Loading...
HomeMy WebLinkAboutBF17 00075 City of Bremerton PERMIT NUMBER: BF17 00075 Fire Department DATE ISSUED: 06/28/2017 4 9]1 Park Avenue,Bremerton WA 98337 SITE ADDRESS: 6000 W WERNER RD (360)473-5380 Fax:(360)473-5461 ��W 5 ASSESSOR NUMBER: 202401-1-004-2007 ZONING: CITY Name Phone Address Access Code APPLICANT: FIRE SYSTEMS WEST INC 253-833-1248 209 FRONTAGE RD N STE C GMEVT-XRG38 PACIFIC,WA 98047 OWNER: SOUND WEST WERNER ROAD LLC 423 PACIFIC AVE STE 402 D6D2D-JBCMI BREMERTON,WA 98337-1948 CONTRACTOR: FIRE SYSTEMS WEST INC 253-833-1248 209 FRONTAGE RD N STE C GMEVT-XRG38 PACIFIC,WA 98047 LENDER: SUBMITTED: 06/19/2017 APPROVED: 06/27/2017 EXPIRATION: 12/25/2017 STATUS: ISSUED VALUATION: $3,182.00 Fire Sprinkler 13 Modifications GENERAL DYNAMICS-Add two sprinkler heads to address missing coverage in existing spaces GENERAL DYNAMICS-Add two sprinkler heads to address missing coverage in Plan Check $66.30 existing spaces BID PRICE2 $102.00 Technology Fee $5.10 TOTAL FEES: $173.40 Inspection Requests: Fire Inspections (360)473-5386 It is the responsibility of the permit holder to see that the required inspections arc made. Failure to obtain required inspections may result in stoppage of the work until such time that the permit holder can susbstantiate to the City of Bremerton that the concealed work meets or exceeds code requirements. I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified hetcin or not. The granting of a permit does not presume to give authority to violate or cancel provisions of any State or local law regulating construction or the performance of the construction. SIGNATURE OF OWNER OR AGENT: PRINTED NAME: "Jzea'1 t.3 DATE: 1 Co/Z-Er17' CONDITIONS j By applying for this permit,the applicant has granted to the City of Bremerton the right to enter the above-described location at reasonable times to inspect the proposed,in-progress or completed work performed under this permit to ensure compliance with the permit conditions and other applicable laws and regulations.Should such entry be refused,all authorizations and approvals contained in this permit shall be immediately suspended and any work performed under the permit shall immediately cease until authorized in writing by the City of Bremerton. Work performed in violation of this condition shall be considered to have been performed without the approval of the City of Bretherton.The City of Bremerton's approval of this application pertains only to the City's regulatory jurisdiction,and thus compliance with City regulations does not necessarily ensure compliance with federal or state laws. Primed by:wood,Tracey on:06/28/2017 02:35 I'M Page 1 of 3 City of Bremerton PERMIT NUMBER: 13E17 00075 Fire Department DATE ISSUED: 06/28/2017 911 Park Avenue,Bremerton WA 98337 SITE ADDRESS: 6000 W WERNLR RD ,1 *�( • 360)473-5380 Fax (360)473-5461 I. (DCD-01) ASBESTOS AND LEAD-BASED PAINT: ASBESTOS:Prior to performing any renovation or demolition work,Puget Sound Clean Air Agency and Washington Dcpartmcnt of Labor and Industries(L&I)regulations require an asbestos survey be performed to determine whether there arc asbestos-containing materials in the work arca or structure. The asbestos survey must be conducted by and EPA-certified (AFIERA)building inspector(except renovation or owner-occypied single family residcnces).For more information,please contact Clean Air Agency through their web site at www.pscleair.org or by phone at 800-552-3565 or 206-343-8800. The . L&I web site can be found at www.lni,wa.govRYadesLicensin LicensingRcq/Asbestos/dcfault.asp. LEAD-BASED PAINT:A contractor or person receiving com cnsation who is performing renovation,repairs or painting on a residential building or a child-occupied facility built before 178,must be trained and certified by an accredited training provider,and registered as a Renovator by the Washington State Department of Commerce-Lead-Based Paint Program. For further information please contact:The Department of Commerce website at:www.commcrce.wa.gov/lead,or call: (360) 586-LEAD(5323). CONTRACTOR:A contractor's registration issued by Washington State Dept.of Labor&Industries is required for anyone who contracts or submits bids for construction work,including new construction,alterations,repairs,or anyone who consults or superintends,improves,demolishes,develops residential property for sale,or"flips"houses.Contact L&I at(360)415- 4000 for information. �-- 2. (DCD-02) DCD:Validity of permit.The issuance or granting ofa permit shall not be construed to be a permit for,or an approval of,any t7 violation of any of the provisions of the Washington State Building code or of any other ordinance of the City of Bremerton. Permits presuming to give authority to violate or cancel the prvisions of the Washington State Building code or other ordinances of the City of Brcmcrton shall not be valid.The iss lance of a permit based on construction documents and other data shall not prevent the building official from requiring the c wrection of errors in the construction documents and other data.The building official is also authorized to prevent occupy ey or use ofa structure where in violation of the Washington State Building code or of any other ordinances of the City 01 Bremerton. 