Loading...
HomeMy WebLinkAbout4169 +--------------------------------------------------------------------------+ 9=Enter Search Criteria, Press Esc Key to Transmit 9= :'Press Del Key to Terminate Delete Mode 9= -- CHANGE Contract Transactions 9= -- Contract Number 4169 -- - - - - 1=vendor Name PARAMETRIX -- 9=Subject ENGINEERING SVCS - TRANSPORTATION COMP PLAN 1= 9=Department ENGINEERING 9= 9=Status Code PRO 9= 9= Amount $157118.00 9= -- Begin Date 04/09/2001 " - - Insurance End Date 12/31/2004 " 1= Type Amount Review Date 02/15/2007 1= 9= GL $1000000.00 9= 9= AL $1000000.00 9= 9= E&O $1000000.00 9= 9= Insurance Total $3000000.00 " -- Insurance Review Date 11/01/2005 " - - -- -.- Comments AMENDMENTS #1 11/02 #2 2/04 -- 9= VAULT 01/01/2007 1= 9= 9= +---------------------------~----------------------------------------------+ ------------ CONTRACT MODIFICATION AGREEMENT NO. 2 BETWEEN THE CITY OF BREMERTON AND PARAMETRIX, INC. PROJECT: Transportation Comprehensive Plan CONSULTANT: Parametrix~ Inc. DATE: January 15, 2004 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services Agreement to provide engineering services for the Transportation Comprehensive Plan (the "Contract") entered into between the City of Bremerton and Parametrix~ Inc. on April 9, 2001 and modified by Contract Modification Agreement No. 1 on November 5~ 2002. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows: No Change Section IL Term , is modified as follows: The Contract will terminate on December 31, 2004~ unless otherwise extended by the City. The Consultant shall complete the work described in this Contract Modification Agreement by December 31, 2004 Section III. Compensation , is modified as follows: No Change II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant's claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City's right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and CONTRACT MODIFICATION NO. 2 1 TRANSPORTATION COMP. PLAN PROJECT NO. 10417 other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. city Engineer / Public Works Director approved to process ,.~/']'.t~' ~/~' ~ ~ls an~Dat~' CONSULTANT THE CITY OF ~ON By. ~. ~i~ By oz Its ~ ~i ~[ Its Mayor DATE: t ~[~ DATE: a-lO- O¢ APPROVED AS TO FO~: ATTEST: ~eme.on C~t~ Xttomey ~y E~r~ / NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: 3 ol,~v~ ~e.([ ~ Luke Korpi ?a~t~c~ [~/_. Managing Engineer ~,015 Lo.[c~ l;Ot~i~?r~x ~[V~, City ofBremerton PWfUtilities 5~4-~ 400 u- 3027 Olympus Drive ~.xv, lg.~ log, ~0~3 ~ ~0 Bremerton, WA 98310 Phone/Fax:360-473-5342/5398 CONTRACT MODIFICATION NO. 2 2 TRANSPORTATION COMP. PLAN PROJECT NO. 10417 +Browse: Next Previous First Last Update Delete Restart X - Exit +Retrieve the Next record +Found: 10 Record(s) MAINTAIN Contract Transactions + Contract Number 4169 + +Vendor Name PARAMETRIX +Subject ENGINEERING SVCS - TRANSPORTATION COMP PLAN +Department ENGINEERING +Status Code PRO + Amount $98935.00 + Begin Date 04/09/2001 + Insurance End Date 12/31/2003 + Type Amount Review Date 11/01/2003 + GL $1000000.00 + AL $1000000.00 + E&O $1000000.00 + Insurance Total $3000000.00 + Insurance Review Date 11/01/2003 + + Comments + + CONTRACT MODIFICATION AGREEMENT NO. 1 BETWEEN THE CITY OF BREMERTON AND PARAMETRIX, INC. PROJECT: Transportation Comprehensive Plan CONSULTANT: Parametrix~ Inc. DATE: November 5~ 2002 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services Agreement to provide engineering services for the Transportation Comprehensive Plan (the "Contract") entered into between the City of Bremerton and Parametrix, Inc. on April 9~ 2001. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. Whereas additional work items were requested the City of Bremerton, Parametrix, Inc. desires to modify the contract as further described in Exhibit A-1. For valuable consideration and by mutual consent of the paxties, the modifications to thc Contract are as follows: L · Section 1. Scope , is modified as follows: The contract is supplemented to include the additional work items contained in the "Scope of Work - Downtown Circulation Study" attached as Exhibit A-1. The schedule for work contained in Exhibit A-1 is attached as Exhibit C-1. · Section 2. Term , is modified as follows: The contract will terminate on December 31, 2003, unless otherwise extended by the City. The original contract amount was ninety-eight thousand nine hundred thirty-five Dollars ($98~935.00). The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed fift.¥-eight thousand one hundred eighty three Dollars ($58~183.00) for a total amended contract amount of one hundred fifty-seven thousand one hundred eighteen Dollars ($157~118.00), including this Contract Modification. Charges for the additional work items contained in Exhibit A-1 shall conform to the fee schedule attached hereto and incorporated herein as Exhibit B-1. II. Consultant accepts ali requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement CONTRACT MODIFICATION NO. 1 I November 5, 2002 PROFESSIONAL SERVICES AGREEMENT TRANSPORTATION COMPREHENSIVE PLAN of all claims for contract time and for all costs of any kind, incluaing costs of delays, related to any work either covered or affected by this Contract Modification. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into a contract modification that is binding on the parties of this contract. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. Project Manager approved to process t~x~.~ [ t / 0 Initials and Date City Engineer approved to process ~/~ ~3~ Ifii~als and ~t[ Director, Depa~ment of ~blic Wor~ and Utilities approved to pr~ess ~g ~ /~ I~itial~d ~te CONSULTANT~'~'~-~ ~~ TH~ By ~ ~/, ~.~A- I1~ . ~ ~ ~ ~ By C~ Bozeman Its 0~~ ~, ~ Its Mayor DA~: [k~ ~ O~ DA~: APPROVED AS TO FORM: ATTEST: Bremerton City Attorney City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Mr. Luke Korpi Managing Engineer Bremerton Dept. of Public Works & Utilities 3027 Olympus Drive Bremerton, WA 98310 Phone/Fax: 360-478-5342/360-478-5398 CONTRACT MODIFICATION NO. 1 2 November 5, 2002 PROFESSIONAL SERVICES AGREEMENT TRANSPORTATION COMPREHENSIVE PLAN Exhibit A-1 Scope of Work Downtown Bremerton Circulation Study The purpose of the Downtown Bremerton Circulation Study is to evaluate alternatives to improve transit, pedestrian, bicycle, and vehicle circulation in Downtown Bremerton. The study will consider the effects of all short-term planned improvement projects in the area including: · Puget Sound Naval Shipyard (PSNS) parking garage · Bremerton Conference Center/Hotel · Government Center Complex · Pacific Avenue Park and Museum Three different circulation concepts will be considered in the analysis: · No Build Option - This will assume no changes to the existing street and intersection configurations in Downtown Bremerton · Tunnel Option - This will assume construction of a new two-lane tunnel to accommodate exiting fency traffic between the ferry terminal and Burwell Street. · Surface Option - This option would relocate the primary ferry terminal exit route from Washington to l~t/Pacific/Burwell consistent with the "modified Pacific Gateway" option, the preferred alternative from the BTC EA. For each option, roadway and intersection improvements needed to accommodate exiting ferry traffic will be identified. The Tunnel and Surface Options will emphasize pedestrian and transit improvements on Washington Avenue between the ferry terminal and the Manette Bridge. This will potentially include extending the one-way northbound configuration of Washington Avenue further north. The study area for the analysis will extend from 11th Street to the north, PSNS and the Bremerton ferry terminal to the south, Sinclair Inlet to the east, and Warren Ave. to the west. The Circulation Study will take into consideration past efforts addressing Downtown Bremerton circulation issues including the SR 304 Bremerton-Gorst Environmental Impact Statement (EIS) and Bremerton Transportation Center (BTC) Environmental Assessment (EA). Subsequent phases of the Circulation Study will include the preparation of environmental documentation to supplement or amend one of these documents, since the potential circulation improvements have a strong relationship to either effort. One end of the study area addressed in the SR 304 EIS is Downtown Bremerton including the ferry terminal and the BTC EA also addressed a similar study area. Task 1 - Data Collection and Existing Travel Patterns Objective: To quantify existing traffic flows and directional travel patterns in Downtown Bremerton during PM peak conditions. Discussion: PM peak hour traffic intersection turning movement counts will be conducted at up to nine downtown intersections to obtain existing turning movement volumes. Data from the peak 10-15 minute time period following a car ferny arrival will be used to estimate outbound travel patterns. AM peak hour counts will be obtained at three of the nine intersections to quantify the difference between AM and PM peak volumes. It is anticipated that PM peak volumes will be higher than AM peak volumes at all intersections. Therefore, the LOS analysis described in Task 2 will be completed for the PM peak hour only. Assumptions: Intersection turning movement volumes from the Bremerton Parking Study will be used to summarize and compare to the adjusted 10-15 minute peak volumes. Deliverable: A summary of existing turning movement volumes and travel patterns in Downtown Bremerton for the average one-hour period and for the peak 10-15 minute time period. Task 2 - Prepare Future Base Traffic Volume and Level of Service (LOS) Estimates Objective: To estimate future downtown traffic volumes with planned projects Discussion: Future traffic volume forecasts will be prepared for one future horizon year (2005 or 2010). The future volumes will include traffic generated from the four short-term planned projects mentioned in the introduction and estimated background growth from other traffic sources (such as the ferry terminal) This will include coordination at one meeting with the consultants preparing the traffic impact study for the PSNS parking garage. LOS for existing and future base conditions will be calculated using Synchro software based on the 2000 Highway Capacity Manual. Existing intersection lane configurations will be used for initial LOS calculations. The Synchro software will provide the LOS analysis results as well as visual simulation capabilities to demonstrate