Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4321
+--------------------------------------------------------------------------+ =:Enter Search Criteria, Press Esc Key to Transmit + = :press Del Key to Terminate Delete Mode + CHANGE + Contract Number + +Vendor Name +Subject =FDepartment ='Status Code Contract Transactions -( + + + + + + 4321 STAN PALMER SEWAGE PUMP ENGINEERING CON CONSTRUCTION INC STATION EB-2 2002 MODIFICATIONS + =F Insurance Type Amount GL $2000000.00 AL $1000000.00 Amount Begin Date End Date Review Date $1943804.57 11/26/2002 10/15/2005 -.- 02/15/2007 + + Insurance Total $3000000.00 Insurance Review Date 07/01/2004 + + + + + + +--------------------------------------------------------------------------+ Comments CHANGE ORDER #1 7/03 - #2 10/03 - #3 4/04 - #4 10/04 CLOSE OUT 8/05 VAULT 01/01/2007 V3~1 Public Works and Utilities Department - Administration 3027 Olympus Drive. Bremerton, WA 98310 . (360) 473-2327 . FAX (360) 473-5018 August 10, 2005 United States Fidelity and Guaranty Company 6100 219th St SW, Ste 300 Mountlake Terrace, W A 983043 RE: Release of Retainage Bond for Public Works Contract Stan Palmer Construction, Inc. Bond #400SV041802 Dear United States Fidelity and Guaranty Company: Stan Palmer Construction, Inc. has completed all work required under contract for the Sewage Pump Station EB-2 2002 Modifications. Please release the retainage bond you are holding in the amount of Eighty-three Thousand Seven Hundred Twelve and 13/100 ($83,712.13). Thank you for your services and your prompt attention to this matter. Sincerely, A1NV~ Mildred H. V ellegas, CPA PW & U Financial Manager cc: Stan Palmer Construction, Inc. City Clerk Contract file Bill Davis, Project Mgr NOTICE OF FINAL COMPLETION AND ACCEPTANCE Project: Date of Notice: Sewage Pump Station EB-2 2002 Modifications October 15, 2004 In accordance with paragraph 00800 SC-14.06.B of the contract specifications, the City of Bremerton is issuing this Notice of Final Completion and Acceptance for the aforementioned project. By signing below, the City and the Contractor agree to fix the final completion and acceptance date of the project on October 15, 2004. ;S,lL~s Bill Davis City of Bremerton 10 J2b/or / t z~ /~/zgLoi- Tod Ha a I I Stan Palmer onstruction 01/20/2005 14:34 360-674-7190 STAN PALMER CONST PAGE 02/02 ACCEPTANCE & RELEASE Sewage Pump Station EB-2 2002 Modifications Project No. 526 STAN PALMER CONSTRUCTION, INC. hereby indicates agreement with, and acceptance af, the final Contract payment of $15,769.32 and the total Contract Amount of $1,944,002.07, as full and final compensation for all the Work performed in connection with the referenced Contract, and does hereby release the City of Bremerton from all claims, liability, demands, damages, and actions of any kind whatsoever, arising from the referenced contract. By: Todd Haga Project Manag Stan Palmer Construction, Inc. ~ent By: BREMERTON POLICE DEPARTMENT; 1 360 478 5395; Dec-1Q-04 9:03; Page 2/2 AFFIDA VIT OF pUBLICATION No, Ad # JOOUl104 STATE Or WASHINGTON COUNTY OF KITSAP I, Christim: NeiSl)I), being fust duly 5worn on oath, depOseR and says: ThaI she is now, and at all times cmbmced in Ou:publication herein mentioned was the :principal clerl of the printers itnd publishers of THE SUN; that said newspaper lIall beerl approved liS a le3aJ newspaper by order of the Superior Ulurt of the C.)unty or Kitsap. in which County it is publi:;hcd AJ'Id is now and has been tOr m<<e than six months prior tt! the date of tile publication hereinafter referred lQ, published in the English language continually as a daily newspaper in Bremet1.l.m, Kitsap County, Washington, and is now and during aU of said time, was printed in an office maintained in the aforesaid pJace of pubJicaliull of said newspaper; Nuvember 19'" , 2004 and that such newspaper was regularly distributed to its subsLTibers during aU of said period. That the; full mount of the f~ ~harged for ~e foregoing publication is, the SU1Tl uf ,S33.01"which amou'!t ~ nQt been p~lid in fun, ,\\\\\lIltIl1/ ..........' ~t.FFE:FI. ~/III ...'... C( ...... ilIa "... ~~~.,;... .......~ ~. ... "0: . _\.01 AR.... . "t- ~.., S' f p' . J 1 k) ~ ~: ~ r',:= ( 19nature 0 tlnclpa C er ::: .. . ~ = : MAV 4,?008 ; 2' == Subscribe4~lfw~p co ~e~:this day of November 29nd, 2004. ~; ". (JB\- .:t ~: ,~ '/~>""... .* C.~ . lA -:-...,.(' O....<~<f, ..;ffi;n1 8 /$f(tU /11/ I": wp.":J .,\1.'1. --- 11/1I1f1111\'\' -. ... C- /-,~~~~ .,{,~k CrfY OF BREMllRTON' NOTICE OF FTNAL COMPLETION' Notice of final completion ha.~ been flied with the City of Brcmerton by Stan Palmer Construction Compil.nY, Inc.. for Contract No. 4321 - Sewage Pump Stalion EB-2 2002 Modificalions,- Any parties having a claim for materiaJs. labor or damages with reference \(l this c;ontract bave thirt.y (30) daYlI from (he date of publication of tbis notice to file a claim.- Purchasing Division- 345 6th Slreet. Suite #60(:>- p'remenon, W A 98337- Novemlx..1' 19, 2004..tloo131104- + ?~lE Washington State Department of Revenue PO Box 47474 Olympia, WA 98504-7474 Certificate of Payment of State Excise Taxes by PublicW orks Contractor 600 33.6 ~,,_."~"~~___ RE EIV\ED JAN 14 DIVISION STAN PALMER CONSTRUCTION INC 5107 STATE HIGHWAY 3 SW PORT ORCHARD WA 98367 7486 CITY OF BREMER TON PUBLI~~ WILLIAM J DAVIS 3027 OLYMPUS DR BREMERTON WA 98310 4799 We hereby certify that taxes, increases and penalties due or to become due from the above-named contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works contract: CITY OF BREMERTON PUBLIC WORKS 526, SEWAGE PUMP STATION EB-2 2002 MODIFS together with all other taxes, increases and penalties due from such contractor, have been paid in full or that they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained percentage. This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the sole purpose of informing the state, county, or municipal. officer charged with the duty of disbursing or authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor. This certificate does not release said contractor from liability for additional tax that may be later determined to be due with respect to the above-mentioned contract or other activities. Dated ~Y'l..lClV\.t'\ -l t \ Cf5 \ at Olympia, Washington, State of Washington Department of Revenue ~~1 Certifying Officer . . To inquire about the availability of this document in an alternate format for the visually impaired or in a language other than English, please call (360) 486-2342. ITY users may call 1-800-451-7985. REV 31 0028 (10-01-02) ROUTING: Disbursing Officer, Contractor, File, Special File Verify Workers' Camp Premium Status - Employer Liability C.. https:/ / fortress.wa.gov /lni/ crpsi/ AcctInfoPrint.aspx?&Acco... Washington State Department of Labor and Industries Employer Liability Certificate Department of Labor and Industries Employer Liability Certificate Date: 1/12/2005 Business Name: 600 336 626 STAN PALMER CONST.INC. STAN PALMER CONSTRUCTION INC 383,931-00 STAN PALMER CONST INC UBI #: Legal Business Name: Account #: 'Doing Business As' Name: Quarterly Premium Reports: Workers' Comp Premium Status: Quarter 3 of Year 2004 Account is current. Firm has voluntarily reported and paid their premiums. Licensed Contractor? Yes Account Representative: TO / DALE MCMASTER (360)902-5617 Industrial Insurance Information The information above shows the employer's industrial insurance (workers' compensation) premium status with the Department of Labor and Industries. Employers report and pay premiums each quarter based on hours of employee work already performed, and are liable for premiums found later to be due. Industrial insurance accounts have no policy periods, cancellation dates or limitations of coverage. (See RCW 51.12.050 and 51.16.190.) 