+ Contract Number 4258 +
+ +
+Vendor Name FRIBERG CONSTRUCTION +
+Subject RESERVOIR 4 MODIFICATIONS +
+Department ENGINEERING +
+Status Code CON +
+ Amount $754343.00 +
+ Begin Date 03/20/2002 +
+ Insurance End Date 07/31/2002 +
+ Type Amount Review Date 02/15/2005 +
+ GL $2000000.00 +
+ AL $1000000.00 +
+ +
+ Insurance Total $3000000.00 +
+ Insurance Review Date 02/01/2003 +
+ +
+ Comments VAULT O1/01/2005 +
+ +
+ +
IqJBLIC WORKS AND UTILITIES
3027 Olympus Drive * Bremerton, WA 98310-4799 * (360) 478-5318 * FAX (360) 478-5018
MEMORANDUM
ENGINEERING DIVISION
TO: Paula Johnston
FROM: Paul Wandling
DATE: October 29, 2003
SUB J: Friberg Construction, Inc. - Reservoir No. 4 Modifications
I have now received all the releases from the State of Washington and completed the necessary
procedures for project closeout. The following documentation is attached for your files and to
confirm this:
Affidavit of Publication for the "Notice of Final Completion" dated 10/4/03
Project Release signed by Contractor
Certificate of Payment of State Excise Taxes by Public Works Contractor
Department of Labor and Industries Release
Certificate of Payment from Employment Security Department
If release of retainage for this project is acceptable to you, please indicate by signing below and
retuming to me. I will see that the necessary paperwork is processed to release the retainage.
Please call me if you have any questions at X2351.
flail'la Johnsto/(, D[l~U~t~ Ci~'y Clerk
AFFIDAVIT OF PUBLICATION
County of Kitsap, State of Washington
No. 100076640
I, Valerie Zoller, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
THE SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court of
the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually
as a daily newspaper in Bremerton, Kitsap County, Washington, and is now and during all of said time,
was printed in an office maintained in the aforesaid place of publication of said newspaper; that the
following is a true text ora legal advertisement as it was published in regular issues (and not in
supplement form) of said newspaper on the following dates, to wit: October 4, 2003 and that such
newspaper was regularly distributed to its subscribers during all of said period. That the full amount of the
fee charged for the foregoing publication is the sum of $32.51 amount has not been paid in full.
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of October 8, 2003
Notary Public in and for the State of Washington, Kitsap County.
CITY OF BREMERTON'
NOTICE OF FINAL COMPLETION'
Notice of Final Completion has been filed with the City of Bremerton by Friberg Construction, Inc. on
Contract No. 4258 for the Reservoir No. 4 Modifications Project. Any parties having a claim for material,
labor or damages with reference to this contract have thirty (30) days from the date of publication of this
notice to file a claim.-
William Eley-
Purchasing Manager-
239 4th Street-
Bremerton, WA 98337-
October 4, 2003° · #100076640-
RELEASE
Reservoir No. 4 Modification
The Contractor, by signing below, is in a re ·
· ,~- work pertormed under the Contr~o, ~ / -'"~ tOtal snail represent full
...... t ,ererenced above. '-'mp~usatlon
Furthermore, the Contractor releases the City of Bremerton from any and all claims,
liability, demands, damages, and actions, involving the above referenced project.
Friberg Construction, Inc.
By: ~/-~c~ Frib~rc~
Vice President ~.~
Wa,h,n on State RECEIVED
Department of Revenue
PO Box 47474
Olympia, WA 98504'7474 0Cl 2 ? 2003
600 3~( 5~I~INEERINGDIVISION
Certificate of Payment of State Excise
Taxes by Public Works Contractor
FRIBERG CONSTRUCTION CO CITY OF BREMERTON PUBLIC WORKS
P O BOX 1406 PAUL C WANDLING
FERNDALE WA 98248 1406 3027 OLYMPUS DR
BREMERTON WA 98~10 4799
We hereby certify that taxes, increases and penalties due or to become due from the above-named
contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works
contract:
CITY OF BREMERTON PUBLIC WORKS
RESERVOIR RETROFIT & REPLACE PIPING
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained
percentage.
This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the
sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor.
This certificate does not release said contractor from liability for additionaI tax that may be later
determined to be due with respect to the above-mentioned contract or other activities.
Dated /t~/c~ ~//~c-~._~ at Olympia, Washington,
State of Washington
Department of Revenue
Certifying Officer x.
To inquire about the availabiliB~ of this document in an alternate format for the visually impaired or in a language other than English. please call (360) 753-3217.
Try users may call 1-800-451-7985.
REV 31 0028 (10-01-02) ROUTIN~ontractor, File, Special File
STATE OF WASHINGTON
DEPARTMENT OF LABOR AND INDUSTRIES
PO Box 44000 · Olympia, Washington 98504-4000
July 31, 2003
CITY OF BREMERTON
3027 OLYMPUS DR
BREMERTON WA 98310
Account ID: 430-796-00
Contractor: Friberg Construction Company, Inc.
Contract Number: 420 & R8370102
Contract For: reservoir #4 modifications
Please be advised that the Department of Labor and Industries shows industrial insurance
account status for work on the above contract as:
Contractor: Friberg Construction Co., Inc. Account Status: current
This letter does not release the City of Bremerton or any of it's contractors from liability for
additional industrial insurance premiums pursuant to RCW 51.12.050 and RCW 51.12.070,
which later may be determined to be due, or for any other obligations under other statues (e.g.
Prevailing Wage) with respect to the above mentioned contract of any other contracts said
contractor may have performed.
Sincerely,
Dept. of Labor & Industries
PO Box 44152
Olympia WA 98504-4152
Phone Number: 360-902-4762 / Fax Number: 360-902-4757
CculRa
cc: FRIBERG CONST CO 1NC
PO BOX 1406 a E C E I ¥ £ D
FERNDALE WA 98248
AUG - ~ 2003
ENGINEERING DIVISION
STATE OF WASHINGTON
EMPLOYMENT SECURITY DEPARTMENT
PO Box 9046 · Olympia, WA 98507-9046
CONTRACTOR: Friberg Construction ) CERTIFICATE OF
6425 W 20th Ave. ) PAYMENT OF CONTRIBUTIONS
Femdale, WA 98248 ) PENALTIES AND INTEREST ON
) PUBLIC WORKS CONTRACT
ES Reference No. 484303-009
TO: City of Bremerton Public Works & Utilities
3027 Olympus Drive
Bremerton, WA 98310
The Employment Security Department hereby certifies that contributions, penalties and interest
due from the above named contractor under the Employment Security Act have been paid in full or
provided for with respect to the following public works contract:
Retxofit and Piping Replacement of Reservoir
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50.24.130 against the public body named above for tax attributable to service performed for said public
body by the above named contractor on the above described contract. The Employment Security
Department releases its lien on the retained percentage which is provided by RCW 60.28.040 for
contributions, penalties and interest due from said contractor.
This certificate does not release said contractor from liability for additional contributions,
penalties and interest which may be later determined to be due with respect to the above mentioned
contract.
Dated at Olympia, Washington on October 14, 2003.
COMMISSIONER
EMPLOYMENT SECURITY DEPARTMENT
(/~fthorized Representahve)
~1~ :er
Duplic at e--Emp~f'd~-
Triplicate---Central Office Files
EMS 8449 760 R3-98
SAVINGS ACCOUNT AGREEMENT
TO: PEOPLES BANK SAVINGS ACCT. NO: 5077-001385
1750 LABOUNTY DRIVE
FERNDALE, WA 98248
AGENCY: CITY OF BREMERTON
3027 OLUMPUS DR.
BREMERTON, WA 98310
CONTRACT NO: #R8370102
PROJECT TITLE: RESERVOIR NO.4 MODIFICATIONS
The undersigned, Friberg Construction Co., Inc., herein referred to as the CONTRACTOR,
has directed the CITY OF BREMERTON, Washington, hereinafter referred to as the
AGENCY, to deliver to you its warrants which shall be payable to you and the
CONTRACTOR jointly. Such warrants are to be held and disposed of by you in accordance
with the following instructions and upon the terms and conditions hereinafter set forth.
INSTRUCTIONS
1. Warrants or checks made payable to you and the CONTRACTOR jointly upon
delivery to you shall be endorsed by you and forwarded for collection. You will
then place the monies in an interest-bearing savings account.
2. You are not authorized to deliver to the CONTRACTOR all or any part
of the principal held by you pursuant to this agreement, except in accordance with
written instructions from the AGENCY. Compliance with such instructions shall
relieve you of any further liability related thereto.
