Loading...
HomeMy WebLinkAbout140-063_Supplement01.v2 Supplemental Agreement Number Organization and Address Phone: Original Agreement Number Project Number Execution Date Completion Date Project Title New Maximum Amount Payable Description of Work The Local Agency of desires to supplement the agreement entered in to with and executed on and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: By: Consultant Signature Approving Authority Signature Date DOT Form 140-063 Revised 09/2005 City of Bremerton DKS Associates 11/02/2022 315042 See Exhibit A attached No changes See Exhibit D attached. 01 315042 DKS Associates 719 2nd Ave, Suite 1250 Seattle, WA 98104 206-328-9800 HSIP-000S(629)11/02/2022 12/31/2024 Systemic Pedestrian Treatments - Rectangular Rapid Flashing Beacons $ 286,543.12 The project will install Rectangular Rapid Flashing Beacons (RRFB) systems at eight locations throughout the city of Bremerton. The project will include thermoplastic marked crosswalks and ADA curb ramps associated with the RRFB enhanced marked crosswalks. Richard Hutchinson, DKS Associates Greg Wheeler, Mayor City of Bremerton DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5 11/7/2023 Exhibit “A” Summary of Payments Basic Agreement Supplement #1 Total Direct Salary Cost Overhead (Including Payroll Additives) Direct Non-Salary Costs Fixed Fee Total DOT Form 140-063 Revised 09/2005 47,576.53 86,527.44 72,623.86 13,321.42 220,049.25 6,202.45 11,280.40 47,274.34 1,736.69 66,493.87 53,778.98 97,807.84 119,898.20 15,058.11 286,543.12 DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5 Page 1 of 5 Systemic Pedestrian Treatments- RRFB Bremerton, WA DKS Associates EXHIBIT A SCOPE OF WORK City of Bremerton - Systemic Pedestrian Treatments- RRFB Bremerton, WA Supplement #1 November 1, 2023 Project Description The City of Bremerton (CITY) requested the DKS team (CONSULTANT) re-design the curb ramps at the southeast and southwest corner of the Perry Ave and Stone Way intersection to fit with the Kitsap County sidewalk improvement design north of the intersection crossing the city limits. During the design, it was identified that the project needs right-of-way acquisitions for one (1) parcel and eight (8) Temporary Construction Easements (TCE). The original scope of work assumes two (2) TCEs in support of the City’s project objectives. All other assumptions from the base contract are still in effect with the exception of tasks and deliverables delineated in this supplement. Task 1: Project Management The CONSULTANT will perform project management and administration tasks for the sub-consultants contract and additional scope of work. The CONSULTANT will work with the CITY to coordinate with the County’s design north of the Perry Ave and Stone Way intersection. Task 5: 90% Design The CONSULTANT will revise the 90% PS&E packages for the curb ramp re-design at Perry Ave and Stone Way. Both southeast and southwest corners will be revised to two curb ramp designs from the current combined signal ramp design. The CONSULTANT will also add the crosswalk pavement markings on the east and west leg of the intersection connecting to the County designed curb ramp on the north side of Stone Way. DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5 Page 2 of 5 Systemic Pedestrian Treatments- RRFB Bremerton, WA DKS Associates Fee covers redesign of 4 curb ramps at Stone Way and Perry Ave. All other deliverables are unchanged from base contract. Task 5 Deliverables: The curb ramps redesign will be part of the 90% PS&E package. No separated design deliverables. Task 6: 100% Design and Bid Documents The CONSULTANT will incorporate the four curb ramp design at Stone Way and Perry Ave. Both southeast and southwest corners are changed to two curb ramp designs. The crosswalk pavement markings are added on the east and west leg of the intersection connecting to the County designed curb ramp on the north side of Stone Way. Fee covers redesign of 4 curb ramps at Stone Way and Perry Ave. All