HomeMy WebLinkAbout4356
+--~--------------------~--------------------------------------------------+
+Enter Search Criteria, Press Esc Key to Transmit +
+press Del Key to Terminate Delete Mode +
+ CHANGE Contract Transactions +
+ Contract Number 4356 +
+ +
+vendor Name RICE FERGUS MILLER ARCHITECTURE & PLANNING LLP +
+Subject ARCHITECT - FIRE STATION+
+Department ECON DEVEL +
+Status Code PRO +
+ Amount $217156.00 +
+ Begin Date 04/30/2003 +
+ Insurance End Date 12/31/2004 +
+ Type Amount Review Date 02/15/2007 +
+ E&O $2000000.00 +
+ +
+ +
+ Insurance Total $2000000.00 +
+ Insurance Review Date 02/01/2007 +
+ +
+ Comments SUPPLEMENTAL AGREEMENT 2/05 +
+ VAULT 01/01/2007 +
+ +
+--------------------------------------------------------------------------+
~!~Yrgus
i\~ ER
supplemental sef'/\ces ~9{eement
fife Station #' ownef: CitY of Bfe{l\erton
PfO}ect: SSp.. No.: 2002' 62.00
oate of p..gfee{l\ent: febfuafY 4, 2005 PfO}ect NO.: .
10 accordaoce wito toe j\.greemeot relereoced abOve, autMrizatiOO is oerelYi gIVeO
to: S .
o proceed witO P.dditiOoal ervlces . .
o proceed witnrevised scope 01 BasIC servIces
\! ioCur Reimbursable l'>< eoses. PlaooiO LLP. will assist witO
t;S fOLLOWS: RIC~ ferguS 1I\IIIer :,colt~'~~~I~~ witO toegcxr{s cooseo lurnitUre
lurnitUre aod labllc selectlOo aO coor I
vend Of fOf uP to 20 hoUfS.
. I II WS' fee will be billed at 5110.00 per oour
compensation soall be adlu~ted as 0 ~ t' . 0 time re<\uested bY toe City will be
up to 51,600. P.dditiOoal MOlture consu a 10
billed on an oourlY basis 01 5BO.00/oour.
1\me lor pe!formance soall be adjusted as {olio"": nla
. I S iCes j\.greemeot soall become a part 011\le
Upon e~ecutiOO, tOIS Supplemeot> erv d upplemental serviCes described abOve
original j\.greement relerenced above, aO s
; com ence. p..uthOf\Zed bY Ownef:
SU ",\tte
..-.,~..';. ::: .
62 00 .t'J of bfetnerton fife
. ,.\2002162 c\I'i 01 b<<",arton .<< .,""on .r \2002\ . ~
\\SbseNef\CotnpanY\Pfolec
station #"\\contfacts\SSa#O"\ .dOC
+
iEnter Search Criteria, Press Eec Key to Transmit
Press Del Key to Terminate Delete Mode
CHANGE Contract Transactions
Contract Number 4356
Vendor Name RICE FERGUS MILLER ARCHITECTURE & PLANNING LLP
Subject ARCHITECT - FIRE STATION
IDepartment ECON DEVEL
Status Code PRO
Amount $215556.00
Begin Date 04/30/2003
Insurance End Date 12/31/2004
Type Amount Review Date 11/01/2004
+ $2oooooo.oo
Insurance Total $2000000.00
Insurance Review Date 02/01/2005
Comments
+
+
Professional Services Agreement
A. Project Owner: City of Bremerton, 239 Fourth Street, Bremerton, WA 98337,
phone - (360) 473-5234, fax - (360) 473-5850.
B. Architect: Rice Fergus Miller Architecture & Planning, LLP
262 4th Street, Bremerton, WA 98337
(360) 377-8773; FAX: (360) 792-1385
C. Time for Performance: Per Article II - Schedule of Performance
D. Compensation for Services: $215,556
E. Architects Authorized Basic Representative: David A. Fergus, Partner
F. City's Representatives:
Kathleen McCluskey, Project Administrator
Gary Sexton, Director of Economic Development
The parties listed as authorized representatives have authority, make decisions and on
behalf of the respective party.