3. The CONTRACTOR agrees to pay you as compensation for your service
hereunder as follows:
Payment ot all tee shall be the sole responsibility ot the CON i RAC i-OR an(3 shall
not be deducted from any monies placed with you pursuant to this agreement until
and unless the AGENCY directs the release to the CONTRACTOR, whereupon
you shall be granted a first lien upon such monies released and shall be entitled to
reimuulse yourself horn such monies for i.t)e en[i~e amou~L of your fees as provided
for herein above. In the event that you are made a party to any litigation with
respect to the monies held by you hereunder, or in the event that the conditions of
this agreement are not promptly fulfilled, or that you are required to render any
service not provided for in these instructions, or that there is any assignment of the
interests of this agreement, or any modification hereof, you shall be entitled to
reasonable compensation for such extraordinary services for the CONTRACTOR
and reimbursement from the CONTRACTOR for all costs and expenses, including
attorney fees occasioned by such default, delay, controversy or litigation.
4. This agreement shall not be binding until executed by the CONTRACTOR and the
AGENCY and accepted by you.
5. This instrument contains the entire agreement between you, the CONTRACTOR
and the AGENCY. You are not a party to nor bound by any instrument or
agreement other than this. You shall not be required to take notice of any default
or any other matter nor be bound by nor required to give notice or demand, nor
required to take any action whatever except as herein expressly provided. You
shall not be liable for any loss or damage not caused by your own negligence or
willful misconduct.
6. The foregoing provision shall be binding upon the assigns, successor, personal
representative and heir of the parties hereto.
FRIBERG CONSTRUCTION CO., INC. CITY OF BREMERTON
CONTRACTOR AGENCY
CONTROLLER ~ ,, ~
Date: 6-12-02
The above savings account agreement and instruction received and accepted this 12th day
of June , 2002.
PEOPLES BANK
Auth~Officer - ' /-I
November 13, 2003
Peoples Bank
P. O. Box 3108
Femdale, Washington 98248
RE: Release of Reta'mage Agreement - #5077-001385
Dear Sir or Madam:
Please be advised that Friberg Construction, Inc. has completed all work required under the
contract for the Reservoir No. 4 Modifications. Please release retainage in the amount of Thirty-
six Thousand Seven Hundred Thirty-six and 50/100 Dollars ($36,736.50).
Thank you for your prompt attention to this matter.
Sincerely,
Assistant City Treasurer
CJ:ch
cc: vl~riberg Construction (Attn: Robin)
Public Works & Utilities
City Clerk
CiTY OF BREMERTON CHANGE ORDER
Page 1 of 1
Contract Change Order No. 1
Project Name Reservoir No. 4 Modification Orig. Contract Amt. $ $754,343.00 Days 120 days
Project No. R8370102 &420 Prev. Appvd. Changes $ N/A Days 0
Contractor Friberq Construction This Change $ 59,765.42 Days 189 days
Revised Contract Amt. $ 814,108.42 Days 309 days
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump
sum price agreed upon between the Contractor and the City of Bremerton.
Description of Changes Increase in (Decrease) Contract
Contract in Contract Time
Amount Amount Extension
($) ($) (days)
1) Work Change Directive No. 1 $6,888.50 N/A
2) Work Change Directive No. 2 $10,500 10
3) Work Change Directive No. 3 $2,904.95 N/A
4) Work Change Directive No. 4 $0 18
5) Work Change Directive No. 5 $6,524.88 N/A
6) Work Change Directive No. 6 $19,273.37 161
7) Delay Costs associated with suspension of work and $8,991.64 N/A
revision of scope associated with Work Change Directive
No. 6
8) Washington State Sales Tax (8.5%) for total cost 4682.08 N/A
increase
Totals $59,765.42 189 days
Net change in contract amount $59,765.42
increase or (decrease)
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price
specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in
work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order.
The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or
indirectly related to the approved time extension, required to complete the Change Order items. This document will
become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be
effective when approved by the City of Bremerton. I/
Recommended:-'"~d).. (' ~.~ ~ /Proiect Enqineer Date:
Accepted: Date:
WORK CHANGE DIRECTIVE
WCD # 1 PAGE 1 OF
PROJECT Reservoir No.4 Modifications PROJECT # R8370102
CONTRACTOR Friberg Construction Co., Inc. DATE April 2, 2002
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGES(S):
Provide geophysical testing per the attached proposat from Philip H. Duoos dated February 13, 2002
lone orientation option.) This special service wii[ be paid on the basis of time and material in accordance with
Section 00800 - SC 11.01 .A.5.
ATTACHMENT(S): Proposal from Philip H. Duoos for Ground Penetrating Radar dated February 13, 2002
If a claim is made that the above change(s) have affected Contract Price or Contract Times, any claim for a Chart.ce
Order based thereon .,vii[ involve one or more of the methods of determining the effect of the change(s) identified
below. Depending on the contract format, any Change Order resulting from this instrument will be executed in
accordance with Section 1-0.4.4 of the WSDOT Standard Specifications. or Articte 10 of the General Conditions
CONTRACT PRICE AND TIME IMPACTS DETERMINED BY:
[] Lump Sum Increase (De~-ease) in Contract Price is: $
increase (Dec'ease) in Contract Time is:
.... OR ....
[] Unit Price Estimated* Increase (Decrease) in Contract Price is: $ 6.888.50
r~ Time & Materials Estimated* Increase (Decrease) in Contract Time is:
[] Other
*Estimated Price or Time shall not be exceeded without further authorization.
CFFY~ CONTRACTOR ACCEPTANCE:
C,TY ENG, NEE~ ~ ~
'. p'~I,L~ H. Duoo$ GEOPHYSICAL CONSULTAKT
Februar~ 13, 2002 Our Ref: 549-02
Mr. Paul Wandeding
City of Bremer~on ~ ~ C
Public Works
3027 Olympus Ddve
Bremerton, WA 98311
Cit~ 0F 8RE~1'0h~
PROPOSAL: Orouna Penetr~tJng Radar Inves~gation
Reservoir No. 4, Bremerton, WA
Dear Mr. Wancleding:
Thank you for your c~ll yesterday regarding the ground bene~tJng r~dar (GPR) surYey for the Reservoir
No. 4 project in Bremerton. I underst~cl that you are interest~ in Ioceting voids below the concrete
slabs (estimated at I 0-inchss thick) over an area about 83,000 square feet in size. I have been using ~he
GPR quite a bit lately in cietec~ng air-tilled voids directly below ~ncrete sl~bs because of last year's
ea~hqu~ke (Boeing Field, McChord Airforoe Base and numerous roac~wys). The GPR has been very
sucoeseful at detedJng shallow voids. P[ease note that anometies in the dat~ may also be c~use~ by
other features which have a similar GPR anomaly ss vokJs (suc~h as logs, boulders, and clay lenses).
You h~ve requested that GPR ciat~ be obtained along tr~nsect, s spaced 4 feet af:~rt- The GPR provides
information clirec~ below the t~nsducer, so this spedng may not detect voids smaller ~an 4 feet in aeaal
ex~ent. If time allows, additJona[ transoms will he run in areas v~th known d~mage anct/or areas with
anomalous GPR ci.~ta that we observe in the tie!ci reco~s. Base~ on similar projects, the main item of
contra for these types of pmbtems is concrete ovedying an air-fii~J void. Therefore, the GPR cJat~ will
be g~t~ered using a high-,~quency (~0 ~Hz) ~n~ucer to provide the resolution required for dete~ng
voids directiy below the concrete slab. A~though the ~00 ~Hz tmn~ucer provides high resolution, its
depth penetration is usually limited to a few feet or less. Initial fieid activities will include establishing
reference I:~seJine~ marked ~t 10-foot intervals over the are~ using t~pe measures a~ spray p~int
The~e b~selines ~11 allow me~o aca~teiy loc~te the survey linss~ and will provkle a reference for future
Limited confimation drilling using a 1-inch diameter rotohammer is recommencle~ to confirm the
field interpretation of shallow ~icis. Dri~ng will stop once the concrete has been penet~ted, and the
thickness of any voids will be probed ar~ messured. The holes ~il be ~eady mark~ and will be filled
~ Quikrete. I have planned on about 4 hours for field work for the drJIling which should allow for
completion of ~bout 18 drfllholes.