10fl 1/12/20052:24 PM STATE OF WASHINGTON EMPLOYMENT SECURITY DEPARTMENT PO Box 9046 · Olympia, WA 98507.9046 CONTRACTOR: STAN PALMER CONST INC 5107 STATE HWY 3 SW PORT ORCHARD, W A 98367 ) CERTIFICATE OF ) PAYMENT OF CONTRIBUTIONS ) PENALTIES AND INTEREST ON ) PUBLIC WORKS CONTRACT ES Reference No. 4611 02-00 1 TO: CITY OF BREMERTON PUBLIC WORKS 3027 OL YMPUS DR BREMERTON, WA 98310 The Employment Security Department hereby certifies those contributions, penalties and interest due from the above named contractor under the Employment Security Act have been paid in full or provided for with respect to the following public works contract: ~-Trev..~c.~r\ ~S)I'- C.SOUg"2.) The Employment Security Department hereby certifies that it has no claim pursuant to RCW 50.24.130 against the public body named above for tax attributable to service performed for said public body by the above named contractor on the above described contract. The Employment Security Department releases its lien on the retained percentage, which is provided by RCW 60.28.040 for contributions, penalties and interest due from said contractor. This certificate does not release said contractor from liability for additional contributions, penalties and interest which may be later determined to be due with respect to the above mentioned contract. Dated at Olympia, Washington on December 13, 2004. Original- Disbursing Officer Duplicate- Employer Triplicate-Central Office Files EMS 8449 760 R3-98 @~~18 o .-.u';I::'i::L"":!:if:-l~-_..,~~.~~.:~:;t:;.~~2:t;lffin;~;.::-'~~-';;'i:~l:~~"U:t~; ....' :M~-":':; t'ii i ..4....~.;!~,,\,:;i.H..~...>;h'>k,U;..,,_..J.,,~M"~~.~'-~~-,_t~:~t.t..:;n.'):o.i~..i:.u~~~,~,.~.:~~~~V-.l..'~ ~ ~~.......__..-....:.U~.rt.:~' ,.';'~'H""''-~''4 V ~~-l:ft....A'ntH-\:R)\\RH:..';;:<t;-~.~->:~"",r.It>'.'''~'''~' UP' ~"".u~ ",d., "~~ -~j'~;;:l Sd.0 -r Ir G- "t-C"" I c. h Co, V Y - ",-, . .P:OWELL.&,GttN"rER. . ", . .^ - - - ',--' _ . ., .~ \. . " " . .', '.' - -, ;Attorn.eys"a.fLaw . 1025:Jadwin Richlalld, WA 99352 (509)943-6731 , FAX(509)946-5177 RECEIVED 600 S. Columbia P.O; Box 932 Connell, W A 99326 (509) 234-6581 FAX (509)234-8722 *Please respond to Richland office. Alan B. Gunter. Don E. Powell" DEC 08 2003 December 4, 2003 DEPTQF PUBLIC WORKS AND UTILITIES TO: Clerk of the Bretnerton City Council City ofBremerton 239 4ih Street Bremerton,W A 98337 Attention: Clerk of the City Council TofV'\ \o"e.toe-s+~ct +~Cltlt\lS ~ ~ coPy b<: S(:lI\t TO you .::tlo",~ -;:;:..: wi +'" <: 0., ig: 0'" \ r,leClseS J. ~ ot"'ell dOCvMC:lI\tt\t{OlJ\ :it: 5vppovti",-, t~c.. fyoj G\ose-ou1".~ Certified MailReturnReceiptRequestedNo.~ 70030500 0000 6081 7915 i,).-, i~'-! Re: Stoneway Electric Supply Company~sNotice of01aim against Retained Percentage Fund of Design Air, Ltd., and N otice~fClaimagam,stContractor'sPayment.and Performance Sl.1rety. Bond, with. Stan Palmer ConstrUCtion, hic.,as. Principal and. United States. Fidelity and Guaranty Company, as Surety, bothclaiTIls with respect to: Sewage Pump Station EB~2 Modifications. ..'... Gentlemen: Enclosed are the following for filing with the Bremerton City Council. 1. Notice of Claim against State Munic~pal Retained Percentage Fund in the amount of $55,977.85 including interest, costs, andattomeys fees with respect to the above project. 2. Notice of Claim against Contractor's Payment and Performance Surety Bond with Stan Palmer Construction, hic., as Principal and United States Fidelity and Guaranty Company, as Surety, with respect to Bond No. 400SV041702 in the amount of $55,977.85 including interest, costs, and attomeysfees with respect to the above project. Please file these two claims with your office on behalf of Stone way Electric Supply Co., and_ acknowledge receipt of both the bond claim and.theretainedpercent(!.ge fund lien claim to the above Richland address. For your convenience indoing so, duplicate copies of both the bond claim and retained percentage fund claim are enclosed as well as a stamped, self~addressed envelope. Please acknowl~dge the same on the face' of the instrument and show the date of filing with the proper municipal organization. 'Please retumthe filed and acknowledged copies of both of said claims to me at the above Richland address. "t .. "I ., '...:"- (:12,' .... 'I __~~~t>. ~,"';"l d,:n~1 .~, :',,", ....... Bremerton City Council Page Two Thank you very much for your cooperation and attention in this regard. Very truly yours, r /1\, I Vv,- DEP:cap Enclosures cc: w/enclosures. C;ity,ofBremerton - CertNo. 7003050000006081 7915 7922 Department of Public Works . 3027 Olympus Drive Bremerton, WA983l0 Baird-Weber Enterprises, Inc. -CertNo.7003 050000006081 7939 1725 Pennsylvania Avenue N: . Bremerton,WA 98337 "'f Stan Palmer Construction, Inc. - Cert No. 7003 05000000 6081 7946 5107 St. Hwy. 3 S.W. . Port Orchard,W A 98367 United States Fidelity and Guaranty Company., Cert No. 70030500 000060817953 6100 2l9thStSW, Ste 300. · Mountlake Terrace, W A 98043 Stoneway Electric Supply Co. Attention: Thomas R. Cathcart P.O;Box 300313 Seattle, 98301 . -.". ~ 4 ~ f!1;{-.~:;. ~ "':'~J,' ~~~'; NOTlCE OF CLAIM AGAINST CONTRACTOR'S SURETY BOND TO: Clerk of the Bremerton City Council Re: Sewage Pump Station EB-2 Modifications Attention: The.Clerk of the Bremerton City Council NOTICE IS HEREBY given that the undersigned, Stoneway Electric Supply Co., has a claim in the sum of Forty-Tbree Thousand Thirty-One Dollars and Forty-OI1.e Cents ($43,031.41) for electric materials and supplies and/or work performed for which paymenthas not been made and/or accrued interest thereon, plusaccruedinterest of$1,576.44, plus additional estimated interest at the rate of 18% in the amount of$3,870.00, plus additional estimated sums for attorneys fees and courFcosts of $7,500:00, for a total present claim of $55,977.85, againstthe surety bond taken from Stan Palmer Construction, Inc., as principal, and United States Fidelity and Guaranty Company, a~ surety, which claimant is informed is Bond No. 400SV041702, for the work of .; Claimant reserves theright to augment said claim at time of trial for such additional sums as may be proven foradditional.electricalmaterial supplied, additional interest, and additional costs and attorneys fees. I Furnishing electric supplies and materials with respect to the construction of: SewagePurnp StationEB-2 Modifi.cations C1aim.antfurnishedworkat the request of Baird-Weber Enterprises, Inc., the subcontractor to Stan Palmer Construction, Inc. ' DATED Tl:IIS1f--daY ofDecember, 2003. STO CL BY: ; Don E.' Powell Attorney for Claimant POWELL & GUNTER 1025 Jadwin Richland, WA 99352 (509) 943-6781 COf) Stoneway.SewagePumpStation.StanPalmer.aondClaim. wpd ~ .~ 6".;;. ~ '.. .,~..., ;.....:.. _.._.~. 