BUILDING PERMIT
Job Addr: 2600 CHERRY AVE
Location: OLYMPIC PROFESSIONAL BUILDING
Parcel No: 3967006-001-0001
Permit No: 02-0311
Status: ISSUED
Applied: 06/21/2002
Issued: 06/21/2002
Expires: 12/18/2002
Applicant: PORTER CONSTRUCTION INC 206-634-2955
3601 WOODLAND PARK AVE N SEATTLE WA 98103
Owner: CROMWELL GORDON
2600 CHERRY AVE BREMERTON WA 98310
"
'"'.
Contractor: PORTER CONSTRUCTION INC 206-634-295Lic #: PORTEC1992B6 Exp: 01-03-2003
3601 WOODLAND PARK AVE N SEATTLE WA 98103
Subcontr:
Dssc: CORRECT WATER-DAMAGED PLYWOOD/FRAMING
***~~****************~********~*********~*********************~*****************~************
Valuation * Permit Fees: 441.75 Total Calculated Fee: 446.25
30,000.00 * Plan Check Fees: .00 Additional Fees: .00
* Other Fees: 4.50 Total Permit Fee: 446.25
******m***,******~********************~*****m*************************************************
This permit shall become null and void it t~ building or work authorized by this permit is XlOt cOrnroenced within
180 dayS hom the date of s1.ich permit. or it this building or WOYk authorized by such permit is suspended or
abandoned at any time after the work is COOllllenced for a pe~'iod of 180 days.
NOTICE - It i,s the responsibility of the permit holder, not the City of BrEliOOrton or Building Official tel see
to .it that required ifl$Pec'l:.iol'l$ are made. The permit holder must notify the Building Official when ready for
inspections. Failure of the permit holder to notify the Building Official of required inspections may result
in the stoppage of the work until slJch time that t~ permit holder can substantiate to the building official
that the concealed work meets or exceeds code requirements. Any demolition, testing, or financial bu~'den shall
be bome directly by the permit holder. Failure to substantiate code requirem.ents will indemnify the City
against any and all responsibility or liability connected with the construction.
I hereby certify that I have read and examined this permit and know the same to be tyue and conect. All
provisions of laws and ordinances governing thi$ type of work will be complied with whether specified herein
or- not. The nantil19 of a permit doe$ not presume to give authodty to violate or' cancel the provisions of
an)'o her st te or lcea l' I regulating COTl$truction or the performance of const.ruction.
, =~ : ---.,. o-ate:---'-.-:1../- 02-
v
I certify ha I am ex~r~t from tf~ requirements of the state contractor's registration law, undey
Section 3, Chapter' 126, laws of 1967.
Signature:_ DOl,te:
*************************** ~I/) ~ ~
Permit Center-~Approved BY:__~ Date:~- ~~ . Ll~
:':'
I
-'-..~~~
, "-",;;... "I
'.~
.~.- 'p'>
'... \.
:(r ,
. I
,I "
, ~"""
~R~MERTON PERMIT CENTER
286 4th street~ Bremerton~ ~ 98337
_ phone: (36Q) 478-5275 FAX:, (360) 478-5278
..;.}~.
F (VU&~-jl
!~~"\;
..il
:.,.. ,._ll' \
"
Job Address: 2600 CHERRY AVE
Location: OLYMPIC PROFESSIONAL BUILDING
ASST Acct No: 3967006-001-0001
Building Permit No: 02-0311
Status: ISSUED
Issued: 06/21/2002
Expires: 12/18/206~
R E Q~ U IRE D
INS P E C T ION S
Item: 01700 FRAMING
Item: 01900 SHEETROCK NAILING
Item: 02700 FINAL--8LDG
Dept: BLDG
Dept: BLDG
Dept: BLDG
Division:
Division:
Division:
....' ~ " "., ,,~'.~ "",' <;".-"
*********************************************************************************
TESTING:
SPECINSP:
ST OF WA:
f'IEAL TH:
Must be recognized by the Washington Association of 8uilding Officials
Must be registered with the State of WA
State of WA Dept. of Labor and Industries 478-4921
8remerton/KitsapHealth District 478-5235
ALL INSPECTIONS PERFORMED BY THE CITY OF 8REMERTON MUST BE SCHEDULED THROUGH THE
PERMIT CENTER, (360) 478-5275"
***********:1** ******************************************************************
Permit Hol e"s C /4 ',.. ~ _. '1/-0 "'7,
Signature: ,~(f____ Date: (Q ~ ~
(\
.,
\,
,.,1';,;:,
. ':",";"", w: ,_ -.'- . ...
