Loading...
HomeMy WebLinkAbout2014-03-12 1610 WINFIELD AVE - PermitsENTER Z [U14 RESIDENTIAL Building Permit Application nerton, DCD llenartrnent of Conuuunih lleveloptnent ' 345 - 6th Street, Suite 600 Bremerton ' VVA ' 98337-1873 (360) 473-5275 ' Fax (360) 473=5278 ' «inma.ci.bremerton.wa.us Applicant: ❑ Owner Contractor ❑ Authorized Agent Site Address: `I t0 l[///P Dim% jl E 401 k WP Tn annly fnr a nrnnorhi arlrlrocc rnntact Public Wnrkc at_/3Rnl d73.F97n.. r, J� CONTRACTOR 6 r1licto VrA� OWN E R:IL DK dLy h. rv�.rZ Address: Z i 7j folcAp<<,G S V, Address: l ' a_ j' *� VC f Cit , State, Zi a V< (o%1 IV City, State, Zip: 107 License # & Exp. Date: COON 6 `j ZO Z Phone #: t , e' I` 71te l Contact Name: GLl Authorized Agent Name, Contact Phone #: /4e 7 6 _ Address: Email address: M (e5ir "10) V ", <, i,i City, State, Zip: Tax ID/Parcel #: ML Phone #: ( ) ❑ Sewer ❑ Septic Email address: What is the application for? (Please check) New Construction ❑ Alteration ❑ Addition ❑ NEW SINGLE-FAMILY RESIDENCE ❑ NEW DUPLEX ❑ NEW MANUFACTURED HOME ❑ NEW GARAGE/CARPORT ❑ RESIDENTIAL REBUILD ❑ RESIDENTIAL ADDITION ❑ RESIDENTIAL REPAIR ❑ NEW ACCESSORY BUILDING DEMOLITION sf Interior ❑ sf Exteriors' sf Foundation Wall'* sf Roof/Section•' Separate demolition permit and fees required. Contact Public Works for sewer cap permit (473-5270). Sewer must be capped prior to demolition permit issuance. 0 OTHER: IS THIS PROPERTY WITHIN 200 FEET OF A SHORELINE? YES aa5J NO ❑ Scope of work proposed: (' %i �' r. (� �fJ� s� &e , rd wvt Square Footage: Building: 1st Floor Basement- Garage: 2nd Floor Other Deck(s): 1st Floor Valuation ,Ian Review Fee Permit Fee Surcharge Total Fees Application for which no permit i issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may ther fter be returned to the applicant or destroyed by the building official. The building official may extend the time lo r action by the applica�6r a period not exceeding 180 days on request by the applicant, showing that circumstances beyond the control of th p 'ant ha re"vented action f b ing taken. No applicant shall be extended more than once. In order to renew action on an apply ation• r Pxpiratio e spy scant all resubmit plans and pay a new plan review fee. (Print) � Date oct. zoos (Continued on back) line sets run on the exterior of the building they shall have a rigid line hide weatherproof covering. £ Leak Testing, Evacuation and Charging — Factory as well as field -fabricated joints shall be checked, and any leaks found shall be repaired. Evacuation and charging shall be done in accordance with the manufacturer's instructions and recommendations. 12.6.6 Condensate System a. Condensate Drain —Line shall slope downhill to allow for gravity flow of condensate to terminate outside of the building. b. Piping Material — Condensate drain piping shall meet IMC and should be copper, plastic or other corrosion -resistant material. c. Drains —Condensate drain lines shall run to an open drain or location outside of the building foundation. Condensate shall not drain onto areas where ice formation may create a hazard (walkways etc.). Under no circumstances may condensate be drained into a crawl space or direct connected into a sewer line. d. Condensate Pump — Condensate pumps are not recommended unless there is no other alternative. If a condensation pump must be installed, follow the manufacturer's installation requirements.12.6.7 Indoor Thermostats 12.6.8 Existing Equipment a. Wireless Remote Control — A wireless remote control is standard equipment for adjusting the indoor comfort. Wireless remote controls are to be provided to the building owner.12.6.4 Damages a. The LA will be held responsible for any and all damages created during the performance of the work. b. All debris resulting from the work will be removed and legally disposed of with every effort made toward recycling waste materia1.12.6.10 Disclaimer If a conflict between the Section 12.6 guidance document and the local building department's equipment installation requirements, the local building official's requirements take precedence. This document is only to be used as a general guide for providing quality products and installation. For complete information regarding installation requirements, features, benefits, operation, and maintenance, review the manufacturer's installation manual of the product being installed. Price: $3500.00 8. REPLACE ELECTRICAL PANEL (CDBG) Condition: Current panelZynsco and potential fire hazard. Recommended Action: Replace existing panel to code, price includes permit, indoor and outdoor units) using a torque wrench tightened to manufacturer's specifications. £ Refrigerant Charge — Technician shall follow manufacturer's guidelines when charging a new system and make any needed adjustments for non-standard line set lengths using a programmable refrigerant charging scale. g. Electric Wiring — When attached to the exterior walls shall be in conduit to protect them from contact and exposure. All field wiring, line and low voltage, shall comply with the manufacturer's recommendations, the National Electrical Code and all applicable local codes and ordinances. All interior wiring is to run along walls where possible and along the edge of the ceiling where it is necessary to run on the ceiling. h. Filters — Indoor unit shall come with air filters installed from the factory. i. Ductless — The heat pump will be fully ductless. Units using any type of field installed duct system are NOT eligible. 12.6.4 Noise and Vibration Abatement a. Outdoor units should be located to avoid transmission of objectionable noise to adjacent properties, sleeping areas or other areas where noise control is critical. Outdoor units shall comply with all state and local noise control ordinances. The LA shall be responsible for any modifications necessary to reduce noise. Unit base shall not be connected to the foundation. 