HomeMy WebLinkAbout02/18/2026 CITY COUNCIL AGENDA PACKET Please contact City.Clerk@bremertonwa.gov or (360) 473-5323 up to 24 hours prior to the meeting to
request Americans with Disabilities Act (ADA) accommodations.
______________________________________________________________
CITY COUNCIL 345 6th Street, Suite 100, Bremerton, WA 98337 - Phone (360) 473-5280
WEDNESDAY, FEBRUARY 18, 2026
CITY COUNCIL MEETING AGENDA
1. BRIEFING: 5:00 – 5:30 P.M. in COUNCIL CONFERENCE ROOM 603
A. Review of Agenda
B. General Council Business (Only as necessary)
2. CALL TO ORDER: 5:30 P.M. in FIRST FLOOR CHAMBERS
3. CONSENT AGENDA
A. Claims and Check Register
B. Minutes of Council Meeting – February 4, 2026
C. Minutes of Study Session – February 11, 2026
D. Confirm Reappointment of Vanessa Acierto to BKAT Community Advisory Committee
E. 2026 Excess Workers’ Compensation Insurance Renewal with Safety National Casualty
Corporation
F. Public Works Agreement for the Purchase of Playground Equipment from Buell Recreation LLC
for the Kitsap Lake Park Playground
G. National Fitness Campaign Court Grant Application
H. Utility Relocation Agreements for Site B and Site C with Kiewit for WSDOT Fish Passage Project
4. GENERAL BUSINESS – There are no General Business items.
5. MAYOR'S REPORT
6. COUNCIL MEMBER REPORTS
7. ADJOURNMENT OF CITY COUNCIL BUSINESS MEETING
Council Members and staff will be participating in the meeting in-person, and the public is invited to attend.
Or beginning at 5:30 PM, the public may attend remotely through one of the following options:
To stream online only (via BKAT Feed, with no interaction possible):
https://bremerton.vod.castus.tv/vod/?live=ch1&nav=live
Members of the public are invited to join the Zoom Meeting by clicking on the link below:
https://bremertonwa-gov.zoom.us/j/89694813320?pwd=Z0JvSXNhSFp1c0xhL1NxUjRhN20xUT09
Or One tap mobile:
US: +12532050468…89694813320#...*173061# or +12532158782…89694813320#...*173061#
Or Telephone: Dial (for higher quality, dial a number based on your current location):
US: +1 253 205 0468 or +1 253 215 8782 or +1 669 444 9171 or +1 669 900 6833
Webinar ID: 896 9481 3320; Passcode: 173061
Public questions or comments may be submitted ahead of time to City.Council@bremertonwa.gov
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: N/A
Claims & Check Register COUNCIL MEETING Date: February 18, 2026
Department: Legal Services
Presenter: Angela Hoover
Phone: (360) 473-5323
SUMMARY: Approval of the following checks and electronic fund transfers:
1. Check Numbers 413879 – 414024 and EFT Numbers V45511 - V45635 in the grand total
amount of $3,179,722.79
2. Regular Payroll for pay period ending January 31, 2026 in the amount of $1,236,872.42
3. Regular Payroll Payouts for pay period ending January 31, 2026 in the amount of $4,223.54
ATTACHMENTS:
FISCAL IMPACTS:
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the Claims & Check Register as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
3A
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT:
Minutes of Council Meeting – February 4,
2026
Study Session Date: N/A
COUNCIL MEETING Date: February 18, 2026
Department: City Council
Presenter: Council President
Phone: (360) 473-5280
SUMMARY: The Minutes for the Council Meeting held on February 4, 2026 are attached.
ATTACHMENTS: Council Meeting Minutes
FISCAL IMPACTS (Include Budgeted Amount): None
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Mo ve to approve the February 4, 2026 Council Meeting Minutes as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
3B
CITY COUNCIL MEETING MINUTES
Wednesday, February 4, 2026
The bi-weekly meeting of the City Council of the City of Bremerton was called to order Wednesday,
February 4, 2026 at 5:00 PM in Council Conference Room 603 of the Norm Dicks Government Center,
345 6th Street, in Bremerton, Washington, with Council President Jane Rebelowski presiding.
Council Members present were Jennifer Chamberlin, Denise Frey, Christy Cammarata, Michael
Goodnow, Anna Mockler (remote 5:30 PM), and Rick Tift. At 5:30 PM, the meeting moved to the First
Floor Meeting Chambers. Also present were City Attorney Kylie Finnell; City Clerk Angela Hoover;
Legislative Assistant Christine Grenier; and IT Manager Dave Sorensen.
CONSENT AGENDA
3A – CLAIMS AND CHECK REGISTER
Check Numbers 45363 through 45371 and 413717 through 413878 and EFT Numbers V45362
through V45510 in the grand total amount of $9,384,114.90; Regular Payroll for pay period ending
December 31, 2025 in the amount of $1,243,531.43; Regular Payroll for pay period ending January
15, 2026 in the amount of $1,302,997.42; Retiree Payroll for pay period ending January 31, 2026
in the amount of $46,813.18; Regular Payroll Pay Out for pay period ending January 15, 2026 in
the amount of $12,227.05.
3B – MINUTES OF MEETING – JANUARY 21, 2026
3C – MINUTES OF STUDY SESSION – JANUARY 28, 2026
3D – CONTRACT MODIFICATION AGREEMENT NO. 2 WITH PARAMETRIX, INC. FOR
DESIGN AND CONSTRUCTION SERVICES FOR THE E. 9TH STREET STORMWATER
IMPROVEMENTS PROJECT
3E – APPROVE EASEMENT ACQUISITION FOR SEWAGE PUMP STATION EB-10 FOR THE
TRACYTON BEACH ROAD SEWER IMPROVEMENTS PROJECT
3F – DRINKING WATER STATE REVOLVING FUND LOAN CONTRACT WITH WA STATE
DEPARTMENT OF HEALTH FOR THE MANGANESE TREATMENT FACILITIES (EASTSIDE)
PROJECT
3G – CONTRACT MODIFICATION NO. 8 WITH PARAMETRIX, INC. FOR ENGINEERING
SERVICES FOR THE KITSAP LAKE PARK RENOVATION PROJECT
3H – WASHINGTON STATE DEPARTMENT OF ECOLOGY 2025-2027 BIENNIAL
STORMWATER CAPACITY GRANT
3I – CLEAN WATER STATE REVOLVING FUND LOAN AGREEMENT WITH WA STATE
DEPARTMENT OF ECOLOGY TO FUND CONSTRUCTION OF THE DECOMMISSION BEACH
SEWER FROM OB-4 TO EB-2 PROJECT
3J – APPROVE EXTENSION OF APPOINTMENT OF CHANCE BERTHIAUME AS
PROVISIONAL PUBLIC WORKS & UTILITIES DIRECTOR
3K – LETTER IN RESPONSE TO BREMERTON HOUSING AUTHORITY
5:35 PM M/S/C/U (Chamberlin/Frey) Move to approve the CONSENT AGENDA as presented.
Motion carried unanimously.
PUBLIC HEARING
4A – PUBLIC HEARING ON INTERLOCAL AGREEMENT WITH THE PORT OF PORT
ANGELES FOR SALE AND PURCHASE OF SURPLUS EMERGENCY FIRE AND RESCUE
BOAT: Fire Chief Pat McGanney presented on this item. The City of Bremerton desires to enter
into an interlocal agreement (ILA) with the Port of Port Angeles for the sale of the fire department ’s
1991 Fire and Rescue Boat, a Northwind 32 Pilothouse Boat, and Trailer. The total purchase price
shall be $59,895.00.
City Council Reg. Mtg. Minutes
Wednesday, February 4, 2026
Page 2 of 4
President Rebelowski explained the purpose of this Public Hearing was to accept public
comment and action was anticipated.
Questions or comments from the public were provided by Jose Camacho, Robin Weldin.
With no further questions or comments received, President Rebelowski closed the Public
Hearing.
5:41 PM Motion was made by Goodnow; and Seconded by Chamberlin.
5:42 PM M/S/C/U (Goodnow/Chamberlin) Move to approve the Interlocal Agreement for Sale and
Purchase of Surplus Emergency Fire and Rescue Boat between City of Bremerton and Port of Port
Angeles; and authorize the Fire Chief to finalize and execute the agreement with substantially the
same terms and conditions as presented. Motion carried unanimously.
5 – GENERAL BUSINESS
5A – CONTRACT MODIFICATION AGREEMENT NO. 1 WITH PARAMETRIX, INC. FOR THE
ACTIVE TRANSPORTATION PLAN: Public Works Project Manager Katie Ketterer presented
on this item. Staff have negotiated a contract modification with Parametrix to complete updates to
the Active Transportation Plan (ATP). The ATP updates were started in 2023 as part of the
Comprehensive Plan update, and both were originally intended to be delivered together. Following
public feedback, it was decided that the ATP could be carved out of the Comp Plan and handled
separately. This would allow for additional public outreach and engagement, more specifically
focused on the ATP. The plan will establish the vision for future improvements to active
transportation facilities in the City, and outline resources needed to implement the vision.
Parametrix’s scope of work includes the additional community engagement that will take place
during the planning process. The amendment amount is $185,728.45 for a total amended contract
amount of $714,580.05, inclusive of this Contract Modification.
5:47 PM Motion was made by Frey; and Seconded by Chamberlin. Questions or comments were
provided by Frey, Tift, Chamberlin, Mockler, Cammarata, Rebelowski; with responses provided by
Public Works Project Manager Ketterer.
6:07 PM M/S/C/U (Frey/Chamberlin) Move to authorize the Contract Modification with Parametrix,
Inc. for the Active Transportation Plan; and authorize the Mayor to finalize and execute the
modification with substantially the same terms and conditions as presented. Motion carried
unanimously.
At 6:08 PM, Council Member Michael Goodnow recused himself from discussion and action on
Item 5B.
5B – 2026 LODGING TAX ADVISORY COMMITTEE FUNDING RECOMMENDATIONS:
2025 LTAC Chair and Council Member Jennifer Chamberlin presented on this item. The
Lodging Tax Advisory Committee (LTAC) received 20 eligible requests for funding totaling
$1,363,885.
Direction provided by City Council when considering these requests included support of long -time
community events, kick-starting new events, tourism-based organizations and venues, and
municipal projects. Also, criteria provided by the City Council when evaluating the requests included
consideration of economic impact, events or activities that draw tourists from 50 miles or more away,
events or activities that focused on Bremerton’s community, and requests that demonstrated
collaboration with other community organizations.
Following the application process, interviews with the applicants were held on November 12,
City Council Reg. Mtg. Minutes
Wednesday, February 4, 2026
Page 3 of 4
November 18, and December 9, 2025. Deliberations were then held on December 9 and 10, 2025.
The LTAC is now presenting for the Council’s consideration Funding Recommendations with a total
proposed allocation of $450,000 (Exhibit A). Included in the City of Bremerton’s 2026 Budget are
continued annual commitments to the Kitsap Conference Center for $250,000 and $150,000 for the
Admiral Theatre, for a grand total of $850,000 for Fiscal Year 2026.
6:10 PM Main Motion was made by Frey; and Seconded by Tift. Questions or comments were
provided by Frey, Tift, Chamberlin, Cammarata, Mockler, Rebelowski; with responses provided by
Council Member Jennifer Chamberlin and City Attorney Kylie Finnell.
A second round of discussion included questions or comments provided by Tift, Mockler, Frey,
Rebelowski; with responses provided by Council Member Jennifer Chamberlin.
6:41 PM Main Motion was withdrawn by Frey.
6:41 PM Motion to reject the funding recommendations and to ask LTAC to reconsider only the
DMO request was made by Mockler and died due to a lack of a second.
6:43 PM M/S/C (Frey/Cammarata) Move to reject Funding Recommendations from the Lodging
Tax Advisory Committee; and return recommendation to LTAC for reconsideration of the
allocations and give further explanation of the decision-making criteria.
Voted in Favor of Motion: Mockler, Tift, Frey, Cammarata, Rebelowski
Abstained: Chamberlin
Recused: Goodnow
Motion carried: 5-Yes; 1-Abstention; 1-Recusal
At 6:45 PM, Council Member Michael Goodnow returned to the meeting.
6 – MAYOR’S REPORT – Mayor Wheeler provided highlights of the following:
New Bremerton Foodline Donation Program for City Employees led by Diversity &
Community Engagement Manager Dr. Jeneise Briggs
New CommUNITY Engagement Hub on the City’s Website
Well 7A Update
Partnership with Washington Youth Academy for Blueberry Park Restoration
Open Air Gallery to open on February 23 at 3:00 PM on Washington Avenue
“Sweetheart Stampede” Daddy Daughter Dance on February 7 from 7:00 to 10:00 PM at
the Bremerton Elks Lodge, 4131 Pine Road
7 – COUNCIL MEMBER REPORTS
Jennifer Chamberlin will be re-activating the Stephenson Canyon Stewardship Group soon.
Denise Frey provided an overview of the Harrison Heights Subarea, which included the
opportunities for projects in the former Harrison hospital site and throughout District 2.
Christy Cammarata invited the community to join her District 3 contact list; provided a reminder to
arrange safe transportation to and from Superbowl gatherings; and featured 4th Street business
Fingers Duke for Seahawks apparel and local art.
Michael Goodnow welcomed new District 7 businesses: Lobster Dogs, 2711 6th Street and Hippie
Hut, 347 North Callow Avenue; and announced upcoming events: Cupid Chocolate Crawl &
Costume Contest on February 13 from 5:00 to 7:00 PM and the Charleston Business District’s
Monthly Meeting on February 17 at 6:00 PM at Eastern Wind Glass, 2604 Burwell.
Anna Mockler announced her next District 6 Town Hall on Monday, February 9 featuring Finance
Director Mike Riley from 5:00 to 6:30 PM in the Conference Room at the Public Works Oyster Bay
City Council Reg. Mtg. Minutes
Wednesday, February 4, 2026
Page 4 of 4
Facility; and public comments will be accepted on the proposed conversion of the former Premier
Rentals building at Kitsap Way and National Avenue to a gas station/convenience store.
Rick Tift provided an update on the Kitsap Lake Stormwater Retrofit Project.
President Rebelowski encouraged the community to continue sending comments via email, which
are reviewed and included in the meeting record; encouraged designated drivers during the
Superbowl; and announced that comments for Council’s consideration may be sent by the
Tuesday before each regular business meeting; and that the next Study Session will be on
Wednesday, February 11 beginning at 5:00 PM in the 6th Floor Council Conference Room.
8 – ADJOURNMENT OF CITY COUNCIL BUSINESS MEETING
With no further business, President Rebelowski adjourned the Council Meeting at 7:17 PM.
Prepared and Submitted by:
______________________________
CHRISTINE GRENIER
Legislative Assistant
APPROVED by the City Council on the 18th day of February, 2026.
________________________________________
JANE REBELOWSKI, City Council President
Attest:
________________________________________
ANGELA HOOVER, City Clerk
JR:AH:AW:CG
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: N/A
Minutes of Study Session – February 11,
2026
COUNCIL MEETING Date: February 11, 2026
Department: City Council
Presenter: Council President
Phone: (360) 473-5280
SUMMARY: The Minutes for the Study Session held on February 11, 2026 are attached.
