Loading...
HomeMy WebLinkAbout4076 +--------------------------------------------------------------------------+ +Browse: Next Previous '~etrieve the Next record . 'Found: 1 Record (s) First Restart =l= =l= =l= =l= =l= =l= =l= =l= =l= $4495184.00 =l= 04/14/2000 =l= 09/30/2002 =l= 02/15/2005 =l= t Last Update Delete x - Exit MAINTAIN Contract Number Contract Transactions 4076 =l= =l=Vendor Name .1'Subj ect . 'Department · 'Status Code STAN PALMER CONSTRUCTION SR304 TIP GATEWAY PHASE ENGINEERING CON =l= + Insurance Type Amount AL $1000000.00 GL $2000000.00 E&O $5000000.00 Amount Begin Date End Date Review Date Insurance Total Insurance Review Date $8000000.00 -- 07/01/2002 -- Comments VAULT 01/01/2005 =l= T =l= +--------------------------------------------------------------------------+ +--------------------------------------------------------------------------+ +Enter Search Criteria, Press Esc Key to Transmit .. ~Press Del Key to Terminate Delete Mode .. .. CHANGE Contract Transactions .. Contract Number 4076 " 'r'Vendor Name ,1'Subj ect , 'Department "Status Code STAN PALMER CONSTRUCTION SR304 TIP GATEWAY PHASE ENGINEERING CON Insurance Type Amount AL $1000000.00 GL $2000000.00 E&O $5000000.00 Amount Begin Date End Date Review Date $4495184.00 .. 04/14/2000 " 09/30/2002 .. 02/15/2005 " " Insurance Total Insurance Review Date $8000000.00 07/01/2002 X Comments VAULT 01/01/2005 " i +--------------------------------------------------------------------------+ CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 35 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.28 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 382,781.68 Days 10.5 Contractor Stan Palmer Construction, lnc ThisChange $ (6,900) Days 0 Revised ContractAmt $ 4,626,034.96 Days 310.5 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price a~]reed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) This Change Order revises the plant establishment period modified in Change Order #16. Plant area #1 received initial plant acceptance by the City November 0 30, 2000. Plant area .~2 received initial acceptance by the City September 30, 2001. The irrigation system complete was accepted by the City October 31,2001. The City will be accepting final responsibility and maintenance for area #1 beginning December 1, 2001. To eliminate conflicts in the maintenance in the planting and lawn areas and the irrigation system, the City has agreed to accepting final responsibility and maintenance of plant area #2 beginning December 1, 2001. n to the Group 1 Item #54, Irdgation. The elimination of the maintenance pedod for the irrigation system and plantings within area #2 shall be a credit to the City of $6,900.00. Construction Contractor shall be held responsible for healthy plantings in area ~2. Two inspections shall be held, one on Apdl 30 and on September 30, 2002. At these times, unhealthy, dying or diseased plants in area ~ replaced. Measurement and Payment Group 1 Item #54, Irdgation, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. The lump sum bid price shall be decreased from $149,721.90 to $142,821.90. $(6,359.45) Sub Total $(6,359.45) Sales Tax (Group 1 items only) $(540.55) Total $(6,900.00) Net chan_qe in c0otract amount increase or [aecrease) $(6,900.00) Page 1 of 2 CITY Of BREMERTON CHANGE ORDER Contract Change Order No. 35 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.28 Days 300 Project No. A420452 Prey. Appvd. Changes $ 382,781.68 Days 10.5 Contractor Start Palmer Construction, Inc ThisChange $ (6,900) Days 0 Revised Contract Amt $ 4,626,034.96 Days 310.5 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~ Engin~er ,/'-h Date Accepted: J:~~ _ /,/~/~ /Co?itracte{ ) Date ,7~/ Parle 2 of 2 C1'I¥ OF BREMERTON CHANGE ORDER Contract Change Order No. 34 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.28 Days 300 Project No. A420452 Prev. Appvd. Changes $ 365,218.47 Days 10.5 Contractor Stan Palmer Construction, Inc This Change $ 17,563.21 Days 0 Revised Contract Amt $ 4,626,034.96 Days 310.5 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price a,(]reed upon between the Contractor andthe City of Bremerton. Description of Changes Increasein IDecrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Force Account items from Totem Electric have been summarized into this Change Order and will be addressed as Group 2 item #172, Completion of Force 0 Account Work for Totem Electric. DescripUon '1. Rebuild Cantilever Foundation #t. Soil conditions were more sandy than expected requiring a change in the method of construction for the foundation. (5/16, 5/17, 5/18/01) $3,425.21 2. Additional Conduits at Callow and Burwell. Additional conduits were placed into the Callow and Bum/ell intersection for the new luminaire at the northwest corner, interconnect and lighting to the north along Callow. (6/21/01) $2,115.53 3. Replacement of Interconnect Interconnect cable for the project was to be 25 pair jel- filled cable. The contracts documents called for 12 pair cable. (6/22/01) $6,054.72 4. Ad(~itional Luminaire An additional luminaire was placed at the northwest comer of Callow and Burwel/to illuminate the crosswalk. (6/25, 6/26, 7/18/01) $6,339.32 5. Repair of damaged Pole. The signal pole in the northeast corner of Callow and Bum/ell was found damaged by a hit-and-run accident. (7/9, 7/12/01 ) $2,210.34 6. Adiuet Pole B 203. A change in sidewalk grade from the pouringof the light base found the top of the foundation Iow to the sidewalk. The light was removed to chip away at the sidewalk to be able to plumb the pole. (7/19/01) $243.42 Construction Work completed for the above listed items was completed at the request of the Engineer. All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Group 2 item #172, Completion of Force Account Work for Totem Elecric, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance w~t"h the Standard Specifications and as described in this change order. The contract documents have signs S2 and S4 for the FarragutJCambrian signal poles as reading"SR 304". They do not indicate Charleston Avenue. The City wishes to change the two signs indicating the new street name. n to the Group 1 Item #104, Permanent Signing. The cost for replacing the two signs is $903.05. CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 34 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.28 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 365,218.47 Days 10.5 Contractor Start Palmer Construction, Inc This Change $ 17,563.21 Days Revised Contract Amt $ 4,626,034.96 Days 310.5 Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Construction Replacement of signs S2 and S4 with the new signs as shown in the plans and specifications. Measurement and Payment Group 1 Item #104, Permanent Signing, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. The lump sum bid pdce shall be increased from $30,000 to $30,903.05. $819.09 The contract called for the existing cantilever sign and foundat on on the north side of Burwell Street tobe removed and a new cantilever, sign and foundation placed. Concern was raised for the City's water main in the this area. It was decided to have the City arrange for the existing pole to be cleaned and painted and reset on the existing foundation with a new s~gn. ~on to t he Group 2 Item #106, Cantilever Sign Structure No. 2. The credit for deleting the cantilever foundation is $3,711.58. Construction Setting the refurbished structure and new sign as directed. Meesur~ment and Payment Group 2 Item #106, Cantilever Sign Structure No. 2, shall be full pay for all labor, materials tools and equipment required to perform the work in accordance w~th the Standard Specifications and as described in this change order. The lump sum bid price shall be decreased from $20,000 to $16,288.42. $3,711.58 Sub Total $21,207.63 $3,711.58 Sales Tax (Group 1 items only) $67.16 Total $21,274.79 Net ~hanqe in c00tract anlount increase or (aecrease) $t 7,$63.2t CITY Of BREMERTON CHANGE ORDER Contract Change Order No. 34 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.28 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 365,218.47 Days 10.5 Contractor Stan Palmer Construction, lnc ThisChange $ 17,563.21 Days Revised ContractAmt $ 4,626,034.96 Days 310.5 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all superv s on costs and other miscellaneous costs relating to the change in work, and as to the extension of time al owed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all abor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~' ~'~"~ Date Recommended: ~eer~,,~ - //~)' ,' Date ~/~i Date ?/9/01 P~n~ ;~ rlf 3 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 33 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.28 Days 300 Project No. A420452 Prev. Appvd. Changes $ 359,153.05 Days 10.5 Contractor Stan Palmer Construction, Inc ThisChange $ 6,065.42 Days 0 Revised ContractAmt $ 4,608,471.75 Days 310.5 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Force Account items from have been summarized into this Change Order and will be addressed as Group 2 item #170, Completion of Force Account Work to 18 0 August 2001. Description 1. Adlustment of 42 inch Pipe Ooenina, The knockout for the twin 42 inch storm lines in 144 inch manhole stored at the Forestry Division was found to inadequate during inspection by the City and Start Palmer. This compensates equipment costs for the item. (5/14/01 X-65) $495,48 2. Corinfl of 144 inch Manhole The storm system at Callow Avenue and Burwell Street was modified per Work Change Directive #& An additional opening for the system redesign was required in the 144 inch manhole. This compensates equipment costs for the item. (5/29/01 X-66) $211,44 3, Mid~s Parking lot sawcuttinfl The grade difference between the new sidewalk and the existing parking lot was found to be larger than expected. An additional cut was required to better transition between the new sidewalk and the existing parking lot. (6/14/01 X-72) $259,64 4. Gradin;I behind Sidewalks The area adjacent to the back of the sidewalks north of 1st Street along Callow Avenue was not addressed in the contract documents as to how it was to be dressed. This coupled with a grade difference which was larger than expected required additjonal work to eliminate the potential for a pedestrian hazard. (6/7-8/13/01 X-71) $3,656.94 5, Cleanin;I of Sanitary Line The 8 inch sanitary line in Callow Avenue was found to be partially plugged with construction debris and some sanitary debris. The City has accepted responsibility for 25% of the cleaning costs. (7/31/01) $135.03 6. Rebuild Block Waliat Rainier Auto The concrete block wall at Rainier Auto was damaged by removal of the existing concrete sidewalk and alley by no fault of the contractor. $953.55 Construction Work completed for the above listed items was completed atthe requestof the Engineer. All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Group 2 item #170, Completion of Force Account Work to 18 August 20Of, shall be full pay for all labor, materials tools and equipment required to perform the work in accordance w th the Standard Spec ftc. at OhS and as described in this change order. °~^1 nf? CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 33 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.28 Days 300 Project No. A420452 Prev. Appvd. Changes $ 359,153.05 Days 10.5 Contractor Stan Palmer Construction, Inc This Change $ 6,065.42 Days 0 Revised Contract Amt $ 4,608,471.75 Days 310.5 Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) 2 item #171, Additional Sawcutting Depth at Callow and Burwell will be created. The patterned concrete crosswalk sawcut is shown on WSDOT Standard Plan A-1 at a maximum dap. th of 25mm. As the crosswalk is 300mm thick, this w~ll not be sufficient for cracking. The sawcut will be an additional 125mm in depth for a cost of $S.,"~ Per meter for approximately 39 meters. ~.....e~ Construction The additional depth of cut is to be done on each patterned concrete sidewalk. Total depth of cut is to be 150mm. Measurement and Payment The new item, Additional Sawcutting Depth at Callow and Burwell, will be full pay for all labor, materials tools and equipment required to complete the additional sawcutting in accordance with the Standard Specifications and as described in this Change Order. $353.34 Sub Total $6,065.42 Sales Tax (Group 1 items only) Total $6,065.42 Net ~hange in c0r~tract amount increase or [aecrease) $6,065J42 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and mateda s and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change~3rder shall be effective when approved by the City of Bremerton. Recommended: ~..---~--~.~ Date ,.9/4/0' ,,,,~-i~cff~ipe, er~ ~', ' Date <~/~,~ Accepted: (~'~o~/~ ~.~-~~-~ __ Date Approved: / M~r~~ ~-.. Date Pa~]e 2 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 32 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A420452 Prev. Appvd. Changes $ 359,153.05 Days 10.5 Contractor Stsn Palmer Construction, Inc This Change $ 0 Days 0 Revised ContractAmt $ 4,521,577.93 Days 310.5 This Change Order covers changes to the subject contract as described heroin. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or requinbd to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) The original landscaping plans called for Taxus Media "Brownie" (Brown's Yew)to be incorporated into the site, 0 0 The Yew was placed into the project during the month of October 2000. Current plantings have experienced a high mortality rate and the remaining plants appear unhealthy. The City has directed Stun Palmer to replace all Yews on the site, The repiacementplants are not available until late September. It is desirous of the City and Stun Palmer to $0 replace the plantings as soon as possible and not to have the problem recur. Stun Palmer has suggested replacing the plantings with Viburnum Tinus. The City has accepted this replacement. Unit bid item #77, Taxus X Media "Brownii"-5 Gal., PSIPE, shall be changed to unit bid item #77, Viburnum Tinus-5 Gal., PSIPE. There shall be no change in maintenance, warranty, contract price or time with this change order. Sub Total $0 Sales Tax (Group 1 items only) $0 Total $0 Net ~;han.cje in cootract amount mcrease or ~oecrease) $0 · The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in th~ contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extens on, requ red to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order .,~hall be effective when approved by the City of Bremerton. Recommended: Pl~./t~.' ee(~~ ~ Date Recommended: v,- ~-~ ~ ,,/ / City Accepted: ~~~ ,~ ~- PP : A roved Maydr Date ,P~//~'~ /'/~/ Pace 1 of 1 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 31 Project Name SR 304 The Gateway Phase OriginaIContractAmt $ 4,243,253.28 Days 300 Project No. A420452 Prev. Appvd. Changes $ 357,488.14 Days '10.5 Contractor Stan Palmer Construction, Inc This Change $ 1,664.91 Days 0 Revised Contract Amt $ 4,602,406.33 Days 310.5 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Force Account items from have been summarized into this Change Order and will be addressed as Group 2 item #169, Completion of Force Account Work to 26 0 June 200'L Description 1. Adiustment of 42 inch Pipe Openin,q. The knockout for the twin 42 inch storm lines in 144 inch manhole stored at the Forestry Division was found to inadequate during inspection by the City and Stan Palmer. Stan Palmer was verbally instructed to increase the size of the knockout. This compensates labor for the item, equipment costs shall be in a later change order. (5/14/01 X-65) $248.85 2. Corln~l of 144 inch Manhole The storm system at Callow Avenue and Burwell Street was modified per Work Change Directive #9. An additional opening for the system redesign was required in the 144 inch manhole. This compensates labor for the $113.11 item, equipment costs shall be in a later change order. (5/29/01 X-66) $. Side Sewer Repairs A side sewer was found to be in conflict with the new storm line on the west side of Callow Avenue and was repaired and adjusted out of the way. (6/25-26/01 X-74) $553.65 4. Raise Force Main Valve A force main valve has been asphalted over on Farragut Street. The valve had not been located on the plan set or in the field by the locater. The valve was raised for . access by City crews, (7/12/01 X-79) $287.27 5. Set Type 50 Catch Basins in front of Business Two existing catch basins for an adjacent commercial business were not addressed in the Plan Set. Work including resetting the basins and replacing the storm lines. $462.03 Construction work completed for the above listed items was completed at the request of the Engineer, All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Group 2 item #169, Completion of Force Account Work to 26 June 2001, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order, Sub Total $1,664.91 CITY Of BREMERTON CHANGE ORDER Contract Change Order No. 31 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.28 Days 300 Project No. A420452 Prev. Appvd. Changes $ 357,488.14 Days 10.5 Contractor Stan Palmer Construction, Inc This Change $ 1,664.91 Days 0 Revised Contract Amt $ 4,602,406.33 Days 310.5 Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Sales Tax (Group 1 items only) Total $1,664.91 Net ;hange in cootract anlount mcrease or [oecrease) $1,664.91 The undersigned Contractor approves the foregoing Change Order as to the changes, if any in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and pen~orm all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Brernerton.  Date Recommended: Pfo~,/~ Date Accepted: ~/~,~o Date ~ ~/ Approved: "~ ~ ~' ~ ~"~ / Ma~or Date CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 30 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A420452 Prev. Appvd. Changes $ 356,735.73 Days 10.5 Contractor Stan Palmer Construction, Inc This Change $ 752.41 Days 0 Revised ContractAmt $ 4,600,741.42 Days 310.5 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bramerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Force Account items from have been summarized into this Change Order and will be addressed as Group 2 item #168, Completion of Force Account Work to 12June 0 2001. Dascdpflon 1. Maintenance of Gravel. The driving lane was removed at Callow Avenue and Burwell Street to mutually benefit City utilities and the Contractor. The City agreed to aid in the cost of maintenanca of the area. (6/1/01 X-69) $293.98 2. Removal of Concrete from Buildinq. The building located at the northeast corner of Callow Avenue and Burwell Street required additional work to remove the concrete sidewalk to ensure no damage was done to the tile fascia on the building. (6/4/01 X-70) $125.89 3, Conflict on Installation of CB D7-4. Upon installation of CB D7-4, a conflict was found with an existing unmarked sanitary lateral. The lateral was $332.54 moved to accommodate theCB (6/12/01 X-67) Construction Work completed for the above listed items was completed at the request of the Engineer. All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Group 2 item #168, Completion of Force Account Work to 12 June 2001, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. Sub Total $752.41 Sales Tax (Group 1 items only) Total $752.41 Net phanqe in c00tract amount increase or ~aecrease) $752.41 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract pdce specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Paae 1 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 30 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 356,735.73 Days 'i0.5 Contractor Start Palmer Construction, Inc This Change $ 752.41 Days 0 Revised Contract Amt $ 4,600,741.42 Days 310.5 Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: /3~/~-~ ~.//~ Proj~'fEngineer Date Recommended: /~.~ /~ ,~ Date ~/~ ~/.//~/ Accepted: ~~4~~~ _~. Date Z.o Approved: ~~ --~'. ~' Date Paoe 2 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 29 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A420452 Prav. Appvd. Changes $ 352,852.15 Days 10.5 Contractor Stan Palmer Construction, thc This Change $ 3,883.58 Days 0 Revised ContractAmt $ 4,599,989.01 Days 310.5 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price a,qreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Force Account items from have been summarized into this Change Order and will be addressed as Group 3 item #167, Completion of Force Account Work to 29 May 0 2001. Description 1. Load Manhole. The storm manhole stored at the Forestry Division at Gorst required the use of a large crane to be loaded onto trucks and brought to the project site. (5/18/01 X-60) 2. Removal and Return of Manhole Section. $820.85 A conflict in grade was found with the placing of the final 144 inch manhole section. The manhoJe section was found not to be needed and was removed and salvaged to the Forestry Division. (5/25/01 X-65) $2,864.23 3. Core Drillinl:l of 144 Manhole, The 144 inch manhole was core ddlting for a revision to the storm system in this area per Work Change Directive #3. (5129101 X-66) $198.50 Construction Work completed for the above listed items was completed at the request of the Engineer. All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Group 3 item #167, Completion of Force Account Work to 29 May 2001, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. Sub Total $3,883.58 Sales Tax (Group t items only) Total $3,883.58 Net ~;hange in c0r)tract amount increase or (oecrease) $3,883.58 The undersigned Contractor approves the foregoing Change Order as to the changes if any, in the contract pdce specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work and as to the extension of time allowed if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Pa~3e 1 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 29 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A420452 Prev. Appvd. Changes $ 352,852.15 Days 10.5 Contractor Stan Palmer Construction, Inc This Change $ 3,883.58 Days 0 Revised ContractAmt $ 4,599,989.01 Days 310.5 Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Rec°mmended: e~ E ~ "~' Date '7///~' 3,///°/ Recommended: Accepted: ~ Approved: C,~.~tor - ~ DateZOJ~'~°i ~/~\'"~' ~-~/~ '~'~ ' Date Page 2 of 2 CiTY Of BREMERTON CHANGE ORDER Co~tract Change Order No. 28 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 338,232.97 Days 10.5 Contractor Start Palmer Construction, Inc This Change $ 15,554.83 Days 0 Revised Contract Amt $ 4,597,041.18 Days 310.5 This Change Order covers changes to the subject contract as described herein. The Contractor sha construct, furnish equipment and materials, and perform all work as necessary or required to comp ete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of i3remerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Force Account items from have been summarized into this Change Order and will be addressed as Group 2 item #165, Completion of Force Account Work to 20 May 0 2001. atarel Protection. The storm laterals for catch basins D3-18, D4-1 and D4- 3 ware found to be shallower than expected. A concrete cap was placed to minimize traffic impacts to the HDPE pipe. Work was completed on 4/30, 5/1 and 5/2/01. $1,869.20 2. Cold Mix. No b-i"""""""'~ exists for the use of cold mix on the project for tampory repairs of driveways, walkways and roadways. (4/02/01) 3. Cleanlno of Cantilever Siqn Bolt Threads. $417.03 Cantilever sign No. 2 foundation is to be reused. The foundation bolts required cleaning for inspection. (4/30/01 ) $82.08 4. Additional Sawcutting Concern was raised in demolition of the existing concrete street panels and sidewalks adjacent to the existing water valves and buildings. Additonal sawcutting was completed to minimize the impacts. Work was completed on 4/11,4/13, 4/16, 4/23 and 4/24/01. $3,337.32 5. 10 Inch Sanitary Sewer in 1st Street. The existing 10 sa.0. itary line in Callow ~,venue is not needed south of 1 =' Street. F}ows to 1" Street can be diverted to the existing 36 inch sanitary line in the alley between Callow and Montgomery Avenues. This required the placement of approximately 135 feet of 10 inch sanitary line. Work was completed on 4/24, 4/25, 4/26, 4/27, 4/30 and 5/1/01. $9,849.20 Construction Work completed for the above listed items was completed at the request of the Engineer. All materials incorporated into the project by this change order shall be approved by the Engineer. ,~easurement and Payment roup 2 item #165, Completion of Force Account Work tO 20 May 2001, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. Sub Total $15,554.83 Sales Tax (Group 1 items only) Page 1 of 2 CITY Of BREMERTON CHANGE ORDER Contract Change Order No. 28 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 338,232.97 Days 10.5 Contractor Stan Palmer Construction, Inc This Change $ 15,554.83 Days 0 Revised Contract Amt $ 4,597,041.18 Days 310.5 Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amour~t Amount(S) Extension ($) (days) Total $15,554,83 Net ~hange in co0tract amount increase or ~oecrease) $15,554.83 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~ ~ .~4~ Jd~'~ ProJ'ec, ,glneer Date ^ccepted: Approved: M; Date Page 2 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 27 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 329,094.97 Days 10.5 Contractor Start Palmer Construction, Inc This Change $ 17,400.00 Days 0 Revised Contract Amt $ 4,589,748.35 Days 310.5 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price a,qreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) The 18 inch sanitary line located in Burwell Street was to have been lowered and connected into an existing manhole for the 36 inch sanitary connection. The two 0 lines are parallel and separatedby 0.12m hodzontally. Due to this close proximity, it was decided by the City to place a 3050mm straddle manhole on the two lines and channel the 18" line into the 36" line in the manhole. 