Loading...
HomeMy WebLinkAbout4100 +--------------------------------------------------------------------------+ = :Browse : ::Retrieve +Found: 1 =l= :'-: ::Vendor Name = =Subj ect +Department ,.Status Code Next Previous First Last Update the Next record Record(s) MAINTAIN Contract Number 4100 Delete Restart X - Exit Contract Transactions .,. TETRA TECH/KCM INC W 540 PRESSURE ZONE IMPROVEMENTS ENGINEERING PRO ,. -.- =l= =l= =l= =l= :': Insurance Type Amount GL $2000000.00 AL $1000000.00 E&O $4000000.00 Amount Begin Date End Date Review Date $247800.00 .- 08/10/2000 ;= 08/10/2002 =l= 02/15/2005 =l= ,. Insurance Total Insurance Review Date $7000000.00 10/01/2004 Comments VAULT 01/01/2005 -.- =l= =l= =l= =1= =l= =l= +--------------------------------------------------------------------------+ +~-------------------------------------------------------------------------+ +Browse: +Retrieve +Found: 7 + + +Vendor Name +Subject +Department +Status Code Next Previous First Last Update the Next record Record(s) MAINTAIN Contract Number 4100 Delete Restart X - Exit + + + + + + + + + $247800.00 + 08/10/2000 + 08/10/2002 + 02/15/2005 + Contract Transactions TETRA TECH/KCM INC W 540 PRESSURE ZONE IMPROVEMENTS ENGINEERING PRO + + + + + + + + + + + + + Insurance Type Amount GL $2000000.00 AL $1000000.00 E&O $4000000.00 Amount Begin Date End Date Review Date Insurance Total Insurance Review Date + + + $7000000.00 + 10/01/2003 + + + + + Comments VAULT 01/01/2005 +--------------------------------------------------------------------------+ PROFESSIONAL SERVICES AGREEMENT West 540 Pressure Zone Improvements R6235102 The City of Bremerton ("City") and KCM, Inc. dba Tetra Tech/KCM, Inc., a Washington corporation CComractor"), referred to collectively as the "Parties," emer into the following agreement for professional services: I. Scope: The Contractor will perform the services set out in the Scope of Work, which is attached as Exhibit A and incorporated herein by reference. The Scope of Work may be modified only pursuant to Section VI. D. of this Agreement. If the Scope of Work provides for unspecified additional services the City may request, such services shall only be performed upon the express, written request of the City. II. Term: This Agreement commences on August 10, 2000 and terminates on August 10, 2002 unless another date is substituted pursuant to Sections VI. D. or VIII. 11I. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Contractor in an amount not to exceed $247,800. Contractor's charges and bills shall conform to the Scope of Work, attached hereto as Exhibit A, and to Contractor's Estimate of Professional Services, attached as Exhibit B and incorporated herein by this reference, and shall be paid lump sum, per each subtask conforming thereto. The Contractor shall submit regular billing statements describing services rendered and the amount charged for each service. The descriptions shall conform to and fall within the categories set out in Exhibit A, the Scope of Work. Upon receipt of a conforming billing statement, the City shall promptly process payment. Miscellaneous engineering support services included in Exhibit A (Task 208) shall be performed by Contractor and compensated by City only after City has directed such performance in writing. Contractor shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Additional services shall be compensated for only if requested pursuant to Section I and shall be compensated as set out in the request or, if the request does not so provide, as set out in the attached fee schedule. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance~ Such withholding does not relieve Contractor of its obligations under this Agreement. IV. Relationship of Parties: Contractor is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Contractor and its personnel are independent contractors and not employees of the City. Contractor and its personnel have no authority to bind the City or to control the City's employees and other contractors. Bremerton-Tetra Tech/KCM West 540 Pressure Zone Improvements Page 1 of 4 As an independent contractor, Contractor is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Contractor or its personnel. As an independent contractor, Contractor is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, B&O, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Contractor. V. Insurance and ltold E[armless: Prior to the commencement date of this Agreement, Contractor shall provide Certificates of Insurance to the City's Risk Manager verifying the following coverage: 1) a professional liability policy ("E&O") providing coverage of $500,000 for errors and omissions committed by Contractor while performing its obligations under this Agreement, and 2) a comprehensive general liability ("CGL") policy providing coverage of at least $500,000 per occurrence and including bodily injury and property damage. The CGL shall name the City as an additional insured. Both policies shall remain in full force and effect, and provide coverage for the full term of this Agreement. Insurer shall provide the Risk Manager with 30 days' written notice of any cancellation or change of coverage of either policy. Contractor shall be solely responsible for the acts and failures to act of its personnel which arise in any way out of performance of this Agreement. Contractor agrees to defend, indemnify, and hold harmless the City and its officials and employees from and against all liability, loss, damages, and expenses, including costs and attorneys' fees, resulting from actions, claims, and lawsuits arising or alleged to have arisen, in whole or in part, out of or in consequence of the omissions, negligent acts, or failures to act, of Contractor, its employees, its subcontractors, its agents, or its assigns in the performance of this Agreement. The City and Contractor have specifically negotiated Contractor's waiver of its immunity under Title 51 RCW, which is hereby waived for purposes of Contractor's indemnification and hold harmless of the City, including the duty to defend. This provision shall be inapplicable to the extent such action, claim, or lawsuit is judicially found to arise solely from the acts or failures to act of the City. VI. General Conditions: A. Reports and Information: When requested by the City, Contractor shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Contractor shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. Bremerton-Tetra Tech/KCM West 540 Pressure Zone Improvements Page 2 of 4 C. Severability: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. D. Modification: This Agreement may only be modified by written instrument signed by both Parties. E. Notices: Notices shall be in writing and delivered to the following addresses: City Address Contractor Address Robert Earl, Project Manager Lowell W. Warren, Principal Engineering Division Tetra Tech/KCM, Inc. 3027 Olympus Drive 1917 First Avenue Bremerton, Washington 98310 Seattle, Washington 98101-1027 F. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. G. Compliance with Laws: Contractor shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. H. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. I~ Attorneys' Fees: The substantially prevailing Party in any litigation arising out of this Agreement shall be entitled to its reasonable attorneys' fees and court costs. V1L Nondiscrimination: Contractor shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, or disability, except for employment actions based on bona fide occupational qualification. VIII. Termination: This Agreement may be terminated, at will, by either Party upon 30 days' notice to the other Party. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non-performing Party does not commence correction of the failure of performance within five days of the terminating Party's sending notice to the non-performing Party. Upon termination the City will be entitled to reports showing the status and/or all work products, independent of their stage of completion or preparation format, of all items listed in the Scope of Work current through the termination date. Bremerton-Tetra Tech/KCM West 540 Pressure Zone Improvements Page 3 of 4 CITY OF BREMERTON CONTRACTOR By: ~~ ~~ E. Rosholt, P.E. its: its: President DEPARTMENTAL APPROVAL: its: APPROVED AS TO FORM: ~-~L~N~MALANCA, City Attorney RECEIVED FOR FILING: KATHLEEN L. McCLUSKEY, City Clerk Bremerton-Tetra Tech/KCM West 540 Pressure Zone Improvements Page 4 of 4 Exhibit A City of Bremerton · West 540 Water Pressure Zone Scope of Work Introduction The proposed West 540 Pressure Zone lies within the City of Bremerton's water service area and is bounded on the East by Anderson Hill Road; on the West by Sunny Slope Water District; on the South by Old Clifton Road; and on the North by State Highway 16. The project objective is to provide sufficient water pressure and flow to support existing and future development within the pressure zone boundary as outlined in the City of Bremerton's Comprehensive Plan. The immediate project goal is to provide sufficient water pressure and flow to support the Northwest Corporate Campus development, which is located within the proposed pressure zone boundary. The purpose of this Contract is for TetraTech/KCM, Inc. (Contractor) to complete final design of a booster pump station and water transmission main that will satisfy the immediate project goal and the project objective, and to provide support services to the City dtmng construction of these improvements. The Contractor will lead the design work and will coordinate the activities required by the City, subcontractors and subContractors during the design phase. The Contractor will provide support services during construction as described in this Scope of Work and as may be otherwise requested by the City. SERIES 100 TASKS - PROJECT MANAGEMENT Task 101 - Pro_i eot Management & Coordination Contractor Responsibilities: 1. Contracting, internal project control, billing and accounting. 