the performance of each alternative. Assumption: The LOS analysis will be conducted for the peak 15-minute period after a ferry arrival during the PM peak hour. LOS analysis for the AM peak period will not be conducted as part of this effort. Deliverable: Future year traffic volume forecasts at study area intersections Task 3 - Determine Intersection Lane Needs for Tunnel and Surface Options Objective: To establish the number of lanes needed at study area intersections for the tunnel and surface options Discussion: For both the tunnel and surface options, intersection LOS analysis will be conducted to establish lane requirements to achieve LOS D/E conditions or better at all intersections. The number of intersection lanes will be tested using an iterative process to maximize the overall traffic flow efficiency while minimizing the number of lanes. The tunnel and surface option plans will also address the location of kiss-n-ride activity at the BTC, vehicle/track access to particular businesses and facilities in the BTC vicinity, and the lane requirements and other physical space needs at the ferry terminal. Assumptions: · The initial configuration of Washington Ave. will include a minimum of two northbound travel lanes (one transit-only lane and one lane for traffic destined to the Manette bridge only). The analysis results based on this initial configuration of Washington Ave. will be reviewed to determine whether adjustments to the number of lanes or lane designations are warranted. · All other outbound ferry terminal traffic (except transit and local Manette neighborhood traffic) will be directed to the SR 304 (Burwell Street) and SR 303 (Warren Avenue) corridors · The Bremerton Transportation Center (BTC) bus deck will not be proposed for kiss-n-ride activity Deliverables: · Schematic drawings showing the number of lanes required at study area intersections for the tunnel and surface options · Tabular summary of LOS analysis results for each option Task 4 - Develop Pedestrian, Bicycle and Transit Circulation Elements Objective: To develop pedestrian, bicycle, and transit circulation elements of the tunnel and surface circulation options Discussion: The pedestrian, bicycle, and transit circulation elements will be developed for both the surface and tunnel options. With the tunnel option, the grade-separated ferry terminal egress route will improve the environment for walkers and bicyclists on the surface. For both options, transit circulation will be improved with the addition of an outbound transit only lane on Washington Ave. or other transit-priority treatments.The resulting transit level of service (LOS) and operations will be qualitatively described for each of the options. Deliverable: Maps showing a graphical depiction of the pedestrian, bicycle and transit circulation elements of the tunnel and surface street improvement options. Task 5- Prepare Traffic Impact Study for the Bremerton Conference Center/Hotel Objective: To prepare a stand-alone traffic impact study document for the Bremerton Conference Center using information from Tasks 14 above. Discussion: A traffic impact study for the Bremerton Conference Center/Hotel will be prepared. The traff~c impact analysis will address the impacts from the project at the nine study area intersections during the PM peak hour. Site access requirements for the project will also be evaluated. Assumptions: · The future horizon year for this traffic impact study will be the same as the future horizon year for the Downtown Circulation Study. · The traffic impact study is assumed to be 10-15 pages long and will contain the following sections: ~' Existing Conditions - A suinmary of existing traffic volumes, LOS and street and intersection characteristics in the study area. ~' Future Conditions Without the Project - A summary of future intersection LOS at the nine study area intersections for the future horizon year without the project. ~ Future Conditions With the Project - A summary of trip generation, distribution and assignment of new traffic from the conference center during the PM peak hour, and LOS analysis with the project at study area and site access intersections. ~' Improvements Needed to Mitigate Project Impacts - A summary of street or intersection improvements needed to mitigate project impacts. · Comments on the draft report are assumed to be editorial in nature and would not require additional LOS analysis. · Five copies of the draft and final traffic impact study documents would be provided. Deliverable: Draft and final traffic impact study documents for the Bremerton Transportation Center/Hotel Task 6 -Final Report Preparation and Agency Coordination Objective: To prepare a final report summarizing the work completed in Tasks 1-4 above. Discussion: A final report documenting the technical work in the above tasks 1-4 will be prepared. This will include recommended lane configurations and intersection traffic control at all study area intersections. The final report will become part of the environmental documentation for the Downtown Bremerton Tunnel project. Assumptions: · We will respond to one-round of comments on the draft report from City of Bremerton and Kitsap Transit