4330
==Vendor Name
= =Subj ect
= =Department
= 'Status Code
t
STAN PALMER CONSTRUCTION
NAVAL AVENUE SEWER FORCE MAIN RECONSTRUCTION
ENGINEERING
CON
=f=
Insurance
Type Amount
GL $2000000.00
AL $1000000.00
Amount
Begin Date
End Date
Review Date
$200000.00
01/29/2003 =f=
05/31/2003
02/15/2005 --
+
1=
1= Comments VAULT 01/01/2005 +
1= 1=
1= 1=
+--------------------------------------------------------------------------+
Insurance Total
Insurance Review Date
$3000000.00 T
07/01/2003 --
+--------------------------------------------------------------------------+
+Browse, Next Previous First Last Update Delete Restart X - Exit +
+Retrieve the Next record +
+ Found , 10 Record(s) MAINTAIN Contract Transactions +
+ Contract Number 4330 +
+
+Vendor Name
+Subject
+Department
+Status Code
+
+
+
+
+
+
+
+
+
+
+
+
+
Insurance
Type Amount
GL $2000000.00
AL $1000000.00
Amount
Begin Date
End Date
Review Date
+
+
+
+
+
$200000.00 +
01/29/2003 +
05/31/2003 +
02/15/2005 +
+
+
+
$3000000.00 +
07/01/2003 +
+
+
+
+
STAN PALMER CONSTRUCTION
NAVAL AVENUE SEWER FORCE
ENGINEERING
CON
MAIN RECONSTRUCTION
Insurance Total
Insurance Review Date
Comments
VAULT 01/01/2005
+--------------------------------------------------------------------------+
PUBLIC WORKS AND UTILITIES
3027 Olympus Drive * Bremerton, WA 98310-4799 * (360) 478-5318 * FAX (360) 478-5018
MEMORANDUM
ENGINEERING DIVISION
TO: Paula Johnston
FROM: Gunnar Fridriksson~
SUB J: Naval Avenue Forcemain Replacement, Stan Palmer Construction Co., Inc.
I have received all the releases from the State of Washington and have completed the necessary
procedures for project closeout.
The following original documentation is attached for your files:
Project Release signed by Contractor
Advertisement of "Notice of Final Completion"
Certificate of Payment of State Excise Taxes by Public Works Contractor
Department of Labor and Industries Release
Certificate of Payment from Employment Security Department
If release ofretainage bond for this project is acceptable to you, please indicate by signing below
then return this to me. I will see that the necessary accounting paperwork is processed to release
the retain~d. ~lease call me if you have any questions at X5324.
P~fl4~J/~fu~s~o~, Deputy City Clerk
/
ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS
Naval Avenue Force Main Replacement
Project No. 515 - Contract No. 4330
Stan Palmer Construction Company, Inc, hereby indicates agreement with, and
acceptance of, the final Contract Payment of $158,251.14, the total Contract Price of
$158,251.14 including Washington State sales and/or use taxes, and the final Contract
Time of 30 calendar days, as full and final compensation for all Work performed in
connection with Contract Number 4330, and does hereby release the City of Bremerton
from all claims, liability, demands, damages and actions of any kind whatsoever, arising
from performance of that Contract.
Certificate of Notary
Subscribed and swom to before me this 5/~ dayof /~r'L~ , O~
AFFIDAVIT OF PUBLICATION
County of Kitsap, State of Washington
No. 100051236
I, Vaierie Zoller, being first duly sworn on oath, deposes and says: That she is now, and at all
times embraced in the publication herein mentioned was the principal clerk of the printers and
publishers of THE SUN; that said newspaper has been approved as a legal newspaper by order of
the Superior Court of the County of Kitsap, in which County it is published and is now and has
been for more than six months prior to the date of the publication hereinafter referred to,
published in the English language continually as a daily newspaper in Bremerton, Kitsap County,
Washington, and is now and during ail of said time, was printed in an office maintained in the
aforesaid place of publication of said newspaper; that the following is a true text of a legai
advertisement as it was published in regular issues (and not in supplement form) of said
newspaper on the following dates, to wit: April 10, 2003 during all of said period. That the full
amount of the fee charged for the foregoing publication is the sum of $23.99 which amount has
not been paid in full.