ATTACHMENTS: Council Meeting Minutes
FISCAL IMPACTS (Include Budgeted Amount):
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Mo ve to approve the February 11, 2026 Study Session Minutes as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
3C
CITY COUNCIL STUDY SESSION MINUTES
Wednesday, February 11, 2026
A Study Session of the City Council of the City of Bremerton was called to order on Wednesday,
February 11, 2026 at 5:00 PM in Council Conference Room 603 located in the Norm Dicks
Government Center at 345 6th Street, with Council President Jane Rebelowski presiding. Other
Council Members present were Jennifer Chamberlin, Denise Frey, Christy Cammarta, Michael
Goodnow, Anna Mockler, and Rick Tift. Legislative Office Manager Anne Williams provided staff
support.
A. AGENDA BILL BRIEFINGS
1. Confirm Reappointment of Vanessa Acierto to BKAT Community Advisory Committee –
Public Access Manager Colleen Miko, to be placed on the February 18 Council Meeting on
the Consent Agenda.
2. 2026 Excess Workers’ Compensation Insurance Renewal with Safety National Casualty
Corporation – Risk Manager Specialist Melisa Folmer and City Attorney Kylie Finnell, to be
placed on the February 18 Council Meeting on the Consent Agenda.
3. Public Works Agreement for the Purchase of Playground Equipment from Buell
Recreation LLC for the Kitsap Lake Park Playground – Parks & Recreation Director Tim
Barker, to be placed on the February 18 Council Meeting on the Consent Agenda.
4. National Fitness Campaign Court Grant Application – Parks & Recreation Director Tim
Barker, to be placed on the February 18 Council Meeting on the Consent Agenda.
5. Utility Relocation Agreements for Site B and Site C with Kiewit for WSDOT Fish
Passage Project – Managing Engineer Bill Davis, updated Agenda Bill to be placed on the
February 18 Council Meeting on the Consent Agenda.
President Rebelowski called a break from 6:11 PM to 6:25 PM.
B. GENERAL COUNCIL BUSINESS
1. Discussion on Transportation Benefit District – Council President Jane Rebelowski and
Financial & Administrative Services Director Mike Riley
2. Continued Discussion on Public Comment and Public Recognition – Council President
Jane Rebelowski and City Attorney Kylie Finnell. Council will review resource materials from
the ACLU and MRSC, as well as examples of policies that other Cities have adopted.
Councilmembers were asked to be prepared to discuss their recommendations at the
February 25 Study Session.
3. Audit Committee Briefing (Last Meeting 2/2/26) – Chair Christy Cammarata shared there
will be a special meeting on February 17 at noon to wrap up one final audit report from 2025.
Going forward the 2026 meeting schedule will be every other month on the second Tuesday
at noon.
4. Public Safety Committee Briefing (Last Meeting 2/3/26) – Chair Michael Goodnow shared
the main topic at the last meeting was the proposed Fire Levy Lid Lift, which will be brought to
the February 25 Study Session for review.
5. Regional and Other Committee/Board Briefings – President Rebelowski provided an
update from the Kitsap 911 retreat. The top priority of the 2026 Board is to reduce the number
of directors, which currently sits at 13 on the BOD. The City is the third highest user of 911
services behind Kitsap County Sheriff, Regional Fire Districts, and all the rest of the cities total
13%. The City and County currently have three seats on the Board.
6. General Council Business (Only as necessary, as time allows) – was discussed, including
the updated Traffic Calming policy that was signed by the Mayor at the end of 2025.
City Council Study Session Minutes
Wednesday, February 11, 2026
Page 2 of 2
C. EXECUTIVE SESSION
At 7:30 PM, President Rebelowski announced the Council would meet for 15-Minutes to discuss
Potential Litigation as allowed under RCW 42.30.110 (1)(i). No action was anticipated.
At 7:45 PM, President Rebelowski called the meeting back to order.
D. ADJOURNMENT OF STUDY SESSION
With no further business, the Study Session was adjourned at 7:45 PM.
Prepared & submitted by:
_____________________________
ANNE WILLIAMS
Legislative Office Manager
APPROVED by the City Council on the 18th day of February, 2026.
JANE REBELOWSKI, Council President
ATTEST:
______________________________
ANGELA HOOVER, City Clerk
JR:AH:AW
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: February 11, 2026
Confirm Reappointment of Vanessa Acierto
to BKAT Community Advisory Committee
COUNCIL MEETING Date: February 18, 2026
Department: Bremerton Kitsap
Access Television
Presenter: Colleen Miko
Phone: (360) 473-5014
SUMMARY: The Mayor is seeking confirmation for the reappointment of Vanessa Acierto to BKAT
Community Advisory Committee as a City of Bremerton staff representative. The term expires
December 31, 2026. Vanessa has been serving on the Committee since late 2022.
ATTACHMENTS: Application for City Boards/Commissions/Committees
FISCAL IMPACTS (Include Budgeted Amount): None.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to confirm the reappointment of Vanessa Acierto to BKAT Community Advisory Committee as
City of Bremerton staff representative for the term expiring December 31, 2026.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
3D
Application for City Boards / Commissions / Committee
Date 1/13/2026
First Name Vanessa
Middle Name Field not completed.
Last Name Acierto
Home Phone
Address1
Address2 Field not completed.
City Silverdale
State WA
Zip 98383
Occupation Human Resources Analyst I
Employer City of Bremerton
Work Address1 345 6th Street
Work Address2 Field not completed.
City Bremerton
State WA
Zip 98311
Work Phone 3606890390
Fax Field not completed.
Email vanessa.acierto@ci.bremerton.wa.us
Education Bachelor of Arts in Political Science from University of
Washington, Seattle
Certificate in Business Administration, Foster School of
Business, University of Washington, Seattle
Local References Angela Hoover, 360-473-5323
I am interested in
serving:
Public Access Citizens Advisory Committee (Bremerton Kitsap
Access Television/BKAT)
Is this an application for
reappointment?
Yes
If yes, how many years
have you served on
this commission or
committee?
First appointed August 2022
How long have you
lived in Bremerton
over 25 years total (moved and came back)
Why are you applying
for this appointment?
I continue to be impressed by the hard work and dedication
BKAT Staff and BKAT members have for the programming
they put out and have been honored to be even a small part of
that. I hope to be reappointed and serve another term.
Which of your personal
and / or professional
interests prompted you
to apply for this
appointment?
I like the idea of BKAT bridging the gap between area citizens
and those at City Hall and all the City Staff in the communities
BKAT covers.
Have you ever served
on any other Bremerton
board, commission,
committee or task
force? If yes, please
list.
I served as the staff person for City Council's Public Safety
Committee for over 2 years.
Please list your
qualifications for this
appointment (include
skills, activities,
training, education):
The classes I took to earn my Certificate in Business
Administration provided me with much training that could be
very useful serving on this advisory committee. I learned about
interpersonal communication, negotiation, project
management, budgeting and accounting for businesses,
advertising and communicating with a broad audience through
various forms of media. My Political Science degree has taught
me effective writing skills, critical thinking skills, an ability to
always see both sides of an issue, and the appreciation of the
difference even just one person can make in society. I've spent
over 15 years working in the legal field where I've learned to
have compassion, patience, and attention to detail. I've worked
with many different types of people from varying
socioeconomic backgrounds which will help me keep an open
mind and be particularly inclusive on this committee. Of course,
now that I've had a chance to serve on the Committee, I have
that experience to help me as well.
What are your
community interests
(committee,
organizations, special
activities)?
I am very open in my interests! I like the idea of helping BKAT
target younger community members in order to grow support
early from them and hopefully, gain some lifelong supporters.
I have spent the last two year acting with various community
theaters in Kitsap County, which takes quite a bit of my time. I
also enjoy attending events around town, such as Story Night
and Bremerton First Fridays.
Please list any
accommodations you
need to perform
volunteer duties:
N/A
We welcome your willingness to serve Bremerton.
Pursuant to the Washington Public Disclosure Act, (RCW 42.56), this form
constitutes a public record and is subject to public release upon request. Prior to
release, the following information may be redacted pursuant to RCW 42.56.250(3):
Residential addresses, residential telephone numbers, personal wireless telephone
numbers, personal electronic mail addresses, social security numbers, driver’s
license numbers, identicard numbers, and emergency contact information of
employees or volunteers of a public agency, and the names, dates of birth,
residential addresses, residential telephone numbers, personal wireless telephone
numbers, personal electronic mail addresses, social security numbers, and
emergency contact information of dependents of employees or volunteers of a
public agency.
Applicants are considered for appointment without regard to race, color, religion,
gender, national origin, sexual orientation, age, genetic information, marital or
veteran status, or the presence of any disability.
Updated 3/24/2020
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: February 11, 2026
2026 Excess Workers’ Compensation
Insurance Renewal with Safety National
Casualty Corporation
COUNCIL MEETING Date: February 18, 2026
Department: City Attorney’s Office /
Risk Management
Presenter: Kylie Finnell / Melisa
Folmer
Phone: (360) 473-5302
SUMMARY: The Bremerton Municipal Code authorizes the Risk Management Specialist, with the
approval of the City Attorney, to bind insurance and requires City Council approval for the
continuation of any bound coverage that exceeds an annual premium of $25,000. Excess Workers’
Compensation for 2026 has been bound with Safety National Casualty Corporation at an annual
premium of $158,312. The self-insured retention (“SIR”) for first responders is $1,000,000 and for all
other employees $500,000. There are no changes in retentions or policy forms from last year.
ATTACHMENTS: Aon’s Details of Coverage / Policy Term / Premium
FISCAL IMPACTS (Include Budgeted Amount): Sufficient funds have been budgeted in the Risk
Management Fund for this expenditure for 2026.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the purchase of the 2026 Excess Workers’ Compensation Insurance with Safety
National Casualty Corporation in the amount of $158,312.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
3E
Proprietary & Confidential
Details of Coverage / Policy Term / Premium
6
Expiring Program
2025-26
Renewal Program
2026-27
Insurance Company Safety National Casualty Corporation
A.M. Best's Rating AA++ XV
Exposure and Rate
Work Hours 678,031 713,116
Rate Worker Hours 0.222 0.222
Premiums
Deposit $150,523 $158,312
TRIA Included Included
Limit Each Accident
Workers' Compensation Statutory Statutory
Employers Liability $1,000,000 $1,000,000
Retentions
Each Occurrence Except $500,000 $500,000
Police, Firefighters and Volunteer Law Officers $1,000,000 $1,000,000
Endorsements (Not Limited too)
1) Voluntary Compensation X X
2) Terrorism Risk Insurance Program Reauthorization Act X X
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: February 11, 2026
Public Works Agreement for the Purchase of
Playground Equipment from Buell
Recreation LLC for the Kitsap Lake Park
Playground
COUNCIL MEETING Date: February 18, 2026
Department: Parks & Recreation
Presenter: Tim Barker
Phone: (360) 473-5428
SUMMARY: This project will install a new accessible playground at Kitsap Lake Park. The
playground equipment was selected through public feedback collected via a survey, and the
Commission approved the final design on January 27th.
The equipment pricing has been competitively solicited and publicly awarded through the Sourcewell
Cooperative Purchasing Agreement. The Total Project Cost: $192,211.66 includes equipment, safety
surfacing, installation, ADA ramp, freight, and sales tax.
ATTACHMENTS: 1) Public Works Agreement; 2) Buell Recreation LLC Quote #G25-0579A; 3)
Playground Design Drawings
FISCAL IMPACTS (Include Budgeted Amount): The playground equipment ($192,211.66) is
funded through a $311,370 Department of Commerce grant.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the Public Works Agreement for the purchase and installation of playground
equipment from Buell Recreation LLC in the amount of $192,211.66, sales tax included; and
authorize the Mayor to finalize and execute the agreement with substantially the same terms and
conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
3F
Public Works Agreement (short form)
Rev. 04/2023
PUBLIC WORKS AGREEMENT
THIS AGREEMENT is entered into between the City of Bremerton, a Washington
Municipal Corporation (“City”), and Buell Recreation LLC (“Contractor”), whose mailing
address is 7327 SW Barnes Rd. #601, Portland, OR 97225.
The parties agree as follows:
1. CONTRACTOR SERVICES. The Contractor shall perform the following
services for the City:
Playground equipment
Layout, mark, and dig all holes required for the installation of play equipment
Install posts and platforms per the manufacturer’s specifications
Supervise play equipment installation and assembly during the Community Build Day
as identified in quotation ##G25-0579A, attached hereto as Attachment A, which is
incorporated herein.
Install new ADA ramp per specs in new location to fit use zones of play equipment
Certified Engineered Wood Fiber Surfacing – Blow In
2. TIME OF COMPLETION. Contractor shall complete the work within 90
calendar days from the date of issuance of the City’s Notice to Proceed.
3. COMPENSATION. The City shall pay the Contractor the total amount of
$192,211.66, which includes Washington State Sales Tax, for the work and services
contemplated in this agreement. The City shall pay the Contractor ninety percent (90%) of the
Contract amount upon completion and acceptance of the work by the City, and the remainder
upon fulfillment of the conditions listed below and throughout this agreement.
A. No Performance Bond. Because this contract including applicable sales
tax is $150,000 or less, and pursuant to Chapter 39.08 RCW, the
Contractor, in lieu of providing the City a performance bond, has elected
to have the City retain the final ten percent (10%) of the Contract amount
for a period of thirty (30) days after the date of final accep tance, or until
receipt of all necessary releases from the State Department of Revenue
and the State Department of Labor & Industries and until settlement of any
liens filed under Chapter 60.28 RCW, whichever is later.
B. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work.
Defective or unauthorized work includes, without limitation: work and
materials that do not conform to the requirements of this agreement; and
extra work and materials furnished without the City’s written approval. If
Contractor is unable, for any reason, to satisfactorily complete any portion
of the work, the City may complete the work by contract or otherwise, and
Public Works Agreement (short form)
Rev. 04/2023
Contractor shall be liable to the City for any additional costs incurred by
the City. “Additional costs” shall mean all reasonable costs, including
legal costs and attorney fees, incurred by the City beyond the maximum
Contract price specified above. The City further reserves its right to
deduct the cost to complete the Contract work, including any Additional
Costs, from any and all amounts due or to become due the Contractor.
C.. Final Payment: Waiver of Claims. THE MAKING OF FINAL
PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL
PRECLUDE ALL CLAIMS, EXCEPT THOSE PREVIOUSLY AND
PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS
UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS
MADE.
4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times
acting as an independent contractor and not as an employee of the City. The Contractor shall
secure at its expense, and shall be responsible for all payments of income tax, social security,
state disability insurance compensation, unemployment compensation, and all other payroll
deductions for the Contractor, officer, agents, employees and sub-contractors. The Contractor
shall also secure all applicable business licenses, if required, in connection with the contract
services, including all required licenses for Contractor's officers, agents, employees and sub-
contractors.
5. TERMINATION. The City may terminate this agreement for good cause.
“Good cause” shall include, without limitation, any one or more of the following events:
A. The Contractor’s refusal or failure to supply a sufficient number of
properly skilled workers or proper materials for completion of the
Contract work.
B. The Contractor’s failure to complete the work within the time specified in
this agreement.