staff. · We have assumed attendance at three meetings with Kitsap Transit and City of Bremerton staff during the study process. Deliverables: Draft and Final reports (10 copies of each report plus an electronic version of the final report will be provided) Exhibit C-1 Schedule Downtown Bremerton Circulation Study · Work described in Exhibit A-l, Task 5 will be completed by November 21, 2002 · Work described in Exhibit A-I Tasks 1-4 and Task 6 will be completed by March 1, 2003. PROFESSIONAL SERVICES AGREEMENT Parametrix Inc. THIS AGREEMENT is between the City of Bremerton, a municipal corporation (hereinafter referred to as "City" and "Owner") and PARAMETRIX Engineering (hereinafter referred to as "Consultant" and "PARAMETRIX"). WITNESSETH: 1. SCOPE: Consultant agrees to provide engineering services for the Transportation Comprehensive Plan as further described in the Scope of Work attached hereto and incorporated herein by this reference as Exhibit "A". The schedule for this work is attached hereto and incorporated herein by this reference as Exhibit "C" (Schedule). 2. TERM: Contract shall commence on the date of this agreement and will terminate on December 31, 2002, unless otherwise extended by the City. 3. COMPENSATION: City shall pay Consultant compensation as follows: Total fees under this Agreement shall not exceed ninety-eight thousand nine hundred thirty- five ($98,935.00). Charges for services shall conform to the fee schedule attached hereto and incorporated herein as Exhibit "B". Consultant shall submit regular statements describing the services rendered with a breakdown for work completed as authorized under this Agreement. The City, upon receipt of thc completed statement, shall promptly process said claim for payment. Additional services which may bc requested by the City will be paid for by the City at the rates set forth in Exhibit B, which sum may exceed thc "not to exceed" amount set forth above. However, said services will only be performed, and compensated by thc City after the City has directed such performance in writing. 4. RELATIONSHIP OF PARTIES: The parties understand and agree that PARAMETRIX Engineering, Inc. is a firm skilled in matters pertaining to Civil Engineering and will perform independent functions and responsibilities in the area of its particular field of expertise. Consultant and its personnel shall act as independent contractors and not employees of the City. As such they have no authority to bind either the City or control employees of the City, contractors, or other entities. Within the performance of these duties, Consultant shall work under the direction of the Director of Public Works & Utilities. 5. INDUSTRIAL INSURANCE: Consultant agrees to provide for State industrial insurance coverage for its personnel as required by State law. 6. LICENSE AND TAXES: Consultant shall possess a current Bremerton Business PROFESSIONAL SERVICES AGREEMENT -1- PAR~ETRIX.PSA - 3/i/01 ab, Transp Comp Plan, PSA License and any regulatory license required to fulfill Consultant's obligations under this Agreement. B & O taxes shall be paid when due and Consultant, by this Agreement, assigns any payments due under this Agreement to the City Clerk for payment of such taxes that have been declared delinquent. 7. INSURANCE AND HOLD HARMLESS: Consultant shall provide professional liability or errors and omissions insurance of $1,000,000 per claim and comprehensive general liability insurance, including bodily injury and property damage, of at least $1,000,000 per occurrence. The City shall be named an additional insured on the comprehensive general liability insurance policy. Consultant shall, at all times, be responsible for the negligent or wrongful acts or failures to act of its personnel which occur or arise in any way out of the performance of this agreement. Consultant agrees to defend and indemnify and hold harmless the City, its appointed and elected officers and employees, from and against any and all liability, loss, costs, damage, and expense, including costs and attorney fees in defense thereof, because of actions, claims or lawsuits for damages resulting from personal or bodily injury, including death at any time resulting therefrom, sustained by any person or persons, and on account of damage to property, to the extent arising out of the negligent performance of this Agreement, if such injuries to persons or damage to property is due to the negligence of the Consultant, its subcontractors, its agents or assigns. This provision shall be inapplicable to the extent such damage or injury is judicially found to be caused by the negligence of the City. The parties have specifically negotiated to provide that Consultant defend, hold harmless, and indemnify the City for all claims, damages, and losses, including attorneys fees, arising from any claims of Consultant's employees for injuries covered by Title 51 RCW, and for which Consultant could not be held directly liable. 