THIS AGREEMENT IS MADE SUBJECT TO THE TERMS AND CONDITIONS SET
FORTH ON THE FOLLOWING PAGES HEREOF. THE ARCHITECT
SPCIFICALLY AGREES THAT THE INDEMNIFICATION AND SAVE HARMLESS
PROVISIONS OF SUCH AGREEMENT, TOGETHER WITH THE ARCHITECT'S
WAIVER OR IMMUNITY UNDER WASHINGTON RCW TITLE 51, WERE
SPECIFICALLY REVIEWED AND MUTUALLY NEGOTIATED, INCLUDING BUT
NOT LIMITED TO PARAGRAPH 9.
Rice Fergus Miller
nrch~tur~ ~n~ ning, LLP City of Bremerton
Title: Partner Title: Mayor
Professional Services Agreement
Page 1 of 15
4/21/2003
I. Consultants:
The Architect shall, in a timely manner, designate and appoint sub-consultants
after conferring with the City's Project Administrator. The Architect shall not
appoint any sub-consultants to which the City has a reasonable objection. The
Architect shall incorporate the provisions of this agreement, the scope of work,
and the requirements of the project into the contracts with sub-consultants.
The Architect shall not change consultants on this project without the express
written approval of the owner project representative, which approval shall not
unreasonably be withheld.
II. Schedule of Performance
Schedule of performance, Basic Services, Bremerton Headquarters Fire Station
Complete by
Schematic Design Phase 07/15/2003
Design Development Phase 08/30/2003
Construction Documents Phase 10/30/2003
Bidding Phase 11/31/2003
Construction Phase 11/31/2004
Construction Completion Phase 12/31/2004
III. Scope
The Architect will perform architectural and engineering base services for
Schematic Design, Design Development, Construction Documents, Bidding and
site visits for the construction phase. These services include structural,
mechanical, and electrical engineering services.
The fire station is to be constructed on a 1.1 acre parcel being purchased by the
City adjacent and west of Park Avenue and between Ninth and Tenth Streets,
plus possible property for parking north, south or west of the primary properties.
The anticipated building size is approximately 15,300 sq. ft.
The Architect shall review information provided by consultants directly retained
by the City and shall coordinate the work and work product of such consultants
with the Architect's work into an overall set of consistent drawings,
specifications and other contract documents. The Architect may reasonably rely
upon the accuracy and completeness of City furnished services, information,
surveys and reports. In such cases, authorship of such documents will be clearly
identified.
Professional Services Agreement
Page 2 of 15
4/21/2003
The Architect shall provide to the Project Administrator four (4) copies of project
documents upon completion of each of the Schematic Design, Design
Development and Construction Document phases. Project documents shall be in
a form and style suitable for presentation, review and reproduction.
The Project Administrator shall submit the Architect's documents for obtaining a
building permit and other permits or approvals required for the project. Upon
application for such permits, the Architect shall reply to all inquiries from
governing agencies forwarded by the Project Administrator, shall make any
necessary or appropriate changes to the Contract Documents approved by the
City and assist the City in expediting the issuance of all such permits or
approvals.
The Architect shall meet solely with Kathleen McCluskey, Project Administrator
or in her absence, Gary Sexton and A1 Duke, Fire Chief as reasonably requested
to ensure that the developing design is meeting the City's requirements and shall
conduct presentations of the Project to the City Council or other groups as
requested by the Project Administrator, limited to one such presentation at the
completion of each phase of service.
A detailed list of the documents to be prepared for each scope of work is attached
hereto as Attachment A.
Through the design process, the Architect shall assist Project Administrator with
analyzing the project scope, design alternatives, schedule and budget options to
keep the project within the Maximum Allowable Construction Cost (MACC). If
the construction cost estimate exceeds the MACC, the Architect shall analyze
design alternatives and submit cost saving options for the City's consideration.