The following paces and mett~JoJog~ assumes that we wiJl h~ve ~e~r access to the surface (no
obstructions, equipment etc.)~th no delays, and one field he!per ~11 be provided by the City of
Bremerton to assist in establishing the reference baselines an~ to be present for hea~ and safe~ issues
as the work will be perform~ on the sloping slabs. The ~te of progress in the field has been estimate~
conservat~el¥ at 1000 linear feet of GPR ~nse~ per hour, and assumes that the sl~bs c~n be
on. If the slabs are so slipbe~/as to prchibit walking, a system using ropes will need to be rigged so that
the GPR antenna c~n be pulled up and ctown each slab[ perpendicular transects may be more difficult to
perform. Rates of progress on a slippery surface are dKrficu~ to estimate now, but should be close to the
1000 ~f/hr. estimate. A few h~rs work ~t the site '~il provide a ~earer i~ea of the difficulties the site
presents and the rme of progress.
PBn.n~ H. Dooo~ 13503 NE 78TH PI,ACS, RED~OI~W, W~SI=~rGTO~ 98052
~/r.~:: (425) 882-2634 E~u~,: O~OF'~a"-&~.OL.COM
Cost Estimates
One Odentaticn (4-foot sparing, about 15,600 linear feet of t~ansect)
Mobilization, tz-avet: = $ 400.
GPR Equipment 3 days @ $ 280. = $ 840.
Hotel, food 3days @ $ 90. =$ 270.
Reference BaseJines: 5 hours @ $ 80. = $ 400.
Equipment Setup 1 hour @ $ 80. =$ 80.
GPR Field Surveying 16 hours @ $ 80. = $ 1,280.
Shallow Ddliholes 4 hours @ $ 80. = $ 320.
Interpretation 16hours @ $ 80. =$ 1,280.
Report, mappreparatien- 14hours @ $ 80. =$ 1.120.
Total: =$ 5,990.
Two Odentatidns (4-fcot spac~g, about 31,200 linear feet of transect)
Mobilization, bravet: = $ 400.
GPREquipment 4days @ $280. =$ 1,120.
Hotel, food 4days @ $ ,cO. =$ 360.
Reference Baselines: 5 hours @ $ 80. = $ 400.
Equi~"nent Setup 1 hour @ $ 80. = $ 80.
GPR Field Surveying 31 hours @ $ 80. = $ 2,480.
Shatlow Ddllholes 4 hours @ $ 80. = $ 320.
Interpretation 31 hours @ $ 80. = $ 2,480.
ReporL map preparation 16 hours @ $ 80. = $ 1.280.
Total: = $ 8,920.
The use of ground penetha'dng radar t~picaliy provides good information on the location of voids and other
buried objects. However, because of the numerous variables involved in any geophysical inves§gation,
there is a possibility that some subsurface features may not be detected. Additionally, small voids
(perhaps less than 1-inch thick) may not be detected. As with any geophysical method, only direct
observations using borings or or,her means can ultimately characterize subsurface cond~ons, using the
geophysical results as a guide.
Please feel free to contact me ,--'t (425) 882-2634 or cell phone (425) 765-6316 if you have any questions
or comments regarding the proposed scope of work. I look forward to helping you on this very interesting
project_
Resp,e~'f~ly submitted,
Philip FI. Duoos
Geophysical Consultant
Attachment
GROUND PENETRATING RADAR
Sorr~ of the uses of GPR include Ioceting buried tanks and dn~ms, delineating boundaries of landfills and
t~enches, and defining voids and geologic stratigraphy. AJthough other tednniques can also provide this
information, GPR is less affected by cultural interferences such as overhead powedines, buildings, and
fences. GPR can also provide higherresolution of the target in many cases.
The antenna can e~er be moved menuatly by an operator or towed by a vehicle. Depths of exploration can
vary widely, from less than a few feet i~ water-saturated clayey materials to hundreds of feet in gladal ice. A
vadet7 of antennas (ranging from 15 MHz to 2 GHz) can be used depending on subsurface conditions and
the objective of the survey. Res~lutid~ of shallow objects requires higher frequencies, while lower
frequencies work better for deeper investigations. The profile recorder supplies the power and synchronizing
signals to the antenna. The antenna outputs a pulse of elect~'omagnetic energy to the ground. The energy
pulse is reflected by geologic layers or objects under the surface back to the antenna. The antenna converts
the pulse (nanoseconds in duration) to an analog signal (tens of milliseconds in duration) back to the radar
unit. The signal is then pro~ and sent to a graphic recorder whic!n creates a continuous profile of the
subsurface reflectors.
Several factors can affect, the effectiveness of the GPR method including reinforced concrete at the surface,
the presence of highiy conductive materials (such as clays and water), the size, depth, and physical property
of the target and; in strafigraphic investigations, U~e conductMty contrast between ~l,airJgraphic units. The
presence of numerous buried objects may mask objects and/or sh,~lJgraphy below.
7
GEOPHYSICAL CONSLrLTa, NT ,) ,~!?;~!!i ~,. ~11
I have over 16 years of experience, a_nd have been providing geophysical services exclusively for the
en,Aronmental and eno~neering community since I earned my de~ee in Geophysical Engineering fi.om
the Colorado School of Mines. I have investigated more than 300 sites, ranging from Superfund sites
in the Southeast to landslides in the Northwest. I have a w/de range of' expertise with most of the
geophysical techniques applied to shallow investigations mcludLng seismic refraction, DC resistivity,
grmmd penetrating radar, elecl~-om ~agnetics, m ~agnetometry, borehole geophysical logging and
vibration monitoring.
I use time-proven methods that are constantly
updated as newer technolo~ is available. My
years of experience at a variew of sites provide a
special insig, ht into the subsm-face problems that
confront my clients and the geophysical
solutions that can help them. The reformation I
provide is invaluable for their site evaluations and
the planmng, desigu and development of thei;
projects. As a specialist I have the experience and
knowledge to ensure that the project objectives
are met using the most effective and efficient
geophysical techniques - t~Miques that are rapid.
accurate, non-destmcrive and cost-effective.
ENG~'EERLNG PROBLEMS OFTEN
ENVIRONMENTAL SITES CAN BE
AiUSE BECAUSE OF LrNICNOWN SUBSURFACE
PO2:'LDLY ASSESSED USEN'G GEOPHYSICS. CON-~[TiONS. GEOPHYSICAL METHODS
B LT,~ED DEBTS PRO x,'~,E CONTFNRJOUS AND DETAILED
PrPELENT
PROFT_ES OF TI~E EARTH.
BUR;ED DR~FMS ; · '
ELECTROMAGNETIC DATA CONTOL~. 3LAP GROLTWD PENETR_a,.TING P~I).41t PROFILE
SLq3SURFACE ELECT~CAL PROPERTIES ~ ~ LOCATIONS OF L~ERGROL~D UT~I~S,
~LAPPED OVER A LARGE SITE T0 TARGET S~LOW ROCK , ~ ~L, A~ OT~R
PROBLEM A~AS. TEST PffS AND BO~'GS CON~ITIONS CAN BE DETE~M~ED BEFO~
PLACED AT 0P~[ LOCATIONS, PE~0NSEL.&N~ EQUIP~T~VE ON SITE.
%~ILE AVOID~G PIPES A~ OTHER
PHILIP H. DUOOS GEOPHYSICAL CONSULTPuNT
Phone,,'fax: (425) 822-2634 geopyg@aol.cam 13503 NE 78th PLACE, REDMOND, WA 98052
7
West East West ~ast
Profile Showing Pipe & Geolo~' ~ Crossline Over Tank
Some of the uses of Ground Penetrating Radar
(GPR) mctude locating buried tamks, pipes and
drums; del/nearing boundaries of landfills and
trenches, defining voids and slxatigraphy; and
locanng non-metallic objects such as plaSnc,
clay' and concrete pipes and buried foundations.
GPR is less affected by cultural interferences
such a~ overhead powerlJnes, buildings and
fences, wkich may limit the use of other
geophysical methods. GPR can also provide
k/~er resolution of the target in man3,' cases.
The antenna can be moved manually by an
operator or towed by a vekicle. Depths of
exploration can vary.' widely, from just a few
feet m saturated clayey materials to over a
hundred feet in dry, sand and gravel deposits. A
vane¢' of antennas (ran~g from 15 MHz to 2
GHz) are used depending on subsurface
conditions and the objectives of the survey.
Resolution of shallow objects requires higher
Ground Penetrating Radar System frequencies, wb_/le lower frequencies are better
in Field Portable Cart; 500 MHz Antenna for deeper investigations.