10 O.:..,~ ',,-... ~.,';~~:?' " '. NO'l'ICEOF CLAIM AGAINST STATE RETAINED PERCENTAGE FUND TO: Clerk of the Bremerton City Council Re:Sewage Pump Station EB-2 Modifications Attention: Clerk of the Bremerton City Council . NOTICE IS HEREBY given that the undersigned, Stoneway Electric Supply Co., has a claim in the sum of Forty-Three Thousand Thirty.,.One Dollars and Forty-One Cents ($43,131.41) for electric materials and suppliesand/orwork performed for which payment has not been made and/or accrued interest thereon, plus accrued interest of $1 ,576.44, plus additional estimated interest at the rate of 18% in the. amount of $3 ,870.00, plus additional estimated sums for attorneys fees and court costs of$7,500.00, fora total present claim of $55,977.85, against the retained percentage taken from and withheld by Stan Palnler Construction, Inc., as principal, and United States Fidelity and Guaranty Company, as surety, which claimant is informedis Bond No. 400SV041702, for the work of: ' .Furnishingelectricsupp.lies and materials with respect to the construction of: Sewage Pump Station EB-2 Modifications Claimant reserves therightto augment said claim at time of trial for such additional sums as maybe proven fotadditional electrical material supplied, additional interest, and additional costs and attorneys fees. . Claimant furnished work at the request ofBaird...Weber Enterprises, me., the subcontractor to Stan Palmer Construction, Jnc. . . ....J~ DATEDTHIS-r- day of December, 2003. STONE .CL BY: DonE. Powell . Attorney for Claimant POWELL & GUNTER 1025 Jadwin Richland,W A 99352 (509) 943-6781 Stoneway.SewagePumpStation.StanPalmer.BondClaim.Percentage.wpd ., '" +--------------------------------------------------------------------------+ "Browse: Next Previous First Last Update Delete Restart X - Exit __ '~etrieve the Next record . ,Found: 1 Record (s ) : :Vendor Name . 'Subj ect 'fDepartment r""" 'od. + I " " " " Comments MAINTAIN Contract Number Contract Transactions 4321 STAN PALMER CONSTRUCTION INC SEWAGE PUMP STATION EB-2 2002 MODIFICATIONS ENGINEERING CON Insurance Type Amount GL $2000000.00 AL $1000000.00 Amount Begin Date End Date Review Date $1943804.57 11/26/2002 .. 10/31/2004 .. 02/01/2006 Insurance Total Insurance Review Date $3000000.00 t 07/01/2004 I CHANGE ORDER #1 7/03 - #2 10/03 - #3 4/04 - #4 10/04 CLOSING OUT 10/04 VAULT 01/01/2006 " , + +--------------------------------------------------------------------------+ CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 4 PROJECT NAME: Sewage Pump Station EB-2 2002 Modifications PROJECT NO: 526 CONTRACTOR: Stan Palmer Construction ORIGINAL CONTRACT AMOUNT: $1,674,242.50 DAYS: 280 PREVIOUSLY APPROVED CHANGES: $269,562.07 DAYS: 232 THIS CHANGE: $0 DAYS: 127 REVISED CONTRACT AMOUNT: $1,943,804.57 DAYS: 639 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract pdce shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN DECREASE CONTRACT o ~- CONTRACT IN TIME ~ ~ AMOUNT CONTRACT EXTENSION -5 '5 ($) AMOUNT (DAYS:) n, a~ ($) Contract Time Extension. Revised Substantial Completion date 0 0 127 is October 6, 2004. NET CHANGE IN CONTRACT AMOUNT 0 ~ 127 INCREASE OR (DECREASE) Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous Costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. CONTRACT CHANGE ORDER NO: 4 PROJECT NAME: Sewage Pump Station EB-2 2002 Modifications This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. CI'P? I~NGINEi:IS, / DIRECTOR OF PUBLIC WORKS /Date~ CONTF~C¥O~ / D~'e APPROVED: /0- ,,,,3~.. ~,Z Date APPROVED AS TO FORM: AT~EST: Bm erton"-~ty Attorney C~i~ Cl~rk -//~' ' Page 2 of 2 +Enter Search Criteria, Press Eec Key to Transmit ~Press Del Key to Terminate Delete Mode ~ CHANGE Contract Transactions ~ Contract Number 4321 Vendor Name STAN PALMER CONSTRUCTION INC ~Subject SEWAGE PUMP STATION EB-2 2002 MODIFICATIONS Department ENGINEERING Status Code CON + Amount $1811789.18 $ Begin Date 11/26/2002 Insurance End Date 06/01/2004 ~ Type Amount Review Date 02/01/2006 + GL $2000000.00 + AL $1OOOOOO.OO + ~ Insurance Total $3000000.00 $ Insurance Review Date 07/01/2004 + + Comments CHANGE ORDER #1 7/03 - %2 10/03 - #3 4/04 + CLOSING OUT 9/04 VAULT 01/01/2006 + CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 3 PROJECT NAME: Sewage Pump Station EB-2 2002 Modifications PROJECT NO: 526 CONTRACTOR: Stan Palmer Construction ORIGINAL CONTRACT AMOUNT: $1,674,242.50 DAYS: 280 (end of Phase 4) PREVIOUSLY APPROVED CHANGES: $137,546.68 DAYS: 32 THIS CHANGE: $132,015.39 DAYS: 200 REVISED CONTRACT AMOUNT: $1,943,804.57 DAYS: 512 (Revised Substantial Completion date: 6/1/04) This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN DECREASE CONTRACT CONTRACT IN TIME AMOUNT CONTRACT EXTENSION ($) AMOUNT (DAYS:) ($) $7,649.99 30 Item 1: WCDs #45, 46.51, 54, 55, 57. (Attached). $700.00 Item 2: WCD #56. (Attached). $11¢673.30 85 Item 3:EB-2 flowmeters. (See Exhibit A). $46,820.00 85 Item 4:EB-3 pump station upgrade. (See Exhibit B). $57,672.10 Provide additional 1200 SY of asphalt paving per Bid Item No. 6 $10,00000 Miscellaneous materials and services (Project Manager written authorization required) NET CHANGE IN CONTRACT AMOUNT $134,515.39 200 INCREASE OR (DECREASE) CONTRACT CHANGE ORDER NO: 3 PROJECT NAME: Sewage Pump Station EB-2 2002 Modifications Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. t ~ Date CITY ENGINEER / DIRECTOR OF PUBLIC WORKS APPROVED: MAYOR APPROVED AS TO FORM: ATTEST: Bremerton City Attorney Page 2 of 2 Sewage Pump Station EB-2 2002 CITY OF BREMERTON Modifications WORK CHANGE DIRECTIVE (WCD) ProjectNo.: 526 Contractor: Stan Palmer Construction WCD #: 45 Date: 10/8/03 Contract Date (NTP): January 6, 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): · Generator exhaust installation ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineer's Records [] Time & Materials [] Other: [] Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ $2042 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization, are not to be exceeded without further authorization. RECOMMENDEDh ~ AUTHORIZED: ~ ~ CITY OF BREMERTON .- ~ / / / ab. FORMS, Work Change Direc~e 3~0 0~.- 14- lC3'92 11: 26,RM FROM TO 47~5:~9~ P.02 INSULATI~O. ' ~' , , INC~ ~ ~:~, ~ ~.~ ,e~~ 01-14-1992 11:27RN FROM TO 47~5~8 P.O~ 8TAN PAI.I~R CON~I~JCTK~ CI~NGE CN:tDER NO: GENERATOR EXHAUS'I INSULATION X-106 DIRECT O0~TS FI ~ W~I( SHEET EeUlr't~m' ow~o ~.o0 S?BCONT'RACTORS $1.7~.00 : SUBTOTAL $1,740.~0 £1~I. JIPMENT OWNED 15.00% MATERIALS 15.00% JO.00 : SUBTOTAL 1.00 TOTAl[ COST & MARK UP $2,1X~1.00 IOME OFFICE OVERHEAD 0.00% 0.00 2.oo TOTA. CHANGE ORDER ~2,041,82 TOTAL P.~ Sewage Pump Station EB-2 2002 CITY OF BREMERTON Modifications WORK CHANGE DIRECTIVE (WCD) ProjectNo.: 526 Contractor: Stan Palmer Construction WCD #: __46 Date: 10/01/03__ Contract Date (NTP): January 6, 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): · Modifications to fence at EB-2 ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineer's Records [] Time & Materials [] Other: [] Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 688 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization, are not to be exceeded without further authorization. RECOM~.' / ~ AUTHORIZED: ab, :FORMS, Work Change Dire~ CHANGE ORDER PROPOSAL STAN PALMER CONSTRUCTION PROJECT: EB-2 2002 MODIFICATIONS DATE: 27-Feb-04 CHANGE ORDER NO: X-109 WCD 46 CHANGE FENCE AT THE PUMPSTATION SITE DIRECT COSTS FROM WORK SHEET LABOR $0.00 EQUIPMENT OWNED $0.00 RENTAL EQUIPMENT $0.00 MATERIALS $0.00 SUBCONTRACTO SUBTOTAL MARK UP FIELD OVERHEAD 0.00% ;0.00 LA OR 20.00% ;o.oo EQUIPMENT OWNED 15.00% ;0.00 RENTAL EQUIPMENT 15.00% ;0.00 MATERIALS 15.00% ;0.00 SUBCONTRACTORS 5.00% "-~'3-' "3~2 "7,~...~ SUBTOTAL TOTAL COST & MARK UP ~g1,~6~.75 HOME OFFICE OVERHEAD 0.00%~'--'--$0~ BOND & B and O taxes 2.00% $29.~ TOTAL CHANGE ORDER ~tg'494.63 ~F, 16 2004 ;!'45AM VIKING FENCE COMPANY "; k:Lng Yence Co. Dr~ertc, n, WA 98312-5015 [llvoice Date: VOiCe: 360-373-7918 Ship to: Sold lo: bewage Puz~p Statloa EB-Z Scan Palmer Construction Bremer ton 5107 St. Nwy 3 $W Port Orchard, WA 98367 Customer ID I Customer PO Payment Terms ......................... ~ ............................ Net 1() Days ST~lq-6742100/3 .......................... I Shipping Method Ship Date Due ]Date ROSE J7072 Quanti~ ] Item ' Description 1 ;nit Price Extension ...... ~'i00 ......... '~59' of 6' high black chainlink. ~,lh~.uO ~, · ~,- 1.00 '24' of 8' high black chainlink !,130.00 ~nd1- 8~8 DD.- '- I Subtotal Sales Tax 'Total Invoice Amount Check]Credit Memo No: Payment/Credit Applied TOTAL z, 2%,, 7,,7 Th~lk YOU For Your Business! We finance charge on invoices over 15 days. Sewage Pump Station EB-2 2002 CITY OF BREMERTON Modifications WORK CHANGE DIRECTIVE (WCD) Proieot No.: 526 Contractor: Stan Palmer Construction Contract Date (NTP): January 6, 2003 WCD #: 51 Date: 11/13/03__ YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): · Install curb and drain between City prope~y and Boatshed Restaurant ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineer's Records [] Time & Materials [] Other: [] Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ /~ Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization, are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED:/~: By: /! ~' ~ ' By: ab. FORMS, Work Change Directive, 3-00 Sewage Pump Station EB-2 2002 CITY OF BREMERTON Modifications WORK CHANGE DIRECTIVE (WCD) Project No.:526 Contractor: Stan Palmer Construction WCD #: 54 Date: 11/19/03 Contract Date (NTP): January 6, 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): · Install two conduits (3/4" and 1 1/2") from EB-2 DLCV vault to electrical building. Core through building approximately 6-inches above floor slab. Perform work in accordance with plans and specifications. See attached figures. Please perform this work prior to asphalt paving at site. ATTACHMENT(S): None If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineer's Records [] Time & Materials [] Other: [] Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 350 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization, are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: ~.~/NTRACTOR CITY OF BREMERTON ab. FORMS, Work Change D//~cbve, 3-00 Sewage Pump Station EB-2 2002 CITY OF BREMERTON Modifications WORK CHANGE DIRECTIVE (WCD) ProjectNo.: 526 Contractor: Stan Palmer Construction Contract Date (NTP): January 6, 2003 WCD #: 55 Date: 1/14/04 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): · Additional PLC work at EB-2 per attachment ATTACHMENT(S): None If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineer's Records [] Time & Materials [] Other: [] Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ $1157 Substantial Completion: 30 days; If the change involves an increase, the estimated Ready for final payment: days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization, are not to be exceeded without further authorization. AUTHORIZED.,: · ab, FORMS, Work Change Directive 3 O0 Controls. C-orpomt on 5030 Date: .Ianua~ I0, 2004 To: Stan Palmer Co¢oration 5107 State Hw~ 3 S.W. Port Orchard, WA 98367 A~n: Todd Haga Re: Bremerton Sewage Pump Station EB-3 QCC Prqiect No. PI 041 Slakes ot'WCD 55- PLC work change Mr. Naga, Please ret~r to the commenB below for QCC response to fl~e Bremerton EB-2 "Status WCD5S-PLC work - o" ' chan=e dated Jamm~, 8, 2004. Item 2) Problem with high flow sequencing trader PLC-2. The. PLC code was reviewed for proble ns witl~ tbund. The Pump 3 could not h~ ..... ~ ~ - [~T-v -~quencmg but no problems ~ ,~,t~u oecause lr [sour ~br repair, were Item 3) Problem with local pump sequencing under PLC-2 operation. Tbe local pump sequencing could not be changed because there is no fault tbedback ~vail~le to the PLCs. The city will not be charged tier this item. Item 4) LIT-103 failure signal. Code was added t{) the PI,C and the Pane view so that thc level hiI alarms lbr I;I'F-102 .J F-lO.., ~outd be reset by die' operal Item 5) Beach main check valve thae delay. The lime de/a? Ibr tf~e bcilch main check valve was added to the PLC along w~lh the requested time dehw ac[iustme~ts on d~e Panelvicw. Item 6) Failure to monitor/sense "Hand" mode by PLC. Extra wiring and PLC code was added to so that PLC #l would be abte to dctemm~e when the pumps were in hand mode. This allows fl~e e~oneous al~ to bc suppressed. Item 7) Time delay fi~r level floats. The Ci~ determined that the time delays were not needed because PLC~i does not use the floats for control 'ust indicatmn . J ' . The ci~,' wil~ not be charged tbr this item. Ir'em 8) Set Time and date at PLC. The addition ora Panelview semen w~s installed which allows the PLC and Pm~eMew time at~d date to he changed. The a~/t~sted total cost of all of the changes is $t020. Please let me Icnow if you have any questions regarding these items. ~ ~ S~'ely, Greg Lesniak ': Prqject Engineer Sewage Pump Station EB-2 2002 CITY OF BREMERTON Modifications WORK CHANGE DIRECTIVE (WCD) ProjectNo.: 526 Contractor: Stan Palmer Construction Contract Date (NTP): January 6, 2003 WCD #: 56 Date: 1/13/04 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): · Modify channeling at OF-7 MH ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineer's Records [] Time & Materials [] Other: [] Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ "~ ~"-~ Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization, are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: /~~NTRACTOR ~ ~IT,,Y-O~ BRE M.E RTO N Sewage Pump Station EB-2 2002 CITY OF BREMERTON Modifications WORK CHANGE DIRECTIVE (WCD) ProjeotNo.: 526 Contractor: Start Palmer Construction WCD #: 57 Date: 1/13/04 Contract Date (NTP): January 6, 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Adicle 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineer's Records [] Time & Materials [] Other: [] Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ /G;~I y' Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization, are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: ,/~ Change Order 3 Item 3:EB-2 Flowmeters EXHIBIT A SCOPE OF WORK The work consists of installing three 1 O-inch magnetic flowmeters in the EB-2 high flow wet well, and associated piping, fittings, electrical work, and testing to confirm proper operation. The City will supply the following items: (3) 10-inch diameter Sparling Tigermag flowmeters (each flowmeter comes with 150 LF of cable and a remote- mounted signal converter, manufacturer info attached.) The City will vacuum the high flow wet well prior to the Contractor start'mg the work. WORK RESTRICTIONS 1. At least two of the EB-2 high flow pumps shall rema'm operable at all times while performing the work. The Contractor may be required to vacate the work area inside the wet well should high system flows be anticipated. 2. The EB-2 local pumps shall remain operable at all times while performing the work. Change Order 3 Item 3 February 18, 2004 Exhibit A, Sheet 1 of 9 pIPE ~o ~ Item # Description o~ .c_ 1 IExisting 10" 90° deg bend. FE x FE · c~ _ IFlanged coupling adapter, 10" (Romac z uJ z Istyle FCA 501 or equal) ~ 3 !Existing flanged pipe support ~ 110", FE x PE. Cut existing vertical pipe as 1needed and rotate 180© to make FE x FE ~--- 4 1connection to new flowmeter. Connect to ~ 190° bend with FCA (Item 2). i10 magnetic flowmerer, to be supplied by U1 5 ithe City iAdapter flange with set screws for plain- 6 lend pipe, 10". Romac Field Flange'"" or IUni-Flange~ Series 200 Adapter Flange. ,. 