CHANGE Contract Transactions t
Contract Number 4468 t
t
t
t
t
+
,=Vendor Name
+Subject
, =Department
'=Status Code
t
t
t
t
+
INSITUFORM TECHNOLOGIES INC
BRENTWOOD AVENUE STORM DRAIN
ENGINEERING
CON
PROJECT
Insurance
Type Amount
GL $2000000.00
AL $2000000.00
Amount
Begin Date
End Date
Review Date
$133068.00
11/08/2004 -(
03/15/2005 t
02/15/2007 t
h
Insurance Total
Insurance Review Date
$4000000.00
07/01/2006
t
t Comments VAULT 01/01/2007 9=
t t
t t
+--------------------------------------------------------------------------+
--------------- --- ~- ----
~i
BLIC VII RI<S & UTILITIES
gil1eeril1g DivisiOI1
March "\5,2005
losituform ,echoolOgies, 10C,
702 spirit 40 parK orive
Chesterlie\d, MO 63005
1\\\.0,: NIt. \-I, Douglas ,holOas
'E 9 oc:;.J Repair - fioal I\CCeptaoce
subject, Breo\VIood Drive storlO oralo lOer e
oear Mr, "thomas',
, of the Breo\VIood orNe storm oraiO
,he City herebY graotsfloal I\cceptaoc:ot will be sent under separate cover, upon
t.lOergeoCY Repalf project, final paY~ the enclOsed I\cceptaoce of final paylOeot and
receipt of final paylOent, please e1<ecu e
Release of ClailOS and retulO It to lOe,
R t' ge will be released 60 dayS frolO the date of final acceptaoce or alter receipt of
a~ ~~~ired releases per the original cOntract,
Please call lOe at (360) 413-5344 if yoU have anY questions,
Sincere\')! ,
~e -'~
Brad Ginn, p .E..
bg/\S
cc', proiect fi\e
25'\23
ACCEPTANCE OF COMPENSATION & RELEASE OF CLAIMS
Brentwood Drive Storm Drain Emergency Repair
Project No. 812
Insituform Technologies, Inc., hereby indicates agreement with, and acceptance of, the
final Contract Payment of $144,511.85, less $6,653.40 retain age, and the total Contract
Price of $144,511.85, including Washington State sales and/or use taxes, as full and final
compensation for all Work performed in connection with the Brentwood Drive Storm
Drain Emergency Repair Project, and does hereby release the City of Bremerton from all
claims, liability, demands, damages and actions of any kind whatsoever, arising from
performance of that Contract.
Insituform ~echnologies, Inc.
BY:~
Title 1- n, ' ~ t)
Date:
7/a:5ks
,:j,J ~~
Certificate of Notarv
SUbU~~
;);;#1 day of
.--- .
Jut/j
;200>)
,
1r'~~~. ;~l
~~~
AFFIDAVIT OF PUBLICATION
No. Ad # 100144820
ST ATE OF WASHINGTON
COUNTY OF KITSAP
I, Dina Christensen, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of THE
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, and is now and during all of said time, was
printed in an office maintained in the aforesaid place of publication of said newspaper March 17th, 2005,
and that such newspaper was regularly distributed to its subscribers during all of said period. That the full
amount of the fee charged for the foregoing publication 's the sum of $29.86 which amount has not been
paid.
\\\\1\1"""
",,~ ?fEFFt:::',~
, ~. ...... '7.t-"',;:
~~ .' ..'IO?
.2~:"~OT41? ....~~
~ : M ;.. ..~ -: (Signature of Principal Clerk)
:: (J): AY 4,2008 : ~
Subscriijc'tirv.cf>swtJ~ t~be~jJ.e this day of March 28th, 2005.
~~'. .;.:-:: ~ ~
". '" --. ..- '\..:J ~ ~
'/ Of:" ..... \~ "
///1 WAS\(\. ",....
,,,,,,,,,,,,,,,, ,C ?ffidD/'IA1.J
~
NOTICE OF COMPLETION'
Notice of Completion has been issued to Insituform Technologies, Inc., on City Construction Contract No.
4468, for the Brentwood Drive Storm Drain Emergency Repair project. Any parties having a claim for
material, labor or damages related to this Contract have forty-five (45) days from the date of first
publication of this notice to file a claim.-
William Eley-
Purchasing Manager-
345 Sixth Street, Suite 600-
Bremerton, Washington 98337-1873-
March 17, 2005,,# 1 00144820-
.....
~~~
Washington State
Department of Revenue
PO Box 47474
Olympia, WA 98504-7474
601 880 220
Certificate of Payment of State Excise
Taxes by Public Works Contractor
INSITUFORM TECHNOLOGIES INC
702 SPIRIT 40 PARK DR
CHESTERFIELD MO 63005 1195
CITY OF BREMERTON PUBLIC WORKS
ROBERT B GINN
3027 OLYMPUS DR
BREMERTON WA 98310 4799
We hereby certify that taxes, increases and penalties due or to become due from the above-named
contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works
contract:
CITY OF BREMER TON PUBLIC WORKS
BRENTWOOD DR STORM DRAIN EMERG REPAIR
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained
percentage,
This certificate is issued pursuant to the provision of Chapter 60,28 Revised Code of Washington for the
sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contraCtor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes duefrom said contractor,
This certificat~ does not release said contractor from liability for additional tax that may be later
determined to be due with respect to the above-mentioned contract or other activities,
Dated S u.'ru.. n, OS-
\
at Olympia, Washington,
State of Washington
Department of Revenue
C~Of~
To inquire about the availability of this document in an alternate format for the visually impaired or in a language other than English, please call (360) 486-2342.
1TY users may call 1-800-451-7985.
REV 310028 (10-01-02) ROUTING: Disbursing Officer, Contractor, File, Special File
,--
REC
~VED
STATE OF WASHINGTON
M ft,r} 1, 20'05
riH " "
EMPLOYMENT SECURITY DEPARTMENT
PO Box 9046 II Olympia, WA 98507-9046
CONTRACTOR: Insituform Technologies Inc.
702 Spirit 40 Park Dr.
Chesterfield, MO 63005
) CERTIFICATE OF
) PAYMENT OF CONTRIBUTIONS
) PENAL TIES AND INTEREST ON
) PUBLIC WORKS CONTRACT
ES Reference No.
056196-006
TO: City of Bremerton - Public Works & Utilities
3027 Olympus Dr.
Bremerton, WA 98310
The Employment Security Department hereby certifies that contributions, penalties and interest
due from the above named contractor under the Employment Security Act have been paid in full or
provided for with respect to the following public works contract:
Brentwood Drive Storm Drain Emergency Repair
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50,24,130 against the public body named above for tax attributable to service performed for said public
body by the above named contractor on the above described contract. The Employment Security
Department releases its lien on the retained percentage which is provided by RCW 60.28,040 for
contributions, penalties and interest due from said contractor.
This certificate does not release said contractor from liability for additional contributions,
penalties and interest which may be later determined to be due with respect to the above mentioned
contract.
Dated at Olympia, Washington on March 17, 2005,
COMMISSIONER
EMPLOYMENT SECURITY DEPARTMENT
Bkr1(~~~~Rep~~
Original-Disbursing Officer
Duplicate-Employer
Triplicate-Central Office Files
EMS 8449 760 R3-98
@~18
o
Verify Workers' Comp Premium Status - Employer Liability Certificate
https://fortress.wa.gov/lni/crpsi/ AcctInfoPrint.aspx? AccountId=882...
Washington State Department of
Labor and Industries
Employer Liability
Certificate
Department of Labor and Industries
Employer Liability Certificate
Date: 08/11/2005
UBI #: 601 880220
Business Name: INSITUFORM TECHNOLOGIES INC
Legal Business Name: INSITUFORM TECHNOLOGIES INC
Account #: 882,695-01
'Doing Business As' Name: INSITUFORM TECHNOLOGIES INC
Quarterly Premium Reports: Quarter 1 of Year 2005
Workers' Comp Premium Status: Account is current. Firm has voluntarily reported and
paid their premiums,
Licensed Contractor? Yes
Account Representative: T6 / SUE REED (360)902-4631 - E-mail:
HUGS235@lni.wa.gov
Industrial Insurance Information
The information above shows the employer's industrial insurance (workers' compensation)
premium status with the Department of Labor and Industries.
Employers report and pay premiums each quarter based on hours of employee work already
performed, and are liable for premiums found later to be due, Industrial insurance accounts have
no policy periods, cancellation dates or limitations of coverage, (See RCW 51.12,050 and
51.16,190,)
lof!
81ll/2005 10:40 AM
+--------------------------------------------------------------------------+
"Press Esc Key to Insert new record, Ctrl-Z to Clear form
"Press Del Key to Terminate Insert Mode
INSERT Contract Maintenance
Contract Number 4468
"Vendor Name
"Subj ect
, 'Department
"Status Code
INSITUFORM TECHNOLOGIES INC
BRENTWOOD AVENUE STORM DRAIN PROJECT
ENGINEERING
CON
Insurance
Type Amount
.. Press F1 for GL $2000000,00
.. valid insuranceAL $2000000.00
type codes
Amount
Begin Date
End Date
Review Date
$133068.00 -,-
11/08/2004 ,.
01/02/2005 ,',
02/15/2007 ..
Insurance Total
Insurance Review Date
$4000000.00 ..
07/01/2005
Comments
VAULT 01/01/2007
T
,.
+ ,.
+--------------------------------------------------------------------------+
PUBLIC WORKS AGREEMENT
THIS AGREEMENT, is entered into between the City of Bremerton, a Washington
Municipal Corporation ("City"'), and Insituform Technologies. Inc. ("Contractor"'), whose
mailing address is P.O. Box 519, 5100 E Second Street. Benicia, CA 94510.