2. Staff administration and scheduling. 3. Preparation of project schedules. 4. SubContractor administration, coordination and control. 5. Conduct periodic coordination meetings with Contractor and and City project staff. 6. Monthly reports. 7. Monthly invoices Assumptions: 1. Invoices and reports will be prepared and submitted monthly. 2. Contractor's standard invoice format will be used. If Contractor's standard format does not contain an itemized listing of project staff charged to the project; hourly rates; hours charged and other direct costs, Contractor will provide this information as a part of the Monthly Report. 3. Invoices will classify hours charged by Task. City of Bremerton Exhibit A-Scope of Work West 540 Pressure Zone Development Page I of 10 4. Backup information (i.e. timesheets, logs, receipts, etc.) will not be furnished with invoices. Backup information will be available in Contractor's files and shall be made available at any time, in whole or part, to City's staff or auditors upon City's request. 5. Contractor's initial project schedule will be prepared in bar-chart format using software acceptable to the City, and shall indicate completion of Tasks by required target dates. Contractor shall update the schedule each month to indicate progress and the status of each Task at month end. 6. Three SubContractors (EISI, Inc., ESM, Inc. and HWA Geosciences, Inc.) will be employed by Contractor to support its design services. EISI, Inc. will provide electrical, instrumentation and controls assistance; ESM, Inc. will provide surveying and legal description assistance, and HWA Geosciences, Inc. will provide geotechnical assistance. 7. Coordination meetings will typically be conducted at least monthly and shall be arranged and conducted by Contractor via telephone/conference call. Contractor will furnish meeting notifications, agendas and other necessary materials to all meeting participants by telefax or e-mail at least 2 business days before scheduled meetings. 8. Meeting minutes will be produced by Contractor and distributed to attendees within 2 business days after the date of the coordination meeting. 9. City will maintain the role of overall project coordination with other governmental agencies. Work Products: 1. Monthly invoices. 2. Monthly reports describing the work performed, keyed to charges indicated in Contractor's invoices. 3. Project Schedules. 4. Meeting notifications and agendas, other meeting-related materials as necessary or as City may request. 5. Meeting Minutes. Task 102 - Ouali _ty Assurance Review Contractor Responsibilities: 1. Assure that project objectives and goals are being met. A senior engineer who is not directly involved in the project design shall review the design, including cost estimates, at the 50 percent and 90 percent stages, prior to submission to City for review. The reviewing engineer shall produce a brief written report of his findings. Assumptions: 1. Review criteria will include comparison to stated objectives and goals, permitting requirements, stated construction budgets, and constructibility. 2. Requests to City for additional information or direction will not be included in the review report, but will be made separately by Contractor's project manager. 3. Contractor's project manager or project engineer will review and address the reviewing engineer's comments for inclusion in the review report. Work Products: 1. Review Report. The report shall be distributed to appropriate Contractor and City project staff. City of Bremerton Exhibit A-Scope of Work West 540 Pressure Zone Development Page 2 of 10 SERIES 200 TASKS - DESIGN SERVICES & CONTRACT DOCUMENTS Task 201 - Land Surveying & Assistance in Right of Way Acquisition Contractor Responsibilities: 1. Perform field and office surveying work to provide alignment location, control points, existing topography and utility location data in sufficient detail for accurate construction drawings. 2. Establish permanent control points for use in construction staking. 3. Produce base plan and profile database for use in final design of both transmission pipeline and pump station. 