MONTGOMERY WATSON HARZA
CALLOW AVE CSO PUMP STATION - DESIGN & BID SUPPORT
ENGINEERING
PRO
9=
+
9=
9=
9=
Insurance
Type Amount
GL $2000000.00
E&O $5000000.00
Amount
Begin Date
End Date
Review Date
$264613.00
04/05/2001
12/31/2002 9=
02/15/2005 9=
9=
9=
9=
9=
9=
9= I
+--------------------------------------------------------------------------+
Insurance Total
Insurance Review Date
$7000000.00
08/01/2005
Comments
E&O EXPIRES 5/1/03 AMENDMENT *1 4/2/02
NEARLY COMPLETE 03/2003 VAULT 01/01/2005
-.-
+--------------------------------------------------------------------------+
Browse:
Retrieve
Found: 1
Next Previous First Last Update
the Next record
Record(s) MAINTAIN
Contract Number 4168
Delete Restart X - Exit
,.
t
Contract Transactions
- -Vendor Name
"Subject
, 'Department
"Status Code
MONTGOMERY WATSON HARZA
CALLOW AVE CSO PUMP STATION - DESIGN & BID SUPPORT
ENGINEERING
PRO
Insurance
Type Amount
GL $2000000.00
E&O $5000000.00
Amount $264613.00
Begin Date 04/05/2001 "
End Date 12/31/2002 ..
Review Date 02/15/2005 ..
..
Insurance Total $7000000.00 "
Insurance Review Date 09/01/2004 ..
..
"
"
Comments
E&O EXPIRES 5/1/03 AMENDMENT #1 4/2/02
NEARLY COMPLETE 03/2003 VAULT 01/01/2005
"
T
,.
+--------------------------------------------------------------------------+
AMENDMENT NO. 1
TO
PROFESSIONAL SERVICES AGREEMENT
FOR
CONSTRUCTION SUPPORT SERVICES
The City of Bren~rton, Washington, (the "City"), and Montgon~ry Watson Harza, ("Consultant") have
entered into a PROFESSIONAL SERVICES AGREEMENT, hereinatler refen'ed to as AGREEMENT for
a project described as the Callow Avenue CSO Pump Station.
This AMENDMENT NO. 1 modifies the Scope of Work and Budget set forth in the AGREEMENT dated
April 2, 2001, as follows:
The Scope of Work shall be modified to add additional scope items as outlined in the attached Amendment
No. 1, Exhibits E and F.
The Compensation for services shall be increased by $134,667 and the total fees under this Agreement shall
not exceed Three Hundred Ninety Nine Thousand Two Hundred Eighty dollars ($399,280.).
Except as herein modified, the terms of the AGREEMENT shall remain in full force and effect.
In WITNESS WHEREOF, the parties hereto have executed the AMENDMENT NO. 1 to the Professional
Services Agreement the date and year indicated.
For Montgomery Watson Harza, dated this [ ~ day of //~r~ ], 2002.
By:
For the City of Bremerton, dated this ~ day of
DEP~OVAL: Cary Bozeman~ Mayor
W. Eugene ~ampley, l~'n:ff'Pubhc Works and UtthUes
APP~g. Ov~n A g 2D_~O~:
City~ttomey ~
RECEIVED FOR FII~ING:
Kathleen McCluskey, City Clerk
AMENDMENT NO.1
EXHIBIT E
SCOPE OF WORK
CITY OF BREMERTON
WB-6 PUMP STATION
CONSTRUCTION SUPPORT SERVICES
BACKGROUND AND GENERAL PROJECT DESCRIPTION
Montgomery Watson Harza (Consultant) has designed the WB-6 Pump Station, a 7,500 gpm CSO pump
station involving wet-pit submersible pumps, a hydropneumatic surge control tank, a standby engine
generator, electrical enclosure, and associated appurtenances. The City of Bremerton (City) plans to
construct the project during calendar year 2002 under a single lump sum construction contract. The
anticipated duration of construction is 6 months, all-inclusive.
The City will provide all construction contract administration, day-to-day inspection of the work, and
interface with the construction contractor and other entities involved in the construction process. The
City has requested that the Consultant provide limited construction support services, consisting of office
engineering and periodic field assistance to support the City's construction management effort.
Services described herein will be performed by Montgomery Watson Harza, with the exception of
electrical and instrumentation work (performed by Casne Engineering, Inc.), and geotechnical support
(provided by GeoEngineers).
In addition to constmctinn support services, this Scope of Work includes additional work performed
during final design of the WB-6 Pump Station, as described under Task 6.1.
A. SCOPE OF WORK
TASK 1: OFFICE ENGINEERING
Task 1.I - Shop Drawing Submittal Reviews
Consultant will review shop drawing submittals for major civil, structural, mechanical, electrical, and
instrumentation items. A list of anticipated subm/ttals is included as Exhibit 1. Submittals not included
in Table 1 but required under thc contract will be reviewed by the City. The budget estimate assumes
that shop drawings will be approved in no more than two submittal events (i.e., one original submittal and
one subsequent resubmittal). Shop drawings requiring mom than two submittal events may necessitate an
adjustment of the Consultant's budget.
Work Product: Shop drawing submittal reviews, prepared on City's standard shop drawing
submittal review form included in the construction documents. Consultant shall receive six
copies of each submittal from the City. Four copies of each submittal will be returned to the City
complete with accompanying submittal review form, and clarifying "red-line" marks on submittal
as required.
Task 1.2 - Technical Support for Document Interpretations and Change Orders
Consukant will respond to City-furnished requests for clarification or interpretation of the construction
documents, and will provide support for change order-related items on an as-needed basis. The level of
effort for this task is difficult to predict; a budget allowance of 72 hours (6 months x 12 hours per month)
of engineering staff time is established each for Montgomery Watson Harza and Casne Engineering, Inc.
Amendment No. 1
Exhibit E, City of Bremerton WB-6 Pump Station Conslrucfion Support Page E - I
Construction contractor's Requests for Information shall be prepared on standard City forms included in
the construction documents.
A budget allowance of 32 hours of geotechnical staff time is established for GeoEngineers for techrdcal
support services related to geotechnical work, to be used on tasks determined at the discretion and
direction of the City.
Work Product: Written plan clarifications and supporting sketches, prepared on City's Request
for Information form included in the construction documents..
TASK 2: FIELD SUPPORT
Task 2.1 - Periodic Meetings and Construction Site Visits
Consultant shall attend the Preconstruction Conference and shall perform construction site visits at times
requested by thc City. Montgomery Watson Harza shall provide up to 6 site visits and Casn¢
Engineering, Inc. up to 8 site visits. Visits are anticipated to require 6 hours total duration.
Work Product: Notes from periodic site visits describing action items and presenting their
resolution.
Task 2.2 - Startnp Assistance
Consultant shall provide on-site startup assistance to assist the City with validation of pump station
operation, and control and alarm systems. Startup assistance shall include 40 hours of on-site t/me by
Montgomery Watson Harza, 40 hours of on-site time by Casne Engineering, Inc, and 16 hours of shop
testing of control panelwork/PLC system by Casne Engineering, Inc.
Work Product: Field notes from starmp activities, including suggested items for punch list.
Tabulation of alarm and control point testing/validation activities, noting initial setpoints for
control and alarm systems.
TASK 3: O&M MANUAL PREPARATION
Task 3.1 - Prepare Draft O&M Manual
Consultant will prepare a draft O&M Manual for the WB-6 Pump Station which meets the requirements
of WAC 173-240-080. The O&M Manual will utilize text, photographs, and drawings to describe the
following aspects of the pump station: Design criteria and pump/rig capacities; relationship with
upstream gravity conveyance and the Cross Town Pipeline; and the general theory of pump station
operation; pumping system operation; surge control system operation; equipment inspect/on and
maintenance schedule; facility operation during maintenance; emergency procedures; safety; and record-
keeping logs and forms. Vendor-furnished O&M data submitted under Section 01300 of the construction
documents shall be used in combination with the O&M Manual prepared by the Consultant. For
example, equipment-specific maintenance procedures/requirements [WAC 173-240-080 (4) (i)] and spare
parts/supplier/warranty/catalog data [WAC 173-240-080 (4) (k)] shall be contained in the vendor-
furnished O&M data, but not repeated in the O&M Manual.