City shall furnish required information, approvals and services as expeditiously
as necessary for the orderly progress of the work. Architect shall promptly notify
the Project Administrator in writing in the event orderly progress of the work is
disro, pted by failure of the City to provide such information, approvals or
servmes, and the project schedule shall be adjusted as mutually agreed.
The City shall separately furnish the following services: · Land survey of the site, prepared by a registered land surveyor.
· Legal, accounting, and insurance counseling services reasonably required.
· Geotechnical engineering, which may include test borings, test pits, soil
bearing values, and air and water pollution tests.
· Civil engineering.
· Landscape and irrigation design services.
· Specialty consultant services, such as communications, acoustic, indoor
air quality, security, audio visual, or similar.
· Testing services during construction that are reasonably required.
Professional Services Agreement
Page 3 of 15
4/21/2003
The City shall arrange and pay for the required advertisements for bid and other
legal notices.
A. Schematic Design Phase
1. Based upon the City's approved program created in consultation with the
Architect, the Architect shall prepare the general and detailed
requirements for the Project, for the Project Administrator's approval.
The Schematic Design Phase shall consist of two parts: a) Conceptual
Design Alternatives and b) Schematic Design Documents. Upon approval
of the Conceptual Design by the Project Administrator, the Architect shall
prepare the Schematic Design Documents.
2. The Architect shall submit to Project Administrator a Construction Cost
Estimate projected to the expected time of bid, itemized by major
categories, to give reasonable assurance that construction costs will not
exceed the MACC. The format of the estimate shall be based on format
approved by the Project Administrator. The Construction Cost estimate
shall establish a preliminary schedule setting forth the expected period of
time required for completion of construction.
3. The Architect shall provide a timely written response, in accordance with
the schedule, to Project Administrator review comments, and shall secure
the City's written approval of the Schematic Documents.
B. Design Development Phase
1. Upon written authorization to proceed fi-om City, the Architect shall
prepare, based upon the approved Schematic Design documents, Design
Development documents required to fix, describe and illustrate the full
size, character and scope of the Project.
2. The Architect shall submit to Project Administrator an updated and
itemized Construction Cost Estimate including an updated Project
schedule, based on the completed Design Development documents, in the
same format as the Estimate prepared for the Schematic Design Phase.
The updated Construction Cost Estimate shall be in sufficient detail to
give reasonable assurance that construction costs will not exceed the
MACC.
3. The Architect shall review and respond to the Project Administrator's
review comments and shall secure Project Administrator's written
approval of the Design Development documents.
C. Construction Documents Phase
Professional Services Agreement
Page 4 of 15
4/21/2003
1. Upon written authorization to proceed from Project Administrator, the
Architect shall prepare, based upon the approved Design Development
documents, Construction Documents consisting of Drawings,
Specifications and other documents setting forth in detail the scope of the
Project, Such documents shall describe materials, standards of
workmanship, finishes, equipment and the conditions affecting the work
required to be performed in all divisions of the construction work.
2. In preparing the Construction Documents, the Architect shall, in
consultation with the Project Administrator, prepare the necessary bidding
information, bidding forms, which shall include the City's General
Conditions of the Contract, Supplemental Conditions, instructions to
bidders and prevailing wage rates and ensure that the subsequent divisions
of the Construction Documents are consistent therewith.
3. The Architect shall prepare a detailed Construction Cost Estimate,
including an updated Project schedule, based on the completed
Construction Documents. The final detailed Construction Cost Estimate
shall include an itemization of alternates proposed and the estimated
construction cost to be added or deducted from each alternate selected.
a. The Architect shall propose and prepare bid alternates to provide
reasonable assurance that the City will be able to award a construction
contract that does not exceed the MACC.
4. The Architect shall submit to Project Administrator four (4) sets of the
completed construction drawings and specifications.
5. The Architect shall secure the City's written approval of the drawings and
specifications, the final cost estimate, and the alternates.
