Loading...
HomeMy WebLinkAbout4364 +--------------------------------------------------------------------------+ =l=Enter Search Criteria, Press Esc Key to Transmit =1= =l=Press Del Key to Terminate Delete Mode =1= =1= CHANGE Contract Transactions =1= =1= Contract Number 4364 =1= =1= =1= =l=Vendor Name ARAI/JACKSON ARCHITECTS & PLANNERS =1= =l=Subject POLICE/COURT FACILITY - DESIGN OF =1= =l=Department ECON DEVEL =1= =l=Status Code PRO =1= =1= Amount $267072.00 =1= =1= Begin Date OS/21/2003=1= =1= Insurance End Date 12/27/2004 =1= =1= Type Amount Review Date 02/15/2007 =1==1= =1= GL $2000000.00 =1==1= AL $1000000.00 =1= E&O $2000000.00 =1= =1==1=. Insurance Total $5000000.00 =1= Insurance Review Date 02/01/2006 =1= =1==1= =1= Comments MODIFlCATION #1 - 11/04 =1= =1= VAULT 01/01/2007 =1= =1= =1= +--------------------------------------------------------------------------+ CONTRACT MODIFICATION AGREEMENT NO.1 BETWEEN THE CITY OF BREMERTON AND Arai Jackson Ellison Murakami, LLP City Project No. 2701 PROJECT - Police and Courts Building Design CONSULTANT - Arai Jackson Ellison Murakami LLP, also referred to as Arai/Jackson Architects and Planners, 2300 7th Ave., Seattle, W A 98121. DATE - October 21, 2004. THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE AGREEMENT (the "Contract") entered into between the City of Bremerton and Arai/Jackson Architects and Planners on June 7, 2003. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows: The project as set forth in the Scope of Services defined in Article Ill. Scope, is hereby suspended at completion of Construction Documents Phase, Section lll-C (95% design). Additional services required to complete Construction Documents Phase and evaluate alternative sites are included in this Contract Modification. See Exhibit A - Summary of Negotiated Fee dated October 21,2004. Section III. Comoensation , is modified as follows: The original contract amount was Two Hundred Eighty Two Thousand, Two Hundred Sixty Dollars ($282,260.00). The City shall pay the Consultant for the revised scope of services work described above, an amount not to exceed Two Hundred Sixty Seven Thousand, Seventy Two Dollars ($267,072.00) as the total amended contract amount, including this Contract Modification. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant s claims for contract time and for all costs of any kiud, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City s right to bring a claim for past performance. Arai/Jackson CONTRACT MOD #1 Project Number: 270 I The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. Director of Economic Development approved to process l~itj~q~ a~t Da e CONSULTANT T~O~ON By( Steve Arai By Carv Bozeman Its Partner Its Ma/or DATE: October 29, 2004 DATE: //- ! q- D~ ~O. RM: ATTES~ Z~~ ~i~e~on~tomey '~'/~- -/~-/-~-~-"~ 't'¢~' -~"~ NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Mr. Guy Thomsen Mr. Gary Sexton Project Architect Director of Economic Development Arai Jackson Ellison Murakami, LLP City of Bremerton 2300 Seventh Avenue 239 4th Street Seattle, WA 98121 Bremerton, WA 98337-1806 206.323.8800 360.473.5282 Guy:2003110_Bremerton: 0A Contract:AJEM P&C Mod. 1 10.25.04.doc Arai/Jackson CONTRACT MOD #1 2 Project Number: 2701 Exhibit A CONTRACT MODIFICATION AGREEMENT NO. 1 Arai Jackson Elfison Murakami, LLP Police and Courts Building Design SUMMARY OF NEGOTIATED FEE October 21, 2004 Original Contract amount $ 282,260.00 Payable at 95% design $ 208,000.00 Add 1. Services Request No. 1 ~ $ 23,378. Add 1. Services Request No. 2 2 $ 17,500. Add 1. Services Request No. 3 3 $ 5,000. Add 1. Services Request No. 4 4 $ 4,500. Add 1. Services Request No. 5 5 $ 8,694. Total Add 1. Services Fee $ 59,072.00 Total Modified Contract Amount $ 267,072.00 ~ Letter Guy Thomsen to Gene Sampley dated 9/24/04 - Additional Services Fee Request No. I City of Bremerton Program Increases, and Letter Guy Thomsen to Gary Sexton dated 10/21/04 - Additional Services Fee Request Agreement - Revised 2 Letter Guy Thomsen to Gene Sampley dated 9/24/04 - Additional Services Fee Request No. 2 City Requested Modifications, and Letter Guy Thomsen to Gary Sexton dated 10/21/04 ~ Additional Services Fee Request Agreement - Revised 3 Letter Guy Thomsen to Gene Sampley dated 9/24/04 - Additional Services Fee Request No. 3 -- City Requested Security, A/V and Data/Communications Consulting Services Addition to Contract, and Letter Guy Thomsen to Gary Sexton dated 10/21/04 - Additional Services Fee Request Agreement - Revised 4 Letter Guy Thomsen to Gene Sampley dated 9/24/04 - Additional Services Fee Request No. 4 -- Foundation Redesign Required by Geotechnical Report, and Letler Guy Thomsen to Gary Sexton dated 10/21/04 - Additional Services Fee Request Agreement - Revised ~ Letter Guy Thomsen to Gary Sexton dated 10/21/04 - Additional Services Fee Request No. 5 -- Alternate Site Evaluation Arai/Jackson CONTRACT MOD #1 3 Project Number: 2701 ar~ ~a~ge e41h~ult murakam~ LL:~ October 21,2004 Mr. Gary Sexton, Director of Economic Development City of Bremerton 239 Fourth Street Bremerton, WA 98337-1806 Re: City of Bremerton Police Courts Building Additional Services Fee Request Agreement - Revised Dear Mr. Sexton: This correspondence is a summary of the agreement reached in yesterday's negotiations between you, me and Steve Arai on the four (4) requests for additional services submitted on Phase I of this project. The summary of the agreed upon additional services for the individual requests is as follows: 1. Additional Services Fee Request No. 1 (Thomsen letter dated 09.24.04): For MACC increase at the conclusion of 50% Contract Document phase formally approved by adjustment of the published Project Budget on 12.18.03 (copy attached). In addition, please note that it was Steve's proposed intention to use the Basic Services fee percentage in the original Contract. He inadvertently used the rate without the Remodel Design Premium. The following is the corrected total. Original Contract MACC = $ 3,000,000. Revised MACC per 12.18.03 Project Budget -- $ 3,351,488. MACC Increase = $ 351,488. Basic Services Fee Percentage per Original Contract $ 351,488. x 7.7% = $ 27,065. $ 351,488. x 1.8% x 70% (Remodel Design premium for existing structure) -- $ 4,528. Subtotal Basic Services Fee for MACC Increase = $ 31,593. Services through Construction Documents Phase (Schematic Design, Design Development & Construction Documents) x 74% Total Additional Services for Fee Request No. 1 = $ 23,378. 