Six copies of the draft O&M Manual will be submitted to the City for review during the fifth month of
construction, two of which will be forwarded to the Department of Ecology for review.
FFork?roduct: Draft O&M Manual.
Amendment No. l
Exhibit E, CiB' of Bremerton WB-6 Pmnp Station Construction Support Page E - 2
Task 3.2 - Prepare Final O&M Manual
Within 30 days of receipt of City and Department of Ecology comments on the draft O&M Manual,
Consultant will prepare a final O&M Manual. Six copies of the final O&M Manual will be furnished to
the City.
Work Product: Final O&M Manual.
TASK 4: PROJECT MANAGEMENT
Task 4.1 - Project Management
Consultant will prepare up to seven monthly invoices for services performed. Invoices will include a
brief summary of major work activities performed during invoice period and a budget summary by task
noting amount expended and amount remaining.
Work Product: Monthly invoices.
TASK 5: CONSTRUCTION SUPPORT CONTINGENCY
Task 5.1 - Construction Support Contingency Allowance
This task is intended to provide a reserved budget for unanticipated construction support activities. It is
understood that the Consultant must obtain prior authorization to utilize the contingency budget. Scope
of services and budget for contingency tasks will be defined when authorization is requested. A budget
allowance of $5,000 is established for this task.
Work Product: To be defined if contingency work is requh-cd.
TASK 6: ADDITIONAL DESIGN SERVICES
Task 6.1 - Additional Design Services
Tt~s task addresses engineering antivities performed during final design of the WB-6 Pump Station which
the City agrees arc beyond the Scope o£Work for design. Specific items include:
a) Modification of civil and electrical site plan drawings to accommodate revisions required by
Kitsap Transit.
b) Specifications for provision of a pre-engineered metal building to house electrical panelwork.
c) Electfic/panelwork revisions.
d) Electrical and control-related design work for thc sm:ge control system.
Work Product: Design drawings and specifications, as reflected in the January 2002 Drawings
and Specifications for the WB-6 Pump Station.
C. SERVICES PROVIDED BY THE CITY
1. Construction contract award, construction contract administration, day-to-day inspection of
construction work, punch list preparation, project closeout, and warranty-related service
administration.
Amendment No. 1
Exhibit E, City ofBremerton WB-6 Pump Station Construction Support Page E - 3
2. Transmittal of shop drawing submittals (6 copies) for review by Consultant, sent by overnight
delivery within 24 hours of receipt whenever possible. Where submittals require review by Casne
Engineering, Inc., 2 copies shall be sent directly to Casne, with 4 copies to Montgomery Watson
Harza.
3. Transmittal of construction contractor's Requests for Information sent via e-mail or facsimile, within
24 hours of receipt.
4. Access to construction site and staffaccompaniment during site visits.
5. Establishment and maintenance of logs to track the disposition of shop drawing submittals,
Contractor Requests for Information, and similar priority paperwork. City will provide Consultant
with weekly updates of said logs.
6. Conduct construction-related meetings, including preparation of agendas and preparation/distribution
of meeting notes.
7. Construction materials testing (geotechnical/soils, concrete, welding, etc.).
8. Payment of fees for construction-related permits and approvals.
9. Maintenance of record drawings at the construction site, including regular review of construction
contractor's record drawings for completeness and accuracy.
10. Construction progress photographs.
11. Review of vendor O&M submittals
D. SCHEDULE
Services am anticipated to begin during April 2002 and conclude no later than Janum'y 1, 2003.
Amendment No. l
Exhibit E, CiD, of Bremerton WB-6 Pump Station Construction Suppor[ Page
TABLE 1
CITY OF BREMERTON
CONSTRUCTION SUPPORT FOR PUMP STATION WB-6
ANTICIPATED LIST OF SHOP DRAWING SUBMITTALS
Division 01 - General Requirements
01300 List of submittals
01311 Construction schedule (anticipate one odginal
submittal and one update)
01660 Testing and startup plan
Division 02 - Sitework
02140 Construction dewatering plan
02160 Excavation support (shoring) systems
02556 RCP pipe, ASTM C-76
Division 03 - Concrete
03100 Concrete formwork (for cast-in-place wet well)
03200 Reinforcing steel (for cast-in-place wet well)
03290 PVC waterstop
03290 Construction joint sealant
03300 Concrete mix designs
03315 Grout
Division 07 - Thermal and Moisture Protection
07920 Sealants and caulking
Division 09 - Protective Coatings
09800 Protective coatings
Division '11 - Equipment
11148 Submersible non-clog pumps
11149 Sump pumps
Division 13- Special Construction
13202 Surge contro~ system (surge tank, complete
and including compressor and controls))
13251 Activated carbon canister
Division 15 - Equipment
15000 Vault and wet well piping layout
15000 Yard piping layout
15000 Cross Town Pipeline Hot Tap Connection
15000 Sleeve-type couplings
15006 Pipe support configurations
Amendment No. 1
Exhibit E, City ofBremerton WB-6 Pump Station Construction Support Page E - 5
15006 Pipe support location drawings
Division 15 - Equipment (continued)
15081 Magnetic flow meter
15201 Valve actuatom
15203 Swing check valves
15206 Resilient seated gate valves
15230 Air-vacuum and air-release valves
15850 In-line exhaust fan
Division 16 - Electrical (Casne Engineering, Inc.)
16010-16180 Basic electrical materials
16200 Engine generator
16400 Service and metedng
16460 Transformem
16471 Panelboards
16740 Telephone service
16850 Electrical heat tracing
16910 Vadable frequency drives
16920 Motor control centem
16922 Power and control panel
'~6922 PLC program (program developed by othem)
16950 Pm-engineered metal electrical building
AJnendment No. I
Exhibit E, City of Bremerton WB-6 Pump Station Construction Support Page E - 6
PROFESSIONAL SERVICES AGREEMENT
CITY OF BREMERTON - CALLOW AVENUE CSO PUMP STATION
PREDESIGN, DESIGN, AND BID SUPPORT SERVICES
Montgomery Watson Americas, Inc.
THIS AGREEMENT is between the City of Brcmcrton, a municipal corporation
(hcreinai~er referred to as "City" and "Owner") and Montgomery Watson Americas, Inc.
(hereinafter referred to as "Consultant").
WITNESSETH:
1. SCOPE: Consultant agrees to provide engineering s~rvices for the predesign, design, and
bid support services of the Callow Avenue CSO Pump Station, and predesign of the Callow Avenue
Storage Structure, as further described in the Scope &Work, attached h~r~to and incorporated herein
by this reference as Exhibit "A" (Scope of Work). The schedule for this work is attached hereto and
incorporated by this reference as Exhibit "C" (Schedule). Thc quality and expected content of
engineering design products produced by the Consultant for this work and delivered to the Owner is
described in Minimum Requirements for Architectural Engineering Design Product Submittals,
attached hereto and incorporated by this reference as Exhibit "D".
2. TERM: Contract shall commence on the date &this agreement and will terminate on
December 31, 2002, unless otherwise extended by thc City.
3. COMPENSATION: City shall pay Consultant compensation as £ollows:
Total fees under this Agreement shall not exceed two hundred sixty four thousand, six
hundred thirteen dollars. Charges £or services shall conform to thc £¢¢ schedule attached hereto and
incorporated herein as Exhibit "B".
Consultant shall submit regular statements describing thc s~wiccs rendered with a
breakdown for work completed as authorized under this Agreement. Thc City, upon receipt of thc
completed statement, shall promptly process said claim £or payment.
Additional services which may be requested by thc City will be paid for by the City at the
rates set £orth in Exhibit B, which sum may exceed thc "not to exceed" amount set forth above.
However, said s~rvices will only be performed, and compensated by the City after the City has
directed such performance in writing.
4. RELATIONSHIP OF PARTIES: The parties understand and agree that Montgnmcry
Watson Americas, Inc. is a firm skilled in matters pertainin§ to Civil Engineering and will pcr£orm
independent functions and responsibilities in thc area &its particular field of expertise. Consultant
PROFESSIONAL SERVICES AGREEMENT -1-
Montgomery Watson PSA - 2/27/01
and its personnel shall act as independent contractors and not employees of the City. As such they
have no authority to bind neither the City or control employees of the City, contractors, or other
entities. Within the performance of these duties, Consultant shall work under the direction of the
Director of Public Works & Utilities.