other deliverables are unchanged from base contract. Task 5 Deliverables: The curb ramps and pavement marking design will be part of the 100% design and final bid documents. No separated design deliverables. Task 8: Right-of-Way Services ROW Plans The original contract set aside a $5,500 fee for ROW confirmation, plans, and obtaining title reports assuming (2) temporary construction easements. As the design is being finalized, the project identified one parcel that need exhibits, maps and legal descriptions; and eight Temporary Construction Easements (TCE) will be required for construction. The CITY authorizes the CONSULTANT to use the $5,500 set-aside budget for ROW plans. This task revision includes additional budget to cover 6 additional TCEs and one acquisition. ROW Services • The right-of-way needs for 30% plans have been developed. The ROW services scope is amended based on (6) additional temporary construction easements and one fee takes – a total of six additional parcels in support of the CITY's project objectives DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5 Page 3 of 5 Systemic Pedestrian Treatments- RRFB Bremerton, WA DKS Associates • Regarding the six (6) additional parcels requiring fee takes and temporary construction easements, it is assumed they are non-complex in nature, will amount to less than $25,000 each, and therefore valuations can be provided via Administrative Offer Summary (AOS) reports. It is understood that federal funding will be a component of the program and therefore that WSDOT Right-of-Way Certification will be required Project Management • Attend kick-off meeting with the CITY to obtain further project background and discuss design impacts and communications approaches for each property/business owner and tour each project site. • Lead regular acquisition status meetings, provide verbal and written status reporting, a total of two 30-minutes status meetings and 6 monthly reports for the acquisition of ROW from six additional parcels. • Coordinate with design team, project team, city's public outreach teams in settlement and mitigation strategies for an additional six parcels. • Provide oversight into State and Federal compliance issues and requirements for six additional parcels. Valuation Services • Complete Administrative Offer Summaries (AOS's) for six additional parcels - resulting with a total of eight AOS reports based on WSDOT and Uniform Relocation Act requirements. • Perform market data research, improvements valuations, for (6) additional acquisitions. • Integrate valuation findings into final valuation determinations and offer packages for CITY review/approval for six additional parcels. • Title Review and Offer Package Preparations for six additional parcels. • Review preliminary title reports, confirm vesting interest of each parcel affected for six additional parcels. • Prepare acquisition files according to WSDOT, CITY and Uniform Relocation Act standards for six additional parcels. • Prepare offer packages, conveyance documents, notices and all other documentation associated with the negotiations process. If acquisitions require the need for fee takes and permanent easements from additional parcels, an additional budget will be negotiated before commencing work Negotiations/Settlement Justifications DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5 Page 4 of 5 Systemic Pedestrian Treatments- RRFB Bremerton, WA DKS Associates • Contact property owners, impacted by CITY's acquisition, present offer packages for six additional parcels. • Negotiate and settlement terms for TCE and/or permits, perform property research, counteroffer justifications and other data to reach settlement for six additional parcels. • Conduct a minimum of three (3) significant and meaningful contacts with each property owner before recommendation of impasse in negotiations for six additional parcels. • If it becomes apparent that negotiations have reached an impasse and sufficient time has passed for the property