2. Additional Services Fee Request No. 2 (Thomsen letter dated 09.24.04): For program changes and redesign of several building areas, site access and landscaping required by utility vault installation, and printing requested by City at the end of the 90% Contract Document phase. Municipal Court Changes: = $ 6,391. Police Evidence Storage Changes: = $ 3,669. Utility Vault Installation Changes: = $ 6,568. Progress Set Printing: = $ 872. Total Additional Services for Fee Request No. 2 = $ 17,500. Mr. Gary Sexton, Director of Economic Development City of Bremerton Police Courts Building Additional Services Fee Request Agreement - Revised October 21,2004 3. Additional Services Fee Request ldo. 3 (Thomsen letter dated 09.24.04): Addition of security system, audio/visual system, and data/communication system architectural and engineering design services to the Scope of Professional Services. Total Additional Services for Fee Request No. 3 = $ 5,000. 4. Additional Services Fee Request No. 4 (Thomsen letter dated 09.24.04): Design and document changes necessitated by soil conditions reported in the Geotechnical Report received at the end of the 90% Contract Document phase. Total Additional Services for Fee Request No. 4 = $ 4,500. Total Additional Services for Fee Request Nos. 1, 2, 3 and 4 = $ 50,378. If the foregoing summary is not your recollection of the negotiations, please contact me. Otherwise I will have our accounting department invoice the City for the foregoing sum. Thank you for your careful consideration of our requests. Upon receipt of payment Phase I of the Contract will be complete and all future work will be billed against the amendment to the Contract as defined in the Revised Architectural and Engineering Services Proposal dated October 13, 2004. Sincerely, Arai Jackson Ellison Murakami, LLP Guy~Th~msen, AIA Project Manager Attachment cc: Gene Sampley, Project Administrator Steve Arai, Arai Jackson Ellison Murakami Bruce Ellison, Arai Jackson Ellison Murakami File Page 2 POLICE/COURT FACILITY BUDGET $5,600,000.00 Land $1,010,000 Construction $3,351,488 Hales Tax $284,876 Professional Services $306,596 Expenses, printing, etc~ $20,000 Special Inspections & Testing $15,000 Environmental $2,500 Geotechnical $7,O00 Survey $5,200 SecurityPermits ~,,00~20~0 ,'"~ Equipment & Furnishings :$3 , ,~ Total: $5,752,689 Balance Remaining ($152,889) Other Possible Expenditures: Project Fencing $3,000 Other Possible Revenue: $2o,o0o.o0 ?f,~OP~ .. GE Contribution to phone room ~_.. Interest Income $200,000 (if all interest is used for this project) October 21,2004 Mr. Gary Sexton, Director of Economic Development City of Bremerton 239 Fourth Street Bremerton, WA 98337-1806 Re: City of Bremerton Police Courts Building Additional Sen/ices Fee Request No. 5 - Alternate Site Evaluation Dear Mr. Sexton: This correspondence is a request for additional services for investigation, evaluation and documentation required for selection of an alternate site for the Police Courts Building. The search for an alternate site was necessitated when costs for unanticipated site soil conditions, off site street improvements, additional electrical/electronic programmatic requirements, and market steel prices pushed the 95% Contract Document Estimate of Probable Construction Costs well beyond the MACC. With no way to reduce the project cost and still meet all program requirements at this site, the City instigated the search of alternative sites and requested Arai Jackson Ellison Murakami assist them in the process of evaluating and selecting an alternate site. The City requested AJEM's assistance in a phone call on June 8, 2004 and set June 15~" for a meeting to visit "other potential sites". The time for these site visits, research of these sites, time for evaluation and preparation of the Alternate Site Evaluation letter submitted on June 21, plus the time for follow-up cost comparisons, schedule revisions, and meetings necessary to evaluate the original sites, and specifically the selected Kitsap Federal Credit Union site, is itemized below. Our requested Additional Sen/ices Fee is for the services performed by Arai Jackson Ellison Murakami to coordinate the investigation and document the evaluation of alternate sites. The activities and hours below are an itemization of actual time spent for this evaluation: Date Activity Hours June 15 Alternate Site Visits (West Precinct, Fire Station and Credit Union) 10.5 hrs. 16 Alternate site evaluation research & report preparation 7.0 hrs. 17 8.25 hrs. 18 7.0 hrs. 19 2.5 hrs. 21 Alternate site evaluation report letter completed & sent 11.0 hrs. June 28 Alternate Site Cost Comparison 9.0 hrs. 29 Alternate Site Review Meeting 6.5 hrs. 30 Further evaluation of CU Site Area and Parking 6.5 hrs. July 6 Administration (Phone, smalls, etc.) 1.5 hrs. 7 Administration (Phone, emails, etc.) 1.0 hrs. 8 Schedule revision and further parking evaluation 7.0 hrs. 2300 sevei~th avel3ue se;~Ltle wa 98121 v 206 323 8800 f 206 323 8518 www a~aj~ksor~ con-, PARTNERS: steven arai · cliff jackson · bruce ellison, richard rnurakami PRINCIPALS; frank silkwood ASSCClATES: ben dayot, jeffrey harnlett · greg ransom · gary oppenheimer · connie cadag · mark spitzer DIRECTOR: darryl dawson Mr. Gary Sexton, Director of Economic Development City of Bremerton Police Courts Building Additional Services Fee Request No. 5 October 21, 2004 July 12 Fur[her parking evaluation, phone and meeting prep 4.5 hrs. 13 CU Design Alternatives & Program Meeting and prep 8.25 hrs. 14 Consultant program coordination 3.5 hrs. August 16 CU Site Review Meeting 9.5 hrs. Total Additional Services Fee Request for Alternate Site Evaluation 103.5 hrs. @ $ 84./hr. = $ 8,694. Please review this additional services fee request and contact me if you have any questions regarding this information. Sincerely, Arai Jackson Ellison Murakami, LLP Guy Thom~en, AIA Project Manager Attachment cc: Gene Sampley, Project Administrator Steve Arai, Arai Jackson Ellison Murakami Bruce Ellison, Arai Jackson Ellison Murakami File Page 2 +Enter Search Criteria, Press Esc Key to Transmit Press Del Key to Terminate Delete Mode CHANGE Contract Transactions Contract Number 4364 Vendor Name ARAI/JACKSON ARCHITECTS & PLANNERS ~Subject POLICE/COURT FACILITY - DESIGN OF ~Department ECON