANGE(S):
Provide two Flygt flush valves installed on pumps 1 and 3 as shown in the attached sketCh. AI50 revise pump spacing
and provide two 45 d!!g~,~..~':!.'ds as sl1own, " _...__
ATTACHMENT(S):
Wet Well Sk~tch. Flush Valve info
_....-._ ----..,. _.':A-:c._~'~::"L""_.Il.~~ pq ... ."_"~._""~_'.:-""'-"-'_;~~" _ ...
II a claim IS made lhat the atlove changels) have affected Contract Price or Contract Times any claim for a Chaf'ge Order
is based Iher~of' will involve one or more of rhe following methods of determining the effect of the change(s). T~
Cl'lange Order .....ill be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications. or Article 10 of
lhe General Conditions. . .
MethOd of determining change in Contract Price:
Unit t'rice
Method of determining change in Contract Times:
o Contractor's Records
o Engineer's Records.
o
Lg]
o
o Olhe.:
E$timated~~~ecrCilsel in Contract Price:
S t '~:(7 - p,;JUc, treer.
ll:l~~ a.J~
~& r..riteriatr:::)
o
Olher:
N(;~goliated
Estimated increase (decrease) in Contract Times:
Substa,ntial Completion:
o
days:
If lhe c:tlange involves an increase, the estimated
amount is not Ie be exceeded without further
autho(j%ation
Readv for final payment: 0 days;
If the change involves an increase. the estimated times
lIrc not 10 be excQI'lder1 without further authorization.
RECOMMENDED:
feAs.t: " S:,}.)~ t ;z:.,v t-
CO~R
8~ (?_ t/.!:-.
AUTHORIZED;
(
By.
,t" F'Ol'(MIi wo)r~ end.'!!" nir""li~e. ~1.IID
11I/221n4 FlU 1():22 nX/nx'\l() 639BI
Force Account Worksheet
Wor t Change Directives 2, 5, and 6
WCD #2
Pease Labor Hrs Unit Cost Total Markup
Kirk 0.5 58.66 29.33 35.20
Rick 2 54.81 109.62 131.54
Pease Materials Quantity
Flygt Flush Valves 2 1750 3500.00 4025.00
Flanged 45 deg Bends 2 125 250.00 287.50
Subtotal 4479.24
Bonds and Insurance 89.58 W,o JI Z
Total 4568.82 .
WCD#5
Pease Labor Hrs
Operator 6 54 324.00 388.80
Laborer 2 41.3 82.60 99.12
Jimmy 2.5 41.3 103.25 123.90
Rick 0.5 54.81 27.41 32.89
Julian 0.5 41.3 20.65 24.78
Pease Materials Quantity 0.00
ConcreteCY 6 76 456.00 524.40
Pease Equipment Hrs 0.00
Backhoe 6 40 240.00 276.00
Boom Truck 0.5 73.08 36.54 42.02
Bainbridge Island Electric 1 5150 5150.00 5407.50
Subtotal 6919.41
Bonds and Insurance 138.39
Total 7057.80
WCD#6
Pease Labor Hrs
Jimmy 2 41.3 82.60 99.12
Rick 4 54.81 219.24 263.09
Elmer 4 54.81 219.24 263.09
Pease Materials Quantity
CDF CY 3 65 195.00 224.25
MJ 45 deg Bends 2 86.14 172.28 198.12
6" DI Pipe If 10 10.5 105.00 120.75
6" Mega lugs 4 0 0.00 0.00
Pease Equipment Hrs 0.00
Backhoe 6 40 240.00 276.00
Boom Truck 0.5 73.08 36.54 42.02
Subtotal 1486.44
Bonds and Insurance 29.73
Total 1516.17
Grand Total
1 ~~
1 T---
314 22 ':':
--+--~
311 22 .:~
J l.-===
ELEV.
1
-2
"'.
~'..!.
~~" \/),UJE:,'; ('L)
.. ...'
...,
..
. '.
~.~---
"
~
.
.:.,
'...
-,
A-~"
. ... .. E-t '-:;.. '.' ..':
" '.' .....a .. .....', . I . .
. '.. .... . . . . :.. . . ." .. ~
,:
'. .
'''.. -!
-42-
...
.......
:'.'" .... .: .~. . .: "4 <..
J . .. . A
:.
ELEV. 133,9~
.,
....
<<4.,
'. .
..
.
87
..
~] 22U~,
.:; I
. , I
.::.; 17 I
127.72' :~~ i
~ I I
.~:. I
;' \111 ~
~.~ ~I --- .~~:
" - ~.:;.~.~: A.
~:.' .~. " - :~ . )~'~~~1~~:t~~<.
j' .'" c:::l ~. . ,'.....,.n .... ". .':.
:....i :~., :~' ':.: :.......... :/..;. ./..:.....::..~..~~~~ ;'~
.