~ - '~ :~,,"".,,. ~t",
~ g)'_~"~ .~ ~1%C~ ~ (Signature ~ Principal Clerk)
Sul~c~',~n6lr.~. t~ l~fore me this day of September 12, 2003.
~- 0,- -6x~'
~//////..,- w~, .',~xxxxx~ Notary Public in and for the'State df WaShington, Kitsap County.
~tltlllllll~~'
CITY OF BREMERTON'
NOTICE OF'
COMPLETION'
Notice of Completion has been filed by Stan Palmer Construction
Company, Inc., on contract No. 4330, for the Naval Avenue Force
I~ain Replacement. Any parties havin~ a claim for materal, labor,
or damages related to the Contract have thirty (30) days from
the date of first publication of this notice to file a claim.
William Eley-
Purchasin~ Mana~er-
239 4th Street-
Bremerton, WA 98337-
STATE OF WASHINGTON
DEPARTMENT OF LABOR AND INDUSTRIES
PO Box 44000 · Olympia, Washington 98504°4000
September 2, 2003
RECEIVED
CITY OF BREMERTON
PUBLIC WORKS SEP Il 5 21183
3027 OLYMPUS DR
BREMERTON WA 98310 ENGINEERING DIVISION
Account ID: 383-931-00
Contractor: Stan Palmer Construction Inc.
Contract Number: none
Contract For: Naval Avenue force main
Please be advised that the Department of Labor and Industries shows industrial insurance
account stares for work on the above contract as:
Contractor: Stan Palmer Construction, Inc. Account Status: current
This letter does not release the City of Bremerton or any of it's contractors from liability for
additional industrial insurance premiums pursuant to RCW 51.12.050 and RCW 51.12.070,
which later may be determined to be due, or for any other obligations under other statues (e.g.
Prevailing Wage) with respect to the above mentioned contract of any other contracts said
contractor may have performed.
Sincerely, .
Bonnie Fahmkopf
Contractor Compliance Release Unit
Dept. of Labor & Industries
PO Box 44152
Olympia WA 98504-4152
Phone Number: 360-902-4762 / Fax Number: 360-902-4757
Ccu 1 Ra
cc: STAN PALMER CONST [NC
5107 STATE HWY 3 SW
PORT ORCHARD WA 98367
STATE OF WASHINGTON
DEPARTMENT OF LABOR AND INDUSTRIES
PO Box 44000 · Olympia, Washington 98504-4000
September 2, 2003
CITY OF BREMERTON
PUBLIC WORKS
3027 OLYMPUS DR
BKEMERTON WA 98310
Account ID: 383-931-00
Contractor: Stan Palmer Construction Inc.
Contract Number: none
Contract For: Naval Avenue force main
Please be advised that the Department of Labor and Industries shows industrial insurance
account status for work on the above contract as:
Contractor: Stan Palmer Construction, Inc. Account Status: current
This letter does not release the City of Bremerton or any of it's contractors fzom liability for
additional industrial insurance premiums pursuant to RCW 51.12.050 and RCW 51.12.070,
which later may be determined to be due, or for any other obligations under other statues (e.g.
Prevailing Wage) with respect to the above mentioned contract of any other contracts said
contractor may have performed.
Bonnie Fahmkopf
Contractor Compliance Release Unit
Dept. of Labor & Industries
PO Box 44152
Olympia WA 98504-4152
Phone Number: 360-902-4762 / Fax Number: 360-902-4757
CculRa
cc: STAN PALMER CONST 1NC
5107 STATE HWY 3 SW
PORT ORCHARD WA 98367
STATE OF WASHINGTON
EMPLOYMENT SECURITY DEPARTMENT
PO BOX 9046 * Olympia, WA 98,507-9046
CONTRACTOR: Stan Palmer Construction Company, Inc. ) CERTIFICATE OF
5107 State Hwy. 3 S.W. ) PAYMENT OF CONTRIBUTIONS
Port Orchard, WA 98367 ) PENALTIES AND INTEREST ON
) PUBLIC WORKS CONTRACT
ES Reference No. 461102-001
TO: City of Bremerton Dept. of Public Works & Utilites
3027 Olympus Drive
Bremerton, WA 98310
1 2 2003
The Employment Security Department hereby certifies that contributions, pe alties and interest
due from the above named contractor under the Employment Security Act have been
provided for with respect to the following public works contract:
Naval Avenue Force Main Replacement
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50.24.130 against the public body named above for tax attributable to service performed for said public
body by the above named contractor on the above described contract. The Employment Security
Department releases its lien on the retained percentage which is provided by RCW 60.28.040 for
contributions, penalties and interest due from said contractor.