12.6.5 Refrigerant Piping This section applies to the copper refrigerant line sets a. Materials — Field -supplied refrigerant piping shall be clean, dehydrated, sealed and seamless copper tubing or the manufacturer's pre -charged tubing. Fittings shall be wrought copper. Field supplied tubing shall be evacuated to 500 microns and purged and pressure tested as per manufacturer's recommendation, soft solders shall not be permitted. b. Sizing — To maintain oil return to the compressor and avoid inefficiency and capacity loss, refrigeration piping or refrigeration line set shall be sized and installed in accordance with the manufacturer's instructions and recommendations. Piping between the two sections of split units shall not exceed the manufacturer's maximum recommended length, horizontally or vertically, and shall be run parallel to building lines and in a straight and workmanlike manner to prevent oil traps. c. Support — Refrigerant piping shall be properly supported in accordance with manufacturer's specifications, AM and IMC (International Mechanical Code). d. Penetrations —Refrigerant piping passing through openings in the unit cabinet or the building structure shall be installed to prevent wear or sound generatio"A e to contact with the cabinet or building structure. All penetrations in the envelope of the building shall be properly sealed with an insulative sealant. e. Insulation —Refrigerant lines shall be insulated with a minimum of/2" thick continuous closed -cell foam rubber. Insulation must cover entire line set length. Where refrigeration cooling, defrost). All this information shall be provided in the owner's manual given to the building owner. The LA shall instruct the building owner how to operate the DHP in coordination with the existing zonal systems in the home. Instructions shall include adjusting other zonal thermostats so the DHP is the primary heating system. d. Safe Work Practices —This or will usually not disturb lead based paint nor asbestos. All work that may disturb lead based paint must be performed in accordance with federal and state regulations, including the use of Lead Safe Weatherization practices (LSW) and in compliance with the EPA's Renovation, Repair, and Painting Rule (RRP). The LA must document crew certification for compliance with LSW and RRP. In addition, the LA must keep abreast of changes in federal or state requirements regarding lead based paint and comply accordingly. Failure to utilize LSW/RRP, where required, may lead to immediate work stoppage, clearance testing, relocation of occupants, clean-up and/or legal claims. The LA is responsible for costs of activities that arise from a failure to follow the lead safe protocol. 12.6.3 New Equipment Installation Pursue compliance with federal, state, and local building and environmental codes for the installation of this product. Follow manufacturer's installation instructions and specifications. The following specifications are not intended to replace manufacturer's specifications. a. Permits —The LA shall be responsible for all permits required by State and local ordinances for the installation of the he pump system. The LA shall provide the building owner and the Local Agency with copies of all permits related to the work. b. Access — Equipment shall be located to allow easy service access and adequate working space for servicing any component without removal of piping or other permanently installed fixtures. Components that require frequent attention, such as filters, shall be located in easily accessible areas. Installations located in attics or crawispaces are not allowed. c. Location of Indoor Unit —Indoor unit shall be located in the main living area, located for best air circulation. Unit shall be installed level and located high on the wall. d. Location and Support of Outdoor Units — Outdoor units shall be located to avoid restrictions in the outdoor airstream. Defrost melt shall not drain onto areas where ice formation may create a hazard (walkways etc.). Outdoor units must be installed level. Outdoor units will be installed with either of the following methods: 1. Units may be anchored to risers which are secured with an adhesive and mechanical connection to an adequate, solid pad which provides proper drainage and prevents a buildup of water, snow or ice. A minimum clearance shall be provided as per manufacturer's instructions and recommendations. In any installation there shall a minimum of 3" of free and clear area under the outdoor coil drainage area. 2. Units may be mounted on the building exterior wall, secured and supported according to the manufacturer's instructions following noise and vibration abatement requirements. e. Refrigerant Tubing — Factory tubing flares and fittings are NOT to be reused. Create new flares using appropriate R410a flaring tool and measurement gauge. Apply refrigerant oil to the end of each flare. Connect tubing with R410a nuts (supplied with company listed in the Air Conditioning, Heating and Refrigeration Institute (AHRI) Unitary Directory. The Weatherization Program promotes sustainability. The Local Agencies (LA) performing this work are encouraged to utilize "green" materials and products wherever possible and make every effort to recycle waste material. b. Ratings —Heat pump equipment shall meet the performance, safety, and rating requirements as given in the latest revision of AHRI Standard 240. Units shall be listed by Underwriters' Laboratories or equivalent and shall display the AMU symbol of certification. The DHP equipment shall be listed by model number on the most current Bonneville Power Administration's Qualified Products List. Last accessed from http://www.bpa.gov/ResHVAC/ on March 19, 2013. The heat pump equipment shall be rated with an HSPF of 10.0 or greater. c. Heat Pump Sizing —The heat pump system shall be a single head unit with a minimum size of one ton heating capacity (12,000 BTUs at 47 degrees Fahrenheit OD temperature). If the system provides adequate heat at the winter design temperature, a separate back-up system is not required. Otherwise, the system shall be designed to include zonal electric resistance heat (either in unit or as separate zone heaters) up to the total capacity required by the house. Sizing of the DHP shall take into consideration the planned thermal improvements to the building through the weatherization program. d. Warranty —Heat pump equipment shall be warranted by the manufacturer against defects in material and workmanship for a minimum of two years from the date of start- up of the equipment. In addition, the compressor shall be warranted by the manufacturer against defects in material and workmanship for a minimum of five years from the date of start-up. This warranty should not be considered to cover equipment failure caused by failure to perform normal maintenance, abuse or external causes beyond the control of the LA. A Statement of Warranty must accompany your invoice and must be provided to the building owner. 