5. INDUSTRIAL INSURANCE: Consultant agrees to provide for State industrial
insurance coverage for its personnel as required by State law.
6. LICENSE AND TAXES: Consultant shall possess a current Bremerton Business
License and any regulatury license required to fulfill Consultant's obligations under this Agreement.
B & O taxes shall be paid when due and Consultant, by this Agreement, assigns any payments due
under this Agreement to the City Clerk for payment of such taxes that have been declared delinquent.
7. INSURANCE AND HOLD HARMLESS: Consultant shall provide professional
liability or errors and omissions insurance of $1,000,000 per claim and commercial general liability
insurance, including bodily injury and property damage, of at least $1,000,000 per occurrence. The
City shall be named an additional insured on the commercial general liability insurance policy.
Consultant shall, at all times, be responsible for the negligent or wrongful acts or failures to
act of its personnel which occur or arise in any way out of the performance of this agreement.
Consultant agrees to defend and indemnify and hold harmless the City, its appointed and elected
officers and employees, from and against any and all liability, loss, costs, damage, and expense,
including costs and reasonable attorney fees in defense thereof, because of actions, claims or lawsuits
for damages resulting from personal or bodily injury, including death at any time resulting
therefrom, sustained by any person or persons, and on account of damage to property, to the extent
arising out of the negligent performance of this Agreement, if such injuries to persons or damage to
property is due to the negligence of the Consultant, its subcontractors, its agents or assigns. This
provision shall be inapplicable to the extent such damage or injury is caused by the negligence of the
City.
The parties have specifically negotiated to provide that Consultant defend, hold harmless, and
indemnify the City for all claims, damages, and losses, including reasonable attorneys fees, arising
from any claims of Consultant's employees for injuries covered by Title 51 RCW, and for which
Consultant could not be held directly liable.
8. GENERAL CONDITIONS:
a. Reports and Information - Consultant, at such times and in such forms as the City may
require, shall furnish the City such reasonable periodic reports and documents as it may request
pertaining to the work or services undertaken pursuant to this Agreement, the costs and obligations
incurred or to be incurred in connection therewith, and any other matters covered by this Agreement.
Consultant will maintain accounting records in accordance with generally accepted accounting
PROFESSIONAL SERVICES AGREEMENT -2-
Montgomery Watson PSA 2/27/01
principles and practices to substantiate all invoiced mounts.
b. Entire Agreement - This Agreement constitutes the entire agreement between the parties
and both parties acknowledge that there are no other agreements, written or oral, that have not been
fully set forth in the text of this Agreement. There are attached hereto and incorporated by reference
as part of this Agreement Exhibits "A, B, C, and D".
c. Amendments - The parties hereby further agree that this Agreement cannot be amended or
modified without the written concurrence of both parties.
d. Notices - Any notices required to be given by the City to Consultant or by Consultant to
the City shall be in writing and delivered to the parties at the following addresses:
City of Bremerton Montgomery Watson
City Clerk 2375 - 130th Avenue NE,
239 Fourth St. Bellevue, WA 98005-1758
Bremerton, WA 98337 Attention: Mr. Pat Burke
e. Waiver - Failure to insist upon strict compliance with any terms, covenants or conditions
of this Agreement shall not be deemed a waiver of such, nor shall any waiver or relinquishment of
such fight or power at any time be taken to be a waiver of any other breach.
f. Compliance with State, Local and Federal Laws - Consultant agrees to comply with all
applicable local, state and federal laws in performance of all services under this Agreement.
g. Applicable Law; Venue - This Agreement shall be construed and interpreted in
accordance with the laws of the State of Washington and, in the event of dispute, the venue of any
action brought hereunder shall be in Kitsap County Superior Court.
h. Attorney Fees - The substantially prevailing party in any litigation arising hereunder shall
be entitled to its reasonable attorney's fees and court costs, including appeals, if any.
9. NONDISCRIMINATION: Consultant shall not discriminate in employment or services
to the public on the basis of race, color, national origin, sex, religion, age, marital status or disability,
except employment actions based on a bona fide occupational qualification.
10, TERMINATION: This Agreement may be terminated by either party for convenience
upon thirty (30) days' written notice to the other party, or for cause if either party fails substantially
to perform through no fault of the other and does not commence correction within five (5) days of
written notice and diligently completes the correction thereafter. Upon such termination, City will
be entitled to reports showing the status of all matters upon which Consultant is advising the City as
of the effective date of termination.
PROFESSIONAL SERVICES AGREEMENT -3-
Montgomery Watson PSA - 2/27/01
ab, Callow Priority ~ CSO PSA
11. STANDARD OF PERFORMANCE: The standard of care for all professional
engineering and related services performed or furnished by Consultant under this Agreement will bc
the care and skill ordinarily used by members of Consultant's profession practicing under the same
or similar circumstances at thc same time and in the same locality.
12. CONSTRUCTION PROCEDURES: Not Applicable (Noconstructionpmceduresarc
directly associated with this project).
13. RE-USE OF DOCUMENTS: All documents, including all reports, drawings,
specifications, computer software or other items prepared or furnished by Consultant pursuant to this
Agreement, are instruments of service with respect to the project and are property of the City. The
format for documents and work products shall be as specified in the exhibits.
14. HAZARDOUS MATERIALS: City represents to Consultant that, to the best of its
knowledge, no hazardous materials are present at the project site. However, in thc event hazardous
materials are known to be present, City represents that it has disclosed to Consultant the existence of
all such hazardous materials, including but not limited to asbestos, PCB's, petroleum, hazardous
waste, or radioactive material located at or near the project site, including type, quantity and location
of such hazardous materials. It is acknowledged by both parties that Consultant's scope of services
do not include services related in any way to hazardous materials. In the event Consultant or any
other party encounters undisclosed hazardous materials, Consultant shall have the obligation to
notify City and, to the extent required by law or regulation, the appropriate governmental officials,
and Consultant may, at its option and without liability for consequential or any other damages to
City, suspend performance of services on that portion of the project affected by hazardous materials
until City: (i) retains appropriate specialist consultant(s) or contractor(s) to identify and, as
appropriate, abate, remediate, or remove the hazardous materials; and (ii) warrants that the project
site is in full compliance with all applicable laws and regulations. City acknowledges that
Consultant is performing professional services for City and that Consultant is not and shall not be
required to become an "arranger," "operator," "generator," or "transporter" of hazardous materials,
as defined in the Comprehensive Environmental Response, Compensation, and Liability Act of 1990
(CERCLA), which are or may be encountered at or near the project site in connection with
Consultant's services under this Agreement. If Consultant's services hereunder cannot be performed
because of the existence of hazardous materials, Consultant shall be entitled to terminate this
Agreement for cause on 30 days written notice. To the fullest extent permitted by law, City shall
indemnify and hold harmless Consultant, its officers, directors, partners, employees, and
subconsultants from and against all costs, losses, and damages (including but not limited to all fees
and charges of Consultants, architects, attorneys, and other professionals, and all court or arbitration
or other dispute resolution costs) caused by, arising out of or resulting from hazardous materials,
provided that (i) any such cost, loss, or damage is attributable to bodily injury, sickness, disease, or
death, or injury to or destruction of tangible property (other than completed Work), including the
PROFESSIONAL SERVICES AGREEMENT -4-
Montgomery Watson PSA - 2/27/01
loss of use resulting therefrom, and (ii) nothing in this paragraph shall obligate City to indemnify any
individual or entity from and against the consequences of that individual's or entity's negligence or
. misconduct.
1N WITNESS WHEREOF the parties hereto have executed this Agreement the date and year
indicated.
MONTGOMERY WATSON AMERICAS, INC.