. ....
I
. ,
~." ~1' ~O.
~. &ffo,1~ ~ .. Ao p
, '
, o6' +~oJ M WC>S
'.: f.J ~
l~ ---
'"
.
.. :
. '.
,." ,
..
ELEV. 118.77'
FLYGT
6' NP3202.090-462HT
WET WELL RETROFIT
CITY OF BREMER TON, W'ASHINGTON
PUMP STATION EB-6
.~.: 11
. ;
.....
:
,. .
."
:.~ il \:i
""~ I
-,r fl'hl
. '",.:r
r
I ~
t: .
, .'
.
..
::\.,
.~
r.o'
'. ..
. .
00 :4l
..
.,
."
....'!'
~~.
:-
..
.:~...+...."o. ......... '0.....
. . . '.. ..
. .
....'......:. ~
108
u
flush Valve gives you automatic sump desludging
Let grease and solids build up inside pump wells, and they
will cause more than just an unpleasant smell; at worst, level
regulators can be fouled, operational efficiency will suffer and
flooding may occur. So regular cleaning is essential - and that
means frequent downtime and
expense, particularly where
mechanical desludging is used,
Now there's a simpler, more
cost-efficient answer: simply
flush them away. The Flush
Valve is a fully automatic valve
that stirs up the sump water
at the start of each pumping
cycle, resuspending solids so
that they can simply be pumped
away. The result: less sedimentation, fewer unpleasant odours
and less labor-intensive maintenance,
When the pump starts, the valve is open.
The jet stream passing through the valve
creates a vacuum, or under-pressure, in
the ball chamber.
As pumping starts, the Flush Valve is open
and the pump runs for approximately
30 seconds, stining the water in the
sump and resuspending any settled solids.
The valve that turns pumps into mixers
The Flush Valve is a unique device which gives a pump
the capability of a mixer and provides automatic desludging.
Attached easily to the pump volute, the valve is open at
the start of the pumping cycle and water is forced through
the valve as a powerful jet flushing stream, Water in the sump
is immediately subjected to intensive turbulence, and all
sludge deposits as well as floating solids are resuspended
before being pumped out.
After flushing for approximately 30 seconds, the valve
automatically closes, shutting off the flushing stream.
The valve will open again once pumping has stopped, thus
being ready for flushing at the start of the next pumping cycle.
The Flush Valve operates entirely on the pressure in the
pump and therefore requires no additional power or special
equipment,
During the next 30 seconds, a membrane
under the ball is lifled by the under pressure.
The time can be varied by regulating oil flow
from the upper reservoir to the chamber
beneath the membrane.
Cleaner sumps and better cost savings
The Flush Valve provides a simple, effective and reliable way of
keeping sewage stations continuously clean, In sumps that are
less than 2.1 m in diameter, a Flush Valve need only be fitted to
one of the pumps in order to keep the station free from sludge.
Wherever the valve has been fitted, the result has always
been a dramatic change for the better. Gases in the station
and unpleasant odours in the surroundings have been
completely eliminated, Frequent cleaning and desludging have
become unnecessary. And significant savings in operation and
maintenance costs have been achieved.
Reaching critical posision, the ball is forced
by the flow onto its seat, shutting off the
valve, The flow of the pump is now
concentrated on draining the sump.
The pressure in the valve presses the
membrane back into its starting position.
When the pump stops, the ball falls back
to its resting position. The valve is now
open and ready for the next pumping cycle.
Flush Valve 4901 technical data
General
Flush Valve fits all new, and can be retrofitted to
all existing CP 3085-3300 and DP 3085-3152
Flygt pumps
Specific
Length of flushing
Flush Valve contains no electrical parts
Recommended 20 seconds,
max, 50 seconds,
Weight
8,0 kg
Ambient temperature
Material
400C max
Valve body:
Ball:
Membranes:
Oil:
cast iron
cast iron or polyurethane
nitrile rubber
rape seed oil
The Optimum Pumping Station from ITT Flygt.
The Flush valve is just one example of how ITT Flygt can improve the
efficiency of a pumping station by making it cleaner and more reliable.
Ask your ITT Flygt representative for more information about the following:
APF automatic
pump sump cleaning system
The intelligent controller that will
automatically clean your sumps
up to 40 times a day,
NevaClog split-vane impellers
The unique design of the NevaClog
impeller reduces the chance of pumps
clogging and boosts pumping efficiency
at the same time,
F
An III Industries company
<ri
'"
~
~
.
e
'"
.
'.
>
<Ii
<X:
0,
>-
u::
1=
@
.....
"'!
o
~
"<.
OJ
c
L1.!
o
N
o
0;
>
~
.c
iJ)
::>
u:
a:J
....
ro
N
'"
ro
~~f"UfV~ lDU ~V,~~ C^A ~~~~~lg~~~
I l,;an.i;"i;. u. ..,v~,.."
