HomeMy WebLinkAbout4296
+--------------------------------------------------------------------------+
~Browse: Next Previous First Last Update Delete Restart X - Exit +
-~etrieve the Next record
TFound: 1 Record(s)
+
+
+Vendor Name
+Subject
=!=Department
--Status Code
MAINTAIN
Contract Number
Contract Transactions
4296
TRAFFIC SAFETY COMMISSION
PEDESTRIAN ENFORCEMENT PROJECT
POLICE
GOV
(WA STATE)
#2012
+
Insurance
Type Amount
Amount
Begin Date
End Date
Review Date
$5000.00 +
05/01/2002 ,.
10/01/2002 +
02/15/2005 ,.
+
=!=
- .
$0.00 . .
. .
- -
-.-
,.
+
+
Insurance Total
Insurance Review Date
Comments
VAULT 01/01/2005
=1=
,. -.-
+--------------------------------------------------------------------------+
+--------------------------------------------------------------------------+
+Browse: Next Previous First Last Update Delete Restart X - Exit +
+Retrieve the Next record +
+Found: 10 Record(s) MAINTAIN Contract Transactions +
+ Contract Number 4296 +
+
+Vendor Name
+Subject
+Department
+Status Code
TRAFFIC SAFETY COMMISSION
PEDESTRIAN ENFORCEMENT PROJECT
POLICE
GOV
(WA STATE)
#2012
+
+
+
+
+
$5000.00 +
05/01/2002 +
10/01/2002 +
02/15/2005 +
+
+
+
+
+
+
+
+
+
+
+
+
+
Insurance
Type Amount
Amount
Begin Date
End Date
Review Date
Insurance Total
Insurance Review Date
+
+
+
$0.00 +
+
+
+
+
+
Comments
VAULT 01/01/2005
+--------------------------------------------------------------------------+
0 6 2002
Traffic *
Saieb
MO DUM OF
WAS~GTON ~C S~ CO--SION
~S AG~E~, p~ ~ ~ 39.34 R~ is ~e ~d ~ i~ by ~d b~n
B~me~on Poli~ ~pa~ment
H~c~ ~ ~ ~ "C~r" ~ ~e WASHINGTON T~FPlC SALTY
CO~ION, ~e~ ~c~ to ~
~ IS ~ P~OSE OF ~S AG~E~ ~ ~s~ ~SC m a proj~ ~:
Pe~ Enfo~ment ~oj~
IT IS, ~~ ~TU~LY AGREED ~T:
U~n mi~ ~p~o~ ~r (or ~ ~i~ ~r~ve) ~ll sub~ a ~l~
wo~ p~ ~ni~ a ~lc ofp~ ~ ~ ~y ~cy) n~ ~ ~
$5,0~.~ ~ ~ ~ ~ ~on p~ ~ on a ~ey ~ be ~l~ by
~ of~e ~inin~.
2. W~ ~ll p~dc wfia~ ~p~v~ of~e w~ p~ ~ ~d a~iliW before ~g
3. ~r ~ll ~o~ ~W ~ ~ m ~ ~p~v~ p~.
4. ~r ~ll ~t for ~mbu~ ~ a 6~ly ~er (n~ ~ ~c~ 60 ~ys p~
b~l~ ~v~). B~lln~ ~H
~voi~ Vouch~, A19-1A FO~ (~h~) Pl~e no~ ~ we ~ ~ a F~. We
m~t have ~9~ ~n~ i~ntif~ ~ the ~Cl~m~t% a F~r~ TO ID ~ ~d an o~6nal
~ of~ ~ ~a~ co~ o~r or ~a~n~ o~r on th~ A-19 form.
Pa~B s~ d~ (si~ OT s~, ~ll d~m~, ~)
S~ of~vi~
~ w~ - ~h~ (~g 3 or mo~ ~-~ ~ ~ ho~)
5. ~u~ ~g ~ ~ ~ s~l ~ r~olv~ by a p~l eo~inE
~ve of ~ W~n T~c ~ ~ssio~ one r~ve ~m y~r
~ ~ a m~ly ~ u~n ~ p~. ~ ~ ~cl s~l ~er~r d~ide
~ue w~ ~e ~j~ p~.
6. Ei~ p~ ~y~ ~ ~m~ u~ (30) ~ ~ ~ ~ ~e ~ p~.
· c ev~ of t~on of ~ ~c~ ~e t~g ~ s~l be liable for
~o~ r~d~ed p~or ~ ~ ~ive ~e oft~ina~on.