CITY OF BREMERTON
Date: z/-,.~.OI BY:L.~-.J ~ ~
~Yle~ S. HORTON, Mayor
DEPARTMENTAL APPROVAL:
W. DIRECTOR OF PUBLIC WORKS & UTILITIES
APPROVED AS TO FORM:
City Attorney
Received for Filing:
Kathleen L. McCluskMy, City Clerk
PROFESS IONAL SERVICES AGREEMENT - 5 -
Montgomery Watson PSA - 2/27/01
EXHIBIT A
SCOPE OF WORK
CALLOW AVENUE CSO PUMP STATION
PREDESIGN, DESIGN, AND BID SUPPORT SERVICES
BACKGROUND AND GENERAL PROJECT DESCRIPTION:
The Callow Avenue Basin CSO Pump Station consists of a 7,500 gpm wastewater pump station,
and one each diversion structure and downstream level control structure on the existing 42-inch
diameter Callow Avenue Basin Interceptor. The pump station is proposed to be located within
the existing Callow Avenue right-of-way, near the intersection of Callow Avenue and Rodgers
Street. Pump station capacity was established under the October 2000 City of Bremerton CSO
Reduction Plan Update and through supplemental investigations undertaken by the City. The
facility is anticipated to operate five times in a typical year.
The City proposes that the pump station will be initially constructed without the storage structure
described in the CSO Reduction Plan Update. The City will determine at a future date if storage
and associated inlet/flow control structures should be designed and built. As such, the storage
structure and associated inlet/control facilities will be considered in predesign but are excluded
from final design.
The pump station will normally operate as an automated, unstaffed facility and will have standby
emergency power supply from an engine generator. The pump station will be provided with
protective alarms and PLC modem telemetry connected to the City's SCADA system to facilitate
unstaffed operation. After a CSO event, the pump station will require inspection and cleaning by
City staff.
The pump station will consist of a wet pit submersible pump installation with three or four
pumps. At the City's request, the pump station wet well will be a precast concrete structure,
appropriate to house the selected pumps. The wet well will be provided with a supply air fan and
exhaust air duct. No odor control facilities are proposed; however, the wet well ventilation
ductwork will be conftgured to facilitate future connection to an activated carbon scrubber.
The 7,500 gpm pumping capacity will be available with one pump out of service. The pumps
will discharge into the existing Crosstown Pipeline, an existing 30-inch diameter manifolded
low-pressure forcemain, that will convey flow to the City's wastewater treatment plant. In
addition to the main CSO pumps, the facility may include a small submersible pump to aid
draining and cleaning following CSO events. Pump controls will include variable frequency
drives with ultrasonic level measurement and depth proportional speed control by means of a
PLC. Hard-wired float switches will provide backup in the event of PLC or level control system
failure. The City intends to contract with another finn for instrumentation and control systems
integration, PLC programming, screen design, and related tasks.
EXHIBIT A, CALLOW AVENUE BASIN CSO PUMP STATION Page
Soils in the project vicinity are reported to be suitable for slab on grade construction, without
need for piles or other deep foundations. Deep foundations are therefore not anticipated in the
scope of the design.
The pump station will not include a building. Electrical and instrumentation appurtenances will
be enclosed in a weatherproof prefabricated metal enclosure. The engine generator will be
mounted in a weatherproof metal enclosure rum/shed as part of the engine generator equipment
package. The surrounding areas adjacent to the pump station will be finished with pavement,
gravel, or bark surfacing as appropriate. No landscape restoration is proposed under this project.
Stormwater management will rely on existing stormwater collection facilities in the area. No
stormwater detention or treatment is proposed as part of this project.
System hydraulic controls will include a Level Control Structure and a Diversion Structure. The
Level Control Structure will consist of a gate (float actuated Grande Novak type or motorized
gate with level controller system) located downstream of the pump station that will throttle the
Callow Avenue Basin Interceptor flow to cause in-line storage in response to a rising
downstream water surface. The Level Control Structure will be located in the vicinity of Callow
Avenue at Farragut Avenue. The Diversion Structure will route excess flows from the Callow
Avenue Basin Interceptor into the pump station after in-line storage has reached a predetermined
elevation. The Diversion Structure will consist of a gate or weir structure. The Diversion
Structure will be located adjacent to the pump station site.
The project will be bid as a single constmction contract.
A. SCOPE OF WORK
The intent of this contract is to provide engineering services for predesign, final design and
construction assistance of the Callow Avenue CSO Pump Station project. The Scope of Work
for construction assistance tasks will be developed during design, when the anticipated level of
assistance is further established. The Consultant intends to accomplish the tasks defined by this
scope within the total project budget cost indicated but shall not be bound to individual task
budget costs.
TASK 1 - PROJECT MANAGEMENT
Includes ongoing management, administration, and coordination of consultant and subconsultant
activities, directing the work, preparing monthly invoices, monitoring schedule and budget and
making staff assignments to maintain the project schedule.
Task 1.1 Project Plan and Initiation Workshop
The consultant will prepare a brief Project Plan that includes the following elements: Project
team directory and contact information; Scope of Work; matrix depicting the individual work
elements and responsible parties; design schedule showing critical milestones, meetings, and
EXHIBIT A, CALLOW AVENUE BASIN CSO PUMP STATION Page 2
deliverables; quality assurance summary; and invoicing requirements. The Project Plan will be
updated if required by changes in project schedule or scope of work.
The consultant will conduct a project initiation workshop to introduce all key team members to
the City and to discuss execution of the project. The meeting will be attended by the City's CSO
program consultant (HDR), the street design consultant (Parametrix) and representatives of
Kitsap Transit and Puget Sound Naval Shipyard to facilitate sharing of background project
information.
Task 1.2 Contract Administration, Invoices, Progress Tracking
The Consultant will manage and coordinate work performed by subconsultant firms. The
Consultant will prepare monthly invoices that document costs by task and provide supporting
documentation as required by the Agreement. Invoices will include a task level summary of
previous cost, current period cost, total cost to date, budget remaining, and percent expended for
each task. The invoices will bc accompanied by brief monthly reports that summarize the status
of major work activities by task, schedule, and budgeted costs versus actual expenditures.
Assumptions
The scope and cost of the Project Management task is based on a 9 month duration for
predesign, design, and bidding, as listed under Project Schedule.
Deliverables 1. Project Plan and updates (3 copies each).
2. Design Schedule and updates (3 copies each).
3. 9 Monthly Reports and Invoices (1 copy each).
4. Project Initiation Workshop meeting minutes (1 copy and electronic distribution)
TASK 2 - PROJECT INITIATION
Initiate data gathering and investigation activities that are necessary for developing the Predesign
Report and Contract Documents.
Task 2.1 Survey and Mapping
Survey and mapping work are to be performed by the City. The Consultant will define the
required topographic survey and utility locating needs and electronic file formats to assist the
survey effort.
Assumptions
1. City furnished base maps will show the following features: Existing underground and
overhead utilities, utility poles, right-of-way and easement lines; curb and gutter,
sidewalks, street signs, pavement, path, and driveway limits; ~ontage of buildings and
structures; fences, mail boxes, catch basins, culverts, and drainage ditches, size and
EXHIBIT A, CALLOW AVENUE BASIN CSO PUMP STATION Page 3
invert elevation for existing gravity pipelines, manholes, water meter boxes, valve
boxes and utility vault covers; and trees over 8-inch diameter. In addition, delineation
of future roadway will be shown. Where questions exist on the location or depth of
existing underground utilities, the City will perform potholing work to verify location
or depth.
Deliverables
1. Memorandum summarizing survey requirements.
Task 2.2 Geotechnical Investigation
The Consultant will retain GeoEngineers to complete a geotechnical investigation. Geotechnical
investigation will involve the following activities:
1. Review existing background geotechnical data
2. Perform geoteehnical borings (including utility locate service contacts and traffic
control), consisting of one boring completed to a depth of approximately 50 feet at pump
station site and three borings completed to depths of approximately 25 feet along the
proposed storage structure. If groundwater is encountered during borings, two borings
will be developed as piezometers.
3. Perform laboratory analyses on samples collected fi.om borings to characterize soil
moisture, density, particle size distribution, and Atterberg limits.
4. Prepare geotechnical report summarizing recommendations for sloping and shoring of
excavations; lateral and bearing pressures; backfill and compaction; design groundwater
elevation and dewatering considerations.
Assumptions
1. The City will furnish any permits or approvals necessa~ for geotechnical borings within
7 days of receipt of sketch showing proposed boring locations.
