3829
KITSAP CO PUBLIC WORKS
Funding - SR3/SR304 Transportation Improvement
Engineering
LEG 12-1
06/16/1997
06/15/2010
Completion or Funds Expended
Amendment #1-3/01 #2-9/03 #3-5/07 #4-5/07 #5-5/07
#6-5/07 #G-8/07 #H-8/07
Review date for tracking purposes only
.. .
AMENDMENT H
INTERLOCAL AGREEMENT
Kitsap County Agreement No. KC105-97
City Agreement No. 3829
THIS AMENDMENT NUMBER C (3) to the Interlocal Agreement between the City of
Bremerton, (hereinafter referred to as "CITY") and Kitsap County (Hereinafter referred to as
"COUNTY"), made and entered into this q day of '..\ LU-i ' 2007.
WHEREAS, the CITY and COUNTY entered into an Interlocal Agreement pursuant to Chapter
39.34 RCW (Interlocal Cooperation Act) on June, 16, 1997, to facilitate the development of
improved access between the Bremerton Ferry Terminal and Gorst as described in the Final
Environmental Impact Statement entitled, "SR3/304 Bremerton Ferry Terminal to the Vicinity of
Gorst Highway Improvement Project" (hereinafter referred to as "PROJECT"); and
WHEREAS, the CITY is planning the construction or improvement of a section of SR 304, and
in connection therewith, the COUNTY has requested that the CITY perform certain work as
herein described, and
WHEREAS, it is deemed to be in the best interest for the CITY to include the necessary items of
work in the CITY's construction contract proposed for the improvement of this section of the
PROJECT, and
WHEREAS, the COUNTY is obligated for the cost of work described herein.
NOW THEREFORE, by virtue of Chapter 39.34 RCW (Interlocal Cooperation Act) and in
consideration of the terms, conditions, covenants, and performances contained herein, or attached
and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS:
I
GENERAL
The CITY, as agent acting for and on behalf ofthe COUNTY, agrees to perform the following
"Descriptiol). of Work":
Plans, specifications and cost estimates shall be prepared by the COUNTY in accordance with.
the current State of Washington Standard Specifications for Road, Bridge, and Municipal
Construction, and amendments thereto, and adopted design standards, unless otherwise noted for
the sanitary sewer work. The CITY will incorporate the plans and specifications into the CITY's
project and thereafter advertise the resulting project for bid and, assuming bids are received and
contract is awarded, administer the contract. A scope of work is included as Exhibit "B".
The COUNTY may, ifit desires, furnish an inspector on the project. Any cost for such
inspection will be borne solely by the COUNTY. All contact between said inspector and the
CITY's contractor shall be through the CITY's representative.
City of Bremerton and Kitsap County
Amendment Number 3 to Inter/ocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
..'
The COUNTY agrees, upon satisfactory completion of the work involved, to deliver a letter of
acceptance to the CITY, which shall include a release and waiver of all future claims or demands
of any nature resulting from the performance of the work for the sanitary sewer work under this
AGREEMENT.
If a letter of acceptance is not received by the CITY within 90 days following completion of the
sanitary sewer work, the work will be considered accepted by the COUNTY and shall release the
CITY from all future claims and demands of any nature resulting from the performance of the
work under this AGREEMENT.
The COUNTY may withhold this acceptance of sanitary sewer work by submitting written
notification to the CITY within the 90-day period. This notification shall include the reasons for
withholding the acceptance.
In the event that any damage is discovered or is incurred after acceptance of the work and to the
extent that such damage is to the COUNTY'S facilities or is alleged to be caused by the
COUNTY'S facilities under this AGREEMENT, then the CITY agrees to execute a general
assigrunent of its claims against he project prime contractor so that the COUNTY may pursue
any claims or causes of action that the CITY may have against its prime contractor for the
damages mentioned herein.
The CITY shall ensure that all contracts related to the completion of this project include a
comprehensive indemnification clause holding harmless the CITY and COUNTY. The CITY
shall also ensure that liability related to its general contractor is appropriately covered by
insurance and that said insurance coverage include and name the COUNTY as an additional
insured. "
II
PAYMENT
The COUNTY, in consideration of the faithful performance of the work to be done by the CITY,
agrees to reimburse the CITY for the actual direct and related indirect cost of the work.
An itemized estimate of cost for work to be performed by the CITY at the COUNTY's expense is
marked Exhibit "A", and is attached hereto and by this reference made a part ofthe AGREEMENT.