8. GENERAL CONDITIONS: a. Reports and Information - Consultant, at such times and in such forms as the City may require, shall furnish the City such reasonable periodic reports and documents as it may request pertaining to the work or services undertaken pursuant to this Agreement, the costs and obligations incurred or to be incurred in connection therewith, and any other matters covered by this Agreement. Consultant will maintain accounting records in accordance with generally accepted accounting principles and practices to substantiate all invoiced amounts. b. Entire Agreement - This Agreement constitutes the entire agreement between the parties and both parties acknowledge that there are no other agreements, written or oral, that have not been fully set forth in the text of this Agreement. There are attached hereto and incorporated by reference as part of this Agreement Exhibits "A, B, & C". c. Amendments - The parties hereby further agree that this Agreement cannot be amended or modified without the written concurrence of both parties. PROFESSIONAL SERVICES AGREEMENT -2- PARA~4ETRIX. PSA 3/1/01 ab, Transp Comp Plan, PSA d. Notices - Any notices required to be given by the City to Consultant or by Consultant to the City shall be in writing and delivered to the parties at the following addresses: City Clerk PARAMETRIX 239 Fourth St. 5808 Lake Washington Blvd, NE Bremerton, WA 98337 Suite 200 Kirkland WA 98033-7350 e. Waiver - Failure to insist upon strict compliance with any terms, covenants or conditions of this Agreement shall not be deemed a waiver of such, nor shall any waiver or relinquishment of such right or power at any time be taken to be a waiver of any other breach. f. Compliance with State, Local and Federal Laws - Consultant agrees to comply with all applicable local, state and federal laws in performance of all services under this Agreement. g. Applicable Law; Venue - This Agreement shall be construed and interpreted in accordance with the laws of the State of Washington and, in the event of dispute, the venue of any action brought hereunder shall be in Kitsap County Superior Court. h. Attorney Fees - The substantially prevailing party in any litigation arising hereunder shall be entitled to its reasonable attorney's fees and court costs, including appeals, if any. 9. NONDISCRIMINATION: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status or disability, except employment actions based on a bona fide occupational qualification. 10. TERMINATION: This Agreement may be terminated by either party for convenience upon thirty (30) days' written notice to the other party, or for cause if either party fails substantially to perform through no fault of the other and does not commence correction within five (5) days of written notice and diligently completes the correction thereafter. Upon such termination, City will be entitled to reports showing the status of all matters upon which Consultant is advising the City as of the effective date of termination. 11. STANDARD OF PERFORMANCE: The standard of care for all professional engineering and related services performed or fiu'nished by Consultant under this Agreement will be the care and skill ordinarily used by members of Consultant's profession practicing under the same or similar circumstances at the same time and in the same locality. 12. CONSTRUCTION PROCEDURES: notapplicable (noconstructionprocedures are directly associated with this projecO. 13. RE-USE OF DOCUMENTS: All documents, including all reports, drawings, PROFESSIONAL SERVICES AGREEMENT -3- PARAMETRIX . PSA 3/1/01 ab, Transp Comp Plan, PSA specifications, computer software or other items prepared or fumished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are property of the City. The format for docments and work products shall be as specified in the exhibits. The City agrees, to the fullest extent permitted by law, to indemnify and hold the Consultant harmless from any claim, liability or cost (including reasonable attorneys' fees and defense costs) arising or allegedly arising out of any reuse of the documents, other than for the specific project and purpose for which they were prepared, by the City or any person or entity that acquires or obtains the documents fi.om or through the City. 14. HAZARDOUS MATERIALS: not applicable (there are no construction projects or subsurface exactions associated with this projecO. 1N WITNESS WHEREOF the parties hereto have executed this Agreement the date and year indicated. PARAMETRIX CITY OF BREMERTON Date: ~'~'~'~ -C} ' BY: L~S. HO~R~ N,~ayo~rO DEP~TMENTAL ~PROV~: ~omey Received for Filing: ~TH~EN L. McCLUS~Y, Ci~ Clerk PROFESSION~B SERVICES ~GREE~ENT -4- Exhibit A Bremerton Comprehensive Transportation Plan Scope of Work Introduction The specific tasks for completing the Bremerton Transportation Plan Update are organized in three phases reflecting the primary deliverables. · Phase 1 will provide a more complete and thorough update of the Transportation Plan in conjunction with the Comprehensive Plan update planned in 2002. The transportation plan update will address all travel modes and facility types in the City of Bremerton including: streets and highways, HOV facilities, ferry traffic, bus transit, pedestrian and bicycle facilities, and transportation demand management. Facilities in each of these areas are all integral parts of the overall multi-modal transportation system. Phase 2 will update the Transportation Element