Deliverables
1. Geotechnical Report, six copies to be furnished to the City
Task 2.3 Data Research and Field Inspections
The Consultant will review available documents depicting existing conditions including:
geoteehnical reports, utility mapping, surveys and maps (topographic, planimetric, aerial, etc.),
right-of-way and property ownership (including easements). Review documents depicting
proposed future roadway conditions including: demolition and removal, utility relocations, new
roadway improvements, Kitsap Transit improvements, street sig~age and surface drainage
modifications.
EXHIBIT A, CALLOW AVENUE BASIN CSO PUMP STATION Page 4
Obtain all available record drawings and information that characterizes the existing Crosstown
pipeline as needed to conduct a hydraulic transient (surge) analysis. Information about pipeline
profile elevations, pipe materials, joint types, operating pressures, existing and proposed flows,
connecting pipes, appurtenances etc. are needed.
Assumptions
1. The City will provide background data on existing utilities and improvements, and will
assist with obtaining data fi.om other agencies (Kitsap Transit, U.S. Navy, etc.).
2. 8 hours are allocated to eunduct research with the City to compile record information for
the Crosstown pipeline for the surge analysis.
TASK 3 - PREDESIGN
The Predesign Report will compile the information assembled in Task 2 - Project Initiation,
develop project design criteria, and present a recommended design configuration for the CSO
pump station and associated control and diversion structures. Preliminary design drawings will
be provided to illustrate concepts and layouts. A preliminary design cost estimate will be
developed under this task.
Task 3.1 Predesign Workshops
Consultant will conduct the following meetings with the City as part of the predesign process: 1).
Introductory design workshop to review proposed design criteria and preliminary pump station
layouts; 2). One meeting with City operations staff to determine design preferences and to
address O&M issues; 3). One predesign summary workshop to present the findings and
recommendations of the predesign and to solicit comments on same. Meetings will be attended
by City's project manager, operations staff, and other City staff as appropriate.
Task 3.2 Predesign Technical Memoranda
Predesign will involve the development of Technical Memoranda on the following subjects to
define the pump station project:
1. Design criteria consisting of: a) Design flows and performance requirements for
pumping equipment, b) Summary of design code requirements ("code search") that
impact pump station configuration (Uniform Building Code, Uniform Fire Code,
Uniform Plumbing Code, Uniform Mechanical Code, Washington State Energy Code,
National Electric Code, local noise ordinances, and NFPA 820.
2. Hydraulic design evaluations consisting off a) Analysis of the flow and level control
strategy utilizing inline storage with diversion of excess flows to the pump station, b)
Conceptual steady state hydraulic profile for proposed storage structure, based on
controlling water surface profile assumptions developed working in conjunction with
City c) Pumping system hydraulics will be evaluated for defined storm inflow scenarios,
EXHIBIT A, CALLOW AVENUE BASIN CSO PUMP STATION Page 5
verifying the functional benefit of variable speed pump drives, d) A hydraulic transient
(surge) analysis will be performed on the Crosstown Pipeline to establish acceptable
operating conditions and evaluate the need for surge protection.
3. Instrumentation, and control system strategy will be defined through process and
instrumentation diagrams (P&IDs) and written control strategies.
4. Preliminary construction sequencing and constraints and proposed construction schedule.
5. Conceptual layout for off-line storage facility, providing storage volume identified in
City's CSO Reduction Plan Update, identifying proposed inverts and crown elevations
developed in conceptual hydraulic profile. Storage would be constructed of precast
concrete elements.
Task 3.3 Predesign Report
Consultant will prepare a draft Predesign Report consisting of a brief summary memorandum
(anticipated length of 3 to 5 pages), preliminary cost estimate; 20 pement drawings, outline
specifications and a compendium of Technical Memoranda summarizing the analyses performed
under Task 3.2. The Predesign Report will include a table of contents for the specifications and
standard specifications for major equipment items such as wastewater pumps, variable frequency
drives, and engine generator set. The Predesign Report will be revised in response to City
review comments. The Final Predesign Report will provide definition of the project for final
design and will constitute a design freeze. After completion of the Final Predesign Report,
requested changes in facility and equipment layouts and configurations; basic functions, utilities
and amenities; system capacities; number of equipment units; or operation and control strategies
may require an adjustment of the consultant's design fee.
Assumptions
1. The City of Bremerton will provide the following information:
· Equipment and product preferences, including instrumentation and control strategies,
engine generator requirements, and wastewater pumps.
· Flow, hydrograph, and water surface profile information for the Callow Avenue
Basin Interceptor and other pipelines affected by the project.
2. 20 percent drawings will be presented in 11-by 17-inch format, hard copy only.
Deliverables 1. Meeting notes.
2. Draft Predesign Report, accompanied by 20 percent drawings of pipeline and pump
station facilities (five copies).
3. Final Predesign Report, accompanied by 20 percent drawings of pipeline and pump
station facilities (five copies).
EXHIBIT A, CALLOW AVENUE BASIN C~O PUMP STATION Page 6
TASK 4 - FINAL DESIGN
Based on the project definition developed in the Final Predesign Report. The consultant will
prepare 50 percent, 90 percent and 100 percent construction plans and specifications. Submittal
· contents will be in accordance with Exhibit D of this Agreement.
Task 4.1 Final Design Workshops
· The Consultant will conduct design review workshops with the City to present the 50 percent
and 90 percent design documents and to receive comments on same. Workshops will be
attended by City's project manager, operations staff, and other City staff as appropriate.
Task 4.2 Drawings and Specifications
Drawings will be organized into separate design disciplines. A list of the drawings anticipated
for the project is included as part of this Exhibit. The specifications will consist of a single
volume in CSI format.
Task 4.3 Construction Cost Estimate
Consultant will prepare an engineer's estimate of the construction cost for the project. The-
estimate will be updated with the 50 and 90 percent design submittals. Bid contingencies will be
developed working jointly with the City.
Task 4.4 Pre-Bid Meeting
One representative of the Consultant's design team will attend the Pre-Bid Meeting to review the
proposed project with bidders and to respond to bidder's questions.
Task 4.5 Address Bid Questions and Prepare Addenda
Consultant will provide written clarification of the design documents and/or prepare addenda
during the bid period, as requested by the City.
Assumptions
1. City and Consultant will utilize Engineers Joint Contract Documents Committee
(EJCDC) edition for Division 0 specifications.
2. The Consultant's standard technical specifications and details will be used whenever
applicable. Consultant's standard specifications and details will be modified to meet
project-specific conditions where required.
3. Pump station and all associated structures and piping will be bid under a single lump sum
construction contract.
4. Bidding will be completed within a single period not to exceed 30 days.
5. The City will maintain a planholders list.
EXHIBIT A, CALLOW AVENUE BASIN CSO PUMP STATION Page 7
6. City will receive bid questions in written or facsimile format, and will provide duplicate
facsimile copies to the Consultant for response.
7. Consultant will respond only to bid comments or questions related to Consultant's scope
of work (i.e., City will be responsible for questions related to Division 0 specifications,
City-issued permits, City standard details and specifications, etc.).
Deliverables 1. 50 percent, 90 percent and 100 percent drawings and specifications. 30 percent, 60
percent and 90 percent plans will be submitted as bound 11 by 17-inch photocopies. 100
percent plans will be submitted as 22 by 34-inch reproducible paper copies and digital
scanned files for reproduction by the City. 50 pement, and 90 percent plans and
specifications will be submitted as bound documents. 100 percent plans and
specifications will be submitted as unbound master copies for reproduction.
2. Autocad 2000 (or later) electronic files of 100 pement drawings.
3. Microsoft Word 2000 electronic files of specifications.
4. Design phase meeting notes (1 copy and electronic distribution).
5. Addenda
6. Pre-Bid Meeting notes (1 copy and electronic distribution)
TASK 5 - PERMITTING SUPPORT
The City is the designated SEPA Lead Agency and will obtain required construction permits and
approvals. The City will determine and conduct the appropriate environmental review; issue a
project SEPA Threshold Determination; and release required notices and documents. Consultant
will provide limited support services to the permitting process, as follows:
Task 5.1 SEPA Support
The consultant will provide support services to assist the City's preparation of a SEPA Checklist
document, related to defining existing environmental conditions; identifying potential adverse
effects upon the environment; identifying construction impacts such as truck traffic and noise
issues; developing mitigation measures. An allowance of 8 hours of engineering staff time is
allocated to this Task.