D. Bidding Phase
1. The Architect shall assist the Project Administrator in issuing the Bid
Documents to bidders and plan centers. The Architect shall attend and
participate in the prebid conference and generally assist Project
Administrator in managing the bid process.
2. In the event the lowest responsive bid submitted by a responsible bidder
satisfactory to the Project Administrator exceeds the MACC, then the
Architect will, at it's sole cost and expense, revise the drawings and
specifications as may be required by Project Administrator to reduce or
modify the quality or quantity, or both, of the work so that the total
construction cost of the Project will not exceed the MACC.
Professional Services Agreement
Page 5 of 15
4/21/2003
E. Construction Phase
1. The Architect shall participate with Project Administrator in the
preconstruction conference with contractor.
2. During the progress of construction, the Architect shall perform services
including:
· Visit the site a minimum of twice weekly during construction. Architect
shall be familiar with the progress and quality of the work completed
and able to determine if the work is being performed in a manner that
will be in general conformance with the contract documents when
completed.
· Consult with the Project Administrator during the Construction Phase.
Instructions to the contractor shall be communicated by the Architect.
The Architect shall have authority to act on behalf of the Project
Administrator only to the extent provided in the Contract Documents
unless otherwise modified in writing by the Project Administrator.
· Interpretations of the requirements of the Contract Documents shall be
made by the Project Administrator with consultation and written
recommendation from the Architect.
· Provide to Project Administrator copies of all written communications
that the Architect provides to Contractor, at the same time such
communication is provided to Contractor.
· Verify general conformance with the contract documents, review,
approve or otherwise take appropriate action upon Contractor's
submittals, including field questions, shop drawings and submittals of
materials, equipment, tests and inspections. The Architect shall take
prompt action so as to cause no delay in the work.
· Prepare necessary documents for changes in the work including revision
drawings, cost estimates and reasons for change, and secure, analyze in
detail and recommend disposition of proposals from Contractor. If
requested, the Architect shall attend Project Administrator meetings
convened for purpose of reviewing proposed changes in the work.
· Determine and certify the amount owing to Contractor, based on the
Architect's observations and evaluation of Contractor's Application for
Payment. The Architect's certification for payment shall constitute a
representation that the work has progressed to the point indicated and
that, to the best of the Architect's knowledge, information and belief,
the quantity and quality of the work is in general conformance with the
Contract Documents and that the Contractor is entitled to payment in the
amount requested.
· Review Contractor's progress schedules at least once per month for
conformance with the Construction Documents, and promptly notify the
Project Administrator and Contractor of deviations and noncompliance.
· Attend on-site Project progress meetings once per week. The Architect
shall require its sub consultants attend progress meetings as needed
Professional Services Agreement
Page 6 of 15
4/21/2003
and/or requested by the Project Administrator. The Architect shall keep
project meeting minutes, and transmit copies to the Project
Administrator and Contractor as soon as possible but in no event later
than one day prior to the next weekly meeting.
· The Architect shall select finish materials and colors and prepare color
schedules for items included in the construction contract for the Project
Administrator's approval.
3. The Architect shall not be responsible for construction means, methods,
techniques, sequences or procedures, or for safety precautions, and
programs in connection with the work, and shall not be responsible for
Contractor's failure to carry out the work in accordance with the Contract
Documents.
4. The Architect shall at all times endeavor to discover and guard owner
against defects and deficiencies in the work of Contractor, but it is
understood that the Architect does not guarantee the performance of the
Contractor. The Architect shall promptly advise the Project Administrator
of work which does not conform to the Contract Documents.
5. The Architect shall have authority to reject work which does not conform
to the Contract Documents. The Architect shall recommend to the Project
Administrator that the Contractor be directed to stop work when such
stoppage may, in the Architect's reasonable opinion, be necessary to
ensure the proper execution of the work.
F. Construction Completion Phase
1. The Architect shall conduct pre-final inspection and prepare check lists of
corrective items, make final inspections by all disciplines, including at
least one re-inspection, recommend the date or dates of final completion
and recommend acceptance of the Project to Project Administrator.