12.6.2 Local Agency Requirements a. Training —The LA shall be responsible for the technical competence and qualifications of his or her salespeople, installers, and service technicians. Technicians must attend the Northwest Ductless Program orientation and be listed on the Northwest Ductless website. At least one technician working on the job site must have received certified installation training from the manufacturer of the installed DHP equipment and be certified as a Type II technician as required by 40 CFR Part 82, Subpart F. b. Electrical -All electrical connections and repairs are to be performed by individuals who, working for a licensed electrical contractor, have received appropriate electrician certifications from the Washington State Department of Labor and Industries (L&I). Electrical repairs are to be conducted under the supervision of an electrical administrator. L&I provides both electrician and administrator certifications for various levels of electrical work. The LA is responsible for obtaining required certifications and licensing for self -performance of electrical repairs or for subcontracting electrical repairs to a properly licensed electrical contractor. c. Owner Instruction —The LA shall instruct the building owner in proper operation and maintenance of the DHP system. The LA shall provide the building owner with the manufacturer's owner's manual, demonstrate filter replacement/cleaning and demonstrate the operation of indoor thermostat controls and indicator lights. The LA shall explain to the building owner the different operating modes of the heat pump system (e.g. heating, 5. INSTALL BATH FAN (H & S) Condition: Bath fan pulling 10 cfm and is dumping into attic. Recommended Action: Install 80 cfm Panasonic in bath model FV- 08vks3-Continous, vented out with rigid pipe with new dampened vent cap. Insulate pipe Min. r-11 un-faced fiberglass tied off with twine. When ducting through the roof connected to a collar of the termination cap. Collar shall pass through the roof sheathing. Mechanically fastened at each joint using a minimum of 2 screws, and taped using aluminum butyl tape, to the fan outlet and to the collar of termination cap Read Commerce Specification below. 10.5.4 Bathroom fan exhaust ducting shall be: a. Metal, 30 gauge, minimum thickness (galvanized metal, aluminum, copper, or stainless steel) or PVC, schedule 40, minimum thickness. Exceptions: 1. Where rigid vent pipe is impracticable, aluminum flex duct may be used for runs no longer than 2 feet from fan to vent cap. 2. Mylar flex or rigid aluminum flex duct may be used if the duct diameter is increased an additional 50% from the fan outlet diameter. In no installation shall the flex duct be allowed to loop. If running flex duct across varying heights (such as ceiling joists), the flex duct shall be stretched and secured to a splint to avoid sagging and the collection of condensation. b. Insulated to minimum R4 (R-I I with unfaced fiberglass insulation) if duct is more than 6 feet in length, and passes through unconditioned space. c. Air tight and ducted to the outside (preferably through a vertical surface, rather than through the roof). d. If ducting through the roof, connected to a collar of the termination cap. Collar shall pass through the roof sheathing. e. Mechanically fastened at each joint using a minimum of 2 screws, and taped using aluminum butyl tape, to the fan outlet and to the collar of termination cap. £ Termination cap shall have at least the equivalent net free area of the fan outlet. g. Supported where duct runs horizontally using nylon, plastic or metal strapping with a minimum width of inch. Support strapping or hangers shall not compress the insulation. Support strapping or hangers shall be installed within 1 foot of a joint or connection and a minimum of every 4 feet thereafter, or per manufacturer's recommendation. Price:$600.00 6. DUCT OUT DRYER (H & S) Condition: Dryer duct has loop in crawl for water to collect. Recommended Action: Install new rigid metal under home, vent out rim joist with new dampened cap. Make sure not to use screws and slant ducting downward towards termination point. Tie up at elbow and every four feet thereafter, foil tape joints. Read Commerce Specification below. Dryer vent ducts in unconditioned spaces Dryer vent ducts in attics, crawlspaces, basements, or cellars shall conform to the following: a. Extend directly to the outside of the structure. b. Have a smooth interior finish. c. Vent shall terminate in a non -screened vent cap with a damper. d. Not exceed 25 feet in length from dryer location to outlet terminal. The maximum length shall be reduced two and one-half (2.5) feet for every 45 degree elbow and five (5) feet for each 90 degree elbow. e. Extension material in excess of six (6) feet must be metal with a non -ribbed interior and must be mounted in such fashion that no traps or reversing horizontal runs are present. Horizontal runs shall be sloped toward the vent discharge. Discharge will not place moisture on building materials or walkways. £ Screws shall not be used to connect dryer ducting. g. Have no more than three (3), 90-degree elbows present. h. Be supported using nylon, plastic, or metal strapping with a minimum width of inch. Support trappingogers shall be installed within one (1) foot of a joint or connection and a maximum of every four (4) feet thereafter. Price: $150.00 7. INSTALL DUCTLESS HEAT PUMP Condition: Electric baseboard heat. (PSE) Recommended Action: Install new Ductless Mini -split Heat Pump minimum size of one ton heating capacity. Fujitsu 15 rlsz 21.5 SEER, 12 HSPF.. Read Commerce Specification below. 