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
WCD#: Three
Page' Of 1
PROJECT: EB-6 Pump Station Modifications
Project #: 592
CONTRACTOR: Pease and Sons
Da;e: October 22, Z004
....--..-.- -.....-
~ . :.r'.o::;r;.:~.,...___ -- . -..
~..............-:........-
,.~--=-===::.;::.:...:=~:-:.==.. >':II:~~~::'"~__'''''
YOU ARE OIREC:~TO PROCEED PROMPTL~~ TH!..,~,~l::9~ING .CHANGE(S);
Delete t"~.~~~n..~~li!:!;J In the existing w~~~na,~ ,~,I1,O~.~,.C?,r1_~.!"el!t M, i.
,A,TTACHMEN1(S):
~e~1I Ske~__,
it-; claim IS ,maa~- 'hatlhe above ~;)t;~v;~-fu;cted Con;Price or Com;~~t;-it'"'1es any ~m for a Change Order
is based theteol'l will involve one or more of the following methods of determining the effect of Ihe change(s) The
Change Order will be executed in accordance with Section 1.04.4 0' ttle WSDOT SlanoiJrd Specifications. or Article 10 of
tn!? General ConditIons.
Melhod of determining change in ~ontrac;l Price:.
Method of determinIng change in Contract Times:
Lump Sum
o
o
Contracto,.s Records
II
~
o
u
Unit Price
Engineer's Records
Time & Materi"IS
O;he~:
o
Other
Negotiated
Es1ln1ated increase ~e~i" Conlract Price:
5 2-q,()~
ESlimated increase (decrease} in Contract Times.
Substantial Completion:
o
days,
If :he change involves an increase, the estimated
<lr:\ountIS nct Ie be exceeded WIthout furrher
a;J1 norizat:on
Ready for final payment: 0 days;
If [he change involves al'\ increase, the estimated times
are nOl 10 be exceeded withoul further Ciluttlor;zation
RECOMMENDEO:
Damm C. Pease, Vice ~r:nt
::Nru-
(/1,
AUTHORIZED:
-I /'~
C'7 Bf<EMEf<TON
By:
-
IrO, FO"M~. WOI'" C:'1.41tW: Om,I:I:"t" 3.~D
/,--,
-.......... ~-
f--
rJ8"
J-- ,"'won
-!. -!J i'
-t:f-= :-:::rr l'
L- ~
w
z
o
z
~
t:'
w
cr
, X
I -r+:-'--
8" OVERFlO~
CAST IN PLACE CONCRETE
CURB, SEE DETAil rn
C2
./
'"
Ie'
C ~
-;;:;
'"
z
~
0
I
0
""
u
0 I
, .-;
~ ./
.~ ;; <:n
<xl
'"
on
'I' 0
./
I i 0
'"
'"
....
0
!"'I~~ :; ./
'"
" 0
I Z
II ~
./
",~ - G
~
;{
, E
"
- '"
'"
"
0
.;.;
'"
'"
...
0
'--
1I '"
"
<xl
0
.;.;
>-
C!i
I, II
~
13
U)
>-
. 0
-l
Q
. ::;;
<0
<Il
""
~
8" INFLUENT
El 125.62
-F-t
2'-0" orA
CORE DRILL -- ____
I~~
I
(l\c.~ 1l'f1~
,pOll ,,-.
~~Gf
1 1/2" HB WI HOSE RACK
(FIELD VEIFY wi CITY)
TAP PIPING WI 3/4"
PIPE AND BALL VALVE
I 6" SWING CHECK
\ VALVE, TY~P FOR CONTINUATION
LADDER SEE DWG C1
<0550SU01S)
~6"-SS-FM)
-, 6" GATE
VALVE, TYP
6" FLOW METER
I WWEB0600FM1011
4" VENT INTAKE
TERMINAlf ABOVE GRADE!
WALL
PENETRATION
01 BOOU003
TYP
o
~-
-~==: (-5"\
~~~J------
) ~
[J
~6"x6"x6" BASE
/' TEE, SI1.4, TYP
" <J 5061 MOOZ>
...---FLANGED PIPE
SUPPORT, TYP
<15090MO 11)
.'
J~
a
..
~6" FLEX
COUPUNG, TYP
~EXHAUST FAN
I WWE8D600EF1011
6" BASE ELBOW @
~1 l/Z" NPW)
8'-0"x6'-0"x6'-6"
INSIDE DIMENSION
VALVE VAULT
4" VENT EXHAUST
TERMINATE ABOVE GRADE
MOTOR FLOOR PLAN
SCALE: 3/8"=1'-0"
ACCESS HATCH (4" VENT INTAKE WI
PER SPECIFlCATlO,N, 1/2" MESH GALV SCREEN
SECTION 08315 OVER OPENING
'"'C
--'
.