15/8" threaded rod (typ of 2). Use ductile 7 Ilugs and 90° SS eye bolts, spanning from IFCA to FM flan,qe Existing 10" x 6" reducer All p~ping and fittings on this sheet shall be ductile iron (System 3 per 15060). All exposed piping and fittings shall be coated per 09905. All metal nuts, bolts, washers, and rods shall be 316 SS, except -i ductile lugs. FE = flanged end; PE = plain end Chan~e Order 3 item 3 Exhibit ~. Sheet 2 of 9 Product Data Sheet TigermagEP PDS-656 Technica/ SPec/f/cations FM656 Obstructionless Electromagnetic Flowmeter DESCRIPTION PRINCIPLE OF OPERATION The Model 656 is a microprocessor-based The Model 656 magnetic flowmeter is based electromagnetic flowmeter designed to on Faraday's Law which states that the measuretheflowofconductivetiquidsinfull voltage induced in a conductor moving pipes, The sensor and the transmitter are throughamagneticfieldis propodionaltothe integralandenclosedinaNEMA-7explosion- velocity of that conductor, The magnetic proofhousing, Thesensorhousingismade flowmeter will measure liquids with of steel, conductivities greater than 5 micromhos. Awide variety of liners and electrodes are STANDARD FEATURES available to allow you to tailor the meter to Sampling frequency up to 100 Hz for your process, accurate measurement of fluids with high levels of inherent noise The Model 656's nonvolatile E2PROM memory and circuitry eliminetesthe need for Forward, reverse and net totalization a microprocessor backup battery. It is not Programmable high andlowflowalarms necessary to reprogram if the electronic Nonvolatile E2PROM memory module is replaced or exchanged with elec- Universal electronics module tronics from another size flowmeter, compatibility 2-line, 16 character backlit display APPLICATIONS Programming made easy with The Model 656's high signal frequency makes it ideally suited to applications with Mag-Command" j~ high levels of inherent noise including: · User-selectabledamping& Process Chemicals, Heavy Sludges, Pulp & Iow flowcutoff Paper Stock, Mining Slurries, Polymers, · NEMA-4X&NEMA-7explosionproof Acids, Alkalies, Sewage, Cooling Water. enclosure Nearlyanyconductiveliquidcanbemeasured. · Approvalsinclude: FM, CSA(std.) Pending approvals include: CE CE CERTIFIED ACCURACY Rotatable modular display Each TigermagEP ~" is wet-fl°w calibrated in Empty pipedetection Sparling~s Primary Flow Lab traceable to the PZR - Positive Zero Return NationaHnsiitute of Standards and Technology. A certificate of accuracy is furnished with each Standard 0.5% accuracy meter. Sizes available from 0.5" - 72" ~PPROVED Item 3 Exhibit A, Sheet 6 of 9 TWO FLOW ALARMS Fault alarms can be configured with alarm set points between 0-99% of flow for each alarm. Open collector outputtums on above programmed set poinL ~ PZR - Positive Zero Return An electronic circuit is activated by an external contact closure when EASY TO READ BACKLIT ROTATABLE DISPLAY lines go empty or when a pump or valve is shut down, indicating to The 16 character, 2-line backlit transmitter displayis rotatable 360° in the meter that it should drive the output signal to 4 mA or zero, 90° increments ensuring easy reading in any orientation, REMOVABLE ELECTRODES (apron) INSTALLATION Two configurations of removable electrodes are Themetermustbemountedatapointinthe}ineinwhichthepipeis available in sizes 6" or greater for all FM656 meters, always fult of the process liquid under flawing conditions The first configuration allows removal of the electrode after the line The meter may be equipped with ANSI 150 or 300 lb., AWWA, DIN, has been depressurized and drained. Removal is performed with PN 10 or 16, JIS 1aK or 2OK, or British Standard flanges, an 11/32" nut driver and a 3/4' socket wrench. 0 nly three diameters of straight pipe length are required from the center of the meter to normal obstructions to obtain specified accuracies, in the smaller sizes all of the necessary straight pipe Cable is contained within the meter itself. E2PROM NONVOLATILE MEMORY \ A backup battery is not required and there is no need to reprogram - Shut-off if the electronics module is replaced or exchanged. Meter identifica- va~v. Handle tion (tube ID, serial number, K, offset, etc.) is stored on an E2PROM chip independent of transmitter electronics. The E~PROM chip has lifetime data retention, EMPTY PIPE DETECTION - Standard The Spading TigermagEPTM is designed to detect absence or inadequate volume of process fluid in the pipe and will hold the output signal to 4 mA or zero, This feature does not require any hard wiring as it is a software selection. One of the most important values of this featureisthatitpreventsfalsetotalizationpossiblewithothermeters The second is the "hot-tap~ electrode which allows electrode underpartiallyfilledpipeconditions, replacement while the system is still under pressure without disturbing the process flow, Removal can be easily performed with EASE OF COMMUNICATIONS a phillips screwdriver and a crescent wrench. Special locking The TigermagEPTMis programmable with Mag-Command or Had catcheswere designed to prevent high pressure accidents during Protocol. 4-20 mA, RS~232 or RS-485 outputs giveyou flexibilitywhen electrode removal. The shut-off vatve must be closed before the interfacingwithyourdistributedcontrolsystem, electrode may be removed. REMOTE MOUNTED TRANSMITTER Remote mounting of the transmitter is required when pipe vibration is excessive, when flooding is possible or where high temperature conditions exist (over 212°F / 100°C). The TigermagEP"' remote transmitter is housed in a NEMA-4X enclosure and features a larger sized (8mm) 16 digit 2qine backlit display. All power, coil and electrode connections are made within the transmitter enclosure and junction box. The meter is programmed Grounding Rings using Mag-Command, Halt-effect switcheswhich are energized from outside the enclosure, The enclosure can be wall mounted, An optional bracket for pipe mounting is available. HI-Z CIRCUITRY GROUNDING The Spading TigermagEPTM provides superior performance in The use of grounding rings is recommended to ensure accuracy, liquids which tend to deposit nonconductive coatings, Hi-ZTM GroundingringsarerequiredifadjacentpiPingislinedornonconduc- circuitry produces a high input impedance to the transmitter's tire. Pump noise or excessive RF should be minimized to achieve preamplifier (10TM ohms)l The impedance of the coating is highestaccuracy. negligible as compared to the impedance of the receiving instrument. The voltage drop across the electrode coating is also neglig ible eliminating the need for electrode cleaners, Change Ord.' Item 3 Exhibit A, Sheet 7 of 9 FLOW RATES & DIMENSIONS Table I · Flow & Dimensions · Integral Mount Transmitter Meter Mating Dimensions Flow rates - GPM - Full Scale Size Flange nches Size A B C D I fps 3 fps 33 fps 0.5 0.5 4.00 3.50 9.50 9.25 0.6 1.7 18 1 1 400 4.25 10.19 9.94 2 6 66 1.5 1.5 4.00 5.00 10.88 10.63 5 15 174 2 2 4.00 6.00 11.69 11,44 9 27 303 3 3 600 7.50 13.00 12.75 20 60 664 4 4 6.00 9.00 14.38 14.13 35 I07 1182 6 6 13.38 11.00 17.00 16~75 85 254 2800 5 8 13.36 13.50 19.40 1915 145 436 4800 10 10 18.15 16.00 22.56 22.31 236 709 7800 12 12 19.40 19.00 25.00 24.75 333 1000 11000 14 14 21.38 21.00 26.67 26,42 409 1227 13500 16 16 23.38 23.50 29.97 28.72 545 1636 18000 .Remote Mount Transmitter- 18 18 27.25 25.00 31.14 30.89 667 2000 22000 20 20 27,63 27,50 33.39 33.14 879 2636 29000 24 24 32.75 32.00 37.44 37.19 1273 3818 42000 ~-~' ~ 30 30 43.50 38.75 43.72 43,47 1909 5727 63000 36 36 47.75 46.00 50.20 49.95 2925 8775 96525 42 42 51.75 53.00 56.90 56.65 4040 12120 133320 48 48 51.75 59,50 63.05 62.80 5322 15966 175626 54 54 53.50 66,25 69.88 69.63 7144 21433 235800 60 60 65.50 73.00 76.75 76.50 8500 25500 280500 66 66 65.50 80.00 83.75 83.50 10300 31000 341000 72 72 72.75 86.50 90.00 89.75 12700 38100 419100 Dimensions for 150 lb flan~les. Allow 1/8" to 1/4' for lini~ thickness / Dimensions O & 0 -~.0125' HOW TO ORDER A TIGERMAG EP MODEL 656 ASensor Table 5 - Flange Rating 1 150 lb. flanges 4 PN 10 DIN 6 JIS 10K O O L acciden0al submergence proof sensor h __ Hart® protocol (KP602 programmer available) __Hot Tap removable electrode design (6" & above only) Alarm with relay contacts (remote only) Ohange Order 3 -- Item 3 ~M656 *FM approval is UP to 120 volts Exhibit A, STANDARD SPECIFICATIONS MODEL FM-656 SPECIFICATIONS Accuracy: 0,5" (Frequency Output) 0.5% of span (1-3 fps) 1.0 The magnetic flowmeter shall be microprocessor-based, and Ilanged. It shall 0.25% of span (-< 50% of span) (3-33 fps) indicate, totalize, and transmit [iow in full pipes. 