Task 5.2 Construction Permit Support
The City will identify and obtain required permits and approvals, and will advise the Consultant
of any resultant constraints or impacts to the design. The Consultant, as directed by the City,
will prepare draft text for selected portions of permit applications. The Consultant will assist the
City in responding to comments from permitting agencies. An allowance of 16 hours of
engineering staff time is allocated to this Task.
EXHIBIT A, CALLOW AVENUE BASIN CSO PUMP STATION . Page 8
Assumptions
1. Environmental review will involve a single SEPA checklist, which will be prepared by
the City.
2. Consultant will be given a minimum of one-week advance notice to prepare necessary
materials.
Deliverables
1. Memoranda and other work products supporting the permitting process.
TASK 6 - QUALITY ASSURANCE AND QUALITY CONTROL
This Task includes activities to assure the quality of all work performed under the contract,
including checking, coordinating, and interfacing activities and deliverables. Prior to submittal,
all Consultant work products will undergo internal review to ensure that they are complete and of
consistent quality and presentation. Work products will include statements of assumptions,
regulation interpretations, descriptions of methodologies, calculations, rationale supporting
alternative selection, and meeting and conversation records, to document and support the basis of
decisions.
The Consultant will conduct a quality assurance reviews on Predesign, 60 percent, 90 percent,
and 100 percent submittals.
Assumptions
1. City review comments will be received in accordance with dates established in project
schedule.
2. City will designate a project review team. The review team is anticipated to include the
Project Manager and personnel representing operations, electrical/instrumentation and
controls, and/or other personnel as appropriate.
Deliverables
1. Tabulation of City review comments and summary of resolutions.
TASK 7 - CONSTRUCTION MANAGEMENT ASSISTANCE
Specific scope and budget for this task will be determined during design.
TASK 8 - CONTINGENCY SCOPE
This task is intended to provide a reserved budget allowances for unanticipated design activities.
It is understood that the Consultant must obtain prior authorization to utilize the contingency
budget. Scope of services and budget for individual tasks requested, will be defined at the time
of written authorization. A budget allowance of $25,000 is established for this task.
EXHIBIT A, CALLOW AVENUE BASIN CSO PUMP STATION Page 9
B. SERVICES PROVIDED BY THE CITY
1. Site access.
2. Drawings of Crosstown Pipeline and existing underground utilities in proj eot area.
3. Flow data and hydrographs for Crosstown Pipeline and Callow Avenue basin Interceptor.
4. Project survey, mapping and utility locating work.
5. Timely review of predesign and design submittals, in accordance with dates established
in the Project Schedule. City review shall be presented as a single comment set,
organized by drawing and specification number.
6. Permits, approvals, SEPA process, and easement acquisition
7. Payment of all permitting, regulatory approval and site acquisition tees.
8. Interface with Kitsap Transit and U.S. Navy.
9. Department of Ecology interface and approvals.
-_ 10. Bid advertisement, administration, and evaluation, including services of legal counsel if
required.
11. Reproduction and distribution of bid documents and addenda.
C. ANTICIPATED LIST OF DRAWINGS (Reference Table A-l, following page)
EXHIBIT A, CALLOW AVENUE BASIN CSO PUMP STATION Page 10
TABLE A-1
ANTICIPATED LIST OF DRAWINGS
General
-- Cover
G 1 Location Map, Vicinity Map and Drawing Index
G 2 Design Criteria and Equipt Schedule
G 3 Symbols
G 4 Abbreviations
;ivil
C 1 General Civil Details 1
C 2 Site Notes, Easements, Geotech Borings, Construction Stormwater Mgt
C 3 Site Piping/Grading/Paving Plan
C 4 Crosstown Pipeline Connection Plan and Details
C 5 Callow Basin Interceptor Control and Diversion Structures
C 6 Callow Ave Sewer Relocation, Plan and Profile
Mechanical
M 1 Piping Schedule
M 2 Mechanical Details 1
M 3 Wet Well Plan and Sections
M 4 Standby Engine Generator, Details
M 5 Callow Basin Interceptor Control Structure Plan/Section
M 6 Callow Basin Interceptor Diversion Structure Plan/Section
Instrumentation
I 1 Process and Instrumentation Legend
I 2 SCADA Block Diagram
I 3 Process & Instrumentation Diagram
Electrical
E 1 Electrical Symbols and Abbreviations
E 2 Eleotircal One Line Diagram and Demand Call
E 3 Pump Station: Power/Controls Plans and Schedule
E 4 Control Structure: Power/Controls Plans and Schedule
E 5 Panel Elevations and Schedule
E 6 Control Wiring Diagrams 1
E 7 Control Wiring Diagrams 2
E 8 Telemetry Wiring Diagram
EXHIBIT A, CALLOW AVENUE BASIN C80 PUMP STATION Page 1'1
EXHIBIT B
CITY OF BREMERTON
CALLOW AVENUE CSO PUMP STATION
COMPENSATION
Compensation for Consultant's services under this Contract shall be on a Cost Plus Fixed
Fee basis but not to exceed the Total Price. The sum of Cost and Fixed Fee shall be the
compensation for the Scope of Services. The estimated staff hours budget for this project
is as shown in Table B-1.
Cost shall include Direct Labor Cost, Indirect Costs, and Reimbursable Expenses. Cost
shall be an amount equal to Direct Labor Cost times a factor of 2.94 plus Reimbursable
Expenses.
Direct Labor Cost shall mean salaries and wages, (basic and overtime) paid to all
personnel for time worked directly on the project.
Indirect Costs shall include overhead, taxes and other indirect project administrative
costs.
Fixed Fee shall mean a fixed amount of fee that is added to the Cost. The Fixed Fee for
all tasks included in the Scope of Services shall be at a rate of twelve percent (12%) on
the additional work Cost excluding Reimbursable Expenses. The Cost may vary, but the
Fixed Fee shall remain the same provided the Scope of Services does not change. The
fixed fee will be prorated and paid monthly in proportion to the project work
satisfactorily completed. A payment for an individual month shall include that portion of
the fixed fee allocable to the project work satisfactorily completed during the month and
not previously paid (e.g. pro-rated in accordance with the amount spent-to-date). Any
portion of the fixed fee not previously paid in the monthly payments shall be included in
the final payment.
Compensation Schedule
Reimbursable Expenses shall mean the actual expenses incurred directly or indirectly in
connection with the project for transportation travel, subconsultants, subcontractors,
computer usage, telephone, fax, shipping and express, and other incurred expense.
Charges for reimbursable expenses incurred by the Consultant will be at the following
rates as shown in Table B-2. The amount of any sales tax, excise tax, or gross receipts
tax that may be imposed on this Agreement shall be added to the Consultant's
compensation as Reimbursable Expenses.
City of Bremerton
Table B-2. Reimbursable Expense Char[~es
Item Billing Rate
Travel Mileage at 32.0 cents per mile or the current Internal Revenue Service (IRS)
allowable rate for business use of an automobile
Other travel expenses at cost
Associated $8.91 per hour
Project Costs
(APC)~
Computer CADD ~ $15 per hour
1. Associated project costs include telecommunications, FAX transmittals, in-house reproduction and
plolting, postage, and computer (PC).
Monthly invoices shall be submitted to the City for work performed subsequent to work
covered by all previously submitted invoices and shall be computed pursuant to the rates
and limitations set forth above.
The labor rates listed herein are representative of the actual rates that might apply
during the term of this Agreement. Billings will be based on the individual labor rates
current at the time the services being billed for were performed. Labor rates are subject to
change without notice. Montgomery Watson Americas, Inc. will notify the City of labor
rate changes 30 days before submitting an affected invoice. Labor rate changes shall not
alter the stipulated "not to exceed" amount or fixed fee.
The overhead rate shall be fixed for the term of this Agreement.