' ¢ ~ ~ P. O~x40944
Ol~p~ WA 98~9~
~-' Washington Traffic Safety Commission ~'~
Project Ap'eement
Atlachment B Rev. 2/07K)2
Washington Traffic S.;=~ Commission
1000 South Cherry Street
PO Box 40944
Olympia, WasNngton g8504-0944
Phone (360) 753-6197
~.x Oeo)
www.wa.gov/wtsc
Section 1
Authorization
Project Title: __ Pedestrian Enforcement Project
Type of Application: Initial XX Revision: WTSC Tracking Number
WTSC use only
Ownership of facilities or equipment, acquired through thi~ funding, aha# be vested with the applicant agency, not the sta~ of
Washington. However, facilitie~ or equipment acquired through ~ agreement shall be utilized and re~ained in highway
operation~ during the useful existence of such equipment or facilities. CoMa incurred for maintenance, repaim o~ support of such
project, a~ more Imrticulmty dem~tbed in ~.:tton. 2 and 3 attached thereto and made a part hereof, ia undertaken under authority of
Title 23, United Stalin Code and is subject to the administrative regulations established by federal guic~dtnes and the Washington
State Traffic Safety Commission.
Applicant ARency/Orgaaizatimz Bremertoa Police Dqmnment
Na~_Lieutenant Tim Lopez Address :239 4* ~treet Bremerton Wa. 98337
Title__Lieutenant Address_same as above
Signature .City, ~-**, zip__same as above
It-mail Addre~_tloper~ ci. bremerton, wa.u; Area Code (360) Phone__ 478-5237
Applicant Agency Autbortztn~ Official (perzon with contracting authority) if different from above:
Organization
Name Add~-4
Title Address
Signature City State Zip
Area Code Phone
WTSC Program Manager Itl ~ /~
~/ ' I
Planned Project Duration: Fro~: May 1, 2002 To: . October 1, 2002
Approved by:
Title: / Director, WT$C ~ Federal Funds (obllgated)$.
Signature: CFDA Number
Date:
It is hereby undemtoed that this application and attachments hereto, when approved and signed by all concerned parties, es indicated shall constitute an
ngresment by and behvsefl the applicant organization to perform in accordance w~h the terms of this application and attachments, taken as a whole. This
agreement is based en gutdslines found in the Common Rule, OMB Circutsr A-102, in o~ler to ~tsndardize and simplify federal grants. The signetu~e below of an
authorized representative of the applicant agency certifies and assures that all the following cond'lltans will be met.
1) Resefts - The Confractor shsil submit quartedy reports, a final report at end of projac~, aed submit spocial report, s es outlined Proiact Agreement, Audendum
A, ~ and Rqx~t Reqaremems.
2) Cca~ri~h~. Pub#caliens. and Patsn~- Where activities supported by this project produce original oapyrtght material, the Contractor may copyright such, but
the WTSC reserves nonaxutu~ve and irrevocable license to reproduce, publish, and use such matariais and to authorize others to do ac. The Coofractor
may publish, at its own expense, the results of project activities without prior review by the WTSC provided that any publications (written, visual, or sound)
contain aclmowisdgment of the National Hig~my Traffio Safety Admi~a~en (NHTSA) and the W'I'SC sepport. Any discovery er invention derivert from
work perfom-,ed under this pr~jec~ shall be referred to the WTSC, who will determins through NHTSA whether or not patent protec~ens will be sough~, how
any rig.s will be administered, and other action required to protoof the pubic interest.
3) Term~natisn - This project agreement may be terminated or fund payments discontinued or reduced by WTSC at any time upon written natico to the
Canlractor due to noe,-avall~bib/of funds, falure of the CcoOaofor to accomplish am/of the tem~ heraln, er from any chenge in the acope er timing of the
4) Fmcol Records - Comptsto and de~alled acco~g records will be mal~aised by the Coofractor of ell co~s incurred on this project, including documentation
of all purchases of supplies, equipment, and sorvices; travel expenses; payrolis; and time records of any person employed part*time on this project. Federal,
state, or WTSC auditors shall have access to any records of the Contra~or. These records shall be retained for three years after the final au(~t is oomp~ed
and all que~iens resolved.
5) Fundino - The ~or will utitlze funds ixovidsd theraln to supplement end nat to sepplant atate end incat funds othervdan avalleble for thsee puq)o<ses.