C. The Contractor’s failure to make full and prompt payment to sub-
contractors or for material or labor.
D. The Contractor’s persistent disregard of federal, state or local laws, rules
or regulations.
E. The Contractor’s filing for bankruptcy or becoming adjudged bankrupt.
If the City terminates this agreement for good cause, the Contractor shall not receive any
further monies due under this agreement until the Contract work is completed.
6. PREVAILING WAGES. Contractor shall file a “Statement of Intent to Pay
Prevailing Wages” with the State of Washington Department of Labor & Industries prior to
Public Works Agreement (short form)
Rev. 04/2023
commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter
39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate
provisions. Contractor will be required to pay Federal, Davis-Bacon Wage Rates current on
the bid opening date. The Davis-Bacon wage rates are available at the US Department of Labor
website.
7. CHANGES. The City may issue a written work change directive for any change
in the Contract work during the performance of this agreement. If the Contractor determines, for
any reason, that a change order is necessary, Contractor must submit a written change order
request to the City’s project manager within two (2) business days of the date the Contractor
knew or should have known of the facts and events giving rise to the requested change. If the
City determines that the change increases or decreases the Contractor’s costs or time for
performance, the City will make an equitable adjustment. The City will attempt, in good faith, to
reach agreement with the Contractor on all equitable adjustments. However, if the parties are
unable to agree, the City will determine the equitable adjustment as it deems appropriate. The
Contractor shall proceed with the change order work upon receiving a written work change
directive or change order from the City. If the Contractor fails to require a change order within
the time allowed, the Contractor waives its right to make any claim or submit subsequent change
order requests for that portion of the contract work. If the Contractor disagrees with the
equitable adjustment the Contractor must complete the change order work; however, the
Contractor may elect to protest the adjustment as provided below:
A. Procedure and Protest by the Contractor. If the Contractor disagrees with
anything required by a work change directive or change order, including
any direction, instruction, interpretation, or determination by the City, the
Contractor shall:
1. Immediately give a signed written notice of protest to the City;
2. Supplement the written protest within fourteen (14) calendar days
with a written statement that provides the following information:
a. The date of the Contract’s protest.
b. The nature and circumstances that caused the protest.
c. The provisions in this agreement that support the protest.
d. The estimated dollar cost, if any, of the protested work and
how that estimate was determined.
e. An analysis of the progress schedule showing the schedule
change or disruption if the Contractor is asserting a
schedule change or disruption.
The Contractor shall keep complete records of extra costs and time
incurred as a result of the protested work. The City shall have
access to any of the Contractor’s records needed for evaluating the
protest.
Public Works Agreement (short form)
Rev. 04/2023
3. The City will evaluate all protests, provided the procedures in this
section are followed. If the City determines that a protest is valid,
the City will adjust payment for work or time by an equitable
adjustment. No adjustment will be made for an invalid protest.
B. Contractor’s Duty to Complete Protested Work. In spite of any protest,
the Contractor shall proceed promptly with the work as the City has
ordered.
C. Contractor’s Acceptance of Changes. The Contractor accepts all
requirements of a change order by: (1) endorsing it, (2) writing a separate
acceptance, or (3) not protesting in the way this section provides. A
change order that is accepted by Contractor as provided in this section
shall constitute full payment and final settlement of all claims for contract
time and for direct, indirect and consequential costs, including costs of
delays related to any work, either covered or affected by the change.
D. Failure to Protest Constitutes Waiver. By not protesting as this section
provides, the Contractor also waives any additional entitlement and
accepts from the City any written order (including directions, instructions,
interpretations, and determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the
procedures of this section, the Contractor completely waives any claims
for protested work and accepts form the City any written order (including
directions, instructions, interpretations, and determination).
F. Liens. In the event that there are any liens on file against the City of
Bremerton, the City of Bremerton shall be entitled to withhold final or
progress payments to the extent deemed necessary by the City of
Bremerton to properly protect the outstanding lien claimants until proper
releases have been filed with the City Clerk
8. CLAIMS. The Contractor shall give written notice to the City of all claims other
than change orders within fourteen (14) calendar days of the occurrence of the events giving rise
to the claims. Any claim for damages, additional payment for any reason, or extension of time,
whether under this agreement or otherwise, shall be conclusively deemed to have been waived
by the Contractor unless a timely written claim is made in strict accordance with the applicable
provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim
is set forth in detail in writing and received by the City within seven (7) calendar days from the
date Contractor knew, or should have known, of the facts giving rise to the claim. At a
minimum, a Contractor’s written claim must include the information set forth regarding protests
in Section 7.A.2.a.-e.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS
Public Works Agreement (short form)
Rev. 04/2023
ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM
OR CAUSED BY THAT DELAY.
Contractor must, in any event, file any claim or bring any suit arising from or connected
with this agreement within 120 calendar days from the date the contract work is complete.
9. WARRANTY. The Contractor shall correct all defects in workmanship and
materials within one year from the date of the City’s acceptance of the Contract work. When
defects are corrected, the warranty for that portion of the work shall extend for one year from the
date such correction is completed and accepted by the City. The Contractor shall begin to
correct any defects within seven (7) calendar days of its receipt of notice from the City of the
defect. If the Contractor does not accomplish the corrections within a reasonable time, the City
may complete the corrections and the Contractor shall pay all costs incurred by the City in order
to accomplish the correction.
10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officer, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits including all legal costs and attorney fees, arising out of or in connection
with the performance of this agreement, except for injuries and damages caused by the City’s
sole negligence.
The City’s inspection or acceptance of any of Contractor’s work when c ompleted shall
not be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor and
the City, its officials, employees, agents and volunteers, the Contractor’s liability hereunder shall
be only to the extent of the Contractor’s negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
INDEMNIFICATION CONSTITUTES THE CONTRACTOR’S WAIVER OF IMMUNITY
UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF
THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE
MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this
agreement.
11. INSURANCE. The Contractor shall procure and maintain for the duration of this
agreement insurance of the types and in the amounts described below against claims for injuries
to persons or damage to property which may arise from or in connection with the performance of
the work by the Contractor, its agents, representative, employees, sub-consultants or sub-
contractors.
Public Works Agreement (short form)
Rev. 04/2023
Before beginning work on the project described in this agreement, the Contractor shall
provide a Certificate of Insurance evidencing:
A. Automobile Liability insurance with limits no less than $1,000,000
combined single limit per accident for bodily injury and property damage;
and
B. Commercial General Liability insurance written on an occurrence basis
with limits no less than $1,000,000 combined single limit per occurrence
and $2,000,000 general aggregate for personal injury, bodily injury and
property damage. Coverage shall include but not be limited to: blanket
contractual; products/completed operations/broad form property damage;
explosion, collapse and underground (XCU); and
C. Excess Liability insurance with limits not less than $1,000,000 per
occurrence and aggregate; and
B. Workers Compensation insurance as statutorily required by the Industrial
Insurance Act of the State of Washington, Title 51, Revised Code of
Washington and employer's liability with limits not less than $1,000,000.
Any payment of deductible or self-insured retention shall be the sole responsibility of
the Contractor.
The City, its officials, employees, agents and volunteers shall be named as an
additional insured on the insurance policy, as respects work performed by or on behalf of the
Contractor and a copy of the endorsement naming the City as additional insured shall be attached
to the Certificate of Insurance.
The Contractor’s insurance shall contain a clause stating that coverage shall apply
separately to each insured against whom claim is made or suit is brought, except with respects to
the limits of the insurer’s liability.
The Consultant's insurance shall be primary and non-contributory insurance as respects
the City and shall contain a waiver of subrogation against the City for claims arising out of any
operations, liabilities and obligations to which coverage applies. It shall be an affirmative
obligation upon Consultant to advise the City’s Risk Manager by fax at (360) 473-5161, or by
certified mail, return receipt requested to City of Bremerton, attn: Risk Management, 345 6 th
Street, Suite 100, Bremerton, WA 98337 within two days of the cancellation, suspension or
substantive change of any insurance policy set out herein, and failure to do so shall be construed
to be a breach of this Agreement.
The City reserves the right to receive a certified copy of all the required insurance
policies. In the event that the Contractor employs other contractors (sub-contractors) as part of
the work covered by this Agreement, it shall be the Contractor’s responsibility to require and
confirm that each sub-contractor meets the minimum insurance requirements specified above.
Public Works Agreement (short form)
Rev. 04/2023
The Contractor shall, upon demand of the City, deliver to the City copies of such policy or
policies of insurance and the receipts for payment of premiums thereon.
12. MISCELLANEOUS.
A. Equal Employment Opportunity Statement. In the hiring of employees for
the performance of work under this Agreement, the Contractor, its subcontractors, or any person
acting on behalf of Contractor shall not discriminate in any employment practice on the basis of
age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital
status, military status, or the presence of any physical, mental or sensory disability.
B. ADA Statement. The City of Bremerton does not discriminate on the
basis of disability in programs and activities, which it operates pursuant to the requirements of
the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to
both employment and admission to participation in the programs, services and activities of the
City of Bremerton. Reasonable accommodation for employees or applicants for employment
will be provided.
C. Compliance with Laws. Contractor shall comply with all federal, state
and local laws, rules and regulations throughout every aspect in the performance of this
agreement.
D. Work Performed at Contractor’s Risk. Contractor shall take all
precautions necessary and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of this agreement. All work shall be done at Contractor’s own
risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other
articles used or held for use in connection with the work.
E. Nonwaiver of Breach. The failure of the City to insist upon strict
performance of any of the terms and rights contained herein, or to exercise any option herein
conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of
those terms and rights and they shall remain in full force and effect
F. Governing Law. This agreement shall be governed and construed in
accordance with the laws of the State of Washington. If any dispute arises between the City and
Contractor under any of the provisions of this agreement, resolution of that dispute shall be
available only through the jurisdiction, venue and rules of the Kitsap County Superior Court,
Kitsap County, Washington.
G. Attorney’s Fees. To the extent not inconsistent with RCW 39.04.240, in
any claim or lawsuit for damages arising from the parties’ performance of this agreement, each
party shall be responsible for payment of its own legal costs and attorney’s fees incurred in
defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the
City’s right to indemnification under Section 10 of this agreement.
H. Written Notice. All communications regarding this agreement shall be
sent to the parties at the addresses listed on the signature page of this agreement, unless
Public Works Agreement (short form)
Rev. 04/2023
otherwise notified. Any written notice shall become effective upon delivery, but in any event
three (3) calendar days after the date of mailing by registered o r certified mail, and shall be
deemed sufficiently given if sent to the addressee at the address stated on this agreement.
I. Assignment. Any assignment of this agreement by the Contractor without
the written consent of the City shall be void.
J. Modification. No waiver, alteration, or modification of any of the
provisions of this agreement shall be binding unless in writing and signed by a duly authorized
representative of the City and Contractor.
K. Severability. If any one or more sections, sub-sections, or sentences of
this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity
of the remaining portion of this agreement and the remainder shall remain in full force and
effect.
L. Entire Agreement. The written provisions and terms of this agreement,
together with any attached Exhibits, supersede all prior verbal statements by any representative
of the City, and those statements shall not be construed as forming a part of or altering in any
manner this agreement. This agreement and any attached Exhibits contain the entire agreement
between the parties. Should any language in any Exhibit to this agreement conflict with any
language contained in this agreement, the terms of this agreement shall prevail.
M. Mutually Bound. Contractor and Subcontractor are mutually bound by
the terms of this agreement. Terms of this agreement will apply to the work of any subcontractor.
The Contractor shall assume toward the subcontractor all obligations and responsibilities the
Owner, under this agreement, assumes toward the Contractor, and the Subcontractor shall
assume toward the Contractor all obligations and responsibilities which the Contractor, under
this agreement, assumes towards the Owner.
N. Suspension & Debarment. For contracts involving Washington State and
Federal funding, Contractor hereby certifies, by signing this agreement, that neither it nor its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any State or Federal department or
agency. Contractor shall provide immediate written notice to the City if at any time it learns that
it is or has become ineligible for certification. Should Contractor enter into a covered transaction
with another firm, Contractor agrees by signing this agreement that it will verify that the firm
with whom it intends to do business is not debarred, suspended, ineligible, excluded or
disqualified.
O. Solicitation of Minority Business. Per RCW 35.22.650, Contractor agrees
that the contractor shall actively solicit the employment of minority group members. Contractor
further agrees that the contractor shall actively solicit bids for the subcontracting of goods or
services from qualified minority businesses. Contractor shall furnish evidence of the contractor's
compliance with these requirements of minority employment and solicitation. Contractor further
agrees to consider the grant of subcontracts to said minority bidders on the basis of substantially
Public Works Agreement (short form)
Rev. 04/2023
equal proposals in the light most favorable to said minority businesses. The contractor shall be
required to submit evidence of compliance with this section as part of the bid.
IN WITNESS WHEREOF, the parties below have executed this agreement.
CONTRACTOR THE CITY OF BREMERTON
Print Name: Print Name:
Title: Title:
DATE DATE
Notices to be sent to: Notices to be sent to:
CONTRACTOR: CITY OF BREMERTON:
Attn: Ryan Bittner, CFO Attn: Tim Barker
Buell Recreation LLC City of Bremerton
7327 SW Barnes Rd. #601 345 6th Street, Suite 100
Portland, OR 97225 Bremerton, WA 98337
(360)
(360) (facsimile)
APPROVED AS TO FORM:
Kylie J. Finnell
Bremerton City Attorney
ATTEST:
Angela Hoover, City Clerk
R:\Legal\Legal\Forms\FORMS ON COBWEB\Public Works Agreement (short form) Rev. 04 2023.doc
Fax: 866-597-0033 | 1-800-266-1250 | 1-800-266-1250
Buell Recreation LLC
7327 SW Barnes Rd #601
Portland, OR 97225 USA
+15039221650
admin@buellrecreation.com
Quote
ADDRESS
Bremerton Parks & Recreation
680 Lebo Blvd
Bremerton, WA 98310
SHIP TO
Kitsap Lake Park
1978 Price Rd NW
Bremerton, WA, 98312
QUOTE #DATE EXPIRATION DATE
G26-0054 01/28/2026 02/27/2026
PROJECT SALES REPRESENTATIVE
Kitsap Lake Park- Option C2 Rachel Gora
ACTIVITY QTY RATE AMOUNT
Play Structure
BCI Burke Structure per proposal #907-207726-7
1 116,801.00 116,801.00T
Sourcewell Discount
Sourcewell Contract Discount per Contract #010521-BUR
1 -17,520.15 -17,520.15T
Discount
Special Pricing Discount
1 -11,417.85 -11,417.85T
Freight
Shipping
1 7,750.00 7,750.00T
Supervised Install
Layout equipment per Proposal 907-207726-7, and install posts
and platforms (does not include attaching slides). Includes
offloading equipment if arrives at same time as installation and
disposal of spoils/trash offsite.
Supervised install $4,000/day - for City to install panels and
attachments. If not done after one day can extend for additional, or
they can continue on their own. Does not include any installation
warranty on the portions installed by others. City will need to
provide their own tools. Does not include any additional labor
after posts and platform installation. (One day is included in the
total)
Install new ADA ramp per specs in new location to fit use zones
of playground equipment. ***Excludes demo of existing ADA
ramp***
Prevailing Wages
1 67,067.00 67,067.00T
EWF
144 CY Certified Engineered Wood Fiber Surfacing- Blown- In
Note: Freight is calculated based on one truckload required.