Partial payments shall be made by the COUNTY, upon request ofthe CITY, to cover costs incurred.
These payments are not to be more frequent than one (1) per month. It is agreed that any such
partial payment will not constitute agreement as to the appropriateness of any item and that, at the
time of the final audit, all required adjustments will be made and reflected in a final payment.
The COUNTY agrees to make payment for the sanitary sewer work to be done by the CITY within
thirty (30) days from receipt of billing from the CITY.
City of Bremerton and Kitsap County
Amendment Number 3 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
The COUNTY agrees that ifpayment for the sanitary sewer work is not made within ninety (90) days
after receipt of billing the CITY shall assess a penalty of 10% on all amounts outstanding until
payment for the work is received by the CITY.
The COUNTY agrees to pay the CITY an "Advance Payment Amount" of$80,000 within 20 days
after the CITY submits its first partial payment request to the COUNTY. The advance payment
represents approximately fifteen (15) percent ofthe estimate of cost and covers costs incurred by the
CITY in the initial stages ofthe project. The advance payment will be carried throughout the life of
the project with final adjustment made in the final payment.
Upon completion of the work outlined herein, all future operation and maintenance of the
COUNTY's facilities shall be at the sole cost of the COUNTY and without expense to the CITY.
ill
DELETION OF WORK
In the event the estimate of cost, EXHIBIT "A", is in excess of $20,000 and the total actual bid
prices for the work covered by this AGREEMENT exceeds the estimate of costs by more than 15
percent, the COUNTY shall have the option of directing the CITY to delete all or a portion of the
work covered by this AGREEMENT from the CITY's contract. Except, that this provision shall be
null and void if the COUNTY's portion of the work exceeds 20 percent of the actual total contract
bid price, Or if the COUNTY is responsible for the costs under State law or the Washington
Administrative Code WAC 468-18-040(5)( d).
The COUNTY shall have five (5) working days from the date of written notification to inform the
CITY to delete the work. Should the COUNTY exercise its option to delete the work, the COUNTY
agrees, upon billing by the CITY, to reimburse the CITY for preliminary engineering costs incurred
by the CITY to include the work covered by this AGREEMENT in the CITY's contract.
IV
EXTRA WORK
In the event unforeseen conditions require an increase in the cost of 25 percent or more from that
agreed to on Exhibit "A", this AGREEMENT will be modified by a supplement AGREEMENT
covering said increase.
In the event it is determined that any change from the description of work contained in the
AGREEMENT is required, approval must by secured from the COUNTY prior to the beginning of
such work. Where the change is substantial, written approval must be secured.
Reimbursement for increased work and/or a substantial change in the description of work shall be
limited to costs covered by a written modification, change order or extra work order approved by the
COUNTY.
City of Bremerton and Kitsap County
Amendment Number 3 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
V
RIGHT OF ENTRY
The COUNTY hereby grants and conveys to the CITY the right of entry upon all land which 'the
COUNTY has interest, within or adjacent to the right of way of the highway, for the purpose of
constructing said improvements.
VI
VENUE
In the event that any party deems it necessary to institute legal action or proceedings to enforce any
right of obligation under this AGREEMENT, the parties hereto agree that any such action or
proceedings shall be brought in a court of competent jurisdiction situated in Kitsap County,
Washington.
VII
LEGAL RELATIONS
No liability shall attach to the CITY or the COUNTY by reason of entering into this AGREEMENT
except as expressly provided herein.
IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NUMBER,
the day and year first above written.
CITYg;~
Cary Bozeman, Mayor
c
ATTEST:
ChM.I.)f~
Paula Johnston, City Clerk r-
City of Bremerton and Kitsap County
Amendment Number 3 to Inter/oeal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
?/n/1l7
Da I
dl/r,7
Dat I
Date
as of
1/3/07
Date
~/19/07
Date
City of Bremerton and Kitsap County
Amendment Number 3 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
BOARD OF COMMISSIONERS
KITSAP COUNTY, WASHINGTON
'1/1/07
I
Date
~ (iM. (""- AA r> 0 Q
Jan. g , Commissioner ~
7/; /61
, .
Date
~ ~/?U(/
Stephen Bauer, Commissioner
ATTEST:
() P AL LrJ,.JAi;, ~
Opal Robertson, Clerk of the Board
7/,/d7
, ,
Date
City of Bremerton and Kitsap County
Amendment Number 3 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
.'
CONSTRUCTION COSTS
SANITARY SEWER WORK FOR K1TSAP COUNTY
SANITARY SEWER
MOBILIZATION LS. 1 $ 35 000.00 . ~~c; 000.