2. The Architect shall obtain, review, approve and deliver to the Project
Administrator, written guarantees, manuals and instructions from
Contractor as required by the Construction Documents upon completion of
construction and prior to recommending acceptance of the Project to the
Project Administrator.
3. The Architect shall modify the original Construction Drawings to conform
to the project record drawings provided by Contractor which incorporates
all changes in the work, including utilities, made during construction and
addenda during bidding. The modified original Construction Drawings
and related electronic media shall be completed and submitted to the
Professional Services Agreement
Page 7 of 15
4/21/2003
Project Administrator within two months of owner's acceptance of the
Project or as otherwise mutually agreed.
4. Upon the Project Administrator's request during the warranty period set
forth in the Construction Contract, the Architect shall assist Project
Administrator in identifying defects in the Project, determine corrective
measures, provide inspection of the Project and assist the Project
Administrator in implementing corrective measures.
G. Additional Services and Reimbursable Expenses
1. The City shall pay for the following Additional Services performed,
furnished, or incurred by the Architect. However, the City has no
obligation to pay Architect for Additional Services performed by Architect
prior to receipt of the Project Administrator's authorization for such
service. The City reserves the right to employ other means to accomplish
said services.
a. Revising drawings or specifications previously approved by the City
when such revisions are due to changes in project scope, program
changes, changes required by the enactment or revisions to codes,
laws, or regulations subsequent to the preparation of such documents,
or changes directed by the City that are not normally made as a part of
the Schematic or Design Development phases
b. Providing consulting services for City-supplied equipment, new or
used, to be incorporated into the Construction Contract, such as bunker
gear extractors and dryers, diesel exhaust collection equipment,
compressors, breathing air fill equipment, or the like.
c. Providing consulting services in connection with selecting and/or
procuring furniture, fixtures, and equipment (FF&E) outside of the
Construction Contract.
d. Providing consultation or contract administration for the replacement
of any work damaged by fire, accidental or natural causes during
construction, provided that such damage was not caused by the fault or
negligence of the Architect; providing professional services or
arranging for the work to proceed should the contractor default in the
performance of the construction contract or become delinquent or
insolvent.
e. Providing services in connection with improvements and/or equipment
installation at either of Bremerton's other two fire stations.
Professional Services Agreement
Page 8 of 15
4/21/2003
f. Providing brochures, detailed architectural models, or additional
graphic presentations beyond the TWO graphic presentations agreed
to.
g. Providing services during the construction phase in connection with
unforeseen conditions or changes requested by the Project
Administrator.
h. Providing services during construction in connection with processing
more than 75 contractor-generated Requests for Information (RFI's),
excluding any RFI's reasonably contributed to an error or omission of
the Architect.
i. In the event the construction period up to substantial completion
exceeds the time stipulated in the construction contract including
change order extensions by more than 10%, the Architect shall
continue administration of the construction contract and be entitled to
Additional Services compensation for the construction time extension
occurring through no fault or neglect of the Architect.
j. Providing services a~er issuance to the City of the Contractor's final
Certificate for Payment.
2. The City shall pay for the following reimbursable expenses incurred by
the Architect and/or their sub-consultants. The City will pay the Architect
an additional 7.5% of authorized reimbursable expenses as a handling fee.
a. Providing additional copies of drawings, specifications, studies,
reports, Contract Documents, correspondence, and/or papers received
or issued by the Architect as requested by the Project Administrator.
b. Providing printing and distribution of documents to the City at the
completion of each phase of service, including the construction
documents for bidding.
c. Out-of-pocket reprographic expenses when substantiated by third-
party invoices. No reimbursement shall be made for postage, handling,
telephone expenses, faxes, or copies of documents used by the
Architect to perform normal services and not provided to the City.
3. Fees for authorized Additional Services shall be mutually agreed to by the
City and the Architect prior to performing such services.