City of Bremerton 2
EXHIBIT C
SCHEDULE
CALLOW AVENUE CSO PUMP STATION
PREDESIGN, DESIGN, AND BID SUPPORT SERVICES
ACTIVITY COMPLETION DATE
· City provide Notice to Proceed to Consultant April 2, 2001
Project initiation workshop April 16, 2001
City furnish topographic survey to Consultant April 30, 2001
Complete geotechnical investigation May 14, 2001
Predesign submittal/20 percent drawings June 15, 2001
City submit review comments on predesign June 29, 2001
submittal/20 percent drawings
50 percent design submittal July 27, 2001
City submit review comments on 50 percent August 10, 2001
design submittal
90 percent design submittal September 21, 2001
City submit review comments on 90 percent October 5, 2001
design submittal
100 percent design submittal October 19, 2001
Document reproduction October 25,2001
Begin construction bidding October 26, 2001
EXHIBIT C, CALLOW AVENUE BASIN C~O PUMP STATION Page
EXHIBIT D
MINIMUM REQUIREMENTS FOR ARCHITECTURAL AND ENGINEERING DESIGN
PRODUCT SUBMITTALS
City of Bremerton
Department of Public Works and Utilities
Minimum Requirements for Architectural & Engineering Design
Product Submittals
1. INTRODUCTION
Quality control reviews are necessary and essential at the milestones indicated. These reviews provide a
mechanism to demonstrate and verify that services and work meet the predetermined established
standards and requirements.
The following table is a summary of document expectations at project submittal milestones of 30%, 60%
and 90%. The table is intended to be a guide and it is understood that each project may have
requirements that result in variations fi.om the requirements shown. Specifically the project size,
location, permitting requirements and complexity may result in variations of the format indicated.
Additionally, the Washington State Department of Ecology has established general recommendations for
plans and specifications in Chapter Gl-4 of the "Criteria for Sewage Works Design" (the Orange Book)
and the Washington Administrative Code (WAC) has established requirements for plans and
specifications in WAC 173-240-070. Both of these sources should be referenced during preparation and
review. However, the information included on the attached table is typical of most projects and
therefore can be used to establish project progress at the milestones indicated.
The table indicates generally the level of completion required at each submittal milestone with the
following designations: D - indicates the item is required in a draft form; E - indicates the item is to
be essentially complete. These designations are general and a further description of the expected level of
completion at each submittal milestone follows the table.
At all levels of design, drawings must be prepared in accordance to the City's standards for drafting (e.g.
software version, layering, title block, etc. The Project Manager should provide the Consultant with the
latest drafting standards at the beginning of the project.
EXHIBIT D. CALLOW AVENUE BASIN CSO PUMP STATION Page 1
REQUIREMENTS OF LEVEL OF DESIGN 30% 50% 60% 90%
General Drawings
Title Sheet D E E E
Location and Vicinity Map D E E E
Drawing Index D D E E
General Symbols and Legends D E E E
Abbreviations D E E E
Design Data and Criteria (i.e. - Hydraulic Profiles, Process Flow Diagrams ) D E E E
Key Map D E E E
Civil/Sitework Drawings
Existing Site and Utility Plans D E E E
Revised Site and Utility Plans D D D E
Revised Site Grading D D E
Site Utilities - Plans & Profiles D D D E
Pipeline Alignment Plans & Profiles D D D E
Sedimentation & Erosion Control Plan E
Civil Details D D E
Landscaping Drawings
Co~nceptual landscaping - Plan D D E
Architectural Drawings
Buildings - Plan, Elevations, and Sections D D D E
Structnral Drawings
Foundation - Plans and Sections D D E E
Buildings- Plans, Sections, and Details D D D E
Below grade structures - Plan and Section D D D E
Mechanical Drawings
Major Equipment and Piping Layout - Plans, Sections, and Details D D D E
HVAC/Plumbing Plans and Sections D D D E
HVAC Schedules and Schematics D E
Electrical Drawings
One Line Diagrams D D D E
Site Electrical - Plan D D D E
Power Plans, Control Diagrams~ and Schedules D D E
Lighting Plans and Reflective Ceiling Plans D E
Major Equipment (i.e. - MCCs, Substations, Transfer Switches, etc.) Layout / D D D E
Electrical Room Plans
D - Draft; E - complete
EXHIBIT D, CAL.LOW AVENUE BASIN CSO PUMP STATION Page 2
REQUIREMENTS OF LEVEL OF DESIGN 30% 50% 60% 90%
Instrumentation Drawings
Process and Instrumentation Diagrams D D D E
Control panel layouts and details D D E
Telemetry schematics and design D D E
Riser diagrams D E
Specifications
Table of Contents D E E E
First draft of Specialty Specifications (e.g. major equipt.) D D E E
Major equipment selection in Products sections. D D E
Major material selections completed (pipe, coatings, concrete, etc.) D D E
General requirements: (Sequence, conslraints, work scope, asbestos D D E
determination, etc)
Memorandum on recommended modifications to General Conditions D E
Other Submittal Items
Basis of Design Technical Memorandum D E E E
G~otechnical interpretive report (GIR) D E E E
Geotechnical data report (GDR) D E E E
Geotechnical baseline report (GBR) D
Level I Environmental Assessment E
Level II Environmental Assessment (if required) E E
Equipment & Instrument List D D D E
Contractor/subcontractor qualifications memorandum D D E
City supplied safety ehecldist D E
O&M impact memorandum E
Contract time memorandum E
D - Draft; E - Complete
EXHIBIT D, CALLOW AVENUE BASIN CSO PUMP STATION Page 3
2. 30 PERCENT LEVEL OF DESIGN
At the 30% design level the submittal should show progress toward a coordinated plan set. Items to be
generally expected at this level include:
A Drawing Index that reflects the total number of drawings anticipated for the completed project.
· Title blocks and drawing layouts that allow verification of City standards.
· General Symbols, Legends, and Abbreviations that allow verification of City standards.
· Design Data and Criteria (Process Schematic) established and depicted in an acceptable format.
Site Plan and Vicinity Map that accurately depict the existing site features and boundaries.
(including topographical data, coordinate system, zoning, geotechnical boring locations, etc)
· Site and Utility Plans that accurately depict existing utilities (above and below ground), buildings,
roadways, etc.
· Site Plans that accurately depict new structure footprints, locations, and orientation on-site including
preliminary finish floor elevations. Site Plan also to include preliminary site grading coordinated
with the geotechnical requirements.
· Plans and Profiles of pipelines that locate major utilities and piping corridors (horizontal and
vertical). Property acquisition and easements necessary for permitting and construction should be
identified.
· Utility plans that generally identify proposed interfaces with existing utilities. Actual routing and
location of connection to existing utility roughly shown.
· Architectural plans, sections, and elevations that establish the preliminary room sizes, exterior
architectural theme, materials of construction, roof type, etc. Plans adequate to verify access and
egress, materials of construction, and other general .building and fire code requirements.
· Structural plans that establish foundation type and depict the preliminary foundation layout.
Foundation plans adequate to confirm approach in compliance with geotechnical requirements. Floor
plans coordinated with the architectural plans.
· Mechanical Plans and Sections that depict location of major equipment and major piping alignments
to verify clearances and general configurations. Plans also to indicate proposed equipment
maintenance features (i'.e. overhead crane and monorails, hatches, pads, etc) and identification of
areas requiring noise abasement.
· HVAC/Plumbing Plans that depict location of major equipment and major piping alignments.
· Evaluation of the level of design that a fire protection system would be included on the drawings.
· Preliminary electrical one-line diagrams and site electrical plans. Preliminary layout of electrical
moms in adequate detail to determine size requirements and clearances. Identify available corridors
for routing of electrical raceways and cable tray. Identify area classifications per NEC.
· Preliminary Process and Instrumentation Diagrams (P&IDs) that depict the mechanical equipment,
piping, instrumentation and control equipment interlocking.
EXHIBIT D, CALLOW AVENUE BASIN CSO PUMP STATION Page 4
· Preliminary Table of Contents for the Specifications. Draft copies of specialized specifications that
originate from sources other than City guide specifications.
· Preliminary equipment list that includes equipment number, equipment size, equipment power
requirements, and basic controls and operating strategies.
· Draft Basis of Design Technical Memorandum that summarizes technical criteria and assumptions
used for the design and includes an evaluation of code interpretation and permit requirements for the
Project. Also include an initial evaluation of safety considerations for equipment access, facility
access and egress, and daily maintenance considerations. Identify items requiring modeling.
· Draft Geotechnical Interpretive Report (GIR) and Geotechnical Data Report (GDR).