DO
.1
~l
~ ~~
I ______ ~i!i ~SLOPE ACCESS UD TO
'~='-'~~ ~_,~ E:=URFACE
'd---- ~~~ - ~:..~~_ =
19 -
(6"-SS-FMr,,, j _; _ F - _ ____
\. .F-C- - C-----------c:
, II I '.L\~ - 4-' D 1 l/Z" NPW
6" FLEX
eOUPUNG, TYP
I I I WALL PENETRATION <OIBOOUOO:j>
I ~ -rl.--::SET PIPE SUPPORT <!5090MOZZ)
'I @ s' OC
_A-tLrJ TERMINATE 4" D 2'
1 ABOVE FLOOR AND
j PROVIDE TIDE VALVE
ON END OF PIPE
elL EL 127.72
FLANGED PIPE
SUPPORT, TYP<,50901
SLOPE BOTTOM TO DRAIN
~/
I @'""{
11liI101R lEl11lg)lllniSiS/l'nlJ'ilgj, h~.
fA\ SECTION
SCALE: 3/8"=1 '-0"
REVISIONS
NO. DESCRIPTION
'"
Z"
,
FIELD BOOK
DATE
BY
TWO INCHES AT FULL SCALE
IF NOT SCALE ACCOROINGL Y
SCALE
HORIZ. 3/8"=1'-0" VERT.
ORAWING NO, DRAWN 8Y: 51
EB6M1. dWQ DATE 1,
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
WCD#: Four
Page 1 Of 1
PROJECT: EB-6 Pump Station Modifications
Project #: 592
CONTRACTOR: Pease and Sons
Date: January 11, 2005
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S):
Relocate the MCC pad and the Generator pad as shown on the attached sketch and extend the duct bank as necessary
to accommodate the new location.
A TT ACHMENT(S):
Layout Drawing, Bainbridge Island Electric Estimate, Pease and Sons Change Proposal
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change in Contract Times:
o Contractor's Records
o Engineer's Records
0 Unit Price
~ Lump Sum
0 Time & Materials
0 Other:
o
Other:
Negotiated
Estimated increase (decrease) in Contract Price:
Estimated increase (decrease) in Contract Times:
$ 2896.25
Substantial Completion:
o
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization.
RECOMMENDED:
CONTRACTOR
By:
By:
ab, FORMS, Work Change Directive, 3-00
9840- BREMERTON EB.6
Change Proposal- Lump Sum Basis
DESCRIPTION: Modify Location of Generator and Control Panel
COST CODE PEASE ISSUE #; 006 CITY REF# RFI: {}
J
PEASE & SONS LABOR HOURS HOURLY RATE EST. COST
OH 01030 Project Manager $ 125.00 $
OH 01031 Project Superintendant $ 70.04 $
Project Engineer $ 40,00
Carpenter Foreman 2.0 $ 59.17 $ 118.35
Carpenter $ 52.25 $
laborer $ 43.64 $
Millwright $ 57.24 $
TOTAL - Pease & Sons labor 118.35
PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST
01513 Forklift $ 24.54 $
01624 Job Truck $ 9.00 $
01512 Boom Truck $ 73.08 $
01515 Compressor $ 14,36 $
01516 Welding Machine $ 10.34 $
01517 Generator / Light Plant $ 12.70 $
01950 laser $ 11.55 $
TOTAL - Pease & Sons Equipment $
MATERIAL AND MAJOR EQUIPMENT SUPPLIERS, EST. COST
1$
$
$
I:
TOTAL - Material and Major Equipment Suppliers $
SUBCONTRACTORS EST. COST
02200 Group Concepts (exclbkfill) $ 175.00
16000 Bainbridge ISland Electric $ 1,937.00
15000 Pease Piping $
01050 Coates Surveying 1$
TOTAL - Subcontractors $ 2,112.00
Page 1 of 2
12/27/2004
6:38 AM
9840- BREMERTON EB.6
Change Proposal - Lump Sum Basis
DESCRIPTION: Modify Location of Generator and Control Panel
COST CODE
PEASE ISSUE #:
006
CITY REF #
RFI:
I)
CONTINUED FROM PAGE 1 of 2
GENERAL RELATED COSTS HOURS HOURLY RATE
Change Order Processing Fee Lump Sum $ 75.00 $
CPM Schedule Check & Revisions $ 125.00 $
Estimating $ 75.00 $
OH 01031 As-Built Drawings 1 $ 59.17 $
TOTAL - General Related Costs $
EST. COST
59.17
59.17
SUBTOTAL - DIRECT COSTS
SUBTOTAL - DIRECT COSTS
HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 15%
SUBTOTAL
PROFIT @ 10%
SUBTOTAL - Direct Costs
EST. COST
$ 2,289.52
$ 343.43
$ 2.632.95
$ 263.30
$ 2,896.25
EST. COST
$
$ 2,896.25
EST. COST
FINANCING COSTS
Financing Of Change Order (3 months @ 1.5% compounded)
TOTAL - Direct Costs
TIME EXTENSION AND RELATED COSTS
TIME EXTENSION REQUESTED - WORKING DAYS:
TIME EXTENSION REQUESTED - CALENDAR DAYS:
CPM ACTIVITY NUMBERS AFFECTED:
EXTENDED FIELD OVERHEAD (rate per work day):
VALUE OF EXTENDED FIELD OVERHEAD
EXTENDED FIELD OVERHEAD @ 15%
SUBTOTAL
PROFIT @ 10%
TOTAL - Time Extension and Related Costs
$
$
$
$
$
TOTAL CHANGE ORDER REQUEST:
$
2,896.25
This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time
extension for work elements identified, unless speCifically negoiated as part of this Change Proposal. Work will proceed in accordance
with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed
in a~~~dan~ with this proposal \ ailure to accept this proposal within the proposal time will result in cost escalation and possible
ddlti~1 def~ys.__~ '
r-l- T .j (...1\ -'1 -
. j " ---r', i rr.....