12.6.1 New Equipment Requirements a. Materials —Equipment shall be a split system Ductless Heat Pump (DHP) with an inverter -driven, variable speed compressor, a variable speed outdoor fan, and amulti- speed or variable speed indoor blower unit. Equipment shall be manufactured by a 4. INSULATE WATER HEATER LINES (Materials) Condition: Lines off of water heater are not wrapped. Recommended Action: Wrap water heater lines to min. R-4 using closed cell foam. Read Commerce Specification below. 15.1 Pipe insulation R-value Water pipe insulation installed by the Local Agency shall have a minimum effective insulation value of R-3 (R-4 requirement per KCR). 15.2 Installation standard for foam pipe insulation Insulation shall be installed to these standards: a. Insulation with a lengthwise slit shall be positioned on horizontal pipe so that the slit is on the bottom side of the pipe. b. Insulation shall be sized to fit and firmly secured to the pipe. Products that are glued shall use the manufacturer's recommended adhesive and all slits in the material shall be sealed. c. Products that are not glued shall be held in place with elasticized tape, wire, or plastic ties. d. Elasticized tape shall be applied every nine (9) inches on center, and around each joint between separate pieces of material. e. If ties are used, they must be made of either galvanized wire or non -slipping plastic. £ The ties shall be spaced at one inch from each end of the material and thereafter every nine (9) inches on center. g. Other techniques for attaching pipe insulation maybe acceptable if approved in writing by Commerce. h. Insulation material shall be cut and folded, or otherwise molded, to completely cover all elbows or curved pipe without compressing the insulation or allowing gaps to occur in the insulation. 15.3 Installation standard for fiberglass If fiberglass batts are used, then the batts shall be at least R-7 when flat. After installation a minimum of R-4 shall be present on any water pipes, The insulation shall be permanently attached to the pipe with wire, cable ties, twine, strapping tape, or by other approved methods. Waste or drain pipes are excluded from this insulation requirement. Price: $68.00 Each agency will establish a cost-effectiveness guideline. This guideline will reflect the cost to achieve a 100CFM50 reduction as a result of air sealing. Air sealing shall continue until the additional costs of air sealing cannot be justified in terms of the energy savings it will produce. A savings to investment ratio (SIR) of one or greater shall be used when determining the cost-effectiveness of air sealing. Documentation of the air sealing time and efforts must be present in the client file. After all air sealing in an attic/ceiling addressing health, safety and durability issues is complete, then air sealing should continue until it is determined that further work is not cost effective. Reference materials for establishing a cost effectiveness guideline can be found in Residential Energy by John Krigger, Appendix A42, Air Sealing Economic Limits, 5.0.4 Use of pressure diagnostics and blower door The Local Agency shall perform a pre and post retrofit blower door test on all homes. Blower -door guided air sealing shall be used to assist in determining appropriate air sealing measures. Pre and post blower door test results (CFM50) shall be recorded in the client file. 5.0.5 Target air -leakage reductions The Local Agency shall air seal homes to 100% of the calculated Building Airflow Standard (BAS), See Exhibit 5.S4, Buildinz Airflow Standard (BAS). If this target cannot be reached the Local Agency shall document the reason in the client file. 5.1 Preferred installation method The preferred method for installing air -sealing materials is from the attic side, not living space side, of ceilings and attics, from the inside surface of walls, and from the underside of floors. 5.1.1 Dirt and debris removal All loose dirt and debris or other materials that might prevent the adherence of the air -sealing materials to the surface shall be removed prior to installation. 5.1.2 Depth of sealant Sealant shall be installed following the manufacturer's recommendations. 5.1.3 Filler materials Filler materials that will adequately support the sealant, such as polyurethane foam, backer rod or other suitable materials will be installed in cracks deeper than 1/2 inch to a depth of 3/8 inch below adjacent surfaces to support the sealant when necessary. Price: $250.00 Exception: Smaller access is allowable when dictated by existing framing. 8.4.1 Exterior access Exterior access to the crawlspace shall have a cover or door that fills the opening, is tight fitting, and can be securely attached using hand -operable mechanical fasteners. Hand tightening fasteners, butterfly clips, or screws are acceptable. Nails shall not be used to secure access covers to framing. Cover and framing material exposed to weather, or in contact with soil or concrete, shall be pressure treated or cedar. Other types of wood may be used if they are primed and painted with exterior grade paint. Nails, screws, fasteners or other hardware used shall be made of galvanized metal, stainless steel, or similar corrosion resistant material. Recottttnettdntiott: Cover crawlspace access wells with a shed roof type cover where bulk moisture is an issue. Construct the cover to conform to well dimensions. Include appropriate roofing material, prime or paint, or use treated plywood. Install handles for ease of removal. Do not install vents. Price: $2,660.00 3. PRIORITY AIR SEALING (Materials) Condition: Air leakage under bath and kitchen sinks at plumbing penetrations, around electrical panel, plumbing drain for washer machine, around kitchen exhaust ducting in cabinet, leakage around door 2, Recommended Action: Seal plumbing penetrations under sinks and kitchen exhaust ducting in cabinet with foam —cut off excess foam clean, Clear caulk around electrical panel, and washer plumbing drain. Install adjustable door kit on door 2 - (no visible daylight). Read Commerce Specification below. 5.0.1 Air sealing locations Air seal the building envelope including the heating or cooling duct system, at the pressure boundary and align it with the thermal boundary. Priority air sealing Priority air sealing shall be performed, and shall include air sealing of all large holes, including obvious bypasses, chase ways, and gaps that exist between the unconditioned areas and the conditioned areas. 