PORT OF BREMERTON
Harbormaster Facility- Design & Construction
Econ Devel
LEG 12-1
09/25/2002
09/30/2005
02/15/2009
01/01/2009
MEMORANDUM OF INTENT
between
THE CITY OF BREMERTON
and the
PORT OF BREMERTON
A. Harbor Master Facility.
1. The Port will be allocated up to 3,400 square feet of space on the southeast
side of the Conference Center site north of the ferry terminal property and the second
level of the parking structure for use and construction of a Harbor Master facility.
2. The air rights to the space will be leased to the Port at a cost of $1.00
annually.
3. The Port will retain Opus NW to design the Harbor Master facility
pursuant to Port design criteria and subject to Port approval. The square footage cost
and payment for the design work shall be as agreed between the Port and Opus NW.
Design work will occur and be completed between September 15 and October 15,
2002.
4. Opus NW will be the general contractor for the construction of the Harbor
Master facility pursuant to the terms of the development agreement with the City of
Bremerton.
5. The Port shall pay a sum negotiated between the Port and Opus NW for
the construction. The City of Bremerton will pay the sum of $90,000 for the 940
square feet ± toward the agreed total cost of construction of the Harbor Master
facility.
B. Existing Port Bathrooms and Workshop.
1. The Port's existing restroom and shop building are located on space it
leases through an agreement with the Washington State Department of Natural
Resources (DNR). The Port recognizes the importance of incorporating this space
into overall design of the Conference Center pedestrian open space plan. Within its
authority under its agreement with the DNR the Port will agree to not construct
improvements on said space.
2. The City will provide a reasonable level of temporary 24-hour
restroom/shower and maintenance facilities to serve the Port's marina during
construction.
D. Marina Parking and Loading. The City will provide the Port With 10
parking spaces on Second Street (approximately four at the base of Second Street and
six stalls along Second Street east of Washington), at no cost to the Port. The City
will manage the parking and loading areas with continual input and coordination with
the Port.
C:/Marina /Harbor Master Agreement/September 6, 2002 1
E. Covered Moorage. The Port may consider covered moorage north of Second
Street extended eastward, subject to the terms of the April 2002 Letter of Agreement
to Cooperate on Contiguous Development Planning between Kitsap County
Consolidated Housing Authority, the Port and the City, and further subject to the City
of Bremerton Comprehensive Plan and zoning codes. The Port will not consider
constructing such moorage south of this line.
Boa~rd ChairfPort of Bremerton Mayor, City of Bremerton
Date t~t/~/t~ff--- 7/~"/~c~> ~
- - Dae / / -
C:/Marina /Harbor Master ,~greement/September 6, 2002 2