owner to make a settlement decision, the CONSULTANT shall provide written notice to the CITY of impasse in negotiations and recommendation for condemnation • If the CITY choses to continue negotiations as opposed to filing condemnation, an additional budget to extend negotiation efforts will be negotiated. • Prepare Administrative Justification Settlement Memorandums, per CITY, WSDOT and Uniform Act requirements for one parcel – resulting in no changes to scope our hours. • Facilitate execution of all conveyance documents, prepare CITY payment vouchers and coordinate with CITY on owner settlement payments for six additional parcels. WSDOT Certification Oversight/Project Close Out • Prepare all acquisition files for WSDOT Local Area Coordinator (LAC) Review for six additional parcels. • Coordinate with WSDOT LAC on certification issues and concerns that arise, as needed • Provide CITY with final, closed out, acquisition files, both digital and hard copies for six additional parcels. Assumptions • All negotiations shall continue to follow the CITY's approved ROW procedures. This includes negotiations being conducted by a WSDOT certified real estate agent and diaries kept for all interactions with property owners • Any title clearance to be performed by CITY • Right-of-way plans and right of way legal descriptions to be provided by CONSU LTANT's team • CITY will facilitate payment of claims to affected property owners. • Consultant will order and pay for six additional (6) Preliminary Title Reports (PTR's) necessary to confirm all affected ownerships. Cost of PTR's is included in this Scope and Fee Proposal. Any title clearance action is not included in this scope of work • All valuations are assumed to less than $25,000. If above, scope and fee proposal is subject to revision to account for appraisal and appraisal review costs, per Uniform Act Requirements. An additional budget to include appraisal fees will be negotiated prior to commencing work DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5 Page 5 of 5 Systemic Pedestrian Treatments- RRFB Bremerton, WA DKS Associates • Scope and Fee Proposal in Amendment 1 is based on design assumptions based on the 30% plan submittal. Task 8 Deliverables: • Draft ROW plans - in conjunction with the 30% milestone • Final ROW plans - in conjunction with 100% PS&E milestone • Developing project funding estimate (PFE) for WSDOT approval • Obtaining ROW certification from WSDOT for the project • Permitting, licensing, recording fees or closing costs are not included. DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5 EXHIBIT DHOUR AND FEE ESTIMATE Project: 10-Oct-23 DKS Associates Total Fee Principal Project Senior Project Assistant CAD Project Effective Task Engineer Manager Engineer Engineer Engineer Technician Coordinator Admin Direct Overhead Profit multiplier 101.65$ 76.89$ 59.66$ 51.25$ 47.21$ 36.63$ 39.15$ 40.43$ Hours Labor Cost 181.87% 28%3.0987 Task 1 - Project Management 1.1 General Project Management 0 8 0 0 0 0 3 0 11 732.57 1,332.33 205.12 2,270.01 1.2 QA/QC 0 4 8 0 0 0 0 0 12 784.84 1,427.39 219.76 2,431.98 1.3 Coordination and Meetings (1)0 4 2 0 0 0 0 0 6 426.88 776.37 119.53 1,322.77 0 16 10 0 0 0 3 0 29 1,944.29 3,536.08 544.40 6,024.77 Task 5: 90% Design 5.1 90% Design Plans 3 8 8 20 18 57 2,721.49 4,949.57 762.02 8,433.08 5.2 90% Specifications 0 0 0 0 0 - - - - 5.3 90% Construction Cost Estimate 0 1 2 3 154.08 280.23 43.14 477.45 5.4 Draft MEF Document 0 0 - - - - 0 3 9 8 22 18 0 0 60 2,875.57$ 5,229.80$ 805.16$ 8,910.53$ Task 6: 100% Design and Bid Documents 6.1 100% Design Plans 1 3 2 12 6 24 1,144.67 2,081.81 320.51 3,546.99 6.2 100% Specifications 0 0 0 0 0 - - - - 6.3 100% Construction Cost Estimate 0 0 1 0 1 47.21 85.86 13.22 146.29 6.4 Final MEF Document 0 0 0 0 - - - - 6.5 Bid Ready Package 1 2 1 4 190.71 346.84 53.40 590.95 0 1 4 2 15 7 0 0 29 1,382.59$ 2,514.52$ 387.13$ 4,284.23$ Task 8 - Right-of-Way Services 8.1 ROW Plans (KPG) 8.2 ROW Services (Abeyta) 0 0 0 0 0 0 0 0 0 -$ -$ -$ -$ SUM 0 20 23 10 37 25 3 0 118 6,202.45$ 11,280.40$ 1,736.69$ 19,219.53$ Sub Consultants: KPG PSOMAS: Task 8.1 - ROW Plans 3,943.37$ Abeyta: Task 8.2 - ROW services 43,330.97$ ODC: Milage/Print Grand Total 66,493.87$ City of Bremerton Systemic Pedestrian Treatments RRFB Supplement #1 Labor Hour Estimate Task Totals Description Task Total Task Total Task Total City of Bremerton Page 1 of 1 DKS 10/10/2023 DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5 KPG PSOMAS COST COMPUTATIONS Client: DKS Project: Bremerton Systemic Pedestrian Treatments RRFB Supplemental Budget for Right of Way Plans and Legal Descriptions DATE: October 2023 Survey ManagerSurvey Crew II (W/Equip)Survey Crew I (W/Equip)Project SurveyorSenior Survey Technician$82.73 $82.00 $64.50 $54.06 $45.12 Hours Fee 12.1 ROW Rearch 0 -$ 12.2 ROW Plans Preparation 24 24 1,082.88$ 12.3 Legal Descrriptions and Exhibits 5 5 225.60$ 0 0 0 0 29 29 1,308.48$ 0 0 0 0 29 29 1,308.48$ ICR Overhead @ 1.7337% = 2,268.51$ Fixed Fee @ 28% = 366.37$ Total KPG (DL + OH + Fixed Fee) = 3,943.37$ N/A -$ Mileage at current IRS rate -$ Reproduction Allowance -$ -$ 3,943.37$ Note: this budget is a supplement to the $5,500 originally allocated for ROW plans and Legal Description Preparation Task No.Task Description Labor Hour Estimate Total Hours and Labor Fee Estimate by Task Task 12 Right-of-Way Plans Task Total Done under previous task Total Estimated Budget Total Labor Hours and Fee Subconsultants Total Subconsultant Expense Reimbursable Direct Non-Salary Costs Total Reimbursable Expense DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5 Prepared for: DKS Supplement 1 City of Bremerton - Systemic Pedestrian Treatments- RRFB NEGOTIATION SERVICES $61.53 $50.32 SR Item 1: Project Administration Prop Mgt Admin SR/PM Agent Acq Agent Acq Agent Title REO Escrow Total Coord with City and DKS (three additional hours).3 0 3 Certification Assistance / Coordination with City and WSDOT - four additional hours 4 0 4 Clerical - 0 0 0 Contract Admin and Management of overall ROW activities (5 additional hours)5 0 5 Administrative Offer Summary Reports (8) Parcels (60 additional hours)24 32 56 Progress Reporting, Meetings & Kick-off Meetings - (5 additional hours)5 0 5 Prepare one ROW Funding Estimate - [8 Parcels: 1 fee take and 7 TCE(s)] = 12 additional hours 12 0 12 Coord w/Subconsultants- 0 0 0 Hours:0 0 53 32 0 0 0 0 85 Direct Labor $:0.00 0.00 3,261.09 1,610.24 0.00 0.00 0.00 0.00 4,871.33$ Item 2: Right-of-Way Acquisition Title, Plans, and Appr. Review - six additional parcels = 44 additional hours 22 22 44 Pre-Offer/File Setup/Document Prep - 8 packages/files for (7) parcels with TCE(s) & 1 parcel with a Fee Take = 52 additional hours 25 25 50 Negotiations (TCEs from seven tax parcels and fee take from one parcel) = 108 additional hours.53 55 108 Administrative Settlement Memorandums (1 Parcel) No additional hours.0 Clearing Title - City assumes the risk and/or is responsible for clearing title.0 0 0 Condemn Support - 0 0 0 Data/file & Diary Management, Maintenance for City & WSDOT = six additional parcesl = 28 additional hours. 14 14 28 Hours:0 0 114 116 0 0 0 0 230 Direct Labor $:0.00 7,014.42 5,837.12 12,851.54$ Direct Labor Totals: Hours:0 0 167 148 0 0 0 0 315 Dollars:0 0.00 10,275.51 7,447.36 0 0 0 0 17,722.87$ Direct Salary Cost:17,722.87$ Per Parcel Breakdown:Direct Labor Rate:17,722.87$ Summary Audited Overhead Rate:110%19,495.16$ Direct Salary Cost 17,722.87$ Profit:26%4,607.95$ Overhead Cost @ 110.00%19,495.16$ Composite Multiplier:136%41,825.97$ Fee @ 26%4,607.95$ *Total Labor Fee:41,825.97$ Labor 41,825.97$ Expenses: Expenses 1,505.00$ Review Appraisal -$ Subconsultant -$ Appraisal -$ Contract Total 43,330.97$ Mileage/Travel 825.00$ Reprographic, Copy, & Printing 300.00$ Courier Overnight Postage 380.00$ Subtotal:1,505.00$ *TOTAL 43,330.97$ Abeyta Associates 10/10/2023 / City of Bremerton Project - Fee Supplement 1.05302023 Page1 DocuSign Envelope ID: B8E2AA7F-DEC4-4FDD-99BD-66304D32B4A5