of the Comprehensive Plan focusing on establishing a furore vision for transportation and developing goals and policies to achieve the vision. This phase will be developed in close coordination with the overall Bremerton Comprehensive Plan Update process. The objective, approach, and deliverables for each phase and work task are summarized below. PHASE 1 - Prepare Comprehensive Transportation Plan Task 1.1 -Public Outreach/Interagency Coordination Objective: To involve all interested and affected community members as well as other agency staff throughout the transportation planning process. Approach: In order to achieve the goal ora transportation plan that is supported by all involved, it is important to include community members and affected agencies throughout the process of developing the plan. We will work closely with City of Bremerton staff to develop a public outreach plan to solicit citizen input. A series of three community workshops is recommended as one element of the community outreach effort. These workshops could be combined with other elements of the Comprehensive Plan or could focus exclusively on transportation issues. The community workshops are suggested during the following phases of the project: (1) visioning/problem identification, (2) initial concept development, and (3) draft transportation plan completion. As part of the outreach effort, we will also be available to conduct smaller focus meetings with the City Council, Planning Commission, or other community groups. (A total of three council/plauning commission meetings were assumed.) Other agencies affected by the transportation plan, including the Washington State Department of Transportation (WSDOT), Kitsap County, and Kitsap Transit, will be kept informed and involved throughout the process, and proposed improvements will be developed in coordination with the agencies' proposed plans. (A total of 2 meetings with staff from other agencies were assumed.) City Responsibilities: · Lead meeting set-up, announcement, and advertisement. · Assist with meeting facilitation and presentations. · Attend meetings with other affected agencies. Deliverables: Informational materials, graphics, and displays fi)r the meetings. Task 1.2 - Develop Transportation Goals and Policies Objective: To develop transportation and goals and policies that reflect community values and the vision for future development. Approach: We will work closely with Bremerton staff involved in updating the Comprehensive Plan to develop transportation goals and policies. This will begin with a review of Regional goals and policies from the PSRC Destination 2030 Plan. The goals and policies will establish the direction for future transportation system improvements in Bremerton, while emphasizing viable options to the automobile. The transportation goals and policies may also address facility design, neighborhood protection, environmental protection, and other values important to the community. City Responsibilities: · Provide initial direction to the consultant team on the primary categories and content of transportation policies. · Provide consistency review and comparison with other Comprehensive Plan policies. · Provide a map of Bremerton center locations. Deliverable: Draft and Final technical memo listing the transportation goals and policies. Task 1.3 - Existing Conditions and Deficiencies Identification Objective: To develop an accurate base of information on the existing conditions and deficiencies of the transportation system. Approach: All existing transportation system information will be compiled and summarized based on available information and field visits to the site. This information will include current roadway functional classifications based on the existing Transportation Plan, traffic volumes, and level of service (LOS); existing transit, ferry, and bicycle/pedestrian facilities; and deficiencies based on existing LOS and any high accident locations. This will include development of a prioritized list of traffic count locations to be conduced in spring/summer 2001. The existing functional classification of arterial streets will be reviewed for internal consistency and appropriateness. Changes to the existing functional classifications will be recommended where appropriate. The City's street maintenance program will also be described. City Responsibilities: · Compile all existing traffic volume information and conduct new counts. · Compile information on the components, frequency, and budget for the City's existing maintenance program. · Compile all existing traffic accident information. Deliverable: Existing conditions information presented in graphical format on a network map of the City. Task 1.4- Travel Demand Forecasting and Future Deficiencies Identification Objective: To prepare a city-wide transportation planning model utilizing the UFOSNET computer software package. The UFOSNET model will analyze the effects of local and regional growth on the city-wide system. Approach: One of the first steps in determining the future needs or deficiencies in the transportation system is to develop future travel demand forecasts within the study area. RST International is fully equipped to develop a