Depending on the maximum EWF weight, loads may be shortened
or additional freight costs may be required due to potential wet
weather impacting the EWF weight.
1 13,338.00 13,338.00T
Buell Billing 1 0.00 0.00
Fax: 866-597-0033 | 1-800-266-1250 | 1-800-266-1250
ACTIVITY QTY RATE AMOUNT
Please make Purchase Order to Buell Recreation and email to your
representative or sales@buellrecreation.com. Acceptance of this
proposal indicates your agreement to the terms and conditions
stated herein.
Please provide the following with your signed quote/purchase
order:
-Payment per terms if required
-Color selections
-Shipping Address
-Site Contact Name and Phone Number
-Any Other Key information requested
Terms Govt.
Govt. Purchase Order with payment due 30 days from product
shipment and services such as installations due upon completion.
Equipment may be invoiced separately from other services and are
payable in advance of project/supply or completion. No retainage.
1 0.00 0.00
Lead Time
Lead Time is approx. 4-5 weeks from receipt of your completed
order and payment (if required).
Lead times can fluctuate so please inquire upon time of ordering.
We are making every effort to increase our capacity and improve
our lead times.
1 0.00 0.00
Bond
Performance Bond is not included- if required add 3% to the
overall bid.
1 0.00 0.00
Sourcewell Contract
Sourcewell Publicly Solicited Contract #: 010521-BUR
Bremerton Member ID#: 20107
https://www.sourcewell-mn.gov/
1 0.00 0.00
PLACING AN ORDER: Upon ordering please review and return this signed quote
with a copy of your purchase order and tax exempt certificate, if applicable. Please
mark any changes on the quote such as billing/shipping address, drivers contact and
color selection. IF INSTALLATION IS INCLUDED: This quote does not include
Prevailing Wages, Davis Bacon Wages or Performance Bonds unless noted. Owner is
responsible for site preparation unless otherwise noted.
SUBTOTAL 176,018.00
TAX (9.2%) 16,193.66
TOTAL $192,211.66
Accepted By Accepted Date
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: February 11, 2026
National Fitness Campaign Court Grant
Application
COUNCIL MEETING Date: February 18, 2026
Department: Parks & Recreation
Presenter: T. Barker
Phone: (360) 473-5428
SUMMARY: The Parks & Recreation Department is requesting support to apply for a grant to
provide partial funding for the development and installation of a fitness court at Evergreen Rotary
Park. Outreach and feedback from the PROS plan showed a desire for more fitness-related amenities
within our park system. This product provides the ability for residents to utilize free fitness equipment along
a busy pathway within the community. The space also allows the ability for various types of classes to be
programmed on the second half of the court, such as tai chi, yoga, or similar. Applying for the grant does
not lock the city into purchasing the equipment if awarded.
ATTACHMENTS: 1) NFC Health Impact Fact Sheet; 2) NFC 2026 Muni Briefing Deck; 3) NFC
Funding Slide
FISCAL IMPACTS (Include Budgeted Amount): The grant is for $40,000 towards the purchase and
installation of the court. Additional fundraising will occur through donations, sponsorships and/or
offset by the Parks Capital fund. No general fund tax support is being requested currently. Full
buildout cost ranges between $200,000-$275,000 depending on amenities, the exact design is yet to
be determined.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the National Fitness Campaign Grant Application; and authorize the Parks and
Recreation Director to finalize and submit the application with substantially the same terms and
conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
3G
National Fitness Campaign Partnership
Health Impact Fact Sheet
1. Physical Activity & Preventable Disease
● Physical inactivity is linked to at least 35 chronic conditions — including heart
disease, type 2 diabetes, hypertension, breast and colon cancer, depression, and
cognitive decline.¹
● In the United States, insufficient physical activity contributes to ~110,000 premature
deaths annually and roughly $117 billion in avoidable health‑care costs each year.²
● Increasing moderate-to-vigorous activity by just 10 minutes per day could prevent more
than 100,000 deaths annually.³
● One U.S. analysis estimated that 1.1 million cardiovascular disease cases and
$5.4 billion in direct medical expenditures were associated with inactivity.⁴
Sources:
1. Booth et al., Prog Cardiovasc Dis (2017) 64(1): 12‑27 PubMed 28814614
2. CDC, “Physical Activity: Key Facts,” 2023 (cdc.gov)
3. Saint‑Maurice et al., JAMA Intern Med (2022) 182(3): 231‑238 (dceg.cancer.gov)
4. Pratt et al., Med Sci Sports Exerc (2000) 32(9 Suppl): S605‑S615 PubMed 15454355
2. Quality of Life, Mental Health & Activity
● A meta‑analysis found that adults meeting recommended physical activity levels had
~25% lower risk of depression compared to those who were inactive; even at about
half those activity levels the risk reduction was ~18%.⁵
● Regular physical activity significantly reduces the risk of anxiety: a meta-analysis across
11 cohorts found increasing physical activity was associated with up to 16% lower risk
of anxiety, with stronger reductions (~49%) in certain sub‑groups.⁶
Older adults engaging in higher levels of physical activity can gain an additional
6.3 years of healthy life (good self‑rated health) and 2.9 years without chronic
disease between ages 50‑75, compared with inactive peers.⁷
A study of seniors found that those who were more physically active enjoyed years of
self‑reported good health and years without difficulty in daily activities, compared
to sedentary older adults.⁸
Sources:
5. Systematic review/meta‑analysis on physical activity & depression: PMC 9008579
6. Meta-analysis on physical activity & anxiety: PubMed 40534999
7. Older adults: additional years of healthy life (OUP Academic) (academic.oup.com)
8. Seniors’ quality of life and daily function (PMC) (PMC 3978479)
National Fitness Campaign Partnership
Health Impact Fact Sheet
3. Built Environment & Behavior / Culture
● Built environments that encourage walking and social interaction promote social
cohesion and emotional well‑being, reinforcing mental‑health resilience across
communities.⁹
● A strong body of evidence shows that walkability, mixed land use, safe streets, and
access to green/open space are positively correlated with physical activity and lower
obesity rates.¹⁰
● In U.S. cities, each 10 % increase in land‑use mix is associated with a 25 % lower
prevalence of overweight and obesity among adults aged 50‑75.¹¹
● A review of 169 empirical studies found that nearly 90 % reported beneficial
relationships between built-environment features (parks, trails, sidewalks, connectivity)
and activity or weight outcomes.¹²
● Multiple longitudinal and intervention-based studies now show that intentionally
modifying the built environment (e.g., creating walkable routes, adding exercise facilities,
improving destination accessibility) leads to measurable increases in physical
activity, providing strong proof that built environments do change behavior.¹³
Sources:
9. Coffee et al., Health Place (2013) 21: 163-169 PubMed 23501378
10. Sallis et al., Health Place (2012) 18(5): 795‑803 PubMed 28784183
11. Frank et al., Am J Prev Med (2008) 35(2): 114‑122 PubMed 18541175
12. Papas et al., Obesity Reviews (2007) 8(2): 115‑129 PubMed 22897546
13. Smith et al., Int J Behav Nutr Phys Act (2022) 19: 142 IJBNPA
NATIONAL FITNESS CAMPAIGNCAMPAIGN BRIEFING
Healthy Community this Year to welcome 1000 Healthy Communities by 2026
CELEBRATING 750TH NOW FUNDED
America’s Largest Public-Private Wellness Partnership
OUR MISSION : to Build Healthy Communities
USA
Switzerland
Japan
FranceIsrael
UK
Austria
85
75
80
70
$1,000 $5,000 $10,000
Life Expectancy vs Health Expenditure
TO MAKE WORLD CLASS FITNESS FREE
WHY WE DO IT
UNDERSTANDING THE PROBLEM
AMERICA IS FACING A HEALTH CRISIS CAUSED BY SEDENTARY LIFE-
STYLES AND CITIES DESIGNED FOR CARS. USA SPENDS MORE MONEY
THAN ANY OTHER ON HEALTHCARE WITH POOR RESULTS.
BECOMING THE SOLUTION
WHEN COMMUNITIES ARE DESIGNED TO SUPPORT WELL-
BEING, HEALTH OUTCOMES CHANGE!
BROUGHT TO YOU BY
MULTI-SITE FUNDING FOR HEALTH IMPACT
HEALTHY INFRASTRUCTURE PLANNING
PLANNING PHASING LAYOUTS PROJECTIONS SCORES MAPPING TRAILS
80%
HEALTHY
SITE SCORE
78%
HEALTHY
SITE SCORE
84%
HEALTHY
SITE SCORE
92%
HEALTHY
SITE SCORE
BUILDING HEALTHY COMMUNITIES
MULTI-SITE PHASING FOR HEALTH IMPACT
HEALTHY SITE SCORE (HSS)
STUDIO
A COMPREHENSIVE COMMUNITY
WELLNESS PROGRAM
WHAT WE DOCAMPAIGN OVERVIEW
AMBASSADOR
TRAINING
MOBILE APP
PUBLIC ART
LAUNCH &
PRESS
DESIGN &
PLANNING
GRANT
FUNDING
INSTALLATION
EXPERT
CONSULTING
STUDIO
HIIT YOGA ZUMBA DANCE STRETCH KICKBOXING TAI -CHI
OUTDOOR WELLNESS
CENTER CONFIGURATION:
FITNESS COURT®
STUDIO
COMMUNITY
WELLNESS
PROGRAMMING
WELCOMES ENTIRE
COMMUNITY
MAYORS
WELLNESS SERIES
COMMUNITY WELLNESS HUB
OUTDOOR WELLNESS CENTER
CONFIGURATION:
FITNESS
COURT®
CORE SQUAT PUSH LUNGE PULL AGILITY BEND
7 MOVEMENT
FULL BODY WORKOUT
FUNCTIONAL TRAINING SYSTEM
DIGITALLY ACTIVATED
Coach in your Pocket
WORLDS BEST OUTDOOR GYM
ART
EVERY FITNESS COURT IS A WORK OF ART
WORK WITH LOCAL ARTISTS
NFC DESIGN STUDIO
WORLD RENOWN ARTIST GALLERY
KEITH HARING | JEAN MICHEL BASQUIAT
Custom Art Work with the in-house NFC Art Studio Team
Fitness Court Art Unique design included in your state campaign
Fitness Court Art Offerings
Front Wall Unlocked for
Additional Artwork
Support your Local Artist Community with a $5,000 Grant
to the Artist provided by NFC!
Local Artist Invite a Local Artist to create a mural
that represents your community!
Additional Funding Required. Example Art: Will be customized for your city
Additional Funding Required. Example Art: Will be customized for your city
Example Art: to be confirmed at Award
EXTENDED
SEASONAL USE
UV & SUN
PROTECTION
INTEGRATED
DESIGN ENHANCED
AESTHETICS
MADE IN
USA
LONG LASTING
MATERIALS
FITNESS COURTS &
FITNESS COURT STUDIOS
NOW AVAILABLE FOR
SHADE
WORLDS BEST OUTDOOR GYM JUST GOT COOLERNEW!
NFCCAMPAIGN IMPACT
BUILDING HEALTHY COMMUNITIES 1.
2.
3.
4.
5.
BE A PART OF THE
NATIONAL FITNESS CAMPAIGN
AMERICA’S LARGEST PUBLIC PRIVATE
WELLNESS PARTNERSHIP
HEALTH BENEFITS
MORE TIME OUTDOORS, IMPROVED MENTAL &
PHYSICAL WELLBEING
HEALTHY INFRASTRUCTURE
PLACES DESIGNED FOR PEOPLE
NOT CARS
BUILDING COMMUNITY
CREATING A WELLNESS CULTURE THAT IS
SOCIAL, CONNECTED AND FUN!
REDUCED HEALTHCARE COSTS
HEALTHIER, HAPPIER, PEOPLE
WE’RE PLEASED TO ANNOUNCE THE 2026 CAMPAIGN
NATIONAL FITNESS CAMPAIGN
200 NEW PARTNERS
2026
STATEWIDE CAMPAIGN
JOIN THE CAMPAIGN
LEADERSHIP
SUPPORT
SITE
WITH IMPACT
FUNDING
MATCH
QUALIFY FOR
GRANT
STEP 1 STEP 3STEP 2 STEP 4
NFC Grant Requirements
Program Qualification
LEADERSHIP SUPPORT
SHARE 3 MINUTE VIDEO
BUILD CONSENSUS / CONFIRM FEASIBILITY
MUNICIPAL LEADER SUPPORT
STEP 1
92%
HEALTHY
SITE SCORE
88%
HEALTHY
SITE SCORE
90%
HEALTHY
SITE SCORE
97%
HEALTHY
SITE SCORE
STUDIO
SITES WITH IMPACT
Supported by NFC’s Expert Consulting
Services, Identify Site Locations that Meet
Criteria for Funding Qualification & Health
Impact
STEP 2
NFC HEALTHY SITE
SCORE
NATIONAL INDEX & DATASET
EXPERT CONSULTING FOR
LOCATING SUCCESSFUL
OUTDOOR WELLNESS HUBS
Participate in Virtual Workshop led by
NFC Expert Consultants to receive data &
qualification information regarding your public
spaces. See how your municipality or school
benchmarks vs national averages.
HEALTHY INFRASTRUCTURE PLANNING
• VISIBLE • CONNECTED • ACCESSIBLE •
HSS
HEALTHY
SITE SCORE
POWERED BY
FUNDING MATCH
NFC GUIDES FUNDING PLAN
STEP 3
GRANT FUNDING AVAILABLE:
$30,000-$60,000 PER SITE
LOCAL FUNDING REQUIREMENT
$160,000-$270,000
per site, pending program
configuration & installation method
QUALIFY FOR GRANT
SUBMIT GRANT
APPLICATION
A. PRE-APPLICATION PHASE
B. GRANT AWARD
C. BUILD/SITE PLAN
D. LAUNCH LOCAL CAMPAIGN
STEP 4
JOIN US
LET’S BUILD HEALTHY COMMUNITIES
TOGETHER
Discussion - Q&A
NEXT STEP
DISCUSSED AT NEXT STEP:
1. SITE WORKSHOP & HEALTHY SITE
SCORE REVIEW
2. FEASIBILITY & ALIGNMENT WITH
LOCAL PRIORITIES
3. FUNDING REQUIREMENT DETAILS AND
GRANT PROGRAM & AVAILABILITY FOR
YOUR STATE
4. NON-BINDING GRANT QUALIFICATION
PROCESS
SCHEDULE VIRTUAL SITE
REVIEW WORKSHOP LED BY
NFC EXPERT CONSULTANTS TO
EXPLORE FEASIBILITY
HSS
HEALTHY
SITE SCORE
TITLE TITLENATIONAL FITNESS CAMPAIGN
84%
HEALTHY
SITE SCORE
92%
HEALTHY
SITE SCORE
VISIBLE1Site locations must be
recognizable with high
visibility.
3 CONNECTED
Site locations must
be integrated with
pedestrian infrastructure.
2 ACTIVE
Site locations must be
heavily trafficked and
centrally located.