4. Assist in fight of way and easement acquisition. Identify all permanent and temporary right of way or easements required for construction and maintenance of proposed facilities. Conduct preliminary title searches. Prepare construction easements and permanent easements, including legal descriptions. Assumptions: 1. City will provide all available, City-owned survey, boundary and control data. 2. City will assist in obtaining survey, control and boundary data from owners of adjacent properties as may be necessary. 3. Northwest Corporate Campus (NWCC) will provide permanent easement documents and legal descriptions for transmission and distribution mains within its boundaries. 4. All Work Products will be supplied in hardcopy and electronic formats. The Contractor will convert all electronic formats not compatible with City's sofc, vare and equipment to compatible formats. Work Products: 1. Survey data & drawings. 2. Survey control database. 3. Plan/profile data for use in design of transmission main and pump station. Task 202 - Geotechnical Investigation Contractor Responsibilities: 1. Drill subsurface borings or dig test pits at the pump station site and along the t~ansmission main alignment in areas where insufficient geotechnical data is available. Obtain sufficient samples of soil materials determine physical characteristics of existing soils. 2. Perform testing to determine mechanical soil characteristics, including bearing strength, as may be required for design and construction of the proposed facilities. City of Bremerton Exhibit A-Scope of Work West 540 Pressure Zone Development Page 3 of 10 Assumptions: 1. City has provided available geotechnical data & reports prepared for the Northwest Corporate Campus development. 2. At least three borings or test pits will be made at the pump station site. 3. Borings or test pits along the transmission main alignment will be at 500-foot intervals or less, in areas insufficiently covered by existing geotechnical information provided by the City. 4. Borings shall not be less than ten feet in depth; test pits shall not be less than 6 feet in depth. 5. City will provide a backhoe and operator for a maximum of two days to dig test pits. Work Product: 1. Geotechnical Report including at minimum a description of field explorations and laboratory testing, existing site conditions, subsurface conditions, conclusions and recommendations for design and construction of the proposed facilities and field exploration logs. Task 203 - Permits & Approvals Contractor's Responsibilities: 1. Building Permit: Determine Kitsap County requirements for issuance of a building permit for the pump station. Participate in meetings required by County's permit process. Revise final Plans and Specifications as required by County's plans review, sufficient to obtain building permit approval. 2. Washington State Department of Health Approval: revise final plans and specifications as required to obtain construction approval from WSDOH. 3. Clearing & Grading Permit: Determine Kitsap County requirements for issuance of clearing and grading permits. 4. Prepare a Biological Assessment suitable for submittal to the USNMFS and Washington State DOE. Assumptions: 1. City will prepare and submit SEPA checklist, Shoreline permit application and JARPA as required. 2. City will obtain a Short Term Water Quality Modification directly from the Washington Department of Ecology if required. 3. City will pay all plan review and environmental permitting fees directly. 4. City's construction contractor will apply for and obtain building and clearing/grading permits following completion of plan reviews and County approvals. Work Products: 1. Evidence of building plan approval by Kitsap County. 2. Completed biological assessment, ready for submittal. City of Bremeaon Exhibit A-Scope of Work West 540 Pressure Zone Development Page 4 of 10 Task 204 - Final Design and Construction Drawings Contractor's Responsibilities: 1. Perform final design of pump station including, but not limited to, the following: A. Pump selection. B. Piping system design. C. Instrumentation and control system design & coordination with City's SCADA system (at new pump station and at City's operations center). D. Pump station building architectural, structural, plumbing, HVAC and electrical designs. E. Civil site design and details, including grading, paving and utilities. 2. Perform final transmission main design from pump station to proposed reservoir site. 3. Prepare final construction contract drawings for pump station. 4. Prepare final construction contract drawings for transmission main. Assumptions: 1. The pump station and transmission main will be constructed under separate contracts and will have separate construction drawing sets. 2. The pump station will be designed in general accordance with Contractor's West 540 Pressure Zone Predesign Report and Final Route and Site Recommendation. June 2000 as approved by City. 3. The pump station building will be designed in accordance with codes and requirements in force in Kitsap County Washington on the date of this Contract, or as may be later required for issuance of a building permit by Kitsap County. 