bEVEL Status Code PRO Amount $282260.00 Begin Date 05/21/2003 Insurance End Date 12/27/2004 Type Amount Review Date 10/01/2004 GL $2000000.00 AL $1000000.00 E&O $2000000.00 Insurance Total $5000000.00 Insurance Review Date 02/01/2005 + IComments Professional Services Agreement A. Project Owner: City of Bremerton, 239 Fourth S~'eet, Bremerton, WA 98337, phone - (360) 473-5234, fax - (360) 473-5850. B. Architect: Arai/Jackson Architects & Planners 1601 East John St. Seattle, Washington 98112-5221 C. Time for Performance: Per Article li - Schedule of Performance D. Compensation for Seiwices: $282,260.00 E Architects Authorized Basic Representative: Bruce Ellison, AIA F. City's Representatives: Kathleen McCluskey, Project Administrator Gary Sexton, Director of Economic Development The parties listed as authorized representatives have authority, make decisions and on behalf of the respective party. THIS AGREEMENT IS MADE SUBJECT TO THE TERMS AND CONDITIONS SET FORTH ON THE FOLLOWING PAGES HEREOF. THE ARCHITECT SPECIFICALLYAGREES THAT THE INDEMNIFICATION AND SAVE HARMLESS PROVISIONS OF SUCH AGREEMENT, TOG-ETHER WITH THE ARCHITECT'S WAIVER OR IMMUNITY UNDER WASHINGTON RCW TITLE 51, WERE SPECIFICALLY REVIEWED AND MUTUALLY NEGOTIATED, INCLUDING BUT NOT LIMITED TO PARAGRAPH 9. Arai/Jackson Architects & Planners City of Bremerton By:Architecture'& Planning' L'LP~ ~~ By: ~ Steven Arai Cary Bozeman Title: Parmer Title: Mayor Date: ~t~,O~ Date: ~// ~~__ Arai/J~kson P~e 1 of 15 5/7/2003 I. Consultants: The Architect shall, in a timely manner, designate and appoint mb-consultants after conferring with the City's Project Administrator. The Architect shall not appoint any sub-consultants to which the City has a reasonable objection. The Architect shall incorporate flae provisions of this agreement, the scope of work, and the requirements of the project into the contracts with sub-consultants. The Architect shall not change consultants on this project without the express written approval of the owner project representative, which approval shall not unreasonably be withheld. II. Schedule of Performance Schedule of performance, Basic Services, Police and Courts Building: Start date: Completed by: Programming May 21 2003 June 21, 2003 Base Drawings May 21, 2003 June 21, 2003 Schematic Design June 27, 2003 July 28, 2003 Design Development August 4, 2003 September 29, 2003 Construction Docs October 6, 2003 December 29, 2003 Bidding January 5, 2004 January 28, 2004 Construction February 23, 2004 November 29, 2004 Construction Completion November 29, 2004 December 27, 2004 III. Scope The Architect will perform architectural and engineering base services for Schematic Design, Design Development, Construction Documents, Bidding and site visits for the construction phase. These services include structural, mechanical, electrical engineering and landscape design services as well as program update and base drawings documentation. The Police/Court Building project includes the remodel of the US Bank Building at the comer of 6t~ and Pacific Avenue. The site is 52, 090 square feet and the building consists of 20,525 square feet on three floors. A new addition to the building of approximately 7,000 square feet will also be required. The Architect shall review information provided by consultants directly retained by the City and shall coordinate the work and work product of such consultants with the Architect's work into an overall set of consistent drawings, specifications and other contract documents. The Architect may reasonably rely upon the accuracy and completeness of City furnished services, information, surveys and reports. In such cases, authorship of such documents will be clearly identified. Ar~$ack~m P~2ofl5 5/7/2003 The Architect shall provide to the Project Administrator four (4) copies of project documents upon completion of each of the Schematic Design, Design Development and Consl~uction Document phases. Project documents shall be in a form and style suitable for presentation, review and reproduction. The Project Administrator shall submit the Architect's documents for obtaining a building permit and other permits or approvals required for the project. Upon application for such permits, the Architect shall reply to all inquiries from governing agencies forwarded by the Project Administrator, shall make any necessary or appropriate changes to the Contract Documents approved by the City and assist the City in expediting the issuance of all such p~amits or approvals. The Architect shall meet with Kathieen McCluskey, Project Adminisl~ator, or in her absence Gary Sexton Economic Development Director; Rob Forbes, Police Chief and Judge James Docter as reasonably requested to ensure that the developing design is meeting the City's requirements and shall conduct presentations of the Project to the City Council or other groups as requested by the Project Administrator, limited to one such presentation at the completion of each phase of service. A detailed list of the documents to be prepared for each scope of work is attached hereto as Attachment A. Through the design process, the Architect shall assist Project Administrator with analyzing the project scope, design alternatives, schedule and budget options to keep the project within the Maximum Allowable Construction Cost (MACC). If the construction cost estimate exceeds the MACC, the Architect shall analyze design alternatives and submit cost saving options for the City's consideration. City shall furnish required information, approvals and services as expeditiously as necessary for the orderly progress of the work. Architect shall promptly notify the Project Administrator in writing in the event orderly progress of the work is disrupted by failure of the City to provide such information, approvals or services, and the project schedule shall be adjusted as mutually agreed. The City shall separately furnish the following services: · Land survey of the site, prepared by a registered land surveyor. · Legal, accounting, and insurance counseling services reasonably required. · G-eotechnical engineering, which may include test borings, test pits, soil bearing values, and air and water pollution tests. · Civil engineering. · Specialty consultant services, such as communications, acoustic, indoor air quality, security, audio visual, or similar. · Testing services during construction that are reasonably required. P~3ofl$ The City shall arrange and pay for the required advertisements for bid and other legal notices. A. Schematic Design Phase 1. Based upon the City's approved program created in consultation with the Architect, the Architect shall prepare the general and detailed requirements for the Project, for the Project Administrator's approval. The Schematic Design Phase shall consist of two parts: a) Conceptual Design Alternatives and b) Schematic Design Documents. Upon approval of the Conceptual Design by the Project Administrator, the Architect shall prepare the Schematic Design Documents. 