Loading...
HomeMy WebLinkAbout4337 +--------------------------------------------------------------------------+ .~nter Search Criteria, Press Esc Key to Transmit t .,:Press Del Key to Terminate Delete Mode "I. t CHANGE Contract Transactions -- t Contract Number 4337 - - -- -- .:Vendor Name URS CORPORATION AMERICA - - .,.Subj ect WATER SYSTEM DESIGN - W650 ZONE + .:Department ENGINEERING + .=Status Code PRO - - - - Amount $220183.00 == - - Begin Date 01/20/2003 == + Insurance End Date 10/01/2004 == - - Type Amount Review Date 02/15/2007 "i" - - GL $2000000.00 t -- AL $1000000.00 + -- E&O $1000000.00 - - ;= Insurance Total $4000000.00 == t Insurance Review Date 02/01/2005 == + + + Comments EXTENDED BY LETTER OF AGREEMENT 4/04 t =+= MODIFICATION #1-9/03 #2-12/04 VAULT 01/01/2007 =+= t t +--------------------------------------------------------------------------+ - CONTRACT MODIFICATION AGREEMENT NO.2 BETWEEN THE CITY OF BREMERTON AND URS CORPORATION AMERICA Project No. R6236102 PROJECT: West 650 Pressure Zone Improvements CONSULTANT: URS Corporation DATE: November 9, 2004 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services Agreement - Design & Construction Phase Services, West 650 Pressure Zone Upgrades AGREEMENT (the "Contract") entered into between the City of Bremerton and URS Corporation America (Consultant) on January 20, 2003. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the Contract is modified as follows: I. Section I. Scope, is modified as follows: Provide the City "Full Size" mylars for the City's Record Files and one (I) electronic copy (CD- Auto CAD r14.drwg format). Section III. Compensation, is modified as follows: The original contract amount was One Hundred Eil~hty-One Thousand, Five Hundred Seventy- Eight Dollars ($181,578.00).The City modified the Agreement an additional Thirty Six Thousand Dollars ($36,000.00) September IS, 2003. The City shall pay the Consultant for the additional scope of work described above, based on time and materials, an amount not to exceed Two Thousand Six Hundred Five Dollars ($2,605.00) for a total amended contract amount of Two Hundred Twenty Thousand, One Hundred - Eighty Three ($220,183.00) including this Contract Modification_ II. The Consultant accepts all reqnirements of this Contract Modification No.2 by endorsing below. The Consultant further agrees that this Contract Modification No.2 constitutes full and final settlement of all Consultant's claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City's right to bring a claim for past performance. In addition, the Consultant shall inform any Surety providing bond(s) required under this contract of this Contract Modification and shall take appropriate action to incorporate this change into the required bond(s). The parties whose names appear below warrants under penalty of perjury that they are authorized to enter into a contract modification that is binding on the parties ofthis contract. CONTRACT MODIFICATION No.2 1 Project No. R62361 02 IN WITNESS WHEREOF, the parties have executed this Contract Modification No. 2 on the day and year first written above. Public Works Director Dept. Hea~~ Initials and Date CONSULTANT: T~OF~ON URS CORPORATION By _(/~, ~a ~A'~, ~-~-/_ By Cary Bozeman Its lq~a,~-i ~t"l/r:.l'-I dql~ Its Mayor DATE: t~O-O 'ZZ. ~ DATE: /e~ ~APPROVED AS TO RM: ATTEST:~~~ Br~erton City Attorney "~:~y'Cler~ NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Mr. Ross Pouley Dan Miller Title: Project Manager Title: Project Manager URS Corporation America City of Bremerton Public Works & Utilities 1501 4th Avenue, Suite 1400 3027 Olympus Drive Seattle, WA 98101-1616 Bremerton, WA 98310 Phone/Fax: 360-473-2314/360-473-5018 CONTRACT MODIFICATION No. 2 2 Project No. R6236102 CONTRACT MODIFICATION AGREEMENT NO. 1 BETWEEN THE CITY OF BREMERTON AND URS CORPORATION AMERICA PROJECT West 650 Pressure Zone Improvements CONSULTANT URS Corporation DATE September 12, 2003 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services Agreement - Design & Construction Phase Services~ West 650 Pressure Zone Upgrades AGREEMENT (the "Contract") entered into between the City of Bremerton and URS Corporation America (Consultant) on Januar~ 20, 2003. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope · is modified as follows: See Amended Scope of Work attached as Exhibit A. Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by January 31~ 2004. Section III. Compensation , is modified as follows: The original contract mount was One Hundred Eighty-One Thousand~ Five Hundred Seventy - Eight Dollars ($181,578.00). The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed Thirty-Six Thousand Dollars ($36~000.00) for a total amended contract amount of Two Hundred Seventeen Thousand, Five Hundred Seventy - Eight Dollars ($217~578.00). including this Contract Modification. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant's claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City's right to bring a claim for past performance. CONTRACT MODIFICATION 1 Project Number: R6236102 - The' undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on thc day and year first written above. 