Design & Planning Consulting
Sites with Impact
QUALIFY SITE LOCATIONS FOR FUNDING
PLANNING PHASING SCORES MAPPING TRAILSPROJECTIONSLAYOUTS
STEP 2
2026 CAMPAIGN FUNDING REQUIREMENT
PHASE 1: NFC PROGRAM FUNDING
The Fitness Court® and National Campaign Services
NFC GRANT FUNDING AWARD (if selected and approved)
Optional Fitness Court® Additions: Art & Shade
• FITNESS COURT® & NATIONAL CAMPAIGN SERVICES
See GPR Milestone 2
PHASE 2: ASSEMBLY FUNDING
• CONCRETE SLAB (Slab Dimensions 38’x38’ - refer to drawings)
Can be performed in-house, in-kind or by contractor (separate agreement)
See GPR Milestone 5
• FITNESS COURT® ASSEMBLY
NFC Approved Network (separate agreement)
See GPR Milestone 6
Fitness Court® & Assembly Total Program Funding
Estimate After $30,000 Grant Funding (if selected and approved)
**Assumes concrete pad costs of $25,000 (national average) and includes Fitness Court® Art
$175,000
($30,000)
$145,000
est. $0-25,000
$30,000
with prevailing wage rates: $32,000
**$200,000
PHASE 1: NFC PROGRAM FUNDING
The Fitness Court® Studio and National Campaign Services
NFC GRANT FUNDING AWARD (if selected and approved)
Optional Fitness Court® Studio Additions: Art & Shade
• FITNESS COURT® STUDIO & NATIONAL CAMPAIGN SERVICES
See GPR Milestone 2
PHASE 2: ASSEMBLY FUNDING
• CONCRETE SLAB (Slab Dimensions 38’x73’ - refer to drawings)
Can be performed in-house, in-kind or by contractor (separate agreement)
See GPR Milestone 5
• FITNESS COURT® STUDIO ASSEMBLY
NFC Approved Network (separate agreement)
See GPR Milestone 6
Fitness Court® Studio & Assembly Total Program Funding
Estimate After $30,000 Grant Funding (if selected and approved)
**Assumes concrete pad costs of $45,000 (national average) and includes Fitness Court® Art
$210,000
($30,000)
$180,000
est. $0-45,000
$37,750
with prevailing wage rates: $39,750
**$262,750
Fitness Court® Art (included)Fitness Court® Art (included)Custom Art (+$10,000)Custom Art (+$10,000)Local Artist Program (+$25,000)Local Artist Program (+$25,000)Shade Structure*Shade Structure*
FITNESS COURT®
*funding requirements available upon request *funding requirements available upon requestNote: powder-coating color and included art design dependent on campaign sponsor Note: powder-coating color and included art design dependent on campaign sponsor
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: February 11, 2026
Utility Relocation Agreements for Site B and
Site C with Kiewit for WSDOT Fish Passage
Project
COUNCIL MEETING Date: February 18, 2026
Department: PW&U
Presenter: Bill Davis
Phone: (360) 473-2312
SUMMARY: The WSDOT Fish Passage Program removes barriers along state routes that prevent
salmon from migrating upstream. These barriers are oftentimes culverts, which are removed and
replaced with bridges. WSDOT has contracted with Kiewit Infrastructure West (Kiewit), a design-
build contractor, to design and construct fish barrier improvements at five sites along SR3 and SR 16
near Sinclair Inlet. Two of these sites, Site B and Site C, will require relocation of City water and
sewer utilities. Utility relocation agreements between the City and Kiewit for the design and
relocation of these utilities have been developed for each site. The work at Site C will be done in
2026 and at Site B in 2027. Currently these agreements include only design costs and will be
amended at a future time to include construction costs, which are still being developed. The Kiewit
design fee is $190,000 for Site B and $125,000 for Site C.
ATTACHMENTS: 1) Site Map; 2) Site B Utility Relocation Agreement; 3) Site C Utility Relocation
Agreement
FISCAL IMPACTS (Include Budgeted Amount): A 2026 project budget of $350,000 will be
established, which includes $315,000 for Kiewit design fees and $35,000 for City Engineering staff to
support the design effort. The budget will be allocated as $192,000 to the Water fund and $158,000
to the Wastewater fund. Construction fees will be determined at a later time.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to award the Site B and Site C Utility Relocation Agreements to Kiewit for $315,000; and authorize
the Mayor to finalize and execute the agreements with substantially the same terms and conditions as
presented; and further establish a 2026 project budget of $350,000.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
3H
Site CSite B
WSDOT FISH BARRIER PROJECT
SITES B AND C
This Utility Relocation Agreement (the Agreement) is made and entered into between Kiewit
Infrastructure West Co. (KIEWIT) and the above-named Utility (UTILITY), collectively the “Parties” and
individually the “Party.”
Recitals
1. The Washington State Department of Transportation (WSDOT) is planning an improvement along
______________________________________ which consists of the removal and replacement of
five existing culverts with fish passage structures (referred to as sites), per the project titled above;
and has contracted with KIEWIT to perform the necessary improvements (theexhib Project). The
project site included as part of this agreement is as follows:
Site ID WDFW Site ID US / SR Name County
Site A 990168 SR 3 Gorst Creek Kitsap County
Site B 991585 SR 3 / SR 16 UNT to Gorst Creek Kitsap County
Site C 991670 SR 16 Kabelac Creek Kitsap County
Site D 990270 SR 16 UNT to Ross Creek Kitsap County
Site E 15.0201 0.90 SR 166 Olney Creek Kitsap County
2. The WSDOT has granted an “Assignment/Delegation of Utility Permit/Franchise Rights and
Obligations” dated ______________ to KIEWIT regarding WSDOT Utility Permit/Franchise Numbers
below and as shown in Exhibit A.
Site
ID
WDFW Site
ID Utility Owner Franchise Number Included as part of
this Agreement
Site B 991585 City of Bremerton 30497 Yes
Site C 991670 City of Bremerton 30314 No
3. In connection therewith, it is necessary to design and remove and/or relocate and/or construct
certain UTILITY facilities (the Work) to facilitate the Project.
Utility Relocation Agreement No. 6 – Site B
SR 3/SR 16/SR 166, Gorst Vicinity – Remove Fish Barriers Project
(Contract No. 9920)
City of Bremerton
345 6th Street
Bremerton, WA 98337
City of Bremerton
City of Bremerton
Construction Responsibility:
City of Bremerton
Klijhn
Design Responsibility:
□ Type 1 □ Type 2
WSDOT #9920 RFP Utility Designation:
Cost Responsibility:
Utility Name & Address:
Contractors Name & Address:
SR 3/SR 16/SR 166
02/26/2024
Kiewit Infrastructure West Co.
33930 Weyerhaeuser Way, Suite 300
Federal Way, WA 98001
X
x
4. In order to facilitate the completion of the Work, KIEWIT will provide all materials, equipment,
labor, contract administration, and any other efforts required to perform the following for facilities
owned by UTILITY:
5. In order to facilitate the completion of the Work, UTILITY will provide all materials, equipment,
labor, contract administration, and any other efforts required to perform the following for facilities
owned by UTILITY:
6. As defined in the conformed Request for Proposals (RFP) of WSDOT Project 9920 dated October
November 26, 2024, the following Party is of the Type noted above and is entirely responsible for
the cost to complete all aspects of the work for UTILITY facilities:
7. Both KIEWIT and UTILITY will perform their respective duties in a timely manner so that the design
& construction is completed is completed for Site B to
The Final Relocation Agreement supersedes any and all versions of the Draft Utility Relocation
Agreement of the same Number, and between the same Parties for the same Project designated above.
Now, therefore, in consideration of the terms, conditions, covenants, and performances contained
herein, as well as the attached Exhibits which are incorporated and made a part hereof,
IT IS MUTUALLY AGREED AS FOLLOWS:
1. Plans and Special Provisions
1.1. Program Guide: The “Utility Relocation and Accommodation on Federal Aid Highway Projects”
shall determine and establish the definitions and applicable standards for this Agreement. By
this reference this document is adopted and made a part of this Agreement as if fully contained
herein.
1.2. Betterment: A betterment is an improvement to UTILITY facilities not required by code,
regulation, standard industry practice, or any other applicable regulation. If any of the Work
constitutes a betterment as defined in the “Utility Relocation and Accommodation on Federal
Aid Highway Projects”, the UTILITY is solely responsible for the costs of such improvement.
1.3. The Party performing the construction agrees to perform the work in accordance with:
□ The Plans identified in Exhibit B
□ The Special Provisions in Exhibit C (if applicable)
UTILITY agrees that is solely responsible for ensuring that all Plans and Special Provisions meet
UTILITY’s standards, codes, and regulations. In the event of a discrepancy between UTILITY’s
standards, codes, and regulations and those of WSDOT, those of UTILITY shall prevail unless it is
determined by WSDOT that this condition will present a hazard to the safety and comfort of
the traveling public.
□Design □Design Review □Protect in Place □Removal
□Relocation □Construction □Field Inspection □Betterments
□As-Built Survey □As-Built Review □Franchise/Permit Application/
□Permanent Material Supply for Construction Amendment
□Design □Design Review □Protect in Place □Removal
□Relocation □Construction □Field Inspection □Betterments
□As-Built Survey □As-Built Review □Franchise/Permit Application/
□Permanent Material Supply for Construction Amendment
□KIEWIT □UTILITY
x
x
x
x
x
x
x
x
x
x
x
x
x
2. Construction, Inspection, and Acceptance
2.1. UTILITY agrees to disconnect/reconnect and or deactivate/activate its facilities upon
reasonable notice to UTILITY as requested by KIEWIT when such action is required to be
performed by UTILITY. The Parties agree to define disconnect/reconnect and or
deactivate/activate requirements, including notification and response, in Exhibit C. UTILITY
facilities not removed pursuant to this Agreement shall remain the ownership, operation and
maintenance responsibility of UTILITY.
2.2. Salvage: All materials removed from UTILITY’s facilities shall become the property of UTILITY
and disposed of by UTILITY, unless otherwise specified in Exhibit C. Arrangements to salvage
certain materials for later usage by either Party shall be specified in Exhibit C.
2.3. If KIEWIT is to perform the Work, UTILITY shall furnish an inspector in a timely manner to
observe the Work and verify that all standards, codes, and regulations are being met as
described in Section 1.3. If UTILITY is to perform the Work, KIEWIT shall supply an inspector in a
timely manner to observe the Work and verify that all improvements are compatible with the
overall design, phasing, and construction of the Project.
2.4. The Party performing the construction agrees to promptly notify the other Party upon
completion of the Work.
2.5. If KIEWIT is performing the Work, UTILITY shall, within five (5) working days of being notified
that the Work is completed:
(a) deliver a letter of acceptance to WSDOT, or
(b) deliver to WSDOT written reasons why the Work does not comply with the
previously approved Plans and Special Provisions. UTILITY agrees to work diligently
and in good faith with KIEWIT to resolve any issues so as not to delay the Project. If
all issues are resolved, UTILITY agrees to deliver to WSDOT a letter of acceptance as
provided herein.
2.6. If UTILITY is performing the Work, KIEWIT shall, within five (5) working days of being notified
that the Work is completed:
(a) deliver a letter of acceptance to UTILITY, or
(b) deliver to UTILITY written reasons why the Work does not comply with the
previously approved Plans and Special Provisions. KIEWIT agrees to work diligently
and in good faith with UTILITY to resolve any issues so as not to delay the Project. If
all issues are resolved, KIEWIT agrees to deliver to UTILITY a letter of acceptance as
provided herein.
2.7. If either Party does not respond within five (5) working days as provided in Sections 2.5 and
2.6, the Work and the administration thereof will be deemed accepted by the other Party, and
the Party performing the Work shall be released from all future claims and demands except for
latent defects to the extent allowed by Washington Law.
2.8. Upon completion and acceptance of the Work pursuant to Sections 2.5, 2.6, or 2.7, to the
extent allowed by Washington law, UTILITY agrees that it shall be solely responsible for all
future ownership, operation, and maintenance costs of its facilities, without KIEWIT or WSDOT
liability or expense.
2.9. KIEWIT will prepare the final construction “as-built” survey and documentation in general
conformance with WSDOT’s Construction Manual. KIEWIT will maintain one set of plans as the
official “as-built” set, then make notations in red of all plan revisions typically recorded per
standard WSDOT practice, as directed by WSDOT’s Construction Manual. Once the approving
Party has accepted the Work per Section 2.5, 2.6, or 2.7, KIEWIT will provide one (1)
reproducible set of “as-builts” to UTILITY.
3. Payment
3.1. The Party identified in Recital 6 of this Agreement agrees that it shall be responsible for the
actual direct and related indirect costs of the efforts to perform the Work by the Party(ies)
identified in the following Recitals:
3.2. The total cost to achieve completion of the Work is estimated to be:
□ Unspecified
□ $190,000 (Design)
□ $______ (Construction) to be included in amended Utility Agreement
An itemized estimate of costs for the Work is:
□ Not included
□ Included in Exhibit D
□ To be included in the Final Utility Agreement
3.3. If monies are deemed to be due from one Party to the other as required by the terms of this
Agreement, the Party identified in Recital 6 of this Agreement agrees to pay the other Party the
actual cost for its participation in the completion of the Work for UTILITY. The Party identified
in Recital 6 shall make any payments due to the other Party within thirty (30) calendar days
after receiving request for payment.
3.4. Should the Party identified in Recital 6 of this Agreement fail to make payment to the other
Party according to the terms of this Agreement, the Party owed unpaid monies shall have the
right to terminate this Agreement after reasonable notice to the defaulting Party and an
opportunity to cure.
4. Change in Work or Cost Increase
4.1. Increase in Cost: In the event unforeseen conditions, not caused by the negligence or willful
misconduct of KIEWIT, WSDOT, its or their agents, or a third party, require an increase in the
cost of the Work as specified in Section 3.2, a change in the agreed total cost will:
□ Be paid One Hundred Percent (100%) by KIEWIT
□ Be paid One Hundred Percent (100%) by UTILITY
□ Be paid at a split cost as identified below:
KIEWIT: _______________ Percent (____%)
UTILITY: _______________ Percent (____%)
A change to the total cost of the Work identified in Section 3.2 will only be considered if the
actual cost to complete the Work is equal to or more than the following percentage over
the value identified in Section 3.2
□ _______________ Percent (____%)
□ Not Applicable
□KIEWIT □UTILITY
x
x
Recital 4 (KIEWIT) Recital 5 (UTILITY) x
x
x
4.2. If it is determined by the Party performing the Work that additional Work or a change in the
Work is required, prior written approval must be secured from the Party identified in Recital 6.
However, where the change is required to mitigate a Project emergency or safety threat to the
traveling public, the Party performing the Work may direct the change without the approval of
the Party identified in Recital 6. Proper notifications shall be made between both Parties of
such changes as soon as possible thereafter.
4.3. Regardless of the Party performing the Work, UTILITY may request additions to the Work in
writing. KIEWIT will review the request and accommodate the requested changes as elective
changes, provided that a change does not negatively impact WSDOT’s transportation system
and complies with the Standard Specifications, Project permits, state and/or federal law,
applicable rules and/or regulations, and/or WSDOT design policies, and does not unreasonably
delay critically scheduled Project contract activities. Costs to construct UTILITY facilities above
and beyond the cost required for the scope of the Work will be paid for solely by UTILITY,
regardless of the Party performing these additional activities.