\1\ {...;:::.,../ 27 -Dec-04 1O-Jan-05
PE SE & SONS DATE SUBMITTED PROPOSAL VALID UNl
\ JOhrl Cristello
'''-..sr)rojects Manager
Page 2 of 2
12/27/2004
6:38 AM
[9S9L ON XH/X~] Ot:LT OHM vOIZZIZT
"0"'1:\. IN,Cc
,~ -, ~~,+-..~ ~
PEASE &, 5 ,,' ' '
~ ,', "'1f'!;"'\ i,
ii \"-l'J. ;) P. \),.. ~i
tJ ;"..,~.-" k
BAIN8RIDGE ISLAND
ELECTRIC
:r".Ir':'''''~."'. \w\ fAX
~i:,\.~.1I tJ <
P.O. BOX 10066
Bainbridge Island, We. 96110
info@balnbridgelslandeledriG.com
Construction Techno/r;tJv
WNW,bainbridgelslandliltctric,com
Request for Additional Work
Date 12122/2004
To: Pease and Sons
Re: City of Bremerton EB-6
We have been instructed to perform electrical work that is not on the prints and/or is an addition
to the contract documents. We request additional compensCftion and will proceed with the work
upon written GJPproval. Please forWard for approval as soon as po~~ible, as this additionslwork
may affect the completion date of the project
S~pe of work: Install conductors and conduit to relocate control pc;nel and generator 20
additional feet.
Additional cost $ 1.937.00
-~~
' mjtt~d by:
Ron lubovlch
Bainbridge Island Electric
206-842-420011011;0
20B-84Z-1466 Fax
~cqePtiJd by:
For:
110 Bjune Of, $,1:;. 9ail'1bridge Island, Wa. 9B110
IndU$trial/CommerciaUResldential
Est 1975
10 3!:)\;jd
8313aN\;jISI3!:)aI~8NI\;j8
99P LGvS90l t
139:81 P00Z/ZZ/ZT
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
WCD#: Five
Page 1 Of 1
PROJECT: EB-6 Pump Station Modifications
CONTRACTOR: Pease and Sons
Project #: 592
Date: January 12, 2005
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S):
Provide three 2" PVC conduit between the "service drop" power pole and the existing control panel. This is required to
accommodate Potelco's revised plan and to eliminate the overhead wires above the EB-6 wetwell. The conduit must
have 24 inches of cover and be encased in concrete. Bainbridge Island Electric will also have to provide and set a new
service meter and relocate the light sensor from the existing pole to the existing control panel. The parking lot lights can
be out of service for up to three weeks. If necessary.