'Initials and I~te / ONS Am . Its ~C ~Mo[~ ~ Its Mayor DATE: ~//rD00 3 DATE: ~PRO~D AS TO ~O~: ATTEST: Breme~on City A~omey City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Brian Russell, Vice President Robert Earl URS Corporation America Project Manager 1501 4th Avenue, Suite 1400 City of Bremerton Engineering DepaV_ment Seattle, WA 98101-1616 3027 Olympus Drive Bremerton, WA 98310 (360) 473-5344 (360) 473-5398 (Fax) R:\LEGAL\Contracts~FORMS\Contract Modification (2003).doc CONTRACT MODIFICATION 2 Project Number: R6236102 +Enter Search Criteria, Press Esc Key to Transmit Press Del Key to Terminate Delete Mode CHANGE Contract Transactions Contract Number 4337 ~Vendor Name URS CORPORATION AMERICA ~Subject WATER SYSTEM DESIGN - W650 ZONE Department ENGINEERING Status Code PRO Amount $181578.00 Begin Date 01/20/2003 Insurance End Date 10/01/2004 Type A-mount Review Date 09/01/2004 GL $2000000.00 AL $1000000.00 E&O $1000000.00 Insurance Total $4000000.00 Insurance Review Date 02/01/2005 + + Cory Bozeman April 16, 2004 Brian Russell, P.E. Vice President URS Corporation America 1501 4th Avenue Suite 1400 Seattle, WA 98101-1616 Re: Professional Services Agreement between URS Corporation America and the City of Bremerton dated January 20, 2003 Dear Mr. Russell: The Professional Services Agreement ("Agreement") between the City of Bremerton ("City") and URS Corporation America (URS) dated January 20, 2003 expired on December 31,2003 pursuant to paragraph 2 of the agreement. Although the termination date identified in the agreement has passed, the work outlined in the agreement has not been completed. It is the intent of the City to extend the agreement for the period of nine (9) months, commencing January 1, 2004 and terminating on October 1, 2004. All original contract terms and conditions to remain unchanged. If URS agrees to the above terms, please indicate acceptance by signing below where indicated. If you have any questions or concerns, please contact Tom Knuckey at (360) 473-2376. Cary Bozeman Mayor dh/Is cc: Tom Knuckey, P.E., Managing Engineer-Utilities 24113 Page 1 of 2 URS - PSA Extension URS Corporation America agrees to the above terms: URS Corporation America Its: ~t:t4~a4-. ~Je, V't/l O~a Date: ~'1 ~ ~. Page 2 of 2 URS - PSA Extension +Enter Search Criteria, Press Esc Key to Transmit +Press Del Key to Terminate Delete Mode CHANGE Contract Transactions Contract Number 4337 + +Vendor Name URS CORPORATION AMERICA +Subject WATER SYSTEM DESIGN - W650 ZONE +Department ENGINEERING +Status Code PRO Amount $181578.00 Begin Date 01/20/2003 Insurance End Date 12/31/2003 Type Amount Review Date 06/01/2004 $2000000.00 AL $1000000.00 E&O $1000000.00 Insurance Total $4000000.00 Insurance Review Date 02/01/2005 + + PROFESSIONAL SERVICES AGREEMENT Design and Construction Phase Services West 650 Pressure Zone Upgrades The City of Bremerton ("City") and URS Corporation America ("Contractor"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Contractor agrees to perform the services more specifically described in the Scope of Services, dated January 20, 2003, including any addenda thereto as of the effective date of this Agreement, attached hereto as Exhibit A, which is incorporated herein by this reference as if fully set forth. The Scope of Services may be modified only pursuant to Section VII.H. of this Agreement. If the Scope of Services provides for unspecified additional services, the services shall only be performed upon the express written request of the City. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: Time is of the essence for this Agreement. The City and the Contractor agree that the effective date of this Agreement is January 20, 2003 for all services on the tasks described in Exhibit A. The parties agree that certain services described in Exhibit A is to be completed in accordance with Section 4.0 - Project Schedule included in Exhibit "A". All other services shall be completed by December 31, 2003; provided however, that additional time shall be granted by the City for excusable delays or extra services as provided for in Section IX (A) of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Contractor in an mount not to exceed One Hundred Eighty One Thousand, Five Hundered Seventy-Eight dollars ($181,578). Contractor's charges and bills shall conform to the fee schedule attached hereto as Exhibit "B" and incorporated herein by this reference. The Contractor shall submit regular billing statements describing services rendered and the amount charged for each service. The descriptions shall conform to and fall within the categories set out in the Scope of Services. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOW-EVER, the City reserves the right to direct the Contractor's compensated services under the time frame set forth in Section II herein before reaching the maximum amount. The Contractor's bill rates shall be as delineated in Exhibit B. Contractor shall not perform work beyond the Scope of Services, nor shall be compensated for such services, unless the Scope of Services or amount of compensation is modified pursuant to this Agreement. Additional services shall be compensated for only if requested pursuant to Section I and shall be compensated as set out in the request or, if the request does not so provide, as set out in the attached fee schedule. Bremerton/URS Corporation West 650 Pressure Zone Design & Construction Phase Services Page 1 of 7 If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Contractor of its obligations under this Agreement. IV. Relationship of Parties: Contractor is skilled in the matters addressed in the Scope of Services and is performing independent functions and responsibilities within its field of expertise. Contractor and its personnel are independent contractors and not employees of the City. Contractor and its personnel have no authority to bind the City or to control the City's employees and other contractors. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-contractors of the Contractor. Contractor will be solely and entirely responsible for its acts and for the acts of Contractor's agents, employees, representatives and sub-contractors during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent contractors to perform the same or similar work. As an independent contractor, Contractor is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Contractor or itg personnel. As an independent contractor, Contractor is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, B&O, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Contractor. V. Indemnification: Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's willful misconduct or negligent performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE iNDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY Bremerton/URS Corporation West 650 Pressure Zone Design & Construction Phase Services Page 2 of 7 FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. VI. Insurance: The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the services hereunder by the Contractor, its agents, representatives, employees, sub-consultants or sub-contractors. Before beginning work on the project described in this Agreement, the Contractor shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; and employer's liability; and 3. Excess Liability insurance with limits not less than $1,000,000 limit per occurrence and aggregate. 4. Professional Liability insurance with limits no less than $1,000,000 limit per claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Contractor. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which shall be provided on a "claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the fight to receive a certified copy of all the required insurance policies. The Contractor's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Contractor's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. Bremerton/URS Corporation West 650 Pressure Zone Design & Construction Phase Services Page 3 of 7 The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. VII. General Conditions: A. Reports and Information: When requested by the City, Contractor shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Contractor shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports developed under this Agreement shall belong to and become the property of the City. All written information submitted by the City to the Contractor in connection with the services performed by the Contractor under this Agreement will be safeguarded by the Contractor to at least the same extent as the Contractor safeguards like information relating to its own business. If such information is publicly available or is already in Contractor's possession or known to it, or is rightfully obtained by the Contractor from third parties, Contractor shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Contractor under this Agreement may be stored at Contractor's office in Seattle, Washington. Contractor shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. Any use or reuse of the documents, data and files created by Contractor for the City on this project by anyone other than Contractor on any other project shall be without liability or legal exposure to Contractor. C. Contractor to Maintain Records to Support Independent Contractor Status: On the effective date of this Agreement (or shortly thereafter), Consultant shall: 1. File a schedule of expenses with the Internal Revenue Service for the type of business Consultant conducts; 2. Establish an account with the Washington State Department of Revenue and other necessary state agencies, for the payment of ail state taxes normally paid by employers, register to receive a unified business identifier number' from the State of Washington; and 3. Maintain a separate set of books and records that reflect all items of income and expenses of Consultant's business, all as described in the Revised Code of Washington (RCW) Section 51.08.195, as required to show that the services performed by Consultant under this Agreement shall not give rise to an employer- Bremerton/URS Corporation West 650 Pressure Zone Design & Construction Phase Services Page 4 of 7 employee relationship between the parties which is subject to RCW Title 51, Industrial Insurance. D. Work Performed at Contractor's Risk: Contractor shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the E. Place of Work: The Contractor shall perform the services authorized under this Agreement at its offices in Seattle, Washington. Meetings with the City staff as described in Exhibit A, Scope of Services, shall take place at the City's offices at 3027 Olympus Drive, Bremerton, Washington, or at locations mutually agreed upon by the parties. F. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. G. Severabilit¥: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. H. Modification: This Agreement may only be modified by written instrument signed by both Parties. I. WrittenNotices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below, unless notified to the contrary. Any written notice hereunder shall become effective upon the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address Contractor Address Robert Earl, Project Manager Brian Russell, Vice President Dept. of Public Works & Utilities URS Corporation America. 3027 Olympus Drive 1501 4th Avenue, Suite 1400 Bremerton, Wa. 98310 Seattle, Washington 98101-1616 J. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other fight or power. K. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. Bremerton/URS Corporation West 650 Pressure Zone Design & Construction Phase Services Page 5 of 7 L. Compliance with Laws: Contractor shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. M. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. N. Attorneys' Fees: The substantially prevailing Party in any litigation arising out of this Agreement shall be entitled to its reasonable attorneys' fees and court costs. VIII. Nondiscrimination: Contractor shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, or disability, except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement may be terminated, at will, by either Party upon 30 days' notice to the other Party. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non-performing Party does not commence correction of the failure of performance within five days of the terminating Party's sending notice to the non-performing Party. If the City receives reimbursement by any federal, state, or other source for services described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. Termination shall be effective ten calendar days after Consultant's receipt of the written notice by certified mail. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity; and (4) negotiated and executed supplemental agreements between the City and Consultant for Consultant to perform extra work defined as tasks not included in the Scope of Services referenced as Exhibit A. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Rights Upon Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City Bremerton/URS Corporation West 650 Pressure Zone Design & Construction Phase Services Page 6 of 7 without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. Upon termination the City will be entitled to reports showing the status of all items listed in the Scope of Services current through the termination date. CONTRACTOR · its: Mayor. its: p~/L~ ~r~4]~/~ Approved as to fo~: Bremerton/URS Corooration West 6.50 Pressure Zone Design & Construction Phase ScrvJ-'~ Page 7 of 7 EXHIBIT "A" January 20, 2003 CITY OF BREMERTON Design and Construction Management Services West 650 Pressure Zone Upgrades Scope of Services 1.0 INTRODUCTION The purpose of this contract is to provide project management services, review and finalize design and construction documents, review supporting assumptions, documentation and calculations, and provide limited construction phase services for the planned upgrades to the West 650 Pressure Zone for the City of Bremerton. The contract includes upgrades for three separate projects, including: · Reservoir No. 23(Tasks 201-203) · Pump Station No. 8 (Tasks 2'11-213) · Transmission and Distribution Water Mains (Tasks 22~-223) Owner Information: Robert Earl, Project Manager City of Bremerton 3027 Olympus Drive Bremerton, WA 98310 Phone (360) 478-5270 Fax (360) 478-5398 2.0 SCOPE OF SERVICES URS proposes to provide the scope of services detailed herein to perform the required professional services. We propose to include the following tasks as described in the City's authorization letter to URS dated January 17, 2003, and in follow-up email correspondence. Assumptions used in the preparatior~ of this scope of services are presented in Section 3.0. TASK 100: PROJECT MANAGEMENT A. URS Responsibilities: 1. URS proposes to include an overall project management task to include preliminary review and project coordination, management of the subtasks, overall project review, data collection, kick-off workshop, coordination of subconsultants, and contract management. 2. Invoicing Requirements a. Provide invoices for professional services to City at least monthly, with charges under this authorization itemized separately and organized by project element (Reservoir 23, Pump Station 8, Transmission & Distribution Mains). b. Provide a brief, narrative status report that addresses each project element, to the City with each invoice. c. Meet weekly with the City's project manager by telephone, or in person until all work is completed and accepted by the City. City of Bremerton Exhibit A - Page 2 West 650 Pressure Zone - Scope of Services January 20, 2003 3. Completion Schedule a. The City and URS will agree upon a milestone completion schedule for all work herein authorized after completing detailed review of the existing design bidding and construction documents. b. See Section 4.0 for proposed project deliverable schedule B. Deliverable Products: 1. Monthly invoices for professional services. 2. Minutes of weekly meetings. 3. Monthly reports. 4. Milestone Completion Schedule, when authorized. TASK 200: RESERVOIR No. 23 - DESIGN AND CONSTRUCTION SERVICES Task 20'1: Design Completion A. URS Responsibilities: 1. Review existing design documents, underlying and supporting assumptions, documentation and calculations prepared by other firms for this project. It is understood that The Bremerton Department of Community Development has completed building permit plan check of the existing bidding and construction documents for Reservoir 23, and has issued a building permit authorization. Therefore, the existing engineering design, including deliverable bidding and construction documents and supporting calculations and documentation, are understood to be at least 90 percent complete, as of January 17, 2003. 