Loading...
HomeMy WebLinkAbout05/20/2026 4G AGENDA BILL CITY OF BREMERTON 4G CITY COUNCIL SUBJECT:Study SessionDate: May 13, 2026 Public Works Agreementwith Holt Services, COUNCIL MEETING Date: May 20, 2026 Inc.for Well 6R RehabilitationProject Department: PW&U-Engineering Presenter: Denton Lynch Phone: (360) 473-2350 SUMMARY: Well6R was drilled into the Deep Artesian Aquifer in 2004 to a depth of 640 feet below ground surface. The well was redeveloped in 2021 due to lower-than-anticipated pumping water levels, and loss of efficiency. Based on current observed well production and impacts of previous efficiency loss, additional redevelopment is required. Requests for bids were sent to contractorsselected from the Municipal Research and Services Center (MRSC) Small Works Roster. 3 bids were received. Bids were opened on April 29, 2026. The apparent low bidder was rejected as non-responsive. The lowest responsive, responsible bidder was Holt Services, Inc., who submitted a bid in the amount of ,000 to $200,000. ATTACHMENTS:1.Public Works Agreement; 2. Location Map; 3. Bid Tabulation FISCAL IMPACTS(Include Budgeted Amount):This project is included in the 2026Water CIP for $350,000. STUDY SESSION ACTION:Consent Agenda General Business Public Hearing RECOMMENDED MOTION: Move to approve the Public Works Agreement with Holt Services,Inc. for the Well 6R Rehabilitation Project in the amount of $184,329.60; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 04/19/2024