Phili H. Duoos Geophysical Consultant
PM:ax: (425) 882-2634 Emal: geopyg@aoLcom 13503 NrE 78th Place, Redmond, WA 98052
¸i'
FOUNDATION EVALUATION
I
~ ~ ', ' ~ ~; [-~-':[-k~ ~Ground Pene~ating Radar
] s~eys can provide hi~ r~olufion of
I shallow f~ such ~ rebar, conduiL
~:; .... , ~ ~ ~:~?: ~::~; -;. ~.~ .~; ;{~ic~s of cOncrete sl~s ~d pavemenh
:~2'~ '-?{~:~::~:'¢.:~?:?:]:~::::F% fox.on desi~, flaws in concrete
m~es. and vol& be] ,labs.
PHILIP H. DUOOS GEOPHYSICAL CONSULTAN'
Phone/fax: (425) 822-2634 geopyg~aol.com 13503 NE 7$th PLACE. REDMOND. WA 98052
WORK CHANGE DIRECTIVE
WCD # 2 PAGE 1 OF
PROJECT Reservoir No.4 Modifications PROJECT # R8370102 & 420
CONTRACTOR Friberg Construction Co., Inc. DATE June 21, 2002
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGES(S):
#1. Instalt Reservoir Inlet at grades shown in the Contract Plans. Raise the floor height of the Reservoir to match the
top elevation of the 30 inch ductile iron 90 degree bend. This will require placement of approximately 75 cubic yards of
class 3000 concrete and 8 hours of manual labor. This cost of this work change is estimated not exceed $7,000
and will be paid on a time and materials basis. See RFI #13.
#2. Install CDF backfill to mid-line of the transmission main. This cost is estimated not exceed $1500 and will be
~aids on a cost of material basis.
#3. Shift drainline outside tunnel portal further north and extend drainline through/beneath valve house footing to a 90
degree bend as directed by the Engineer. This shall be a no cost change in condition. See RFI No. 8
¢4. Remove additional concrete from tunnel floor to meet clearance requirements. Payment will be based on labor and
equipment hours. Payment is estimated not exceed $2000. See RFI No.9
#5 Contract time will be extended 10-days for all contract issues, misc changes of condition and all possible related
delays to the date of this work change directive.
ATTACHMENT(S): RFI Log No. 8, No. 9, No. 13, and Engineers Estimate
If a claim is made that the above change(s) have affected Contract Price or Contract Times, any claim for a Change Order
based thereon will involve one or more of the methods of determining the effect of the change(s) identified below. Depending
on the contract format, any Change Order resulting from this instrument will be executed in accordance with Section 1-04.4 of
the WSDOT Standard Specifications, or Article 10 of the General Conditions
CONTRACT PRICE AND TIME IMPACTS DETERMINED BY:
[] Lump Sum Increase (Decrease) in Contract Price is: $
Increase (Decrease) in Contract Time is:
.... OR
[] Unit Price Estimated* Increase (Decrease) in Contract Pr[ce is: $ 10,500.00
['~ Time & Materials Estimated* Increase (Decrease) in Contract Time
is:
1
0
days
[] Other
*Estimated Price or Time shall not be exceeded without further authorization.
CITY APPROVAL: CONTRACTOR ACCEPTANCE:
dITY E-N~INEER
CITY OF BREMERTON
REQUEST FOR INFORMATION
' ~ Log No. ~ (Unique, Chronological)
Project Title: Reservoir Nc. 4 Modifications Project No.: 1520319
Contractor: Friberg Construction Co., Inc. Contract Date: 3-20-02
(For Contractor's Use)
Date: 5-13-02 Subject: Valve House Drain Route Conflict
InfoFnet[on Descript[0n: There is a discrepency in distance of 30" from wall to _
pipe cn page S-3 to S-4. S-3 is larger and tkat c!earence is necessary for
pipe installation in tunnel. S-4 (no dimension)shows pipe tighter to
tunnel wall and t~,ez~fo=-e,tee/v&lve/fitti---gs pkysical size fitting% within
proposed valve house footprint. The larger dimension (S-3) would put the
drainline underneatk tke existing and new va!:e house footings.
Proposal; Extend drain!ine through (or beneaSk) & via sleeve tca pre-
de%ermined distance outside the footing edge before making the 900 bend.
Ccntrsctods Author'zed S[gn~-ture:
(For 0wne/s ""~i
Information Description:
Owner's Authorized Signature: -'~'"'"-(---- ~
Page I of ¢3 Dis~ibution: 1. Contractor
2. Inspector
~..~~ CITY OF BREMERTON
REQUEST FOR INFORMATION
-:- Log No. d~ (Unique, Chrono[og (mi)
Project Title: Reservoir No.4 Modifications Project No.: 1520319
Contractor: Friberc Construction CO.r Inc. Contract Date: 3-20-02
(For ContractoCs Use)
Date: 5-13-02 SubjeC4 Additional Concrete Removal On Tunnel Floor
[~fc~ation Description: =h_=e is additional concrete buried beneath pipe and
accumulated sediment. Does not allow for clearances indicated on plans.- ,
Needed to be removed to complete tunnel f!ccr Drep. ~'.5 days of equipment &
labor to remove.
Cent;scrods Authoriz~ Sienature:
,-or Owned~ Use)
Information Description:
Owner's Authorized Signature: ~ 6_~ ~
Page ~ of ~D Distribution: 1. Con~ctor
2. Inspector
07:57 FA.I ~0 ~84 ~177 FRIBI~G CONST__ ~00~/00~
CITY OF BREMERTON
REQUEST FOR INFORMATION
LoG No. / i ~ .(Unique. Chrenolocjic~l)
Project Tiffs: Reservoir 4 Modifications Pro~¢t NO,: R8370102
C~NtA'~'~Sr: Friberg Constr~cti°n Co Inc. Contract Date: 4-1-02
(For Con~a~oCs Use)
Date: 5-15-02 Subject. Change of conditions re: .Drain kine
Information Description: -
Upon closer review of the existing outlet at reservoir bottom, it appears
that the 16" pipe to have approximately 12" of cover and to be 24"-26"
deep (invert). This represents a difference in the relationship between
the reservoir fl6or bottom and t~nnel bottom, as represented on page C-3.
This change in conditlon!will require modification of the outlet drain
detail, elevation of pipe beneath the reservoir floor, excavation of pipe
within the tunnel and possible footing modifications. Due to the severity
of tkis issue and how it affects our schedule, a timely response would be
ap~rec~a=ed~to minimize further disruption o~ work in progress. This
change will result in a time extension and that amount can be determined
cnce the extent of the modification is established.
DistdbutJon: 1. Contrac~r
Pa~e , of 2. Inspector
3. Project File
oE
WORK CHANGE DIRECTIVE
WCD # 3 PAGE 1 OF
PROJECT Reservoir No.4 Modifications PROJECT# R8370102
CONTRACTOR Friber~ Construction Co., Inc. DATE June 7, 2002
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGES(S):
r'rovlae Co man nours [o asses[ in suusurl~ce tnvesugauorh ~[~ure~se ume requlrea for sugsurl~u~ ~nve~ug~uun to ~z.o nour~
nf
su~ey work and 1/2 day of GPR equipment.
ATTACHMENT(S): Force Account Report Dated 4/19/02 to 4/25/02
If a claim is made that the above change(s) have affected Contract Price or Contract Times, any claim for a Change Order
based thereon will involve one or more of the methods of determining the effect of the change(s) identified below. Depending
on the contract format, any Change Order resulting from this instrument will be executed in accordance with Section 1-04.4 of
the WSDOT Standard Specifications, or Article 10 of the General Conditions
CONTRACT PRICE AND TIME IMPACTS DETERMINED BY:
[] Lump Sum Increase (Decrease) in Contract Price is: $ 2,904.95
Increase (Decrease) in Contract Time is:
.... OR ....
r~ Unit Price Estimated* Increase (Decrease) in Contract Price is: $
[] Time & Materials Estimated* Increase (Decrease) in Contract Time is:
[] Other
*Estimated Price or Time shall not be exceeded without further authorization.
CITY APPROVAL: CONTRACTOR ACCEPTANCE:
CITY E'NG~NEER (
06/05/02 15:19 F~,~ 380 384 3177 FRIBERG CONST ~003
PROPOSED WORK CHANGE DIRECTIVE
WCD# 2 PAGE OF
PROJECT Reservoir No.4 Modifications PROJECT #R8370102
CONTRACTOR Friberg C~nstruction C43., Inc. DATE May 5, 2002
Additional GPR surveying and c~nfirmator7 drilling performed by Philip H. Duoos in accordance
with the attached invoice dated 5-1-2002.
Additional labor performed by Fdberg Construction Co., Inc. to perform the concrete repairs.
Philip Duoos 12.5 hrs. Labor $1,000.00
Philip Duoos ½ day of Equipment 140.0..0
$1,140.00
Markup 15% 171.00
Total $1,311.0O
Friberg Construction Co., Inc.