The parties agree as follows:
1, CONTRACTOR SERVICES. The Contractor shall perform emergency
construction services, in accordance with generally accepted standards and at the direction of the
Public Works Director (Director) for the following project:
Provide labor, equipment, and materials necessary to install a Cured-in-place pipe or Cured-in-
place liner in approximately 625 linear feet of 42 inch storm sewer pipe on Brentwood Drive
between the manhole near 1010 Brentwood Drive and the outfall near 1121 Brentwood Drive. A
detailed description of services is included herein as Attachment I. The Work shall conform to
the 2004 Standard Specifications for Road, Bridge, and Municipal Construction and the
Technical Specifications included herein as Attachment 2.
All work shall be performed under the control of the Director as provided in Section 1-05
CONTROL OF WORK of the 2004 Standard Specifications for Road, Bridge and Municipal
Construction.
2, TIME OF COMPLETION, The Contract time shall be divided into two phases.
Phase I - Procurement: Phase I shall be completed in no more than 25 working days from the
date the Notice to Proceed with Phase I is given by the City. Phase n - Construction:
Completion of Phase n is dependant on weather conditions. Notice to Proceed with Phase II will
be given after consultation between the City and the Contractor regarding weather conditions.
The Contractor shall be prepared to mobilize on-site to begin the physical installation within
three (3) calendar days of issuance of Notice to Proceed with Phase n. Phase II shall be
completed within IS working days of the issuance of the Notice to Proceed with Phase n.
3, COMPENSATION, The City shall pay the Contractor the total amount of
$133,068.00, Applicable Washington State Retail Sales Tax on this contract shall be governed
by WAC 458-20-171 and its related rules for the work contemplated in this agreement. The
Contractor shall invoice the City monthly. The City will pay for the portion of the work
described in the invoice that has been completed by the Contractor and approved by the City.
The City payment shall not constitute a waiver of the City's right to final inspection and
acceptance of the project.
A. Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor, shall
provide the City a performance bond for the full contract amount to be in
effect until sixty (60) days after the date of final acceptance, or until
receipt of all necessary releases from the State Department of Revenue
and the State Department of Labor and Industries and until settlement of
any liens filed under Chapter 60.28 RCW, whichever is later.
PUBLIC WORKS AGREEMENT - Page 1 of 9
(between City of Bremerton and lnsituform Technologies, Inc.)
(November 4,2004)
B. Retainage. The City shall hold back a retainage in the amount of five
percent (5%) of any and all payments made to contractor for a period of
sixty (60) days after the date of final acceptance, or until receipt of all
necessary releases from the State Department of Revenue and the State
Department of Labor & Industries and until settlement of any liens filed
under Chapter 60.28 RCW, whichever is later.
C. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work.
Defective or unauthorized work includes, without hmitation: work and
materials that do not conform to the requirements of this agreement; and
extra work and materials furnished without the City's written approval. If
Contractor is unable, for any reason, to satisfactorily complete any portion
of the work, the City may complete the work by contract or otherwise, and
Contractor shall be liable to the City for any additional costs incurred by
the City. "Additional costs" shall mean all reasonable costs, including
legal costs and attorney fees, incurred by the City beyond the maximum
Contract price specified above. The City further reserves its right to
deduct the cost to complete the Contract work, including any Additional
Costs, from any and all amounts due or to become due the Contractor.
D. Final Payment: Waiver of Claims. THE ACCEPTANCE OF FINAL
PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL
CONS'rrrtJTE A WAIVER OF CLAIMS, EXCEPT THOSE
PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY
CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR
FINAL PAYMENT IS MADE.
4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times
acting as an independent contractor and not as an employee of the City. The Contractor shall
secure at its expense, and shall be responsible for all payments of income tax, social security,
state industrial insurance compensation, unemployment compensarion, and all other payroll
deductions for the Contractor, officer, agents, employees and sub-contractors. The Contractor
shall also secure all applicable business licenses, if required, in connecrion with the contract
services, including all required licenses for Contractor's officers, agents, employees and sub-
contractors.
5. TERMINATION. The City may terminate this agreement without notice for
good cause. "Good cause" shall include, without limitation, any one or more of the following
events:
A. The Contractor's failure to supply sufficient skilled workers or suitable
materials or equipment.
PUBLIC WORKS AGREEMENT - Page 2 of 9 (November 4, 2004)
(between City of Bremerton and Insituform Technologies, Inc.)
B. The Contractor's failure to prosecute the work with such diligence as will
ensure its physical completion within the original physical completion
time specified in this Agreement and any extensions of time which may
have been granted to the Contractor by change order or otherwise.
C. The Contractor's failure to make full and prompt payment to
subcontractors or for material or labor.
D. The Contractor's disregard of federal, state or local laws, rules or
regulations.
E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt.
F. The Contractor disregards the authority of the City.
G. The Contractor performs work which deviates from the Contract, and
neglects or refuses to correct rejected work.
H. The Contractor's failure to provide continuous competent supervision.
I. The Contractor otherwise violates in any material way any provisions or
requirements of the contract.
ff the City terminates this agreement for good cause, the Contractor shall not receive any
monies due under this agreement, if any, until the Contract work is completed.
6. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay
Prevailing Wages," with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter
39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate
provisions. The latest prevailing wage rate revision issued by the Department of Labor and
Industries is attached.
7. CHANGES. The City may issue a written or oral work change directive for any
change in the Contract work during the performance of this agreement. If the Contractor
determines, for any reason, that a change order is necessary, Contractor must submit a written
change order request to the City's project manager within two (2) business days of the date the
Contractor knew or should have known of the facts and events giving rise to the requested
change. If the City determines that the change increases or decreases the Contractor's costs or
time for performance, the City will make an equitable adjustment. The City will attempt, in
good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the
parties are unable to agree, the City will determine the equitable adjustment as it deems
appropriate. The Contractor shall proceed with the change order work upon receiving either a
written or oral work change directive from the City or a change order from the City. If the
Contractor fails to request a change order within the time allowed, the Contractor waives its right
to make any claim or submit subsequent change order requests for that portion of the contract
PUBLIC WORKS AGREEMENT - Page 3 of 9 (November 4, 2004)
(between City of Bremerton and lnsituform Technologies, Inc.)
work. If the Contractor disagrees with the equitable adjustment the Contractor must complete
the change order work; however, the Contractor may elect to protest the adjustment as provided
below:
A. Procedure and Protest by the Contractor. If the Contractor disagrees with
anything required by a written work change directive, oral work change
directive or change order, including any direction, instruction,
interpretation, or determination by the City, the Contractor shall:
1. Give a signed written notice of protest to the City within one
business day;
2. Supplement the written protest within five (5) calendar days with a
written statement that provides the following information:
a. The date of the Contract's protest.
b. The nature and circumstances that caused the protest.
c. The provisions in this agreement that support the protest.
d. The estimated dollar cost, if any, of the protested work and
how that estimate was determined.
e. An analysis of the progress schedule showing the schedule
change or disruption if the Contractor is asserting a
schedule change or disruption.
The Contractor shall keep complete records of extxa costs and time
incurred as a result of the protested work. The City shall have
access to any of the Contractor's records needed for evaluating the
protest.
3. The City will evaluate all protests, provided the procedures in this
section are followed. If the City determines that a protest is valid,
the City will adjust payment for work or time by an equitable
adjustment. No adjustment will be made for an invalid protest.
B. Contractor's Duty to Complete Protested Work. In spite of any protest,
the Contractor shall proceed promptly with the work as the City has
ordered.
C. Contractor's Acceptance of Changes. The Contractor accepts all
requirements of a change order by: (1) endorsing it, (2) writing a separate
acceptance, or (3) not protesting in the way this section provides. A
change order that is accepted by Contractor as provided in this section
shall constitute full payment and final settlement of all claims for contract
time and for direct, indirect and consequential costs, including costs of
delays related to any work, either covered or affected by the change.
PUBLIC WORKS AGREEMENT - Page 4 of 9 (November 4, 2004)
(between City of Bremerton and lnsituform Technologies, Inc.)
D. Failure to Protest Constitutes Waiver. By not protesting as this section
provides, the Contractor also waives any additional entitlement and
accepts from the City any written or oral order (including directions,
instructions, interpretations, and determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the
procedures of this section, the Contractor completely waives any claims
for protested work and accepts from the City any written or oral order
(including directions, instructions, interpretations, and determination).
8. CLAIMS. The Contractor shall give written notice to the City of all claims other
than change orders within fourteen (14) calendar days of the occurrence of the events giving rise
to the claims. Any claim for damages, additional payment for any reason, or extension of time,
whether under this agreement or otherwise, shall be conclusively deemed to have been waived
by the Contractor unless a timely written claim is made in strict accordance with the applicable
provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim
is set forth in detail in writing and received by the City within seven (7) calendar days from the
date Contractor knew, or should have known, of the facts giving rise to the claim. At a
minimum, a Contractor's written claim must include the information set forth regarding protests
in Section 7.A.2.a.-e.
FAILURE TO PROVIDE A COMPLETE, WRI'I't'EN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS
ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM
OR CAUSED BY THAT DELAY.
Contractor must, in any event, file any claim or bring any suit arising from or connected
with this agreement within 120 calendar days from the date the contract work is complete.
9. WARRANTY. The Contractor shall correct all defects in workmanship and
materials within one year from the date of the Contractor's acceptance of the City's final
payment under this contract. When defects are corrected, the warranty for that portion of the
work shall extend for one year from the date such correction is completed and accepted by the
City. The Contractor shall begin to correct any defects within seven (7) calendar days of its
receipt of notice from the City of the defect. If the Contractor does not accomplish the
corrections within a reasonable time, the City may complete the corrections and the Contractor
shall pay all costs incurred by the City in order to accomplish the correction.
10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits including all legal costs and attorney fees, arising out of or in connection
with the performance of this agreement, except for injuries and damages solely caused by the
City's negligence.
