Loading...
HomeMy WebLinkAbout4330 +_________________________________________________L________________________+ = 'Browse: = 'Retr ieve +Found: 1 =f= Next Previous First Last the Next record Record(s) MAINTAIN Contract Number Update Delete Restart X - Exit + + + Contract Transactions 4330 ==Vendor Name = =Subj ect = =Department = 'Status Code t STAN PALMER CONSTRUCTION NAVAL AVENUE SEWER FORCE MAIN RECONSTRUCTION ENGINEERING CON =f= Insurance Type Amount GL $2000000.00 AL $1000000.00 Amount Begin Date End Date Review Date $200000.00 01/29/2003 =f= 05/31/2003 02/15/2005 -- + 1= 1= Comments VAULT 01/01/2005 + 1= 1= 1= 1= +--------------------------------------------------------------------------+ Insurance Total Insurance Review Date $3000000.00 T 07/01/2003 -- +--------------------------------------------------------------------------+ +Browse, Next Previous First Last Update Delete Restart X - Exit + +Retrieve the Next record + + Found , 10 Record(s) MAINTAIN Contract Transactions + + Contract Number 4330 + + +Vendor Name +Subject +Department +Status Code + + + + + + + + + + + + + Insurance Type Amount GL $2000000.00 AL $1000000.00 Amount Begin Date End Date Review Date + + + + + $200000.00 + 01/29/2003 + 05/31/2003 + 02/15/2005 + + + + $3000000.00 + 07/01/2003 + + + + + STAN PALMER CONSTRUCTION NAVAL AVENUE SEWER FORCE ENGINEERING CON MAIN RECONSTRUCTION Insurance Total Insurance Review Date Comments VAULT 01/01/2005 +--------------------------------------------------------------------------+ PUBLIC WORKS AND UTILITIES 3027 Olympus Drive * Bremerton, WA 98310-4799 * (360) 478-5318 * FAX (360) 478-5018 MEMORANDUM ENGINEERING DIVISION TO: Paula Johnston FROM: Gunnar Fridriksson~ SUB J: Naval Avenue Forcemain Replacement, Stan Palmer Construction Co., Inc. I have received all the releases from the State of Washington and have completed the necessary procedures for project closeout. The following original documentation is attached for your files: Project Release signed by Contractor Advertisement of "Notice of Final Completion" Certificate of Payment of State Excise Taxes by Public Works Contractor Department of Labor and Industries Release Certificate of Payment from Employment Security Department If release ofretainage bond for this project is acceptable to you, please indicate by signing below then return this to me. I will see that the necessary accounting paperwork is processed to release the retain~d. ~lease call me if you have any questions at X5324. P~fl4~J/~fu~s~o~, Deputy City Clerk / ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS Naval Avenue Force Main Replacement Project No. 515 - Contract No. 4330 Stan Palmer Construction Company, Inc, hereby indicates agreement with, and acceptance of, the final Contract Payment of $158,251.14, the total Contract Price of $158,251.14 including Washington State sales and/or use taxes, and the final Contract Time of 30 calendar days, as full and final compensation for all Work performed in connection with Contract Number 4330, and does hereby release the City of Bremerton from all claims, liability, demands, damages and actions of any kind whatsoever, arising from performance of that Contract. Certificate of Notary Subscribed and swom to before me this 5/~ dayof /~r'L~ , O~ AFFIDAVIT OF PUBLICATION County of Kitsap, State of Washington No. 100051236 I, Vaierie Zoller, being first duly sworn on oath, deposes and says: That she is now, and at all times embraced in the publication herein mentioned was the principal clerk of the printers and publishers of THE SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court of the County of Kitsap, in which County it is published and is now and has been for more than six months prior to the date of the publication hereinafter referred to, published in the English language continually as a daily newspaper in Bremerton, Kitsap County, Washington, and is now and during ail of said time, was printed in an office maintained in the aforesaid place of publication of said newspaper; that the following is a true text of a legai advertisement as it was published in regular issues (and not in supplement form) of said newspaper on the following dates, to wit: April 10, 2003 during all of said period. That the full amount of the fee charged for the foregoing publication is the sum of $23.99 which amount has not been paid in full. ~ - '~ :~,,"".,,. ~t", ~ g)'_~"~ .~ ~1%C~ ~ (Signature ~ Principal Clerk) Sul~c~',~n6lr.