3 Item #165, 3050mm Straddle Manhole, at $22,600 per each. Cons~cl~on Furnish and install complete and in place one 3050mm straddle manhole centered over the two existing 36 inch and 18 inch sanitary lines. The location for the manhole is to be determined in the field by the Engineer. The 36 inch line will be the pdmary channel through the manhole and the 18 inch will be channeled into the 36 inch stream. This work includes all demolition and restoration required to install the manhole. Measurement and Payment Group 3 item #165, 3050mm Straddle Manhole, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change $22,600.00 order. This will reduce the following Group 3 Bid Item quantities: ~k31, Type 4 Manhole-1200mm Diam, by one. $2,000.00 #33, Testing SewerPipe, by 10 m. $200.00 #34, PVC Sanitary Sewer Pipe 455mm Diam, by 10 m. $3,000.00 Sub Total $17,400.00 Sales Tax (Group 1 items only) Total $17,400.00 Net chanqe in cor~tract amount increase or (oecrease) $17,400.09 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract pdce specified.for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Parle ! of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 27 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 329,094.97 Days 10.5 Contractor Stan Palmer Construction, lnc ThisChange $ 17,400.00 Days 0 Revised Contract Amt $ 4,589,748.35 Days 310.5 Recommended: ~ ~ P'ro]~ct Engineer Date Recommended: '~g~ Date Accepted: C~ofitr~ictor(' / ~ Date / ~-/ Approved: t'"/~~r ~'~-~ Date (-,' // ~ ~, Page 2 of 2 ~T~RK COSTING X ACCT NO: X-60 P~OJE~: BREMERTON: S~304 ~T~AY COST DATE: 26-~r-01 WORK: 120" S~DLE MH - BU~ELL S~ER PERFORM DATE: PROPOSED EEM DESCRIPTION UNIT QUiT UN~ COSTS ~TENDED NO. COSTS 1 ~OAVATION L8 I 1495 0 2 MH PURGHASE ~ 1 4663 0 3 MH GONG OUT 11" WALL8 L8 1 1080 0 4 ~ET WITH O~NE L8 1 1404 0 5 GONG BASE ~D MUD UP OPENING L8 1 1230 0 6 HAND EXO L8 I 480 0 7 SUSPEND 18" 8~ER PIPE L~ 1 600 0 80HANNEL GONG L8 1 g48 0 9 GUT/DEMO 18" AND 36" PIPE L~ 1 780 0 10 8ET LID, GONE, F~ME AND OOVER L8 1 1086 0 11 BAOKFILL L8 1 571 12 BY PA88 PUMPING IF REQUIRED BY OTHERS 13 DEMOLITION, RESTO~TION, REP~OEMENT OF UNSUITABLE MATERIAL8 AND ITEM~ NOT LISTED ARE ADDITIONAL AT APPLIOABLE GONT~OT UNIT PRIGE~. COSTS ARE ONLY FOR DIRECTLY AFFECTED TOTAL = 14338 WORK PRICED ABOVE. RIGHT RESERVED TO SUBMIT COSTS FOR DELAY AFFECTS. IMPACTS, AND DISTRUPTiONS NOT KNOWN AT THIS TIME. SALES TAX EXTRA IF APPLICABLE EXTRA TIME REQUIRED= ~' DAYS 04/24/2001 TUE 12:36 FAX 2534471+4747 Hanson Pipe And Products ~ 001/002 Fax message '°'Hanson Tel 253-475-8/~88 April 24, 2001 To John Z. Co...,,,y Start Palmer ,,, (360) 674-7190 120' MH John. The 78" hole is round. The bottom will have to be cut vertically on both sides (4 locations). Fred 04/24/2001 TUE 7.2:36 FAX 253+471+4747 Hanson PJ-pe And Products (~002/002 CONTR~CTOR~ S.O.# P~OJECT: D~G ~ D~A~N ~Y: DAVE SALES PERSON ~: s~,~ o~x: 120" JO~ LOCATION: AGENCY= CUTTING ORDER: ~0 ~ffP~ MANHOLE NO: DEPTH: SHIPPING MATERIAL PLAN VIEW 1-120"x7'-6" SPCL SgCT 1-FST SQ/OS HOLE 78" HOLE -" .C IT OF BREMERTON CHANGE ORDER Contract Change Order No. 26 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 311,171.95 Days 8 Contractor Stan Palmer Construction, Inc This Change $ 17,923.02 Days 2.5 Revised Contract Amt $ 4,572,348.35 Days 310.5 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials and perform all work as necessary or required to complete the Change Order Items for a lump sum pdce agreed upon between the Contractor andthe C ty of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Work Change Directive #11 directed Stan Palmer to rechannel the wetwell, bore a 12 inch opening into the drywell and fill the drywell with CDF andsloped to the 12 0 inch opening. This is to provide additional sanitary storage for WB#3. Group 1 Item #162, 24 Inch Sanitary Repair at Cambrian Avenue, shall be increased by $10,155. $10,155.00 In performing the work required for Change Order #19, timbers and concrete waste from previous construction was encountered. This was unexpected and resulted in additional time and expense in removal. Group 1 Item #162, 24 Inch Sanitary Repair at Cambrian Avenue, shall be increased by $6,409.7. $6,409.71 2.5 Group 1 Bid Item #162, 24 Inch Sanitary Repair at Cambrian Avenue, shall be increased by a total of $16,564.71 from $113,307.00 to $129,871.71. This shall be full payment for all claims associated with this bid item. Th~s change order shall preclude any further claims by Stan Palmer or any subcontractor against the City of Bremerton for work, time delay, idled equipment or materials involved in this incident. Sub Total $16,564.71 2.5 Sales Tax (Group 1 items only) $1,358.31 Total $'17,923.02 Net ~hange in c, qr~tract amount increase or (oecrease) $'17,923.02 The undersgned Contractor approves the foregoing Change Order as to the changes if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order The Contractor agrees to furnish all labor and materials and perform all other necessary work nc us ve of the d recty or indirectly related to the approved time extension required to complete the Change Order items. This document will become a supplement of the contr~'~ct and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Page 1 of 2 .CI'P/OF BREMERTON CHANGE ORDER Contract Change Order No. 26 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 311,171.95 Days 8 Contractor Stan Palmer Construction, Inc This Change $ 17,923.02 Days 2.5 Revised ContractAmt $ 4,572,348.35 Days 310.5 ~j~En~ ~ (//~ Date ~::~ - ~/~ -C2 ( Accepted: ',/.,,.~.,,v~ _. ~--~ - ~~ .~- .~ ~ ~ O/ C,~ntra.ctor ~ Date Approved' /~M a~--~) ~ ~d~-~ =~. Date ~.//~ ~ ye / Page 2 of 2 05-24-2~1 OI:14PP1 Stan Palmer Const. 3~7471~0 P.03 . ~ ~ STAN P~ER ~TRUC~ ~ ~C ~C~ ~2 ~T~ HR 0 55,77 ~1 ~ ~ ~Y FOR O~C~Y ~FEC~ ~E8 T~ ~ IF A~IC~LE BOND ~ 1.~ % E~ TIME REQUIRE~ DAYS S~TOT~ = CREDff ~CKF~ - CRED~ ~LL 1~ PIPE ~D 4 WALL ~T ~ ~559 ~TAL CO~$" S~0,165 05-24-2001 01:14PH Stan Palmer Const. 3G1~o674719~ P.01 STAN PALMER CONSTRUCTION, INC. 5107 STATE HWY 3 SW, PORT ORCHARD, WA 98367 PHONE: (360) 674-2100 FAX: (360) 674-71:~0 DATE:. FAX~:, CORR ESPONDENCE NO., QUANTITY OF 'PAGES INCLUDING LEAD SHEET: SENDER: ~~-~- ~ Washington State Department of Transportation Daily Report of Force Account Worked Contract Number Date Item Number Item Name 3'-Z- l V~ Prime Contractor Subcontractor I Lower T erSubcontmctor Line / Station Group Basis of Matedal Acceptance RAMS Number Descripti~3n of Woj~ Per~orm~ . · --- Record/ ,/~r / Time Worked Workem and/or Equipment I Occupation of Workem or Houm Worked ~Rat~ O.T. Working Equipment Size Reg. O.T. Rate Amount ao 14 ~ 17 20 Calculated By I Date I Checked By Date Total CAPS Entry Number .,~ Entered By I Date Entry Verified I Date - / jif Cl.-Cf OF BREMERTON . . CHANGE ORDER Contract Change Order No. 19 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 155,726.38 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 122,598.17 Days 6 Revised Contract Amt $ 4,521,577.93 Days 306 Th s Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract C,'~tract in Contract Time Amount Amount(S) Extension ($) (days) In performing maintenance to the 24 inch sanitary line from Cambdan Avenue to the existing WB-3 wet well, a failing section of line was found which is allowing 0 0 matedal into the sanitary line. This line lies under a portion of the new SR 304 roadway. It is to be repaired before the roadway is completed above it. Descriptionk~ ~:~"- ~ ~ A new group 1 item shall be created, Item #162, 24 Inch / Sanitary Repair at Cambrian Avenue. The 24 inch~ r,.), section of line is approximately 22 feet long and 20 feet ' deep, with a water level affected by tidal conditions at 13 feet. The line lies directly underneath a 72 inch storm line and 24 inch water line which is not to be disturbed. Construction Furnish and install complete and in place approximately 22-ft of 48 inch diameter steel casing and 24-in diameter sanitary sewer pipe within the new casing as shown on Attachment B This work includes all demolition and restoration required to install the casing and sanitary sewer, along with pressure grouting outsicle the casing as required to fill all voids created during the casing installation, and grOuting the annulus between the casing and the sanitary sewer. The City of Bremerton will provide bypass pumping of wastewater as necessary to support installation of the casing and sewer line. Tasks for the above work and material requirements are listed on Attachment A. All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Item #161, 24 Inch Sanitary I.~epair at Cambrian Avenue, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications, applicable contract provisions and as described in this change order. $113,307.00 '~ Sub Total $I 13,307.00 Sales Tax (Group 1 items only) $9,291.17 Total $122,598.17 Net ~han~le in co0tract amount increase or [(3ecmase) $122,598.'17 ~12:~5PM Stan Palmer Const. 36~747190 P.02 STAN PALMER CONSTRUCTION CO INC A~ D~PT~ ~T ~N AT ~ ~. PR~IT & OH 15.00 % 1917 TIME RE~IRED= ~,__ ~Y~ ~U~TOTAL = t4~ ~EO~ ~E~ 1E PIPE ~ 1 WA~ GROUT ' ~TAL CO~$ = TOTRL P, CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 25 Project Name SR 304 TheGateway Phase OriginaIContractAmt $ 4,243,253.38 Days 300 Project No. A420452 Prey. Appvd. Changes $ 312,217.48 Days Contractor Stan Palmer Construction, Inc This Change $ (1,045.53) Days 0 Revised Contract Amt $ 4,554,425.23 Days This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) The odginal Change Order #21 had an error in the pricing of the change. The increase to the lump sum Group 2 Item #111, Signal Display and Detection 0 System (Callow Ave.), Complete of $4,357.81 was incorrect. The cost of this change order was to be $3,312.28. The lump sum bid item will be decreased from $3,312.28 $4,357.81 $107,596.85 to $106,551.32. No other element of the change order is affected. Sub Total $(1,045.53) Sales Tax (Group 1 items only) $0 Total $(1,045.53) Net than_cie in comract amount increase or teecrease) $(1,045.$3) The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Rec°mmended: P~neer/~'//::~ I Date Recommended: /~--~~//~'"~----- Data (~.~ ngine/e?/ Accepted: ~~ ~-~.~ ~ Date Approved: ~...-/)_./~ Date / Page I of 1 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 24 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A420452 Prev. Appvd. Changes $ 308,274.18 Days ~ Contractor Stan Palmer Construction, Inc This Change $ 3,943.30 Days 0 Revised Contract Amt $ 4,555,470.86 Days ~ This Change Order covers changes to the subject contract as described herein. The Contractor sha construct furnish equipment and materials~ and perform all work as necessary or required to comp ere the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Force Account items from have been summarized into this Change Order and will be addressed as Group 1 and Group 2 item #164, Completion of Force Account 0 Work to 20 April, 2001. Description 1. Additional 2 inch Conduit Run for Interconnect. It was desirable to the City to have an additional 2 inch conduit run for an interconnect system at the intersection of SR 304 and Charleston Boulevard. Work was completed on 3/1, 3/2, 3/5, 3~6, and 3/8/01. (Group 1) $3,406.81 2. Removal of Existin~l Liclht Base. An existing light standard atthe northwest corner of Burwell and Callow was to remain. The age and condition of the structure saw the City revisit its decision to keep the structure. (4/17/01) (Group 2) $257.13 Construction Work completed for the above listed items was completed at the request of the Engineer. All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Group I and Group 2 items #164, Completion of Force Account Work to 20 Apdl, 2001, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. Sub Total $3,663.9;4 Sales Tax (Group 1 items only) $279.36 Total $3,943.30 Net change in c00tract arn, ount increase or Ioecrease) $3,943.30 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work and as to the extension of time allowed, f any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extens on, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Page 1 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 24 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 308,274.18 Days 6 Contractor Stan Palmer Construction, Inc This Change $ 3,943.30 Days 0 .. Revised Contract Amt $ 4,555,470.86 Days 306 Recommended: ~------.~--~--~,- .,~___/~ ~ ,..~' Prb're~'EJ~ineer .... Date ~/"~/ Accepted: //.C~ontractor ~~ Date 2.~ ~ ~:~/ Approved: MaWr Date Page 2 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 23 Project Name SR 304 The Gateway Phase Original Contract Amt $ Days 300 4,243,253.38 Project No. A 420452 Prey. Appvd. Changes $ 282,815.51 Days 6 Contractor Stan Palmer Construction, Inc This Change $ 25,458.67 Days .~'~.. Revised Contract Amt $ Days 30~ 4,551,527.56 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Chan~]e Order Items for a lump sum price agreed upon between the Contractor an the City of Bremerton. I Description of Changes increase in (Decrease) Contract Contract in Time Amount Contract Extension ($) Amount(S) (days) Force Account items from have been summarized into this 0 Change Order and will be addressed as Group 1 item #163, Completion of all Force Account Work to 2 April, 200 I. Description 1. Lower Structure in Sidewalk on Coontz Street. $378.86 A conflict was found in the structure in the sidewalk at Coontz Street. It was ~owered for the sidewalk grades. (6/6/00) 2. $llwcuttino on Rodoara Street. $507.15 Concern was raised for demolition against existing structures. It was decided to have additional sawcutting performed to lessen the demolition impact. (6/9/00) 3. Force ~/lain Manhole. $280.09 The new 36 inch force main manhole was found to be a concern with the paving. It was decided to place a concrete collar around the manhole to solidify its position before paving. (7/4/00) 4. Remove Concrete Wall on Porter Street. $219.08 Excavation for the planting area between Porter Street and the new sidewalk found an ex~sting wall below the existing grade. In order to complete landscaping, the wall was removed. (10/30/00) 5. Sub orade oral3 for deleted sidewalk. $554.38 Sub grade preparation was completed for a portion of sidewalk along WyceffAvenue which was deleted. (10/30/00) 6. R~moval of Street Light Foundation. Existing street light foundation was found to conflict with $349.55 sidewalk grades. It was removed to 6 inches be~ow curb. (1 l/2J00) 7. Sawcuttina on Cambrian. $1200.83 Sawcutting on Cambdan which had been completed in June of 2000, was found to be insufficient. Additional sawcuffing was required for demolition. (3/2/01) 8. Temoorarv Reeaire to Leakina Abandoned Main. $770.85 Excavation for Catch Basin D5-7 uncovered an abandoned water main which had considerable flow remaining in the pipe which was degrading the ditch line. Additional work was required to temporarily patch the abandoned line. (3/8/01) 9. Work ghange Directive #10. Existing sanitary manhole at Wycoff Avenue and Faragut $11,479.02 ~.. Street was found to be in disrepair. This item covers work completed on 3/21, 3/22 and 3/23/01. Also includes increases to the following Unit Bid Items: #13, Gravel Borrow Incl. Haul of 327.73 tons. $5,571.41 #14, Embankment Compaction of 225.4 M3. $225.40 #39, Crushed Surfacing Base Course of 81.97 tons. $1,393.49 10. CDF Placed for 24 inch Sanitary Repair. $507.15 in connection with Change Order #19, CDFwas placed around the 72 inch storm line in Cambrian. (3/27/01) 11. Modifications to CB D1-8. $92.01 Excavation for Catch Basin D1-8 found the existing water main shallower than expected. The top of the catch basin removed to clear the water main. (3/23/01) Paoe 1 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 23 Project Name SR 304 The Gateway Phase Original Contract Amt $ Days 300 4,243,253.38 Project No. A 420452 Prey. Appvd. Changes $ 282,815.51 Days 6 Contractor Stan Palmer Construction, Inc This Change $ 25,458.67 Days 0 Revised Contract Amt $ Days 306 4,551,527.56 Description of Changes Increase in (Decrease) Contract Contract in Time Amount Contract Extension ($) Amount(S) (days) Construction Work completed for the above listed items was completed at the request of the Engineer. All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Item # 163, Completion of all Force Account Work to 2 Apdl, 2001, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. Sub Total $23,529.27 Sales Tax (Group 1 items only) $1,929.40 Total $25,458,67 Net change in contract amount Increase or (decrease) $25,458.67 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish air labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~ ,~ ~ ' .