5. Franchise of Permit
5.1. UTILITY shall apply for a new permit, franchise, or amendment to its current franchise for those
new or modified UTILITY facilities that will be located within WSDOT’s right of way. After
receiving the application, WSDOT will issue a new permit or a new or amended franchise, as
applicable.
6. Right of Entry/Permits
6.1. KIEWIT agrees to provide copies of its Right of Entry Permits and Temporary Construction
Easements with all privately owned lands, as requested by UTILITY. UTILITY may elect to
perform its Work within the limits and restrictions of KIEWIT temporary construction
easement.
If UTILITY does not elect to perform its Work within the limits of KIEWIT temporary
construction easements; UTILITY agrees to arrange for rights of entry upon all privately owned
lands upon which UTILTY has a claimed property rights and which are necessary to perform the
Work. UTILITY also agrees to obtain all necessary permissions for KIEWIT to perform the Work
on such lands, which may include reasonable use restrictions on those lands. UTILITY agrees to
provide the rights of entry and applicable permissions under this section to KIEWIT within ten
(10) calendar days of entering into this Agreement. Upon completion of the Work on such
lands, those rights of entry and permissions beyond the rights of entry and permissions granted
by the WSDOT permit or franchise shall terminate.
6.2. KIEWIT agrees to provide copies of applicable permits that it has received to perform the work
outside of this agreement, as requested. If applicable, UTILITY may elect to perform its Work
under KIEWIT permits with the understanding all permit restrictions and conditions are met. It
is the responsibility of the UTILITY to fully understand and comply with all KIEWIT permit
conditions and requirements, including; but not limited to, performing the work within the
identified boundaries and providing all necessary reports and documentation to support permit
requirements and provide to KIEWIT in a timely manner after completion of Work.
If UTILITY does not elect to perform its Work under KIEWIT permits; UTILITY agrees to obtain all
necessary permits to perform the Work. If UTILITY elects for KIEWIT to perform any of the
Work, UTILITY also agrees to obtain all necessary permit for KIEWIT to perform the Work.
UTILITY agrees to provide the applicable permits under this section to KIEWIT within ten (10)
calendar days of entering into this Agreement. Upon completion of the Work, those permits
beyond the permissions granted by the issuing agencies shall terminate.
7. General Provisions
7.1. Indemnification: To the extent authorized by law, UTILITY and KIEWIT shall indemnify and hold
harmless one another and their employees and/or officers from and shall process and defend
at its own expense any and all claims, demands, suits at law or equity, actions, penalties,
losses, damages (both to persons and/or property), or costs, of whatsoever kind or nature,
brought against the one Party arising out of, in connection with, or incident to the other Party’s
performance or failure to perform any aspect of this Agreement, provided, however, that if
such claims are caused by or result from the concurrent negligence of (a) UTILITY and (b)
KIEWIT, their respective employees and/or officers, or involves those actions covered by RCW
4.24.115, this indemnity provision shall be valid and enforceable only to the extent of the
negligence of UTILITY or KIEWIT, and provided further, that nothing herein shall require the
UTILITY or KIEWIT to hold harmless or defend the other or its employees and/or officers from
any claims arising from that Party’s sole negligence or that of its employees and/or officers.
The terms of this section shall survive the termination of this Agreement.
7.2. Disputes: If a dispute occurs between the UTILITY and KIEWIT at any time during the
prosecution of the Work, the Parties agree to negotiate at the management level to resolve
any issues. Should such negotiations fail to produce a satisfactory resolution, the Parties agree
to enter into arbitration and/or mediation before proceeding to any other legal remedy. Each
Party shall be responsible for its own fees and costs. The Parties agree to equally share the cost
of a mediator or arbiter.
7.3. Venue: In the event that either Party deems it necessary to institute legal action or proceedings
to enforce any right or obligation under this Agreement, the Parties hereto agree that any such
action or proceedings shall be brought in the State of Washington. Each Party shall be
responsible for its own attorney’s fees and costs.
7.4. Termination:
7.4.1. Unless otherwise provided herein, KIEWIT my terminate this Agreement upon thirty (30)
calendar days written notice to UTILITY.
7.4.2. KIEWIT acknowledges and agrees that should it terminate this Agreement, such
termination shall not relieve the Party identified in Recital 6 from its responsibility to
ultimately pay for the design, removal, relocation and/or construction of UTILITY
facilities so as not to delay or conflict with the Project.
7.5. Amendments: This Agreement may be amended by the mutual agreement of both Parties.
Such amendments or modifications shall not be binding unless put in writing and signed by
persons authorized to bind each of the Parties.
7.6. Independent Contractor: Both Parties shall be deemed independent contractors for all
purposes, and the employees of each Party and any of its contractors, subcontractors,
consultants, and the employees thereof, shall not in any manner be deemed to be the
employees of the other Party.
7.7. Audit and Records: During the progress of the Work and for a period of not less than six (6)
years from the date of final payment, both Parties shall maintain the records and accounts
pertaining to the Work and shall make them available upon reasonable notice during normal
business hours and as often as necessary, for inspection and audit by the other Party,
Washington State, and/or Federal Government and copies of all records, accounts, documents
or other data pertaining to the Work will be furnished upon request. The requesting Party shall
pay the cost of copies produced. If any litigation, claim, or audit is commenced, the record,
accounts along with supporting documentation shall be retained until any litigation, claim, or
audit finding has been resolved even though such litigation, claim, or audit continues past the
six-year retention period.
8. Waiver of Consequential Damages
8.1. Neither party will be liable to the other party for consequential damages of any nature or kind,
including loss of profits/revenue and use. Damages based on actual costs incurred as a result
of inexcusable delays on the reference Project are not consequential damages.
8.2. WAIVER OF CONSEQUENTIAL AND PUNITIVE DAMAGES.
In no event shall either party hereto be liable to the other or obligated in any manner to pay to
the other any special, incidental, consequential, punitive or similar losses or damages
(including loss of profits, loss of production, loss of business opportunity or other
consequential or indirect loss) based upon claims arising out of or in connection with the
performance or non-performance of its obligations or otherwise under this Agreement, or the
material inaccuracy of any representation made in this Agreement, whether such claims are
based upon contract, tort, negligence, warranty or other legal theory; provided, however, that
the waiver of this foregoing damages under this Section is intended to apply only to disputes
and claims as between UTILITY and KIEWIT. Nothing in this Section shall limit the obligation of
the UTILITY to indemnify, defend and hold harmless the KIEWIT Indemnitees, or the obligation
of KIEWIT to indemnify, defend and hold harmless the UTILITY Indemnitees, for any
consequential or punitive damages payable to third parties resulting from any act or
circumstance for which the UTILITY or KIEWIT, as applicable, is obligated to indemnify
hereunder.
IN WITNESS WHEREOF, THE PARTIES HERETO HAVE EXECUTED THIS AGREEMENT AS OF THE DAY AND
YEAR LAST WRITTEN BELOW.
ATTACHMENTS:
□ Exhibit A – Assignment/Delegation of Utility Permit/Franchise Rights & Obligations
□ Exhibit B – Plans (as designed by KIEWIT)
□ Exhibit C – Special Provisions
□ Exhibit D – Cost Estimate - Design
□ Exhibit D – Cost Estimate - Construction
UTILITY
__________________________________
Signature
_____________________________________
By (Print Name)
_____________________________________
Title
_____________________________________
Date
KIEWIT
__________________________________
Signature
_____________________________________
By (Print Name)
_____________________________________
Title
_____________________________________
Date
x
x
1 Assignment/Delegation of Utility Franchise/Permit Rights and Obligations This is a Limited Assignment of Rights and Delegation of Obligations (“Assignment”) by and between the Washington State Department of Transportation (“WSDOT”) and Kiewit Infrastructure West Co. (“Design-Builder”). RECITALS 1. WSDOT entered into a design-build contract with Design-Builder, for a highway improvement project within the following locations in Kitsap County, Washington for the SR 3/SR 104/SR 303/SR 307/SR 308 Kitsap County – Remove Fish Barriers Project: a. State Route 3, Mile Post 41.52 to 59.55; b. State Route 104, Mile Post 16.55 to 22.95; c. State Route 303, Mile Post 6.63 to 6.90; d. State Route 307, Mile Post 1.34 to 1.45; e. State Route 308, Mile Post 0.94 to 2.16 2. The Project requires the relocation of utilities that are located on WSDOT right of way pursuant to certain Utility Permits or Franchises. 3. WSDOT determined that it is in the best interest of the State of Washington and the traveling public to temporarily assign certain rights and delegate certain obligations under the Utility Permits and Franchises to the Design-Builder for the orderly, efficient, and effective relocation of utility facilities for the Project. 4. Design-Builder agrees that WSDOT’s temporary assignment of rights and delegation of obligations under the Permits and Franchises will facilitate the orderly, efficient, and effective relocation of utility facilities for the Project. NOW, THEREFORE, IT IS MUTUALLY AGREED THAT: In consideration of the orderly, efficient, and effective relocation of utility facilities located within state highway right of way in support of the Project, WSDOT does hereby assign, transfer, and delegate unto Design-Builder the Utility Permits and Franchises identified in Exhibit A, subject to the terms and conditions set forth below. 1. This Assignment includes only those rights and obligations under the Permit or Franchise (and the General Provisions, Special Provisions, and Exhibits of the Permit or Franchise, if any) that are necessary or convenient for the Design-Builder to execute the Project. 2. This Assignment includes any amendment to, or replacement of, the Permit or Franchise (and the General Provisions, Special Provisions, and Exhibits thereto, if any) issued by WSDOT after the date of execution of this Assignment. 3. This Assignment does not include the right to amend, revoke, cancel, issue or otherwise modify the Permit or Franchise. 4. This Assignment is non-exclusive and WSDOT retains the right to exercise all rights and obligations under the Permit or Franchise. 5. This Assignment shall automatically terminate upon completion of the Project, unless terminated earlier by WSDOT in writing. EXHIBIT A
2 6. Design-Builder agrees that it shall be solely responsible for any causes of action or claims, if any, that arise between the Design-Builder and the Utility during the term of this Assignment; therefore, Design-Builder, its agents, employees, contractors, successors or assigns, will protect, save and hold harmless WSDOT, its authorized agents and employees, from all claims, actions, costs, damages (both to persons and property), injuries or expenses of any nature whatsoever by reason of the acts or omissions of Design-Builder, its agents, employees, contractors, successors or assigns, arising out of or in connection with Design-Builder’s or its agents’, employees’, contractors’, successors’, or assigns’ acts or omissions related to this Assignment; provided, that if the claims or damages are caused by or result from the concurrent acts or omissions of (a) WSDOT’s authorized agents or employees and (b) Design-Builder, its agents, employees, contractors, successors or assigns, this indemnity provision shall be valid and enforceable only to the extent of the acts or omissions of Design-Builder, its agents, employees, contractors, successors or assigns. This provision shall survive the termination of this Assignment. 7. The Design-Builder shall not assign or transfer the rights or obligations granted in this Assignment in any manner whatsoever, unless WSDOT consents thereto in writing. 8. WSDOT shall provide a copy of this Assignment to the Utility after it is executed by WSDOT and Design-Builder. 9. The Design-Builder shall exercise its rights and obligations granted in this Assignment in a reasonable and prudent manner. Design-Builder hereby accepts the rights and assumes the obligations from WSDOT as set forth above. WSDOT hereby assigns the rights and delegates the obligations as set forth above to Design-Builder. Title: Title: Dated: Dated: Area Manager
2/20/2024 2/26/2024
Olympic Region Utility Manager
Bremerton/Kiewit Utility Relocation Agreement February 2026
Exhibit D – Cost Estimate for Design (Site B) Page 1 of 2
EXHIBIT D – COST ESTIMATE FOR DESIGN
GORST VICINITY - REMOVE FISH BARRIERS (C9920)
UTILITY RELOCATION DESIGN WATER AND SEWER SITE B
Kiewit Infrastructure West Co. (KIWC) provides total cost proposal of $190,000 to complete the scope
outlined in this proposal. Breakdown of cost includes:
- $160,000 – Base Design (Lumpsum)
- $30,000 – maintenance reserve for undefined scope that requires authorization by the City
Site B
• Two water mains running parallel to roadway alignment on either side of SR 16 (size unknown).
Single water main service to parcel on north side of state route.
• Single gravity sanitary sewer running parallel to roadway; side sewer to same parcel to north.
Services shall include:
• Work with City and Kiewit to refine concepts and phasing of work to maintain service during
construction (assumed requirement). Water mains to be relocated over the top of the proposed
culvert with presumably minimal cover requiring a variance. The gravity sewer will require
replacement of a to-be-determined length to provide adequate capacity.
• Meetings – as identified in the attached fee worksheet, shall include:
• Bi-weekly meetings with WSDOT, akin to Task Force meetings to keep them informed on
design development.
• Owner Meetings – City of Bremerton to work through technical issues.
• Kiewit and Team Meetings
• Preparation of utility plans, profiles, details and specifications. Refer to fee spreadsheet for
assumed number of plans.
• KPFF will support the utility owners with the preparation of utility variances. Owner is
responsible for submission to WSDOT.
• Plan reviews will be limited to a constructability review performed by Kiewit prior, an over-
the-shoulder review with WSDOT at the 60% design level. KPFF to resolve all comments
from WSDOT and the utility owners and provide a formal submittal to WSDOT at 100%.
Comments from the 1005 review will be resolved prior to RFC.
Assumptions
• Sewer to be replaced in kind with a gravity line. Design flows to be provided by the City of
Bremerton; no modeling or calculations presumed.
• Assumes that the RFC roadway paving and site prep drawings will require additional
modifications to account for impacts including pavement removal and replacement or other
misc. curb and gutter civil changes to accommodate the new utilities. Effort estimated at
approximately 120 hrs of design and plan updates.
Exclusions
• Updates to plans beyond what is scoped herein to be addressed by others. This scope does not
include any revisions to the current plans such as Site Preparation, TESC, or to address conflicts
with drainage, for example.
Bremerton/Kiewit Utility Relocation Agreement February 2026
Exhibit D – Cost Estimate for Design (Site B) Page 2 of 2
• This scope of services does not include calculations or modeling of the water distribution
system. It is assumed that the main will be replaced in kind and any modifications will not have
an appreciable impact on the performance of the system. Necessary modeling or calculations
will be performed by the utility owner.
• Additional traffic control plans to that already developed for Site C are excluded from the scope
estimate.
• Excludes updates to the stormwater system to accommodate the utility relocations. Additional
effort and cost required for stormwater modifications to accommodate the utility relocation.
• The RFC plans for other disciplines other than Roadway are already completed and work doesn’t
cover updates to other RFC sheets.
• Excludes any work associated with obtaining permits or environmental documentation
This Utility Relocation Agreement (the Agreement) is made and entered into between Kiewit
Infrastructure West Co. (KIEWIT) and the above-named Utility (UTILITY), collectively the “Parties” and
individually the “Party.”