This certificate does not release said contractor from liability for additional contributions,
penalties and interest which may be later determined to be due with respect to the above mentioned
contract.
Dated at Olympia, Washington on May 9, 2003.
COMMISSIONER
EMPLOYMENT SECURiTY DEPARTMENT
(Au~orized Representative)
Original--Disbursing Officm'
Duplicate--Employer
Triplicate~entral Office Files
EMS 8449 760 R3-98
Washington State
Department of Revenue
PO Box 47474
Olympia, WA 98504-7474
600 336 626
Certificate of Payment of State Excise
Taxes by Public Works Contractor
STAN PALMER CONSTRUCTION INC CITY OF BREMERTON PUBLIC WORKS
5107 ST HWY 3 SW M H VELLEGAS
PORT ORCHARD WA 98367 7486 3027 OLYMPUS DR
BREMERTON WA 98310 4799
We hereby certify that taxes, increases and penalties due or to become due from the above-named
contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works
contract:
CITY OF BREMERTON PUBLIC WORKS
NAVAL AVE FORCE MAIN REPLACEMENT
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained
percentage.
This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the
sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor.
This certificate does not release said contractor from liability for additional tax that may be later
determined to be due with respect to the above-mentioned contract or other activities.
Dated ~ ~L~-~ at Olympia, Washington,
/ /
State of Washington
Dep ent of Revenue
C'er~gUO~i~mcer - - ~,, t,' ,' ~
To inquire about the availabiliiy of this document in an alternate format for the visually impaired or in a language other than English, please call (360) 753-3217.
TTY users may call 1-800-451-7985.
REV 31 0028 (10-01-02) ROUTIN~on~ractor, File, Special File
PUBLIC WORKS AGREEMENT
THIS AGREEMENT, is entered into between the City of Bremerton, a Washington
Municipal Corporation ("City"), and Stan Palmer Construction, Inc. ("Contractor"), whose
mailing address is 5107 State Hwy 3 SW, Port Orchard, WA 98367.
The parties agree as follows:
1. CONTRACTOR SERVICES. The Contractor shall perform emergency
construction services, in accordance with generally accepted standards and at the direction of the
Public Works Director (Director) for the following project:
Provide labor, equipment, and materials necessary to reconstruct approximately 2,300 linear feet
of 12 inch sewer forcemain on Naval Avenue from Pump Station CW-1 on 19th Street to a
connection point designated by the City at approximately 13th Street. The description of services
is more specifically defined in and included herein as Attachment 1.
All work shall be performed under the control of the Director as provided in Section 1-05
CONTROL OF WORK of the 2002 Standard Specifications for Road, Bridge and Municipal
Construction
2. TIME OF COMPLETION. Time is of the essence for completion of this work.
Contractor shall complete the work in a reasonable time frame given the current conditions of the
site and based on the amount and type of work directed to be done by the Director.
3. COMPENSATION. The City shall pay the Contractor, for the work and services
contemplated in this agreement, on a Time and Mater/als Basis as calculated in Section 1-09.6
FORCE ACCOUNT of the 2002 Standard Specifications for Road, Bridge and Municipal
Construction, provided in addition to on-site labor, the Contractor shall be compensated for
necessary on-site supervision as approved by the City. This compensation shall not exceed the
total amount of $200,000 plus any applicable Washington State Sales Tax. The Contractor shall
invoice the City monthly. The City will pay for the portion of the work described in the invoice
that has been completed by the Contractor and approved by the City. The City payment shall not
constitute a waiver of the City's fight to final inspection and acceptance of the project.