A TT ACHMENT(S):
Layout Drawing
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
D Unit Price
D Lump Sum
~ Time & Materials
D Other:
Method of determining change in Contract Times:
D Contractor's Records
D Engineer's Records
Method of determining change in Contract Price:
D
Other:
Negotiated
Estimated increase (decrease) in Contract Price:
Estimated increase (decrease) in Contract Times:
$
Substantial Completion:
o
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization,
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization,
RECOMMENDED:
AUTHORIZED:
~/{
CITY ~ BREMERTON
CONTRACTOR
By:
By:
ab, FORMS, Work Change Directive, 3-00
Force Account Worksheet
Wor ;: Change Directives 2, 5, and 6
WCD #2
Pease Labor Hrs Unit Cost Total Markup
Kirk 0.5 58.66 29.33 35.20
Rick 2 54.81 109.62 131,54
Pease Materials Quantity
Flygt Flush Valves 2 1750 3500.00 4025.00
Flanged 45 deg Bends 2 125 250,00 287.50
Subtotal 4479.24
Bonds and Insurance 89.58
Total 4568.82
WCD#5
Pease Labor Hrs
Operator 6 54 324.00 388.80
Laborer 2 41.3 82.60 99.12
Jimmy 2.5 41.3 103.25 123.90
Rick 0.5 54.81 27.41 32.89
Julian 0,5 41.3 20.65 24.78
Pease Materials Quantity 0.00
Concrete CY 6 76 456.00 524.40
Pease Equipment Hrs 0.00
Backhoe 6 40 240.00 276.00
Boom Truck 0.5 73.08 36.54 42.02
Bainbridge Island Electric 1 5150 5150.00 5407.50
Subtotal 6919.41
Bonds and Insurance 138.39 W'OI.t;
Total 7057.80 ~
WCD#6
Pease Labor Hrs
Jimmy 2 41.3 82.60 99.12
Rick 4 54.81 219,24 263.09
Elmer 4 54.81 219.24 263.09
Pease Materials Quantity
CDF CY 3 65 195.00 224.25
MJ 45 deg Bends 2 86.14 172.28 198.12
6" DI Pipe If 10 10.5 105.00 120.75
6" Mega Lugs 4 0 0.00 0.00
Pease Equipment Hrs 0,00
Backhoe 6 40 240.00 276.00
Boom Truck 0.5 73.08 36.54 42.02
Subtotal 1486.44
Bonds and Insurance 29.73
Total 1516.17
Grand Total
REVISIONS
DESCRIP110N
\
\ '\
"-'\\
/\ J
/f:;6f ]rUJ rrA.
\
..
'I'WONCJ.efATFll.LSCAlE
IFNOTSCAU!A_.'--,......t
HCR2.-,o-:J1 ~ VF.RT tJl>>&J~::'.c:.NO.,MA\Wf B'r:SDG
CITY OF BREMERTON
DEPARTMENT OF PUBUC WORKS & UTIUTIES
ENGINEERING DIVISION
I ~ BY: trAy J CHECKED BY: ECH
EB.6 PUMP STATION MODIFICATIONS
~
5
I
/"""'" 'Ii
~~
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
WCD#: Six
Page 1 Of 1
PROJECT: EB-6 Pump Station Modifications
CONTRACTOR: Pease and Sons
Project #: 592
Date: January 18, 2005
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S):
Provide additional fittings and piping as required to modify the header assembly for the force main cut-in. This includes
CDF backfill, the additional piping for the 4" bypass pumping connection, the two 45 degree bends and additional piping
between the valve vault and the wye,
A IT ACHMENT(S):
Layout Drawing
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involye one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change in Contract Times:
o Contractor's Records
o Engineer's Records
0 Unit Price
0 Lump Sum
~ Time & Materials
0 Other:
o
Other:
Negotiated
Estimated increase (decrease) in Contract Price:
Estimated increase (decrease) in Contract Times:
$
Substantial Completion:
o
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization,
RECOMMENDED:
AUTHORIZED:
By:
~~! //
CITY OF 'EMERTON
By:
.
CONTRACTOR
ab, FORMS, Work Change Directive, 3-00
Force Account Worksheet
Work Change Directives 2, 5, and 6
WCD #2
Pease Labor Hrs Unit Cost Total Markup
Kirk 0,5 58.66 29.33 35.20
Rick 2 54.81 109.62 131.54
Pease Materials Quantity
Ftygt Flush Valves 2 1750 3500,00 4025.00
Flanged 45 deg Bends 2 125 250,00 287.50
Subtotal 4479.24
Bonds and Insurance 89.58
Total 4568.82
WCD#5
Pease Labor Hrs
Operator 6 54 324,00 388,80
Laborer 2 41.3 82.60 99.12
Jimmy 2.5 41.3 103.25 123.90
Rick 0.5 54.81 27.41 32.89
Julian 0,5 41.3 20.65 24.78
Pease Materials Quantity 0.00
Concrete CY 6 76 456.00 524.40
Pease Equipment Hrs 0.00
Backhoe 6 40 240.00 276.00
Boom Truck 0,5 73.08 36.54 42.02
Bainbridge Island Electric 1 5150 5150,00 5407.50
Subtotal 6919.41
Bonds and Insurance 138.39
Total 7057.80
WCD#6
Pease Labor Hrs
Jimmy 2 41.3 82.60 99.12
Rick 4 54.81 219,24 263.09
Elmer 4 54.81 219.24 263.09
Pease Materials Quantity
CDF CY 3 65 195,00 224.25
MJ 45 deg Bends 2 86,14 172.28 198.12
6" DI Pipe If 10 10.5 105,00 120.75
6" Mega lugs 4 0 0.00 0.00
Pease Equipment Hrs 0.00
Backhoe 6 40 240.00 276.00
Boom Truck 0,5 73.08 36.54 42.02
Subtotal 1486.44
Bonds and Insurance 29.73 IAI'I>" "
Total 1516.17 ~
Grand Total
I Ned lever - 9840- EB-6 testing and startup - ISSUE #15: I&C Modifications
Page 1 I
From:
To:
Date:
Subject:
"John Cristello" <John@Peaseandsons.com>
"Ned Lever (E-mail)..<NLever@CJ.Bremerton.Wa.US>
1/26/20054:01:17 PM
9840- EB-6 testing and startup - iSSUE #15: i&C Modifications
Mr. Lever-
Williams Instrumentation. is requesting a change order in the amount of $4~ment changes that
you have apparently requested. Please issue change order in the amount 575' he City wishes to
have us proceed with this extra work. Note that Williams wili be on site tomorrow afternoon as well as
Friday. They can implement these changes at that time, if we receive authorization.