0.5% of flow rate ~ 50% of span) {3-33 fps) 1~ The magnedc flowmeter shalt utilize DC bipolar pulsed coil excitation, operating 1.0"-72" at frequencies up to 100 Hz and automafically re zeroing after every cycle O 25% of span (~ 50% of span) (1-3 fps) 0.5% of flow rate (~ 50% of span) (1-3 fps) 1.2 The accuracy shall be at least 0.5% (-> 50% of sPa~) offlow rate over a 33:t 0.1% of span (% 20% of span) (3 33 fps) turndown at ali flow rates above I fps. Accuracy shall be verified by calibration 0.5% of flow rate (, 20% of span) (3-33 fps) in a flow laboratory traceable to the U S National Institute of Standards and Technology. Temperature Effe6b -~0.025 % FS/~C 1.3 The flow sensor liner shall be Ceramic, Hard Rubber, Soft Rubber, Neoprene, Full Scale Ranges: From 0-3 to 0-33 ~seo. PolyurethaneerTefzel®,Thehousingshatlbesteel. Repeatability: -+0.1% full scale 1.4 The integrally-mounted how sensor and t ransmiger shall be FM approved for Electrodes: Stainless steel standard (others available) Class I, Divi$iaf] 1 & 2, Groups B, C. D and Class II, Division 1, Groups E, F, G Liner: Ceramic (aluminum oxide 99 5%), Hard Rubber, Soft Rubber, environments without use of air purge. CSA Approved for Class I, Division 2 Neoprene, Po~yurethafle or Telzel ® Optional Cenelec approval available. t5 The etectronfcs shall be integrally or remote mounted. 4097N.Temple Ci~yBIvd, · I~,01Box5988 · EIMonte, CA USA91731 Change Order 3 Ph {626) 444~571 · Fx (626} 452~)723 Item 3 Intemet: http://~vw,sparlinginstruments,com · E-moji: sales@spadinginstruments.com Exhibit A, Sheet 9 of 9 Change Order 3 Item 4:EB-3 Pump Upgrade EXHIBIT B SCOPE OF WORK The work consists of demolishing existing pumps (2) and associated pump bases, motors, piping and fittings as noted on the demolition plan; installing new dry-pit pumps (2) and associated pump bases, piping and fittings as noted on the attached plan sheet. The City will furnish the following items: Two Flygt NT-3171 pumps. City responsibilities: The City will provide and operate the flow bypass system so the Contractor can work in the wet well. The City will clean and vacuum the wet well prior to the Contractor beginning work. The City will perform all electrical/instrumentation work and starmp of the pumps. Attachments: Demolition plan, 8-1/2" x 11" sheet Cut sheet with dimensions for Flygt NT-3171 tl"~ /7~' EB-3 Pump Installation, Plan and Detail Sheet, ~2g" x 34" plan sheet February 25, 2004 NT-3171 Section 4 ~ Outline Dimensions Ilssued: 5/02 ISupersedes: S R MD (4×) ' ~ HOLE D~A K D~A. j H ', c.i. FLANGE I ~ ~ANCHORBOLT(6x) (NOM' SIZE) '"~--~ --tF~l / 1~ pROJECDON ~" ~ -~ ~ ~.~., ~N~E (NOU. S~ZE) " NOTE: ~I~Ei I I~ PUMP CAN BE ROTATED ABOUT IT'S MODEL VERS!ON CENTERUNE TO ~ POSI~ONS RELAqlVE NT 4" J HT J aoo ..~ TO THE INLET ELBOW. NT I 6"/ MT ~ 8~o ] INCREMENTS ARE 90'. EB-3 Existing Pump Station Section Demolition Plans :Enter Search Criteria, Press Esc Key to Transmit ~Press Del Key to Terminate Delete Mode CHANGE Contract Transactions Contract Number 4321 =Vendor Name STAN PALMER CONSTRUCTION INC =Subject SEWAGE PUMP STATION EB-2 2002 MODIFICATIONS =Department ENGINEERING =Status Code CON Amount $1811789.18 Begin Date 11/26/2002 Insurance End Date 10/31/2003 Type Amount Review Date 11/01/2003 GL $2000000.00 AL $1000000.00 + Insurance Total $3000000.00 Insurance Review Date 07/01/2003 Comments CHANGE ORDER #1 - 7/17/03 #2 - 10/13/03 + CITY OF BREMERT :)N CHANGE ORDER CONTRACT CHAN(;E ORDER NO: 2 PROJECT NAME: Sewage Pump Station EB-2 2002 Modific itions PROJECT NO: 526 CONTRACTOR: Stan Palmer Construction ORIGINAL CONTRACT AMOUNT: $1,674,24 2.50 DAYS: 0 PREVIOUSLY APPROVED CHANGES: $129,252.47 DAYS: 0 THIS CHANGE: $8,29 ¢.21 DAYS: 32 REVISED CONTRACT AMOUNT: $1,811,789.18 DAYS: 32 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT c~ ,-- CONTRACT CONTRACT TIME ,.- ,- AMOUNT AMOUNT EXTENSION · · ($) ($) (DAYS:) X Rule 170 Items: WCDs #44, 48, 501 $296.21 X Rule 171 Items: WCDs #41,41,43, 27 $7,998.00 Time extension: Delay by power company installing permanent 23 power at site, resulting in 23 day delay. Time extension: Delay to Contractor due to City having 9 Contractor vacate staging area early so City can do landscape improvements. NET CHANGE IN CONTRACT AMOUNT $6,294.21 32 INCREASE OR (DECREASE) Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: Sewage Pump Station EB-2 2002 Modifications overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. RECOMMENDED: R~N ~ P EER / Date APPROVED: MAYOR Date APPROVED AS TO FORM: ATTEST: Bremerton City Attorney C~y Clerl~ / Page 2 of 2 Sewage Pump Station EB-2 2002 Modifications 10/10/2003 Change Order #2 Cost Summary Sheet {~{~l~l~lilmmml~l mmmm~mmmm~mmmmm~mm~mm~mmmmmm~m~m~m{mmmmmmmmmmm~mmmm~mmm~mmmmm~mmmm~m~ {~immmmmlmmm{mla{mmmm{mlmlmlm}mmmmmmlml ~mmlmmmmmmlm~mmmm}lil I~ffillllll{~l~l mimm~mmmmlmlmlmmm~mmm~ Sales Tax or Rule 170 WCD # Subject Negotiated Cost Rule 170 Rule t71 Items 41 Sawcutting asphalt at East 10th and OF-7 $900.0(: X 42 Mislocated 12" piping connection at OF-7 $4,933.0(: X 43 Groundwater issues at East 10th St $5,000.0(: X 44 Roof drain installation at EB-2 $600.0(: X $51.00 47 Eliminate paving upper parking lot -$2,835.0(: X 48 Brick wall installation around electrical pole $1,173.0(: X $99.71 50 Eliminate wall hangers on three pipes -$1,500.0(: X ($127.50', TOTAL TAX -> $23.21 TOTAL VALUE, RULE 170 ITEMS (incl. sales tax) $296.21 TOTAL VALUE, RULE 171 ITEMS $7,998.00 TOTAL VALUE FOR C.O. #2 ~ Sewage Pump Station EB-2 2002 CITY OF BREMERTON Mo;Imoations WORK CHANGE DIRECTIVE (WCD) Pro ,o.: Contraclor: Slan Palmer Construction WCD #: __41 Date: 5122/03.._ Co;,~,-~ct Date (NTP): January 6. 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): · Additional asphalt cuffing costs at Shorn Dr. and East 10~h A'~'ACHMENT($): if a claim is made that the above change(s) have affected Conlract Price ~- Conlract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effeot of the change(s). The Change ' . . On:let wdl be executed in accordance with Section 1-04.4 of the WSDOT ~tenclard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price; Method of determining change in Contract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineer's Records [] Time & Materials [] Other: [] Other. Estimated increase (decreese~ !ntContraol Price: Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be excee~lecl wi~out further authorization. If the change Involves an increase, the estimated times are not to be exceeded without further authorization. Sewage Pump Station ED-2 2002 CITY OF BREMERTON WORK CHANGE DIRECTIVE (WCD) Contractor. Start Palmer Consb~clion WCD #: __42 Date:., 5/22/03__ Contra= Date (NTP): January 6, 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WiTH THE FOLLOWING CHANGE(S): * Mislocated piping connections at Bachmann Park A'I-I'ACHMENT(S}: If a G.;,. ~s ,,,o,,m thet the above ,.h., ~(s) have oF, =:..