5.0.3 Determining cost-effectiveness The lath used shall be dry, a minimum 1/'+ thick, and not damaged. The lath shall be sized and spaced so insulation does not sag. The exterior row of lath shall be no more than 4" from the foundation wall and 20" on center in the field. Lath or other approved support mechanism shall be provided within 4 inches of the end of any batt. The wood lath shall be fastened to the bottom of beams or joists using galvanized roofing nails which aHow 5/84nch penetration of the joist, or zinc coated, stainless steel or similar corrosion resistant staples with a minimum 3/8" inch crown and 5/8 penetration of the joist. 8.2.2 Twine method Materials used for the twine method shall meet the following conditions: a. Twine must be polyester, polypropylene, or nylon and have a breaking strength of at least 150 pounds. b. Twine shall be installed in a joist -to joist shoelace or zigzag pattern across each joist space with anchor points no more than 12 inches apart. Anchor points may not be placed in the joistibeam closer than 4 inches to the underside floor surface. c. Nails used as anchors shall be hot -dipped, galvanized metal, or have similar corrosion resistance, and penetrate the beam/joist at least 5/84nch. d. Staples used as anchors shall be made of stainless steel or equivalent material of similar corrosion resistance (such as galvanized metal, nickel, solid bronze, or aluminum). Staples must be a minimum of 18 gauge, penetrate the joist a minimum of 5/8 inch, have at least a 3/8 inch crown width, and be made in a divergent point or modified divergent point style. e. Shall be anchored to parallel joists or beams spaced up to 52 inches apart. 8.3 Ground cover Ground cover moisture barrier shall be installed in accordance with the following: a. Shall be installed in a crawlspace when no ground cover exists or when an existing ground cover has been extensively damaged. b. All wood or other cellulose fiber -based debris, where practical, shall be removed before new ground cover is put in place. c. The ground cover shall be 6 mil black polyethylene, or its equivalent in perm -rating, strength, and resistance to soil -chemical degradation. d. All ioints shall be lapped a minimum of 12 inches. e. The poly cover shall extend at least 6 inches up the foundation wall or pier blocks, but shall not contact any wood members. f. New ground cover may be installed over existing ground cover that is deteriorated or incomplete. g. When existing ground cover is clear it must be covered with black. Exception: When underfloor insulation is installed over an unconditioned basement and the basement has no exposed soil (has a concrete floor and walls), ground cover is not required. 8.4 crawlspace access All crawlspaces shall have an access. The minimum access opening size shall be 18 x 24 inches. Insulation shall fill the cavity and have an SIR of 1.0 or greater. 8.0.2 Installation standard Insulation shall be installed as follows: a. Be in substantial contact with the sub -floor with no voids or gaps. b. Insulation batts shall not be compressed more than 10% of rated thickness. c. Insulation shall be cut to fit each foist space. d. All ends shall fit tight without overlapping. e. Insulation shall fit tight against structural members, rim foist, foundation walls and pipes. 8.0.3 Insulation in area of routine human contact Underfloor insulation installed over an unconditioned basement or crawlspace subject to routine human contact shall be covered with material having a flame spread index of 25 or less and smoke developed index of not greater than 450 when tested in accordance with ASTM- E84-01. See Exhibit 5.S5, Flame Spread and Smoke Development. 8.2 Insulation support systems The floor support matrix shall be used to determine insulation support systems. FLOOR SUPPORT MATRIX Floor Type Support Material Maximum Acceptable Minimum Minimum Material requirements Spacing patterns fastener fastener type depth Joist up to Lath 3/8X1.5" 20"O.C. Across floor joists Corrosion 5/8" 24" resistant 3/8"crown 18AWG Joist up to Twine 150 LBS. 12" O.C. Shoelace/Zigzag Corrosion 5/8" 24" polyester, (must be stapled at resistant polypropylene each joist 3/8"crown or nylon 18AWG Post &Beam Lath 3/8X1.5" 20" O.C. Across floor beams Corrosion 5/8" over 32" up to 54". If over resistant O.C. 54" need center 3/8"crown support 18AWG Post &Beam Twine 150 LBS. 12" Shoelace up to 54" Corrosion 5/8" over 32" O.0 polyester, across. If over 54" resistant polypropylene need center support 3/8"crown or nylon 18AWG 8.2.1 Lath Method A certificate of insulation will be completed and posted as per Section 1, Genera! Requirements. Price: $2628.00 2. INSULATE FLOOR (Materials) Condition: Floor has no existing insulation, joists are 2' x 6' 16" oc. Ground cover is clear, water pipes are un-insulated. 3 bays are insulated poorly and covered with chicken wire. Recommended Action: Install 1008 sq. ft. of R-19 un-faced fiberglass Batts @ $2.54 a sq ft. Insulation must be in contact with floor. Tied off with twine in zig-zag pattern no more than 12 inches apart. Remove existing 3 bays of insulation and chicken wire ($200) Wrap all water pipes to min. R4 fiberglass tied off with twine, air seal all penetrations with spray foam prior to insulating floor, install new ground cover. Post cent and bag at crawl space entrance. Read Commerce Specification below. Section 8.0 Crawlspace /LTnderfloor/Perimeter Insulation Floors over unconditioned crawlspaces and basements shall be insulated if the cost to insulate is justified using an evaluation of cost-effectiveness where the Savings to Investment Ratio (SIR) is 1.0 or greater. Exceptions: a. Work in areas with less than 18-inch clearance may be waived. b. Floor contains knob and tube wiring that cannot be certified safe by a licensed electrician or inspector as defined in RCW 19.28.070. c. There is sewage waste on the ground, or any other condition is present that poses a health or safety hazard that cannot be corrected with available repair funds. d. The sub -floor, floor or structural members are wet, rotten or unsound and the problem cannot be corrected with available repair funds. e. Insect or rodent infestation is present that cannot be eliminated prior to insulating. £ Extensive debris or household goods or personal belongings are present. 