"
, '~
;~I
},
f
!
\ ~~,' ,,~~~l',tI. . .
=~=.=========~================================================================
.~..5'-
't~
r {f wi.
BREMERTON PERMIT CENTER
PERMIT CONDITIONS
Permit No: 02";;'l)311
Page:
1
~===~=========================================================================
Job Address: 2600 CHERRY AVE
Ass~ Acct; No: 3967006-001-0001
'icid~tion: OLYMPIC PROFESSIONAL BUILDING
Applicant: PORTER CONSTRUCTION INC
Owner: CROMWELL GORDON
Contractor: PORTER CONSTRUCTION INC
Applied: 06/21/2002
Approved: 06/21/2002
Issued: 06/21/2002
Description:
CORRECT WATER-DAMAGED PLYWOOD/FRAMING
. !....., -." .~ ~ .
Conditions:
1. PLAN REVIEW:
APPROVAL IS SUBJECT TO THE ENGINEER OF RECORD (CLEMENS J
ROSSELL. PROFESSIONAL ENGINEER). FRAMING AND FINAL
APPROVAL IScSUBJECT TO ON-SITE INSPECTION APPROVAL.
Permi~ d ~ ~
S19naturel\ . f . Date
;;-2I-o~
'.
-<,;
Building Permit Application
City of Bremerton, W A 98337 Phone: (360) 478-5275 Fax: (360) 478~5278
T1X .\.ccount ~umbe=: 3'- ~3 C:::>C40
0.d1 i-(J~ l ~
~f)
i
!
ONTRACTOR DAUTHORIZED AGENT
APPLICA1"IT: DOWNER
. Sicc .\.Jdress: 2~m ((?~'\ lIo.\J\:=N\t~
, CJwnc:: \>{L,~~~~~~~8?\f
COCC;1C: Person:
.\.ddress:
i-N
I
Contact Phone':;:
Check the type of application for below:
o SF RESIDE~lLU NEW 0 COMMERCIAL ~tW
o DCPLEX 0 COMMERCIAL REMODEL
o :\-L-\;.~L~E-\CTURED HOME 0 9OMMERCL-li. ADDITION
o RESIDENTIAL REMODEL B' COl\-L.'VIERIC.AL REP.AIR
o RESIDENTIAL ADDITION 0 :\-IrLTI-E-\"'vIILY
o RESIDENTIAL REPA1R 0 TEN~-\.1'iT r:WIPROVEMENT
o GARAGE
o ACCESSORY BLDG
o SIGN
o DEMO
o GRADING (Cubic yards:
o OTHER:
Scope of Work Proposed:
{orrfC( I J.,)c.T.f'rctc<(Y\..c..Q~ct
I
pi,; ,"""^,,d I F'rc~ ,^ j
/
Square Footage:
D\'lieiling:
Gange:
Ded;:s:
IS TEIS PROPERTY WITHIN 200 FEET OF .-\ SHORELINE?