Funds ere to be exponded coly for purposes and achvitise a~pproved herein. Rsimbumement will be made beriodica,y by WI'SC fer ils share based on
apl~oved coat rapm~. Tbe Con~ractor wil expand from noofederal so~a'cesthe requtred matching amounts, which shal be e~pended nof laler than 30 dsys
Cost Princi~es and ~ Menseement - The allowability of costs incurred aed the management of this pra~act shall be determined in accordance with the
O~ce of Management and Budg~ (OMB) Circular A~7 and 4OCFR, Part 18 for state and local agencies, OMB Cimuiars A-21 and A-110 for educational
in~tobens, and OMB Circular A-122 for nonprofi~ eofities.
7) <:)lY~a~n Funds - Federal bunds may nof be oblig~ed paler to the effective date or subseque~ to the termination dale of this projec~ pefied. Ob41gations
8) Chanose - The ~er must o~aln prior written approval from the WTSC for major project changes, including: changes of sob~ence in projec~ objectives,
9) Income - Im~me esmed by the Cordmcter wlh reape~ to Ute conduct of the project (sale of publications, registration fees, service charges, etc.) must be
accoanted for and income appltsd to projact ~ or in reduation of pro, eat co~s.
10) Pumhases - Pul'ohean of equiprnsat or services must comply w~ atete or local regulations. After the end of the project period, equipment will continue to be
utilized for hlgh,,~y sa~e~ poq~ses or ~ not be dta~o~ed of without written approval of the W I'SC. The C(mtraofor shall make and maintain an inventory of
equipment to include deactiplions, serial numbers, incaticos, co~s or o~her idanlff~ng iofommtian, and ~ a copy to the WTSC.
11) Thir~l Padv PerflsiDar~s - No c-.~ acts er ago'semen, s tony be entered in~o by the Coofraofor ratsted to this projest, which ere nof incolporeted bemin and
approved in advettce by the WTSC. The Cor~actor will retsin ultimate co~r~ and restx~tsibi~ty for the project. WTSC shall be provided ~ a copy of all
12) ~ by DIsadvantaeed I~alnees F_nts~'ises - The co~[rac~or agrean to take al nacm~e.y and reasonable steps in accordance with Title 49, CFR,
Sut~le A, Part 26 to ensure that minority business enterprises have the maximum oppodu~ity to coml3~e for and perform contracts. Recipients and their
cor4ractom shall nof discflminate en the baals of race, c~or, naltonal or[~]tn, or sex in the award and pertormance of any sui3cantracts flna~ceq in whois or in
pelt with Federal funds.
13) Americens with Dtsahitities/~;t - In the pen'ormenco of thts a~'seme~t, the Contractor N~all comply with the provialons of Tltie VI of Civit Rights AOf of 1 g64
42 USC 200d, Sactio~ 504 of the Rehabitl(eden Act of 1973 29 USC 794 Chapts~' 40.60 RCW, end Titie I of the Americans with Dtsal~iUes Act 42 USC tZI l-
to include taking afFl'fr~ltive action ne(~-~/to acoomp~l~ rite objeatNse of this polt and denying ao indivfdcal the apportenity to padicipale in any program
provided by this agreement through the provisions of services, or otherwise afforded others.
t4) Po#ticat Achvibel - No fueds, matertais, eduipment, or servicos provided bel'atn shall be used fer eny portisan ixxti'dcal autivtiy or to further the eleation of
defeat of any candidete for pol3~c office erto pay any pamofl to inflsenoe er etteml31 to intfuence an officer er employee of congrean, or an emptoyee of a
momber of congress, an officer or em~ptsyse of congress in connscfinn with ~ awarding of any federal Moan er the enter~g in of any cooperative
a~'eemento.
15) Sinltie Andti - SUille and lesal govemmeofs thet racetve federal aesill~,lloe are subjact to the audil[ requtremento of the Oftice of Managemel'it aed Budget
(OMB) Circular A-128. An ~ of higher educatian or a nonprofit enUty muat comply with aud~ reqdremeflts in OMB Ciroular A-133. An indapendent
au~ of the ltnenc~si aperations, including compllen~e with provisions of federal law and rnguleticos of all funds expended, must be arranged for by the
cof~'actor. A copy of the comp!e~ed audit must be acbmitted to the WTSC.
16) Se~ Batt Po~v - No fumls, materials, property, or services witl be provided to any political sulxlk, iston that does not have a cencurreot and actively enforced
pchcy requiring the L~e of seat belts.
17) ~ - In acco~lenco with the Anti-Drug Ac~ of 1968 41 USC 702-707 and Drug-Frse Wed~pleco, 42 USC 12644, the ~q'SC has the
reqx)~ibility to ensure that u~!awfui menufa~ure, dlaOibutien, dis~.~g, posees~en or use of a cen0'olled substance by any omployses, grantees, and/or
18) Dat)erment end 8~,~fl - The applicant agency c~titles, by submission of this proposal, that neither it or its pfincipais is presently debarred, suspended,
proposed for deberment, declared ineligible, or volu~erity exctuded from participation in this transaction by any Federal department or agency.