8.0.1 Insulation levels SCOPE OF WORK Client name: Cindy Schwarzkopf Client address: 1610 Winfield Ave Job # 0455 Auditor: Ian Bremerton 1. INSULATE ATTIC (Materials) Condition: Attic has an equivalent R-11 of Rockwool insulation. Soffit venting is screened but not baffled. Woodstove pipe is not hooked up. Marriage line is not insulated. Electrical boxes inside attic access will be moved to be able to build plywood dam. Access lid is not insulated. Recommended Action: Blow 1008 sq. ft. of R-38 cellulose @ $2.21 a sqo ft. through attic access on top of existing insulation. Foam marriage line, Air -seal all penetrations with foam prior to insulating. Install soffit baffles in every bay ($400.00). End of baffle must be 4" above insulation. Insulate attic access lid with 6 inch foam board and weather-strip, install CELLULOSE measure sticks ABOVE EXISTING INSULATION, Blow right up to woodstove pipe. Call 24 hours in advance for in progress inspection PRIOR to blowing in insulation. Post bag and cert at entrance. Read Commerce Specification below. Section 6.0 Attic/Ceiling Insulation Attics/Ceilings will be insulated if the cost to insulate is justified using an evaluation of cost- effectiveness where the Savings to Investment Ratio (SIR) is 1 or greater. The State Energy Code has established R-38 as the target level for insulating attics/ceilings. Insulation material shall be installed in a uniform manner throughout the attic and cover exterior wall plates with a minimum R-7 of insulation. 6.0.2 When insulating attic/ceilings the thermal and pressure boundary shall be aligned. 6.1 Ceiling loading The Local Agency is responsible for ensuring that the ceiling can bear the loads that will be imposed when insulation (new or additional) is installed. 6.4 Sloped cengs Sloped ceng cavities shall be insulated using one of the following methods: a. Sloped cavities may be insulated with loose fill, batt or rigid insulation while maintaining a ventilated one (1) inch air space between the insulation and the roof sheathing. Refer to Energy Out West Weatherization Field Guide, Section 5.4 Attic Insulation. 6.10 Attic access Access shall be provided into attic spaces wherever it is practical for a person to reasonably work. Access shall be from the dwelling interior. Attic access covers and doors from conditioned to unconditioned spaces (attics and crawlspaces) shall be tight fitting or weatherstripped to prevent air leakage. All installed attic access shall be easily movable, such as on hinges or screwed. No nails can be used to secure attic access covers. Attic entry access shall be framed to prevent loose -fill insulation from falling or sloughing through the opening. If interior access is to be installed, it shall have an opening of least 14.5 inches by 24 inches, and be installed in a workmanlike manner. In all cases, a rigid dam around the opening shall extend at least four (4) inches above the level of the insulation. Exception: When the access is located in an area where a rigid dam is not practical, fiberglass batts surrounding the opening and extending back from the opening a minimum of 16" can be used. Insulating access openings Attic access covers shall be insulated to the same level as the surrounding area. 6.12 Passive ventilation Installation of ventilation is allowable. The installation of additional ventilation is not required. If ventilation is installed, the code minimum shall not be exceeded. 6.12.1 Roof top vent locations Roof top vents (i.e., roof jacks) shall not be installed in the lower portion of a roof. Roof top vents installed on cedar shake roofs shall be of a type designed for that purpose. 6.12.2 Ventilation baffling Baffling shall be installed for those eave/soffit vents that are necessary to meet minimum ventilation requirements. Baffling shall be installed in a fashion that will permanently maintain the airflow from the vent. Baffling shall be installed in a fashion that allows the maximum amount of insulation to be installed over the top plates of outside walls. Baffling shall extend a minimum of four (4) inches vertically above the level of insulation shall be inset stapled, or otherwise shall be permanently affixed. 6.13 Certificate of insulation BUILDING PERMIT O PROTECT THIS CARD FROM THE WEATHER Building Lj Plumbing 1610 WINFIELD AVE Mechanical Alarm/Sprinkler Li This Placard must be posted on or near bung and the Permit &"Approved" plans must be at the site. Call the following Agency Telephone Numbers for inspections: Building Department Inspections: (360) 473-5870 Water - Public Works: (360) 473-5927 PW - Public Works - Engineering_ 360) 473-5270 Kitsap Public Health: (360) 337-5235 Fire - Fire Department: (360) 473-5386 L&I - Dept. of Labor and Industry: (360) 4154000 - Property lines shall be properly identified and marked before foundation footing inspection. Setbacks are measured to the finished wall structure. Reinspection fee may be assessed if inspection has been requested when not ready or corrections are not completed. Permit, approved plans, engineering, and inspection card shall be on site during construction or Reinspection Fee may be assessed. Inspection APP DATE Notes L&I - Electrical Final Inspection R Mechanical Rough -In '50-- Z41 tl Final Inspection - Building FINAL BUILDING (3C0) 473-5870 All of the above n2i�st be approved. Approved I%inal Inspection grants occupancy fin° single family reside��ce only. Commercial structures require separate Certijicale of Occupancy. DO NOT OCCUPY BUILDING WI'1'HOVI' BUILDING Dh.PAR'I'MEN"f APPItOVAI. Page I of I Page 1 of 1 Print Parcel Search Map � l� ®o 13� r itsap ®unty parcel earch � �� Legend Parcels Raai� Names DISCLAIMER: This map is intended for display purposes only and is not intended for any legal representations. jC;lick h�rc fa F'rintl http://kcwppub3.co.kitsap.wa.us/ParcelSearch/PRINT.ASP?CMD=ZOOMOUT&APAN=... 