A. Performance Bond. Within 5 days of written notice to proceed and
pursuant to Chapter 39.08 RCW, the Contractor, shall provide the City a
performance bond in the amount of $200,000 to be in effect until sixty
(60) days after the date of final acceptance, or until receipt of all necessary
releases from the State Department of Revenue and the State Department
of Labor and Industries and until settlement of any liens filed under
Chapter 60.28 RCW, whichever is later.
B. Retainage. The City shall hold back a retainage in the amount of five
percent (5%) of any and all payments made to contractor for a period of
sixty (60) days after the date of final acceptance, or until receipt of all
PUBLIC WORKS AGREEMENT -Page 1 of 6 (January 30, 2003)
(between City of Bremerton and Stan Palmer Construction, Inc.)
necessary releases from the State Department of Revenue and the State
Department of Labor & Industries and until settlement of any liens filed
under Chapter 60.28 RCW, whichever is later.
C. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work.
Defective or unauthorized work includes, without limitation: work and
materials that do not conform to the requirements of this agreement; and
extra work and materials furnished without the City's written approval. If
Contractor is unable, for any reason, to satisfactorily complete any portion
of the work, the City may complete the work by contract or otherwise, and
Contractor shall be liable to the City for any additional costs incurred by
the City. "Additional costs" shall mean all reasonable costs, including
legal costs and attorney fees, incurred by the City beyond the maximum
Contract price specified above. The City further reserves its right to
deduct the cost to complete the Contract work, including any Additional
Costs, from any and all amounts due or to become due the Contractor.
D. Final Payment: Waiver of Claims. THE MAKING OF FINAL
PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL
CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE
PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY
CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR
FINAL PAYMENT IS MADE.
4. INDEPENDENT CONTRACTOR. The parties intend that an Independent
Contractor - Employer Relationship will be created by this agreement, the City being interested
only in the results obtained under this agreement.
$. TERMINATION. The City may terminate this agreement when determined by
the Director to be in the best interest of the City.. In the event of termination, the Contractor
shall be compensated for all work completed, including all materials acquired for the project,
through the effective date of termination. All such materials acquired for the project shall
become the property of the City. If the City terminates this agreement, the Contractor shall not
receive any further monies under this agreement.
6. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay
Prevailing Wages," with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter
39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate
provisions. The latest prevailing wage rate revision issued by the Department of Labor and
Industries is attached.
7. CLAIMS. The Contractor shall give written notice to the City of all claims
within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any
claim for damages, additional payment for any reason, or extension of time, whether under this
PUBLIC WORKS AGREEMENT - Page 2 of 6 (January 30, 2003)
(between City of Bremerton and Stan Palmer Construction, Inc.)
agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor
unless a timely written claim is made in strict accordance with the applicable provisions of this
agreement; or, if (and only if) no such provision is applicable, unless that claim is set forth in
detail in writing and received by the City within seven (7) calendar days from the date Contractor
knew, or should have known, of the facts giving rise to the claim. At a minimum, a Contractor's
written claim must include the information set forth regarding protests in Section 7.A.2.a.-e.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHiN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS
ARISiNG IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDiNG THAT CLAIM
OR CAUSED BY THAT DELAY.
Contractor must, in any event, file any claim or bring any suit arising from or ~onnected
with this agreement within 120 calendar days from the date the contract work is complete.
8. WARRANTY. The Contractor shall correct all defects in workmanship and
materials within one year from the date of the City's acceptance of the Contract work. When
defects are corrected, the warranty for that portion of the work shall extend for one year form the
date such correction is completed and accepted by the City. The Contractor shall begin to
correct any defects within seven (7) calendar days of its receipt of notice from the City of the
defect. If the Contractor does not accomplish the corrections within a reasonable time, the City
may complete the corrections and the Contractor shall pay all costs incurred by the City in order
to accomplish the correction.
9, INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officer, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits including all legal costs and attorney fees, arising out of or in connection
with the performance of this agreement, except for injuries and damages caused by the City's
negligence.
The City's inspection or acceptance of any of Contractor's work when completed shall
not be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor and
the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall
be only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
iNDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY
UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF
THIS iNDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE
MUTUALLY NEGOTIATED THIS WAIVER.
PUBLIC WORKS AGREEMENT -Page 3 of 6 (January 30, 2003)
(between City of Bremerton and Stan Palmer Construction, Inc.)