PVC SANITARY SEWER PIPE 8-10 DIAM. l.F. 1.193 $ 80.00 $95.440.
PVC SANITARY SEWER PIPE 12-10 DIAM. l.F. 1.475 $ 90.00 $132.750.
PVC SANITARY SEWER PIPE 18-10 DIAM. l.F. 103 $ 100.00 $10.300.
SIDE SEWER CONNECTION. 6-io PVC. BETWEEN MAIN AND PROPI L.F. 494 $ 130.00 $64.220.
. SIDE SEWER CONNECTION. 8-in PVC.BETWEEN MAIN AND PROP! l.F. 33 $ 100.00 $3.300.
SIDE SEWER CONNECTION 4-in PVC OPEN TRENCH ON PRIVATE L.F. 110 S 120.00 513.200.
TESTING SEWER PiPe- L.F. 3389 $ 5.00 $16.945.0
POTHOLE SIDE SEWER EACH 46 $ 500.00 $23.000.
SEWER CLEANOUT EACH 26 $ 250.00 $6.500.
TEMPORARY SEWAGE BYPASS PUMPING L.S. 1 $ 15 000.00 $15.000.
MANHOLE 48 IN. DIAM. TYPE 3 EACH 11 ! S 5.000.00 $55.000.
STRUCTURE EXCAVATION CLASS B C.Y. 3.250 $ 25.00 5812..'iO.
STRUCTURE EXCAVATION CLASS B INCl. HAUL C.Y. 500 $ 25.00 $12.500.
SHORING OR EXTRA EXCAVATION ClASS B . S.F. 25.523 $ <-1.00 $25.523.
BANK RUN GRAVEL FOR TRENCH BACKFILL C.Y. 257 $ 20.00 $5 140.
PLUG EXISTING PIPE EACH 20 $ 100.00 $2 000.
UNSUITABLE FOUNDATION EXCAVATION INCL. HAUL C.Y. 51 $ 20.00 ~
ADJUST EXISTING MANHOLE EACH 1 $ 350.00
ADJUST EXISTING MANHOLE - NON-8TANDARD EACH 1 $ 900.00 900.
REMOVE EXISTING MANHOLE EACH 16 $ 250.00 $4.000.
WOOD STAVE PIPE REMOVAL LF. 600 1$ 2.00 .$1.200.
Subtotal $604.538.00
State Retail Sale Tax (8.6%1 $51.990.27
Sub-Total S856.52827
Construction Contlnaency SO", S32.82SA1
I
. Grand Total $689,354.68 I
/I:1Wp CooaI9'
~dorivedfroM Bit! Os-JngJOr
8R3(J1:NoYyY""'~_
Nilyl1.:ztX11
, . .
EXHIBIT B
SCOPE OF WORK - SANITARY SYSTEM IN CHARLESTON BEACH ROAD
Work to be included into the Navy Yard Highway Phase ofthe SR3/SR304 T .I.P., is the replacement
of an existing 8-inch sanitary main located in Charleston Beach Road. The replacement would
consist of placing approximately 93 feet of new 18-inch and 2,658 feet of new 8-inch sanitary main,
11 manholes, repairing/replacing the lateral connections and abandoning the existing 8-inch main.
This work is shown in.greater detail on Pages SI through S9 of the Plan Set for the project.
Specifications are in accordance with the 2006 Washington State Department of Transportation
Standard Specifications for Road, Bridge and Municipal Construction, and as amended in the
Special Provisions section of the Contract Documents.
City of Bremerton and Kitsap County
Amendment Number 3 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
. -
AMENDMENT G
INTERLOCAL AGREEMENT
Kitsap County Agreement No. KC 1 05-97
City Agreement No. 3829
THIS AMENDMENT NUMBER D (4) to the Interlocal Agreement between the City ofBremerton,
(hereinafter referred to as "CITY") and Kitsap County (Hereinafter referred to as "COUNTY"), made
and entered into this 9 day of ~, 2007.
WHEREAS, the CITY and COUNTY entered into an Interlocal Agreement pursuant to Chapter
39.34 RCW (Interlocal Cooperation Act) on June, 16, 1997, to facilitate the development of
improved access between the Bremerton Ferry Terminal and Gorst as described in the Final
Environmental Impact Statement entitled, "SR3/304 Bremerton Ferry Terminal to the Vicinity of
Gorst Highway Improvement Project" (hereinafter referred to as "PROJECT"); and
WHEREAS, the CITY is planning the construction or improvement of a section ofthe Project within
the COUNTY, and in connection therewith, the COUNTY has requested that the CITY perform
certain work as herein described, and
WHEREAS, it is deemed to be in the best interest for the CITY to include the necessary items of
work in the CITY's construction contract proposed for the improvement of this section of the
PROJECT, and
WHEREAS, the COUNTY is obligated for the cost of work described herein.