2. The Architect shall submit to Project Administrator a Construction Cost Estimate projected to the expected time of bid, itemized by major categories, to give reasonable assurance that conslruction costs will not exceed the MACC. The format of the estimate shall be based on format approved by the Project Administrator. The Conslruction Cost estimate shall establish a preliminary schedule setting forth the expected period of time required for completion of construction. 3. The Architect shall provide a timely written response, in accordance with the schedule, to Project Administrator review comments, and shall secure the City's written approval of the Schematic Documents. B. Design Development Phase 1. Upon written authorization to proceed from City, the Architect shall prepare, based upon the approved Schematic Design documents, Design Development documents required to fix, describe and illuslrate the full size, character and scope of the Project. 2. The Architect shall submit to Project Administrator an updated and itemized Construction Cost Estimate including an updated Project schedule, based on the completed Design Development documents, in the same format as the Estimate prepared for the Schematic Design Phase. The updated Construction Cost Estimate shall be in sufficient detail to give reasonable assurance that construction costs will not exceed the MACC. 3. The Architect shall review and respond to the Project Adminiswator's review comments and shall secure Project Administrator's written approval of the Design Development documents. Ar~YJ~ 5/?120O3 C. Construction Documents Phase 1. Upon written authorization to proceed from Project Administrator, the Architect shall prepare, based upon the approved Design Development documents, Construction Documents consisting of Drawings, Specifications and other documents setting forth in detail the scope of the Project, Such documents shall describe materials, standards of workmanship, finishes, equipment and the conditions affecting the work required to be performed in all divisions of the construction work. 2. in preparing the Construction Documents, the Architect shall, in consultation with the Project Administrator, prepare the necessary bidding information, bidding forms, which shall include the City's General Conditions of the Contract, Supplemental Conditions, instructions to bidders and prevailing wage rates and ensure that the subsequent divisions of the Construction Documents are consistent therewith. 3. The Architect shall prepare a detailed Construction Cost Estimate, including an updated Project schedule, based on the completed Consm~ction Documents. The final detailed Consm~ction Cost Estimate shall include an itemization of alternates proposed and the estimated construction cost to be added or deducted from each alternate selected. a. The Architect shall propose and prepare bid alternates to provide reasonable assurance that the City will be able to award a construction contract that does not exceed the MACC. 4. The Architect shall submit to Project Administrator four (4) sets of the completed construction drawings and specifications. 5. The Architect shall secure the City's written approval of the drawings and specifications, the final cost estimate, and the alternates. D. Bidding Phase 1. The Architect shall assist the Project Administrator in issuing the Bid Documents to bidders and plan centers. The Architect shall attend and participate in the prebid conference and generally assist Project Administrator in managing the bid process. 2. In the event the lowest responsive bid submitted by a responsible bidder satisfactory to the Project Administrator exceeds the MACC, then the Architect will, at it's sole cost and expense, revise the drawings and specifications as may be required by Project Administrator to reduce or modify the quality or quantity, or both, of the work so that the total construction cost of the Project will not exceed the MACC. E. Construction Phase 1. The Architect shall participate with Project Administrator in the preconsWaction conference with contractor. 2. During the progress of construction, the Architect shall perform services including: · Visit the site a minimum of twice weekly during construction. Architect shall be familiar with the progress and quality of the work completed and able to determine if'the work is being performed in a manner that will be in general conformance with the contraet documents when completed. · Consult with the Project Administrator during the Construction Phase. Instructions to the contractor shall be communicated by the Architect. The Architect shall have authority to act on behalf of the Project Administrator only to the extent provided in the Contract Documents unless otherwise modified in writing by the Project Adminislrator. · Interpretations of the requirements of the Contract Documents shall be made by the Project Administrator with consultation and written recommendation from the Architect. · Provide to Project Administrator copies of all written communications that the Architect provides to Contractor, at the same time such communication is provided to Contractor. · Verify general conformance with the contract documents, review, approve or otherwise take appropriate action upon Contractor's submittals, including field questions, shop drawings and submittals of materials, equipment, tests and inspections. The Architect shall take prompt action so as to cause no delay in the work. · Prepare necessary documents for changes in the work including revision drawings, cost estimates and reasons for change, and secure, analyze in detail and recommend disposition of proposals from Contractor. ff requested, the Architect shall attend Project Administrator meetings convened for purpose