The City's inspection or acceptance of any of Contractor's work when completed shall
not be grounds to avoid any of these covenants of indemnification.
PUBLIC WORKS AGREEMENT - Page 5 of 9 (November 4, 2004)
(between City of Bremerton and lnsituform Technologies, Inc.)
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor and
the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall
be only to the extent of the Contractor's negligence.
1T IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
INDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY
UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF
THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE
MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this
agreement.
11. INSURANCE. The Contractor shall procure and maintain for the duration of this
agreement, insurance against claims for injuries to persons or damage to property that may arise
from or in connection with the performance of the Contract work by the Contractor, its agents,
representatives, employees or subcontractors.
Before beginning the work on the project described in this agreement, the Contractor
shall provide a Certificate of Insurance evidencing:
A. Automobile Liability insurance with limits no less than $1,000,000 combined
single limit per accident for bodily injury and property damage; and
B. Commercial General Liability insurance written on an occurrence basis with
limits no less than $2,000,000 combined single limit per occurrence and
$2,000,000 aggregate for personal injury, bodily injury and property damage.
Coverage shall include but not be limited to: blanket contractual;
products/completed operations/broad form property damage; explosion,
collapse and underground (XCU) if applicable; and employer's liability.
Any payment of deductible or self insured retention shall be the sole responsibility of the
Contractor.
The City reserves the right to receive a certified copy of all the required insurance
policies.
The City, its officials, employees, agents and volunteers shall be named as an additional
insured on the insurance policy, as respects work performed by or on behalf of the Contractor
and a copy of the endorsement naming the City as additional insured shall be attached to the
Certificate of Insurance.
PUBLIC WORKS AGREEMENT - Page 6 of 9 (November 4, 2004)
(between City of Bremerton and lnsituform Technologies, Inc.)
The Contractor's insurance shall contain a clause stating that coverage shall apply
separately to each insured against whom claim is made or suit is brought, except with respects to
the limits of the insurer's liability.
The Contractor's insurance shall be primary insurance as respects the City, and the City
shall be given thirty (30) calendar days prior written notice by certified mail, return receipt
requested, of any cancellation, suspension or material change in coverage.
If this contract requires work to be performed in or on navigable waters, the Contractor
shall provide insurance written on an occurrence basis with limits no less than $2,000,000
combined single limit per occurrence and $2,000,000 aggregate for claims made under the
Longshoreman and Harbor Workers Act and the Jones Act.
12. MISCELLANEOUS.
A. Nondiscrimination. In the hiring of employees for the performance of
work under this Agreement or any sub-contract hereunder, the Contractor,
its sub-contractors, or any person acting on behalf of such Contractor or
sub-contractor shall not, by reason of race, religion, color, sex, national
origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform
the work to which the employment relates.
B. Compliance with Laws. Contractor shall comply with all federal, state
and local laws, rules and regulations throughout every aspect in the
performance of this agreement.
C. Work Performed at Contractor's Risk. Con~xactor shall take all
precautions necessary and shall be responsible for the safety of its
employees, agents, and subcontractors in the performance of this
agreement. All work shall be done at Contractor's own risk, and
Contractor shall be responsible for any loss of or damage to materials,
tools, or other articles used or held for use in connection with the work.
D. Nonwalver of Breach. The failure of the City to insist upon s~ct
performance of any of the terms and rights contained herein, or to exercise
any option herein conferred in one or more instances, shall not be
construed to be a waiver or relinquishment of those terms and rights and
they shall remain in full force and effect
E. Governing Law. This agreement shall be governed and construed in
accordance with the laws of the State of Washington. If any dispute arises
between the City and Contractor under any of the provisions of this
agreement, resolution of that dispute shall be available only through the
jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap
County, Washington.
PUBLIC WORKS AGREEMENT - Page 7 of 9 (November 4, 2004)
(between City of Bremerton and Insituform Technologies, Inc.)
F. Attomey's Fees. To the extent not inconsistent with RCW 39.04.240, in
any claim or lawsuit for damages arising from the parties' performance of
this agreement, each party shall be responsible for payment of its own
legal costs and attorney's fees incurred in defending or bringing such
claim or lawsuit; however, nothing in this subsection shall limit the City's
right to indemnification under Section 10 of this agreement.
G. Written Notice. All communications regarding this agreement shall be
sent to the parties at the addresses listed on the signature page of this
agreement, unless otherwise notified. Any written notice shall become
effective upon delivery, but in any event three (3) calendar days after the
date of mailing by registered or certified mail, and shall be deemed
sufficiently given if sent to the addressee at the address stated on this
agreement.
H. Assignment. Any assignment of this agreement by the Contractor without
the written consent of the City shall be void.
I. Modification. No waiver, alteration, or modification of any of the
provisions of this agreement shall be binding unless in writing and signed
by a duly authorized representative of the City and Contractor.
J. Severability. If any one or more sections, sub-sections, or sentences of
this agreement are held to be unconstitutional or invalid, that decision
shall not affect the validity of the remaining portion of this agreement and
the remainder shall remain in full force and effect.
K. Entire Agreement. The written provisions and terms of this agreement,
together with any attached Exhibits, supersede all prior verbal statements
by any representative of the City, and those statements shall not be
construed as forming a part of or altering in any manner this agreement.
TMs agreement and any attached Exhibits contain the entire agreement
between the parties. Should any language in any Exhibit to this agreement
conflict with any language contained in this agreement, the terms of this
agreement shall prevail.
PUBLIC WORKS AGREEMENT - Page 8 of 9 (November 4, 2004)
(between City of Bretnerton and lnsituform Technologies, Inc.)
IN WITNESS WHEREOF, the parties below have executed this agreement.
CONTRACTOR ' THFwCe-Ft~/3OF ~ON
Insituform Technolo~T--I~nc. ~ ~
Print Name:~[t' Doug las Thomas Print Name:~
Title:Vice President Project SupportTitle: /~d/3,~F' '"-
DATE November 24, 2004 DATE /.~ - ~-~7~,~
Notices to be sent to: Notices to be sent to:
CONTRACTOR: CITY OF BREMERTON:
Insituform Technologies, INc. CityClerk
H. Douglas Thomas 345 6m Street, Suite 600
702 Spirit 40 Park Drive Bremerton, WA 98337-1873
Chesterfield, MO 63005 (360)473-5323
636 - 530 - 8000 (360) 473-5200 (facsimile)
636-519-8010 fax
APPROVED AS TO FORM:
Bre~l:~ity A~eX~
TSALL USERS\GINN~rentwood SD\041104_insim form_PWA.doc
PUBLIC WORKS AGREEMENT - Page 9 of 9 (November 4, 2004)
(between City of Bremerton and lnsituform Technologies, Inc.)
State of Washington
DEPARTMENT OF LABOR AND INDUSTRIES
Prevailing Wage Section - Telephone (360) 902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage Rates For Public Works Contracts
The PREVAILING WAGES listed hem include both the hourly wage rate and the hourly rate of fringe benefits.
On public works projects, workem' wage and benefit rates must add to not less than this total. A bdef
description of overtime calculation requirements is provided on the Benefit Code Key.