· Level I Environmental Assessment and work plan for Level II Environmental Assessment.
3. 50 PERCENT LEVEL OF DESIGN
The 50% design level is generally used as an alternative to producing two inteium sets (the 30% and the
60% sets). The degree of completion of the product at 50% is as specified in the table. The list is
similar to the 60% list and as such is not re-written here.
4. 60 PERCENT LEVEL OF DESIGN
At the 60% design level the submittal should show significant progress toward a completed plan set. The
60 % submittal should reflect review comments fi.om the 30% submittal along with subsequent meetings
and design decisions. This submittal should establish final locations, alignments, and configurations and
move the design toward final production. Items to be generally expected at this level include:
· Title Sheet, Drawing Index, and Location and Vicinity Map essentially complete.
· General Symbols, Legends, and Abbreviations essentially complete.
· Design Data and Criteria essentially complete.
· Site Plan with proposed final location of structures, roadways, and major site elements (fencing,
gates, etc). Include proposed contractor staging, storage, access, and off-site corridors (traffic
routing plans).
· Site Plan with horizontal control and proposed grading.
· Plans and Profiles of pipelines with final proposed alignments (horizontal and vertical). Easement
limits identified and included on drawings.
· Details of manholes, pavement and trench sections, and other civil details.
· Proposed landscaping plan and schedules.
· Architectural plans, sections, and elevations that depict the proposed final exterior architectural
theme, materials of construction, and floor plan of structures.
· Structural plans, sections, and details coordinated with other design disciplines. Large structural
penetrations identified and potential conflicts with mechanical and electrical features resolved.
EXHIBIT D, CALLOW AVENUE BASIN CBO PUMP STATION Page 5
Foundation plans, floor plans, and roof plans to include structural member sizes. Reinforcement
detailing partially complete.
Mechanical plans, sections, and details with proposed final location of major equipment, piping, and
appurtenances. Minor piping partially complete however adequate corridors identified. Location of
equipment maintenance features finalized.
· HVAC/Plumbing plans and sections adequately complete to verify City standards and building code
compliance. Preliminary equipment schedules and system schematics to allow review of system
configuration and design intent. Fire protection system design (if required).
· Proposed final electrical one-line diagrams, control room layouts, and panel layouts.
· Power plans, control diagrams, and schedules adequately complete to review layout and design
intent.
· Proposed final lighting plan and reflective ceiling plan.
· P&IDs developed to greater detail including revisions based on proposed final equipment selection
and configuration.
· Draft Specifications of all specifications in Divisions 1 through 17. Coordinated such that project
specific information has been included and non-pertinent information has been removed. Major
equipment specifications should be nearly fmal. First draft of construction sequence, milestones, and
constraints.
· Equipment list that includes equipment number, equipment size, equipment power requirements, and
basic controls and operating strategies for all equipment anticipated on the project.
· Final Basis of Design Technical Memorandum that summarizes technical criteria and assumptions
used for the design and includes an evaluation of code interpretation and permit requirements for the
Project. Also include an evaluation of safety considerations for equipment access, facility access and
egress, and daily maintenance considerations.
· Geotechnical Interpretive Report (GIR) and Geotechnical Data Report (GDR) incorporating all
information obtained to date and recommendations for any additional investigations necessary for
design completion.
· Level II Environmental Assessment (if required) that evaluates worker health and safety and
identifies suspect, contaminated, and hazardous materials of concern for the Project.
EXHIBIT D, CALLOW AVENUE BASIN CSO PUMP STATION Page 6
5. 90 PERCENT LEVEL OF DESIGN
At the 90% design level the submittal should include all information necessary to complete the 100%
documents with the exception of subsequent detailed review comments from the client and regulatory
agencies. The 90 % submittal should reflect review comments fi:om the 60% submittal along with
subsequent meetings and design decisions. This submittal should reflect coordination between all design
disciplines and should require only detailed level corrections to result in a biddable set of documents.
Items to be generally expected at this level include:
· Title Sheet, Drawing Index, and Location and Vicinity Map complete.
· General Symbols, Legends, and Abbreviations complete.
· Design Data and Criteria complete.
· Site Plan with final location of structures, roadways, and major site elements (fencing, gates, etc).
Include contractor staging, storage, access, and off-site corridors (traffic plans).
· Plans and Profiles of pipelines with final alignments (horizontal and vertical). Easement limits
identified and included on drawings.
· Details of manholes, pavement and trench sections, and other civil details.
· Sedimentation and Erosion Control Plan and details.
· Landscaping plan and schedules.
· Architectural plans, sections, and elevations that depict the final exterior architectural theme,
materials of construction, and floor plan of structures.
· Structural plans, sections, and details coordinated with other design disciplines. Foundation plans,
floor plans, and roof plans to include structural member sizes and reinforcement detailing complete.
· Mechanical plans, sections, and details with final location of major equipment, piping, and
appurtenances. All piping layouts essentially complete.
· HVAC/Plumbing plans and sections complete. Equipment schedules and system schematics
adequately complete to review system configuration and design intent.
· Final electrical one-line diagrams, control room layouts, and panel layouts.
· Power plans, control diagrams, and schedules complete and coordinated with process/mechanical
design.
· Final lighting plan and reflective ceiling plan coordinated with other disciplines.
· Final P&IDs developed to greater detail and including revisions from previous comments and
coordinated with final operational control strategies.
· Final version of Specifications Divisions 1 through 17 incorporating comments from the 60 percent
submittal review and reflecting full coordination with drawings. Include final construction sequence,
milestones and constraints, measurement and payment, and proposed bid form. Include
memorandum with recommendations of changes to be made by City to General Conditions (Section
0700) in the Supplemental General Conditions (Section 0800)
EXHIBIT D, CALLOW AVENUE BASIN CSO PUMP STATION Page 7
· Equipment list that includes equipment number, equipment size, equipment power requirements, and
basic controls and operating strategies for all equipment on the project.
· Final Basis of Design Technical Memorandum that summarizes technical criteria and assumptions
used for the design and includes an evaluation of code interpretation for the Project. Also include an
evaluation of safety considerations for equipment access, facility access and egress, and daily
maintenance considerations.
· Final Geotechnical Interpretive Report (GIR) and Geotechnical Data Report (GDR) incorporating all
information obtained to date.
· Draft Geotechnical Baseline Report (GBR) for projects where this is deemed necessary.
· Memorandum summarizing recommended contractor and subcontractor qualifications to be used for
the bid evaluation.
· Completed safety checklist provided by City.
· Memorandum summarizing impacts of the Project on existing systems and probable impacts to the
existing system operation and maintenance requirements.
· Memorandum evaluating Contract Time.
6. 100 PERCENT LEVEL OF DESIGN
The 100% submittal should include changes agreed upon by the reviewer and the person preparing the
documents from the 90% submittal. This submittal should reflect coordination between all design
disciplines and corrections to this submittal will be done by addenda. Items to be generally expected at
this level include:
· Final Drawings and Specifications
· Final GIR, GDR, and GBR (where required).
· Final equipment list.
· Final Basis of Design Report.
REVIEW CONSIDERATIONS
A brief description of special review considerations related to the design submittal disciplines is
presented below.
EXHIBIT D, CALLOW AVENUE BASIN CSO PUMP STATION Page 8
GENERAL DRAWINGS
The items listed under this category are typical for most projects. Exceptions might be the Key Map and
the Design Data and Criteria. The Key Map may be required for large or complex drawing sets to assist
the user in navigating through the set. The Design Data and Criteria is required if the submittal is to be
reviewed by Ecology. For some projects it may be possible to combine a number of the items listed onto
common drawing sheets to reduce the number of drawings submitted. However specific attention
should be directed to the requirements of permitting and regulatory agencies when reviewing these
drawings. These agencies have sometimes established strict criteria for drawing format and content that
must be complied with to obtain approval.
CIVIL/SITEWORK DRAWINGS
It may be possible to combine information onto common drawings and reduce the number of drawings
submitted. This is again dependent on the complexity of the project and permit requirements.
ELECTRONIC FORM_AT FOR DELIVERABLES
Text documents shall be Microsoft® Word 2000. Drawing files shall be AutoCAD 2000®.
EXHIBIT D, CALLOW AVENUE BASIN CSO PUMP STATION Page S