2. Validate, adjust, and complete existing reservoir shell, foundation, piping and electrical designs to a final state of completion 3. Prepare Project Approval report for submission to the Washington State Department of Health. This Report shall be based on information provided by the City of Bremerton pertaining to system sizing and description. URS will complete one Report/Application to include all three program components (Reservoir 23, Pump Station 8 and Water Mains). 4. URS shall be the Professional Engineer of Record, for final bidding & construction documents for Reservoir 23, excluding instrumentation and controls. 5. URS shall coordinate its electrical power, lighting and grounding designs, and validation of existing designs with Technical Systems, Incorporated (TSI), which shall be the Engineer of Record for instrumentation and controls. B. Deliverable Products: 1. Design & Construction Drawings in a final state of completion -100% review set will be issued prior to final submittal. URS will provide one full size and one half size reproducible set of each submittal. Final drawings will also be provided in digital form. 2. Construction Project Manual (project technical specifications and special conditions) in a final state of completion -100% review spec will be issued prior to final submittal. URS will provide one unbound copy of the project manual for each submittal. Final specs will also be provided in digital form. 3. Completed Project Approval Report to Washington State Department of Health (to include all three program components (Reservoir 23, Pump Station 8 and Water Mains). City of Bremerton Exhibit A - Page 3 West 650 Pressure Zone - Scope of Services January 20, 2003 4. Design calculations, notes and supporting materials as may be necessary, or requested by the City for issuance of permits and approvals for construction or operation. 5. Other underlying and/or supporting work products of URS as may be requested by the City at completion of the work under this authorization or at a later time. Task 202: Biddin~l Assistance A. URS Responsibilities: 1. Provide assistance to the City during the bid period to include input on addenda issues, preparation for and attendance at pre-bid meeting, responding to bidders questions, review and evaluation of bidders, and assistance with contract award processing, as requested by the City. B. Deliverable Products: 1. One addendum, as needed. Task 203: Construction Support A. URS Responsibilities: 1. Attend pre-construction conference and up to 3 job progress meetings with the Contractor and City of Bremerton representatives. Record minutes of pre-construction meeting and job progress meetings and distribute meeting minutes to the City (official minutes are to be prepared and distributed by the City). 2. Conduct up to 3 site visits, when requested by the City. Document work activities and provide copies of field reports to the City. 3. Review selected Contractor submittals for materials and equipment as requested by the City for quality and compliance with design intent. It is understood that the City will review the majority of the Submittals. URS will review up to 5 submittals, to be determined by the City during construction. These are anticipated to include ail electrical submittals, and most structural submittals, as requested. URS will track all submittals that it reviews, and will maintain a log of submittals to include dates received and returned to the City. 4. Review and respond in writing to Contractor's Requests for Information (RFI), as requested by the City. For budgeting purposes, it is anticipated that URS will respond to up to 5 RFIs as part of this contract. To the extent feasible, RFI responses will be provided within 48 hours of receipt. 5. Assist with the preparation and review of contract change orders as requested by the City. 6. Assist with commissioning activities during project acceptance. Conduct final inspection with City staff to establish final punch list. Verify submittal of specified warranties and coordinate warranty issues with the Contractor until transfer of this task to operations staff. B. Deliverable Products: 1. Meeting minutes (informal) - I copy to City for pre-construction conference and each job progress meeting attended. 2. Field Reports - 1 copy for each site visit conducted. 3. Submittal Review Logs - 2 copies to City upon new entries. 4. RFI Reponses- 1 copy. City of Bremerton Exhibit A - Page 4 West 650 Pressure Zone - Scope of Services January 20, 2003 TASK 210: PUMP STA~I'ION No; 8 - DESIGN AND CONSTRUCTION SERVICES Task 211: Desitin Completion A. URS Responsibilities: 1. Review existing design documents, underlying and supporting assumptions, documentation and calculations prepared by other firms for this project. It is understood that the existing engineering design, including deliverable bidding and construction documents and supporting calculations and documentation, are understood to be at least 90 percent complete, as of January 17, 2003. 2. Validate, adjust, and complete existing building & foundation structure, pump selection, piping and electrical designs to a final state of completion. 3. Make corrections as required by jurisdictional authorities to obtain required building and electrical construction permits. 4. Prepare Project Approval report for submission to the Washington State Department of Health. This Report shall be based on information provided by the City of Bremerton pertaining to system sizing and description. URS will complete one Report/Application to include all three program, components (Reservoir 23, Pump Station 8 and Water Mains). 