YES
NO
Valuation
I Plan Review Fee
Permit fee
Surc~es
: -kaC:J..5." 3.5 iJ 00-
: Smte: S ~.50
I. '.'TotalFees
44-0. d-5
~~O ,(JCO
-B
44-l ~ S
.\ppliC:Hions tor ',vhich no permit is issuo:d ':v1thin 180 days ;'ollowing the date of ipplication ;hall expire !Jy limitation. ,lOU ?i:1n,;
clod 'Hner data submitted for review may thereafter be rerurned to the clpplicant or destroyed by the building officiaL Thc= b uiIuin:;
offici;ll may <:xtend rho: rime for clction by the clpplicant for .1 period not <:xceeding ISO days on request by the .lpplicant ;how'l:1:';
th;lt -.::rcumsranco:s beyond che concrol ()f the clpplicant h;lve prevented clcrion from being taken. No o.Lpplicanr ,hall bo: ;:xrenu-:u
more rh;ln once, In order to reneW:lcnon on cln clPPli,'canon clfter e~Piration, the clpplicant shall resubmit plans :lOd pay cl ne'v pLw
reVIO:';V :'ec=, ~
..\l'PUCA."\j"S SIGNATURE: ~ ., DATE:
I .
fij) rg (G rg D \Iff rg fn1
In) JUN 2 1 20112 ~
BREMERTON
Bun nrl\l~ nl:l'ln n.,.. R~. ._.
,,'Ii>(
1.,1 '
\I';' . .'.;
i}( ~)I( 'I/.)l( lIrltt ~::!r.)if. ltiil: )l:;)~)!Ill(:I:*)l(ll( >>:}l( X()I( ll( >>;>l\)l(il(:<< ll( * >>::<< >>:);()ll);( lX l'I. ~ )l;)l(lli)lt.)(()l()\()I( *)\;>>: *:<< >:( 1lI)l()~ >ll)l( lX r~ 1J( >>:
RECEIPT
*.*.**.~*~..***~**.*..**...******...**..****.*****.*..1.....***.
RECEIPT Number: 02000505 Amount: 446.25 06/21/02 12:43
Payment Method: CK Notation: PORTER CK Init: VW
02,-0311 Type: ,BLDGONL Y SLOG PERMIT -NO MEeHl
3%7006-001-.0001
2600 CHERRY AVE'
OL~MPIC PROFESSIONAL BUILDING
Total Fees: 446.25
Total ALL Pmts= 446.25
Balance: .00
**..****.*~~~)l(w.*~.***********.**..********.~~*~**~~~~*~~~~~(**~~*
Account Code Description Amount
16-322.1001 (2211) BUILDING PERMIT FEES 441.75
643-237.13 (0236) STATE OF WA SURCHARGE 4.50
Permit No:
Parcel No:
SHe Addre.ss ::
Loco. UtHl:
This Payment
446"~?S
1
I
f
'"
-- '
~~
;).000
Qu;G~~
Od---~31 \
Exterior Research & Design, L.L.C.
Clemens J. Rossell, P.E.
clemensr@exdesign.com
Direct: 206.826.0912
June 20, 2002
Porter Construction, Inc.
Attn: Steve Nieman
360 I Woodland Park Avenue N
Seattle, W A 98103
fD)~~~nWl~~
ln1 JUN 24 2002 l0
BREMERTON
\BUILDING DEPARTMENT
RE: Olympic Professional Building - ();)..- 0 3l \
Dear Sirs, ;J hOD t1A e-~'tf-11J \J -e.- ,J
C. /l.. O/A.d I A) .e.11 GOr-e pD
I visited the site together with Davy Landsburgh on JUrle 17, ~002, and observed the repair that
has been done to date. We took note of some issues that need to be addressed.
In addition to the construction observation visit, I reviewed the details and calculations for the
repair, that were prepared by Pro Design, P.O. Box 699, Tracy ton, WA 98393, and that were
approved by Bremerton Permit Center on September 5, 200 I, Building Permit No. 01-0464.
At the time, the Contractor for this project was James H. Robinson Co. Inc.
I am satisfied that the repairs done so far are in agreement with the approved details.