~. t~ l~fore me this day of September 12, 2003. ~- 0,- -6x~' ~//////..,- w~, .',~xxxxx~ Notary Public in and for the'State df WaShington, Kitsap County. ~tltlllllll~~' CITY OF BREMERTON' NOTICE OF' COMPLETION' Notice of Completion has been filed by Stan Palmer Construction Company, Inc., on contract No. 4330, for the Naval Avenue Force I~ain Replacement. Any parties havin~ a claim for materal, labor, or damages related to the Contract have thirty (30) days from the date of first publication of this notice to file a claim. William Eley- Purchasin~ Mana~er- 239 4th Street- Bremerton, WA 98337- STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES PO Box 44000 · Olympia, Washington 98504°4000 September 2, 2003 RECEIVED CITY OF BREMERTON PUBLIC WORKS SEP Il 5 21183 3027 OLYMPUS DR BREMERTON WA 98310 ENGINEERING DIVISION Account ID: 383-931-00 Contractor: Stan Palmer Construction Inc. Contract Number: none Contract For: Naval Avenue force main Please be advised that the Department of Labor and Industries shows industrial insurance account stares for work on the above contract as: Contractor: Stan Palmer Construction, Inc. Account Status: current This letter does not release the City of Bremerton or any of it's contractors from liability for additional industrial insurance premiums pursuant to RCW 51.12.050 and RCW 51.12.070, which later may be determined to be due, or for any other obligations under other statues (e.g. Prevailing Wage) with respect to the above mentioned contract of any other contracts said contractor may have performed. Sincerely, . Bonnie Fahmkopf Contractor Compliance Release Unit Dept. of Labor & Industries PO Box 44152 Olympia WA 98504-4152 Phone Number: 360-902-4762 / Fax Number: 360-902-4757 Ccu 1 Ra cc: STAN PALMER CONST [NC 5107 STATE HWY 3 SW PORT ORCHARD WA 98367 STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES PO Box 44000 · Olympia, Washington 98504-4000 September 2, 2003 CITY OF BREMERTON PUBLIC WORKS 3027 OLYMPUS DR BKEMERTON WA 98310 Account ID: 383-931-00 Contractor: Stan Palmer Construction Inc. Contract Number: none Contract For: Naval Avenue force main Please be advised that the Department of Labor and Industries shows industrial insurance account status for work on the above contract as: Contractor: Stan Palmer Construction, Inc. Account Status: current This letter does not release the City of Bremerton or any of it's contractors fzom liability for additional industrial insurance premiums pursuant to RCW 51.12.050 and RCW 51.12.070, which later may be determined to be due, or for any other obligations under other statues (e.g. Prevailing Wage) with respect to the above mentioned contract of any other contracts said contractor may have performed. Bonnie Fahmkopf Contractor Compliance Release Unit Dept. of Labor & Industries PO Box 44152 Olympia WA 98504-4152 Phone Number: 360-902-4762 / Fax Number: 360-902-4757 CculRa cc: STAN PALMER CONST 1NC 5107 STATE HWY 3 SW PORT ORCHARD WA 98367 STATE OF WASHINGTON EMPLOYMENT SECURITY DEPARTMENT PO BOX 9046 * Olympia, WA 98,507-9046 CONTRACTOR: Stan Palmer Construction Company, Inc. ) CERTIFICATE OF 5107 State Hwy. 3 S.W. ) PAYMENT OF CONTRIBUTIONS Port Orchard, WA 98367 ) PENALTIES AND INTEREST ON ) PUBLIC WORKS CONTRACT ES Reference No. 461102-001 TO: City of Bremerton Dept. of Public Works & Utilites 3027 Olympus Drive Bremerton, WA 98310 1 2 2003 The Employment Security Department hereby certifies that contributions, pe alties and interest due from the above named contractor under the Employment Security Act have been provided for with respect to the following public works contract: Naval Avenue Force Main Replacement The Employment Security Department hereby certifies that it has no claim pursuant to RCW 50.24.130 against the public body named above for tax attributable to service performed for said public body by the above named contractor on the above described contract. The Employment Security Department releases its lien on the retained percentage which is provided by RCW 60.28.040 for contributions, penalties and interest due from said contractor. This certificate does not release said contractor from liability for additional contributions, penalties and interest which may be later determined to be due with respect to the above mentioned contract. Dated at Olympia, Washington on May 9, 2003. COMMISSIONER EMPLOYMENT SECURiTY DEPARTMENT (Au~orized Representative) Original--Disbursing Officm' Duplicate--Employer Triplicate~entral Office Files EMS 8449 760 R3-98 Washington State Department of Revenue PO Box 47474 Olympia, WA 98504-7474 600 336 626 Certificate of Payment of State Excise Taxes by Public Works Contractor STAN PALMER CONSTRUCTION INC CITY OF BREMERTON PUBLIC WORKS 5107 ST HWY 3 SW M H VELLEGAS PORT ORCHARD WA 98367 7486 3027 OLYMPUS DR BREMERTON WA 98310 4799 We hereby certify that taxes, increases and penalties due or to become due from the above-named contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works contract: CITY OF BREMERTON PUBLIC WORKS NAVAL AVE FORCE MAIN REPLACEMENT together with all other taxes, increases and penalties due from such contractor, have been paid in full or that