of reviewing proposed changes in the work. · Determine and certify the amount owing to Contractor, based on the Architect's observations and evaluation of Contractor's Application for Payment. The Architect's certification for payment shall constitute a representation that the work has progressed to the point indicated and that, to the best of the Architect's knowledge, information and belief, the quantity and quality of the work is in general conformance with the Contract Documents and that the Contractor is entitled to payment in the amount requested. · Review Contractor's progress schedules at least once per month for conformance with the Construction Doaunents, and promptly notify the Project Administrator and Contractor of deviations and noncompliance. Pa~6ofl$ 51712003 · Attend on-site Project progress meetings once per week. The Architect shall require its sub consultants attend progress meetings as needed and/or requested by the Project Administrator. The Architect shall keep project meeting minutes, and Iransmit copies to the Project Administrator and Contractor as soon as possible but in no event later than one day prior to the next weekly meeting. · The Architect shall select finish materials and colors and prepare color schedules for items included in the construction contract for the Project Administrator's approval. 3. The Architect shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions, and prog~uns in connection with the work, and shall not be responsible for Contractor's failure to carry out the work in accordance with the Conmact Documents. 4. The Architect shall at all times endeavor to discover and guard owner against defects and deficiencies in the work of Contractor, but it is understood that the Architect does not guarantee the performance of the Contractor. The Architect shall promptly advise the Project Administrator of work which does not conform to the Contract Documents. 5. The Architect shall have authority to reject work which does not conform to the Contract Documents. The Architect shall recommend to the Project Administrator that the Contractor be directed to stop work when such stoppage may, in the Architect's reasonable opinion, be necessary to ensure the proper execution of the work. F. Construction Completion Phase 1. The Architect shall conduct pre-final inspection and prepare check lists of corrective items, make final inspections by all disciplines, including at least one re:inspection, recommend the date or dates of final completion and recommend acceptance of'the Project to Project Adminis~ator. 2. The Architect shall obtain, review, approve and deliver to the Project Administrator, written guarantees, manuals and instructions from Contractor as required by the Cons~uction Documents upon completion of construction and prior to recommending acceptance of the Project to the Project Administrator. A~i/Ja~tu~n Pa~7ofl$ 51712003 3. The Architect shall modify the original Construction Drawings to conform to the project record drawings provided by Contractor which incorporates all changes in the work, including utilities, made during consU'uction and addenda during bidding. The modified original Construction Drawings and related electronic media shall be completed and submitted to the Project Administrator within two months of owner's acceptance of the Project or as otherwise mutually agreed. 4. Upon the Project Administrator's request during the warranty period set forth in the Construction Con~act, the Architect shall assist Project Administrator in identifying defects in the Project, determine corrective measures, provide inspection of the Project and assist the Project Aclministrator in implementing corrective measures. G Additional Services and Reimbursable Expenses I. The City shall pay for the following Additional Services performed, furnished, or incurred by the Architect. However, the City has no obligation to pay Architect for Additional Sereices performed by Architect prior to receipt of the Project Administrator's authorization for such service. The City reserves the right to employ other means to accomplish said services. a. Revising drawings or specifications previously approved by the City when such revisions are due to changes in project scope, program changes, changes required by the enactment or revisions to codes, laws, or regulations subsequent to the preparation of such documents, or changes directed by the City that are not normally made as a pan of the Schematic or Design Development phases b. Providing consulting services for City-supplied equipment, new or used, to be incorporated into the Construction Contract. c. Providing consulting services in connection with selecting and/or procuring furniture, fixtures, and equipment (FF&E) outside of the Construction Contract. d. Providing consultation or contract administration for the replacement of any work damaged by fire, accidental or natural causes during construction, provided that such damage was not caused by the fault or negligence of the Architect; providin8 professional services or arranging for the work to proceed should the contractor default in the performance of the construction contract or become delinquent or insolvent. Atai/$~:b0e P~St~ 8ofl~ e. Providing brochures, detailed architectural models, or additional graphic presentations beyond the TWO graphic presentations agreed to. f. Providing services during the conslruction phase in connection with unforeseen conditions or changes requested by the Project Administrator. g. Providing services during construction in connection with processing more than 75 contractor-generated Requests for Information (l~I's), excluding any RFI's reasonably contributed to an error or omission of the Architect. h. In the event the construction period up to substantial completion exceeds the time stipulated in the construction contract including change order extensions by more than 10%, the Architect shall continue administration of the construction contract and be entitled to Additional Services compensation for the construction time extension occurring through no fault or neglect of the Architect. i. Providing services after issuance to the City of the Contractor's final Certificate for Payment. 