~',/~,,//o /' ~e~'6c t Engineer Date / Recommended: ~'~ "~/, ~~ ~/~'/~/ Accepted: ' ~ 2 /Contractor / Date / ,,,roved: Date ' Paae 2 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 22 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.28 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 282,682.36 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 133.15 Days 0 Revised ContractAmt $ 4,526,068.79 Days 306 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to comp ete the Change Order Items for a lump sum price a,<;reed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) The original contract design called for the use of Corrugated Polyethylene (CPE) Pipe to be used for the 200mm size storm sewer pipes for the catch basin 0 laterals to the e~sting 72-tach storm line located in Farragut Street and Cambrian Avenue. The fittings to the 72-inch storm line for the lateral taps require the use of SDR3034 PVC Pipe. To ease construction and have consistency in materials, the laterals are to be also constructed with SDR3034 PVC Pipe. Description A decrease to the Group 1 unit bid item #19, CorrUgated Polyethylene Storm Sewer Pipe 200 mm Dia. of 136 meters. $6,800 o the Group 2 unit bid item #19, Corrugated Polyethylene Storm Sewer Pipe 200 mm Dia. of 14 meters. $728 A new Group 1 Item #23, SDR 3034 PVC Storm Lateral Pipe, 200 mm Dia. at $51.00 per meter. Estimated quantity of 136 meters. is to be used where the CPE pipe was to be used. Meeeurement and Payment The new item, SDR 3034 PVC Storm Lateral Pipe wilt be full pay for all labor, materials tools and equipment required to furnish and install the matedal in accordance with the Standard Specifications and as described in this Change Order. $6 936 De~cril~tion A new Group 2 Item *r23, SDR 3034 PVC Storm Lateral Pipe, 200 mm Dia. at $51.00 per meter. Estimated antity of,l 4 meters. e is to be used where the CPE pipe was to be used. Mea=urement and Payment The new item, SDR 3034 PVC Storm Lateral Pipe, will be full pay for all labor, materials tools and equipment required to furnish and install the matedal in accordance with the Standard Specifications and as described in this Change Order. $714 Sub Total $7,650 $7,528 Sales Tax (Group 1 items only) $568.75 $557.60 Total $8,218.75 $8,086.60 Page 1 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 22 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.28 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 282,682.36 Days 0 Contractor Stun Palmer Construction, Inc This Change $ 133.15 Days 0 Revised Contract Amt $ 4,526,068.79 Days 306 Description of Changes Increase in I (Decrease> C°ntractIContra(:;tAmount($) Amount(s)in Contract Time(days)Extension Net I;hange in corjtract amount increase or [Decrease) $'133.18 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract pdce specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the direc~Jy or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Ch~ge Order shall be effective when approved by the City of Bremerton. Recommended: ~ ~ ~ Pro :t Engineer Date /.(X~ ngir',',',~r ? Date ~ ~ctor /' N -- Date Approved: ~"~Ma~ ~'--~L Date 5/~¢/0, Page 2 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 21 Project Name SR 304The Gateway Phase OdginalContractAmt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 278,324.55 Days 6 Contractor Stan Palmer Construction, Inc ThisChange $ 4,357.81 Days 0 Revised Contract Amt $ 4,525,935.74 Days 306 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) The original contract design called for the pedestrian controls and photo cells to be mounted on the ornamental light standards at the intersection of Burwell 0 0 Street and Callow Avenue. This is not acceptable as the poles are fluted and will not accept the assemblies. A pedestrian pole is to be placed and used. Description An increase to the lump sum Group 2 Item #111, Signal Display and Detection System (Callow Ave.), Complete of $4,357.81. Construction Pedestrian poles, Type PS, are to be utilized per Standard Plan J-7A for the two poles to be placed. Meaaumment and Payment The lump sum bid item will be increased from $103,239.04 to $107,596.85. This will be fullpay for all labor, materials, tools and equipment requiredto perform the work in accordance with the Standard Specifications and as described in this change order. $4,357.81 Sub Total $4,357.81 Sales Tax (Group 1 items only) $0 Total $4,357.81 Net .chanqe in c0r~tract amount increase or [oecrease) $4,357.81 The undersigned Contractor approves the foregoing Change Order as to the changes if any in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Cha~ge Order shall be effective when approved by the City of Bremerton. Recommended: ~ 'Frb~ct..~.~g,neer ~..~ Date Recommended: ~ ,,,,,"'- · Accepted: ~ Date Ma~o~' , Date Page 1 of 1 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 20 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 278,324.55 Days 6 Contractor Stun Palmer Construction, Inc This Change $ 0 Days 0 Revised Contract Amt $ 4,52'1,$77.93 Days 306 This Change Order covers changes to the subject contract as described herein The Contractor shall construct, furnish equipment and materials and perform all work as necessary or required to complete the Change Order Items for a lump sum price a,qreed upon between the Contractor and'the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) The original traffic control plans and phasing plans for Stage lA, lB, 2, 3A and 3B (Sheets 86 through 89 of the plan set) does not cover all aspects of work to be 0 0 completed and has numerous changes in the detours. This will be confusing and detrimental for the traveling public Theplans have been revised with cooperation from WSDOT and the contractor. Detours have been simplified and each stage has had the work area enlarged to account for all work necessary for the $0 project. This change order accepts the attached revised plans as Traffic Control Plan and Phasing Plans for Stage 2, 3 and 4. There shall be no change in contract price or time with this change order. Sub Total $0 Sales Tax (Group 1 items only) SO Total $0 Net ~chan~3e in cor~tract amount increase or {oecrease) $0 ,,~ The undersigned Contractor approves the foregoing Change Order as to the changes, f any, in the contract price specified for each item including any and all supervision costs and other m sce aneous costs relating to the change in work and as to the extension of time allowed, if any, for comp et on of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform a other necessary work, inclusive of the directly or indirectly related to the approved time extension rec~uired to complete the .Change Order items. This document will become a supplement of the contract and ~ provisions ~vill apply nereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~ ~.~ ~ I~,~ P ~je~t Engineer _ r- '--- Date Recommended:, e~:~ F-'-' - Date Accepted: ~ ~"-'-----"-'-- Date Approved: May0~o'o~,~- ,~* ~'L Date Page 1 of 1 '--- CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 19 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 155,726.38 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 122,598.17 Days 6 Revised Contract Amt $ 4,521,577.93 Days 306 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price a,~reed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) In performing maintenance to the 24 inch sanitary line from Cambrian Avenue to the existing WB-3 wet well, a failing section of line was found which is allowing 0 0 matedal into the sanitary line. This line lies under a portion of the new SR 304 roadway. It is to be repaired before the roadway is completed above it. Description A new group 1 item shall be created, Item #162, 24 Inch Sanitary Repair at Cambdan Avenue. The 24 inch section of line is approximately 22 feet long and 20 feet deep, with a water level affected by tidal conditions at 13 feet. The line lies directly underneath a 72 inch storm line and 24 inch water line which is not to be disturbed. Construction Furnish and install complete and in place approximately 22-ff of 48 inch diameter steel casing and 24-in diameter sanitary sewer I~pe within the new casing as shown on Attachment B This work includes all demolition and restoration required to install the casing and sanitary sewer, along with pressure grouting outside the casing as required to fill all voids created during the casing installation, and grouting the annulus between the casing and the sanitary sewer. The City of Bremerton will provide bypass pumping of wastewater as necessary to support installation of the casing and sewer line. Tasks for the above work and material requirements are listed on Attachment A. All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Item #161, 24 Inch Sanitary Repair at Cambrian Avenue, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance ~ with the Standard Specifications, applicable contract provisions and as described in this change order. $113,307.00 ' Sub Total $113,307.00 Sales Tax (Group 1 items only) $9,291.17 Total $122,598.17 Net change in co~tract amount increase or toecrease) $122,598.17 Page 1 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 19 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 155,726.38 Days 0 Contractor Stan Palmer Construction, lnc ThisChange $ 122,598.17 Days 6 Revised Contract Amt $ 4,521,577.93 Days 306 The undersigned Contractor approves the foregoing Change Order as to the changes if any in the contract price specified for each item including any and ail supervision costs and other miscellaneous costs relating to the change in work and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. q. <71 Recommended: ~ ~ ' Project.,,Ecgineer "' Date Recommended: ~gi~,~./ '~- (/~ Date Accepted: /"-~ /~fltr'~ctor ~ _~,/)~_~.~ Date Approved: ~ ~ May~ Date Page 2 of 2 ;ITY OF BREMERTON CHANGE ORDER Contract Change Order No. 18 Project Name SR 304 The Gateway Phase Original ContractAmt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 151,898.29. Days 0 Contractor Stan Palmer Construction, Inc This Change $ 3,828.09 Days 0 Revised ContractAmt $ 4,544,897.77 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shale construct, furnish equipment and materials and perform all work as necessary or required to comp etd the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Force Account items from 10 October to 15 December, 2000 have been summarized into this Change Order and will be addressed as Group 1 item #160, Fome Account 0 0 Work from 10 October to 15 December, 2000. Description 1. Relocation of HomeRun for Farraqut Signal A conflict was found in the rocation of the home run for the Farragut signal and the patterned concrete sidewalk. $444.19 (10/10/0o) 2. Chan¢dnn of Cotoneaster Plants The pattern for the Cotoneaster at Porter Street was found to be excessive and plants were moved per inspectors direction. (11/7/00) $556.79 3, Moving Three Trees Three trees were found to have been planted at the inspectors direction over an existing sanitary sewer line. Trees were moved off of the line for maintenance reasons. (11/8/00) $32.49 4. Redoing Irrigation Connection to City System The flow meters were incorrecfly placed between the master control valve and the double check valve by the project drawings. The flow meters were to be moved as they were not set with sufficient distance for laminar flow. The City is compensating for % of the total cost of moving the flow meters. (11/20-22/00) $2,336.95 5. Adlust Grade at Welcome to Bremerton Sign Additional filling and adjustment of contours was requested to aesthetically enhance the new sign. (11/8/00) $167.56 Construction Work completed for the above listed items was completed at the verbal request of the Engineer. All materials incorporated into the project by this change order shall be approved by the Engineer. Measurement and Payment Item #160, Force Account Work from 10 October to 15 December, 2000, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. Sub Total $3,537.98 Sales Tax (Group 1 items only) $290.11 Total $3,828.09 Net chan~le in c0r~tract amount ~ncrease or [decrease) $3,828.09 Page 1 of 2 'CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 18 Project Name SR 304 The Gateway Phase Odginal ContractAmt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 151,898.29 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 3,828.09 Days 0 Revised ContractAmt $ 4,544,897.77 Days 0 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for comp etlon of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~ ~.