Recitals
1. The Washington State Department of Transportation (WSDOT) is planning an improvement along
______________________________________ which consists of the removal and replacement of
five existing culverts with fish passage structures (referred to as sites), per the project titled above;
and has contracted with KIEWIT to perform the necessary improvements (the Project). The project
site included as part of this agreement is as follows:
Site ID WDFW Site ID US / SR Name County
Site A 990168 SR 3 Gorst Creek Kitsap County
Site B 991585 SR 3 / SR 16 UNT to Gorst Creek Kitsap County
Site C 991670 SR 16 Kabelac Creek Kitsap County
Site D 990270 SR 16 UNT to Ross Creek Kitsap County
Site E 15.0201 0.90 SR 166 Olney Creek Kitsap County
2. The WSDOT has granted an “Assignment/Delegation of Utility Permit/Franchise Rights and
Obligations” dated ______________ to KIEWIT regarding WSDOT Utility Permit/Franchise Numbers
below and as shown in Exhibit A.
Site
ID
WDFW Site
ID Utility Owner Franchise Number Included as part of
this Agreement
Site B 991585 City of Bremerton 30497 No
Site C 991670 City of Bremerton 30314 Yes
3. In connection therewith, it is necessary to design and remove and/or relocate and/or construct
certain UTILITY facilities (the Work) to facilitate the Project.
Utility Relocation Agreement No. 6 – Site C
SR 3/SR 16/SR 166, Gorst Vicinity – Remove Fish Barriers Project
(Contract No. 9920)
City of Bremerton
345 6th Street
Bremerton, WA 98337
City of Bremerton
City of Bremerton
Construction Responsibility:
City of Bremerton
Klijhn
Design Responsibility:
□ Type 1 □ Type 2
WSDOT #9920 RFP Utility Designation:
Cost Responsibility:
Utility Name & Address:
Contractors Name & Address:
SR 3/SR 16/SR 166
02/26/2024
Kiewit Infrastructure West Co.
33930 Weyerhaeuser Way, Suite 300
Federal Way, WA 98001
X
x
4. In order to facilitate the completion of the Work, KIEWIT will provide all materials, equipment,
labor, contract administration, and any other efforts required to perform the following for facilities
owned by UTILITY:
5. In order to facilitate the completion of the Work, UTILITY will provide all materials, equipment,
labor, contract administration, and any other efforts required to perform the following for facilities
owned by UTILITY:
6. As defined in the conformed Request for Proposals (RFP) of WSDOT Project 9920 dated October
November 26, 2024, the following Party is of the Type noted above and is entirely responsible for
the cost to complete all aspects of the work for UTILITY facilities:
7. Both KIEWIT and UTILITY will perform their respective duties in a timely manner so that the design
& construction is completed is completed for Site C to
The Final Relocation Agreement supersedes any and all versions of the Draft Utility Relocation
Agreement of the same Number, and between the same Parties for the same Project designated above.
Now, therefore, in consideration of the terms, conditions, covenants, and performances contained
herein, as well as the attached Exhibits which are incorporated and made a part hereof,
IT IS MUTUALLY AGREED AS FOLLOWS:
1. Plans and Special Provisions
1.1. Program Guide: The “Utility Relocation and Accommodation on Federal Aid Highway Projects”
shall determine and establish the definitions and applicable standards for this Agreement. By
this reference this document is adopted and made a part of this Agreement as if fully contained
herein.
1.2. Betterment: A betterment is an improvement to UTILITY facilities not required by code,
regulation, standard industry practice, or any other applicable regulation. If any of the Work
constitutes a betterment as defined in the “Utility Relocation and Accommodation on Federal
Aid Highway Projects”, the UTILITY is solely responsible for the costs of such improvement.
1.3. The Party performing the construction agrees to perform the work in accordance with:
□ The Plans identified in Exhibit B
□ The Special Provisions in Exhibit C (if applicable)
UTILITY agrees that is solely responsible for ensuring that all Plans and Special Provisions meet
UTILITY’s standards, codes, and regulations. In the event of a discrepancy between UTILITY’s
standards, codes, and regulations and those of WSDOT, those of UTILITY shall prevail unless it is
determined by WSDOT that this condition will present a hazard to the safety and comfort of
the traveling public.
□Design □Design Review □Protect in Place □Removal
□Relocation □Construction □Field Inspection □Betterments
□As-Built Survey □As-Built Review □Franchise/Permit Application/
□Permanent Material Supply for Construction Amendment
□Design □Design Review □Protect in Place □Removal
□Relocation □Construction □Field Inspection □Betterments
□As-Built Survey □As-Built Review □Franchise/Permit Application/
□Permanent Material Supply for Construction Amendment
□KIEWIT □UTILITY
x
x
x
x
x
x
x
x
x
x
x
x
x
2. Construction, Inspection, and Acceptance
2.1. UTILITY agrees to disconnect/reconnect and or deactivate/activate its facilities upon
reasonable notice to UTILITY as requested by KIEWIT when such action is required to be
performed by UTILITY. The Parties agree to define disconnect/reconnect and or
deactivate/activate requirements, including notification and response, in Exhibit C. UTILITY
facilities not removed pursuant to this Agreement shall remain the ownership, operation and
maintenance responsibility of UTILITY.
2.2. Salvage: All materials removed from UTILITY’s facilities shall become the property of UTILITY
and disposed of by UTILITY, unless otherwise specified in Exhibit C. Arrangements to salvage
certain materials for later usage by either Party shall be specified in Exhibit C.
2.3. If KIEWIT is to perform the Work, UTILITY shall furnish an inspector in a timely manner to
observe the Work and verify that all standards, codes, and regulations are being met as
described in Section 1.3. If UTILITY is to perform the Work, KIEWIT shall supply an inspector in a
timely manner to observe the Work and verify that all improvements are compatible with the
overall design, phasing, and construction of the Project.
2.4. The Party performing the construction agrees to promptly notify the other Party upon
completion of the Work.
2.5. If KIEWIT is performing the Work, UTILITY shall, within five (5) working days of being notified
that the Work is completed:
(a) deliver a letter of acceptance to WSDOT, or
(b) deliver to WSDOT written reasons why the Work does not comply with the
previously approved Plans and Special Provisions. UTILITY agrees to work diligently
and in good faith with KIEWIT to resolve any issues so as not to delay the Project. If
all issues are resolved, UTILITY agrees to deliver to WSDOT a letter of acceptance as
provided herein.
2.6. If UTILITY is performing the Work, KIEWIT shall, within five (5) working days of being notified
that the Work is completed:
(a) deliver a letter of acceptance to UTILITY, or
(b) deliver to UTILITY written reasons why the Work does not comply with the
previously approved Plans and Special Provisions. KIEWIT agrees to work diligently
and in good faith with UTILITY to resolve any issues so as not to delay the Project. If
all issues are resolved, KIEWIT agrees to deliver to UTILITY a letter of acceptance as
provided herein.
2.7. If either Party does not respond within five (5) working days as provided in Sections 2.5 and
2.6, the Work and the administration thereof will be deemed accepted by the other Party, and
the Party performing the Work shall be released from all future claims and demands except for
latent defects to the extent allowed by Washington Law.
2.8. Upon completion and acceptance of the Work pursuant to Sections 2.5, 2.6, or 2.7, to the
extent allowed by Washington law, UTILITY agrees that it shall be solely responsible for all
future ownership, operation, and maintenance costs of its facilities, without KIEWIT or WSDOT
liability or expense.
2.9. KIEWIT will prepare the final construction “as-built” survey and documentation in general
conformance with WSDOT’s Construction Manual. KIEWIT will maintain one set of plans as the
official “as-built” set, then make notations in red of all plan revisions typically recorded per
standard WSDOT practice, as directed by WSDOT’s Construction Manual. Once the approving
Party has accepted the Work per Section 2.5, 2.6, or 2.7, KIEWIT will provide one (1)
reproducible set of “as-builts” to UTILITY.
3. Payment
3.1. The Party identified in Recital 6 of this Agreement agrees that it shall be responsible for the
actual direct and related indirect costs of the efforts to perform the Work by the Party(ies)
identified in the following Recitals:
3.2. The total cost to achieve completion of the Work is estimated to be:
□ Unspecified
□ $125,000 (Design)
□ $______ (Construction) to be included in amended Utility Agreement
An itemized estimate of costs for the Work is:
□ Not included
□ Included in Exhibit D
□ To be included in the Final Utility Agreement
3.3. If monies are deemed to be due from one Party to the other as required by the terms of this
Agreement, the Party identified in Recital 6 of this Agreement agrees to pay the other Party the
actual cost for its participation in the completion of the Work for UTILITY. The Party identified
in Recital 6 shall make any payments due to the other Party within thirty (30) calendar days
after receiving request for payment.
3.4. Should the Party identified in Recital 6 of this Agreement fail to make payment to the other
Party according to the terms of this Agreement, the Party owed unpaid monies shall have the
right to terminate this Agreement after reasonable notice to the defaulting Party and an
opportunity to cure.
4. Change in Work or Cost Increase
4.1. Increase in Cost: In the event unforeseen conditions, not caused by the negligence or willful
misconduct of KIEWIT, WSDOT, its or their agents, or a third party, require an increase in the
cost of the Work as specified in Section 3.2, a change in the agreed total cost will:
□ Be paid One Hundred Percent (100%) by KIEWIT
□ Be paid One Hundred Percent (100%) by UTILITY
□ Be paid at a split cost as identified below:
KIEWIT: _______________ Percent (____%)
UTILITY: _______________ Percent (____%)
A change to the total cost of the Work identified in Section 3.2 will only be considered if the
actual cost to complete the Work is equal to or more than the following percentage over
the value identified in Section 3.2
□ _______________ Percent (____%)
□ Not Applicable
□KIEWIT □UTILITYRecital 4 (KIEWIT) Recital 5 (UTILITY) x
x
x
x
x
4.2. If it is determined by the Party performing the Work that additional Work or a change in the
Work is required, prior written approval must be secured from the Party identified in Recital 6.
However, where the change is required to mitigate a Project emergency or safety threat to the
traveling public, the Party performing the Work may direct the change without the approval of
the Party identified in Recital 6. Proper notifications shall be made between both Parties of
such changes as soon as possible thereafter.
4.3. Regardless of the Party performing the Work, UTILITY may request additions to the Work in
writing. KIEWIT will review the request and accommodate the requested changes as elective
changes, provided that a change does not negatively impact WSDOT’s transportation system
and complies with the Standard Specifications, Project permits, state and/or federal law,
applicable rules and/or regulations, and/or WSDOT design policies, and does not unreasonably
delay critically scheduled Project contract activities. Costs to construct UTILITY facilities above
and beyond the cost required for the scope of the Work will be paid for solely by UTILITY,
regardless of the Party performing these additional activities.
5. Franchise of Permit
5.1. UTILITY shall apply for a new permit, franchise, or amendment to its current franchise for those
new or modified UTILITY facilities that will be located within WSDOT’s right of way. After
receiving the application, WSDOT will issue a new permit or a new or amended franchise, as
applicable.
6. Right of Entry/Permits
6.1. KIEWIT agrees to provide copies of its Right of Entry Permits and Temporary Construction
Easements with all privately owned lands, as requested by UTILITY. UTILITY may elect to
perform its Work within the limits and restrictions of KIEWIT temporary construction
easement.
If UTILITY does not elect to perform its Work within the limits of KIEWIT temporary
construction easements; UTILITY agrees to arrange for rights of entry upon all privately owned
lands upon which UTILTY has a claimed property rights and which are necessary to perform the
Work. UTILITY also agrees to obtain all necessary permissions for KIEWIT to perform the Work
on such lands, which may include reasonable use restrictions on those lands. UTILITY agrees to
provide the rights of entry and applicable permissions under this section to KIEWIT within ten
(10) calendar days of entering into this Agreement. Upon completion of the Work on such
lands, those rights of entry and permissions beyond the rights of entry and permissions granted
by the WSDOT permit or franchise shall terminate.
6.2. KIEWIT agrees to provide copies of applicable permits that it has received to perform the work
outside of this agreement, as requested. If applicable, UTILITY may elect to perform its Work
under KIEWIT permits with the understanding all permit restrictions and conditions are met. It
is the responsibility of the UTILITY to fully understand and comply with all KIEWIT permit
conditions and requirements, including; but not limited to, performing the work within the
identified boundaries and providing all necessary reports and documentation to support permit
requirements and provide to KIEWIT in a timely manner after completion of Work.
If UTILITY does not elect to perform its Work under KIEWIT permits; UTILITY agrees to obtain all
necessary permits to perform the Work. If UTILITY elects for KIEWIT to perform any of the
Work, UTILITY also agrees to obtain all necessary permit for KIEWIT to perform the Work.
UTILITY agrees to provide the applicable permits under this section to KIEWIT within ten (10)
calendar days of entering into this Agreement. Upon completion of the Work, those permits
beyond the permissions granted by the issuing agencies shall terminate.
7. General Provisions
7.1. Indemnification: To the extent authorized by law, UTILITY and KIEWIT shall indemnify and hold
harmless one another and their employees and/or officers from and shall process and defend
at its own expense any and all claims, demands, suits at law or equity, actions, penalties,
losses, damages (both to persons and/or property), or costs, of whatsoever kind or nature,
brought against the one Party arising out of, in connection with, or incident to the other Party’s
performance or failure to perform any aspect of this Agreement, provided, however, that if
such claims are caused by or result from the concurrent negligence of (a) UTILITY and (b)
KIEWIT, their respective employees and/or officers, or involves those actions covered by RCW
4.24.115, this indemnity provision shall be valid and enforceable only to the extent of the
negligence of UTILITY or KIEWIT, and provided further, that nothing herein shall require the
UTILITY or KIEWIT to hold harmless or defend the other or its employees and/or officers from
any claims arising from that Party’s sole negligence or that of its employees and/or officers.
The terms of this section shall survive the termination of this Agreement.
7.2. Disputes: If a dispute occurs between the UTILITY and KIEWIT at any time during the
prosecution of the Work, the Parties agree to negotiate at the management level to resolve
any issues. Should such negotiations fail to produce a satisfactory resolution, the Parties agree
to enter into arbitration and/or mediation before proceeding to any other legal remedy. Each
Party shall be responsible for its own fees and costs. The Parties agree to equally share the cost
of a mediator or arbiter.
7.3. Venue: In the event that either Party deems it necessary to institute legal action or proceedings
to enforce any right or obligation under this Agreement, the Parties hereto agree that any such
action or proceedings shall be brought in the State of Washington. Each Party shall be
responsible for its own attorney’s fees and costs.
7.4. Termination:
7.4.1. Unless otherwise provided herein, KIEWIT my terminate this Agreement upon thirty (30)
calendar days written notice to UTILITY.
7.4.2. KIEWIT acknowledges and agrees that should it terminate this Agreement, such
termination shall not relieve the Party identified in Recital 6 from its responsibility to
ultimately pay for the design, removal, relocation and/or construction of UTILITY
facilities so as not to delay or conflict with the Project.
7.5. Amendments: This Agreement may be amended by the mutual agreement of both Parties.
Such amendments or modifications shall not be binding unless put in writing and signed by
persons authorized to bind each of the Parties.
7.6. Independent Contractor: Both Parties shall be deemed independent contractors for all
purposes, and the employees of each Party and any of its contractors, subcontractors,
consultants, and the employees thereof, shall not in any manner be deemed to be the
employees of the other Party.