KITSAP COUNTY
Effective 09-01-04
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Ccde
ASBESTOS ABATEMENT WORKERS
JOURNEY LEVEL $32.61 1N 5D
BOILERMAKERS
JOURNEY LEVEL $30.34 1
BRICK AND MARBLE MASONS
JOURNEY LEVEL $39.87 1M 5A
CABINET MAKERS (IN SHOP)
JOURNEY LEVEL $12.53
CARPENTERS
ACOUSTICAL WORKER $39.11 1M 5D
BRIDGE, DOCK AND WARF CARPENTERS $38.95 1M 5D
CARPENTER $38.95 1M 5D
CREOSOTED MATERIAL $39.05 1M 5D
DRYWALL APPLICATOR $39.63 1M 5D
FLOOR FINISHER $39.08 1M 5D
FLOOR LAYER $39.08 1M 5D
FLOOR SANDER $39.08 1M 5D
MILLWRIGHT AND MACHINE ERECTORS $39,95 1M 5D
PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING $39.15 1M 5D
SAWFILER $39.08 1M SD
SHINGLER $39.08 1M 5D
STATIONARY POWER SAW OPERATOR $39.08 1M 5D
STATIONARY WOODWORKING TOOLS $39.08 1M 5D
CEMENT MASONS
JOURNEY LEVEL $40.01 IM 5D
DIVERS & TENDERS
DIVER $80.62 1M 5D 8A
DIVER TENDER $41,72 1M 5D
DREDGE WORKERS
ASSISTANT ENGINEER $39.52 1B 5D 8L
ASSISTANT MATE (DECKHAND) $38.76 lB 5D 8L
BOATMEN $39.52 1B 5D 8L
ENGINEER WELDER $39,57 lB 5D 8L
LEVERMAN, HYDRAULIC $41.04 lB 5D 8L
MAINTENANCE $38,76 lB 5D 8L
MATES $39.52 lB 5D 8L
OILER $39.16 lB 5D 8L
DRYWALL TAPERS
JOURNEY LEVEL $39.44 1J 5B
ELECTRICAL FIXTURE MAINTENANCE WORKERS
JOURNEY LEVEL $9.37 1
Page I
KITSAP COUNTY
Effective 09-01-04
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
ELECTRICIANS - INBIDE
CABLE SPLICER $49.51 ID 6H
CABLE SPLICER (TUNNEL) $53.31 1D 6H
CERTIFIED WELDER $47.79 1D 6H
CERTIFIED WELDER (TUNNEL) $51.41 1D 6H
CONSTRUCTION STOCK PERSON $24.33 1D 6H
JOURNEY LEVEL $46.06 1D 6H
JOURNEY LEVEL (TUNNEL) $49.51 1D 6H
ELECTRICIANS - MOTOR SHOP
CRAFTSMAN $15.37 2A 6C
JOURNEY LEVEL $14.69 2A 6C
ELECTRICIANS - POWERLINE CONSTRUCTION
CABLE SPLICER $49.54 4A 5A
CERTIFIED LINE WELDER $45.15 4A 5A
GROUNDPERSON $32.63 4A 5A
HEAD GROUNDPERSON $34.43 4A 5A
HEAVY LINE EQUIPMENT OPERATOR $45.15 4A 5A
JACKHAMMER OPERATOR $34.43 4A 5A
JOURNEY LEVEL LINEPERSON $45.15 4A 5A
LINE EQUIPMENT OPERATOR $38.37 4A 5A
POLE SPRAYER $45.15 4A 5A
POWDERPERSON $34.43 4A 5A
ELECTRONIC & TELECOMMUNICATION TECHNICIANS
JOURNEY LEVEL $12.07 1
ELEVATOR CONSTRUCTORS
MECHANIC $49.28 4A 6Q
MECHANIC IN CHARGE $54.18 4A 6Q
FABRICATED PRECAST CONCRETE PRODUCTS
ALL CLASSIFICATIONS $13.50 1
FENCE ERECTORS
FENCE ERECTOR $13.80 1
FENCE LABORER $11.60 1
FLAGGERS
JOURNEY LEVEL ;27.93 1N 5D
GLAZIERS
JOURNEY LEVEL ;39.96 2E 5G
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC ;41.93 1F 5E
HEATING EQUIPMENT MECHANICS
MECHANIC ;18.45 1
HOD CARRIERS & MASON TENDERS
JOURNEY LEVEL ;33.09 IN 5D
INDUSTRIAL ENGINE AND MACHINE MECHANtCS
MECHANIC ;15.65 1
iNDUSTRIAL POWER VACUUM CLEANER
JOURNEY LEVEL $9.07 1
INLAND BOATMEN
CAPTAIN $35.14 1K 5B
COOK $30.11 1K 5B
DECKHAND $29.09 1K 5B
ENGINEER/DECKHAND $31.66 1K 5B
MATE, LAUNCH OPERATOR $33.24 1K 5B
Page 2
KITSAP COUNTY
Effective 09-01-04
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
INSPECTiON/CLEANING/SEALING OF SEWER & WATER
SYSTEMS BY REMOTE CONTROL
CLEANER OPERATOR, FOAMER OPERATOR $9.73 1
GROUT TRUCK OPERATOR $11.48 1
HEAD OPERATOR $12.78 1
TECHNICIAN $7.16 1
TV TRUCK OPERATOR $10.53 1
INSULATION APPLICATORS
JOURNEY LEVEL $36.95 1M 5D
IRONWORKERS
JOURNEY LEVEL $43.12 lB 5A
LABORERS
ASPHALT RAKER $33.09 1N 5D
BALLAST REGULATOR MACHINE $32.61 1N 5D
BATCH WEIGHMAN $27.93 1N 5D
BRUSH CUTTER $32.61 1N 5D
BRUSH HOG FEEDER $32.61 1N 5D
BURNERS $32.61 1N 5D
CARPENTER TENDER $32.61 1N 5D
CASSION WORKER $33.45 1N 5D
CEMENT DUMPER/PAVING $33.09 1N 5D
CEMENT FINISHER TENDER $32.61 1N 5D
CHANGE-HOUSE MAN OR DRY SHACKMAN $32.61 1N 5D
CHIPPING GUN (OVER 30 LBS) $33.09 1N 5D
CHIPPING GUN (UNDER 30 LBS) $32.61 1N 5D
CHOKER SETFER $32.61 1N 5D
CHUCK TENDER $32.61 1N 5D
CLEAN-UP LABORER $32.61 IN 5D
CONCRETE DUMPER/CHUTE OPERATOR $33.09 1N 5D
CONCRETE FORM STRIPPER $32.61 1N 5D
CONCRETE SAW OPERATOR $33.09 1N 5D
CRUSHER FEEDER $27.93 1N 5D
CURING LABORER $32.61 1N 5D
DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED $32.61 1N 5D
DITCH DIGGER $32.61 1N 5D
DIVER $33.45 1N 5D
DRILL OPERATOR (HYDRAULIC, DIAMOND) $33.09 1N 5D
DRILL OPERATOR, AIRTRAC $33.45 IN 5D
DUMPMAN $32.61 1N 5D
EPOXY TECHNICIAN $32.61 1N 5D
EROSION CONTROL WORKER $32.61 1N 5D
FALLER/BUCKER, CHAIN SAW $33.09 1N 5D
FINAL DETAIL CLEANUP (i.e., dusting, vacuuming, window cleaning; NOT $25.61 IN 5D
construction debris cleanup)
FiNE GRADERS $32.61 1N 5D
FiRE WATCH $27.93 1N 5D
FORM SE'I-FER $32.61 1N 5D
GABION BASKET BUILDER $32.61 1N 5D
GENERAL LABORER $32.61 1N 5D
GRADE CHECKER & TRANSIT PERSON $33.09 1N 5D
GRINDERS $32.61 1N 5D
GROUT MACHINE TENDER $32.61 IN 5D
Page 3
KITSAP COUNTY
Effective 09-01-04
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Cody Code Code
GUARDRAIL ERECTOR $32.61 1N 5D
HAZARDOUS WASTE WORKER LEVEL A $33.45 1N 5D
HAZARDOUS WASTE WORKER LEVEL B $33.09 1N 5D
HAZARDOUS WASTE WORKER LEVEL C $32.61 1N 5D
HIGH SCALER $33.45 1N 5D
HOD CARRIEPJMORTARMAN $33.09 1N 5D
JACKHAMMER $33.09 1N 5D
LASER BEAM OPERATOR $33.09 1N 5D
MANHOLE BUILDER-MUDMAN $33,09 IN 5D
MATERIAL YARDMAN $32.61 IN 5D
MINER $33.45 1N 5D
NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH $33.09 1N 5D
PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST,
GUNITE, SHOTCRETE, WATER BLASTER
PAVEMENT BREAKER ;33.09 1N 5D
PILOT CAR ;27.93 1N 5D
PIPE POT TENDER ;33.09 1N 5D
PIPE RELINER (NOT INSERT TYPE) ;33.09 1N 5D
PIPELAYER & CAULKER ;33.09 1N 5D
PIPELAYER & CAULKER (LEAD) ;33.45 1N 5D
PIPEWRAPPER ;33.09 IN 5D
POT TENDER ~32.61 1N 5D
POWDERMAN ;33.45 1 N 5D
POWDERMAN HELPER ~32.61 IN 5D
POWER JACKS ;33.09 1N 5D
RAILROAD SPIKE PULLER (POWER) ;33.09 1N 5D
RE-TIMBERMAN ;33.45 1 N 5D
RIPRAP MAN ;32.61 1N 5D
RODDER ;33.09 1N 5D
SCAFFOLD ERECTOR ;32.61 1N 5D
SCALE PERSON ;32.61 1N 5D
SIGNALMAN ;32.61 1N 5D
SLOPER (OVER 20") ;33.09 1N 5D
SLOPER SPRAYMAN ;32.61 1N 5D
SPREADER (CLARY POWER OR SIMILAR TYPES) ;33.09 1N 5D
SPREADER (CONCRETE) ;33.09 1N 5D
STAKE HOPPER ;32.61 1N 5D
STOCKPILER ;32.61 IN 5D
TAMPER & SIMILAR ELECTRIC, AIR & GAS ;33.09 1N 5D
TAMPER (MULTIPLE & SELF PROPELLED) ;33.09 1N 5D
TOOLROOM MAN (AT JOB SITE) 132.61 1N 5D
TOPPER-TAlLER ~32.61 IN 5D
TRACK LABORER 32.61 1N 5D
TRACK LINER (POWER) 33.09 1N 5D
TRUCK SPOTTER 32.61 IN 5D
TUGGER OPERATOR 33.09 IN 5D
VIBRATING SCREED (AIR, GAS, OR ELECTRIC) 32.61 IN 5D
VIBRATOR 33.09 1N 5D
VINYL SEAMER 32.61 1N 5D
WELDER 32.61 1N 5D
WELL-POINT LABORER 33.09 1N 5D
Page 4
KITSAP COUNTY
Effective 09-01-04
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
LABORERS - UNDERGROUND SEWER & WATER
GENERAL LABORER $32.61 1N 5D
PIPE LAYER $33.09 1N 5D
LANDSCAPE CONSTRUCTION
IRRIGATION OR LAWN SPRINKLER INSTALLERS $11,42 1
LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $10.94 1
LANDSCAPING OR PLANTING LABORERS $8.54 1
LATHERS
JOURNEY LEVEL $39.63 1M 5D
MACHINISTS (HYDROELECTRIC SITE WORK)
MACHINtST $16.84 1
METAL FABRICATION (IN SHOP)
FITTER $26.96 1
LABORER $7.16
MACHINE OPERATOR $13.83 1
WELDER $13.83 1
MODULAR BUILDINGS
CABINET ASSEMBLY $11.56 1
ELECTRICIAN $11.56 1
EQUIPMENT MAINTENANCE $11.56 1
PLUMBER $11.56 1
PRODUCTION WORKER $9.26 1
TOOL MAINTENANCE $11.56 1
UTILITY PERSON $11.56 1
WELDER $11.56 1
PAINTERS
JOURNEY LEVEL $30.76 2B 5A
PLASTERERS
JOURNEY LEVEL $39.93 1R 5A
PLAYGROUND & PARK EQUIPMENT INSTALLERS
JOURNEY LEVEL $8.54 1
PLUMBERS & PIPEFITTERS
JOURNEY LEVEL $43.61 lB 5A
POWER EQUIPMENT OPERATORS
ASSISTANT ENGINEERS ;37.26 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER) ~39.88 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) ~-0.34 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH ~.0.86 1T 5D 8L
BACKHOES, (75 HP & UNDER) ~39.49 1T 5D 8L
BACKHOES, (OVER 75 HP) ~39.88 1T 5D 8L
BARRIER MACHINE (ZIPPER) ~39.88 1T 5D 8L
BATCH PLANT OPERATOR, CONCRETE 39.88 1T 5D 8L