2. The City shall pay for the following reimbursable expenses incurred by the Architect and/or their sub-consultants. The City will pay the Architect an additional 7.5% of authorized reimbursable expenses as a handling fee. a. Providing additional copies of drawings, specifications, studies, reports, Contract Documents, correspondence, and/or papers received or issued by the Architect as requested by the Project Administrator. b. Providing printing and dislxibution of documents to the City at the completion of each phase of service, including the construction documents for bidding. c. Out-of-pocket reprographic expenses when substantiated by third- party invoices. No reimbursement shall be made for postage, handling, telephone expenses, faxes, or copies of documents used by the Architect to perform normal services and not provided to the City. d. All ronnd-~p ferry fares. 3. Fees for authorized Addilional Services shall be mutually agreed to by the City and the Architect prior to performing such services. Pa~ 9 of 15 H Basis of Compensation 1. Maximum Allowable Construction Cost (MACC) Defined: The MACC for this project is $3,000,000 and is the total sum allocated by the City for construction of the project, not including Washington State Sales Tax, Architect compensation, or other items in the City's project budget such as contingencies, administrative costs, furniture or equipment purchased outside the construction contract. 2. It is understood that the Architect's fixed fee has been established, in part, by a percentage Of the City's MACC (Basic services fee percentage of 7.7% times the MACC plus the Remodel Design premium of 1.8% times $2,200,000, the estimated cost of renovation within the MACC, and additional services to accomplish limited programming services and base drawing documentation), fiat any time the City elects to increase the MACC by more than I0%, the Architects fee shall be adjusted proportionately to the adjustment in the MACC. I Standard T~ms and Conditions 1. Time and Delay. Time is of the essence in this Agreement. The Architect agrees to punctually and diligently perform all parts of it's Services as scheduled in Attachment A, which shall be subject to change by the City as may be deemed necessary to the overall progress of the Project. 2. Monthly Invoices: Final Payment. a. Payments shall be made no more often than once each calendar month within thirty (30) days after the City's receipt of a monthly invoice for fees and costs incurred during the preceding month; provided that: (i) all services covered by the invoice have been fully and timely performed; (ii) the Architect has furnished the City with copies of supporting documentation for all costs covered by the invoice; and (iii) the Architect is not in default under ~is Agreement. b. Each payment made by the City to the Architect shall be deemed made to the Architect in trust for the Architect's sub-contractors and consultants to the extent such parties have not been paid for the services, supplies, equipment or materials provided by such parties. c. Should there be any claim, obligation or lien asserted before or after final payment is made that arises fi.om the negligent performance of the Architect's work, the Architect shall reimburse the City for any costs and expenses, including attorney fees, costs and expenses, incurred by the City in satisfying, discharging or defending against any such claim, obligation or lien, including any action brought or judgment recovered. City shall have the right to withhold fi.om any payment, or otherwise be reimbursed for, an amount sufficient to protect the City from any such claims. P~ 10 of 15 3. Comoliance with Laws: Governmental Agency C0mmunieafioas. The Architect shall comply with all Federal, State and Local laws, rules, regulations and ordinances applicable to the services and the Architect's performance thereof, which are in effect at the time the services are provided and the requirements for environmental documents prepared under the State Environmental Policy Act (SEPA). 4. Performance Standard. The Architect shall perform the services in a professional, efficient and economical manner consistent with the City's needs as set forth in the scope of work attached hereto, and consistent with the level of care, skill, practice and judgment exercised by other professionals performing services of a similar nature under similar circumstances. The Architect represents and warrants to the City that all persons who will be performing the services possess the requisite skill, training and experience and hold all required licenses and l~mits to render the services contemplated by this Agreement. 5. Safety. a. TheArehitect shall comply with all applicable Federal, State and/or Local safety related laws and regulations, and shall comply with any such laws and regulations, including but not limited to any OSHA, WISHA/Oregon Dep~u'Uiient of Labor Health and Safety Rules/Regulations. The Architect shall fully comply with the Hazard Communication Standard for the Construction Industry, and any Federal, State or Local Right to Know Legislation and shall transmit information to all parties concerning chemical hazards requirements. 6. Amendments/Changes. The City may, without invalidating this Agreement, from time to time request changes in the scope of the services. ff such changes involve additional time and expense by the Architect, the Architect shall, within five (5) days of receiving notice of the requested change, submit its estimate to the City of the costs and additional time, if any, necessary to perform such changes. The Architect shall commence any such change order work only upon the written receipt by the Architect of the approval by the City to do so. 7. No Assi~ments or Delegation of Services. a. This Agreement may not be assigned by operation of law or otherwise, without the prior written consent of the City, which may be withheld at its sole discretion. b. The Architect shall assign the persons designated in Section E on the first page of this Agreement as its key personnel to perform the services on behalf of the Architect. Such key personnel shall be replaced only with the prior consent of the Project Administrator, Pa~ 11 offs which may be withheld in its sole discretion. None of the services may be delegated or sub-contracted to an independent conlractor without the prior written consent of the City, which may be withheld at its sole discretion. The Architect shall remain fully responsible for the manner and quality of all services performed, including the performance of all consultants and sub-consultants retained by the Architect. 