David Chavira -Laborer 38hrs. X35.14/hr. $I,265.04
Markup 20% 253.01
Subtotal $1,518.05
Bonding & Insurance 5% 75.90
Total $1,593.95
ATTACHMENT(S): Invoice from Philip Duoos dated 5-1-02
We propose the Contract Price be increased by $2,904.95
~6/0.~/02 15:19 FAI 360 384 3177 FRIBERG CONST
"· ,~r R~ ~9~2
May.t,~2 '. . : .
~a ~.~,; · ......-
~e~e; W~4~-......
.: [~M:~C~ ...'~= SUwey.
. ~. w~
' ~ ~,~;~ me ~ f~me p6~ ~119- ~, 2~2 in~u~i~g
pfi~~ ~:S~yi~g)' ~.5 bm. ~ $ 80.. =$3,080.~
Pfin~[~p~si~'l~n) 7.0 bm. ~ $ ~.' =~- ~.~
G~ph~[:.~quip, ~ $u'pp[~es . ' 3.5 daTs .~ ~80. = $ 980.~
Hb~I'& f~' ' = $ · 259.t8
= $ 4,879.18
~POSTEDa=~-~
DATE POSTED
~CT. CODE
,TE PAiD
WORK CHANGE DIRECTIVE
WCD # 4 PAGE 1 OF
PROJECT Reservoir No.4 Modifications PROJECT# R8370102
CONTRACTOR Friber~ Construction Co., inc. DATE June 24, 2002
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGES(S):
Add 18 additional days towards substantial and final completion due to delays in submittal review of
the liner and design modifications in the floating cover
ATTACHMENT(S): Letter from NW Linings dated 7/22102
If a claim is made that the above change(s) have affected Contract Price or Contract Times, any claim for a Change Order
based thereon will involve one or more of the methods of determining the effect of the change(s) identified below. Depending
on the contract format, any Change Order resulting from this instrument will be executed in accordance with Section 1-04.4 of
the WSDOT Standard Specifications, or Article 10 of the General Conditions
CONTRACT PRICE AND TIME IMPACTS DETERMINED BY:
E~] Lump Sum Increase (Decrease) in Contract Price is: $
increase (Decrease) in Contract Time is:
.... OR ....
r-] Unit Price Estimated* Increase (Decrease) in Contract Price is: $
[] Time & Materials Estimated* Increase (Decrease) in Contract Time is: 18 calandar days
[~ Other
*Estimated Price or Time shall not be exceeded without further authorization.
CITY APPROVAL: CONTRACTOR ACCEPTANCE:
.
-CITY ENGINEER ~
SEN' BY: NORTHWEST LENIN~B & 3EOTENT]zE ~S 872 O~&B; J~L-22-02 B:2~PW; mAGE ~ 3
NORTHWE LININGS
GEOTEXTILE PRODIICT$ Inc.
21000 77th AVE. SOUTH
KENT, WA 98O32
253-872-0244
FAX 253-872-0245
Ju~¥ 22, 2002
Friberg Construat[on C~ ~r''''L t
2628 Thornton Rd.
Femdele, WA 982~.8 v~ fax: 360-3~3177
2 pages
RE: Reservoir ~ ModiF. cations- Ci~of~reme~on
Dear Mr 8~dwir,
Attached :lease fnd · summary o¢ da~s ~na occNrrer, css '.ha~ ~as discuses3 in the July g
comstructlen meeting ,a Ih Fr b~ Con~uc ion, ~e Ci~' of Er~memon ard No~hwest
The follow'ng items and mates h~d ~he most impact on thc ~"acula for c~nst~c~ng the liner
floatin~ cove':
· Mardel ~preval: 3~ ca?s from ~e subm~al of the ;~m~ materi~l (4-9-02) undt verba,
acceptamcm was ~ived on (~t~2). In :he c:n~:rum~n meeting on ~-g-02 aH
were mace ~w~e oF the need to ~t an a~prov~i on the m~:edal as quickly as posmbie
time ~bwed for a submi~a review is (ypic~lly 14 mays a~ m~s: 30 this d~Jay accounts for a:
Mee~g Scheduling: ~e final ~eefing to review the suzm ~tai 2acka~e was delayed by
ci~ or ~e engineer ~m 6-I0~2 [c 8-13-~2. Nommwes; L[mnGs did ~, s ~est to
sched~;ng of '~e mae rigs anm u~ers:ands the d ~it'z o= 9a~timg muldmte pe~ies to~etmer
but th~ im~ '.o ~he 5chiCle wss 3 Ca~ of Geia~. to th~ ....... fa~n~uon sohO,Jla.
Final a~lgn chang~ and ~iew: Ac ecd~tio~ai 5 ~o; cm.,s rrcm 5-~0-02 untd 5-z~-02
devoted to ~ina~ desJg~ oF the cow fica ca~ern by MWH qc~wes= L~n~mg~ ha~ :o stop
f~bri~on cou~d c=ntinue.
· Weather: Due :o wind ~d ~in ~ 5 severete days NeCroses[ L]~ n~s w~s no acie to safe y
work on the liner ~ co,er at the site. Even sm~Ji amour ts 2f :recipitaticn or fog ma~e it very
difficult to pe~c~ f~e installation ~ the steep slopes
Nodhwe~tUnings We have been able to make some oF :he css us but not ~ll. Pease review
~he at~cheC shee~ a~d ~ f you ~ave any questions r~r:~n: the items outiinec
Sincerely,
~'K~rk Liileska~
Cc: Lance Frlme~ fax 360-373-8755
WORK CHANGE DIRECTIVE
WCD # 5 PAGE 1 OF
PROJECT Reservoir No.4 Modifications PROJECT# R8370102
CONTRACTOR Friberg Construction Co., Inc. DATE 9/30/02
YOU ARE DIRECTED TO PROCEED PROMPTLYWITH THE FOLLOWING CHANGES(S):
1. EIectrical Exploration for conduit not shown on plans
2. Extra chlorination required as per AWWA Standards.
3. Additional sawcutting for unexpected depth of concrete.
4. Surface prep of stairs after change of conditions.
5. Square nut for operation of seismic actuator.
ATTACHMENT(S): Force Account Sheets
If a claim is made that the above change(s) have affected Contract Price or Contract Times, any claim for a
Change Order based thereon will involve one or more of the methods of determining the effect of the change(s)
identified below. Depending on the contract format, any Change Order resulting from this instrument will be
executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General
Conditions
CONTRACT PRICE AND TIME IMPACTS DETERMINED BY:
[] Lump Sum increase (Decrease) in Contract Price is: $
6,524.88
Increase (Decrease) in Contract Time is: 0 days
.... OR ....
[] Unit Price Estimated* Increase (Decrease) in Contract Price is: $
E] Time & Materials Estimated* Increase (Decrease) in Contract Time is:
[-'] Other
*Estimated Price or Time shall not be exceeded without further authorization.
CITY APPROVAL: CONTRACTOR ACCEP'[ANCE:
CITY ENGINEER f ~.
FRIBERG CONSTRUCTION COMPANY INC.
FORCE ACCOUNT SHEET
Project Name Bremer~on Reservoir #4 WCD #5
Supe~isor Name Lance Friber~ item #1
Owners Representative Jon Sellar
Date 7/8/02
Task Electrical F-xpl0radon
I L aOR 1
Name Trade Hours Scale S Total Total
Ron Zwick DP 3 $42/I 1 $126,33 $151.60
Josh Koogle Lbr 3 $35.14 $105.4.2 $126,50
Rob Smith Lbr 3 $35,14 $105.42 $126.50
$0.00 $0.00
$0.00 $0:00
$0.00 $0.00
EQUIPMENT
Equipment Description Hours Scale S Total Total
555B Backhoe 3 $27.50 $82.50 $94.88
1 Ton Truck w/Tools 3 $12.00 $36.00 $41.40
Compressor & Hammer 2 $20.00 $40.00 S46.00
Core Ddll I $65.00 $65.00 S74.75
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
I MATERIAL I
Material Description Quantity Unit Unit price S Total Total
Bainbridge Eiectdc 1 $562.00 $562.00 $590.10
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
I ICra.d total with OH/P, No WSST included I
I COMMENTS: I
Explorator,/investigation to identJf,/locations of exist~n~ conduits around reservoir, CCF and old pump house.
Remove sasphalt fTom covered J-Boxes and restoration.
Owners Approval by:
Contractors Approval by:.
Sub-total:
Taxx: 5.15
A L~qQER FONT ¢01~' OF THE TEllS AND CONDITIONS IS AVA]].,ASLE UPON REQUE~?.