3/ 17/2014 i P M ]I City of Bremerton Department of Community Development PERMIT NUMBER: BB14 00132 DACE ISSUED: 03/17/2014 345 - 6th Street, Ste. 600, Bremerton WA 98337 SITE ADDRESS: 1610 WINFIELD AVE (360) 473-5275 Fax: (360) 473-5278 ASSESSOR NUMBER: 4985-002-017-0008 Name APPLICANT: JET HEATING OWNER: SCHWARZKOPF CINDY CONTRACTOR: JET HEATING LENDER: ZONING: CI'CY Phone 360-6204332 360-627-9144 360-620-7332 Address Access Code 2332 8TH STREET LSEEB-EQQJX BREMERTON, WA 98312 1610 WINFIELD AVE DJXWN-ZIGP6 BREMERTON WA 2332 BTII STREET LSEEB-EQQJX BREMERTON, WA 98312 SUBMITTED: 03/17/2014 APPROVED: 03l17/2014 EXPIRATION: 09/13/2014 STATUS: ISSUED VALUATION: Mechanical/Plumbing -Over the Counter DUCTLESS HEAT PUMP DUCTLESS HEAT PUMP Mechanical Fixture Fee $39.80 Building Code Edition: TOTAL FEES : $39.80 Occupancy Group: Type of Construction: Flood Zonc: Setbacks: ll11: (F/L/RT/R/O) Sanitation Method: Number of Bedrooms: Inspection Requests: FIRE: Fire Inspections (360) 473-538f, DCD: Building Inspections: (360) 473-5870 HEALTH: Kitsap County Health District (360) 337-5285 L&I: Department of Labor and Industries (360) 4154000 PW&U: Public Works - Engineering (360) 473-5270 This permit shall become null and void if the described work authorized by this permit has not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned at any time after the work is commenced for a period of 180 days. It is the responsibility of the permit holder to see that the required inspections are made. Failure to obtain required inspections may result in stoppage of the work until such time that the permit holder can substantiate to the City of Bremerton that the concealed work meets or exceeds code requirements. Any demolition, testing, or financial burden shall be borne directly by the permit holder. Failure to substantiate code requirements will indemnify the City against any and all responsibility or liability connected with the construction. 1 hereby certify that 1 have read and examined this permit and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel provisions of any State or local law regulating construction or the performance of the construction. If listing the owner as general contractor, I certify that I am exempt from the requirements of the State Contractor's Registration Law under Section 3, Chapter 126, Laws of 1967. All revisions to an approved plan require DCD review and approval prior to performing work. All building and tenant occupancy permits are required to pass final inspection prior to permit expiration and obtain a certificate of occupancy prior to use or occupancy. SIGNATURE OF 01VNER OR AGENT: CONDITIONS City of Bremerton's approval of this application pertains only to the City's regulatory jurisdiction, and thus compliance with City regulations does not necessarily ensure compliance with federal or state laws. Printed by : Mountjoy, Margret on: 03/17/2014 10:52 AM Page I of 3 1W CITY OF BREMERTON City of Bremerton Department of Com►nunity Development 345 - 60h StreCt, Ste. 600, Bremerton \VA 98337 (360) 473-5275 Fax: (360) 473-5278 PERMIT NUMBER: BB14 00132 DATE ISSUED: 03/17/2014 SITE ADDRESS: 1610 WINFIELD AVE 10. (DCD-02) DCD: Validity of permit. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any lz violation of any of the provisions of the Washington State Building code or of any other ordinance of the City of Bremerton. Permits presuming to give authority to violate or cancel the provisions of the Washington State Building code or other ordinances of the City of Bremerton shall not be valid, The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of the Washington State Building code or of any other ordinances of the City of Bremerton. 10. (DCD-01) ASBESTOS AND LEAD -BASED PAINT: ASBESTOS: Prior to performing any renovation or demolition work, Puget Sound Clean Air Agency and Washington Department of Labor and Industries (L&i) regulations require an asbestos survey be performed to determine whether there are asbestos -containing materials in the work area or structure. The asbestos survey must be conducted by and EPA -certified (AHERA) building inspector (except renovation or owner -occupied single family residences).For more information, please contact Clean Air Agency through their web site at www.pscleanair.org or by phone at 800-552-3565 or 206-343-8800. The L&I web site can be found at www.hai.wa.gov/TradesLicensing/LicensingReq/Asbestos/default.asp. LEAD -BASED PAINT: A contractor or person receiving compensation who is performing renovation, repairs or painting on a residential building or a child -occupied facility built before 1978, must be trained and certified by an accredited training provider, and registered as a Renovator by the Washington State Department of Commerce- Lead -Based Paint Program. For further information please contact: The Department of Commerce website at: www,commerce.wa.gov/lead, or call: (360) 586-LEAD (5323). CONTRACTOR: A contractor?s registration issued by Washington State Dept, of Labor & Industries is required for anyone who contracts or submits bids for construction work, including new construction, alterations, repairs, or anyone who consults or superintends, improves, demolishes, develops residential property for sale, or ?flips? houses. Contact L & 1 at (360)415- 4000 for information. ' 10. (DCD-10) A separate electrical permit issued through Labor & Industries (L&I) is required for any new, modified, repair, replacement, service, maintenance, or temporary installations. Electrical work is inspected by L&i prior to cover and the f arcing inspection. Contact L&I at 360-415-4000 or www.ini.wa.gov. (RCW 19.28) 11, (DCD-47) DCD: Reinspection Fee: All approved plans, the printed building permit, and the permit inspection placard, are required to be C on -site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, approval will not be granted. in addition, a re - inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted. 12. (DCD-08) Plumbing work shall be performed by a Level 01 Journeyman Plumber licensed in the state of Washington. Residential plumbing work may be performed by a Level 01 or :Level 02 Journeyman Plumber licensed in the state of Washington, Single family residential plumbing work may be performed by the owner, jam_ 12. (DCD-50) Final Inspection Required: All building Permits shall have a final inspection performed and approved b the City of Bremerton Department of Community Development prior to permit expiration, The failure to request a final inspection or failure to obtain final approval prior to expiration may require a reactivation fee, or a new permit application if more than a ,J year has passed with no activity. 