7.7. Audit and Records: During the progress of the Work and for a period of not less than six (6)
years from the date of final payment, both Parties shall maintain the records and accounts
pertaining to the Work and shall make them available upon reasonable notice during normal
business hours and as often as necessary, for inspection and audit by the other Party,
Washington State, and/or Federal Government and copies of all records, accounts, documents
or other data pertaining to the Work will be furnished upon request. The requesting Party shall
pay the cost of copies produced. If any litigation, claim, or audit is commenced, the record,
accounts along with supporting documentation shall be retained until any litigation, claim, or
audit finding has been resolved even though such litigation, claim, or audit continues past the
six-year retention period.
8. Waiver of Consequential Damages
8.1. Neither party will be liable to the other party for consequential damages of any nature or kind,
including loss of profits/revenue and use. Damages based on actual costs incurred as a result
of inexcusable delays on the reference Project are not consequential damages.
8.2. WAIVER OF CONSEQUENTIAL AND PUNITIVE DAMAGES.
In no event shall either party hereto be liable to the other or obligated in any manner to pay to
the other any special, incidental, consequential, punitive or similar losses or damages
(including loss of profits, loss of production, loss of business opportunity or other
consequential or indirect loss) based upon claims arising out of or in connection with the
performance or non-performance of its obligations or otherwise under this Agreement, or the
material inaccuracy of any representation made in this Agreement, whether such claims are
based upon contract, tort, negligence, warranty or other legal theory; provided, however, that
the waiver of this foregoing damages under this Section is intended to apply only to disputes
and claims as between UTILITY and KIEWIT. Nothing in this Section shall limit the obligation of
the UTILITY to indemnify, defend and hold harmless the KIEWIT Indemnitees, or the obligation
of KIEWIT to indemnify, defend and hold harmless the UTILITY Indemnitees, for any
consequential or punitive damages payable to third parties resulting from any act or
circumstance for which the UTILITY or KIEWIT, as applicable, is obligated to indemnify
hereunder.
IN WITNESS WHEREOF, THE PARTIES HERETO HAVE EXECUTED THIS AGREEMENT AS OF THE DAY AND
YEAR LAST WRITTEN BELOW.
ATTACHMENTS:
□ Exhibit A – Assignment/Delegation of Utility Permit/Franchise Rights & Obligations
□ Exhibit B – Plans (as designed by KIEWIT)
□ Exhibit C – Special Provisions
□ Exhibit D – Cost Estimate - Design
□ Exhibit D – Cost Estimate - Construction
UTILITY
__________________________________
Signature
_____________________________________
By (Print Name)
_____________________________________
Title
_____________________________________
Date
KIEWIT
__________________________________
Signature
_____________________________________
By (Print Name)
_____________________________________
Title
_____________________________________
Date
x
x
1 Assignment/Delegation of Utility Franchise/Permit Rights and Obligations This is a Limited Assignment of Rights and Delegation of Obligations (“Assignment”) by and between the Washington State Department of Transportation (“WSDOT”) and Kiewit Infrastructure West Co. (“Design-Builder”). RECITALS 1. WSDOT entered into a design-build contract with Design-Builder, for a highway improvement project within the following locations in Kitsap County, Washington for the SR 3/SR 104/SR 303/SR 307/SR 308 Kitsap County – Remove Fish Barriers Project: a. State Route 3, Mile Post 41.52 to 59.55; b. State Route 104, Mile Post 16.55 to 22.95; c. State Route 303, Mile Post 6.63 to 6.90; d. State Route 307, Mile Post 1.34 to 1.45; e. State Route 308, Mile Post 0.94 to 2.16 2. The Project requires the relocation of utilities that are located on WSDOT right of way pursuant to certain Utility Permits or Franchises. 3. WSDOT determined that it is in the best interest of the State of Washington and the traveling public to temporarily assign certain rights and delegate certain obligations under the Utility Permits and Franchises to the Design-Builder for the orderly, efficient, and effective relocation of utility facilities for the Project. 4. Design-Builder agrees that WSDOT’s temporary assignment of rights and delegation of obligations under the Permits and Franchises will facilitate the orderly, efficient, and effective relocation of utility facilities for the Project. NOW, THEREFORE, IT IS MUTUALLY AGREED THAT: In consideration of the orderly, efficient, and effective relocation of utility facilities located within state highway right of way in support of the Project, WSDOT does hereby assign, transfer, and delegate unto Design-Builder the Utility Permits and Franchises identified in Exhibit A, subject to the terms and conditions set forth below. 1. This Assignment includes only those rights and obligations under the Permit or Franchise (and the General Provisions, Special Provisions, and Exhibits of the Permit or Franchise, if any) that are necessary or convenient for the Design-Builder to execute the Project. 2. This Assignment includes any amendment to, or replacement of, the Permit or Franchise (and the General Provisions, Special Provisions, and Exhibits thereto, if any) issued by WSDOT after the date of execution of this Assignment. 3. This Assignment does not include the right to amend, revoke, cancel, issue or otherwise modify the Permit or Franchise. 4. This Assignment is non-exclusive and WSDOT retains the right to exercise all rights and obligations under the Permit or Franchise. 5. This Assignment shall automatically terminate upon completion of the Project, unless terminated earlier by WSDOT in writing. EXHIBIT A
2 6. Design-Builder agrees that it shall be solely responsible for any causes of action or claims, if any, that arise between the Design-Builder and the Utility during the term of this Assignment; therefore, Design-Builder, its agents, employees, contractors, successors or assigns, will protect, save and hold harmless WSDOT, its authorized agents and employees, from all claims, actions, costs, damages (both to persons and property), injuries or expenses of any nature whatsoever by reason of the acts or omissions of Design-Builder, its agents, employees, contractors, successors or assigns, arising out of or in connection with Design-Builder’s or its agents’, employees’, contractors’, successors’, or assigns’ acts or omissions related to this Assignment; provided, that if the claims or damages are caused by or result from the concurrent acts or omissions of (a) WSDOT’s authorized agents or employees and (b) Design-Builder, its agents, employees, contractors, successors or assigns, this indemnity provision shall be valid and enforceable only to the extent of the acts or omissions of Design-Builder, its agents, employees, contractors, successors or assigns. This provision shall survive the termination of this Assignment. 7. The Design-Builder shall not assign or transfer the rights or obligations granted in this Assignment in any manner whatsoever, unless WSDOT consents thereto in writing. 8. WSDOT shall provide a copy of this Assignment to the Utility after it is executed by WSDOT and Design-Builder. 9. The Design-Builder shall exercise its rights and obligations granted in this Assignment in a reasonable and prudent manner. Design-Builder hereby accepts the rights and assumes the obligations from WSDOT as set forth above. WSDOT hereby assigns the rights and delegates the obligations as set forth above to Design-Builder. Title: Title: Dated: Dated: Area Manager
2/20/2024 2/26/2024
Olympic Region Utility Manager
Bremerton/Kiewit Utility Relocation Agreement February 2026
Exhibit D – Cost Estimate for Design (Site B) Page 1 of 2
EXHIBIT D – COST ESTIMATE FOR DESIGN
GORST VICINITY - REMOVE FISH BARRIERS (C9920)
UTILITY RELOCATION DESIGN WATER AND SEWER SITE C
Kiewit Infrastructure West Co. (KIWC) provides total cost proposal of $125,000 to complete the scope
outlined in this proposal. Breakdown of cost includes:
- $105,000 – Base Design (Lumpsum)
- $20,000 – maintenance reserve for undefined scope that requires authorization by the City
Site C
Two Water mains running parallel to roadway alignment on either side of SR 16 (8” and 16”). Water
main service crosses perpendicular to SR 16 to east of culvert crossing.
Two Sanitary Sewer running parallel to roadway force mains on either side of SR 16 (2” and 10”).
Services shall include:
• Brainstorm Concepts – KPFF to work with Kiewit to develop options for the relocations and
identify preferred approaches prior to meeting with the utility owner.
• Meetings – as identified in the attached fee worksheet, shall include:
o Bi-weekly meetings with WSDOT, akin to Task Force meetings to keep them informed on
design development.
o Owner Meetings – City of Bremerton to work through technical issues.
o Kiewit and Team Meetings
• Preparation of utility plans, profiles, details and specifications. Refer to fee spreadsheet for
assumed number of plans.
• KPFF will support the utility owner with the preparation of utility variances. Owner is
responsible for submission to WSDOT.
• Plan reviews will be limited to a constructability review performed by Kiewit prior, an over-the-
shoulder review with WSDOT at the 60% design level. KPFF to resolve all comments from
WSDOT and the utility owners and provide a formal submittal to WSDOT at 100%. Comments
from the 100% review will be resolved prior to RFC.
Assumptions
• KPFF will evaluate with Kiewit options for relocation of the facilities at Site C including below-
grade and above grade solutions prior to outreach to the owners.
Exclusions
• Updates to plans beyond what is scoped herein to be addressed by others. This scope does not
include any revisions to the current plans such as Site Preparation, TESC, or to address conflicts
with drainage, for example. The RFC plans for other disciplines are already completed and work
doesn’t cover updates to other RFC sheets.
• This scope of services does not include calculations or modeling of the water distribution
system. It is assumed that the main will be replaced in kind and any modifications will not have
an appreciable impact on the performance of the system. Necessary modeling or calculations
will be performed by the utility owner.
• This scope of services does not include calculations for the sewer force mains or evaluation of
lift stations. It is assumed that the force main will be replaced in kind and any modifications will
Bremerton/Kiewit Utility Relocation Agreement February 2026
Exhibit D – Cost Estimate for Design (Site B) Page 2 of 2
not have an appreciable impact on the performance of the system. Any such evaluation will be
performed by the utility owner.
• Additional traffic control plans to that already developed for Site C are excluded from the scope
estimate.
• Excludes any work associated with obtaining permits or environmental documentation
Published for
February 18
Council Meeting
Mayor’s Report
Item 5
Mayor’s Report –February 18, 2026MAYOR’S REPORT
February 18, 2026
Downtown Hanging Baskets
•Parks and Recreation staff recently partnered with the local
Bremerton Garden Club on planting flowers for the City’s
downtown hanging baskets. The local club shared their expertise
on these efforts.
•Volunteers worked alongside staff to prepare and plant seasonal
flowers that will be displayed in Bremerton beginning mid-spring.
•These hanging baskets enhance the beauty of the downtown
corridor, support local pollinators, and contribute to a welcoming
environment for residents, visitors, and local businesses.
•This partnership demonstrates how volunteer engagement
continues to support beautification efforts across Bremerton.
•The baskets were prepped at the Parks and Recreation
department greenhouses at Stephenson Canyon Park and will
remain there until they are hung in the City.
Accessibility Improvements at Lions Park
•Today, the Bremerton Central Lions Club charitable
foundation awarded an accessibility grant of
$15,000 toward improvements at the
tennis/pickleball courts at Lions Park
•The project and funding will eliminate slopes on the
courts, provide accessible seating areas and adjust
the courts to follow wheelchair pickleball guidelines
for recreational play and tournaments
•This project was an identified priority at the park in
the City’s 2026 Parks, Recreation and Open Space
(PROS Plan)
•An additional partner in the project includes the
West Sound Pickleball Club
•City staff are seeking to secure additional funding
through grants and donations to complete the
project in 2026.
Central Bremerton Forcemain Replacement Project
1st Street Reconstruction
Project Status:
•Substantial Completion achieved in February
•Minor punch list items remain.
What Was Delivered:
•Central Bremerton Sewer Forcemain replacement.
•1St Street reconstruction, from Naval Ave to Montgomery Ave
Community Benefit:
•New wastewater system to provide conveyance for downtown
Bremerton and the east end of PSNS.
•Visible improvements to streets that provide investment in
neighborhood livability.
•New 6’ sidewalks and 5’ bike lane.
Funding:
•100% Grant funded through Federal program
Photo taken on February 18, 2026
Published for
February 18
Council Meeting
Council Reports
Item 6
Council District
Updates
February 18, 2026
City Council Regular Business Meeting
City Council District 7
Includes:
•Kitsap Lake Park
•NAD Park
•Pendergast Regional Park
•A portion of Kitsap Way
•The area reaching south towards Gorst.
•Providing boundaries for the district are
the Kitsap County neighborhoods called
West Hills and Navy Yard City.
Rick Tift (2026-29)
rick.tift@bremertonwa.gov
2
City Council District 6
Includes:
•Anderson Cove
•Lilian A. and James Walker Park
•Marine Drive
•Madrona Point
•Commercial and residential areas along
11th Street
Anna Mockler (2024-27)
anna.mockler@bremertonwa.gov
3
Setting up
for the
Annual Point
in Time
Count at The
Salvation
Army
4
January 29 Project Connect -
Bremerton
5
Signs stack up at the Public Works
Building
6
February 9
Town Hall –
Provided an
interactive
Budget
exercise!
7
City Council District 5
Includes the area next to:
•Puget Sound Naval Shipyard
•Charleston
•Forest Ridge Park with the district
bounded by 11th Street
Michael Goodnow (2026-29)
michael.goodnow@bremertonwa.gov
8
CONGRATULATIONS
George Stenberg’s
Magical Ferry Ride
9
City Council District 3
Includes:
•Downtown area “Harborside”
•Manette (bounded by NE Stone Way and
Jacobsen Boulevard)
•Evergreen Rotary Park
•Kitsap 9/11 Memorial
Christy Cammarata (2026-29)
christy.cammarata@bremertonwa.gov
10
11
Bremerton Arts Commission’s
Open Art Gallery
12
Light Up Bremerton March 6, 2026
A sunset lantern parade celebrating community, creativity, and downtown vibrancy.
Be Prepared:
🎨Lantern Making Workshop on February 19 @ 5:30 PM
13
City Council District 2
Includes:
•Bataan Park and Eastpark Nature Area
(Madrona Trails)
•Areas along the Wheaton Way corridor
bounded at the north by Riddell Road
Denise Frey (2024-27)
2026 Council Vice President
denise.frey@bremertonwa.gov
14
15
City Council District 1
Includes the areas surrounding:
•Tracyton Beach
•Lions Park
•Blueberry Park
•Stephenson Canyon
•Pine Road
•Part of Wheaton Way bounded by Sylvan Way
Jennifer Chamberlin (2026-29)
jennifer.chamberlin@bremertonwa.gov
16
City Council District 4
Includes the neighborhoods near:
•Downtown
•Puget Sound Naval Shipyard
•Olympic College
•Kiwanis Park
Jane Rebelowski (2024-27)
2026 Council President
jane.rebelowski@bremertonwa.gov
17
CarePortal is coming to Kitsap County on
February 22!
18
19
20
Benjamin Lee Kreifels
1/1/01 –11/10/25
21
Permission to Start Dreaming (PTSD) –March 21
A fundraiser to support our Active-Duty Military, Veterans, and First Responders
22
Upcoming Meetings
•Lodging Tax Advisory Committee (LTAC): 2/19 @ 3:30 PM
•Parks, Finance, Investment, & Parking Committee: 2/24 @ 1:30 PM
•City Council Study Session: 2/25 @ 5:00 PM
•Public Safety Committee: 3/2 @ 1:30 PM
•Regular Meeting: 3/4 @ 5:30 PM
23