The repair work pending to be done includes removing and replacing rotten plywood sheathing,
studs and plates, removing and replacing steel straps, sanding a glu-Iam beam and several studs
that have surface damage.
Sincerely,
Exterior Research & Design, L.L.c.
1'VJ I CJ7.-
()&
Clemens J. Rossell, P.E.
IEXPIRES
6/28/03
,
..
Exterior Research & Design, L.L.C.
Building Science and Envelope Consultants
Transmittal Record
Date: June 21, 2002
Ship t9: . " . , , ..' I "
Valerie Wolf
-----,- -
..m~LJil~irl~I:)f:!'1t!I~PI1'"lf:!rlt~pf:!~iClli~~mmmmmm ............. ..
m ..I:)t!PClr:tI1'"lt!J'I~~r~~I1'"II1'"ILJJ'li~YI:)t!'1t!I~PI1'"It!J'I~m .
City of Bremerton
2864IhStreetm.....mm
Bremerton, WA USA 98337
From: Clemens RossellI jph
Copies To: file
Project Identification: . . /.
Client:
Project Name & No.: Olympic Professional Building
Site Address:
Street Address
siat"
m .. ...m iipc,)Ci"m
Enclosed: . . ,
~
Regarding: Permit Process
[ ] Plans
[ ] Submittals
[ ] Other (detail below)
. Letter from Clemens J. Rossell, P.E.
[ ] Specifications
[ X] Project Documents (detail below)
No. of Packages:
Shipped Via:
Tracking No.: '. , . ; ;'
FedEx Overnight
7918 6822 8342
c:
June I, 200~m ..mmmmmm ..m.
Date Shippedmm. mmm... .mmm p,int"CiNam,,; bat" & iim"m
Receipt Signature: (if applicable) . j .
2412 7th Ave W . Suite 101 . Seattle, WA 98119 . Voice (206) 467-0054 . Fax (206) 467-5840
JUN-20-02 THU 02:27 PM EXTERIOR RESEARCH & DES!
~AX NU. ~Uti 4tir ~e4U
r. Ul
Exterior Research & Design, l.L.C.
CIC,W0Im J. RC~3611, P.D.
cl('m," r::.; r@exd",s.ign.coln
Dlr,:~d: 206.826.()f)12
June 20, 2002
RE: OIYlnpic Professional Building
lO)~~~DW~Jm
In1 JUN 21 2002 ~
BREMERTON
BUILDING DEPARTMENT
Porce,. Construction. Inc.
Artn: Steve Nieman
3601 Woodland Park Avenue N
Seattle, WA 98103
Dear SiI-s,
I visited the site together with Davy Landsburgh on June 17, 2002, and observed the repair that
has been done to date. We took note of some issues that need to be addressed.
In addition to the construction observation visit, I reviewed the details and calculations for the
repair, that we,-e prepared by Pro Design, P.O. Box 699, Tracyton. WA 98393. and that were
app,-oved by Bremenon Per-Olit Center on September 5. 100 I, Building Permit No. 01-0464.
At the time, the Contractor for this project was James H. Robinson Co. fnc.
ram $3.tisfied that the repairs done so far are in agreement with the approved details.
The repair work pending to be done includes removing and replacing rotten plywood sheathing.
studs and plates, ,-emoving and replacing steel straps, s.anding a glu-Iam beam and several studs
that have surface damage.
Sincerely,
Exterior Research & Design, L.l.c,
-')
I v:; I,:? 7.-
0"
c~--\
Clemens J. Rossell, P.E.
(P~,\.. /___--j
'.'
",..,._.".._.J ~. '
i
ERD//
1412 7th Ave W. Suite 10/ 0 Saart:lf:. WA 98/19. Voice (206) <1'7.0054. Fax (206) 467-5840
CLIENT CHANGE ORDER FORM
PROJECT:
01 m ic Professional BLDG.