13. (DCD-52) DCD: Gas Piping: Fuel or gas piping shall be inspected after the installation of fuel/gas piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel/gas piping system shall not be used until the final inspection has been performed and approved by a Building Inspector. RL 14. (DCD-56) Combustion Air: In buildings of unusually tight construction, or within a garage, all fuel -burning appliances, other than cooking appliances and domestic clothes dryers, shall obtain combustion air from outside in accordance with tlae international Mechanical Code, International Fuel Gas Code and/or the International Residential Code. 15. (DCD-FUEL COMBUSTIONAIR: IRC Section M 1701.1. Solid-fuel-buming appliances shall be provided with combustion air in APPLIANCES) accordance with the appliance manufacturer's installation instructions. Oil -fired appliances shall be provided with combustion air in accordance with NFPA 31. The requirements for combustion and dilution air for gas -fired appliances shall be in accordance with Chapter 24. Fireplaces shall comply with Section 1001. APPLIANCE LOCATIONS: iRC Section G2406.2. Fuel burning appliances shall not be installed in a sleeping room, bathroom, toilet room, or closet. Exception: direct vent appliances (see iRC Section G2406.2 for additional exceptions). PROTECTION OF APPLIANCES: IRC Section M 1307.3. Appliances located in a garage or carport or any other location subject to vehicle damage shall be protected by approved barriers. Appliances having an ignition source shall be elevated so that the source of ignition is at least 18? above the Floor in garages and in any room that opens to the garage. Appliances designed to be fixed in position shall be fastened or anchored in an approved method. CARBON MONOXIDE ALARMS: IRC Section 315. An approved carbon monoxide alarm listed with UL 2034 shall be installed outside of each separate sleeping area in the immediate vicinity of the bedroom. In a building where a tenancy exists, the tenant shall maintain the CO alarm as specified by the manufacturer including replacement of the batteries. MANUFACTURER?S SPECS: iRC MI307.1. The manufacturer?s operating and installation instructions shall remain attached to the appliance until final inspection 16. (DCD-14) DCD: Approved Plans, Engineering, Site Plan, Permit, and Conditions shall remain on site and be available for inspection. Any changes to plans shall be approved before construction is performed. Architect or engineer of record shall approve the change before submitting a revision. A revision is subject to a revision fee and additional fees for plan review and inspections. Printed by : Mountjoy, Margret on: 03/17/2014 I0:52 AM Page 2 ot'3 ut I I City of Bremerton Department of Communit} Development PERMIT NUMIMKe. BB14 0013L DATE ISSUED: 03/17/2014 345 - 6th Street, Ste. 600, Bremerton WA 98337 SITE ADDRESS: 1610 WINFIELD AVE (360) 473-5275 Fax: (360) 473-5278 17. (DCD-CO DET. CARBON MONOXIDE ALARMS: IRC Section 315.L An approved carbon monoxide alarm (UL 2034) shall be installed j� (EXIST)) outside of each separate sleeping area in the immediate vicinity of the bedroom in dwelling units and on each level of the dwelling in accordance with the manufacturer's recommendations. In a building where a tenancy exists, the tenant shall maintain the CO alarm as specified by the manufacturer including replacement of the batteries. 18. (DCD-CO DET. (NEW)) Carbon Monoxide Alarms. For new construction, an approved carbon monoxide alarm listed in compliance with UL 2034 shall be installed outside of each separate sleeping area in the immediate vicinity of the bedroom in dwelling units and on each level of the dwelling. In a building where a tenancy exists, the tenant shall maintain the CO alarm as specified by the manufacturer including replacement of the batteries. MINIMUM INSPECTIONS REQUIRED To request an inspection, please call (360) 473-5870 and be sure to provide your permit number, name on permit, site address, contact phone number, and inspection type. To register for on-line inspection access, visit the City's website at ivwwci ..brenterton.wa.use Inspection FINAL - BUILDING MECHANICAL ELECTRICAL FINAL Qty Fixture Typc FURNACE -ELECTRIC Description Final Inspection - Building Mechanical Rough -In L&I - Electrical Final Inspection FIXTURE LIST Qty FixtureTypc Printed by : Mountjoy, Margret on: 03/17l2014 10:52 AM Page 3 of 3 F p I it4. k \SIT CENTER 17_ept. of Communi Development*345 — 6 streets Suite 600*Bremerton')A7A'98337=1873 Mechanical ❑ Plumbing Type of Fuel: 4 q Electric ❑ Gas ❑ Oil ❑ Propane Occupancy: ❑ Residentiai ❑orn_mercial Cil Site Address° 1 U0 I b \, CK71' CC3N T RACT®0 0 C Address: Address: p City, state, Zip: YvtoeAe2w YoGL • W ' City, state, Zip: License #: Phone # (09 z7 q I y' Contact Phone #: �) 0 Taxr ID/Parcel #: hIO. MECHANICAL TYPE OF Et,�UIPNiE11zT %IO. TYPE OF FIB T URI; AIR HAI\IDLIINTG UNIT >I 0,000CFM ATMOSPHERIC VACUUM BRYa Im5 AIR HANDLING UNIT <I 0,000 CFM ATMOSPHERIC VACUUM BRKR >5 BATH FAN AND/OR EXHAUST FAN BACKFLOW DEVICE <=2" CLASS 1 HOOD & DUCT SYSTEM BACKFLOW DEVICE > T' CLASS 2 HOOD & DUCT SYSTEM BUILDING SEWER CLOTHES DRYER W/ EY,_HAUST CLOTHES WASHED. COMMERCIAL FURNACE/DUCT COMMERCIAL FLOOR DRAIN COMM. FURNA CE> 100,000 BTUS DISHWASHER COMPRESSORS DRAIN PIPE/VENT PIPE ALTERATION COOK STOVE W/ EXHAUST DRINKING FOUNTAIN DUCT CHANGE W/O NEW FURNACE FLOOR DRAIN ELECTRIC FURNACE/HEAT PUMA - FLOOR SIIWRIDIRECT WASTE EVAPORATIVE COOLER - GREASE INTERCEPTOR FIREPLAC&GAS OR GAS LOG INSERT HOSE BIBBS FIREPLAC&WOOD, OR. WOODSTOVE INDUSTRIAL SAND/OIL INTERCEPTOR GAS WATER HEATER & VENT LAWN SPRINKLER W/ BACYTLOW DEV, GAS PIP3IeTG ROOF DRAIN MISCELLANEOUS MECHANICAL SHAMPOO SINK W/ BACKFLOW DEVICE NATURAL GAS FURNACE/DUCTING SINK (LAV, KITCHEN, MOP OR BA.R) PROPANE FURNACE/DUCTING SUMP PL%U PROPANE TANK (<2000 GAL LOFTS) TUB AND/OR SHOV% LR UNIT UINTIT HEATER YsTATER CLOSET A2\TD/OR URINAL OTHER: OTHER OTHER: OTHER: FEESa TOTAL PESa E98 lwgw4lum Vate