As a separate but related matter, any headway with PSE?
Thank you,
John Cristello
Sr. Projects Manager
Pease & Sons, Inc,
PO Box 44100
Tacoma, WA 98444
PH 253-531-7700
FAX 253-537-8113
email John@Peaseandsons.com
is?!"'
J /1 e~
J ~7() I
---Original Message-
From: Robert Williams [mailto:wicirpw@direcpc.com]
Sent: Wednesday, January 26, 2005 2:36 PM
To: John CristeUo
Subject: EB-6 testing and startup
',,-
For all concerned we would like to limit our visits to the jobsite to the minimum required to complete the
project.
We anticipate the following site specific requirements.
1) Control system checkout with 120 V AC control power available.
2) Repair mounting systems for panel lights
3) Furnish and install lockout devices for pump circuit breakers
4) Furnish, program and install emergency generator fail alarms.(Requested by owner "Ned Lever")
5) Control system and power wiring checkout with Utility and Emergency power available.
6) Control logic demonstration and acceptance with all power sources available.
7} System functional teats with all power, communication and process components ( lift pumps and
telephone circuits) operational
I Ned Lever - RE: 9840- Bremerton EB-6: Generator Testing-ISSUE #14
Page 1 I
From: "John Cristello" <John@Peaseandsons.com>
To: "Ned Lever" <nlever@cLbremerton.wa,us>
Date: 1/26/20053:49:43 PM
Subject: RE: 9840- Bremerton EB-6: Generator Testing- ISSUE #14
Please issue Owner change order in the amount ~o cover increased costs. NC Power has
confirmed that they will perform this extra work tomorrow.
john Cristeiio
Sr. Projects Manager
Pease & Sons, Inc.
PO Box 44100
Tacoma, WA 98444
PH 253-531-7700
FAX 253-537-8113
email John@Peaseandsons.com
-----Original Message-----
From: Ned Lever [mailto:nlever@cLbremerton,wa.us]
Sent: Tuesday, January 25, 2005 7:55 AM
To: John Cristello
Subject: RE: 9840- Bremerton EB-6: Generator Testing
lets plan on having it done when they come out.
Thanks
Ned
>>> "John Cristello" <John@Peaseandsons.com> 1/24/2005 5:22:49 PM >>>
Mr. Lever-
Thank you!
See attached- I'm not sure why it was not emailed.
John Cristello
Sr. Projects Manager
Pease & Sons, Inc.
PO Box 44100
Tacoma, WA 98444
PH 253-531-7700
FAX 253-537-8113
em ail John@Peaseandsons.com
-----Original Message-----
From: Ned Lever [mailto:nlever@cLbremerton.wa,us]
Sent: Monday, January 24, 2005 4:48 PM
To: John Cristello
Cc: GChvoj@NCPowerSystems.com; WDutt@NCPowerSystems.com; mail
Subject: Re: 9840- Bremerton EB-6: Generator Testing
The City will waive the requirement for this test. Has there been any response regarding the punch list
items I sent last week?
>>> "John Cristello" <John@Peaseandsons,com> 1/24/2005 3:0~-
+--------------------------------------------------------------------------+
"Press Esc Key to Insert new record, Ctrl-Z to Clear form
-~ress Del Key to Terminate Insert Mode -.
INSERT Contract Maintenance
Contract Number 4456 +
,l,
: :Vendor Name
- -Subj ect
- -Department
"Status Code
PEASE & SONS INC
MODIFICATIONS - EB-6 PUMP STATION
ENGINEERING
CON
Insurance
',- Type Amount
+ Press F1 for GL $2000000.00
+ valid insuranceAL $1000000.00
,J" type codes
Amount
Begin Date
End Date
Review Date
$413687.00 -,-
09/20/2004 +
06/30/2005 ,J"
05/01/2005
Insurance Total
Insurance Review Date
$3000000.00 .-
09/01/2005
Comments
',-
of
'"
+--------------------------------------------------------------------------+
AGREEMENT
SECTION 0050O
THIS AGREEMENT is dated the 0~0'~ day of ~~_in the year 2004
by and between City of Bremerton (hereinafter called OWNER) and
(hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter sst forth,
agree as follows:
ARTICLE 1. WORK.