02.4.g-o2 Bid Summary
JOlt: 071~0201 llt~rvior ~4 ~nd~ ~d ~-~le
B~bd~e ~d
~id l~m~ha~ ~n~on ~r S~r L~r H~ ~r C~ M~ Co~ ~r $ Ouo~
To'r.~ ~OM T~OFF $4~33 9,7 $~1 $0 $0
Ta~ff AdJ~a~ ~ 0.~ 0.~ l.ao 0.00 o.00 0,00 l:00
T~offAdj~nt ~t ~.~ 0.~ S0.00 $0.~ $0.00 $0.~ ~0.00
.~ T.~F~ ~O~ $4~3 ~.7 ~68 ~ $0 S0 $468
Bid Quos, Adj~ ~d M~ps:
T~ Ven~' Qu~: o.~ So
T~ ~nmn' Qu~ o.oo
T~ ~e~ Con~o~: o.oo ~o
~e~ S~ez T~ o.oo so
Bid ~d: o
$562
To~ Bid ~:
1 o~1 Pages
FRIBERG CONSTRUCTION COMPANY INC.
FORCE ACCOUNT SHEET
Project Name Bremerton Reservoir ¢~4 WCD #5
Supervisor Name Lance Fdber~ Item #2
Owners Representative Jon Sellar
Date 7/25/02
Task Chlorination
I L~O. I
Name Trade Hours Scale S Total Total
Lance Fdberg FM 12 $45.42 $557.04 $668.45
Josh Koogte Lbr 10 $35.14 $351.40 $421.66
Dennis Hall Lbr 10 $35.14 $351.40 $421.68
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
I EQUIPMENT I
Equipment Description Hours Scale S Total Total
$0,00 $0.00
$0.00 $0.00
$0.00 $O.O0
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
I MATERIAL I
Material Description Quantity Unit Unit price S Total Total
US Filter - Chlodne 400lbs 16 $97.50 $1,560.00 $1,794.00
US Filter - Shackle Clamps 1 1 S42.80 $42.80 $49.22
Kitsap - Hose & Trsh Can 1 1 S31.27 $31.27 $35.96
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
I lerand total with OH/P, No WSST included I $3,458.8q
I COMMENTS: I
Treat and inject additional reservoir water volume to a residual level in access of 50 PPM for 550,000 ~als.
Owners Approval by:
Contractors Approval by:.
302 129108 I ohnny L Spencer 6/t9/02 8488296
DISTRIBUTION GROUP
USF - Puyallup WA Remit to:
Branch - 302 US FILTER DISTRIBUTION GROUP
602 Valley Ave NE FILE 56214
wA s8372 INVOICE LOS
253/840-5505 90074 623
Shipped to: ~Fotal Amount Due
FILIBERG CONSTRUCTION CO INC 16/028 SHiP TO 1650 3RD AVE l 635.93
ACCOUNTS PAY3LBLE BRE~----ETON, WA
PO BOX 1406
~'.~TDA.L~ ~A 98248 1406
CUSTO.u--~--R JOB- 001 BRE~ERTON #4
Thank You For The Opportunity To Serve You.
Return Top Portion With Payment For Faster Credit We appreciateyourpromptpaymen&
Date Ordered Date Shipped Customer PO No. Job Name Job No. Bill of Ladin~ Shipped Via Order
Numb¢
6/!7/02 6/18/02 0201-01 8RE/~ERTON g4 001 / [OUR TRUCK 8488288
Product Code ~ Description I Qua~dty Quantity I Back-
Order:d Shipped Ordered Price Amount
0504040 *-~ ~4 PVC $CE40 PIPE SWB 20' 1.DADO0 ~* ss.;o
SOLVENT WELD BELL '
13!2H$ISTADS ~< 12 ADS SEE 85 SOILTIGHT PEPE 4.04000 =~T 242.40
96CHL025 ~.t~ 25# BUCKETS CHLORINE GP~aN~JLES 97.50000
3607FB500 ~ FB500-3 3/4 Bg-LLCORP MIP)LM. ip 14.62615 '~A 14.~3
APPROVED
Accr, CODE
DATE PAID
CHECK #
Terms Subtotal
NET 30 635.93
Freight Delivery Handling Restock Misc Tax Invoice635 Total
***** THANK YOU FOR YOUR ORDER *****
BY REQUEST, USF PO# TO MATCH VENDOR PACKING SLIPS IS
Please pay thls amount
NOW ON THE FIRST LINE OF DIRECT INVOICES.
Johnny L Spencer 253/840-5505
USF - Puyallup WA
602 Valley Ave ~TE Page: 1
PuyalluD WA 98372
water =o~.~ Invoice: 8488296
...'fairing care of the world's ~¥~ter. '
USF - Puyallup WA DU~LZCAT~ I~emiti-n:
~ranch - 302
Puyallup WA 98372 FILE
253>8~0-5505 F&X Copy 900?4- 62i,
S~vp~d to: To~I A~nt~
ACCO~ ~ ~o~, w~
CUSTO~ JOB- 001 B~MERTON
Return Top Potion ~h Paint For Faster Cred~ r~k You ~r T~e Op~o~ny~ ~o Se~e You.
We appre~ete ~ur prompt ~ymen~ .
i~ ,,m~ an,ppcu ~yu No~} Job N~ Job N'o~ ~ ~8594310
9608SC 8 ~HACKLE CL)~P 2 1 42.8oooo
I
Terms Sub~hd
] l:rc~ DoHvc~ Handling R~ ~ '1~ Tnvoi~ To~{ --
'"" ~K ~OU FOR YO~ 0~
B? REQUEST, USF ~ TO ~T28 V~DOR PA~ING SLIPS Is Please
NOW ON ~E FIRST LI~ OF DI~CT ~OICES.
~y~is
amount
Jo~y L Spencer 253/~0-5505
~,.=~ - ~oz Distrib~on Group DUPLI~
..t~ng ~ ~e ~ ~ter [nvo i c c ~ 85943 ! 0
FRIBERG CONSTRUCTION COMPANY INC.
FORCE ACCOUNT SHEET
Project Name Bremerton Reservoir #4 WCD #5
Supervisor Name Lance Friber~ Item #3
Owners Representative Jon Sellar
Date 7/25/02
Task 2" Op-Nut
L Bo.
Name Trade Hours Scale S Total Total
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$o.oo $o.o0
$0.00 $0.00
$0.00 $0.00
EQUIPMENT
Equipment Description Hours Scale S Total Total
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
MATERIAL
Material Description Quantity Unit Unit price $ Total Total
US Filter- $0.00 $0.00
2" Operator Nut for 8" BFV 1 1 $60.00 $60.00 $69.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
COMMENTS',
2" op-nut for 8" BF valve due to below grade application,
Owners Approval by:
Contractors Approval by:
302 229108 Johnny L S~=C~= 7/26/02 8534.
USF - P'-~Y~lluD WA R~t ~0:
Branch - 302 ' D~LI~
602 Valley Ave ~ ~OICE US FILT~ DISTRI.~iO~ GROU~
~yallu~ WA 98372 FI~ ~6214
2~/s4o-~0~ 90074 6~
S~ ~o: ~
%~01 ~00S~T ~L~
~IBER~ CONS~ION ~ INC ~I~ T0 16S~ ~ A~
ACCO~S PAY~
F~E WA 982~8 1406
Terms Subtow.1
~T 30 60.00
Freigk[ Delivery B'a'nd~illg }Wise Tax Invoice Total
60,00
FRIBERG CONSTRUCTION COMPANY INC.
FORCE ACCOUNT SHEET
Project Name Bremerton Reservoir ~ WCD #5
Supervisor Name Lance Fdber~ Item #4
Owners Representative Jon Sellare
Date 6-3 & 6-4-02
Task Additional Saw Curing
Name Trade Hours Scale S Total Total
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0,00
$0.00 $0.00
t EQUIPMENT
Equipment Description Hours Scale S Total Total
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
MATERIAL
Material/Subcontractor Quantity Unit Unit price S Total Total
Pennisula Concrete Cutting 0.5 0.5 $2,989.00 $1,484.50 $1,558.73
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
[ 16rsnd total with OH/P, No WSST included I $1'589'901
I COMME.TS: I
Additional saw cutting required due to add~onal depth in reservoir floor bottom.