~,~ Contract P~ m Cont~ T~es any Js ~sed ~ereon wiB inv~e one or more ~ ~e ~lowl~ me~s of d~ermining Chan~ ~er w~ ~ ~ ~ a~e w~ S~ 1 ~.4 ~ ~e WSDOT Standa~ ~ ~neral ~itions. ~ of de~ln~g ~ange in ~ P~: Me~ ~ ~te~i~ chan~ h C~a~ ~mes: ~ Lump Sum ~ EngineeKs R~ords ~ T~e & M~ls ~ oth~ ~ ~=: Es~mat~ ~n=ease (~ea~) in Cenffact PH~: Esflma~ I~ease (~cr~se) ~ Contract ~mes: $ ~933 Su~fi~ Completion: 0 da~; If ~e ~ange invo~s ~ in.ease, ~e ~fimat~ R~y fm F~al pa~ent: 0 deys; amount ~ ~t to be exceed without ~her Jf ~e change in~lves an incre~e, au~or~fi~, am not ~ be ex~ed wit~l ~ authori~tion. RE~ AU~ORIZED: ~ . Sewage Pump Station EB-2 2002 CITY OF BREMERTON WORK CHANGE DIRECTIVE (WCD) P~oj==No.: ~26 Contract~. Start Palmer Conslruc~rm WCD #: _..43 Date:. 5/22/03._ Contr~ Date (NTP): Janua~, 6, 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHARGE(S): Groundwater at East 10~ and Shore Dr. ATTACHMENT(S): If a claim is rc,~,e that the above chenC,~s) have affected Conlract Price or Contract Times'[~¥ claim for a Change is based thereon will involve one or more of the following methods of determining the elfec~ of the c.~ange(s), The Change Order will be executed in accordance with Section 1-04.4 of the W~DOT~tandard ~pecificeUons, or Article t0 of the General Condit~ns. Me~ of determining change in Contract Price: Method of determining ctmnge in Conlract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineers Records [] Time & Materials Estimated increase (decrease) in Contract Price: Estimated Increase (decrease) in Contract Times: If Ihe change inv~ves an in~'eeaa, the e~timat~d Ready for final payment: 0 days; amount is not [o be exceeded without fur[her if the change involves an Inc~ease, the estimated times authorization, are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: Sewage Pump Station EB-2 2002 CITY OF BREMERTON Uodm~auoea WORK CHANGE DIRECTIVE (WCD) F,,*o~= No.: $26 Contractoc. Start Palmer Construction WCD #: __~ Date:., 10/~03__ cootract Date (NTP): JaNuary 6, 2003 YOU ARE DIRECTED TO PROCEED PROMPTLy WITH THE FOLLCRNIHG CHANGE(8): · Roof drain installation at electrical building A'i-I'ACHM ENT(S): If a ,.~u.f, is made Ihat the ~bove cJ'ta~ge(s) have ~ C~ P~ ~ C~ ~es any ~aim for a Cha~e 0~ is ~ mean will ~v~e ~e ~ m~e of ~ foiling ~s of dete~i~ng ~ge Or~ w~l be exe~ in a~rda~e with S~ 1~.4 of ~e ~TStande~ Sp~Uons. ~ ~e 10 of · e Gene~ Conditions, Me~ of d~ining change in C~ P~e: Me~ of dete~ini~ ~ in C~a~ ~m~: ~ Un~ Pri~ ~ ~b~tor's ~s ~ Lump ~m ~ ~n~Ks Re~ ~ ~me & Ma~ Estimated in~ (de~se) in Cannot ~j~: Estimated in.ease (d~se) in ~nbao~ Times: S $~ Substantial C~ple~on; 0 If the ~ange involv~ an in~se, ~ esUma~ Ready ~r fin~ ~ent; 0 da~; amount is not to be ex--ed w~out ~her If~e ~ange ~1~ an i~rease, the es~matad tim~ au~o~tion. am not ~ be ex~ ~th~t ~h~ authori~t~n. RECO~ A~RI~D: Sewage Pump Station I~i~.,2 2002 CITY OF BREMERTON WORK CHANGE DIRECTIVE (WCD) Co~tmc~oc. 8tan Palmer Cons~*uc6on WCD #: __47 Date: 1018/03.__ contract Date (NTP): January 6, 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WFFH THE FOLLOWING CHANGE(S): · Eliminat~ demo and paving in upper parking lot (use $9/SY (bid) for 316 SY) ATTACHMENT(S): If a claim is made that the above ~h-~ge('a) have affected Contract Pi'ice or Cont~a~'t Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Stenda~ Spec. ificetions, or A~ticle 10 Of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: [] Unit Price [] Contractor's Records [] Lump Sum [] Engineer's Records [] Time & Materials Estimated increase (decrease) in Centra~t Prise: Estimated increase (decrease) in Conttaat Times: S ( S283S ) Substantial Completion: 0 clays; If the change involves an increase, the estimated Ready for final payment: 0 days; amount ia not to be exceeded without further if the change involves an increase, the e~§mated Umes authorization, are not to be exceeded wfthout further authorization. RE~~ AUTHORIZED; Sewage Pump Station EB-2 2002 CiTY OF BREMERTON Modm=aUons' WORK CHANGE DIRECTIVE (WCD) F rojo t.o.: 526 Contractoc 8ten Palmer Con$1nJCtJon WCD #: ._.48 Date: 1018/03__ Contract Date (NTP): Jmluary 6. 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): · Brick wall installa§on around electrical pole AqTACHMENT($): If a claim is ~-~,e that the above ~.-,,~a) have alfee.~ed Contract Price or Contract Times any claim for · Change Order is based thereon will Involve 0~e or mere of the following m®thocis of determkling the effect of the change(s). The Change Order will be executed in accordance with ~ectJon 1-04,4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change I~ Contract Price: Melho~l of determkling change in Co~tract Times: [] una Price [] C~ttacto¢'s Records ~] Lump Sum [] Engineer's Reco~cla [] Time & Materials Eslimatecl increase (decrease) in Contract P~ce: Estimated Increase (decrease) in Contract Timee: $ ~~"* Sut~stapltial CO~Aplefion: 0 days; If the change Irlvolves an increase, the ',Stimated Rmady for finBI pByment: 0 days: amount is net to be exceeded without further authorization. If the change Invoives an increase, the estimat~ times RECO~ are nm to be exceeded without fu,r,~r authorization. Sewage Pump Station EB.2. 2002 CITY OF BREMERTON Mod~flcaUo., WORK CHANGE DIRECTIVE (WCD) Hroje= Mo.: ~26 Contractor:. Stan Palmer Construction WCD #: __50 Date: t018/03__ Contrac~ Date (NTP): January 6, 2003 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): · Eliminate 3 SS wall hangers on 3 pipes ($500 each to manufacture and install) A'T'I'ACHMENT(S): If a claim is made that the above change(s) have affected Co~tract Price ~' Contract Tk~es a~y claim for · Ch'~ge'0rda- is baa, ecl tilereon will involve one or more of the foilowing methods of determining the effect of the cfla~ge(s). The Change Order Will be exeGuted in accordance ~ Section 1-04.4 of file WSDOT Stenda~cl Specificeb*ons, or Article 10 of the General Conditions. Method of determining change in Con~'act Price: Method of determining change in Contract Times: [] Unit Price [] Contract~'$ Records [] Lump Sum [] Engineer's Records [] Time & Materials [] Other: [] other: Estimated increase (decrease) in Contract Prfl;e: Estimated increase (decrease) in Contract 'Times: $ $(1500) Substantial Completion: 0 days; If t~e change i~velvea an increase, t/to estlmaM~ Ready for final payment: 0 days; amount is not to be exceeded wia~out further If the change involves an lnc~eaea, the estimated times authorfzation. l~-l~-~4d~d 1~: ~ob~ lO 2~3 3027 ~ Brm~ WA 99310 ~ . R~S~ ~PiS~onEB-22~M~fi~o~,~j~t ~o. 5~;Pa~mtfor I m ~tof~i~ ~m Tom ~oy ~g comp ~on me for &e ~m ~. I [' 5107 State Hwy 3 SW, TOTRL P. Enter Search Criteria, Press Esc Key to Transmit Press Del Key to Terminate Delete Mode CHANGE Contract Transactions Contract Number 4321 Vendor Name STAN PALMER CONSTRUCTION IRC ~Subject SEWAGE PUMP STATION EB-2 2002 MODIFICATIONS Department ENGINEERING Status Code CON Amount $1674242.50 Begin Date 11/26/2002 Insurance End Date 09/30/2003 Type Amount Review Date 09/01/2003 2oooooo.oo AL $1000000.00 Insurance Total $3000000.00 Insurance Review Date 07/01/2003 Comments CHANGE ORDER ~1 - 7/17/03 CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 1 PROJECT NAME: Sewage Pump Station EB-2 2002 Modifications PROJECT NO: 526 CONTRACTOR: Stan Palmer Construction ORIGINAL CONTRACT AMOUNT: $1,674,242.50 DAYS: 0 PREVIOUSLY APPROVED CHANGES: 0.00 DAYS: 0 THIS CHANGE: $129,252.47 DAYS: 0 REVISED CONTRACT AMOUNT: $1,803,494.97 DAYS: 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall -'construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT o ,- ~3ONTRACT CONTRACT TIME r-- ~ AMOUNT AMOUNT EXTENSION 0~ 0~ ($) ($) (DAYS:) X 1. Construct EB-2 beach force main as specified in the 292,950 0 following attached documents: a. Drawings titled "Trenton/Cherry Basins Beach Main Improvements", Sheets 1 through 7. b. Specifications titled "Trenton/Cherry Basins Beach Main Improvements." c. Nationwide Permit 12 from U.S. Army Corp of Engineers, Reference No: 2001-2-01059 d. Hydraulic Project Approval (HPA) from Washington State Department of Fish and Wildlife, Reference No: 00-F1546-02 e. Specification section 15086 - Tapping Sleeves f. GeoEngineers Field Report of April 16, 2002 X Work Change Directives 4 - 13, 18, 20, 24, 26, 29, 30, 32, 34, $3,125.35 0 40 X Work Change Directives 1,2, 3, 15, 16, 21,23, 25, 27, 28, 31, ($169,081.71) 0 33, 35 - 39 NET CHANGE IN CONTRACT AMOUNT $129,252.47 0 INCREASE OR (DECREASE) Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. % CONTRACT CHANGE ORDER NO: 1 PROJECT NAME: The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. RECOMMENDED: ~;;;~'-'"'-- ............ - ~ W/'"/~,o~ PROJECT ENGINEER .//... Date CCDY ENGINEER / DIRECTOR OF PUBLIC WORKS -- --Date APPROVED: MAYOR APPROVED AS TO FORM: ATTEST.' Bremerton City Attorney Ci~ Clerk Page 2 of 2 Sewage Pump Station EB-2 2002 Modifications Change Order #1 Summary Sheet Sales Tax on Rule 170 WCD # Subject Negotiated Cost Rule 170 Rule 171 Items 1 Apply Raven Lining to MH 1 on C5 $2,035.29 X 2 Remove 6" water line relocations from contract ($1,000.00) X 3 Eliminate bid item 5 ($186,000.00) X 4 Eliminate vent piping ($5,611.55) X 5 Cost savings for retaining walt ($3,831.54) X 6 PLC pregramming modifications $1,917.09 X $162.95 7 Poor utility locate for 10" sewer at EB-2 $800.00 X $58.00 8 Use 316 SS bolts for all vault fittings $2,421.00 X $205.79 9 Concrete work in dry well $2,407.30 X $204.62 10 3,hanges to PLCs $4,723.11 X $401.46 11 Senerator substitution $4,316.94 X $366.94 12 ~,dd limit switches to check valves $4,336.00 X $368.56 3,hange VFDs to Allen Bradley, eliminate AHF, add Aegis 13 line filter ($13,506.00) X 15 Electrical items at OF-7 $1,036.00 X -- 16 Gas line delay at Trenton Ave $700.00 X -- 18 Remove 8-inch penetration into local wet well $60.00 X $5.10 20 Remove trees associated with OF-4 vault $1,304.00 X $110.84 21 Welding for HDPE manhole lid $200.00 X -- 23 Unsuitable material at East 10th Street $5,200.00 X -- 24 Two conduits at based of Boat Shed stairs $900.00 X $76.50 25 Extra thick asphalt at Trenton and Shore Drive $1,243.00 X -- 26 Delay due to unmarked 1" water in trench $507.00 X -$43.10 27 Material cost for 8" waterline at East 10th St and Shore $636.00 X -- 28 Parking lot near base of stairs at EB-2 $665.00 X -- 29 Dewatering at Boat Shed due to undersized storm line $455.00 X $38.68 30 New storm line at Boat Shed $1,432.00 X $121.72 31 Leaky water main at Trenton $1,200.00 X -- 32 Buried concrete rubble at EB-2 resulting in delay $845.00 X $71.83 33 Unsuitable matedal at OF-7 $2,424.00 X -. 34 Plug 8~inch and 24-inch pipes with concrete $150.00 X $12.75 35 Modifl/storm line at Trenton $181.00 X 36 Delay due to broken water main at Trenton $500.00 X 37 Asphalt prep on East loth St $111.00 X -- 38 Move fence back on sidewalk for signage $900.00 X -- 39 Surveying to relocate displaced monument $887.00 X -- 40 Delete electronic as-builts ($500.00) X -- -- EB-2 18" HDPE beach force main $270,000.00 X $22,950.000 TOTALS Rule 170 Items $3,125.35 Rule 171 Items ($169,081.71) EB-2 18" HDPE beach force main (Rule 170) $270,000.00 ~%~ Total Sales Tax on ~. Rule 170 Items (credit~" BASE VALUE, Change Order #1 items not included) ~ TOTAL VALUE FOR C.O. #1 (Base Value + Sales Tax on Rule f70 Items) +Browse: Next Previous First Last Update Delete Restart X - Exit + +Retrieve the Next record + +Found: 10 Record(s) MAINTAIN Contract Transactions + + Contract Number 4321 + + + +Vendor Name STAN PALMER CONSTRUCTION INC + +subject SEWAGE PUMP STATION EB-2 2002 MODIFICATIONS + +Department ENGINEERING + +Status Code CON + + Amount $1674242.50 + + Begin Date 11/26/2002 + + Insurance End Date 09/30/2003 + + Type Amount Review Date 09/01/2003 + + GL $2000000.00 + + AL $1000000.00 + + + + Insurance Total $3000000.00 + + Insurance Review Date 07/01/2003 + + + + Comments + + + + + AGREEMENT CERTIFICATE ~' (if Corporation) STATE'OFWASHINGTON ) ) SS: COUNTY OF KITSAP ) I HEREBY CERTIFY that a meeting of the Board of Directors of the STAN PALMER CONSTRUCTION. INS. a corporation existing under the laws of the State of WA~IqTNGTON , held on NOVF. M~E~ 2.5. .2002, the following resolution was duly passed and adopted: "RESOLVED, that JOHN A. ZARATIAN , as SP', ¥I¢~ President of the Corporation, be and is hereby authorized to execute the Agreeme~ dated 11/26_, 2002, by and between this Corporation and City of Bremerton and that his/her execution thereof, attested by the Secretary of the Corporation, and with the Corporate Seal affixed, shall be the official act and deed of this Corporation." I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this 25th, day of ~VEMBER ., 2002 Secretary SANDRA TA~-AN f/ (SEAL) Sewage Pump Stafio~ EB-2 2002 Modifications PAGE 00500-4 10/17/2002 072~0-014-002 +--------------------------------------------------------------------------+ TEnter Search Criteria, Press Esc Key to !press Del Key to Terminate Delete Mode CHANGE Contract Number ~I~ Transmit ,l., Contract Transactions 4321 . -Vendor Name I.Subject . 'Department . 'Status Code STAN PALMER CONSTRUCTION INC SEWAGE PUMP STATION EB-2 2002 MODIFICATIONS ENGINEERING CON I Insurance Type Amount GL $2000000.00 AL $1000000.00 Amount Begin Date End Date Review Date $1674242.50 .. 11/26/2002 .. 09/30/2003 .. 09/01/2003 .. Insurance Total Insurance Review Date t $3000000.00 ,l., 07/01/2003 " Comments CHANGE ORDER #1 - 7/17/03 " , + T +--------------------------------------------------------------------------+ CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 1 PROJECT NAME: Sewage Pump Station EB.2 2002 Modifications PROJECT NO: 526 CONTRACTOR: Stan Palmer Construction $1,674,242.50 0.00 DAYS: o ORIGINAL CONTRACT AMOUNT: PREVIOUSLY APPROVED CHANGES: DAYS: o $129,252.47 $1,803,494.97 DAYS: o THIS CHANGE: REVISED CONTRACT AMOUNT: DAYS: o This Change Order covers changes to the subject contract as described herein. The Contractor shall "construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT 0 ~ CONTRACT CONTRACT TIME "- "- AMOUNT AMOUNT EXTENSION ~ ~ " " ($) ($) (DAYS:) & "5 oc -- X 1. Construct EB-2 beach force main as specified in the 292,950 0 following attached documents: a. Drawings titled "Trenton/Cherry Basins Beach Main Improvements", Sheets 1 through 7. b. Specifications titled "Trenton/Cherry Basins Beach Main Improvements." c, Nationwide Permit 12 from U.S. Army Corp of Engineers, Reference No: 2001-2-01059 d. Hydraulic Project Approval (HPA) from Washington State Department of Fish and Wildlife, Reference No: 00-F1546-02 e. Specification section 15086 - Tapping Sleeves f. GeoEngineers Field Report of April 16, 2002 X Work Change Directives 4 -13,18,20,24,26,29,30,32,34, $3,125.35 0 40 X Work Change Directives 1,2,3,15,16,21,23,25,27,28,31, ($169,081.71) 0 33, 35 - 39 NET CHANGE IN CONTRACT AMOUNT $129,252.47 0 INCREASE OR (DECREASE) Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for ~ast ~ectom\ance. ~. CONTRACT CHANGE ORDER NO: 1 PROJECT NAME: The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. RECOMMENDED: cyL __---u<---- _ PFIDJECT ENGINEER -) 7/1 " I~)> Date RECOMMENDED: ~ / / /) /1J..L "":<~/tA L. /,/, p CITY ENGINEER / DIRECTOR OF PUBLIC WORKS ;1j) t/II ::.- / / Date ACCEPTED: I I 7/ Jl.6~ te MAYOR APPROVED: APPROVED AS TO FORM: ~~'-~ Bremerton City Attorney Page 2 of2