4. Contractor will coordinate the transmission main design with Northwest Corporate Campus' grading, roadway, utility and building design, currently under development, as directed by City. 5. Construction drawings will be prepared at scales appropriate for the work, but in any case not less than: 1"=40, for plan/profile drawings and civil site plans; and, %"=1 '-0" for architectural, structural, mechanical and electrical drawings unless approved by City. 6. The City will provide its standard title block layout and City standard detail drawings to Contractor in electronic (Autocad) format. 7. The City will provide, and the Contractor will generally use, City's standards for drawing symbols, text fonts, line styles and weights, layering and other drafting conventions. 8. The City will have right of review, comment and approval of the design and contract drawings at all times. Progress reviews will be conducted for both the pump station and transmission main at 50 percent, 90 percent and final completion. The pump station plans shall be completed in sufficient detail at the 90 percent stage to allow application for plan review and building permit approval from Kitsap County. The Contractor will attend a review meeting with City staff at the 50 percent and 90 percent stages to receive and discuss comments. Work Products: 1. Pump Station construction drawings including general and detailed civil, structural, mechanical, electrical, instrumentation/control, temporary erosion/sedimentation control, standard details, title sheet, vicinity maps and sheet index. City of Bremerton Exhibit A-Scope of Work West 540 Pressure Zone Development Page 5 of 10 2. Transmission Main construction drawings, including plan/profile drawings, details, standard details, temporary erosion/sedimentation control, title sheet, vicinity maps and sheet index. 3. Original Drawings: One full-size and one half-size set of engineer-stamped and signed mylar original drawings, for the pump station and for the transmission main. Full-size originals shall be 22" X 34". 4. Electronic Copy: Two copies of all approved, final drawings in Autocad Release 14 (or newer) format on CD-ROMs. Each electronic copy shall include all XREFs and one completed plot (*.plt) file for each final, approved drawing. 5. Review Copies: Contractor will provide seven copies of all drawings for City's review at 50 percent completion, 90 percent completion and for final review. Contractor and City shall allow 10 calendar days for each City review. Task 205 - Pro_i¢ct Manuals Contractor's Responsibilities: 1. Prepare final project manual for construction of the pump station. 2. Prepare final project manual for construction of the transmission main. Assumptions: 1. The pump station and transmission main will be constructed under separate contracts and will have separate project manuals. 2. The pump station project manual will be prepared in CSI (16-division) format. 3. The pump station project manual will incorporate the Standard General COnditions of the ~.~il~i~, as prepared by the Engineer's Joint Construction Documents Committee (EJCDC 1910-8, 1996 or later edition). The City will provide a licensed copy of EJCDC 1910-8 for the Contractor's use. 4. The Contractor will prepare separate Supplementary Conditions of the Contract based upon EJCDC 1910-8 for incorporation into the pump station project manual. The Supplementary conditions will include City's insurance and indemnification, bonding and other requirements that are specific to the project, the City's business and contracting needs, and of State and Federal laws. The City will provide an example Supplementary Conditions document for the Contractor's use. 5. The Contractor will prepare bidding documents and technical specifications necessary to complete all pump station construction work. The City will supply example proposal, bond forms, insurance forms, and construction agreement for Contractor's use. 6. The transmission main project manual will be prepared in APW,adWSDOT format, based upon the WSDOT 2000 Standard Specifications for Road. Bridge and Municipal Construction (English Units version, M 41-10). 7. The Contractor will prepare bidding documents and technical specifications necessary to complete all transmission main construction work. 8. The City will supply example proposal, bond forms, insurance forms and construction agreement for Contractor's use. Work Products: 1. Pump Station project manual, complete, approved by City, and ready for submittal to permitting and approving agencies. City of Bremerton Exhibit A-Scope of Work West 540 Pressure Zone Development Page 6 of 10 2. Transmission Main project manual, complete, approved by City, and ready for submittal to permitting and approving agencies. 