H Basis of Compensation
Professional Services Agreement
Page 9 of 15
4/21/2003
1. Maximum Allowable Construction Cost (MACC) Defined: The MACC for
this project is $2,760,000, and is the total sum allocated by the City for
construction of the project, not including Washington State Sales Tax,
Architect compensation, or other items in the City's project budget such as
contingencies, administrative costs, furniture or equipment purchased
outside the construction contract.
2. It is understood that the Architect's fixed fee has been established, in part,
by a percentage of the City's MACC ($2,760,000 x 7.81% = $215,556). If
at any time the City elects to increase the MACC by more than 10%, the
Architects fee shall be adjusted proportionately to the adjustment in the
MACC.
IV. Standard Terms and Conditions
1. Time and Delay. Time is of the essence in this Agreement. The Architect
agrees to punctually and diligently perform all parts of it's Services as
scheduled in Attachment A, which shall be subject to change by the City as
may be deemed necessat~ to the overall progress of the Project.
2. Monthly Invoices: Final Payment.
a. Payments shall be made no more often than once each calendar month
within thirty (30) days after the City's receipt of a monthly invoice for
fees and costs incurred during the preceding month; provided that: (i) all
services covered by the invoice have been fully and timely performed; (ii)
the Architect has furnished the City with copies of supporting
documentation for all costs covered by the invoice; and (iii) the Architect
is not in default under this Agreement.
b. Each payment made by the City to the Architect shall be deemed made to
the Architect in trust for the Architect's sub-contractom and consultants to
the extent such parties have not been paid for the services, supplies,
equipment or materials provided by such parties.
c. Should there be any claim, obligation or lien asserted before or after final
payment is made that arises from the negligent performance of the
Architect's work, the Architect shall reimburse the City for any costs and
expenses, including attorney fees, costs and expenses, incurred by the City
in satisfying, discharging or defending against any such claim, obligation
or lien, including any action brought or judgrnent recovered. City shall
have the right to withhold from any payment, or othenvise be reimbursed
for, an amount sufficient to protect the City from any such claims.
3. Compliance with Laws; Governmental Agency Communications. The
Architect shall comply with all Federal, State and Local laws, rules,
Professional Services Agreement
Page 10of15
4/21/2003
regulations and ordinances applicable to the services and the Architect's
performance thereof, which are in effect at the time the services are provided
and the requirements for environmental documents prepared under the State
Environmental Policy Act (SEPA).
4. Performance Standard. The Architect shall perform the services in a
professional, efficient and economical manner consistent with the City's
needs as set forth in the scope of work attached hereto, and consistent with
the level of care, skill, practice and judgment exercised by other
professionals performing services of a similar nature under similar
cirenmstances. The Architect represents and warrants to the City that all
persons who will be performing the services possess the requisite skill,
training and experience and hold all required licenses and permits to render
the services contemplated by this Agreement.
5. Safety.
a. The Architect shall comply with all applicable Federal, State and/or Local
safety related laws and regulations, and shall comply with any such laws
and regulations, including but not limited to any OSHA, WlSHAJOregon
Department of Labor Health and Safety Rules/Regulations. The Architect
shall fully comply with the Hazard Communication Standard for the
Construction Industry, and any Federal, State or Local Right to Know
Legislation and shall transmit information to all parties concerning
chemical hazards requirements.
6. Amendments/Changes. The City may, without invalidating this Agreement,
fi.om time to time request changes in the scope of the services. If such
changes involve additional time and expense by the Architect, the Architect
shall, within five (5) days of receiving notice of the requested change,
submit its estimate to the City of the costs and additional time, if any,
necessary to perform such changes. The Architect shall commence any such
change order work only upon the written receipt by the Architect of the
approval by the City to do so.
7. No Assignments or Delegation of Services.
a) This Agreement may not be assigned by operation of law or otherwise,
without the prior written consent of the City, which may be withheld at its
sole discretion.
b) The Architect shall assign the persons designated in Section E on the first
page of this Agreement as its key personnel to perform the services on
behalf of the Architect. Such key personnel shall be replaced only with
the prior consent of the Project Administrator, which may be withheld in
its sole discretion. None of the services may be delegated or sub-
Professional Services Agreement
Page 11 of 15
4/21/2003
contracted to an independent contractor without the prior written consent
of the City, which may be withheld at its sole discretion. The Architect
shall remain fully responsible for the manner and quality of all services
performed, including the performance of all consultants and sub-
consultants retained by the Architect.