City-wide travel demand forecasting model based on future year population and employment estimates in the City of Bremerton (consistent with the City's Comprehensive Plan) and Kitsap County, as well as existing transportation system characteristics collected in Task 2.3. Future system deficiencies will be identified based on traffic volume forecasts at least 20 years into the futme. System deficiencies will initially be identified using a level-of-service (LOS) C or D or better threshold for meeting transportation system concurrency. City Responsibilities: · Provide future population and employment estimates by Transportation Analysis Zone (TAZ). Deliverable: Future traffic volume forecasts on arterial streets within the City of Bremerton and a list of roadways falling below the LOS C or D threshold. Task 1.5 - Transportation Improvements, Cost Estimates, and Funding Sources Objective: To identify transportation facility improvements, cost estimates, and financing options for the system deficiencies identified in Task 2.4. Approach: This task involves the development and evaluation of alternative transportation improvements that are needed to eliminate the transportation system deficiencies identified in Task 2.4. The transportation goals and policies described in Task 2.2, current non-motorized plans, WSDOT's SR 303 improvement plans, and Kitsap Transit's goals will all be considered in developing the City's transportation system improvements. The improvements will be grouped into three future transportation networks to be tested with the travel demand forecasting model. Potential improvements would include widened roadways and intersections or greater efficiency gained through Transportation Demand Management (TDM) and Transportation Systems Management (TSM) strategies. Improvements for pedestrians, bicyclists, transit and ferry riders, and neighborhood traffic control devices will also be identified. LOS estimates for future conditions ~vith and without the system improvements will be prepared. Preliminary cost estimates (including right-of-way acquisition costs) and potential funding sources for the improvements will also be identified as part of this task. Where possible, transportation improvement projects will be defined to maximize chances of scoring highly on competitive grant applications. City Responsibilities: · Provide historical information on the mount of outside transportation funding used for City projects. · Provide unit cost information on recent capital improvement projects in the City. Deliverable: A 20-year list of transportation improvements and preliminary cost estimates. Task 1.6 - Reassessment and Concurrency Objective: To reassess and balance transportation improvement costs, level of service standards, and future land use forecasts and provide an ongoing "Concurrency Management System" to ensure adequate capacity for new development. Approach: The City of Bremerton's Comprehensive Plan was used to guide the transportation system planning process in the previous work tasks. Upon developing the improvements and transportation network costs associated with these improvements, it may be necessary at this point to reassess the framework which established the identified improvements. We will work closely with City staffto determine whether and how the framework would be revised. The elements of the Comprehensive Plan Transportation Element that could be affected include the following: level of service standards, financing or budgetary priorities, and transportation improvements. Modifications to the City's current street design standards will also be developed in this task. City Responsibilities: · Provide initial input on strengths and weaknesses of current design standards. · Provide input to the consultant team on balancing the level of service and financing elements of the transportation plan. Deliverable: A revised list of transportation improvements and cost estimates and concurrency management system recommendations. The revised project list would become the Capital Improvement Project list for the city. Task 1.7 - Draft and Final Transportation Plan Objective: To prepare Draft and Final Transportation Plan documents. Approach: The transportation plan must include action strategy for bringing into compliance any existing facilities or services that are below established LOS standards, and provide for expansion of facilities and services to meet future needs at established LOS standards. The strategy must be financially sound; planned needs must be financially feasible and committed for implementation within six years. The strategy must be consistent with the six-year transportation improvement programs required for the City, Kitsap County, Kitsap Transit, and WSDOT. City Responsibilities: · Review and comment on the Draft and Final Transportation Plan documents. Deliverables: Draft and Final Transportation Plan documents. Phase 2 - Prepare Transportation Element of the Comprehensive Plan Objective: To summarize the Final Transportation Plan into the overall Comprehensive Plan document. Approach: · Summarize the planning requirements established by the Growth Management Act (GMA). · Summarize the community vision and