3. Electronic Copy: Two copies of the approved, final project manuals in Microsoft Wor0 97(or newer) format on CD-ROMs. 4. Review Copies: Contractor will provide seven copies of both manuals for City's review at 50 percent completion, 90 percent completion and for final review. Contractor and City shall allow 10 calendar days for each City review. Task 206 - Engineer's Construction Cost Estimates Contractor's Responsibilities: 1. Prepare separate engineer's construction cost estimates for the pump station and for the transmission main at the 50 percent and 90 percent design completion stages. Assumptions: 1. Engineer's estimates will be submitted within one week of the review submittals delivered to the City. 2. It is recognized that the engineer's estimates will represent a range of bid prices and that the lowest responsible, responsive bidder's price will vary from the engineer's estimates. 3. The Contractor will include a quantity take-off, integral to each estimate. 4. The Contractor will develop unit prices or schedule-of-value prices for all items, as appropriate to the individual estimate. }Fork Products: 1. Engineer's estimates of construction cost for the pump station at 50 and 90 percent completion. 2. Engineer's estimates of construction cost for the transmission main at 50 and 90 percent completion. Task 207 - Technical Memoranda Contractor's Responsibilities: 1. Prepare technical memoranda on the final pump station and transmission main design. Assumptions: 1. The technical memorandum will include, at minimum, final hydraulic analysis, pump selection, instrumentation and control design, structural design, permitting data, standards and utility information, and design QA/QC reports. 2. The technical memorandum may encompass separate volumes for pump station and transmission main design. 3. The City will have right of review and approval of the final technical memorandum. City of Bremerton Exhibit A-Scope of Work West 540 Pressure Zone Development Page 7 of 10 Work Products: 1. Three bound copies of each technical memorandum, as approved by the City. Binders shall be loose-leaf binders with "Slant-D" or equivalent binding rings, having sufficient capacity to contain the technical memoranda and one copy of all material and equipment submittals approved for use in the construction work. Task 208 - Miscellaneous Engineering Servic~ Contractor's Responsibilities: 1. Perform additional engineering services in support of system analysis or design as may be specifically requested in writing by the City. 2. Attend up to six additional meetings with developers and agencies in response to City's verbal or written requests. 3. If specifically requested in writing by the City, Perform chemical testing sufficient to determine whether contaminated soil or water will be encountered during construction. Recommend a plan for dealing with contaminants or hazardous materials during construction if actionable levels are detected. 4. Prepare support materials for SEPA checklist, Critical Areas Review, Shoreline Substantial Development permit, and JARPA (if required), in response to City's verbal or written request. Assumptions: 1. No work in this task will be performed without prior authorization from the City, as noted above. 3. Contractor will attend meetings and charge to this Task only when requested by City. 4. Contractor will prepare meeting minutes for additional meetings unless otherwise directed or agreed. Minutes will be distributed to City and Contractor staff within 2 business days after the date of the meeting. 4. Additional meetings will be held at City's offices or other locations in Kitsap or King Counties. Work Products: 1. Meeting Minutes for all meetings attended. 2. Support materials for SEPA, Shoreline and other permits and approvals, if requested by City. 3. Other additional work products will be defined by City's request for work under this task. No work is to proceed until work products are defined and approved by City. SERIES 300 TASKS - LIMITED CONSTRUCTION PHASE SERVICES Task 301 - Bidding Assistarlc~ Contractor's Responsibilities: 1. Finalize drawings and project manuals for bidding. After 90 percent stage comments are received from City, Kitsap County, DOH and other agencies having jurisdiction, final revisions will be made to the 90 percent drawings and project manuals to produce final, bid- ready contract documents. City of Bremerton Exhibit A-Scope of Work West 540 pressure Zone Development Page 8 of 10 2. Arrange & Conduct a pre-bid conference for all prospective bidders, for both the pump station and transmission main. 3. Receive City and bidder's questions during the bid advertisement period and prepare a minimum of one addendum to the bid documents. Assumptions: 1. The bidding period will be limited to 21 calendar days. 2. Up to 12 personnel hours will be budgeted for the pre-bid conference and meeting minutes. 