Applicant Agency Authorized Sig Date ~
Section 2
Description of Activity
In this sectkm, the following five elements should be defined in narrative form: (1) Problem
Identification, (2)Project C-,-,-,-,-,-,-,-,-,~al(s), (3) Project Activities and Tasks, (4) Project Evaluation and (5)
Budget (explain how funds will be used and details of any matching funds.)
Please clearly label each element using the titles listed above, and limit Section 2 to three
single-sided pages using nothing smaller than a 12-point font.
Problem Identification and Project Goals:
The City of Bremerton Police Department plans on conducting vehicle and pedestrian enforcement
coverage on city roads in the months of May, June, and July. The specific request is to support the WTSC
project in tableting vehicles that fail to yield to pedestrians in marked crosswalks and pedestrians and
bicycles that fail to obey their duties and responsibilities.
A planning meeting was held with Brernndon Ofticers on this project on 4/10/02 and 4/23/02. Another
meeting for _l~__~ibie invbivement with WSP at the Washington Fern/Terminal on 1~t street was held on
4/25/02. Further meetings with Bremerton and WSP will be held in May.
Bremerton had 959 collisions in 2001 throe resulted in fatalities and there were 298 injuries. The goal of
this project is to reduce fatality and injury collisions through education and enforcement activities in our
community.
The media will be contacted in advance but the exact location of the enforcement action will nut be
announced until the day of the activity. We will also be in contact with Puget Sound Naval Shipyard to
provide infomqation to their employees on the upcoming actions.
Each parson stopped for a violation will he given a brochure explaining the crosswalk and pedestrian
laws.
There will be at up to throe separate Education Tasks that Bremerton Officers will undertake and they will
he held at the Fe~y Terminal, City Hall or another location. Officers will be providing pamphlets and
education infon~nation advising of Pedestrian, Mctodst, and Bicycle Laws.
There wilt also be at least three oparations which will include a plain clothes observer, recorder, and a
unifo~ned bike officer to contact pedestrians, and two marked chase vehicles, and a CenCom Dispatcher.
The will also be at least two ether oparations which will consist of bike officer to contact pedestrians.
The Brernerton Police Department will conduct Education Tasks 1,2, and 3. The Bremerton Police
Department will also conduct Oparations 1, 2, and 4. The Bremerton Police Department will possibly work
with WSP on operations 3 and 5 at the Bremerton Fe~y Terminal with bike officers or they may work
alone.
Proposed Project Activities and Tasks: (these are tentative dates and may change as needed)
Education Task 1
Date and Time: (tentative) Wednesday May 8 ~;~ 1400-1800
Location: The Breme~ton Ferry Terminal
Participants: Two Bremerton Officer providing pamphlet and education information advising of Pedestrian,
Mntodst, and Bicycle Laws.
Educetion Task 2
Date and Time: (tentative) Wednesday May 15 ~ 1400-1800
Location: The Bremerton Ferry Terminal
Participants: Two Bremerton Officer providing pamphlet and education information advising of Pedestrian,
Motorist, and Bicycle Laws.
Education Task 3
Date and Time: (tentative) Tuesday May 21 ~ 1400-1800
Location: The Bremerton Fe~y Tem~inal
Participants: Two Bremerton Officer providing pamphis~ and education information advising of Pedestrian,
Motorist, and Bicycle Laws.
Ooeration 1
Date and Time: (tentative) Wednesday, May 29 ~ 0530-0930
Location: Burwell Street/State Street
Participants: Two Motorized Bremerton Police Units, One Bremerton Bike Unit, and One Breme~ton non-
Uniformed Officer as recorder and one as decoy and one CenCom dispatcher
Ooeration 2
Date and Time: (tentative) Tuesday, June 5 ~ 1430-1830
Location: Bur#ell Street/State Street
Participants: Two Motorized Bremerton Police Units, One Bremerton Bike Unit, and One Bremerton non-
Unifo~mnd Officer as recorder and one as decoy and one CenCom dispatcher
Ooeration 3
Date and T~rne: (tentative) Wednesday, June 19 ~ 0530-0930 and 1430-1830
Location: Washington Feffy Terminal ~ Washington Ave/1'~ Street
Participants: Two Bremerton Bike Units dudng each time frame
Operation 4
Date and T'ene: (tentative) Wednesday, June 26 ~ 0530-0930
Location: Burwell Street/State Street
Participants: Two Motorized Bremerton Police Units, One Bremerton Bike Unit, and One Bremerton non-
Unifonned Offer as recorder and one as decoy and one CenCom dispatcher
O~eration 5
Date and Time: (tentative) Tuesday, July 23 ~ 0530-0930 and 1430-1830
Location: Washington Ave/1= Street
Participants: Two Bremerton Bike Units during each time frame
Budset Infommtion:
Lynn Drake indicated on 4/10/02 that she would provide $5000.00 overtime dollars to the Bremerton
Police Depa~ment to cover costs for officers and dispatchers involved in these operations. There may be
some incorporation of on-duty officers to assist with these enforcement operations. The Bremerton Police
Department will submit an A-19 form to the WTSC to request reimbursement for the overtime dollars.