PROJECT NUMBER: 50
CHANGE ORDER #: 9.00
FIELD DIRECTIVE #: 3.00
CONTRACT DATE: 5/1/2002
CHANGE ORDER DATE: 6/18/2002
CONTRACTOR:
Porter Construction, Inc.
The parties hereto agree to proceed with change in the work by Change Order as specified herein and the charges of change in work shall be determined
on a time and materials basis as set forth below. The owner further agrees that all labor and equipment (time) for change orders or extra work will be billed
to the Owner at the following labor and equipment rates, which exceed Contractor's labor and equipment costs.
Supervisor = $62.00 per hour
Project Foreman = $55.00 per hour
Carpenter = $42.00 per hour
Laborer = $33.00 per hour
Dump Truck = $90.00 per hour
Further Owner agrees that 10% additional profit and 10% overhead will be added to the above labor and equipment rates and all other items that make up
said change in work.
WORK DESCRIPTION: Framing Repairs @ Entry/SW Corner/Sheathing Repl/Susp. Wall/Wing Walls
C/O COMMENCEMT DATE: June 19, 2002
C/O COMPLETION DATE: July 22,2002
IMPACT ON CONTRACT SCHEDULE:
ORIG. CONTRACT COMPLETION DATE:
CHANGE IN COMPLETION DATE:
NEW CONTRACT COMPLETION DATE:
7/5/2002
6/19/2002
7/22/2002
CHANGE ORDER ITEMS TO BE ITEMIZED AND VERIFIED FOR PAYMENT (LISTED CHARGES FOR EACH ITEM ARE ESTIMATES
ONLY AND FINAL CHANGE ORDER TOTAL SHALL BE DETERMINED AT COMPLETION DATE):
ITEM # CSI# DESCRIPTION QTY UNIT UNIT COST TOTAL SUB TOTAL
50.C09.01 06200 2x6x10 185.00 ea 7.10 1,313.50 1,313.50
50.C09.02 06200 2x12x8 20.00 ea 12.00 240.00 240.00
50.C09.03 06200 4x10 40.00 If 3.50 140.00 140.00
50.C09.04 06200 2x4x10 40.00 ea 4.50 180.00 180.00
50.C09.05 06200 1/2"Plywood 120.00 shts 14.50 1,740.00 1,740.00
50.C09.06 06200 1/2" Gypsum 100.00 shts 11.50 1,150.00 1,150.00
50.C09.07 06200 Misc. Hardware 1.00 ea 250.00 250.00 250.00
50.C09.08 06200 Labor 320.00 hrs 42.00 13,440.00 13,440.00
50.C09.09 06200 Supervision 8.00 dys 496.00 3,968.00 3,968.00
50.C09.10 06200 Administrative Requirements 1.00 ea 1,500.00 1,500.00 1,500.00
(Permits) 0.00 0.00
50.C09.11 06200 Boom Lifts 1.00 ea 500.00 500.00 500.00
50.C09.12 06200 Metal Roof @ Entv/Coping 1.00 ea 4,500.00 4,500.00 4,500.00
50.C09.13 06200 Structural Connections 1.00 ea 1,000.00 1,000.00 1,000.00
SECTION TOTAL: 29,921.50
The
compensation
and completion
time allowed bv
fD) ~ ~ ~ 0 \VI ~ 'D.'
trl1 JUN 2 J inn? ~
BREMERTON
IBUllDlNG DEPARTMENT
Date:
Date:
CONSULTANT:
By:
CONTRACTOR:
By:
OWNERlREP:
Date:
Porter Construction, Inc.
Client N/C Change Order Form V06.02.01
VICINITY MAP
-
o
---
J-.
~~
0> '-,
0.---. (")
vd0
::1 .~
v ..--'
o
..-/
.$
.: S
o '7\-
.~ ()
'- A
'(1-
-::::c.