3. Up to 24 personnel hours will be budgeted for receiving and answering City's and bidders' questions and preparation of the first addendum. 4. Preparation of addenda arising from errors or omissions solely of the Contractor will be the separate responsibility of the Contractor. [York Products: 1. Six copies of"ready-for-bidding" contract documents (construction drawings & project manuals) for final inspection by the City and approving agencies. 2. Meeting minutes and attendance list for the pre-bid conference. 3. Telephone/conversation records or other acceptable documentation of all bidders' questions asked and answered. Task 302 - Construction Phase Services Contractor's Responsibilities: I. Manage all KCM and subContractor activity in support of the pump station and transmission main construction, including monitoring budget, schedule and processing monthly invoices. 2. Attend one pre-construction conference. 3. Review contractor's equipment and material submittals for the pump station and transmission main, as authorized or requested by the City. 4. Review electrical and instrumentation/control submittals; allow a maximum of 32 personnel hours for this task. 5. Make periodic visits to the site. 6. Attend construction meetings as City requests. 7. Respond in writing to contractor's formal requests for information, as requested by City. 8. Perform construction surveying. Assumptions: 1. KCM project manager and EISI's project engineer will attend the pre-construction conference; a maximum of 20 personnel hours will be budgeted -construction conference attendance and minutes. 2. City staffwill review the majority of contractor's equipment and material submittals, except electrical and instrumentation control, which will be reviewed by EISI. The Contractor will review contractor submittals, or provide input and clarification for their review, as requested by the City. The Contractors will maintain submittal logs indicating all submittals they have reviewed for this contract, including submittal number and title, date received and date returned to the City, and status of each item reviewed. 3. Make up to eight site visits, when requested by the City. 4. Attend up to six construction meetings, as requested by the City. City of Bremerton Exhibit A-Scope of Work West 540 Pressure Zone Development Page 9 of 10 5. Construction surveying will be provided in up to six separate stages for the transmission main, and up to three separate stages for the pump station. Work Products: 1. Meeting minutes and attendance roster for the pre-construction conference. 2. Submittal review logs. Logs shall be updated and two copies provided to the City by mail or telefax whenever a new entry or entries are made. 3. Construction surveying staking/cut sheets. Construction surveying control data (if not already provided under another task) as hardcopy and on compact disk(s) compatible with AutoCad, release 14 or later. City of Bremer~on Exhibit A-Scope of Work West 540 Pressure Zone Development Page 10 of 10 'Tt/KCM Inc- - ! · Tetra Tech/KCM, Inc. ESTIMATE OF · R OFESSIONAL SER VICES 1917 First Avenue Seattle, WA 98101 (206) 443-5300 CLIENT: City of Bremerton (206) 443-5372 (FAX) PROJECT:West 540 Pressure Zone Improvements Final Design Services P.D. No.: Proj. No.: 2680034 Date: 8/1/00 LEVEL OF EFFORT- STAFF HOURS PHASE/TASK DESCRIPTION Principal Project Senior Prof. CAD Clerical Stnff Staff ERIES 100 TASKS - PROJECT MANAGEMENT Task 101 - Project Management & Coordination 27 6 12 Task 103 - QA Review 4 22 2 ;ERIES 200 TASKS - DESIGN SERVICES & CONTRACT DOCUMENTS Task 201 - Surveying & Assistance in R/W 2 8 Acquisition Task 202 - Geotech. Investigation (Coord.) 2 2 Task 203 - Permits & Approvals 4 16 8 16 4 Biological Assessment 40 24 4 Task 204 - Final Design & Constr. Drawings 2 48 92 472 376 Task 205 - Project Manuals 8 24 24 8 Task 206 - Engineer's Conslr. Cost Estimates 2 12 24 2 Task 207 - Technical Memorandum 4 8 8 8 8 tOTAL HOURS ' 2 10i i 182 584 I 424 40 )IRECT JOB WAGES (DJW) $50.00 $44.10' $32.33 $25.66'l $21.00 $21.00 IlLLING RATE (DJ~V x 3.10) $155.00 $136.71 $100,22 $79.55 $65.10 $65.10 ~UBTOTALS $310 $13,808 $18.241 $46,455 $27.602 $2,604 FOTAL ESTIMATED WAGE COST $109,020 Travel & Per Diem $310 Printing, Publication, & Communications $2,080 Computer $5,200 Other Expenses Subeonsultants EISI $18.369; ESM $24,068; HWA $15,415 (S57,852 x 1.15) $66,530 tOTAL ESTIMATED KCM COST $183,139 I'OTAL ESTIMATED COMPENSATION $183,100 b~get xg,q~ &Mr2) Page Iofl