8. Indemnity. To the fullest extent permitted by law, and to the extent the Architect is negligent, the Architect shall indemnify, defend and hold harmless, the City, its officers, agents, employees and representalives fi.om and against any and all claims, damages, losses and expenses, including, but not limited to, reasonable attorney fees, which arise out of or result from any negligent act or omission of the Architect, any consultants engaged by the Architect and for anyone directly or indirectly employed by them. ffthe claim results from the concurrent negligence of the City and the Architect, the Architect's indemnification obligation shall be limited to the extent of it's negligence; and Co) the Architect expressly waives any immunity that may be granted it under the Washington State Industrial Insurance Act, RCW Title 51, to the extent necessary to provide the City with such full indemnity. The provisions of this Section shall sur~ve termination of this Agreement for any reason. 9. Insurance. Prior to the commencement of the Services, the Architect shall, at its own expense, obtain the following insurance coverage, which coverage shall remain in force during the term of this Agreement: a. Commercial General Liability insurance, including blanket contractual liability coverage, with limits of at least: $1,000,000 General Aggregate (Other Than Produets-Completed Operations) $],000,000 Products- Completed Operations Aggregate Limit $l,000,000 Personal and Advertising Injury Limit $1,000,000 Per Occurrence Limit $ ]00,000 Fire Damage Limit (Any One Fire) b. Professional Liability insurance, including errors and omissions, with limits of liability equal to at least $],000,000 each occurrence; c. Automobile Liability insurance with limits of liability of not less that $1,000,000 per occurrence combined single limit for bodily injury property damage; Pa~ 12 of 15 5/7/~03 d. Employer's Liability or Stop Gap Liability insurance with limits' of not less than $1,000,000 each accident, $1,000,000 each employee-disease and $l,000,000 policy limit-disease; and e. Insurance in accordance with all applicable laws relating to workers' compensation with respect to all of the Architect's employees, owners and officers, regardless of whether such coverage or insurance is mandatory or merely elective under the law. f. Each policy of insurance shall be in a form satisfactory to the City with an insurer having an A.M. Best rating of B+ VI or better, and provide thirty (30) days' advance notice to the City of non-renewal or material change. Such policies shall not have deductibles that exceed $25,000 per occurrence. Prior to the commencement of the services, the Architect shall provide the City with written evidence of the required coverage in the form ofa ce~ficate of insurance with additional insured endorsements naming the City of Bremerton as additional insured attached or, upon the City's request, a copy of the policy. The insurance certificate requirements for the coverage required for workers' compensation will be satisfied by a letter fi.om the appropriate state agency confirming participation in accordance with statutory requirements. 10. Architect's Default. ffthe Architect fails to prosecute the services promptly or properly or breaches or fails to perform any obligation under this Agreement, the City may give the Architect seven (7) days' written notice of such matter, ff such matter has not been corrected within such seven-day period, the City may, without prejudice to any other fight or remedy it may have, terminate this Agreement and correct any defective services and charge the Architect for all costs, expenses, and impacts to the Project arising fi.em such defects, and deduct the same fi.om sums otherwise due the Architect. 11. Documents and Data. a. The Architect agrees that all documents, drawings, reports, eleclronie files, AutoCAD 2000 or compatible or similar electronic information, together with other information prepared or obtained by the Architect in connection with the services including work in progress (cumulatively "materials"), are the sole property of the City for use exclusively by the City or its designated agents and employees and shall be submitted to the City within three (3) working days after a written request fi.om the City and, in any event, upon eompletiou of the services under this Agreement, prior to and as a condition of the final payment to the Architect. City shall indemnify ArcMtect fi.om any claims or damages arising fi.om the City's subsequent use of the electronic version of said materials. P~ 13 of 15 5/7/2003 12. ~ The Architect agrees that all documents, drawings, ' reports and other data and information prepared or obtained by the Architect in connection with the services are confidential and shall not be disclosed or made available to any individual or entity other than the City, its designated agents or employees and any person who must know the information in order for the Architect to complete the services except to the extent required to be disclosed pursuant to the Public Records Act, chapter 42.17 RCW. 13. Royalties. Patents. Cop_ ~vrights and Trade Secrets. a. The Architect shall not infringe on United States patent, copyright, trade secret or other proprietary right for any material, product, or part of any material or product (including, for example, software, hardware, se~ice, design or equipment0 used or furnished in connection with this Agreement, and shall defend and indemnify the City from any suits or claims for infringement of any such rights and shall hold the City harmless from any loss on account thereof. 