Proie~t Evaluation:
Lieutenant Tim Lopez and Officer Floyd May will compile the statistics from these operations to provide
them to the WTSC as well as the media.
Point of Contact:
Lieutenant Tim Lopez, Operations Lieutenant Bremerton Police Department
239 4~ Street
Bmmerton, WA 98337
(36O) 478-5237
Planning Committee; Phone Numbers:
Lieutenant Tim Lopez (360) 478-5237
Officer Floyd May (360) 478-5218
Section 3
Budget Summary
Budget:
(If applicable)
WT$C Costs Applicant Matching/
Contributing Cost
1. Salades and Wages: $ $4850.00 $
2. Employee Benefits: $ $
3. Travel and Subsistence: $ $
4. Contractual Services: $ $
5. Equipment: $ $
6. Goods and Services: $ $
7. Total lines1-6 (Amount Requested from WTSC) $
8. Total lines 1-6 (Amount provided by applicant) $
Total Project Cost (Add lines 7 & 8): $4850.00
WTSC Use Only
Cost Shining Matching Sham:
(Washington Traffic Safety Commission use only) WSP Field Salaries FY
Sham Amount Percent Applies To:
Federal: $ State:
State: $ Local:
Pelitieal Subdivision: $.
Total Estimated Cost: $.
Add~mium A
Billln~ and Repoding Rmquirement~
Billings
Invoice vouche~ for p~meot must be prepared monthly and must be received by the Washington Traffic Saf~
Commission by the ~0"' of the month following the billing period.
Reporting Frequency and Format
The Washington Traffic Safety Commission requires three types of reports in conjunction with traffic safety projects:
1. Quarterly reports during the life of a project;
2. A final report at the conclusion of a project. This is to include training and consultant reports, if applicable; and
3. Special reports as required.
Project reports of every kind provide the Washington Traffic Safety Commission with information that can be used to
strengthen the state's total traffic safety program. These reports keep the commission informed of a project's
progress, e~lain any difficu~es encountered, provide a background of information that can be passed on to others,
suggest ways in which the commission can assist with the project and aid in diatrlbution of state funds. Therefore,
comprehensive reports are a must for continued improvement in the state's traffic safety operations.
Quarterly Reports
These are to be submitted quarterly and are due in the Traffic Safety Commission's office within ~tenn (15) calendar
days after the end of the repo~ng calendar quarter as follows:
First Quarter October - December Report due January 15
Second Quarter January - March Report due April 15
Third Quarter Apdl- Juno Report due July 15
Fourtil Quarter July - September Report due October 15
The Traffic Safe~ Project Report Forms are to be used when compiling these reports. AJI sections are to be filled in
as complately as possible. (Use additional sheets, as necessary). If no action has been taken, please se indicate.
Any original or innovative ideas or methods employed in your project should be incorporated into your reports.
Final Report
Final reports, in duplicate, are to be more informative and must describe whofher the project objectives were
accomplished, if technieal and fiscal problems were encountered, and what improvements in traffic safety have
resulted or probably will result. Included in final reports will be copies of publications, training reports and any
statistical data generated in project execution. These final reports should discuss the folicwing:
1. Accomplishments compared to the original project objectives;
2. Were all aclfvfties of the project completed as scheduled? Include dates and milestones when studies were
completed; equipment acquired, installed and operated;
3. Any unanticipated proceedings that affected the projected;
4. Funding and casts for completion of the project in relationship to original estimates; and
5. Third party performance if consultant was employed. Two copies of consultant reports are to be included with
the project director's reports.
Special Relx~i ng
Special reporting procedures may be required fur special interest projects. If so, report format and frequency will be
outlined on the reverse side of this form.