Loading...
HomeMy WebLinkAbout4310 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4310 PORT OF BREMERTON Harbormaster Facility- Design & Construction Econ Devel LEG 12-1 09/25/2002 09/30/2005 02/15/2009 01/01/2009 MEMORANDUM OF INTENT between THE CITY OF BREMERTON and the PORT OF BREMERTON A. Harbor Master Facility. 1. The Port will be allocated up to 3,400 square feet of space on the southeast side of the Conference Center site north of the ferry terminal property and the second level of the parking structure for use and construction of a Harbor Master facility. 2. The air rights to the space will be leased to the Port at a cost of $1.00 annually. 3. The Port will retain Opus NW to design the Harbor Master facility pursuant to Port design criteria and subject to Port approval. The square footage cost and payment for the design work shall be as agreed between the Port and Opus NW. Design work will occur and be completed between September 15 and October 15, 2002. 4. Opus NW will be the general contractor for the construction of the Harbor Master facility pursuant to the terms of the development agreement with the City of Bremerton. 5. The Port shall pay a sum negotiated between the Port and Opus NW for the construction. The City of Bremerton will pay the sum of $90,000 for the 940 square feet ± toward the agreed total cost of construction of the Harbor Master facility. B. Existing Port Bathrooms and Workshop. 1. The Port's existing restroom and shop building are located on space it leases through an agreement with the Washington State Department of Natural Resources (DNR). The Port recognizes the importance of incorporating this space into overall design of the Conference Center pedestrian open space plan. Within its authority under its agreement with the DNR the Port will agree to not construct improvements on said space. 2. The City will provide a reasonable level of temporary 24-hour restroom/shower and maintenance facilities to serve the Port's marina during construction. D. Marina Parking and Loading. The City will provide the Port With 10 parking spaces on Second Street (approximately four at the base of Second Street and six stalls along Second Street east of Washington), at no cost to the Port. The City will manage the parking and loading areas with continual input and coordination with the Port. C:/Marina /Harbor Master Agreement/September 6, 2002 1 E. Covered Moorage. The Port may consider covered moorage north of Second Street extended eastward, subject to the terms of the April 2002 Letter of Agreement to Cooperate on Contiguous Development Planning between Kitsap County Consolidated Housing Authority, the Port and the City, and further subject to the City of Bremerton Comprehensive Plan and zoning codes. The Port will not consider constructing such moorage south of this line. Boa~rd ChairfPort of Bremerton Mayor, City of Bremerton Date t~t/~/t~ff--- 7/~"/~c~> ~ - - Dae / / - C:/Marina /Harbor Master ,~greement/September 6, 2002 2