14. Notices. Ail notices provided for herein may be transmitted by facsimile, delivered or mailed. If mailed, such notice shall be considered delivered three (3) days alter being deposited in such mail. The addresses to be used in connection with such correspondence and notices are as set forth on the first page of this Agreement, or such. other address as a party shall from time to time direct. Notices or correspondence to the City shall be sent to such address marked for the attention of the City's Representative designated in Section F on the first page of this Agreement, or such other representative as the City may hereafter designate from time to time. 15. Susnension of Services~ Termination. The City may, upon written notice, direct the Architect to suspend all or a portion of the Services. In the event of such suspension, the Architect shall be entitled to payment of: (a) all fees properly em*ned up to the effective date of suspension; and (b) all reimbursable expenses actually and properly incurred up to such date, but excluding any and all unearned overhead and profit. If the services are suspended for a continuous period of more than sixty (60) days, and such suspension is not due to the fault of the Architect, then the Architect shall also be entitled to payment of unavoidable out-of-pocket expenses, excluding any and all unearned overhead and profit, actually suffered as a result of such suspension. The City also reserves the right to terminate this Agreement for the convenience of the City at any time upon three (3) days written notice to the Architect. ffthe City so terminates this Agreement, the Architect shall be entitled to payment of: (a) all fees properly earned up to the effective date ofterminadon, and (b) all direct reimbursable expenses actually and properly incurred up to such date, but excluding any and all overhead and profit accruing after the date of termination. Ar~i/J~w. kso~ Pa~ 14of15 5/7/2003 16. ~ The Architect is an independent conUactor and not an agent or employee of the City. Nothing contained in this Agreement shall be deemed to create a relationship of employer- employee, master-servant, parmership, joint venture or any other relationship between the City and the Architect other than that of independent contractor. Neither party shall have any authority to supervise the employees, representatives or sub-con~'actors of the other party, nor to make any statements, representations or commitments of any kind or take any actions which will be binding upon the other party except as specifically provided in this agreement. 17. Entire A_m'eement This Agreement constitutes the final and complete agreement between the parties hereto with respect to the subject matter of this Agreement, superceding all prior agreements or discussions with respect thereto. No additions, deletions or modifications hereof shall become part of this Agreement unless each party hereto specifically recognizes and consents to their inclusion by a signed instrument. 18. Disvutes a. This Agreement shall be governed by the laws of the State of Washington. b. The Architect consents to consolidation and/or joinder, in a single proceeding, of all claims and disputes by or between the City, sub- conlractors, the Architect, the City's other consultants, or any other person or entity involved with the Project, with a claim or dispute relating in any manner to the Architect's services provided by it under this Agreement. c. In any dispute involving the City and the Architect or otherwise arising under or relating to this Agreement, each party shall be responsible for their own attorney's fees and costs, together with any and all expert fees. P~ 15 o£15 ~/7/2003 Attachment A List of Deliverables SCHEMATIC DESIGN SD-1 4 copies Updated Space List SD-2 4 copies Design Report Preliminary Design Concept Systems Narrative Code Analysis Architectural Structural Civil (by owner) Landscape Mechanical Electrical (Power and Lighting) Communications Coy Owner) Eleclronic/Audio - Visual Coy Owner) Security Coy Owner) SD-3 4 sets Design Drawings Architectural Site Plan Architectural Floor Plans Building Section Key Building Elevations SD-4 4 copies Cost Estimate SD-5 4 copies Updated Schedule DESIGN DEVELOPMENT DD-1- 4 copies Outline Specification DD-2 4 copies Basis of Design Report Design Concept Systems Narrative Code Analysis Architectural Structural Landscape Mechanical Electrical Product Cut-Sheets Atal/Jat:kson - .a,aeh~..~, A Pa~ 1 of 4 DD-3 4 sets Design Development Drawings Landscape Planting Plan Key Details Architectural Site Plan Basement Plan Basement Ceiling Plan First Floor Plan First Floor Ceiling Plan Second Floor Plan Second Floor Ceiling Plan Roof Plan Building Sections Wall Sections Enlarged Floor Plans Door Schedule Structural Structural Notes Foundation Plan Basement Plan First Floor Plan Second Floor Plan Roof Framing Typical Details Mechanical Symbols & Abbreviations Basement Plumbing and Piping Plan Basement HVAC Plan First Floor Plumbing and Piping Plan First Floor I-IVAC Plan Second Floor Plumbing and Piping Plan Second Floor I-IVAC Plan Electrical Symbols & Abbreviations Electrical Site Plan Basement Lighting and Power Plan First Floor Lighting and Power Plan Second Floor Lighting and Power Plan Power One-Line Diagrams DD-4 4 copies Cost Estimate DD-5 4 copies Updated Schedule 1~2of4 5t?12003 CONTRACT DOCUMENTS CD-1 4 sets Final Specifications CD-2 4 se~ Final Drawings Landscape Layout Plan Grading Plan Planting Plan Irrigation Plan Enlarged Area Plan Details Architectural Cover Sheet Code Analysis Site Plan Site Details Basement Plan Basement Ceiling Plan First Floor Plan First Floor Ceiling Plan Second Floor Plan Second Floor Ceiling Plan Roof Plan Roof Details Building Sections Building Elevations Enlarged Floor Plans Suspect Processing Enlarged Floor Plans Courts Enlarged Floor Plans Toilet Rooms Enlarged Plans & Sections Stairs & Elevator Wall Sections, Wall Types Room Finish Schedule Door Schedule - Door Types Interior Elevations Details Signage Plan SWactural Structural Notes Foundation and Basement Plan First Floor Framing Plan Second Floor Framing Plan Roof Framing Plan Partial Framing Plans Lateral Frame Elevations Foundation Details Framing Details Axni/J~k~ya - Altadm~nt A Pa~s 3 of 4 5/7/2003 Mechanical Symbols & Abbreviations Basement Plumbing and Piping Plan Basement HVAC Plan First Floor Plumbing and Piping Plan First Floor HVAC Plan Second Floor Plumbing and Piping Plan Second Floor HVAC Plan Sequence of Operations Enlarged Mechanical Room Plans HVAC Details Plumbing Details Electrical Symbols & Abbreviations Energy Calculations Electrical Site Plan Basement Lighting Plan Basement Power Plan Firs~ Floor Lighting Plan First Fioo~ Power Plan Second Floor Lighting Plan Second Floor Power Plan Electrical Roof Plan Partial Plans, Details One-Line Diagram and Elevation Lighting Fixture Schedule Details CD-3 4 sets Final Cost Estimate BIDDING BI~I. Addenda 1 BID-2 Addenda 2 End of Attachment A Ar~/J~k~o~ ~ .4~L~ m~t ~ A P~ 4of4 ~/7/2~3