~.~ d~ P fore! Engineer Date Recommended: ~~"~',~--'--.- ~ ~ty En ' ~E~ ~ Date Page 2 of 2 --CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 17 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A420452 Prev. Appvd. Changes $ 146,910.36 Days 0 Contractor Stan Palmer Construction, Inc ThisChange $ 4,987.93 Days 0 Revised Contract Amt $ 4,394,159.32 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials and perform all work as necessary or required to complete the Change Order tems for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) This Change Order summarizes revisions to the project plans as of 15 December 2001. 0 0 2 item #158, Concrete Coting will be created. This will be for the additional fencing and bollard around the road ends of Porte{, Farragut and Wycoff Streets. Approximately 16 conngs are required at $58.84 per coring Construction The Engineer shall mark the additional fencing needed in the field. Measurement and Payment The new item, Concrete Coting, will be full pay for all labor, materials, tools and equipment requiredto core the concrete in accordance with the Standard Specifications and as described in this Change Order. $941.47 ~ .. ' 2 item #134.7, Chain LinkFence Type 6 will be created. This will add approximately 44 meters of additional fencing around the road ends of Porter, Farragut and Wycoff Streets to reduce any vehicular access to the project. The fencing is at $50.93 per meter. ~onstruction he Engineer shall mark the additional fencing needed in the field. Measurement and Payment The new item, Chain Link Fence Type 6, will be full pay for all labor, materials, tools and equipment required to furnish, haul, and place the material in accordance with the Standard Specifications and as described in this Change Order. $2,240.70 A new Group 2 item #135.3, End, Comer, and Puli-Post for Chain Link Fence will be created. This will add additional type 6 fencing around the road ends of Porter, Farragut and Wycoff Streets to reduce any vehicular access to the project. Approximately four end or corner posts are required at $68.25 per post. Construction The Engineer shall mark the additional fencing needed in the field. Measurement and Payment The new item, End, Comer, and Puli-Post for Chain Link Fence, will be full pay for all labor, materials, tools and equipment required to furnish, haul and place the material in accordance with the Standard Specifications and as described in this Change Order. $273.00 ~p [cO 2 item #.,1,~, Concrete Filled Steel Bollards will be created. The b-ollards are to be placed to limit Page 1 of 3 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 17 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A420452 Prev. Appvd. Changes $ 146,910.36 Days 0 Contractor Stan Palmer Construction, Inc ThisChange $ 4,987.93 Days 0 Revised Contract Amt $ 4,394,159.32 Days 0 Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) vehicular access to the planting areas. Cost for the bollards are to be $754.68 for each. Construction The bctlards are to be 200mm steel casing filled with ctass 2000 concrete and powder coated b~-ack. The bollard is to be 1.83 meters in length with 1.22 meters visible above the concrete surface. Placement of the bollards is to be at the direction of the Engineer. Measurement and Payment The new item, Concrete Filled Steel Bo/lards, will be full tPoa¥ for all labor, materials, tools and ecjuipment required furnish the material in accordance with the Standard $754.68 Specifications and as descitbed in this Change Order. ~on to the Group 1 item #38, Cement Concrete Stairway. The rairmg for the staircase is -- specified as being 38mm Schedule 40 aluminum pipe railing. To better match the fencing for the site, the railing is to be Schedule 40 gaivamzed piping powder _. coated black. Th s s a no cost change for the City of Bremerton. Measurement and Payment The item, Cement Concrete Stairway, is unchanged and will be full pay for all labor materials tools and equipment required to furnish, haul, and place the matedal in accordance with ~e Standard Specifications $0 and as described in this Change Order. ~p 1 item #tFlX, Additional Sawcutt/ng Depth will be created. The patterned concrete crosswalk sawcut is shown on WSDOT Standard Plan A-1 at a maximum depth of 25mm. As the crosswalk is 300mm thick, this will not be sufficient for cracking. The sawcut will be an additional 125mm in depth for a cost of $6.70 $697.07 Per meter for approximately 104 meters. Construction The additional depth of cut is to be done on each Patterned concrete sidewalk. Total depth of cut is to be 50mm. Measurement and Payment The new item, Additional Sawcutting Depth, will be full pay for all labor, materials, tools and equipment required to complete the additional sawcutting in accordance with the Standard Specifications and as described in this Change Order. Sub Total $4,609.92 Sales Tax (Group 1 items only) $378.01 Total $4,987.93 Net ~chancle in c0~3tract amount increase or t~ecrease) $4,987.93 Page 2 of 3 ( ITY OF BREMERTON CHANGE ORDER Contract Change Order No. 17 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 146,910.36 Days 0 Contractor Stan Palmer Construction, Inc ThisChange $ 4,987.93 Days 0 Revised Gontract Amt $ 4,394,159.32 Days 0 The undersigned Contractor approves the foregoing Change Order as to the changes, f any n the contract price specified for each item including any and all supervision costs and other misce aneous costs relating to the change in work, and as to the extension of time allowed, if any, for comp et on of the ant re work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension required to compete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~ _ I~ct Engineer Date Recommended: (~"E~ ~/~. (// .--. Date ~/-/~.] Accepted: .,/~r~-'t~'c~"--'~ ' Date /'-~ ~ ~'~'~/ ^.,rove : ._. Page 3 of 3 01-10-2001 05:58PM S~an Palmer Contr. 360~747190 P.01 STAN PALMER CONSTRUCTION, INC. 5i07 ,STATE HWY 3 SW, PORT ORCHARD, WA 98367 PHONE: (360) 674-2100 F~: (360) 674-7~90 CORRES~ND~CE NO. ~ A~E~ION:~ QUA~ QF'PAG~ INCLUDING ~D SHE~: 01-1~'-20[11 05:5~H Stan Palmer Const. 3F::~E~?47190 P.{~. 8TAN PALMER CONSTRUCTION CO INC EXTRA WORK COSTING X ACCT NO: X-38 PROJECT: SR 304 BREMERTON GATEWAY COST DATE: 10-Jan-01 WORK: CO#17 PERFORM DATE: PROPOSAL EXTRA DEPTH SAW CUTTING ITEM DESCRIPTION HOUR~ HOURLY Ex'rENDED RATE COSTa: I LABORERS 37,40 0,00 0.00 2 WORKING F'MAN 45.00 0.00 0.00 3 RUNNER TO TACOMA 25.00 0,00 0.00 TOTAL. LABOR: 0.00 L/M~O~ MARK. UP Q 20%: 0.00 EQUIPMENT: 10 PICK UP T~UCK 10.00 0.00 11 0.00 12 0,00 ~ 13 0.00 14 0.00 15 0,00 · _. 16 0.00 17 0.00 18 '0.~0 TOTAL EQUIPMENT: 000 EQUIPMENT MARK-UP Q15%: 0,00 MATERIAI~ & SUPPLIES: 22 0.00 23 :' 0.00 24 0.00 25 0.00 26 0.00 27 LISE TAXQ 8.20% % 0.00 TOTAL MATERIN.8 & ~UPPLIES: · 0.00 MATERIALS MARK-UP ~ t5%; 0.00 SUBS: 28 EXTRA DEPTH SAW CUT (104m x3.28m/fl x5 in) I~/FT 1705.60 0.50 852.80 29 0.00 ~ 0.00 SUBS MARK-UPS ~ 5% 42,64 COSTS ~E ONLY FOR DIRECTLy AFFECTED WORK PRICED A~OV~_ RIGHT RESERVED TO .......... SUBMIT COSTS FOR DELRY AFFECTS, IMPACTS. SUBTOTAL ABOVE COSTS - 895.44 AND OlSTRUPTIOf~ NOT KNOWN AT THIS TIME. B&O~}5%= 44.77 ,~u. Es TAX EXTF~ ~F ~PUC~L~ : ~ EXTRA TIME REQUIRED= DAYS TOTAL COSTS = S 940.21 01-~-2001 05:59PM Start Palmer Const. 3G~747190 P.03 STAN PALMER CONSTRUCTION CO INC EXTRA WORK COSTING X ACCT NO: X-39A PROJECT: SR 304 BREMERTON GATEWAY COST DATE: 10-Jan-01 WORK: C0#17 PERFORM DATE: PROPOSAL CORING ITEM DESCRIPTION HOURS HOURLY EXTENDED NO. RATE COSTS I ~ORERS 37.40 0.~ 0,~ 2 WO~ING PM~ 45.00 0.~ 0.~ 3 RU~ER TO TA~ 25.~ 0,~ ~T~ ~ 0.~ ~R MA~-UP ~ ~: 0.~ E~: 10 PI~ UP TRUCK 10,~ 0.00 11 0.~ 12 0.00 / 13 0.~ 14 0.00 16 0.~ 17 0,~ 18 0.~ TOT~ EQUI~: 0.~ ~UI~ ~K~P ~15%: 0.~ ~TERIALS & SUP~ES: ~ 0.~ 24 0.~ ~ 0.00 ~ 0,00 27 USE T~ ~ 8.~ % 0.00 TOT~ ~TERI~S & SU~UES: 0,~ ~R~ ~RK-~ ~ 15%; 0.00 SUBS: ~ C~ING PER A~AC~ INV~ LS 1,~ 853.~ 853.~ 29 0.~ ~ 0.~ SUBS M~K-U~ ~ 5% 42.70 ~S ~ ~Y FOR DI~TLY ~FECT~ W~ ~ICED ~OVE. RIGHT ~SER~DTO ~IT CO~ FOR DE~Y AFFECTS, I~TS, SUBTOTAL ~E C~TS - ~.64 ~D DISRUPTIONS NOT K~WN AT ~15 ~M;. B & O ~ 5% = ~.83 ~ TiME ~IRE~ DAYS TOTAL CO$T$= $ ~t .47 . 01-1~-2001 05:59PM Start Palmer Const. 36B6~74719~ P.84 WALL SAWING · CORE DRILLING · S~B SAWING "" ~ INVOICE C~CADE CONC~E~ i SAWING & DRILLING PAGE RD. Box 3157 · Kent, WA ~-0203 (253) 872-75~ · {~) 228-~12 · F~ (253) ~-37~ Lic. ~CA-SC-AS-DI 8~N ~ :~TAN PALME~ C~N~T~UC'TiON S ,GATE~AY L 5~C, 7 BTAT~ L PORT ORCHA~O WA 12/05/2000 36058 PAL050 mU Due: O!,' ~/01 UNiT ~ EXTENDED TICKE? ~ OTY. MEAS D~SCRi~TION PRICE 9/0 i~ - A0!~:i20~? 2~4~B2 ~ ~'"5: ~. ~.~"=" COR~.- ~,~'~::..--,-~i ~n AS DIRECTED PER [ 17~75 T;CKETS 2553~7, 254 ' DEC 14 Net Re~e~ ol )r, vo~e To Pay by VISA or MasterCard. i I/iv. · ~ ~ 1~ a ~a, please l~ ~ ~ iDling inlormation: ~ ~ ~ d~ ~ ' Card No. Terms & Cenditions on reverse side ere Exp.date Signature incorporated and ma~e pa~t hereof .... PLEASE PAY FROM THIS INVOi~E~ 01-1~-2~1 ~5:59PM Start Palmer Const. ~6~747190 P.85 STAN PALMER CONSTRUCT]ON CO ~NC EXTRA WORK COSTING X ACCT NO: X-39 1~7 PROJECT: SR 304 BREMERTON GATEWAY COST DATE: 21-Nov4)0 WORK: REF: 16NOV2000 Lbl I~R PERFORM DATE: PROPOSAL ADD FENCING AND i~)LLARD Pt. US CLEAN-UP ITEM DESCRIPTION HOURS HOURLY E~TENDED RATE COSTS 1 LAEiORERS 6.00 37.40 224.40 0.00 2 WORKING i~MAN 1,00 45.00 45.00 O.00 ,3 RUNNERTOTACOMA 2.00 '25.00 50,00 0.00 TOTAL LABOR: 319.40 ~ MARK4JP ~ 20%: 63.88 EQUIPMENT: 10 PICK UP TRUCK 2.00 10.00 20.~0 11 0,00 12 0.00 13 14 0.00 15 0.00 16 O.00 17 18 0,00 TOTAL EQUIPMENT: 20.00 EQUIPMENT MARK-UP ~15%: 3.00 MATERL~ZS & SUPPLIES: 22 23 0,00 24 0.oo 25 ~O~ARD PRE PAINTED EA 1.00 220.00 2~ CONCRETE BASE AND FILL FOR BOLLARD 8G 12.00 5.00 60.00 27 USE TAX ~ 8.20~, % 22.98 TOTAL MATERIALS & SUPPLIES: 302.96 MATERIALS MARK-UP ~ 15%; 45.44 SUBS: 28 FENCING QUOTE LS 1.iX) 2200.00 ' 2200..00-- ' 29 CORE FOR ;E~ICING r HOLES EA 0.00 8Z00 0.00 30 CORE FOR BOLLARD 1~ HOU~ EA O.00 180.00 0.00 SUBS MARKJJPS ~ 5% 11o.oe CO~;1~ ARE ONLY FOR D~RECrLY AFFECTED WOf~K PRICED ABOVE. RIGHT RESERVED TO ~.~ SUBMIT COSTS FOR DELAY AFFECTS, IMPACTS, SUBTOTAL A~iOVE COSTS · 3003.80. AND DISTRUPTION~ ~OT KNOWN AT THIS TIME, B&O~5%= 150.19 SALES TAX EXTRA tF AFpL~ABL; .............................. EXTRA TiME REQUIRED= ,,, DAYS TOTAL COSTS = $ 3.153.~ 01-11~-2001 OS:OI~PH Stan Palmer Const. ~3~747190 P.06 STAN PALMER CONSTRUCTION CO INC EXTRA WO~ COSTIN~ X 39 X ACCT NO: ' PROJECT: SR 304 BREMERTON GATEWAY CO~T DATE: 2t-Nov-00 WORK: REF: 16NOV2000 L=; ~ ~R PERFORM DATE: PROPOSAL ADD FENCING AND BOLLARD I~US CLEAN-UP ITEM DESCRIPTION HOURS HOURLY EX'rENDED RATE COSTS I LABORERS 6.00 37.40 224.40 0.00 2 wORKING FMAN 1.00 45.00 45,00 0.00 3 RUNNER TO TACOMA 2.00 25.00 50,00 · 0.00 TOTAL LABOR: 31~.40 LAISOR MARK-LI~ Q 20%: 63.88 EQUIPMENT: t0 PICK UP TRUCK 2.00 10.00 20.00 11 0.00 12 0.00 13 0.00 14 0.00 15 0.00 16 0.GO 17 0.00 TOTA EGU IPME],,'T: ~.00 EQUIPMENT MARK-UP Q15%: 3.00 MATERIALS & SUPPLIES: 0.00 22 23 0.00 24 25 BOLLARD PRE PAINTED 26 CONCR~ m E BASE ANO FILL FOR BOLLARD BG 12.00 5.00 60.00 27 USETAX ~ 8.20% % 22.96 TOTAL MATERIN. S & SUPPLIES: 302.96 MATERIALS MAR~AJP ~ 15%: 45.44 SUBS: 28 FENCING QUOTE LS 1.00 2200.D0 2200.00 29 CORE FOR FENCING 8" HOLES EA 16.00 82"00 1312.00 30 CORE FOR ~OLIJ~RD 12" HOLE EA 1.00 180.00 180.00 SUBS MARK-~ ~ 5% 184.80 CO~ ARE ONLY FOR DIRECTLY AFFECteD WORK PRICED ABOVE. RIGHT RESEIWED TO SUBMIT COSTS FOR DELAY AFF Ec'rS, IMPACTS, SUBTOTAL ABOVE COSTS = 4390.40 ~ DISTRUPTiONS NOT KNOWN AT ~ T~ME. S & O ~ 5% - 219.52 SALE~ TAX EXTRA iF APPUCAgLE EXTRA TIME REQUIRED WALL SAWING · CORE DRILLING · SLAB SAWING CASCADE CONCRETE INVOICE NO. ]. SAWING & DRILLING PAGE P.O. Box 3157 · Kent, WA 98032-0203 (253) 872-7578 · (800) 228-9612 · Fax (253) 946-3783 Lic. #CA-SC-AS-D185JN I :STAN F'ALNER CQNSTRUCTiCN S GATE~AY L 5i07 STATE H~iY 3 Sb i CALLO~II/CO0NTZ L P.ORT OP.CHARD WA '~ES~7 T BP.EMERTON C506' 33a ~e ON FILE ~/.~, E 1.~/0=/2000 36u58 PAL050 'm't n ,~- O1 ' '~ "' UN I T UN i T EX TENDE[ ~ .~Cr...=~ ff QTY MEAS DE~,,r ! ~ON ~ ~= -4~ COR~ C, eiLLIN6 AS DIRECTED PER 117.75 TICKETS 255387~ DEC 14 2000 TERMS Net Receipt of Invoice To Pay by VISA or MasterCard, 1 1/2% a month or 18% a year please fax back the following information: on all past due accounts Card No. Terms & Conditions on reverse side are ...... t-xp ease ~lgna~ure incorporated and made part hereof, ' ~-PLEASE PAY FROM THIS INVOICE[ Q~OSS I AUTOMATIC LIEN FILED 75 DAYS FROM INVOICE [ ~ ~., ,, ~ I bATE IF UNPAID. We cio not assume respo?s~lllly, for d?mage, ~ ' ] /GITY OF BREMERTON CHANGE ORDER Contract Change Order No. 16 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 146,910.36 Days 0 Contractor Start Palmer Construction, Inc ThisChange $ 0 Days 0 Revised Contract Amt $4,390,163.74 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, fumish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) This Change Order revises Section 8-02.3(12) of the Standard Specifications. Currently the Section reads, "The first year of plant establishmentperiod shall begin immediately upon written notification from the Engineer of the acceptance of initial planting for the entire project." The project shall be staged into two areas of plantings, Area 1 and Area 2, as shown in Exhibit "A". Area 1 and Area 2 will be eligible to have the first year of plant establishment begin immediately upon written notification from the Engineer of the acceptance of initial planting for the respective areas. This revision is being completed to insure uniform shape and size of all plant materials being incorporated into the project. There shall be no change in contract price or time with this change order. 