The provisions of this section shall survive the expiration or termination of this
agreement.
10. INSURANCE. The Contractor shall procure and maintain for the duration of this
agreement insurance of the types and in the amounts described below against claims for injuries
to persons or damage to property which may arise from or in connection with the performance of
the work by the Contractor, its agents, representative, employees, subconsultants or
subcontractors.
Before beginning work on the project described in this agreement, the Contractor shall
provide a Certificate of Insurance evidencing:
1. Automobile Liability insurance with limits no less than $1,000,000
combined single limit per accident for bodily injury and property damage;
and
2. Commemial General Liability insurance written on an occurrence basis
with limits no less than $1,000,000 combined single limit per occurrence
and general aggregate for personal injury, bodily injury and property
damage. Coverage shall include but not be limited to: blanket
contractual; products/completed operations/broad form property damage;
explosion, collapse and underground (XCU); and employer's liability.
3. Excess Liability insurance with limits not less than $1,000,000 per
occurrence and aggregate.
Any payment of deductible or self insured retention shall be the sole responsibility of
the Contractor.
The City, its officials, employees, agents and volunteers shall be named as an
additional insured on the insurance policy, as respects work performed by or on behalf of the
Contractor and a copy of the endorsement naming the City as additional insured shall be attached
to the Certificate of Insurance.
The Contractor's insurance shall contain a clause stating that coverage shall apply
separately to each insured against whom claim is made or suit is brought, except with respects to
the limits of the insurer's liability.
The Contractor's insurance shall be primary insurance as respects the City, and the
City shall be given thirty (30) calendar days prior written notice by certified mail, tatum receipt
requested, of any cancellation, suspension or material change in coverage.
11. MISCELLANEOUS.
A. Nondiscrimination. In the hiring of employees for the performance of
work under this Agreement or any sub-contract hereunder, the Contractor, its sub-contractors, or
PUBLIC WORKS AGREEMENT - Page 4 of 6 (January 30, 2003)
(between City of Bremerton and Stan Palmer Construction. Inc.)
any person acting on behalf of such Contractor or sub-contractor shall not, by reason of race,
religion, color, sex, national origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform the work to which the
employment relates.
B. Compliance with Laws. Contractor shall comply with all federal, state
and local laws, rules and regulations throughout every aspect in the performance of this
agreement.
C. Work Performed at Contractor's Risk. Contractor shall take all
precautions necessary and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of this agreement. All work shall be done at Contractor's own
risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other
articles used or held for use in connection with the work.
D. Nonwaiver of Breach. The failure of the City to insist upon strict
performance of any of the terms and rights contained herein, or to exercise any option herein
conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of
those terms and rights and they shall remain in full force and effect
E. Governing Law. This agreement shall be governed and construed in
accordance with the laws of the State of Washington. If any dispute arises between the City and
Contractor under any of the provisions of this agreement, resolution of that dispute shall be
available only through the jurisdiction, venue and rules of the Kitsap County Superior Court,
Kitsap County, Washington.
F. Attomey's Fees. To the extent not inconsistent with RCW 39.04.240, in
any claim or lawsuit for damages arising from the parties' performance of this agreement, each
party shall be responsible for payment of its own legal costs and attorney's fees incurred in
defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the
City's right to indemnification under Section 10 of this agreement.
G. Written Notice. All communications regarding this agreement shall be
sent to the parties at the addresses listed on the signature page of this agreement, unless
otherwise notified. Any written notice shall become effective upon delivery, but in any event
three (3) calendar days after the date of mailing by registered or certified mail, and shall be
deemed sufficiently given if sent to the addressee at the address stated on this agreement.
H. Assignment. Any assignment of this agreement by the Contractor without
the written consent of the City shall be void.
I. Modification. No waiver, alteration, or modification of any of the
provisions of this agreement shall be binding unless in writing and signed by a duly authorized
representative of the City and Contractor.
PUBLIC WORKS AGREEMENT - Page 5 of 6 (January 30, 2003)
(between City of Bremerton and Stan Palmer Construction, Inc.)