5. URS shall be the professional Engineer of Record, for final bidding & construction documents for Pump Station No. 8, excluding instrumentation and controls. 6. URS shall coordinate its electrical power, lighting and grounding designs, and validation of existing designs with Technical Systems, incorporated (TSI), which shall be the Engineer of Record for instrumentation and controls. B. Deliverable Products: 1. Design & Construction Drawings in a final state of completion -100% review set will be issued prior to final submittal. URS will provide one full size and one half size reproducible set of each submittal. 2. Construction Project Manual (project technical specifications and special conditions) in a final state of completion -100% review spec will be issued prior to final submittal. URS will provide one unbound copy of the project manual for each submittal. 3. Completed Project Approval Report to Washington State Department of Health (to include all three program components (Reservoir 23, Pump Station 8 and Water Mains). 4. Design calculations, notes 'and supporting materials as may be necessary, or requested by the City for issuance of permits and approvals for construction or operation. 5. Other underlying and/or supporting work products of URS as may be requested by the City at completion of the work under this authorization or at a later time. Task 212: Biddin~l Assistance A. URS Responsibilities: 1. Provide assistance to the City during the bid period to include input on addenda issues, preparation for and attendance at pre-bid meeting, responding to bidders questions, review and evaluation of bidders, and assistance with contract award processing, as requested by the City. B. Deliverable Products: 1. One addendum, as needed. City of Bremerton Exhibit A - Page 5 West 650 Pressure Zone - Scope of Services January 20, 2003 Task 213: Construction Support A. URS Responsibilities: 1. Attend pre-construction conference and up to 3 job progress meetings with the Contractor and City of Bremerton representatives. Record minutes of pre-construction meeting and job progress meetings and distribute meeting minutes to the City (official minutes are to be prepared and distributed by the City). 2. Conduct up to 3 site visits, when requested by the City. Document work activities and provide copies of field reports to the City. 3. Review selected Contractor submittals for materials and equipment as requested by the City for quality and compliance with design intent. It is understood that the City will review the majority of the Submittals. URS will review up to 5 submittals, to be determined by the City dudng construction. These are anticipated to include all electrical submittals, and most structural submittals, as requested. URS will track all submittals that it reviews, and will maintain a log of submittals to include dates received and returned to the City. 4. Review and respond in writing to Contractor's Requests for Information (RFI), as requested by the City. For budgeting purposes, it is anticipated that URS will respond to up to 5 RFIs as part of this contract. To the extent feasible, RFI responses will be provided within 48 hours of receipt. 5. Assist with the preparation and review of contract change orders as requested by the City. 6. Assist with commissioning activities during project acceptance. Conduct final inspection with City staff to establish final punch list. Verify submittal of specified warranties and coordinate warranty issues with the Contractor until transfer of this task to operations staff. B. Deliverable Products: 1. Meeting minutes (informal) - 1 copy to City for pre-construction conference and each job progress meeting attended. 2. Field Reports - 1 copy for each site visit conducted. 3. Submittal Review Logs - 2 copies to City upon new entries. 4. RFI Reponses - 1 copy. TASK 220: TRANSMISSION & DISTRIBUTION WATER MAINS - DESIGN AND CONSTRUCTION SERVICES Task221: Design Completion A. URS Responsibilities: 1. Review existing design documents, underlying and supporting assumptions, documentation and calculations prepared by other firms for this project. It is understood that the existing engineering design, including deliverable bidding and construction documents and supporting calculations and documentation, are understood to be at least 50 percent complete, as of January 17, 2003. 2. Validate, adjust, and complete existing transmission and distribution piping, pressure reducing stations and electrical designs to a final state of completion. 3. URS will complete the technical specifications and special provisions for the technical sections only; the City of Bremerton will complete the front end bid instructions, bid forms, agreement forms, general conditions, supplemental conditions and general requirements (Division 1) of the contract documents. City of Bremerton Exhibit A - Page 6 West 650 Pressure Zone - Scope of Services January 20, 2003 4. Prepare Project Approval report for submission to the Washington State Department of Health. This Report shall be based on information provided by the City of Bremerton pertaining to system sizing and description. URS will complete one Report/Application to include all three program components (Reservoir 23, Pump Station 8 and Water Mains). 