they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained percentage. This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor. This certificate does not release said contractor from liability for additional tax that may be later determined to be due with respect to the above-mentioned contract or other activities. Dated ~ ~L~-~ at Olympia, Washington, / / State of Washington Dep ent of Revenue C'er~gUO~i~mcer - - ~,, t,' ,' ~ To inquire about the availabiliiy of this document in an alternate format for the visually impaired or in a language other than English, please call (360) 753-3217. TTY users may call 1-800-451-7985. REV 31 0028 (10-01-02) ROUTIN~on~ractor, File, Special File PUBLIC WORKS AGREEMENT THIS AGREEMENT, is entered into between the City of Bremerton, a Washington Municipal Corporation ("City"), and Stan Palmer Construction, Inc. ("Contractor"), whose mailing address is 5107 State Hwy 3 SW, Port Orchard, WA 98367. The parties agree as follows: 1. CONTRACTOR SERVICES. The Contractor shall perform emergency construction services, in accordance with generally accepted standards and at the direction of the Public Works Director (Director) for the following project: Provide labor, equipment, and materials necessary to reconstruct approximately 2,300 linear feet of 12 inch sewer forcemain on Naval Avenue from Pump Station CW-1 on 19th Street to a connection point designated by the City at approximately 13th Street. The description of services is more specifically defined in and included herein as Attachment 1. All work shall be performed under the control of the Director as provided in Section 1-05 CONTROL OF WORK of the 2002 Standard Specifications for Road, Bridge and Municipal Construction 2. TIME OF COMPLETION. Time is of the essence for completion of this work. Contractor shall complete the work in a reasonable time frame given the current conditions of the site and based on the amount and type of work directed to be done by the Director. 3. COMPENSATION. The City shall pay the Contractor, for the work and services contemplated in this agreement, on a Time and Mater/als Basis as calculated in Section 1-09.6 FORCE ACCOUNT of the 2002 Standard Specifications for Road, Bridge and Municipal Construction, provided in addition to on-site labor, the Contractor shall be compensated for necessary on-site supervision as approved by the City. This compensation shall not exceed the total amount of $200,000 plus any applicable Washington State Sales Tax. The Contractor shall invoice the City monthly. The City will pay for the portion of the work described in the invoice that has been completed by the Contractor and approved by the City. The City payment shall not constitute a waiver of the City's fight to final inspection and acceptance of the project. A. Performance Bond. Within 5 days of written notice to proceed and pursuant to Chapter 39.08 RCW, the Contractor, shall provide the City a performance bond in the amount of $200,000 to be in effect until sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor and Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Retainage. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all PUBLIC WORKS AGREEMENT -Page 1 of 6 (January 30, 2003) (between City of Bremerton and Stan Palmer Construction, Inc.) necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Payment: Waiver of Claims. THE MAKING OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. 4. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor - Employer Relationship will be created by this agreement, the City being interested only in the results obtained under this agreement. $. TERMINATION. The City may terminate this agreement when determined by the Director to be in the best interest of the City.. In the event of termination, the Contractor shall be compensated for all work completed, including all materials acquired for the project, through the effective date of termination. All such materials acquired for the project shall become the property of the City. If the City terminates this agreement, the Contractor shall not receive any further monies under this agreement. 6. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. 7. CLAIMS. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for damages, additional payment for any reason, or extension of time, whether under this PUBLIC WORKS AGREEMENT - Page 2 of 6 (January 30, 2003) (between City of Bremerton and Stan Palmer Construction, Inc.) agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim is set forth in detail in writing and received by the City within seven (7) calendar days from the date Contractor knew, or should have known, of the facts giving rise to the claim. At a minimum, a Contractor's written claim must include the information set forth regarding protests in Section 7.A.2.a.-e. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHiN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISiNG IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDiNG THAT CLAIM OR CAUSED BY THAT DELAY. Contractor must, in any event, file any claim or bring any suit arising from or ~onnected with this agreement within 120 calendar days from the date the contract work is complete. 8. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one year from the date of the City's acceptance of the Contract work. When defects are corrected, the warranty for that portion of the work shall extend for one year form the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. 9, INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officer, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits including all legal costs and attorney fees, arising out of or in connection with the performance of this agreement, except for injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS iNDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS iNDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. PUBLIC WORKS AGREEMENT -Page 3 of 6 (January 30, 2003) (between City of Bremerton and Stan Palmer Construction, Inc.) The provisions of this section shall survive the expiration or termination of this agreement. 10. INSURANCE. The Contractor shall procure and maintain for the duration of this agreement insurance of the types and in the amounts described below against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work by the Contractor, its agents, representative, employees, subconsultants or subcontractors. Before beginning work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commemial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU); and employer's liability. 3. Excess Liability insurance with limits not less than $1,000,000 per occurrence and aggregate. Any payment of deductible or self insured retention shall be the sole responsibility of the Contractor. The City, its officials, employees, agents and volunteers shall be named as an additional insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor's insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Contractor's insurance shall be primary insurance as respects the City, and the City shall be given thirty (30) calendar days prior written notice by certified mail, tatum receipt requested, of any cancellation, suspension or material change in coverage. 11. MISCELLANEOUS. A. Nondiscrimination. In the hiring of employees for the performance of work under this Agreement or any sub-contract hereunder, the Contractor, its sub-contractors, or PUBLIC WORKS AGREEMENT - Page 4 of 6 (January 30, 2003) (between City of Bremerton and Stan Palmer Construction. Inc.) any person acting on behalf of such Contractor or sub-contractor shall not, by reason of race, religion, color, sex, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. B. Compliance with Laws. Contractor shall comply with all federal, state and local laws, rules and regulations throughout every aspect in the performance of this agreement. C. Work Performed at Contractor's Risk. Contractor shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of this agreement. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Nonwaiver of Breach. The failure of the City to insist upon strict performance of any of the terms and rights contained herein, or to exercise any option herein conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of those terms and rights and they shall remain in full force and effect E. Governing Law. This agreement shall be governed and construed in accordance with the laws of the State of Washington. If any dispute arises between the City and Contractor under any of the provisions of this agreement, resolution of that dispute shall be available only through the jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap County, Washington. F. Attomey's Fees. To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties' performance of this agreement, each party shall be responsible for payment of its own legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the City's right to indemnification under Section 10 of this agreement. G. Written Notice. All communications regarding this agreement shall be sent to the parties at the addresses listed on the signature page of this agreement, unless otherwise notified. Any written notice shall become effective upon delivery, but in any event three (3) calendar days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated on this agreement. H. Assignment. Any assignment of this agreement by the Contractor without the written consent of the City shall be void. I. Modification. No waiver, alteration, or modification of any of the provisions of this agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. PUBLIC WORKS AGREEMENT - Page 5 of 6 (January 30, 2003) (between City of Bremerton and Stan Palmer Construction, Inc.) J. Severabilit¥. If any one or more sections, sub-sections, or sentences of this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the remaining portion of this agreement and the remainder shall remain in full force and effect. K. Entire Agreement. The written provisions and terms of this agreement, together with any attached Exhibits, supersede all prior verbal statements by any representative of the City, and those statements shall not be construed as forming a part of or altering in any manner this agreement. This agreement and any attached Exhibits contain the entire agreement between the parties. Should any language in any Exhibit to this agreement conflict with any language contained in this agreement, the terms of this agreement shall prevail. IN WITNESS WHEREOF, the parties below have executed this agreement. //Print Name: -~J //~/ '~:/q-z~47~-~ C'-ary Bol~em~- Title: //,z:v Mayor DATE ~ xJ',q-~/O._3 January 30, 2003 Notices to be sent to: Notices to be sent to: CONTRACTOR: CITY OF BREMERTON: Stan Palmer Construction Inc. City Clerk 5107 State hwy 3 SW 239 Fourth Street Port Orchard, WA 98367 Bremerton, WA 98337 (360) 674-2100 (360) 478-5290 (360) 674-7190 (facsimile) (360) 478-5200 (facsimile) Bremerton Ci~6.~ttomey t~re~n~r~y-C-l~rk - ~ PUBLIC WORKS AGREEMENT - Page 6 of 6 (January 30, 2003) (between City of Bremerton and Stan Palmer Construction, Inc.) ATTACHMENT 1 SCOPE OF SERVICES General The work to be completed under this contract generally consists of construction of approximately 2,300-linear feet of new 12-inch diameter sewer forcemain, including all fittings, thrust restraint, connections with the existing system, adjustment of conflicting utilities, compliance with City construction standards and all other appurtenant work required for a complete functioning system. Construction shall be performed during standard work hours, with the exception of final connections to the operating sewer system, or work in response to emergencies, which may be performed at night. Work in excess of nine hours each day shall be done only with the written approval of the City. The City shall control the work using written Work Directives. The Contractor shall provide a daily accounting for all labor, equipment, and materials used in the completion of the work as directed by the City. The daily quantity reports shall be reviewed jointly by the City and the Contractor, and shall form the basis of payment for the work. The forcemain shall be constructed of Class 150, AWWA C900 pipe. All pipe fittings used for the construction of the forcemain shall be PVC of similar class and type to the pipe, or shall be concrete encased ductile iron. All miscellaneous metals shall be stainless steel, ASTM Types 304 or 316. Contractor shall provide submittal information on all other materials proposed for incorporation in the work. Certain equipment and construction activities shall be provided by the City, as identified below or directed by the City during the course of the work. All activities not specifically identified as being provided by the City shall be the Contractors responsibility. Equipment and Construction Activities to be Provided by the City The City shall provide the following equipment at no cost to the contractor for its use in completing the work: One light plant for use during night time construction · Two 12-inch repair bands for the existing forcemain · Vactor truck and operator for excavation at the southern tie-in to the existing forcemain, and at other locations where identified as necessary by the City. The City shall perform the following work to support the construction at no cost to the Contractor: · Pavement removal, temporary and permanent pavement restoration. Restoration of pavement markings. · Public notification and coordination with nearby residents. ATTACHMENT I to PUBLIC WORKS AGREEMENT - Page 1 of 2 (January 30, 2003) (between City of Brernerton and Stan Palmer Construction, Inc.) · Traffic control including traffic control plan, signs, and flaggers during the construction. · Modifications to the existing traffic signal at the intersection of 15th and Naval Avenue, including restoration of traffic control loops. · Operation of the sanitary sewer system in support of the construction. The City will stop flow and drain the 12-inch Naval Avenue Forcemain, and will stop flow in the 24-inch Crosstown Pipeline for a period of not less than 3-hours, during a period of low flows to allow final connections of the new forcemain to be made to the existing system. · Repair of water services damaged during the construction. ATTACHMENT 1 to PUBLIC WORKS AGREEMENT - Page 2 of 2 (January 30, 2003) (between City of Bremerton and Stan Palmer Construction, Inc.)