CONTRACTOR shall complete the WORK as specified or indicated in the OWNER's Contract
Documents entitled EB-6 Pump Station Modifications.
ARTICLE 2. CONTRACT TIMES.
Substantial Completion, as defined in Section 00800, shall be attained within 270 calendar days of
Notice to Proceed. Final Completion and Acceptance of the Work, as defined in Section 00800,
shall be attained no later than 45 days after Substantial completion.
ARTICLE 3. EQUIDATED DAMAGES.
OWNER and the CONTRACTOR recognize that time is of the essence of this Agreement and
that the OWNER will suffer financial loss if the WORK is not complsted within the time specified in
Article 2 herein, plus any extensions thereof allowed in aCCOrdance with Article 12 of the General
Conditions and Supplementary Conditions. They also recognize the delays, expense, and
difficulties involved in proving in a legal proceeding the actual loss suffered by the OWNER if the
WORK is not complsted on time. Accordingly, instead of requiring any such proof, the OWNER
and the CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) the
CONTRACTOR shall pay the OWNER $700 for each day that expires after the time specified in
Article 2 herein for Substantial Complstion and Final Complstion of the WORK and all fines levied
against the City.
ARTICLE 4. CONTRACT PRICE.
OWNER shall pay CONTRACTOR for complstion of the WORK in accordance with the Contract
Documents in current funds the amount set forth in the Bid Schedule(s).
ARTICLE 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as provided in the
Gen~nditions.
~ontr~btor Initials
ARTICLE 6. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the WORK consist of this Agreement (Section 00500) and the
following attachments to this Agreement:
· Notice Inviting Bids (Section 00030).
· Instructions to Biddem (Section 00100).
· Bid Forms including the Bid, Bid Schedule(s), Information Required of Bidder, Bid Bond,
and all required certificates and affidavits (Section 00300).
· Performance Bond (Section 00610).
· Payment Bond (Section 00620).
· General Conditions (Section 00700).
· Supplementary General Conditions (Section 00800).
· Technical Specifications as listed in the Table of Contents.
· Drawings as listed in the List of Drawings.
· Addenda numbers I to ~ , inclusive.
· Change Orders which may be delivered or issued after Effective Date of the Agreement and
are not attached hereto.
There are no Contract Documents other than those listed in this, Article 6. The Contract
Documents may only be amended by Change Order as provided in Paragraph 3.04 of the
General Conditions.
ARTICLE 7. INDEMNIFICATION.
The CONTRACTOR and OWNER acknowledge and agree that they have negotiated the
following in accordance with the requirements of RCW 4.24.115 and the CONTRACTOR
specifically waives his immunity under industrial insurance under Title 51 RCW. To the fullest
extent permitted by Laws and Regulations, the CONTRACTOR shall indemnify, defend, and hold
harmless the OWNER, ENGINEER, and DESIGN ENGINEER, their consultants, subconsultants,
and the officers, directors, employees, and agents of each and any of them, against and from all
claims and liability arising under, by reason of, related, or incidental to the Contract Documents or
any performance of the WORK, but not from the sole negligence or willful misconduct of the
OWNER and/or the ENGINEER as further defined in the Contract Documents.
Contm~'c~lnitials
AGREEMENT
ARTICLE 8. ASSIGNMENT
No assignment by a party hereto of any dghts under or interests in the Contract Documents will be
binding on another party hereto without the written consent of the party sought to be bound; and
specifically but without limitation monies that may become due and monies that are due may not
be assigned without such consent (except to the extent that the effect of this restriction may be
limited by law), and unless specifically stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty or responsibility
under the Contract Documents. The OWNER, in its sole discretion, may refuse to allow the
CONTRACTOR to assign any or all of its duties, dghts and/or responsibilities under the
Agreement, except with regards to an assignment of funds for security purposes. In the case of
an assignment for security purposes the OWNER may condition its approval to the extent it
deems necessary to assure that there will be adequate funds to complete the WORK and to pay a
subcontractors and suppliers.
OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, its partners, su~ors, assigns and legal
representatives in respect of all covenants, agreements and obligations contained in the Contract
Documents.
IN WITNESS WHEREOF, OWNER and CONTRACTOR have caused this Agreement to be
executed the day and ye~ve written.
Address for giving notices Address for giving notices
License No. P[)~-~S
Approved as to Form:
'~"~'~ ~ ' Agent for service of process:
(Signature)
(Title)