0 0 0 Sub Total Sales Tax (Group 1 items only) Total 0 Net chan~e in cor'jtract amount increase or teecrease) $0 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract pdce specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document willbecome a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: Pr~jec~ Date Recommended: CityEnginee~,r.~ t.,~,.' .. , Datell/l'"~//'''°~ Accepted: C.~tractor(,. Approved: Ma~ ~ Date ~ ~LA~t~ Acc~pTA~lc~ A~A~ CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 15 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.35 Days ,..30 Project No. A420452 Prev. Appvd. Changes $ 128,664.82 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 2,004.08 Days 0 Revised ContractAmt $4,386,918.20 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform a I work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bramerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) This Change Order summarizes revisions to the Lanscaping plans as of September 11, 2000. 0 0 1 item #156, Alpining of Slope will be created. Thegrade change at the tee turnaround in the alley north of Porter Street is steep and does not allow for lawn as originally designed. Alpining the s ope will allow for the transition to the sidewa k with a minimum of maintenance. Construction Use of 2-man Lynch Creek rock will be incorporated nto an area consisting of approximately 3m by 14m Spaces will be provided between the rocks for planting of ground covers. Measurement and Payment The new item, Alpining of Slope, will be full pay for all labor, materials, tools and e§uipment required to furnish, haul, and place the material ~n accordance with the Standard Specifications and as described in this Change Order. 1,852.20 2 item #157, Scadet Oaks will be created. The Scarlet Oaks are to be placed as a link with the ~revious Burwell project. onatruction The Scarlet Oaks are to be 2 ~ inch caliper, well branched specimens on its own root stock. Placement of the materials is to be at the direction of the Engineer. Measurement and Payment The new item. Scarlet Oaks will be fu pay for all labor mater a s, tools and equipment required to fu~ish the ' matedal in accordance with the Standard Specifications 992.25 and as described in this Change Order. Sub Total $ 2,844.45 Sales Tax (Group 1 items only) $151.88 Total $2,996.33 Net change in c0rAract arrtount increase or taecrease/ $2,996.33 The undersigned Contractor approves the foregoing Change Order as to the changes, if any in the contract pdce specified for each item including any and all supervision costs and other m scellaneous costs relating to the change in work, and as to the extension of time altowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessa work, inclusive of the directly or indirectly related to the a,,,,rove,~ ~; .................... !ry ..... -- · *' HH "J I*1111~ ~ffAt~H~J-~IJt ruqulrea [o compleJe ~ne ~.,nange (Jraer ~tems. /his document w /become a suppJement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Page 1 of 2 CFFYOF BREMERTON CHANGE ORDER Contract Change Order No. 15 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 128,664.82 Days 0 Contractor Start Palmer Construction, Inc This Change $ 2,004.08 Days 0 Revised Contract Amt $4,386,918.20 Days 0 ,~:~Sject Engineer Date ' / Recommend~'~.z~w I~l"l~'~ 18 $~-r C~_,~n~r. - Date ~ Approved: ~,--' "'~- ~--, ~_-- D~t~.e////~) Page 2 of 2 r CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 14 Project Name SR 304 The Gateway Phase OdginalContractAmt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd Changes $ 128,664.82 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 15,000.00 Days 0 Revised ContractAmt $4,386,918.20 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum pdce agreed upon between the Contractor andthe Cit7 of Bremerton. Description of Changes Increase in (Decrease) Contract Contract ~n Contract Time Amount Amount(S) Extension ($) (days) This Change Order recognizes additional costs incurred by Stan Palmer Construction upon discovery of the conflict of the existing force main and the new storm 0 0 system at Station 2+246, 8m right in the intersection of Rodgers Street and Wycoff Avenue, which includes: · Work performed on the day of~he discovery of the conflict · Restocking of approved and purchased materials · Equipment idled by the delay in construction. A new Group 2 item #155, Resolution of SewerForce Main and Storm Line Conflict will be created. Conetruction The storm line is to be constructed as revised in Work Change Directive #3, dated 6/12/00. Measurement and Payment This item shall be full payment for all claims associated with the correction of the new storm line in Wycoff Avenue over the existing force main in Rodgers Street. This change order shall preclude any further claims by Stan Palmer or any subcontractor against the City of Bremerton for work, time delay, idled equipment or materials involved in this incident. 15,000.00 /C6nt~to~r ) -- --'~e Sub Total $15,000.00 Sales Tax (Group 1 items only) $0 Total $15,000.00 Net ~han~e in c0~tract arrtount increase or (eecrease) $15,000.00 RECEIVED AUG 1 5 2000 CI17 OF BREMERTON ENGINI~RS Page 1 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 14 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 128,664.82 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 15,000.00 Days 0 Revised ContractAmt $4,386,918.20 Days 0 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document willbecome a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be euective when approved by the City of Bremerton. ~J'ect Engineer Dat~ ,/ Recommended~ t~'~"--- I,~ A~ ~ City"~Engirl~.er ' ' Date .~'ontractor ~'~ ~ · Date Approved: ~ror~~~ Date o~/~///.~) . RECEIVED AUG 1 5 2000 CFR( OF BREMERTON ENGINEERS Page 2 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 13 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253~38 Days 300 Project No. A420452 Prev. Appvd. Changes $ 123,423.36 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 5,241.46 Days 0 Revised ContractAmt $4,371,918.10 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) The crushed surfacing base course (CSBC) is specified for the project. In certain locations this material may not provide the smooth, tight, uniform grade required for the roadway or for temporary sidewalks and driveways. The use of crushed surfacing top course will provide the required surface. 1. Crushed Surfacinq Top Course A new Group 1 Item #39.5, Crushed Surfacing Top Course, at $20.30 per metric ton. Estimated quantity is 100 tonnes. Construction Use of the material is limited to areas as determined by the Engineer where the CSBC will not provide the required surface for paving or temporary sidewalks and driveways. Measurement and Payment The new item, Crushed Surfacing Top Coarse will be full pay for all labor, materials, tools and equipment required to furnish, haul, place and compact the material in accordance with the Standard Specifications and as described in this Change Order. 2,030.00 2. Crushed Suffacin,q Top Course 0 0 'A new Group 2 Item #39.5, Crushed Surfacing Top Course, at $20.30 per metric ton. Estimated quantity is 150 ton nes. Construction Use of the material is limited to areas as determined by the Engineer where the CSBC will not provide the required surface for paving or temporary sidewalks and driveways. Measurement and Payment The new item, Crushed Surfacing Top Coarse, will be full pay for all labor, materials, tools and equipment required to furnish, haul, place and compact the material in accordance with the Standard Specifications and as described in this Change Order. 3,045.00 Sub Total $ 5,075.00 Sales Tax (Group 1 items only) $166.46 Total $5,241.46 Net phancle in c0~tract antount increase or [oecrease) $5,241.46 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all superv s on costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of Page I of 2 cITY OF BREMERTON CHANGE ORDER Contract Change Order No. 13 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A420452 Prev. Appvd. Changes $ 123,423.36 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 5,241.46 Days 0 Revised ContractAmt $4,371,918.10 Days 0 said Change Order. The Contractor agrees to fum sh a abor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time ex'tens on, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. P~P~P~P~P~P~P~P~P~P~ct Engineer Date-/ Recommended: d'~-'-~'.ua¢tn (,~5"-~ I~ E~'I~[ City Engioebr ,~ Date Accepted: / 7--~9~-"'-- .~,,C~-~trac~ ,,,,/ Date Page 2 of 2 'CITY OF BREMERTON CHANGE ORDER Page 1 of 1 Contract Change Order No. 12 Project Name SR 304 TIP The Gateway Phase Orig. Contract Amt. $ 4,243,253.28 Days 300 Proiect No. A 420452 Prey. Appvd. Changes $ 116t760.06 Days 0 Contractor Stan Palmer Constru~ont Inc. This Change $ 6~744.48 Days 0 Revised Contract Amt. $ 4~366~757.82 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount Extension ($) ($) (days) Existing bases were to be reused at the Callow and Burwell Intersection ~or Slgnal Pole #2 and street light pole g 106. The existing bases are not compatible to the new poles and will need to be removed and replaced. .Oescrll~oa An increase to the lump sum Group 2 Item #111, Signal Diaplay and Detection System (Gallow Ave.), Complete of ~,744.48. Ceastrecdoa 0 0 The existing bases are to be removed. The new bases are to be constructed In the same location as the existing bases. The base for Signal Pole #2 is to be constructed identical to Signal Pole #3 and the base for B 106 is to be constructed Identical to g 104. Measurement and Payment The lump sum bid item will be increased from $95,000.00 to 6,744.48 $101.744.48. This will be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. $6,744.48 Total , Net change in contract amount $6,744.48 Increase or (decrease) The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each Item Including any and all supervision costs and other miscellaneous costs relating to the change In work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all prov~slons will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~..~, ~/ProjectEngineer Date: 7/~(~/00 Recommended: ~//~ ~ ~ /City Engineer Date: Appr°ved:/_~~' ~ /Mayor Date: Ci'?f BREMERTON CHANGE ORDER Page 1 of Contract Change Order No. 11 Project Name SR 304 TiP The Gateway Phase Orig. Contract Amt. $ 4,243,253.28 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 115,688.88 Days 0 Contractor Stan Palmer ConstruCtiont [nc. This Change $ 1071.18 Days 0 Revised Contract Amt. $ 4t360~013.34 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount Extension ($) ($) (days) Per discussion in the Construction Heeting on June 15, 2000, this change order is to compensate the contractor for modifying the irrigation system connection to the City water system. Descrlpdon A mod]flcation to the Group 1 Item #36, Irdgation System Service Connection, an increase of $49=;.00 per connection. ¢onsm~cdon Th~on m the connection of the irrigation system to the City Water System will be as shown on page 2, 3, 4, and 5 0 0 of this change order. Measm~emeet and Payment The unit ~d item will be inoreased from $1.140.00 per connection to $1.635.00 per connection. This will be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described In this change order. 990.00 SubTotal $990.00 Sales Tax $81. ! 8 Total $1,071.18 Net change in contract amount $1,071.18 Increase or (decrease) The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of Ume allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, Inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Rremerton. Recommended: .~~__~. /Project Engineer Date:J' ,~7/~'(~ Recommended: v ' ~/'~"~t~.~_..~/,~-~..~/City En gin e er Date: 7/~ ?/~r~ Acce ted: Date: CITY OF BREMERTON CHANGE ORDER Page 1 of 1 Contract Change Order No. 10 Project Name SR 304 TiP The Gateway Phase Orig. Contract Amt. $ 4,243,253.28 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 115,989.78 Days 0 Contractor Stun Palmer Construction~ Inc. This Change $ 300.90 Days 0 Revised Contract Amt. $ 4t358~942.16 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount Extension ($) ($) (days) The Contract documents specified the installation of Harflex elbows for the sprinkler head installations. The City wishes to change the I"larflex elbows to Super Funny Pipe for ease of maintenance for the sprinkler system. n to the Group 1 Item #54, Irrigation. The difference In price of materials between the b4arflex elbows and the Super Funny Pipe Is valued at $278.10. Construction 0 0 ~f the klarflex elbows with the Super Funny Pipe as shown In the plans and specifications. Measurement and Payment The use of the Super Funny Pipe will be incorporated Into the bid item, Irrigation. The rump sum item will be decreased by the difference of the two items. The rump sum bid price was $1§0,000 and will be decreased to $149,721.90. This will be fuU pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. 