J. Severabilit¥. If any one or more sections, sub-sections, or sentences of
this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity
of the remaining portion of this agreement and the remainder shall remain in full force and
effect.
K. Entire Agreement. The written provisions and terms of this agreement,
together with any attached Exhibits, supersede all prior verbal statements by any representative
of the City, and those statements shall not be construed as forming a part of or altering in any
manner this agreement. This agreement and any attached Exhibits contain the entire agreement
between the parties. Should any language in any Exhibit to this agreement conflict with any
language contained in this agreement, the terms of this agreement shall prevail.
IN WITNESS WHEREOF, the parties below have executed this agreement.
//Print Name: -~J //~/ '~:/q-z~47~-~ C'-ary Bol~em~-
Title: //,z:v Mayor
DATE ~ xJ',q-~/O._3 January 30, 2003
Notices to be sent to: Notices to be sent to:
CONTRACTOR: CITY OF BREMERTON:
Stan Palmer Construction Inc. City Clerk
5107 State hwy 3 SW 239 Fourth Street
Port Orchard, WA 98367 Bremerton, WA 98337
(360) 674-2100 (360) 478-5290
(360) 674-7190 (facsimile) (360) 478-5200 (facsimile)
Bremerton Ci~6.~ttomey
t~re~n~r~y-C-l~rk - ~
PUBLIC WORKS AGREEMENT - Page 6 of 6 (January 30, 2003)
(between City of Bremerton and Stan Palmer Construction, Inc.)
ATTACHMENT 1
SCOPE OF SERVICES
General
The work to be completed under this contract generally consists of construction of
approximately 2,300-linear feet of new 12-inch diameter sewer forcemain, including all
fittings, thrust restraint, connections with the existing system, adjustment of conflicting
utilities, compliance with City construction standards and all other appurtenant work
required for a complete functioning system. Construction shall be performed during
standard work hours, with the exception of final connections to the operating sewer
system, or work in response to emergencies, which may be performed at night. Work in
excess of nine hours each day shall be done only with the written approval of the City.
The City shall control the work using written Work Directives. The Contractor shall
provide a daily accounting for all labor, equipment, and materials used in the completion
of the work as directed by the City. The daily quantity reports shall be reviewed jointly
by the City and the Contractor, and shall form the basis of payment for the work.
The forcemain shall be constructed of Class 150, AWWA C900 pipe. All pipe fittings
used for the construction of the forcemain shall be PVC of similar class and type to the
pipe, or shall be concrete encased ductile iron. All miscellaneous metals shall be
stainless steel, ASTM Types 304 or 316. Contractor shall provide submittal information
on all other materials proposed for incorporation in the work.
Certain equipment and construction activities shall be provided by the City, as identified
below or directed by the City during the course of the work. All activities not
specifically identified as being provided by the City shall be the Contractors
responsibility.
Equipment and Construction Activities to be Provided by the City
The City shall provide the following equipment at no cost to the contractor for its use in
completing the work:
One light plant for use during night time construction
· Two 12-inch repair bands for the existing forcemain
· Vactor truck and operator for excavation at the southern tie-in to the existing
forcemain, and at other locations where identified as necessary by the City.
The City shall perform the following work to support the construction at no cost to the
Contractor:
· Pavement removal, temporary and permanent pavement restoration. Restoration
of pavement markings.
· Public notification and coordination with nearby residents.
ATTACHMENT I to PUBLIC WORKS AGREEMENT - Page 1 of 2 (January 30, 2003)
(between City of Brernerton and Stan Palmer Construction, Inc.)
· Traffic control including traffic control plan, signs, and flaggers during the
construction.
· Modifications to the existing traffic signal at the intersection of 15th and Naval
Avenue, including restoration of traffic control loops.
· Operation of the sanitary sewer system in support of the construction. The City
will stop flow and drain the 12-inch Naval Avenue Forcemain, and will stop flow
in the 24-inch Crosstown Pipeline for a period of not less than 3-hours, during a
period of low flows to allow final connections of the new forcemain to be made to
the existing system.
· Repair of water services damaged during the construction.
ATTACHMENT 1 to PUBLIC WORKS AGREEMENT - Page 2 of 2 (January 30, 2003)
(between City of Bremerton and Stan Palmer Construction, Inc.)