Owners Approval by:
Contractors Approval by:
Invoice
PENINSULA CONCRETE CUTTING, INC,
! [~ \ / \\ I P.O. BOX1136
\~/~ ~--~/ PH 360) 683-7070 FAX {360) 683~484
~LIC, PEN i~CO5~P
61312002 6603
Friberg Construction ~65G 3rd Ave
P.O,Box 1406 Bremerton, WA
Femdale, Wa. 98248
None ~ Net 75 Bremerton Resewior
Hydraulic wall sawi~ as aire~'~ed 2,969.00 2.969.00
Isee attached ticket. # 18220,20598-dated 6/3/0£,
20597-dated 6/4/02)
Thank you Lancel
DATE POSTISD.
.GL #
JOB #
APPROVED
DATE PAiD
Invoice Due 06/18/02 - Thanl~ You!'
: TOTAL ~ oo
, ,969.
FRIBERG CONSTRUCTION COMPANY INC.
FORCE ACCOUNT SHEET
Project Name Reservoir No.4 ModificaUons #R8370102 Bid Item #12
Supervisor Name Lance Fdber~
Owners Representative Jon SeUar
Date 6-27-02.
Task Stair Surface Prep
[ L~.OR I
Name Trade Hours Scale S Total Total
Rob Smith Lbr 3 $35.14 $105.42 $126.50
0 $0,00 $0.00 $0.00
0 $0,00 $0.00 $0.00
0 $0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
I EQUIPMENT 1
Equipment Description Hours Scale S Total Total
0 $0.00 $0.00 $0.00
0 $0.00 $0.00 $0.00
0 $0,00 $0,00 $0.00
0 $0.00 $0.00 $0.00
0 $0.00 $0.00 $0.00
$0.00 $0.00
$0,00 $0.00
$0.00 $0.00
MATERIAL I
Material/Subcontractor Description Quantity Unit Unit price $ Total Total
0 0 $0.00 $0.00 $0.00
$0,00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
IGrand total with OH/P, No WSST included I $129'03l
~- COMMENTS: I
Owners Approval by:
Contractors Approval by:
POULSBO: (360) 779-4431 PT. TOWNSEND: (360) 385-41 O0
SAINBRIDGE: (206) ~42-6100 BREMERTON: (360) 674-3131
TOLL FREE: 1-800-422-5010
WATER ADDED AT Concrete Tested [] Yes ~]o I LOT #
CUSTOMER'S REQUEST
-- ~s. = Z~ ~o~= Fred Hill Materials, Inc.
' ~:,t~ ~'-'~-'~Ad%_ P.O. Box 6
sig. of R~.-W=~,^*d~ POUlSbO, WA 98370
NOT RESPONSIBLE IRRITAT~ON TOTHE SKIN AND EYES ADDITIONAL WATEr{ ADDED TO THIS I 8 MINUTES PER YARdi
FOR VARIATION IN C~m~,~o~,~.~o~o~.~u.~ CONCRETE WILL REDUCE ITS /FREE UNLOADING TIMIM~
COLOR OR SURFACE
~m = ~r~y =~ ~.m ~. SEE SACK C USTO MER~ OWN RISK. ~e.
]
L1 [~iTER:~EC-[ [OH'AE:CESS OFF 3RD VE., ~Su:E PAI.L E:f3t~ IF ANY
~ ~S-IIONS**CALL lSf' iF CAN DELtVEREAR[ IER ..... . -
SHIPMENT SU~ECT TO CONDI~ONS ON R~ERSE SIDE.
.C21¢ 12~bO Lb I250 In To] 0.55 AJZ50 ;<] 9 o: ~8 in Tc,]
C200 5936 Lb 5900 In 7ol 5.0~'; A3~3 ~1 (<, oz 0 ~n ToI
%
,~ Tare Zero
Cement Target ~Tct ual
'' ........... ::-'-: I.Jc,~ e,- r.~rget Act ua'l Status
~250 2397 Lb 2480 [h~t Fo [ 'fa're 7e,'n
B;380LJ '~4 238 Lb 240 In 1-o]
. /v B2, E~SW *q. 4.2 Lb ~0 In Tol
' ' :Tare 42 ]'aYe Zero
WORK CHANGE DIRECTIVE
WCD # 6 PAGE 1 OF 7
PROJECT Reservoir No.4 Modifications PROJECT# R8370102
CONTRACTOR Friberg Construction Co., Inc. DATE 11/22/2002
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGES(S):
~rovide & install additional equipment as described in Attachment A and as shown in Attachment B, C & D.
~rovide additional instrumentation design and integration as described in Attachment E. Increase contract
Raise FLO-LOC Actuator up to 18" above the current design elevation using the extention platform
'ecommended by Beaver Equipment Specialty Company and shown in Attachment F.
ATTACHMENT(S): Attachments A, B, C ,D, E & F
If a claim is made that the above change(s) have affected Contract Price or Contract Times, any claim for a Change
Order based thereon will involve one or more of the methods of determining the effect of the change(s) identified
below. Depending on the contract format, any Change Order resulting from this instrument will be executed in
accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions
CONTRACT PRICE AND TIME IMPACTS DETERMINED BY:
[] Lump Sum Increase (Decrease)in Contract Price is: S 19,273,37
Increase (Decrease) in Contract Time is: 161 calendar days (1/31/03 completion)
.... OR ....
[] Unit Price Estimated* Increase (Decrease) in Contract Price is: $
[] Time & Materials Estimated* Increase (Decrease) in Contract Time is:
[] Other
*Estimated Price or Time shall not be exceeded without further authorization.
CITY APPROVAL: CONTRACTOR ACCEPTANCE:
ENGINEER
: Ps-rJI Wandting - RTtJ_IO-1.DOC . Page 1 i
Reservoir 4 RTU Additions
Tcm Baker, EIectronics Dept Beta: July 8, 2002
Additional inputs were requested ~ to be added to ~,TLL This document reviews
the cos~ for fie!d mocifications necessar/for the secsc inputs.
· Reservc[r High LeveE:
I. Instal112x12x~- NEMA 4 SS junction bcx on parapet wall with
existing 1" PVC into bcttom of it.
2. instail new Fiygnt ENM-10 float switch under resem/oir cover at J-
~cx, set at 6" below over flew.
3. Run new 1" PVC conduit cu~ bo~cm cf ,vireway in block building
~hru floor and ~nto s~gn~l j-~cx (box with 2-2" PVC conduits)
4. Full cu~ cid conductors in raceway ~c ~:cck building, pull new 16-2
STP 300 V pcwer imJted trey cable :3 ::[[ding, thru. wireway, into
i' PVC that fcr remote [/O t~at gees :c :unne~
5. Ccnnec:to RTU
· m/SS Fsii
L ~st~il Lsvitcn ~2120-001%/SS be~cv,, :¢~dn9 ~a~el in tunnel.
connect ;o ~,vo 30 amp c:,rcuit breake:;
2. Wire NO reis) con:acts tc RTU input
· S:te pc,,verfsJ~
Fvmp Cd~cff
1. Thts is same as Reser/cir~igh Leve: azove
· Seismic Valve Ou: of Sep¢ice
1. This is a ~ane~ oniy func:Lcc. No fief= m:cificadons are mecessaw
· Ceil to C:ose Seismic V~ive (7F~F}
I. 7his is a p¢~e~ c~y fu~cticn. Nc fie,~ %:dificat]ons are mecessaq
· CaJl to Cpem Seismic Vah, e (Arm:
t. This ~s a pace~ only fucc:icm. No fie;c m:difications are necessaw
WATEKSAVER COMPANY FLOATING COVF_~S
t~,
~ I'
I
WA~RSA~R COMPS, INC.
~ P,0, ~0X 1~4~5 DENVER. ~0. 80216-O~65 [303) ~85-1818 FAX (]0~)
!
D~TAIL NUMbeR: LNR2 [ DRA~N BY: ~C~
!
Technical
Sys[em$
AugUst 1, g002 Jc~ Nurnbe~. 6513
TO: Joe Baldwin, Fdbe~ ~nstruc~on Company
~ EFERENCE: R~e~oir N~.4 ~di~c~
0i~ of Br~eflon, WA
~U~CT; ~slgn Chs~ f~ submi~al review
Techni~ Systems, Inc. ~81) ~ ple~ed ~ pro~e ~ ~=~ for d~iGn c~nges ~ a result of the
subm~l review p~ for ~e ~ve referenc~ p~e~ ~e subm~ review
d~s ~n~n ~me c=~ll~ng ¢~mmen~, b~ J feel ~: th~ ~ De r~lved ~h telephone
conve~a~ns, ~d ncr effe~ our pndng. I ~1~ nets thst ~e r~ue~ to pro,de ~e ~olr ~ver
p~p o~ of s~¢~c~ i~i~den is no.ally ~ fun~n cf :he c~s ~fls and boo.er pumps that are
con~ll~ ~roush ~e SCACA system. Sines ~ese ~ ~ver sump pumps ~at ~e
by the SC~A sy~m ~s fun~cn will net be pro¢~ fn ~ ~ esfim~a.
