Loading...
HomeMy WebLinkAbout4372tEnter Search Criteria, Press Esc Key to Transmit ~Press Del Key to Terminate Delete Mode CHANGE Contract Transactions Contract Number 4372 + ~Vendor Name STAN PALMER CONSTRUCTION INC ~Subject W650 PRESSURE ZONE - WATER MAINS ULID 2002-01 ~Department ENGINEERING ~Status Code CON Amount $1716294.68 Begin Date 06/27/2003 Insurance End Date 03/31/2004 Type Amount Review Date 02/15/2007 + GL $2oooooo.oo + AL $1OOOOOO.OO Insurance Total $3000000.00 Insurance Review Date 07/01/2003 + Comments CHANGE ORDER #1-11/03 #2-11/03 ~3-1/05 #4-1/05 VAULT 01/01/2007 + CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 4 PROJECT NAME: W-650 Pressure Zone Improvements and Distribution Main PROJECT NO: 436 CONTRACTOR: Stan Palmer Construction ORIGINAL CONTRACT AMOUNT: $1,686,160.52 DAYS: 170 PREVIOUSLY APPROVED CHANGES: $23,835.09 DAYS: 0 THIS CHANGE: $6,299.07 DAYS: 0 REVISED CONTRACT AMOUNT: $1,716,294.68 DAYS: 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT CONTRACT CONTRACT TIME AMOUNT AMOUNT EXTENSION ($) ($) (DAYS:) Installation of fiber optic cable, includes connection at terminal $5805.59 0 0 ends and testing (ref Stan Palmer X-103 and X-104) Tax $493~48 NET CHANGE IN CONTRACT AMOUNT $6299.07 6 0 INCREASE OR (DECREASE) Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous CONTRACT CHANGE ORDER NO: PROJECT NAME: costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and ali provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. PROJECT ENGINEER '/ /Date CITY ENGINEER / DIRECTOR OF PUBLIC WORKS /' Date ACCEPTED: ~" COIqTR,IkC"rO ~ ' - MAYOR Date APPROVED AS TO FORM: ATTEST,.-, Brementon City Attorney '~'~ty- C'[e-r~',~' / Page 2 of 2 CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 3 PROJECT NAME: W-650 Pressure Zone Improvements and Distribution Main PROJECT NO: 436 CONTRACTOR: Stan Palmer Construction ORIGINAL CONTRACT AMOUNT: $1,686,150.52 DAYS: 170 PREVIOUSLY APPROVED CHANGES: $12,120.37 DAYS: 0 THIS CHANGE: $11,7t4.72 DAYS: 0 REVISED CONTRACT AMOUNT: $1,709,995.61 DAYS: 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT o ,,- CONTRACT CONTRACT TIME ~- ,- AMOUNT AMOUNT EXTENSION = = ($) ($) (DAYS:) X Additional grading on the service road Schedule A (ref Start $222.17 0 Palmer Construction X-14) X Re-pressure D-line after thrust thrust block Schedule A (ref Start $331.66 Palmer Construction X-15) X Hydroseed Schedule A (ref Stan Palmer Construction X-17) $7759.92 X Repair at D-line drainage Schedule A (ref Start Palmer $258.91 Construction X-18) X Ditch grading at PRV curtain drain Schedule A (ref Stan Palmer $1661.68 Construction X-019) X Replace 6" Storm line at Adult Center Schedule A (ref Start $389.51 Palmer Construction X-020) X Expose 2" Conduit at the top of hill Schedule A (ref Stan Palmer $173.14 Construction X-21) Tax $917.74 NET CHANGE IN CONTRACT AMOUNT INCREASE OR (DECREASE) $11,714.72 0 0 Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Chanae Order. includina, without limitation, claims related to contract time. on-site or home office CONTRACT CHANGE ORDER NO: 3 PROJECT NAME: W-650 Pressure Zone Improvements and Distribution Main~ overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. PROJECT ENGINEER / I~ate CITY ENGINEER ! DIRECTOR OF PUBLIC WORKS Date ACCEPTED: CONTRACTOR Date MAYOR Date APPROVED AS TO FORM: ATTEST: Bremerton City Attorney zC'ity Clerl~ Page 2 of 2 IEnter Search Criteria, Press Esc Key to Transmit Press Del Key to Terminate Delete Mode CHANGE Contract Transactions I~ Contract Number 4372 :Vendor Name STAN PALMER CONSTRUCTION INC Subject W650 PRESSURE ZONE - WATER MAINS ULID 2002-01 tDepartment ENGINEERING ~Status Code CON Amount $1698280.89 Begin Date 06/27/2003 Insurance End Date 12/31/2003 Type Amount Review Date 02/15/2006 AL $1000000.00 Insurance Total $3000000.00 Insurance Review Date 07/01/2003 + Comments CHANGE ORDER #1 - 11/03/#2 - 11/03 VAULT 01/01/2006 + CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: W-650 Pressure Zone Improvements Transmission and Distribution Main SALES TAX 8.5% 379.00 TOTAL 4837.82 Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature adsing from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bdng a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the paAies of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. I~JE~(~T EN{~II~-EER / Dat~ ~IT~-EN(~INEER /DIRECTOR OF PUBLIC WORKS / Dat~ CONI /l~ate MAYOR ~ Date' APPROVED AS TO FORM: ATTEST: Bremerton City Attorney ~"C'ity (~1~i~"" "--- ! y- / Page 2 of 2 ~Press Esc Key to Insert new record, Ctrl-Z to Clear form Press Del Key to Terminate Insert Mode INSERT Contract Maintenance Contract Number 4372 Vendor Name STAN PALMER CONSTRUCTION INC =Subject W650 PRESSURE ZONE - WATER MAINS ULID 2002-01 ·Department ENGINEERING =Status Code CON Amount $1686160.52 Begin Date 06/27/2003 Insurance End Date 12/31/2003 Type Amount Review Date 12/01/2003 Press FI for GL $2000000.00 valid insuranceAL $1000000.00 type codes Insurance Total $3000000.00 Insurance Review Date 07/01/2003 i Comments Enter Search Criteria, Press Esc Key to Transmit Press Del Key to Terminate Delete Mode CHANGE Contract Transactions Contract Number 4372 ~Vendor Name STAN PALMER CONSTRUCTION INC ~Subject W650 PRESSURE ZONE - WATER MAINS ULID 2002-01 ~Department ENGINEERING ~Status Code CON Amount $1698280.89 Begin Date 06/27/2003 Insurance End Date 12/31/2003 Type Amount Review Date 02/15/2006 GL $2000000.00 AL $1000000.00 iInsurance Total $3000000.00 Insurance Review Date 07/01/2003 Comments CHANGE ORDER #1 - 11/03/~2 - 11/03 VAULT 01/01/2006 + CITY OF BREMERTON CHANGE ORDER CONTRAlto: 1 PROJECT NAME: W-650 Pressure Zone Improvements Transmission an~-Distribution Main PROJECT NO: 436 CONTRACTOR: Stan Palmer Construction ORIGINAL CONTRACT AMOUNT: $1,686,160.52 DAYS: 17(%. PREVIOUSLY APPROVED CHANGES: 0.00 DAYS: 0 THIS CHANGE: $7661.55 DAYS: 0 REVISED CONTRACT AMOUNT: $1,693,822.07 DAYS: 170 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicebJe taxes. DESCRIPTION OF CHANGES iNCREASE IN (DECREASE) IN CONTRACT o ,- CONTRACT CONTRACT TIME ~- ,- AMOUNT AMOUNT EXTENSION · e ($) ($) (DAYS:) ~, ~y X Repair abandoned water service at sta. 3+19 schedule A 431.75 0 (ref. Start Palmer Construction X-01) X Repair unlocated abandoned water service at sta 11+00 1643,61 Schedule A (ref.. Satan Palmer Construction X-02) X Removal of fence for fire hydrant installation Schedule A 573.44 (ref. Start Palmer Construction X-04) X Additional Patch on Linden Schedule A 376.00 (ref. Start Palmer Construction X-07) X Remove broken curb on Linden Schedule A 118.28 (ref Start Palmer Constm~on X-010 X Additional tie in expense at Linden and Union Schedule A 3918.26 (ref. Start Palmer Construction X-100) NET CHANGE IN CONTRACT AMOUNT 706'1.34 INCREASE OR (DECREASE) SALES TAX 8.5% 600.21 TOTAL 7661.55 CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: W-650 Pressure Zone Improvements Transmission and Distribution Main PROJECT NO: 436 CONTRACTOR:Stan Palmer Construction ORIGINAL CONTRACT AMOUNT: $1,686,160.52 DAYS: 170 PREVIOUSLY APPROVED CHANGES: $7661.55 DAYS: 0 THIS CHANGE: $4458.82 DAYS: 0 REVISED CONTRACT AMOUNT: $1,698,280.89 DAYS: 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessery or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT o ,- CONTRACT CONTRACT TIME ~- ,- AMOUNT AMOUNT EXTENSION e · ($) ($) (DAYS:) Pothole for unmarked forcemain and re-lay 12'DJ water pipe 1690.41 0 Schedule B (ref Stan Palmer Construction X-009) Pothole for mismarked water service at 5842 Wemer Road Schedule B (ref. Start Palmer Construction X-008) 219.52 Additional labor to hand dig and avoid undocumented tee Schedule B (ref Stan Palmer Construction X-006) 234.68 Locate unmarked water stub Schedule B (ref. Stan Palmer Construction X-005) 105.22 Pothole on Nollwood for the City to find forcemain sewer Schedule B (ref. Stan Palmer Construction X-003) 106.35 Remove valve at sta 40+35 Schedule B (ref. Stan Palmer Construction X-016) 1188.57 Lost time for valve closure Schedule B (ref. Start Palmer Construction X-013) 178.37 Reset 12 foot gate Schedule B (ref> Stan Palmer Construction X-012) 213.64 Excavate for additional air vac Schedule B (ref Slan Palmer X- 011) 522.06 NET CHANGE IN CONTRACT AMOUNT 4458.82