2.78.10 SubTotal $2.78.10 Sales Tax $22.80 Total $ 300.90 Net change in contract amount ($300.90 Increase or (decrease) The undersigned Contractor approves the foregoing Change Order as to the changes, If any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change In work, and as to the extension of time allowed, Jf any, for completion of the entire work on account of said Change Order. The Contractor agrees to fumlth all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It Is Recommended: .~ ~~/-~ /Project Engineer Date: Recommended?~"-'C/,~ [ ~ ~ity Engineer Date: Accepted: ~tractor Date: Approved: ~ ~' f~/./~yor Date: ,7//')Z/ 2,1TY OF BREMERTON CHANGE ORDER Contract Change Order No. 9 Project Name SR 304 The Gateway Phase Odginal Contract Amt $ 4,243,253.38 Days 300 Project No. A420452 Prev. Appvd. Changes $ 113,940.66 Days 0 Contractor Start Palmer Construction, Inc ThisChange $ 2,217.15 Days 0 Revised Contract Amt $4,359,411.19 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor andthe City of Bremerfon. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Force Account Items from May 11 to June 7, 2000, have been summarized into this Change Order and will be addressed as Group 1 Item #154, Force Account Work from May 1'1 to June 7, 2000. Description 1. Stump Removal 0 0 A stump was uncovered when excavating in the old road bed along Wycoff Avenue 5/11/00. This was an unanticipatedadditional excavation to remove the stump. 228.43 2. Reoair of Sanitary Sewer Lateral Unmarked active sewer lateral found in excavation on 5/26/00. Repair and modification of lateral required. (Start Palmer No. X-7). 292.91 3. RePair Sanitary Sewer 8" Main on Rodoem St. The existing sanitary sewer line was found to be much shallower than anticipated on 6/26/00. The line was a clay line which was partially destroyed by the cutting and grading for the new roadway. Repair and modification of the line was required. (Stan Palmer No. X-15). 276.78 4. Potholim~ for Utilities at Rod(~em St. Force Main conflict with new Storm Line at the intersection of Rodgers Street and Wycoff avenue. Contractor was directed on 6/1/00 to locate other utilities to aid in design of storm line revision. (Stan Palmer No. X-12). 632.91 5. Pqtholinf~ for Utilities at Rodgers St. Force Main conflict with new Storm Line at the intersection of Rodgers Street and Wycoff avenue. Contractor was directed on 6/2/00 to locate other utilities to aid in design of storm line revision. (Stan Palmer No. X-12).] 390.36 6. Rf~sol¥inR Conflict of 24 In. Storm line and 12 In. The new storm line was found to be in conflict with an abandoned existing 12 in. cast iron water line on 6/7/00. The line was foundto be shallower than expected. Required removal of a section of the water line to accommodate the new storm line. 227.73 ~on~truction rk completed for the above listed items was completed at the verbal request of the Engineer. Afl materials incorporated into the project by this Change Order shall be approved by the Engineer. Measuremanf; and Payment ,Corca Account Work from May 11 to June 7, 2000, shall be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in the Change Order. Page 1 of 2 SITY OF BREMERTON CHANGE ORDER Contract Change Order No. 9 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 113,940.66 Days 0 Contractor Stan Palmer Construction, Inc This Change $ 2,217.15 Days 0 Revised Contract Amt $4,359,411.19 Days 0 Sub Total $ 2,049.12 Sales Tax $168.03 Total $2,217.15 Net i:;t~an~le in corjtract amount increase or (oecrease) $2,217.15 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and al/supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: .(~ ~'-'~ "~/'~,/O~ Proj~!'~t Engineer Date Recommended: ~'~[L~.J' ~,,,I~ '~,~ ~L~-~ ~ Cit'y"Engiffe~r Date Accepted: ~~' ~-~' ~_........._ Date/~ ~ 2.-':~"'-~2 Approved: ~Ma~ ~"" ~' Date~//~Z//~' Page 2 of 2 ,CITY OF BRENIERTON CHANGE ORDER Contract Change Order No. 8 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 4.20452 Prey. Appvd. Changes $ 111,693.24 Days 0 Contractor Stan Palmer Construction, lnc This Change $ 2,24.7.42 Days 0 Revised Contract Amt $4.,357,193.94 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price a~reed upon between the Contractor and the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) The Contract documents specified the installation of hybrid LED/neon Man/Hand heads for the pedestrian crossings. The Ctty wishes to change these to full LED heads due to the problems associated with maintenance of the neon portion of the signs 1. $1~al Display and Detection System (Fam~a~,ut to the Group ! item #110, Signal Display and Detection System (Farragut St.), Complete. The hybrid display is valued at $241.50 and the full LED at $415.4.5. Conurucdon Replacement of the hybrid LED/neon pedestrian head with the full LED pedestrian head. There are four (4) heads to be modified. Mea~arement ami Payment The use of the full LED pedestrian head will be incorporated into the bid item, Signal Display and Detection System(Farragut St.), Complete. The lump sum bid price was $95,000 and will be increased to $95,695.80. This will be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this Change Order. 695.80 O O ~.. SiBnal Dbplay and Detection System (Callow Ave.) Complete A modification to the Group 2 Item #108, Signal Display and Detection system (Callow Ave.), Complete. The hybrid display is valued at $261.30 and the full LED at $ 4.48.12, Comtructhm Replacement of the hybrid LED/neon pedestrian head with the full LED pedestrian head. There are eight (8) heads to be modified. Measurement and Payment The use of the full LED pedestrian head will be incorporated into the bid item, Signal Display and Detection system (Cal/ow Ave.), Complete. The lump sum item will be increased by the difference of the two items. The lump sum bid price was $95,000 and will be increased to $96,494.56. This will be full pay for all labor, materials, mob and equipment required to perform the work in accordance with the Standard Specifications and as described in this Change Order. 1,494.56 O Reference to Request for Clarification No, 33 0 Page 1 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 8 Proiect Name SR 304 The Gateway Phase Odgtnal Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prey. Appvd. Changes $ ! 11,693.24 Days 0 Contractor Start Palmer Construction, lnc This Change $ 2.,247.42 Days 0 Revised Contract Ami $4,357,193.94 Days 0 Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) Sub Total $ 2,190.36 Sales Tax (Group 1 items only) $57.06 Total $2,247.42 Net change In cc}~ttract amount increase or[aecrease) $2,247.42 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each Item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform ali other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: I~ ~ er Date --~__/f~,7/O Cie/~Eng~ne~ ,,~,~ ~. Date ~ Accepted: /" / ~ ' / Page 2 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 7 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4-,243,253.38 Days 300 Project No. A 420452 Prey. Appvd. Changes 9 95,624.46 Days 0 Contractor Start Palmer Construction, Inc This Change 9 16,068.78 Days 0 Revised Contract Amt 94,354,946.52 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the Cit~ v, Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Time Amount Contract Extension ($) Amount(S) (days) The Force Main located at Rodgers Street and Wycoff Avenue is shallower than expected. The proposed storm line that crosses the Force Main is required to be raised along with several laterals. This places the pipe just below subgrade of the new roadway. The Corrugated Polyethylene (HDPE) Storm Pipe specified for the project will not be sufficient. Reinforced Concrete Pipe (RCP) will be needed due to the minimal burial depth. 1. Reinforced Concrete Pipe 305 mm Diam. Descri~)tion A new Group 1 Item #22.3, Reinforced Concrete Pipe 305 mm Diam,, at 9102 per meter of length of pipe. Approximately 23 meters are needed. Construction Construction is to replace the HDPE pipe from catchbasin D2~7 to D2-6 with the RCP. RCP is to be Class 5. Measurement and Payment The new item, Reinforced Concrete Pipe 305 mm Diam., will be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this Change Order. 2,346.00 0 0 2. Reinforced Concrete Pipe 455 mm Diam. Descriotion A new Group 1 Item #22.5, Reinforced Concrete Pipe 455mm D/am., at 9115 per meter of length of pipe. Approximately 51 meters are needed. Construction Construction is to replace the HDPE pipe from catchbasin D2-9 to D2-6 with the RCP. RCP is to be Class 5. Measurement and Payment The new item, Reinforced Concrete Pipe 455 mm D/am., will be pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this Change Order. 5,865.00 O O Page 1 of 2 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 7 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,2~3.38 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 95,624.46 Days 0 Contractor Start Palmer Construction, Inc This Change $ 16,068.78 Days 0 Revised Contract Amt $4,354,946.52 Days 0 3. Reinforced Concrete Pipe 610 mm Diam. Description A new Group item //22.7, Reinforced Concrete Pipe 610 mm Diam., at $166 per meter of length of pipe. Approximately 40 meters are needed. Construction Construction is to replace the HDPE pipe from catchbasin D2-6 to existing manhole Type 2. RCP is to be Class 5. Measurement and Payment The new item, Reinforced Concrete Pipe 455 mm Diam., will be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this Change Order. $6,640.00 0 0 Sub Total $14,851.00 Sales Tax $1,217.78 Total $16,068.78 Net (;hbnge in contract amount increase or (decrease) $16,068.78 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~L~ -'ljrsIoo P~"Cj'~;Jt Engineer Date I Recommended, ~~ ~' -- City Engineer Date Approved: /~~ ~ Dat~//~ Page 2 of 2 /~ /¢ ~¢~¢ ~0 ~-/~'~/ ~'~"~ CITY OF BREMERTON CHANGE ORDER Page 1 of 2 Contract Change Order No. 6 Project Name SR 304 TIP The Gateway Phase Orig. Contract Amt. $ 4~243,253.28 Days 300 Project No. A 420452 Prey. ^ppvd. Changes $ 92,635.0! Days 0 Contractor Stan Palmer Construction, Inc. This Change $ 2~989.45 Days O Revised Contract Amt. $ 4,338,877.74 Days O This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount Extension ($) ($) (days) The 24 inch water main located on :he south side of Rodgers Street is shallower than expected in the west side of the new roadway curb line and sidewalk. The Bid Item #37, Existing Pipe Protection will not be sufficient for the distance from the top of the water main to the finish grade of the new roadway. p 1 Item #153, WaterMain Concrete Cap at $263. ! 3 per meter of length of cap. Approximately 2762.90 0 0 10.5 meters of cap are needed. Construction Construction is to be as shown on page 2 of this Change Order. Concrete is to be Class III. bleamrement and Payment The new item, Water Main Concrete Cap, will be full pay for afl labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. SubTotal $2762.90 Sales Tax $226.56 Total $2989.45 Net change in contract amount $2989.4.5 Increase or (decrease) The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton./; Recommended: ~.~.,~.~ /Project Eng/neer Date: Recommended: ~ _'~ (~3'~'~/.Ci, En~ineer Date: CITY OF BREMERTON CHANGE ORDER Page 1 of 1 Contract Change Order No. 5 Project Name SR 304- TIP The Gateway Phase Orig. Contract Amt. $ 4~243~253.28 Days 300 Proiect No. A 4.20452 Prey. Appvd, Changes $ 82~715.01 Days 0 Contractor Stan Palmer Construction, Inc. This Change $ 9~920.00 Days 0 Revised Contract Amt. $ 4~335,888.29 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform ail work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount Extension ($) ($) (days) CEkI£NT CONC. BARRIER CURB Bid Item #91, Cement Conc. Barrier Curb did not include the quantities for the alleys from Porter Street to 1st Street, although the Plan Set shows the curb being constructed along these alleys. Construction This is an increase of 320 meters over the original quantity of 280 meters to a new total of 600 meters. Measurement and Payment Will be per Unit Bid Item as specified in the Standard Specifications and Contract Documents. 9,920 0 0 Totals $9,920 Net change in contract amount $9,920 Increase or (decrease) The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended.c::~'~=~..../t'~, ,~' /Project Engineer Date: Recommende~ Engineer Date: ~.~ Accepted: /C~n~actor Date: · /Mayor Date: C1TY OF BREMERTON CHANGE ORDER Contract Change Order No. 4 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 54,246.13 Days 0 Contractor Start Palmer Construction, Inc This Change $ 28,468.88 Days 0 Revised Contract Amt $4,325,968.29 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Time Amount Contract Extension ($) Amount(S) (days) Items overlooked in the original Contract quantities, 0 0 reference to the City letter dated May 24, 2000 for Change Order //4. 1. Brushed Finish Sidewalks with Fence Description New Group 2 Item #131.3, Brushed Finish Sidewalks w/th Fence at $31.71/M=. The alley detail sections shown on Sheet 27 of 89 of the plan set shows cement concrete pavement between the back of curb and fence. The quantity for this item was left out of the original bid quantities. Cpnstruction Concrete is to extended an additional 150mm underneath the fence for weed control, the concrete will be lOOmm thick with a brushed finish and sloped at 2% away from the curb. The quant[ty for this item is 516 m2. Measurement and Payment The new item, Brushed Finish Sidewalks with Fence, will be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. 