. S--cr e..e\
JD)~~rgnWJ~lnl
If1l JUN 2 1 2Il02 @
BREMERTON
IBUiWING DEPARTMENT
c ~c:( ,'-\
v
BREMERTON BUILDING DEPARTMENT
/' ~spection Report
L-~v.Jt4:t1,a~f'J1~4(rJ ". 02 7 I
~~~~;,~~ ~~~o !jt~~~ I ~ ~ 0 Perm~ Num::~ne: ~ CT - ~ \
contract~~/1_t M ( ..o-v .a.f- Phone: dO(.;, - CO '=? i ~ s C;
Inspection card/approved plans on site Setbacks
Footings: required steel placement Walls: required steel placement
Footings: required width & depth Walls: required size
Bearing soil (soils analysis if applicable) Special inspector (when applicable)
FOUNDATION
COMMENTS:
FOOTINGS APPROVED:
WALLS APPROVED:
Electrical approved Plumbing & mechanical approved
Crawl space access (min. 18 x 24) Floor joists and beams/proper clearance to earth
Positive connections posts & beams Foundation vents
Posts properly supported Anchor bolts: nuts & washers in place
Mudsill: treated material Floor joists: size & span
Beams/girders: size & span Notching & drilling: joists & beams, studs
Smoke detectors: all required locations Exhaust fans: where required
Exhaust fans insulated: unconditioned space Whole house fan, outside air intakes each bedroom
Fans terminating directly outside Range hood
Dryer exhaust vent All vent tenninations: windows & property line
Fireplace combustion air Windows: meets egress requirements
Windows: proper U valve Windows: safety glazed where required
Ceiling heights Stairs: headroom clearance
Stairs: rise & run; proper width Fire blocking wall to ceiling, furred walls every 10'
Fire. blocking: stairs, soffits, lowered ceilings Fire blocking: tubs/showers
Fire blocking: lids in void spaces, shafts Fire blocking: stuff holes top & bottom plates
Sheet rock backing Wall bracing
Rafters size/notching Trusses: specs, bracing
Attic access Attic ventilation
Wall & roof sheathing Shear nailing
Building dried in
FRAMING
COMMENTS:
APPROVED:
Insulation: proper R valve Insulation: proper fastening
Insulation: vapor barrier Bottom plates caulked to floors
Penetrations caulked as required Electrical boxes gasketed or caulked
6 mil black poly in crawl space
ENERGY CODE COMPLIANCE
COMMENTS:
UNDER FLOOR/FOUNDA TION INSULATION APPROVED:
WALL INSULATION APPROVED:
CEILING INSULATION APPROVED:
,---- Appliance location and access, proper support Appliance clearance to combustibles
Venting: clearance to combustibles Venting: size & support
Vent termination Combustion air
Ducts: size & support Gas pipe under test
Gas pipe size & support Gas pipe: underground min. 12" below grade
Gas pipe: within 6" or underground-coated Gas shutoff within 3' of appliance
Gas logs: safety shut-off Gas logs: damper permanently open
Wood stoves EPA certified . Wood stoves & fireplaces: Tight-fitting doors
Wood stoves & fireplaces: proper health Manufacturer's specs on site
Chimney liner: when required Chimney: separate flues when required
MECHANICAL
COMMENTS:
GAS PIPING APPROVED:
FURNACE APPROVED:
OTHER APPLIANCES APPROVED:
OWV & water piping under test OWV: proper grade
OWV: proper sizing OWV: proper drainage frttings where required
OWV & water piping proper support OWV: required cleanouts
Vent termination All fixtures vented properly
Water supply: proper sizing Shut-off valves on all fixtures
Water heater: gate valve on cold water supply Vacuum breakers: where required
Water heater relief valve drain to outside Water heater: seismic strap
-
R-10 pad under water heater when required Water-piping insulated as required
Grease traps/interceptors: where required Proper indirect wastes: where required
PLUMBING
COMMENTS:
PLUMBING GROUNDWORK APPROVED:
PLUMBING ROUGH-IN APPROVED:
Proper fastening nails - 7" o.c. horiz. Plane Nails 8" o.c. vertical plane
Proper fastening screws 12" o.C. horiz. Plane (1/2") Screws - 12" o.C. horiz. plane (1/2') 24" o.c. framing
Proper fastening: screws - 16" o.c. vert. Plane (1/2") Screws - 12" o.c. vert. plane (1/2") 24" o.c. framing
Proper fastening screws - 12" o.c. horiz. plan (5/8") Screws - 12" o.C. horiz. plane (5/8') 24" o.c. framing
Proper fastening screws - 16" o.c. vent. Plane (5/8") Screws - 12" o.C. vert. Plane (5/8") 24" o.c. framing
Area & occupancy separation walls Oraftstops where required
Usable space under stairs (5/8" required) Waterboard where required (not on ceiling)
Corridors
SHEETROCK
COMMENTS: .