8. Indemnity. To the fullest extent permitted by law, and to the extent the
Architect is negligent, the Architect shall indermdfy, defend and hold
harmless, the City, its officers, agents, employees and representatives from
and against any and all claims, damages, losses and expenses, including, but
not limited to, reasonable attorney fees, which arise out of or result from
any negligent act or omission of the Architect, any consultants engaged by
the Architect and for anyone directly or indirectly employed by them. If the
claim results from the concurrent negligence of the City and the Architect,
the Architect's indemnification obligation shall be limited to the extent of
it's negligence; and (b) the Architect expressly waives any immunity that
may be granted it under the Washington State Industrial Insurance Act,
RCW Title 51, to the extent necessary to provide the City with such full
indemnity. The provisions of this Section shall survive termination of this
Agreement for any reason.
9. Insurance. Prior to the commencement of the Services, the Architect shall,
at its own expense, obtain the following insurance coverage, which coverage
shall remain in force during the term of this Agreement:
a) Commercial General Liability insurance, including blanket contractual
liability coverage, with limits of at least:
$2,000,000 General Aggregate (Other Than Products-Completed
Operations)
$2,000,000 Products- Completed Operations Aggregate Limit
$1,000,000 Personal and Advertising Injury Limit
$1,000,000 Per Occurrence Limit
$ 100,000 Fire Damage Limit (Any One Fire)
b) Professional Liability insurance, including errors and omissions, with
limits of liability equal to at least $1,000,000 each occurrence;
c) Automobile Liability insurance with limits of liability of not less that
$1,000,000 per occurrence combined single limit for bodily injury
property damage;
d) Employer's Liability or Stop Gap Liability insurance with limits of not
less than $1,000,000 each accident, $1,000,000 each employee-disease
and $1,000,000 policy limit-disease; and
Professional Services Agreement
Page 12 of 15
4/21/2003
e) Insurance in accordance with all applicable laws relating to workers'
compensation with respect to all of the Architect's employees, owners and
officers, regardless of whether such coverage or insurance is mandatory or
merely elective under the law.
f) .Each policy of insurance shall be in a form satisfactory to the City with an
insurer having an A.M Best rating of B+ VI or better, and provide thirty
(30) days' advance notice to the City of non-renewal or material change.
Such policies shall not have deductibles that exceed $25,000 per
occurrence. Prior to the commencement of the services, the Architect
shall provide the City with written evidence of the required coverage in
the form of a certificate of insurance with additional insured endorsements
naming the City of Bremerton as additional insured attached or, upon the
City's request, a copy of the policy. The insurance certificate
requirements for the coverage required for workers' compensation will be
satisfied by a letter from the appropriate state agency confirming
participation in accordance with statutory requirements.
10. Architect's Default. If the Architect fails to prosecute the services promptly
or properly or breaches or fails to perform any obligation under this
Agreement, the City may give the Architect seven (7) days' written notice of
such matter. If such matter has not been corrected within such seven-day
period, the City may, without prejudice to any other right or remedy it may
have, terminate this Agreement and correct any defective services and
charge the Architect for all costs, expenses, and impacts to the Project
arising from such defects, and deduct the same from sums otherwise due the
Architect.
11. Documents and Data.
a) The Architect agrees that all documents, drawings, reports, electronic
files, auto CADD version 12-14 or compatible or similar electronic
information, together with other information prepared or obtained by the
Architect in connection with the services including work in progress
(cumulatively "materials"), are the sole property of the City for use
exclusively by the City or its designated agents and employees and shall
be submitted to the City within three (3) working days at~er a written
request from the City and, in any event, upon completion of the services
under this Agreement, prior to and as a condition of the final payment to
the Architect. City shall indemnify Architect from any claims or damages
arising from the City's subsequent use of the electronic version of said
materials.