5. Accept full responsibility, as.the professional Engineer of Record, for final bidding & construction documents for West 650 Pressure Zone Improvements - Transmission and Distribution Mains. (Technical specs and drawings only) 6. The City has completed preliminary hydraulic modeling to determine size, location and settings of pressure reducing valve stations to be constructed in conjunction with the distribution main using WaterCad by Haestad Methods, Inc. URS shall employ and validate the City's completed preliminary modeling in completing pressure reducing station design. B. Deliverable Products: 1. Design & Construction Drawings in a final state of completion -100% review set will be issued prior to final submittal. URS will provide one full size and one half size reproducible set of each submittal. 2. Construction Project Manual (project technical specifications and special provisions) in a final state of completion -100% review spec will be issued prior to final submittal. URS will provide one unbound copy of the project manual for each submittal. 3. Completed Project Approval Report to Washington State Department of Health (to include all three program components (Reservoir 23, Pump Station 8 and Water Mains). 4. Design calculations, notes and supporting materials as may be necessary, or requested by the City for issuance of permits and approvals for construction or operation. 5. Other underlying and/or supporting work products of URS as may be requested by the City at completion of the work under this authorization or at a later time. Task 222: Bidding Assistance A. URS Responsibilities: 1. No scope of services for this task. B. Deliverable Products: 1. None. Task 223: Construction Support A. URS Responsibilities: 1. No scope of services for this task. B. Deliverable Products: 1. None. City of Bremerton Exhibit A - Page 7 West 650 Pressure Zone - Scope of Services January 20, 2003 3.0 PROJECT ASSUMPTIONS The following assumptions are incorporated into the scope of services as presented by the City of Bremerton in its letter dated January 17, 2003. 1. The term "final state of completion", used in relation to completion of designs and final bidding and construction documents, shall mean: A state of completion acceptable to the City, sealed and signed by a professional engineer registered in the State of Washington, suitable for project approval by the Washington State Department of Health, and suitable for bidding and construction as a public work. 2. The City shall provide all available existing engineering drawings to URS in both digital and plotted formats; all other available documentation and calculations shall be provided to URS in the form currently available. 3. The City will provide information to URS with respect to instructions to bidders, bid forms, agreements, bond forms, general conditions, supplemental conditions, generat requirements, and special provisions that will complement that define the City of Bremerton contracting procedures. 4. URS shall accept and use as-is the following documents that have been completed, sealed and signed by other professional engineers: a. Geotechnical Report, West 650 Pressure Zone, Bremerton Water System, Bremerton, Washin,qton, HWA Project 97102, as Revised October 3, 2002; HWA Geosciences, Inc. b. West 650 Pressure Zone Improvements, Reservoir No. 23, Structural Calculation% June 2001, Tetra Tech/KCM, Inc. c. West 650 Pressure Zone Improvements, Pump Station 8, Structural Calculations, October 2001, Tetra Tech/KCM, Inc. d. West 650 Pressure Zone Improvements Final Route and Site Recommendation, January 1999, Tetra Tech/KCM, Inc. e. Such other directly related work products as may be provided by the City, that have been completed and certified by other professional engineers or land surveyors. 5. The City has completed the SEPA process and has received a Determination of Non- significance for all three components of this project. 6. URS may combine Project Approval Reports for Reservoir 23, Pump Station No. 8 and the West 650 Pressure Zone Transmission and Distribution Mains into a single, programmatic Project Approval Report. 7. Construction staking and surveying will be provided by the City or another consultant. 8. Special Inspections including but not limited to geotechnical testing, soils compaction, concrete and asphalt testing, and structural testing including weld inspections are not included in this proposal. City of Bremerton Exhibit A - Page 8 West 650 Pressure Zone - Scope of Services January 20, 2003 4.0 PROJECT SCHEDULE The design schedule for the three projects in the West 650 Pressure Zone is presented below. The dates shown are delivery dates to the City by close of business. · Reservoir No. 23- 100% Review Set (Drawings and Specifications): Submit on Friday, Feb. 21, 2003. (Submittal could be pushed up to Monday Feb. 17, however, overtime for CADD technicians will be needed and overtime has not been included in the design estimate) Bid-Ready drawings and specifications will be submitted one week following receipt of 100% review set comments from the City. · Pump Station 8 - 100% Review Set (Drawings and Specifications): Submit on Friday April 4, 2003. Bid-Ready drawings and specifications will be submitted one week following receipt of 100% review set comments from the City. · Transmission and Distribution Mains - 100% Review Set (Drawings and Specifications): Submit on Friday, March 14, 2003. This date assumes the hydraulic analysis, with the two new PRV's, can be completed by this date. Bid-Ready drawings and specifications will be submitted one week following receipt of 100% review set comments from the City. City of Bremerton COST SUMMARY West 650 Pressure Zone Design and Construction Services Total Direct Labor Total