SHEETROCK APPROVED:
Energy code requirements met, exhaust fans Plumbing & mechanical
Garage/dwelling door self closing solid core Smoke detectors where required
Handrails & guardrails, as required Fire ratings maintained
Exit signs when required Emergency lighting when required
Occupant load posted when applicable Building weatherlight
Wood siding to earth separation (6") Building address posted
Randon monitor when required
FINAL
COMMENTS:
r-"'..I ^. ^ r'\r'''''''''''I'""'\\ '.n.
.'
Exterior Research & Design, L.L.C.
Building Science and Envelope Consultants
~~:een~r~e~~~~lilg~.~~m ~ ~ ~./ ~ U W ~ ~
Direct: 206.826.0912
S~T 0 3 2002
August 27, 2002
City of Bremerton
Building & Planning Department
286 4th Street
Bremerton, W A 98337
BREMERTON
BUILDING DEPARTMENT
RE: Olympic Professional Building
Dear Sirs,
As part of the repairs and siding renovation for the Olympic Professional Building at 2600 Cherry
Avenue, some areas on the exterior of the building will be covered with a brick veneer. A reason for
concern could be the potential increase in lateral loads for the upper story, for which the resistance to
lateral load is provided by timber framed plywood shear walls.
I have performed calculations to determine the impact on design lateral loads for the building due to the
increased weight with the addition of the veneer. The results of my calculations are summarized as
follows:
The design of the existing building is governed by wind (calculated wind forces are stronger than seismic
forces). With the proposed veneer, we are increasing the building weight but not the area exposed to
wind, so that the wind forces remain the same, while the seismic forces are increased. The lateral load
design of the proposed renovated building is governed by the seismic force. For the upper story, the
increase in lateral load from the total wind load force of the existing building to the total design seismic
force of the renovated building is only 2%. The small increase is therefore negligible and there is no
need to re-design the building.
The total seismic weight tributary to the roof diaphragm and upper story walls increases, due to the
veneer, in approximately 10%, from 156 Kips to 172 Kips. The seismic load increases by 10%
accordingly.
Should you have any questions, please call.
~
Yours Sincerely,
Exterior Research & Design, LLC.
Building Science and Envelope Consultants
Clemens J. Rossell, P.E.
IEXPIRES
6/28/03
~
2412 7th Ave W . Suite 101 . Seattle, WA 98119 . Voice (206) 467-0054 . Fax (206) 467-5840
Project: OLlt1~~EIf-.$Sto)J/).{J ButL.~lient: V~~tLc P~1!}JM---&,p{,-2V'
Notes by: ClJc)-'\ QJS "J - R-o 5J "t.L Date:~:)l~", page__L_ of ----_..
. ') Regarding: GLU -lM1_"J1~ r..'i:Al-JJ~.9~~~Lu_.___ ERD
1/4" X 3" SIMPSON SDS
WOOD SCREWS
WITH HEXAGONAL HEADS
6" 12" TYP
tit
4" t=... '."
8-1/2" TYP
,.