12. Confidentiality. The Architect agrees that all documents, drawings, reports
and other data and information prepared or obtained by the Architect in
connection with the services are confidential and shall not be disclosed or
Professional Services Agreement
Page 13 of 15
4/21/2003
made available to any individual or entity other than the City, its designated
agents or employees and any person who must know the information in
order for the Architect to complete the services except to the extent required
to be disclosed pursuant to the Public Records Act, chapter 42.17 RCW.
13. Royalties, Patents, Copyrights and Trade Secrets.
a) The Architect shall not infringe on United States patent, copyright, trade
secret or other proprietary right for any material, product, or part of any
material or product (including, for example, software, hardware, service,
design or equipment0 used or ftmfished in connection with this
Agreement, and shall defend and indemnify the City from any suits or
claims for infringement of any such rights and shall hold the City harmless
from any loss on account thereof.
14. Notices. All notices provided for herein may be transmitted by facsimile,
delivered or mailed. If mailed, such notice shall be considered delivered
three (3) days after being deposited in such mail. The addresses to be used
in connection with such correspondence and notices are as set forth on the
first page of this Agreement, or such other address as a party shall from time
to time direct. Notices or correspondence to the City shall be sent to such
address marked for the attention of the City's Representative designated in
Section F on the first page of this Agreement, or such other representative as
the City may hereafter designate from time to time.
15. Suspension of Services; Termination. The City may, upon written notice,
direct the Architect to suspend all or a portion of the Services. In the event
of such suspension, the Architect shall be entitled to payment off (a) all fees
properly earned up to the effective date of suspension; and (b) all
reimbursable expenses actually and properly incurred up to such date, but
excluding any and all unearned overhead and profit. If the services are
suspended for a continuous period of more than sixty (60) days, and such
suspension is not due to the fault of the Architect, then the Architect shall
also be entitled to payment of unavoidable out-of-pocket expenses,
excluding any and all nneamed overhead and profit, actually suffered as a
result of such suspension. The City also reserves the right to terminate this
Agreement for the convenience of the City at any time upon three (3) days
written notice to the Architect. If the City so terminates this Agreement, the
Architect shall be entitled to payment off (a) all fees properly earned up to
the effective date of termination, and (b) all direct reimbursable expenses
actually and properly incurred up to such date, but excluding any and all
overhead and profit accruing after the date of termination.
16. Relationship of Parties. The Architect is an independent contractor and not
an agent or employee of the City. Nothing contained in this Agreement shall
be deemed to create a relationship of employer-employee, master-servant,
Professional Services Agreement
Page 14 of 15
4/21/2003
partnership, joint venture or any other relationship between the City and the
Architect other than that of independent contractor. Neither party shall have
any authority to supervise the employees, representatives or sub-contractors
of the other party, nor to make any statements, representations or
commitments of any kind or take any actions which will be binding upon the
other party except as specifically provided in this agreement.
17. Entire Agreement. This Agreement constitutes the final and complete
agreement between the parties hereto with respect to the subject matter of
this Agreement, superceding all prior agreements or discussions with respect
thereto. No additions, deletions or modifications hereof shall become part of
this Agreement unless each party hereto specifically recognizes and consents
to their inclusion by a signed instrument.
18. Disputes
a) This Agreement shall be governed by the laws of the State of Washington.
b) The Architect consents to consolidation and/or joinder, in a single
proceeding, of all claims and disputes by or between the City, sub-
contractors, the Architect, the City's other consultants, or any other person
or entity involved with the Project, with a claim or dispute relating in any
manner to the Architect's services provided by it under this Agreement.
c) In any dispute involving the City and the Architect or otherwise arising
under or relating to this Agreement, each party shall be responsible for
their own attorney's fees and costs, together with any and all expert fees.
Professional Services Agreement
Page 15 of 15
4/21/2003