3. (DCD-47) DCD:Reinspection Fee:All approved plans,the printed building permit,and the permit inspection placard,arc required to be on-site for inspection purposes,and work to be inspected shall be complete and ready for inspection.If an inspection is called for and plans are not available on site,or the work is not ready,for inspection,approval will not be granted,In addition,a re- inspection fcc will be charged and must be collected by the D payment of Community Development prior to any further inspections being performed or approvals granted. 4. (FIRE-01) Life Safety and Fire Protection systems shall comply with: International Fire Code(IFC)with Appendix International Building Code(IBC) National Fire Protection Association(NEPA) Brcmcrton Municipal Code(BMC) Brcmcrton Roadway Standards Bremerton Municipal Utilities Copies of ordinances can be found on the cities website at ww '.ci.bremerton.wruts. To contact the Bremerton Fire Marshal's office: Mike Six at Michael.Six@ci.brenlerton,wa.us or(360)473- 586 ALL INSPECTIONS ARE SCHEDULED AND MUST BE SCHEDULED A MINIMUM OF 2 BUSINESS DAYS IN ADVANCE. All questions,to be binding,must be followed with an email re-stating the question and must include either digital photos and/or drawings to show both existing conditions and proposed changes/alterations. The inspector retains the right to make requirements not addressed during plan review. In many cases the plan reviewer is not given adequate information to address all issues. The onsite inspection allows for a trite representation of the project. All projects require a visible address during and after construction.Final fire inspection will not be signed off without a valid and usable address.Please contact the Public Works Dcpartmcnt for address if need be,(360)473-5337. All projects arc required to have fire extinguishers unless exempt by the installation ofa fire sprinkler system with quick response heads. All violations of the code and referenced documents is a$125 fine per violation.Deviating front the approved plans is a violation of the Fire/Building code.Any revisions need to be pproved by the Fire Marshal. 5. (DCD-10) A separate electrical permit issued through Labor&Industries(L&I)is required for any new,modified,repair,replacement, service,maintenance,or temporary installations,Electrical work is inspected by L&I prior to cover and the framing inspection.Contact L&I at 360-415-4000 or www.lni.wa.gov (RCW 19 28) 6. (FIRE-06) Fire Sprinkler Systems Fire Sprinkler Systems will be designed.built and maintain to NEPA 13,IFC 903.2 and BMC standards.All systems will be monitored by a UL listed central station.When a building r structure has a fire sprinkler.all spaces will be covered. Remote FDC required with fire hydrant located within 75'of hat FDC. THE FIRE SPRINKLER PERMIT IS REQUIRED TO BE A TI1E LOCATION OF TI IE RISER. Printed by:Wrxxt,Tracey on:06/2H/2017 02:35 PM Page 2 ar 3 City of Bremerton PERMIT NUMBER: BF17 00075 Fire Department DATE ISSUED: 06/28/2017 4,4°- '4° 911 Park Avenue,Bremerton WA 98337 SITE ADDRESS:6000 W WERNER RD t 'k X 44 (360)473-5380 fax (360)473-5461 7. (DCD-50) Final Inspection Required:AU building permits shall have a fir al inspection performed and approved by the City of I,A Bremerton Department of Community Development prior to permit expiration.The failure to request a final inspection or failure to obtain final approval prior to expiration may require#reactivation fcc,or a new permit application if more than a year has passed with no activity.The permit expires 180 days past the date of inactivity. Required inspections:Any work required to be inspected and that is covered before such inspection may be required to be uncovered so that the inspection may be performed. Examples of inspections to be performed before covering arc mechanical rough-in,plumbing rough-in,gas piping,framing,and shcctro k nailing. 8. (DCD-14) DCD: Approved Plans,Engineering,Site Plan,Permit,and C nditions shall remain on site and be available for inspection. iD Any changes to plans shall be approved before construction is rformcd.Architect or engineer of record shall approve the change before submitting a revision.A revision is subject to a cvision fee and additional fees for plan review and inspections. 9. (DCD-32) Changes to Plans.Any changes to plans shall be approved baf re construction is performed.Architect or engineer of record shall approve the change before submitting a revision.A revision is subject to a revision fcc and additional fees for plan review and inspections. MINIMUM INSPECTIONS REQUIRED To request an inspection,please call(360)473-5386 and be sure to provide your permit number,name on permit,site address,contact phone number,and inspection type.To register for on-line inspection access,visit the City's website at www.ci.bremerton.wa.us. Inspection Description FIRE-FLUSH FIRE-Fire Sprinkler Flush FIRE-HYDRO FIRE-Fire Sprinkler Hydrostatic I est FIRE-COVER FIRE-Fire Sprinkler/Fire Alarm 4 over FIRE-FINAL FIRE-Final Inspection Printed by:\Vood,Tracey on:06/25/2017 02:35 PM Page 3 of 3