values and related to transportation. · Restate the Transportation goals and policies developed in Task 2.2. · Production coordination and assistance. · Up to two meetings with City staff for coordination. City Responsibilities: · Attend up to two coordination meetings. · Review and comment on the Draft Transportation Element. Deliverable: Transportation Element of the Bremerton Comprehensive Plan EXHIBIT B CITY OF BREMERTON TRANSPORTATION COMPREHENSIVE PLAN COMPENSATION Compensation for Consultant's services under this Contract shall be on a Cost Plus Fixed Fee basis but not to exceed the Total Price. The sum of Cost and Fixed Fee shall be the compensation for the Scope of Services. The budget for this project is as shown in Table B-1. Cost shall include Direct Labor Cost, Indirect Costs, and Reimbursable Expenses. Cost shall he an amount equal to Direct Labor Cost times a factor of 2.85 plus Reimbursable Expenses. Direct Labor Cost shall mean salaries and wages, (basic and overtime) paid to all personnel for time worked directly on the project. Indirect Costs shall include overhead, taxes and other indirect project administrative costs. Fixed Fee shall mean a fixed amount of fee that is added to the Cost. The Fixed Fee for all tasks included in the Scope of Services shall be at a rate of twelve percent (12%) on the additional work Cost excluding Reimbursable Expenses. The Cost may vary, but the Fixed Fee shall remain the same provided the Scope of Services does not change. The fixed fee will be prorated and paid monthly in proportion to the project work satisfactorily completed. A payment for an individual month shall include that portion of the fixed fee allocable to the project work satisfactorily completed during the month and not previously paid (e.g. pro-rated in accordance with the amount spent-to-date). Any portion of the fixed fee not previously paid in the monthly payments shall be included in the final payment. Compensation Schedule Reimbursable Expenses shall mean the actual expenses incurred directly or indirectly in connection with the project for transportation travel, subconsultants, subcontractors, computer usage, telephone, fax, shipping and express, and other incurred expense. Charges for reimbursable expenses incurred by the Consultant will he at the following rates as shown in Table B-2. The amount of any sales tax, excise tax, or gross receipts tax that may be imposed on this Agreement shall be added to the Consultant's compensation as Reimbursable Expenses. City of Bremerton 1 Table B-2. Reimbursable Expense Charges Item Billin$ Rate Miscellaneous Postage at cost Travel Mileage at 34.5 cents per mile or the current Internal Revenue Service (IRS) allowable rate for business usc of an automobile Other travel expenses at cost Copying Standard at t0 cents per page Plotting~ 1 lx17 ~ $3.00 per sheet 22x34 ~ $7.00 per sheet HP755 color ~ $8.50 per sheet Phone At-cost Fax In-coming ~ No charge Outgoing ~ $0.55 per page Computer Engineer ~ $10 per hour CADD ~ $15 per hour 1. In-house billing rate listed above; outside plotting will be billed "at-cost". Monthly invoices shall be submitted to the City for work performed subsequent to work covered by all previously submitted invoices and shall be computed pursuant to the rates and limitations set forth above. The approximate distribution of costs with respect to the tasks is presented in the budget estimate. Consultant may adjust the distribution of compensation between individual tasks for the work noted herein to be consistent with services actually rendered, but shall not exceed the total estimated compensation amount unless approved in writing by the Owner. No costs shall be charged to the budget for Task 3 without written authorization from the City. The labor rates listed herein are representative of the actual rates that might apply during the term of this Agreement. Billings will be based on the individual labor rates current at the time the services being billed for were performed. Labor rates are subject to change without notice. Parametrix will notify the City of labor rate changes 30 days before submitting an affected invoice. Labor rate changes shall not alter the stipulated "not to exceed" amount or fixed fee. The overhead rate shall be fixed for the term of this Agreement. City of Bremerton 2 EXHIBIT C CITY OF BREMERTON TRANSPORTATION COMPREHENSIVE PLAN PROJECT SCHEDULE The schedules for work conducted under this Agreement are listed herein. The Consultant understands that the City Public Works Department must complete the bulk of the Transportation Comprehensive Plan by the end of 2001 and certain other activities within a schedule defined by other departments (e.g. Planning). The following milestones are intended to meet this schedule. Consultant Notice to Proceed March 28, 2001 Transportation Element Final 2001 Comprehensive Plan Update - April 30, 2001 Transportation Element Draft Transportation Comprehensive Plan December 28, 2001 Final Transportation Comprehensive Plan February 6, 2002 Draft 2002 Comprehensive Plan Update - February 27, 2002 Transportation Element Final 2002 Comprehensive Plan Update - March 27, 2002 Transportation Element City of Bremerton 3