Loading...
HomeMy WebLinkAbout03/18/2026 3D AGENDA BILL CITY OF BREMERTON 3D CITY COUNCIL SUBJECT:Study SessionDate: March 11, 2026 Agreement with Coatings Unlimited for COUNCIL MEETING Date: March 18, 2026 Reservoir 18 Interior & Exterior Coating Department: Engineering Replacement Project Presenter: Denton Lynch Phone: (360) 473-2350 SUMMARY:Reservoir 18 is a 1.0-million-gallon steel water reservoir located at 1925 Cheryl St. The scope of work includes abrasive blasting and recoating the entire interior and exterior with a 3-coat epoxy coating system. The interior and exterior were last recoated in 2007 and 1997 respectively. The scope of work also includes coating repair to the roofs of Reservoir 17 and 19. Bids were opened on February 25, 2026. Nine (9) bids werereceived. Coatings Unlimited was the lowest responsible, responsive bidder in the amount of $659,022.00 (which includes sales tax). ATTACHMENTS:1. Agreement; 2. Location Map; 3. Bid Tabulation FISCAL IMPACTS(Include Budgeted Amount): his project is included in the 2026 Water CIP for $700,000.Fund 404; Department 324; Budget Code 594.34324; 56310 STUDY SESSION ACTION:Consent Agenda General Business Public Hearing RECOMMENDED MOTION: Move to award the contract for the Reservoir 18 Interior and Exterior Coating Replacement Project to Coatings Unlimited in the amount of $659,022.00, including sales tax, and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 04/19/2024