Loading...
HomeMy WebLinkAbout06/03/2026 3F AGENDA BILL CITY OF BREMERTON 3F CITY COUNCIL SUBJECT:Study SessionDate: May 27, 2026 ProfessionalServices Agreement with COUNCIL MEETING Date: June 3, 2026 Kennedy Jenks for Westside Treatment Department: Engineering Plant UpgradePlanning and Conceptual Presenter: David Powell Design Phone: (360) 473-5268 SUMMARY:Wastewater operations staff identified several equipment itemsat the Westside Treatment Plantthatmust be replaced or refurbished, which were combined into asingleproject titledWestside Treatment Plant Upgrade. The City has received a Department of Ecology (Ecology) State Revolving Fund (SRF) loan for the planning and design of these improvements, which include: 1) Centrifuge Replacement; 2) Grit Chamber Concrete Rehabilitation; 3) Digester Gas Scrubbing; and 4)Headworks Screen Replacement.The City selected Kennedy Jenksand negotiated a fee of $339,356to prepare planningandconceptual design documents that will be used for scoping the detailed design contract and applying for an SRF construction loan in 2027. ATTACHMENTS:1) Professional Services Agreement; 2) Location Map3) Power Point Presentation FISCAL IMPACTS:The project Westside Treatment Plant Upgrade is identified as ProjectID WW00087in the 6-year Wastewater Capital Improvement Plan (CIP)with a total budget of $6.86M. Theplanning and design of this project is partially funded by a $2.12M SRF loan. STUDY SESSION ACTION:Consent Agenda General Business Public Hearing RECOMMENDED MOTION: Move to approve the Professional Services Agreement for Westside Treatment Plant Upgrade Planning and Conceptual Designwith Kennedy Jenks in the amount of $339,356and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 04/19/2024