REMOVE EXISTING TRUSS-TYPE
STEEL REINFORCEMENT AND
FASTEN
PL 3/8" TO GLU-LAM BEAM
.
l'
..
.
..
...
j'
..
',...
"
..
..
(,
. ,.
...
.'
STRUCTURAL NOTES:
GLU-LAM BEAM REINFORCEMENT
DETAIL
1) STEEL SHALL COMPLY
WITH ASTM A36, FY = 36 KSI
2) WELDERS SHALL BE
CERTIFIED BY WABO.
NTS
3) WELDING ELECTRODES
SHALL BE E70-XX U.N.O.
NEW BRICK VENEER PER
/SEPARATE DETAILS
iI' / , PL 3/8"
I I
J I
I I
I I
5/16"
2@6
4) IF THE PLATE CANNOT BE
PROVIDED IN A SINGLE UNIT
THEN FULL PENETRATION
GROOVE WELD IS REQUIRED
BETWEEN THE INDIVIDUAL
PLATES. IN THIS CASE,
CONTRACTOR SHALL PROVIDE
SHOP DRAWING FOR
REVIEW AND APPROVAL.
2@6
NTS
~"l\ O~ \ D 1.-
lq;fj
PL 1/2"
GLU-LAM BEAM REINFORCEMENT
SECTION
i'i~~",,,.;p.' J:,O;'l\ NFHS CU5Tt.:M"Ofxillllng :\crvlf.l~ f.:l(!G{W~.f~jl:':1 Nr:.lJ5. b;, ~-1nrt~AO'.:(lh. ~.H Od'I~lt\ """I"\".:'.~:~U;'}'IJ
Hl'~ :.u:.: (. 1.1:":S..i"' ,
~ --
.. .. . _____ .~K_~~~~{fV_
..... ... ..... .}bOO__n_.__-
~.. ..~
' 1;-
('"->. ;::..-;
r~ ,- :
4sJ' CB-200
BREMERTON
BUILDING DEPARTMENT
._ _ ~~_'"t_d___
J
/;1,'/;2\1 "
_ _', jh ')::.':1."'. __ _____________
. .. . . ....-L=5uj,m~=;,.__c;>~o/23B:.Lf)=-de..S.2ZJCNg,/-
.. ..-- -----C"!f'4~e.c....G2'k'..cs"'C,~r.JL~o/L~~a. .!* L5_0-7~r~
.. . - . -- ----- TAt2~f/JLL'~Ja._;hLZi1"<UL4 ;Y-.LS'-UL~~~_S~t2~Zt'.
---, .----,~.- .;k_-Ld<(_,i(?'(f:-t5~7jC1Ldf_;;;[ r' aG'-~ ).eu!d~~dx5_LZOL
l ( _) It -i~' \ r _ 1",- ~ I '
---- _-0-. ---,..--- / ,{(jd.f--..-_L)-.L<;_L~...o.__CC!s!/s-f7-_c/a 0:JfJ-;ZLZe qfi,~I..ZtZ/-
- --- -. - - -- . ,_ - -..~a?!_ hC!/ k!rdy_awA~L _:au l-S-~4r-5_i.J_da;':5Q!.fLlrGd '
~ 1~
---___ - - - ~.~-._(aO_.k~/m(.r-Ed.
.=---~'-:.. .-- _'~~' -7-ir4$ .
- ---- - -- -. h___ - ---- ---- ~rr;a)~LL~----
---- ,- --- _..._______.__~_.._~cLl ;golc~.'Jo-/~-Q6-57-
_:..~.~:-n- .~~~~~
-----------~~~~~~~~
.-----.-----_~___,k'~_rb_&2LJ~~ /?/E-.,d,<epPhA1/7 -$.6
__ .___n___....~__GL_"__h4M BEAMs ,,<J~L ./Vt:Ji fLltz..gztO/G to fJlLRK
~
~ t------~--.._---.