~co~e cf OeSf~n C.h. en.oe
1. TS1 ~cds sn 8 ~git~ in¢~ ~rd to ~e RTU panel ~ ~lns~s and misc. ~rdware,
2. TS1 supplies addi~na{ ~n~ineedng dine fcr pan~ ~rk. pro~ming, and screen
development ~o
3. TSI sup¢lies add~onal shop labor for ~1 ~nt~i p~eis in c~er to i~omte design
chan~es.
Our cos~ for t~is change order will be
I will wait for an spproved Cange order before proceeding with work on fl~is project.
EO. E'c'x {~2412. K~nmore, WA 98028
(4~5) 3~. FA3((4Y_.~) 398~S70
11/14/02 11:38 FAX 360 3~4 3177 FRIBF~G CONST ~002
FRIBERG cONSTRUCTION COMPANY INC.
P.O- Box 1#~, Ferudde WA* ~9~ Plume 360-394-4369 / F~x 36~-3~1--3177
City of Bremerton
Reservoir No.4 Modifications
Explanation and Breakdown of Cost x:urr~d due to Three-Month Delay
When a project is bid Friben:j Construction allocates a certain percentage of our markup
to allow for indirect and overhead costs. The contract time to corrkolete plays an integral
part in the projected mark-up. When project delays occur, especially one of this length,
a portion of the indirect and overhead costs are then direct costs specific to the project.
Just as delays cost the Owner hence, 'liquidated damages', delays also cost the
Contractm' and deplete profit.
Builders Risk - $500.00 X .15 = $575.00
This portion of the additional premium is specifically for the delay time extension
through 12-2-02. The additional costs through January are covered in the Change
Order as specified by project specifications.
General Liability Insurance (Oct. through Dec.)- $1,947.75 X. 15 = $2,239.91
Our premiums are based on '~N'ork In Progress", had this project been completed as
originally agreed there would be no extension. However, due to the delay the extension
will now be assessed at $649.25 per month until completion.
Administrative and Management Cost -$5,000.35 X .20 = $6,000.42
During the delay there were administrative and management duties performed that were
directly related to the project.
Administrative $21.83 X 125 hrs. = $2,728.75
Management $37.86 X 60 hrs. = $2,271.60
Total Cost Incurred Due to Delay $8,991
($8,81533 X. 02)
RECEIVED
NOV I t~ 2002
,/~c//~¢,,t,,' ~ ENGINEERING D{V}StOt,~
...--- Psg~ l of I
OY
.Cit___~y o_~f Bremerton
Volume 1 - Specifications
Reservoir No. 4 Modifications
February 2002
SECTION 00500- AGREEMENT
THIS AGREEMENT is dated the ~'-0 ~ day of r~ ¢{J~(..~o in the year 20 O ~_~
by and between Oity of Bremerton (hereinafter called OWNER) and
(hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth,
agree as follows:
ARTICLE 1. WORK.
CONTRACTOR shall complete the WORK as specified or indicated in the OWNER's Contract
Documents entitled Reservoir No, 4 Modifications.
ARTICLE 2. CONTRACT TIMES.
The WORK shall be completed within 120 successive calendar days from the commencement
date stated in the Notice to Proceed. Substantial Completion for the WORK must be achieved
not later than June 26, 2002, based upon the OWNER issuing Notice to Proceed not later than
March14, 2002. Time is of the essence as to each and every deadline set forth in this
agreement. This provision has been specifically negotiated. See SC 12.02 for further reference.
ARTICLE 3. LIQUIDATED DAMAGES.
and the CONTRACTOR recognize that time is of the essence of this Agreement and
OWNER
that the OWNER will suffer financial loss if the WORK is not completed within the time specified in
Article 2 herein, plus any extensions thereof allowed in accordance with Article 12 of the General
They also recognize the delays, expense,
Conditions
and
Supplementary
General
Conditions.
and difficulties involved in proving in a legal proceeding the actual loss suffered by the OWNER if
the WORK is not completed on time. Accordingly, instead of requiring any such proof, the
OWNER and the CONTRACTOR that as liquidated for
agree
damages
delay
(but
not
as
a
penalty) the CONTRACTOR shall pay the OWNER $900 for each day that expires after the time
specified in Article 2 herein for Substantial Completion and Final Completion of the WORK.
ARTICLE 4. CONTRACT PRICE.
OWNER shall pay CONTRACTOR for completion of the WORK in accordance with the Contract
Documents in current funds the amount set forth in the Bid Schedule(s).
ARTICLE 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as provided in the
General Conditions.
Contractor Initials
MWH-012802 AGREEMENT
1520319-RESERVOIR NO. 4 MODIFICATIONS PAGE 00500-1
ARTICLE 6. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the WORK consist of this Agreement (pages 00500-1 to 00500-3,
inclusive) and the following attachments to this Agreement:
o Notice Inviting Bids (pages 00030-1 to 00030- "~, inclusive).
o Instructions to Bidders (pages 00100-1 to 00100- ~2 ,inclusive).
o Bid Forms including the Bid, Bid Schedule(s), Information Required of Bidder, Bid Bond,
and all required certificates and affidavits (pages 00300-1 to 00300- 1~o , inclusive).
o performance Bond (pages 00610-1 to 00610- 'Z- , inclusive).
o Payment Bond (pages 00620-1 to 00620-.._.~, inclusive).
o General Conditions (pages 00700-1 to 00700- ~.1 , inclusive).
f o Supplementary Conditions (pages 00800-1 to 00800- %'=1 , inclusive).
o Technical Specifications consisting of ~ Divisions and z~5 pages, as listed in the
Table of Contents.
o Drawings consisting of ~\ . sheets, as lisled in the Table of Contents/List of Drawings.
Addenda numbers \ to -z_ ,inclusive.
Change Orders which may be delivered or issued after Effective Date of the Agreement
' and are not attached hereto.
There are no Contract Documents other than those listed in this Article 6. The Contract
Documents may only be amended by Change Order as provided in Paragraph 3.04 of the
General Conditions.
ARTICLE 7. INDEMNIFICATION.
The CONTRACTOR and OWNER acknowledge and agree that they have negotiated the following
in accordance with the requirements of RCW 4.24.115 and the CONTRACTOR specifically
waives his immunity under industrial insurance under Title 51 RCW. To the fullest extent
permitted by Laws and Regulations, the CONTRACTOR shall indemnify, defend, and hold
harmless the OWNER, ENGINEER, and DESIGN ENGINEER, their consultants, subconsultants,
and the officers, directors, employees, and agents of each and any of them, against and from all
claims and liability arising under, by reason of, related, or incidental to the Contract Documents or
any performance of the WORK, but not from the sole negligence or willful misconduct of the
OWNER and/or the ENGINEER as fudher defined in the Contract Documents.
Contractor Initials
AGREEMENT
MWH-012802 PAGE 00500-2
.......... ~ ,-,~:~ ~lr~ z~ I~,I(hI')IFICATIONS
ARTICLE 8. ASSIGNMENT
No assignment by a party hereto of any rights under or interests in the Contract Documents will be
binding on another party hereto without the written consent of the party sought to be bound; and
specifically but without limitation monies that may become due and monies that are due may not
be assigned without such consent (except to the extent that the effect of this restriction may be
limiled by law), and unless specifically stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty or responsibility
under the Contract Documents. The OWNER, in its sole discretion, may refuse to allow the
CONTRACTOR to assign any or all of its duties, rights and/or responsibilities under the
Agreement, except with regards to an assignment of funds for security purposes. In the case of
I an assignment for security purposes the OWNER may condition its approval to the extent it
deems necessary to assure that there will be adequate funds to complete the WORK and to pay a
subcontractors and suppliers.
I OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, its partners, successors, assigns and legal
I representatives in respect of all covenants, agreements and Obligations contained in the Contract
Documents.
IN WITNESS WHEREOF, OWNER and CONTRACTOR have caused this Agreement to be
executed the day and year first above written.
OWNER~..ity.,tv ~ ~mc'"~le~n CONTRACTOR F~i
,yf
I ~ ~.l~, ~ .,4' [CORPO, RATE S,E,,AL]
!
Address for giving notices Address for giving notices
License No. Fei
!
I Appr~ Agent for service of process:.
(Signat~
I ' ('fitCe)
II
!
II
I MWH-012802 AGREEMENT
1520319-RESERVOIR NO. 4 MODIFICATIONS PAGE 00500-3