16,362.36 (2) 2. Brushed Finish Sidewalk Descriotion New Group 2 Item #131.5, Brushed Finish Sidewalk at $27.96/M2. There are areas where it may be more appropriate to use a brushed finish for the sidewalk instead of Bid Item #131, Patterned Sidewalk. These areas would be in the transition and curved areas of the patterned sidewalks blending into ex[sting sidewalks. Construction The areas of use for the item are to be identified by the Engineer in the field. The quantity for this item is 180 m~. Meaeurement and Payment The new item, Brushed Finish Sidewalk, will be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard Specifications and as described in this change order. 5,032.80(2) Page 1 of 3 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 4 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 54,246.13 Days 0 Contractor Stan Palmer Construction, lnc This Change $ 28,468.88 Days 0 Revised Contract Amt $4,325,968.29 Days 0 3. Chain Link Fence Double Gate Chain Link Fence Sinqle Gate Description New Group 2 Items #134.3, Chain Link Fence Double Gate at $576.00 each and #134.5, Chain Link Fence Single Gate at $259.20 each. Additional access maintenance of the landscaped areas will be required in the future. Construction The location of the gates are to be identified by the Engineer in the field. The quantity for Item #134.3 is two and for Item #134,5 is one. Measurement and Payment The new items, Cha/n L/nk Fence Double Gate and Cha/n L/nk Fence $/ng/e Gate, will be full pay for all labor, materials, tools and equipment required to perform the work in accordance with the Standard 1,411.20(2) Specifications and as described in this change order. 4. Replace Manhole Cover and Rinq Description New Group 1 and 2 Items #~39.5, Replace Manhole Cover and R/ng at $156.52 each and at $168.41, respectively. There are existing manholes in the project area, which were to be reused, but do not meet City Standards for opening size. Construction The Engineer will determine the location of the manholes to be replaced in the field. The quantity for the Group t item is six. The quantity for the Group 2 item is six. Measurement and Payment The new items for both Group 1 and Group 2 items, Replace Manhole Cover andRing, will be full pay for removal and disposal of the existing cover and ring 939.1 2(1) and delivery to the site for the new cover and ring. 1,010.46(2) Adjusting the new cover and ring to grade shall be covered by Bid Item #139, Adjust Manhole. 5. Replace 24 In. Covers on Force Main Description New Group 1 Item #152, Replace 24 In, Covers on Force Ma/n at $1680. 19 each. To provide improved access to the existing 28 inch blind flanges on the force main, the existing concrete flat top and 24 inch manholes are to be replaced with a new concrete flat top and 36 inch manholes. Construction The two existing structures ere in Cambrian Avenue. The Contractor will provide time to the City once the existing fiat top is removed to allow replacement of the existing bolts on the blind flange. The quantity for the item is two. Measurement and Payment The new item, Replace 24 in. Covers on Force Ma/n, will be full pay for all labor, materials, tools and equipment required to perform the work in accordance 3,360.38(1) with the Standard Specifications and as described in this change order. Page 2 of 3 CITY OF BREMERTON CHANGE ORDER Contract Change Order No. 4 Project Name SR 304 The Gateway Phase Original Contract Amt $ 4,243,253.38 Days 300 Project No. A 420452 Prev. Appvd. Changes $ 54,246.13 Days 0 Contractor Start Palmer Construction, Inc This Change $ 28,468.88 Days 0 Revised Contract Amt $4,325,968.29 Days 0 Totals Group 1 $ 4,299.50 Totals Group 2 $ 23,816.82 Sales Tax Group 1 $ 352.56 Total $28,468.88 Net (~hange in contract amount increase or (decrease) $28,468.88 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. P,~j'~ct Engineer Date / / Accepted: _ ~--,.~'~-///~ ~ MaWr ' Date' Page 3 of 3 ' .. CI-. Y, OF BREHERTON CHANGE ORDER Contract Change Order No. ( :3 ~.~ Project Name SR 304 TIP The Gateway Phase Orig. Contract Amt. $ 4,243~253.Z8''~ Days 300 Project No. A 420452 Prey. Appvd. Changes $ 47~950.13 Days 0 Contractor Stan Palmer Construction~ Inc. This Change $ 6~296 Days 0 Revised Contract Amt. $ 4~297~499.41 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremermn. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount Extension ($) ($) (days) Paving of approximately 85 meters of alley between 0 0 Wycoff and Cambrian and Coontz and First Street. This will be an increase in the Group 2 unit bid item quantities as follows: Item #8 Removing Asphalt Concrete Pavement at $5.00/MZ-lncrease by 274 Mz $1370 Item #12 Roadway Excavation Incl. Haul at $12.00/~43- Increase by 55 M3 $660 Item #39 Crushed Surfacing Base Course at $18.00/tonne-lncrease by 137 tonnes $2466 Item #48 Asphalt Concrete Pavement Cl. A at $45.00/tonne-lncrease by 40 tonnes $1800 Totals $6296 Net change in contract amount $6296 Increase or (decrease) The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and matertals and perform all other necessary work, inclusive of the directly or Indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved Recommended. ~ ~,.~.~ ~.,~.~la~:~rolect Engineer Date: ~-!Z4!C~ Recommended: ~c~j ~-/CJtyEngJneer Date: ~0 AtR,~o~ 'r Date: Z~- ~f/'~ ~ RECEIVED :3 0 ZOOO CITY OF BRE/v~ERTOH ~GltdE~-RS 'CITY OF BREHERTON CHANGE ORDER Page ! of 2 Contract Change Order No. 2. Project Name SR :304 TiP The Gateway Phase Orig. Contract Amt. $ 4~243~253.28 Days 300 Proiect No. A 42.0452 Prey. Appvd. Changes $ 2f088.26 Days 0 Contractor Stan Palmer Construction~ Inc. This Change $ 45~86! .87 Days 0 ., Revised Contract Amt. $ 4f291~203.41 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Tim~ Amount Amount Extension ($) ($) (days) 1. Newltem, Group 1 Item #13.5, Common Sorrow 0 0 Incl. Haul, 9,380 tonnes at $8.54/tonne $80,105.20 Use of Common Borrow as specified by Standard Specification 9-03.14(3). BorroW Is to be used outside of the roadside prism In the landscaping areas of the contract. ^pproval for payment of the material subject to visual inspection and acceptance by field Inspector for the City of Bremerton. See attached letter. Unit price Shall be full pay for excavating, loading, hauling, _ placing and compaction of material. 2. Bid Item #12, Roadway Excavation Incl. Haul $9.00/m3, reduction In quantity of 4,191 m~ $37,719 Totals $80,105.20 $37,719 Sales Tax 8.2% $6,568.63 $3,092.96 Net change in contract amount $45,861.87 Increase or (decrease) The undersigned Contractor approves the foregoing Change Order as to the changes, If any, in the contract price specified for each item including any and ail supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, If any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, Inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It Is understood that the Change Order shall be effective when approved by the City of BrenReGton. , ~ / Recommended:/C~~~°'ect Engineer, Date: Recommended: "~'-~C~ q ~'/City Engineer gate: Accepted: ~~tractor Date: 0S-12-2000 08:2~qM St. an Palmer' Const. ~6066747190 P.02 ~T~ WOrK COSTS X ACCT NO: X-3 PROJECT: SR ~ BREMERTON ~TEWAY COSTED DATE: 11-M~0 WORK DATE: WORK: C~MON BORROW ITEM [~$CRIPTION QUANT UNIT RATE EXTENDED NO COSTS I MATERIAL 1.00 TON 2 LOADouT $0 5O 3 HAUL $3 4 SPREAD AND GRADE MATERIAL ON SITE SUBTOTAL $6.?5 MARK-UP ~ 15% $1.01 TOTAL PER TON~ 1.00 TON $7 76 TOTAL PER METRIC TON ~ $7+76 x I 1 ~ 1.00 MT $8.54 ~8.54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO~TS ARE O~I£Y FOR DIRECTLY AFFECTED WORK PRICED ~O~ l RIGHT RESERVED TO SUBTOTAL A~OVE COSTS = ~,54 SUOMIT COSTS FOR DE-'LAY AFFECTS, IMPACTS, HOME OFFICE OH ~ % - ~000 AND DISTRUPTIONS NOT KNOWN AT THIS TIME. PROFIT ~ % - SALES TAX EXTRA IF APPLICABLE ~OND ~ % - $0.00 EXTRA TIME REQUIRED=- DAYS TOTAL COSTS = ~.,~ ~A~,~.~:LO~qM PORT ORCHARD PEO NO. (d) Me~ C ~ ~ ~ wh6n It O~ bc compa~d m g~ p~t of ~ den~ ~ ~ s~ for ~ ~ ~eut ~ ~ - ~c ~ ~ b~w ~ils ~st visibl~, ~u~ s~ ~ ~gn~ ~o~d b~ d~ to ~S~ T~t ~ T 90 ~on of ~ ~c is ~ bef~ ~ive ~in~ ~0 pit ~ ~ ~S~v~ ~ ~mb]e. ~4 T~p~ Wf~r P~ll~lon s~ed e~h w~s, m ~E ~tsble ma~ ~m~ p~ufi~sion con~l work. for ~y ~e, u~s spe~y ~v~ ~ ~ f~ s~: not e~ ~a~ ~e ~ ~ canal ~ WSDOT Tes~ Me~ which ~des a ~is~e ~i~ ~1~ ff~ ~e p~cu- ~ ~n~l ~em. N ~ pl~ i~e~ ~ ~ ~, I~ ~w ma~, S~on 2-3 ~ec~c~o~ ~e~ when Tes~ M~ ag~gate, eider n~tu~y oc~g .,~V. B.2~E~ 1:21PM., ' ~IX~NC ,N0.154 P.1 .. _ C,',rt.,ulfant~ i~ En~n~e~ng a~d EnWmnmen~l 8700 ~ap Way, Su r ~ ' ....... F~ T~NS~ISSION COVER. PAGE F~ $ 360.479-596 ~ 13~' ~ ' From: ... Sebt By:. Project #: Phone: . '~E,O- ~- ~5~ ProJe~ Name:., cc;~' Total ~ ~ Page~'. ~ UEGE~ ~ FOE R~I~ ~ PEE YOUR REQUEST ~ PL~SE REPLY ~ FOR YOUR FILES ~CKUP COPY ~ ~LL ~ ~LL NOT BE 8E~ VIA Commen~easage: ~ ~ ~'~~, ......... - L/~ . 85-12-2888 08:28AI9 Stan Palmer Const. 36066747190 P.01 STUN ~AL~E~ 60NSTRU6TION, INC. 5107 STATE H~ 3 SW, PORT ORCHARD, WA 98367 PHONE: (360) 674-2100 FAX: (360) 674-7190 DATE: /~ ~. ~ FAX ~: / R E C E I V E D ~AY i 2ZOO0 CORRESPONDENCE NO. A~ENTION:_ ~~ ~ OF B~TON ~IN~ QUANT'~ OF PAGES INCLUDING L~D SHEET:_ COMMENTS:_. ~ ~ ~¢y From: "Wilson, Mike (Olympic Region)" <WilsoMi@WSDOT.WA.GOV> To: '"Gunnar Fridriksson'" <gfridriksson@ci.bremerton.wa.us> Date: 5/11/00 4:51 PM Subject: Common Borrow Gunnar, I checked out the Contractor's borrow site at the airport. There is no problem with the matedal he's proposing, it's basically crusher reject. The material is granular with no clay. Go ahead and negotiate a price and use it when you're read. y. I'll have Barb check on any needed documentation and we can catch up, since it is a plan error we don't want to make it worse by causing a delay. Thanks- Mike CC: "Griffey, Barb" <GdffeB@WSDOT.WA. GOV>, "Soderquist, Eric" <SoderqE@WSDOT.WA.GOV> ' C( W:OF BREHERTON CHANGE ORDER Page 1 of 2 Contract Change Order No. 1 Project Name SR 304 TIP The Gateway Phase Orig. Contract Amt. $ 4t243,253.28 Days 300 Project No. A 420452 Prey. Appvd. Changes $ 0 Days 0 Contractor Stan Palmer Constmction~ Inc. This Change $ 1930 Days 0 Revised Contract Amt. $ 4,245,183.28 Days 0 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremerton. Description of Changes Increase in ~--~'(~:'~ Contract Amount ($) Revision on sheet 39 of 89 in plan set to include additional drainage structures along east side of Wycoff at Farragut Street. theThiSfollowing:Will be an increase of Group 1 unit bid item quantities for Item #15 Catch basin Type 1 $750.O0/each Increase quantity by one. ( 1 ) $750 Item #16 Catch basin Type 1L. $850.O0/each Increase quantity by one. (1) $850 Item #20 Corrugated Polyethylene Storm Sewer Pipe 300mm Dia. $66/meter. Increase by five (5) Iq. $330 Net change in contract amount increase or (decrease) Th~ undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, If any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the direcdy or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto: It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recommended: ~--~__ ~.,~,~ /Project Engineer Date: /,~//~,~ ~ Recommended: ~'~r~ [~ ~' /CityEn~ineer Date: Accepted: ~~"~'~ ntractor ' Date: 304 T?~sp. ~mprov. Project F e: CONTRACT CITY OF BREMERTON, KITSAP COUNTY, WASHINGTON THIS AGREEMENT, made and entered into this 5TH day of A?RI[ ,20 00 between the City of Bremerton under and by virtue of Title 36 RCW (counties) as amended, and STAN PALMER CONSTRUCTION, INC. hereinaftei- called the Contractor. WITNESSETH: That in consideration of the terms and conditions contained herein and attached and made a part of this agreement, the parties hereto covenant and agree as follows: I. The Contractor shall do all work and furnish all tools, materials and equipment for the SR 304 Transportation Improvement Project, Porter Street to Montgomery Avenue, in accordance with and as described in the attached Plans and Specifications, and the Standard Specifications of the Washington State Department of Transportation which are by the reference incorporated herein and made part hereof and shall perform any changes in the work in accord with the Contract Documents. The Contractor shall provide and bear the expense of all equipment, work and labor, of any sort whatsoever, that may be required for the transfer of materials and for constructing and completing the work provided for in these Contract Documents except those items mentioned therein to be furnished by the City of Bremerton. II, The City of Bremerton hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same in accord with the attached Plans and Specifications and the terms and conditions herein contained and hereby Contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices at the time and in the manner and upon the conditions provided for in this Contract. SR 304 Transportation Improvement Project The Gateway Phase 234-1896-036 Bid Proposal .5.54 February 2000 III. The Contractor for'himself/herself, and for; his/her heirs, executors, administrators, successors, assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor. IV. It is further provided that no liability shall attach to the City of Bremerton by reason of entering into this Contract, except as provided herein. IN WITNESS WHEREOF, the Contractor has executed this 'instrument, on the day and year first below written and the Local Agency Approving Authority has caused this instrument to be executed by and in the name of said City of Bremerton the day and year first above written. Executed by the Contractor A~RIL 5, r 20 00 ~TAN PALMER CONSTRUCTION, INC. Contractor Executed by the Local Agency /. ~, /~ ~c~ lz~ , 20 00 Approval Recommended by: ~ . v W. Eugene Sampley, Director, Public Works & Utilities (SEAL) ?" , Approved: .~_./ ,,~ ~ City of Bremerton Approving Authority Lynn Horton, Ma~vor SR 304 Transportation Improvement Project The Gateway Phase 234.1896-036 Bid Proposal