BELT LOADERS (ELEVATING TYPE ) 139.49 1T 5D 8L
BOBCAT 37.26 1 T 5D 8L
BROOMS 37.26 IT 5D 8L
BUMP CUTTER 39.88 1T 5D 8L
CABLEWAYS 40.34 IT 5D 8L
CHIPPER 39.88 1T 5D 8L
COMPRESSORS 37.26 1T 5D 8L
CONCRETE FINISH MACHINE - LASER SCREED 37.26 IT 5D 8L
CONCRETE PUMPS 39.49 1T 5D 8L
CONCRETE PUMP-TRUCK MOUNT WITH BOOM A3q'ACHMENT 39.88 1T 5D 8L
Page 5
KITSAP COUNTY
Effective 09-01-04
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
CONVEYORS $39.49 1T 5D 8L
CRANES, THRU 19 TONS, WITH ATTACHMENTS $39.49 IT 5D 8L
CRANES, 20 - 44 TONS, WITH ATTACHMENTS $39.88 1T 5D 8L
CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING $40.34 1T 5D 8L
JIB WITH ATACHMENTS)
CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $40.86 1T 5D 8L
WITH ATI'ACHMENTS)
CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $41.40 IT 5D 8L
WITH ATTACHMENTS)
CRANES, A-FRAME, 10 TON AND UNDER $37.26 1T 5D 8L
CRANES, A-FRAME, OVER 10 TON $39.49 1T 5D 8L
CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $41.92 1T 5D 8L
CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) ;39.88 1T 5D 8L
CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) ~0.34 1T 5D 8L
CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) "40.86 1T 5D 8L
CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM ~-0.86 1T 5D 8L
CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM ,41.40 1T 5D 8L
CRUSHERS 139.88 IT 5D 8L
DECK ENGINEEPJDECK WINCHES (POWER) 139.88 1T 5D 8L
DERRICK, BUILDING ;40.34 1t 5D 8L
DOZERS, D-9 & UNDER ;39.49 1T 5D 8L
DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT ;39.49 1T 5D 8L
DRILLING MACHINE ;39.88 1T 5D 8L
ELEVATOR AND MANLIFT, PERMANENT AND SHAFT-TYPE ;37.26 IT 5D 8L
EQUIPMENT SERVICE ENGINEER (OILER) ;39.49 1T 5D 8L
FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP ;39.88 1T 5D 8L
FORK LIFTS, (3000 LBS AND OVER) ;39.49 1T 5D 8L
FORK LIFTS, (UNDER 3000 LBS) ;37.26 1T 5D 8L
GRADE ENGINEER ;39.49 1T 5D 8L
GRADECHECKER AND STAKEMAN ;37.26 IT 5D 8L
GUARDRAIL PUNCH ;39.88 1T 5D 8L
HOISTS, OUTSIDE (ELEVATORS AND MANLIFTS), AIR TUGGERS ;39.49 1T 5D 8L
HORIZONTAL/DIRECTIONAL DRILL LOCATOR ;39.49 1T 5D 8L
HORIZONTAL/DIRECTIONAL DRILL OPERATOR ~39.88 1T 5D 8L
HYDRALIFTS/BOOM TRUCKS (10 TON & UNDER) ;37.26 1T 5D 8L
HYDRALIFTS/BOOM TRUCKS (OVER 10 TON) ~39.49 1T 5D 8L
LOADERS, OVERHEAD (6 YD UP TO 8 YD) ;40.34 1T 5D 8L
LOADERS, OVERHEAD (8 YD & OVER) ~40.86 1T 5D 8L
LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED ;39.88 1T 5D 8L
LOCOMOTIVES, ALL ~39.88 IT 5D 8L
MECHANICS, ALL ;40.34 1T 5D 8L
MIXERS, ASPHALT PLANT ~39.88 1T 5D 8L
MOTOR PATROL GRADER (FINISHING) ;39.88 1T 5D 8L
MOTOR PATROL GRADER (NON-FINISHING) ;39.49 1T 5D 8L
MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD ;40.34 1T 5D 8L
OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING ;37.26 1T 5D 8L
OPERATOR
PAVEMENT BREAKER $37.26 1T 5D 8L
PILEDRIVER (OTHER THAN CRANE MOUNT) $39.88 1T 5D 8L
PLANT OILER (ASPHALT, CRUSHER) $39.49 1T 5D 8L
POSTHOLE DIGGER, MECHANICAL $37.26 1T 5D 8L
POWER PLANT $37.26 1T 5D 8L
Page 6
KITSAP COUNTY
Effective 09-01-04
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
PUMPS, WATER $37.26 1T 5D 8L
QUAD 9, D-10, AND HD-41 $40.34 1T 5D 8L
REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $40.34 1T 5D 8L
EQUIP
RIGGER AND BELLMAN $37.26 1T 5D 8L
ROLLAGON $40.34 1T 5D 8L
ROLLER, OTHER THAN PLANT ROAD MIX $37.26 1T 5D 8L
ROLLERS, PLANTMIX OR MULTILIFT MATERIALS $39.49 1T 5D 8L
ROTO-MILL, ROTO-GRINDER $39.88 1T 5D 8L
SAWS, CONCRETE $39.49 1T 5D 8L
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $39.88 1T 5D 8L
OFF-ROAD EQUIPMENT ( UNDER 45 YD)
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $40.34 1T 5D 8L
OFF-ROAD EQUIPMENT (45 YD AND OVER)
SCRAPERS, CONCRETE AND CARRY ALL ;39.49 1T 5D 8L
SCREED MAN ;39.88 1T 5D 8L
SHOTCRETE GUNITE ;37.26 1T 5D 8L
SLIPFORM PAVERS N-0.34 1T 5D 8L
SPREADER, TOPSIDE OPERATOR - BLAW KNOX ;39.88 1T 5D 8L
SUBGRADE TRIMMER ;39.88 1T 5D 8L
TOWER BUCKET ELEVATORS ;39.49 1T 5D 8L
TRACTORS, (75 HP & UNDER ) ;39.49 1T 5D 8L
TRACTORS, (OVER 75 HP) $39.88 1T 5D 8L
TRANSFER MATERIAL SERVICE MACHINE ;39.88 1T 5D 8L
TRANSPORTERS, ALL TRACK OR TRUCK TYPE ;40.34 1T 5D 8L
TRENCHING MACHINES ;39.49 1T 5D 8L
TRUCK CRANE OILER/DRIVER ( UNDER 100 TON) ;39.49 1T 5D 8L
TRUCK CRANE OILER/DR/VER (100 TON & OVER) ;39.88 1T 5D 8L
TRUCK MOUNT PORTABLE CONVEYER ;39.88 1T 5D 8L
WHEEL TRACTORS, FARMALL TYPE ;37.26 1T 5D 8L
YO YO PAY DOZER ;39.88 1T 5D 8L
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER &
(SEE POWER EQUIPMENT OPERATORS)
POWER LINE CLEARANCE TREE TRIMMERS
JOURNEY LEVEL IN CHARGE $33.06 4A 5A
SPRAY PERSON $31.34 4A 5A
TREE EQUIPMENT OPERATOR $31.76 4A 5A
TREE TRIMMER $29.48 4A 5A
TREE TRIMMER GROUNDPERSON $21.94 4A 5A
REFRIGERATION &AIR CONDITIONING MECHANICS
MECHANIC $43.61 lB 5A
RESIDENTIAL BRICK & MARBLE MASONS
JOURNEY LEVEL $17.04 1
RESIDENTIAL CARPENTERS
JOURNEY LEVEL $20.00 1
RESIDENTIAL CEMENT MASONS
JOURNEY LEVEL $30.87 1
RESIDENTIAL DRYVVALL TAPERS
JOURNEY LEVEL $20.00 1
RESIDENTIAL ELECTRICIANS
JOURNEY LEVEL $14.00 1
RESIDENTIAL GLAZIERS
JOURNEY LEVEL $26.84 2E 5G
Page 7
KITSAP COUNTY
Effective 09-01-04
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
RESIDENTIAL INSULATION APPLICATORS
JOURNEY LEVEL $13.96 1
RESIDENTIAL LABORERS
JOURNEY LEVEL $10.04 1
RESIDENTIAL PAINTERS
JOURNEY LEVEL $16.21 1
RESIDENTIAL PLUMBERS & PIPEFI~i'ERS
JOURNEY LEVEL $21.11 1
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $30.22 1J 6L
RESIDENTIAL SOFT FLOOR LAYERS
JOURNEY LEVEL $32.24 lB 5A
RESIDENTIAL SPRINKLER FI'i-I'ERS (FIRE PROTECTION)
JOURNEY LEVEL $26.43 lB 5C
RESIDENTIAL TERRAZZO/TILE FINISHERS
JOURNEY LEVEL $30.26 1
ROOFERS
JOURNEY LEVEL $34.53 1R 5A
USING IRRITABLE BITUMINOUS MATERIALS $37.53 1R 5A
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $46.74 1J 6L
SIGN MAKERS & INSTALLERS (ELECTRICAL)
JOURNEY LEVEL $20.58 1
SIGN MAKERS & INSTALLERS (NON-ELECTRICAL)
JOURNEY LEVEL $9.27 1
SOFT FLOOR LAYERS
JOURNEY LEVEL $32.24 lB 5A
SOLAR CONTROLS FOR WINDOWS
JOURNEY LEVEL $10.31 lB 50
SPRINKLER FI'I-FERS (FIRE PROTECTION)
JOURNEY LEVEL $48.19 1B 5C
STAGE RIGGING MECHANICS (NON STRUCTURAL)
JOURNEY LEVEL $13.23 1
SURVEYORS
CHAIN PERSON $9.35 1
INSTRUMENT PERSON $11.40 1
PARTY CHIEF $13.40 1
TELEPHONE LINE CONSTRUCTION - OUTSIDE
CABLE SPLICER $28.29 2B 5A
HOLE DIGGER/GROUND PERSON $15.91 2B 5A
INSTALLER (REPAIRER) $27.13 2B 5A
JOURNEY LEVEL TELEPHONE LINEPERSON $26.32 2B 5A
SPECIAL APPARATUS iNSTALLER I $28.29 2B 5A
SPECIAL APPARATUS INSTALLER II $27.72 2B 5A
TELEPHONE EQUIPMENT OPERATOR (HEAVY) $28.29 2B 5A
TELEPHONE EQUIPMENT OPERATOR (LIGHT) $26.32 2B 5A
TELEVISION GROUND PERSON $15.10 2B 5A
TELEVISION LINEPERSON/INSTALLER $20.11 2B 5A
TELEVISION SYSTEM TECHNICIAN $23.80 2B 5A
TELEVISION TECHNICIAN $21.43 2B 5A
TREE TRIMMER $26.32 2B 5A
Page 8
KITSAP COUNTY
Effective 09-01-04
(See Benef'~ Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
TERRAZZO WORKERS & TILE SE~'ERS
JOURNEY LEVEL $37.03 1H 5A
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER $12.00 1
TRAFFIC CONTROL STRIPERS
JOURNEY LEVEL $31.90 1K 5A
TRUCK DRIVERS
ASPHALT MIX ( TO 16 YARDS) $36.89 1T 5D 8L
ASPHALT MiX (OVER 16 YARDS) $37.47 1T 5D 8L
DUMP TRUCK $19.60
DUMP TRUCK & TRAILER $19.60 1
OTHER TRUCKS $18.37 1
TRANSIT MIXER $20.79
WELL DRILLERS & iRRIGATION PUMP INSTALLERS
IRRIGATION PUMP INSTALLER $13.17 1
OILER $14.08
WELL DRILLER $14.40 1
Page 9
BENEFIT CODE KEY - EFFECTIVE 09-01-04
OVERTIME CODES
OVERTIME CALCULATIONS ARE BASED ON THE HOURLY RATE ACTUALLY PAID TO THE WORKER. ON PUBLIC
WORKS PROJECTS, THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE
HOURLY RATE OF THE COST OF FRINGE BENEHTS ACTUALLY PROVIDED FOR THE WORKER.
1. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAiD AT ONE
AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. ALL HOURS WORF~D ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND ONE-HALF
TIMES THE HOURLY RATE OF WAGE.
B. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF
WAGE.
C. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
D. THE FIRST EIGHT (8) HOURS ON SATURDAYS OF A FIVE - EIGHT HOUR WORK WEEK AND THE FIRST EIGHT (8)
HOURS WORKED ON A FIFTH CALENDAR DAY, EXCLUDING SUNDAY, IN A FOUR - TEN HOUR SCHEDULE, SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8)
HOURS PER DAY ON SATURDAY; ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS IN A FIFTH CALENDAR
WEEKDAY OF A FOUR - TEN HOUR SCHEDULE; ALL HOURS WORKED 1N EXCESS OF TEN (10) HOURS PER DAY
MONDAY THROUGH FRIDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE
THE HOURLY RATE OF WAGE.
E. ALL HOURS WORKED IN EXCESS OF 10 PER DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. THE
FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SATURDAY, AND ALL HOURS WORKED ON
SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
F. THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED iN EXCESS OF EIGHT (8) HOURS ON SATURDAY, AND ALL HOURS WORKED ON
SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL
HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE.
G. THE FIRST TEN (10) HOURS WORKED ON SATURDAYS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH
CALENDAR WEEKDAY iN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID AT ONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH
SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY
RATE OF WAGE.
H. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO iNCLEMENT WEATHER
CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF
WAGE.
I. ALL HOURS WORKED ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF THE HOURLY RATE OF WAGE.
WORK PERFORMED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. WORK PERFORMED
ON A HOLIDAY SHALL BE PAID ONE AND ONE-HALF TIMES THEIR HOURLY RATE FOR ACTUAL HOURS WORKED
PLUS EIGHT (8) HOURS OF STRAIGHT TIME FOR THE HOLIDAY.
J. THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SATURDAY, AND ALL HOURS WORRED ON
SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
K. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
L. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY AND CHRISTMAS
DAY) SHALL BE pAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON
THANKSGIViNG DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
M. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS 1F WORK IS LOST DUE TO INCLEMENT WEATHER
CONDITIONS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED
ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
N. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID AT ONE AND ONE-HALF TIMES
THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE
THE HOURLY RATE OF WAGE.
BENEFIT CODE KEY - EFFECTIVE 09-01-04
-2-
P. ALL HOURS WOP-KED ON SATURDAYS (EXCEPT MAKEUP DAYS) AND SUNDAYS SHALL BE PAID AT ONE AND ONE-
HALF TIMES THE HOURLY P-~T£ OF WAGE. ~LL HOURS WOP, KED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE
HOURLY RATE OF WAGE.
Q. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIiVlES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT
DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND
ONE-HALF TIMES THE HOURLY RATE OF WAGE.
R. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE.
1. T. ALL HOURS WORKED ON SATURDAYS, EXCEPT MAKE-UP DAYS, SHALL BE PAID AT ONE AND ONE-HALF TIMES
THE HOURLY RATE OF WAGE. ALL HOURS WORKED AFTER 6:00PM SATURDAY TO 6:00AM MONDAY AND ON
HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
U. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES
THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE
HOURLY RATE OF WAGE.
W. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS (EXCEPT MAKE-UP DAYS) SHALL BE PAID AT ONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES
THE HOURLY RATE OF WAGE.
2. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE
AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. THE FIRST SIX (6) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SATURDAY AND ALL HOURS WORKED ON SUNDAYS
AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE.
B. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
C. ALL HOURS WORICED ON SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
ALL HOURS WORICED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE.
D. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORJC~ED ON HOLIDAYS SHALL BE PAiD AT STRAIGHT TIME IN
ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE
PAll) AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
E. ALL HOURS WORKED ON SATURDAYS OR HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE
PAID AT TWO TIMES THE HOURLY RATE OF WAGE.
F. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY PATE OF WAGE
IN ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL
BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS
WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
INCLUDING HOLIDAY PAY.
H. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL
HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE IN
ADDITION TO THE HOLIDAY PAY.
I. ALL HOURS WORKED ON SATURDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND ON LABOR DAY SHALL BE
PAID AT TWO TIMES THE HOURLY RATE OF WAGE.
J. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS
WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY PATE OF WAGE,
INCLUDING THE HOLIDAY PAY. ALL HOURS WORKED ON UNPAID HOLIDAYS SHALL BE PAID AT TWO TIMES THE
HOURLY RATE OF WAGE.
K. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDITION TO
THE HOLIDAY PAY.
BENEFIT CODE KEY - EFFECTIVE 09-01-04
M. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE
OF WAGE.
O. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE.
4. A. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID
AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORICED ON SATURDAYS, SUNDAYS AND HOLIDAYS
SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
HOLIDAY CODES
5. A. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AFTER THANKSGIVENG DAY, AND CHRISTMAS DAY (7).
B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (8).
C. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8).
D. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE
FRIDAY AND SATURDAY AFTER THAIqKSGIVING DAY, AND CHRISTMAS DAY (8).
E. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS
DAY (9).
G. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE
LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7).
H. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE DAY AFTER
T1LKNKSGIVING DAY, AND CHRISTMAS (6).
I. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY (6).
N. HOLIDAYS: NEW YEAR'S DAY. PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY. VETERANS'
DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGiVING DAY. AND CHRISTMAS DAY (9).
O. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY (6).
P. HOLIDAYS: NEW YEAR'S DAY. MEMORIAL DAY. INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AND SATURDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (9).
Q. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY. INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
AND CHRISTMAS DAY (6).
R. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, I~DEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
DAY AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY. (7 1/2).
S. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGiVING DAY, AND CHRISTMAS DAY (7).
T. PAID HOLIDAYS: SEVEN (7) PAID HOLIDAYS.
V. PAID HOLIDAYS: SIX (6) PAID HOLIDAYS.
W. PAID HOLIDAYS: NINE (9) PAiD HOLIDAYS.
X. HOLIDAYS: AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. AFTER 2080
HOURS - NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY. LABOR DAY,
THANKSGiVING DAY, CHRISTMAS DAY AND A FLOATING HOLIDAY (8).
Y. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY. PRESIDENTIAL ELECTION
DAY, THANKSGIVING DAY, THE FRIDAY FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8).
BENEFIT CODE K~Y - EFFECTIVE 09-01-04
-4-
Z. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIViNG DAY, THE FRIDAY AFTER THANKSGIViNG DAY, AND CHRISTMAS DAY (8).
6. A. PAID HOLIDAYS; NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, iNDEPENDENCE DAY, LABOR DAY,
THANKSGIViNG DAY, THE FRIDAY AFTER THANKSGIViNG DAY, AND CHRISTMAS DAY (8).
B. PAID HOLIDAYS: NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY. (9)
C. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE DAY AFTER THA3qKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND
CHRISTMAS DAY (9).
D. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIViNG DAY, CHRISTMAS DAY, THE DAY BEFORE OR THE DAY
A~TER CHRISTMAS DAY (9).
6. H. HOLIDAYS: NEW YEAR'S DAY, MARTiN LUTHER KiNG JR. DAY, MEMORIAL DAY, iNDEPENDENCE DAY, LABOR
DAY, THANKSGIViNG DAY, THE FRIDAY AFTER THANKSGIViNG DAY, AND CHRISTMAS DAY (8).
L PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7).
L. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
THE FRIDAY AFTER THANKSGIViNG DAY, THE LAST WORKiNG DAY BEFORE CHRISTMAS DAY, AND
CHRISTMAS DAY. (8)
Q. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S
DAY THANKSGIVING DAY, THE DAY AFTER THANKSGIViNG DAY AND CHRISTMAS DAY. UNPAID
HOLIDAY2 PRESIDENTS' DAY.
S. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIViNG
DAY, THE FRIDAY AFTER THANKSGIViNG DAY, CHRISTMAS EVE DAY, AND CHRISTMAS DAY (8).
T. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIViNG DAY, THE LAST WORKING DAY BEFORE
CHRISTMAS DAY, AND CHRISTMAS DAY (9).
U. HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIViNG DAY, THE FRIDAY AFTER THANKSGIViNG DAY, THE DAY BEFORE
CHRISTMAS DAY, CHRISTMAS DAY (9).
V. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIViNG
DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY,
AND ONE DAY OF THE EMPLOYEE'S CHOICE (10).
W. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY,
iNDEPENDENCE DAY, LABOR DAY, THANKSGIViNG DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS
DAY, DAY BEFORE CHRISTMAS DAY (10).
X. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIViNG DAY, DAY AFTER THANKSGIVING
DAY, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (11).
NOTE CODES
8. A~ THE STANDBY P-~TE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDITION TO
THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWiNG DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET
OR MORE:
OVER 50' TO 100' - $1.00 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER 100' TO 175' - $2.25 PER FOOT FOR EACH FOOT OVER 100 FEET
OVER 175' TO 250' - $5.50 PER FOOT FOR EACH FOOT OVER 175 FEET
OVER 250' - DIVERS MAY NAME THEIR OWN PRICE, PROVIDED IT IS NO LESS THAN THE SCALE LISTED
FOR 250 FEET
C. THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. iN ADDITION TO
THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWiNG DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET
OR MORE:
OVER 50' TO 100' - SI.00 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER 100' TO 150' - $1.50 PER FOOT FOR EACH FOOT OVER 100 FEET
OVER 150' TO 200' - $2.00 PER FOOT FOR EACH FOOT OVER 150 FEET
BENEFIT CODE KEY - EFFECTIVE 09.01.-04
-5-
OVER 200' - DIVERS MAY NAME THEIR OWN PRiCE
D. WORKERS WORKING WITH SUPPLIED AIR ON HAZMAT PROJECTS I~ECEIVE AN ADDITIONAL $1.00 PER HOUR.
L. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITION,~L HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $0.75,
LEVEL B: $0.50, AND LEVEL C: $0.25.
M. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY pIIEMIUMS AS FOLLOWS: LEVELS A & B: $I .00,
LEVELS C & D: $0.50.
N. WORKERS ON HAZMAT PROJECTS RECEIVE ~kDDIT1ONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $1.00,
LEVEL B: $0.75, LEVEL C: $0.50, AND LEVEL D: $0.25.
ATTACHMENT 1
SCOPE OF SERVICES
General
The work to be completed under this contract generaily consists of installation of
approximately 625 linear feet of cure-in-place liner in a 42 inch storm sewer pipe,
including all materials, equipment, and labor required to install the liner, cure the liner in
place, seal the storm sewer pipe at manholes, and all other appurtenant work required to
install the cured-in-place liner.
Work shall be performed in accordance with Attachment 2, CURED-IN-PLACE LINERS.
Work, Materials, and Equipment to be orovided bv the Contractor: · Mobilization to and demobilization from the Project Site
· Traffic Control per MUTCD
· Bypass pumping of residual dry weather flows up to 1,400 gpm.
· Installation of approximately 625 feet of 42" diameter cured-in-place liner
· Containment, pumping, and discharge of cure water to the nearest sanitary
sewer manhole.
· CCTV inspection of pipe after lining operations
· Testing of a sample of the installed liner in accordance with ASTM D 790 and
ASTM D 5813 at Contractor's in-house laboratory.
Work, Materials and Equipment to be provided by the City · A backflow preventer for connection to a City fire hydrant for water supply
· Water from the nearest fire hydrant for curing the liner
· A dump site near the project for debris removed from the manholes and pipe
· Cleaning of mainline pipe to remove any debris required to be removed from the
interior of the pipe prior to lining.
· CCTV inspection of pipe prior to lining operations. Videos records of this
inspection will be provided to the Contractor to confirm pipe cleanliness.
· Legal and physical access to the manholes and pipe
· Locating, exposing and making accessible all manholes, including removal of
obstructions. This shall also include excavation to expose the upstream manhole
top, removal of all portions of that manhole down to and including the flat top so
that at least a 60" barrel is available for access, placing temporary barrel sections
matching the existing barrel diameter up to the ground surface, providing a cover
for the pit, and restoring the manhole after lining.
· Spot repairs necessary to prepare the existing pipe for lining, including removal
of obstructions that will impede or prevent lining operations and repair of defects
in the existing pipe that would be unacceptable in the finished product
· Repair bottom of existing pipe where required prior to installation of the liner
· As-built surveys and record drawings
· A staging area near the work site
· Notification of any affected parties
· Provide any necessary permits or variances required for performing the work.
Brentwood Storm Sewer Rehabilitation Attachment I-1 City of Brcmcrton
Department of Public Works and Utilities
Other Conditions pertinent to the Derformance of the Contract
· Work shall only be scheduled to be pedormed during an expected prolonged
period of dry weather. CIPP shall not be installed either during, or too soon after,
a storm event.
· No temporary hose or piping will be required to be buried on this project.
· No overtime inspection fees or penalties will be billed to the Contractor for
working outside the normal working hours.
· No water used during the lining process may be discharged to the nearby stream
or storm drain system. All water shall be discharged to the nearest sanitary
sewer manhole.
Schedule
Task Duration Start Finish
Notice to Proceed1 - 11/8/2004 11/8/2004
Procurement 25 working days 11/8/2004 12/12/2004
Constructionz 15 working days 12/13/2004 1/2/2005
Note 1: Date of Notice to Proceed is assumed. Schedule wilt begin on actual date of
Notice to Proceed.
Note 2: Construction is dependant on a 5-6 day period of dry weather. Notice to
Proceed for the Construction Phase will be given after consultation with the
Contractor and when dry weather is expected for the next several days.
Brentwood Storm Sewer Rehabilitation Attachment 1-2 City of Bremerton
Depamnent of Public Works and Utilities
A'FFACHMENT 2
CURED-IN-PLACE LINERS
PART 1 - GENERAL
1.1 DESCRIPTION
A. This specification defines the requirements for the rehabilitation of pipelines
by the installation of a resin-impregnated liner. The liner may be installed
either by inversion or may be pulled in to place. The resin is cured using
steam under air pressure or hot water under hydrostatic pressure within the
liner. The Cured-In-Place Pipe (CIPP) will be continuous and tight fitting.
1.2 REFERENCE STANDARDS
Reference Title
ASTM F1216 Standard Practice for Rehabilitation of Existing
Pipelines and Conduits by the Inversion and Curing
of a Resin-Impregnated Tube
ASTM F1743 Standard Practice for Rehabilitation of Existing
Pipelines and Conduits by Pulled-in-Place
Installation of Cured-in-Place Thermosetting Resin
Pipe (ClPP)
ASTM D790 Standard Test Methods for Flexural Properties of
Unreinforced and Reinforced Plastics and Electrical
Insulating Materials
ASTM D543 Standard Practices for Evaluating the Resistance of
Plastics to Chemical Reagents
ASTM D2990 Standard Test Methods for Tensile, Compressive,
and Flexural Creep and Creep-Rupture of Plastics
^STM D3839 Standard Practice for Underground Installation of
"Fiberglass" (Glass-Fiber- Reinforced Thermosetting-
Resin) Pipe
1.3 DEFINITIONS
A. Definitions are in accordance with terminology of ASTM F412, unless
otherwise specified. Abbreviations are in accordance with terminology of
ASTM D1600, unless otherwise specified.
1. Lateral Connection: The point where a lateral pipe intersects with
the mainline pipe, also known as the lateral interface. It can consist
of a tee, wye, or cut-in connection.
2. Host Pipe: An existing pipeline or conduit to be internally
rehabilitated by installation of a pipe liner.
3. Manufacturer and/or Assembler: The entity responsible for
obtaining individual components of a cured-in-place liner system
and assembling into the final products which are shipped to the job
site for installation.
Brentwood Storm Sewer Rehabilitation Attachment 2- I City of Bremerton
Department of Public Works and Utilities
4. CIPP Contractor: Licensed Contractor or subcontractor responsible
for the installation of the cured-in-place liner system in the field.
5. Lateral Cutter Operator: The person directly responsible for
reinstating lateral connections.
1.4 QUALIFICATIONS
A. Qualification Requirements:
1. The Manufacturer or Assembler shall have supplied a minimum of
50,000 linear feet of liner for similar projects. Contractor shall
provide a list of installation projects including project names, owner
contacts, phone numbers, and year installed.
2. Provide certification showing that the Contractor is currently
licensed by the manufacturer to install the specified product.
1.5 LICENSING AND CERTIFICATION
A. The Contractor or subcontractor installing the CIPP shall have a current
license agreement with the product Manufacturer or Assembler.
1.6 SUBMITTALS
A. Untess otherwise indicated, submittals shall be submitted within 10 working
days of Notice to Proceed. The City will review and return submittals within
5 working days. Disapproved submittals shall be re-submitted within 5
working days of receipt and will be reviewed and returned within 5 working
days.
B. Shop drawings and equipment data:
1. Details on all lining materials and resins.
2. Name of resin supplier and liner fabric supplier.
3. Technical data showing that the cured ClPP system meets the
chemical resistance, corrosion resistance, flexural strength, flexural
modulus, long term flexural modulus, and wall color requirements of
this specification section.