Direct Total Task Description Hours Labor Multiplier Labor Costs Cost Preliminary Review and Project Management 196 $ 6,740 2.5 $ 16,850 $ 1,705 $ 18,555 TOTALTASK 100 196 $ 6,740 $ 16,850 $ 1,705 $ 18,555 201 Design Completion 526 $ 16,964 2.5 $ 42,410 $ 42,410 202 Bidding Assistance 64 $ 2,472 2.5 $ 6,180 $ 6,180 203 Construction Support 129 $ 4,856 2.5 $ 12,140 $ 12,140 TOTAL TASK 200 719 $ 24,292 $ 60,730 $ $ 60,730 211 Design Completion 820 $ 25,296 2.5 $ 63,240 $ 63,240 212 Bidding Assistance 64 $ 2,472 2.5 $ 6,180 $ 6,180 213 Construction Support 136 $ 5,157 2.5 $ 12,893 $ 12,893 TOTAL TASK 210 1020 $ 32,925 $ 82,313 $ $ 82,313 221 Design Completion 253 $ 7,992 2.5 $ 19,980 $ 19,980 222 Bidding Assistance 0 $ 2.5 $ $ 223 Construction support 0 $ 2.5 $ $ TOTAL TASK 220 253 $ 7,992 $ 19,980 $ $ 19,980 SUMMARY Task 100 Project Management 196 $ 6,740 $ 16,850 $ 1,705 $ 18,555 Tack 200 Reservoir No. 23 719 $ 24,292 $ 60,730 $ $ 60,730 Task 210 Pump Station No. 8 1020 $ 32,925 $ 82,313 $ $ 82,313 Task 220 Trans. & Distribution Water Mains 253 $ 7,992 $ 19,980 $ $ 19,980 TOTAL 2188 $ 71,949 $ 179,873 $ 1,705 $ 18t,578 PM Total $ 18,555 Design Total $ 125,630 Bidding Total $ 12,360 Construction Total $ 25,033 TOTAL $ 181,578 2/26/2003 URS CORPORATION City of Bremerton RESERVOIR NO. 23 West 650 Pressure Zone Design and Construction Services ~. ~- 0 0 ~ ~ =~ ~: [] u~ 0 0 Subtotals Task No. Description 50.00 35.00 40.00 35.00 38.00 25.00 37.00 38.00 45.00 35.00 25.00 20.0C Direct Rate Project Review & Management 16 8 16 4£ Data Collection 8 8 Kick off workshop 4 4 Site Visits 16 8 8 32 Hours 16 36 0 8 0 8 6 0 0 0 0 16 84 Direct LaborCosl 800 1260 0 280 0 200 0 0 0 0 0 320 $ 2,860 20f Design Completion Review docs and calcs 32 8 40 Drawing completion to 100% 60 16 8 36 24 108 252 Specifications 36 8 44 8 12 30 138 Cost Estimate 16 16 4 36 QNQC Review 8 8 16 Prepare Final Bid Documents 4 4 4 4 4 8 8 8 44 Hours 8 8 64 72 68 84 0 0 48 20 116 38 526 Direct LaborCost 400 280 2560 2520 2584 2100 0 0 2160 700 2900 760 $ 16,964 202 Bidding Assistance Respond to RFIs 8 8 4 4 24 Attend Pre-Bid Conference 8 8 16 Prepare Addendum 8 8 16 Bid Review/Award Assistance 4 4 8 Hours 12 20 0 0 24 0 0 0 4 0 0 4 64 Direct Labor Cost 600 700 0 0 912 0 0 0 180 0 0 80 $ 2,472 203 ConstructiOn Support Pre-Construction Conference 8 8 16 Site Visits (3) 12 6 18 Project Meetings (3) 12 8 6 26 Respond to RFIs (5) 3 1 2 1 7 Submittal Review (5) 6 8 4 18 Change Order Assistance 16 8 8 32 Commissionin~l Support 8 4 12 Hours 8 49 1 0 40 0 8 0 17 0 0 6 129 Direct Labor Cost 400 1715 40 0 1520 0 296 0 765 0 0 120 $ 4,856 SUMMARY Task 100 $ 2,860 Task 200 $ 24,292 TOTAL - RESERVOIR NO. 23 - DIRECT LABOR $ 27,152 2/26/2003 URS CORPORATION City of Bremerton PUMP STATION NO. 8 West 650 Pressure Zone Design and Construction Services · ~ .~ = = co ~ = ~ ~~*- ~. ~. o o ~ co :~ < ,'~ co o o Subtotals l'ask No. Description 50.00 35.00 40.00 35.00 38.00 25.00 37.00 38.00 45.00 35.00 25.00 20.00 Direct Rate Projact Review & Managament 24 8 24 5~ Data Collection 8 8 Kick off workshop 8 8 Site Visits 16 8 8 8 40 Hours 24 40 8 8 0 8 0 0 0 0 0 24 112 Direct LaborCosl 1200 1400 320 280 0 200 0 0 0 0 0 480 $ 3,880 211 Design Completion Review docs and calcs 4 40 12 56 Drawing completion to 100% 24 20 14 80 32 24 32 200 426 Specifications 16 4 44 16 16 12 20 46 174 Cost Estimate 8 8 8 8 4 36 QA/QC Review 8 16 24 Prepare Final Bid Documents 4 4 16 8 8 16 16 32 104 Hours 8 16 28 48 30 180 64 56 76 36 232 46 820 Direct Labor Cosl 400 560 1120 1680 1140 4500 2368 2128 3420 1260 5800 920 $ 25,296 212 Bidding Assistance Respond to RFIs 8 8 4 4 24 Attend Pre-Bid Conference 8 8 16 Prepare Addendum 8 8 16 Bid Review/Award Assistance 4 4 8 Hours 12 20 0 0 24 0 0 0 4 0 0 4 64 Direct Labor Cost 600 700 0 0 912 0 0 0 180 0 0 80 $ 2,472 213 Construction Support Pre-Construction Conference 8 8 16 Site Visits (3) 12 8 20 Project Meetings (3) 12 8 6 26 Respond to RFIs (5) 3 1 2 2 8 Submittal Review (5) 6 8 4 18 Change Order Assistance 16 8 8 32 Commissionin~l Support 8 8 16 Hour,' 8 49 1 0 42 0 8 0 22 0 0 6 136 Direct Labor Cost 400 1715 40 0 1596 0 296 0 990 0 0 120 $ 5,157 $ 3,880 $ 32,925 MP STATION NO. 8 - DIRECT LABOR $ 36,805 2/26/2003 URS CORPORATION City of Bremerton TRANSMISSION & DISTRIBUTION WATER MAINS West 650 Pressure Zone Design and Construction Services a. ~. 0 0 ,.~ m ~ < LU U~ O O Subtotals Task No. Description 50.00 35.00 40.00 35.00 38.00 25.00 37.00 38.00 45.00 35.00 25.00 20.0(: Direct Rate IIIIII I I I I I1' Project Review & Management 0 Data Collection 0 Kick off workshop 0 Site Visits 0 Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 Direct Labor Cost 0 0 0 0 0 0 0 0 0 0 0 0 $ 221 Design Completion Drawing completion to 100% 24 24 80 128 Specifications 20 8 8 36 Cost Estimate 20 20 QA/QC Review 8 8 16 Prepare Final Bid Documents 12 8 4 24 5 53 Hours 8 8 12 32 64 0 0 0 0 12 104 13 253 Direct Labor Cost 400 280 480 1120 2432 0 0 0 0 420 2600 260 $ 7,992 222 Bidding Assistance Respond to RFIs Attend Pre-Bid Conference Prepare Addendum C Bid Review/Award Assistance C Hours 0 0 0 0 0 0 0 0 0 0 0 0 C Direct Labor Cost 0 0 . 0 0 0 0 0 0 0 0 0 0 $ 223 Construction Support Pre-Construction Conference C Site Visits (5) Proiect Meetings (5) Respond to RFIs (10) Submittal Review Change Order Assistance Commissionin~ Support 0 Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 Direct Labor Cost 0 0 0 0 0 0 0 0 0 0 0 0 $ $ $ 7,992 NSMISSION & DISTRIBUTION WATER MAINS - DIRECT LABOR $ 7,992 2/26/2003 URS CORPORATION