4. Manufacturer certification that the liner materials are in compliance
with the specifications, codes, and standards reference herein.
5. Manufacturer's recommendation for storage procedures and
temperature control, minimum and maximum pressures and
temperatures; time durations for handling and inserting the liner,
curing, and cool down; service connection methods, and trimming
and finishing.
6. Material Safety Data Sheets for resins, hardeners, solvents, and all
other compounds or chemicals to be used on job site.
7.Flat plate samples from each section of liner.
C. Pipe sizing calculations which demonstrate that the liner has been properly
sized to avoid the creation of wrinkles or folds.
D. Bypass pumping and/or diversion plans at least 10 working days prior to
the work. Notify the ENGINEER 24 hours prior to commencing with the
bypass pumping operation. The Contractor's plan for bypass pumping
shall be satisfactory to the ENGINEER before the CONTRACTOR shall be
allowed to commence bypass pumping. The bypass pumping plan shall
include an emergency response plan to be followed in the event of a failure
of the bypass pumping system.
Brentwood Storm Sewer Rehabilitation A~achment 2-2 City of Bremer~on
Department of Public Works and Utilities
E. The resin manufacture's heating requirements, and conceptually discuss
with the ENGINEER the general curing guidelines.
1.7 QUALITY ASSURANCE
^. The finished ClPP shall be continuous over the entire length of an insertion
run between two manholes or access points and shall be free from visual
defects such as foreign inclusions, dry spots, pinholes, and delamination.
B. Wrinkles in the finished ClPP greater than 5% of the pipe diameter shall be
unacceptable and shall be removed and repaired by the Contractor at the
Contractor's expense. Methods of repair shall be proposed by Contractor
and submitted to the Project Representative for review.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Liner:
1. The CIPP shall consist of one or more layers of flexible needled felt
or an equivalent non-woven material, or a combination of non-
woven and woven materials capable of carrying resin and
withstanding installation pressures.
2. The liner shall have a uniform thickness that when compressed at
installation pressures will meet or exceed the design thickness.
3. The liner shall tightly fit the internal circumference and length of the
host pipe.
4. The liner shall be homogeneous across the entire wall thickness
containing no intermediate or encapsulated elastomeric layers. No
material shall be included in the tube that may cause delamination
in the cured CIPP. No dry or unsaturated layers shall be evident.
5. The wall color of the interior pipe surface of CIPP after installation
shall be a light reflective color.
6. Seams in the liner shall be stronger than the non-seamed fabric.
7. The outside of the liner shall be marked for distance at regular
intervals along its entire length, not to exceed 25 ft. Such markings
shall include the Manufacturers name or identifying symbol.
B. Resin: The resin shall be a corrosion resistant polyester, vinyl ester, or
epoxy system.
C. The layers of the cured CIPP shall be uniformly bonded. It shall not be
possible to separate any two layers with a probe or point of a knife blade so
that the layers separate cleanly or the probe or knife blade moves freely
between the layers.
2.2 DESIGN PARAMETERS
A. The hydraulic capacity of the CIPP shall be greater than or equal to the
hydraulic capacity of the original host pipe, based on hydraulic calculations
with standard engineering roughness coefficients.
B. The liner thickness shall be designed based on the engineering formulas
listed in ASTM F1216 for fully deteriorated pipes, assuming groundwater at
the surface, HS-20 live loading, 120 pounds per cubic foot dry soil density,
and depth of cover as determined by the adjacent upstream or downstream
manhole, whichever is deeper. The thickness shall be sufficient to prevent
Brentwood Storm Sewer Rehabilitation Attachment 2-3 City of Bremenon
Department of Public Works and Utilities
groundwater from entering the pipe, while maintaining the maximum cross-
sectional pipe area possible. The CIPP design shall assume no bonding to
the original pipe wall.
MINIMUM PHYSICAL PROPERTIES
Curred Composite Curred Composite
Composite Property Test Method min. per ASTM F1216 (400,000 psi Resin)
ASTM D-790
Modulus of Elasticity i (short term) 250,000 psi 400,000 psi
Flexural Stress ASTM D-790 4,5000 psi 4,000 psi
G. Chemical Resistance; The CIPP shall meet the chemical resistance
requirements of ASTM F1216, Appendix X2. ClPP samples for testing shall
be of liner and resin system similar to that proposed for actual construction.
D. Hydraulic Capacity: Overall, the hydraulic profile shall be maintained as
large as possible. The ClPP shall have a minimum of the full flow capacity
of the original pipe before rehabilitation.
2.3 SAMPLES
A. ClPP Field Samples: When requested by the ENGINEER, the Contractor
shall submit test results from field installations of the same resin system
and tube materials as proposed for the actual installation. These test
results must verify that the ClPP physical properties have been achieved in
previous field applications.
PART 3 - EXECUTION
3.1 HANDLING AND STORAGE
A. Handling and storage of the resin-impregnated liner before installation shall
be per the manufacturer's instructions.
3.2 INSTALLATION
A. Cleaning and Inspection:
1. Contractor shall inspect the pipe immediately prior to lining.
B. CIPP installation shell be in accordance with ASTM F1216, Section 7, or
ASTM F1743, Section 6, with the following modifications:
1. Resin Impregnation:
a. The quantity of resin used for liner impregnation shall be
sufficient to fill the volume of air voids in the tube with
additional allowances for polymerization shrinkage and the
loss of resin through cracks and irregularities in the host
pipe wall. Any alternate resin impregnation method must be
proven.
b. The resin impregnation method shall be vacuum
impregnation, or an alternate proven method producing
similar results.
Brentwood Storm Sewer Rehabilitation Attachment 2-4 City of Bremerton
Department of P~blic Works and Utilities
2. Liner Insertion: Inversion Method
a. The impregnated tube shall be inserted through an existing
manhole or other access point by means of the
Manufacturer's or Assembler's recommended installation
process and in accordance with ASTM F1216. The
application of air or water pressure shall fully extend the
liner to the next designated manhole or termination point
and inflate and firmly adhere the liner to the pipe wall.
b. Single liners may be installed through intermediate
manholes.
c. When inversion is by water pressure, the Contractor shall
use methods which control the installation rate, accounting
for the increase in hydrostatic head in pipes which have
significant elevation change.
3. Liner Insertion: Pull/Winch Method
a. The impregnated tube shall be pulled into place in
accordance with ASTM F1743 within the host pipe with the
aid of a power winch.
b. The maximum allowable longitudinal elongation, or stretch,
of the material shall be one percent. The longitudinal stretch
of the tube shall be gauged by comparing marker on the
fully inserted tube to the actual length of pipe being
rehabilitated.
4. Curing:
a. After placement of the liner is complete, provide a suitable
heat source and distribution equipment. The equipment
shall be capable of circulating hot water or steam throughout
the lined section in accordance with the Manufacturer's or
Assembler's recommendations to raise the temperature
uniformly above the temperature required to affect a resin
cure. This temperature shall be determined by the
Manufacturer or Assembler based on the resin/hardener
system employed.
b. The heat source shall be fitted with continuous monitoring
thermocouples to measure and record the temperature of
the incoming and outgoing hot water or steam.
c. Provide standby equipment to maintain the heat source
supply. The temperature during the cure shall not be less
than 130 degrees Fahrenheit at the boundary between the
pipe wall and the liner unless otherwise directed by the
Manufacturer.
d. Temperature shall be maintained during the curing period as
recommended by the Manufacturer, and shall follow the
heating schedule supplied by the Manufacturer.
e. A data logger shall record temperature, pressure and time
during heating, cure, and cool down at both ends of the
liner. Contractor to provide a color plot in Microsoft Excel
format comparing temperature and pressure against time.
Units shall be degrees Fahrenheit, psi and minutes.
5. Cool Down
Brentwood Storm Sewer Rehabilitation Attachment 2-5 City of Bremerlon
Department of Public Works and Utilities
a. Cool the liner down to below the temperature specified by
Manufacturer following the cure period, for duration specified by
Manufacturer, prior to relieving installation pressure.
b. Care shall be taken to ensure that a vacuum is not induced
which could damage the new CIPP during the release of head
on the new CIPP.
c. Continue data logger operation throughout the cool down
phase.
6. Ends of the finished CIPP liner shall be sealed at the interface of
the manhole with the host pipe to prevent water movement between
the host pipe and the finished CIPP liner. The end sealing material
shall be an approved epoxy or sealing material that is compatible
with the finished CIPP liner and shall provide a durable watertight
seal as approved by the Engineer.
3.3 TESTING
A. CIPP samples shall be prepared in accordance with ASTM D5813, Section
7, ASTM F1216 or ASTM F1743, Section 8, using either method proposed.
The flexural properties must meet or exceed the values listed in Table 1 of
the applicable ASTM standard.
B. CIPP fiat plate samples shall be submitted to the ENGINEER for testing.
The sample will be large enough to allow for a minimum of five specimens
for flexural testing. Samples shall be cured on conditions similar to those of
the CIPP liner.
C. Wall thickness of samples shall be determined as described in paragraph
6.3.3 of ASTM D5813 or paragraph 8.1.6 of ASTM F1743. The minimum
wall thickness at any point shall not be less than 871/2°/o of the design
thickness.
D. Visual inspection of the CIPP shall be in accordance with ASTM F1743,
Section 8.6.
E. Should the pre-installation inspection reveal conditions in the sewer to be
substantially different than those presented in the appendices of these
Specifications, the Contractor shall report the changes to the Engineer
along with supporting videotape recording of existing conditions.
3.4 FIELD QUALITY CONTROL
A. Should the post*installation CCTV inspection reveal any material flaws or
ineffective installation of the liner, the Contractor will make corrections as
approved by the Engineer, at no cost to the OWNER.
END OF SECTION