NOW THEREFORE, by virtue of Chapter 39.34 RCW (Interlocal Cooperation Act) and in
consideration of the terms, conditions, covenants, and performances contained herein, or attached
and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS:
I
GENERAL
The CITY, as agent acting for and on behalf of the COUNTY, agrees to perform the following
"Description of Work":
Plans, specifications and cost estimates shall be prepared by the CITY in accordance with the current
State of Washington Standard Specifications for Road, Bridge, and Municipal Construction, and
amendments thereto, and adopted design standards, unless otherwise noted for the street lighting
work. The CITY will incorporate the plans and specifications into the CITY's project and thereafter
advertise the resulting project for bid and, assuming bids are received and contract is awarded,
administer the contract.
The COUNTY hereby approves the plans and specifications for the described work as shown on
Exhibits "B", attached hereto and by this reference made a part ofthe AGREEMENT.
City of Bremerton and Kitsap County
Amendment Number 4 to Inter/oeal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
The COUNTY may, if it desires, furnish an inspector on the project. Any cost for such inspection
will be borne solely by the COUNTY. All contact between said inspector and the CITY's contractor
shall be through the CITY's representative.
The COUNTY agrees, upon satisfactory completion of the work involved to deliver a letter of
acceptance to the CITY, which shall include a release and waiver of all future claims or demands of
any nature resulting from the performance of the work for the sanitary sewer work under the
AGREEMENT.
If a letter of acceptance is not received by the CITY within 90 days following completion of the
work, the work will be considered accepted by the COUNTY and shall release the CITY from all
future claims and demands of any nature resulting from the performance of the work under this
AGREEMENT.
The COUNTY may withhold this acceptance for work by submitting written notification to the CITY
within the 90-day period. This notification shall include the reasons for withholding the acceptance.
In the event that any damage is discovered or is incurred after acceptance of the work and to the
extent that such damage is to the COUNTY'S facilities or is alleged to be caused by the COUNTY'S
facilities under this AGREEMENT then the CITY agrees to execute a general assignment of its
claims against the project prime contractor so the COUNTY may pursue any claims or causes of
action the CITY may have against its prime contractor for the damages mentioned herein.
The CITY shall ensure that all contracts related to the completion of this project include a
comprehensive indemnification clause holding harmless the CITY and COUNTY. The CITY shall
also ensure that liability related to its general contractor is appropriately covered by insurance and
that said insurance coverage include and name the COUNTY as an additional insured.
II
PAYMENT
The COUNTY, in consideration of the faithful performance of the work to be done by the CITY,
agrees to reimburse the CITY for the actual direct and related indirect cost of the work.
An itemized estimate of cost for work to be performed by the CITY at the COUNTY's expense is
marked Exhibit "A", and is attached hereto and by this reference made a part of the
AGREEMENT.
Partial payments shall be made by the COUNTY, upon request ofthe CITY, to cover costs
incurred. These payments are not to be more frequent than one (1) per month. It is agreed that
any such partial payment will not constitute agreement as to the appropriateness of any item and
that, at the time of the final audit, all required adjustments will be made and reflected in a final
payment.
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
The COUNTY agrees to make payment for the work to be done by the CITY within thirty (30)
days from receipt of billing from the CITY.
The COUNTY agrees that if payment for the storm sewer work is not made within ninety (90)
days after receipt of billing the CITY shall assess a penalty of 10% on all amounts outstanding
until payment for the work is received by the CITY.
The COUNTY agrees to pay the CITY an "Advance Payment Amount" of $1 0,000 within 20
days after the CITY submits its first partial payment request to the COUNTY. The advance
payment represents approximately twenty (20) percent of the estimate of cost and covers costs
incurred by the CITY in the initial stages of the project. The advance payment will becarried
throughout the life of the project with final adjustment made in the final payment.
Upon completion of the work outlined herein, all future operation and maintenance of the
COUNTY's facilities shall be at the sole cost ofthe COUNTY and without expense to the CITY.
III
DELETION OF WORK
In the event the estimate of cost, EXHIBIT "A", is in excess of $20,000 and the total actual bid
prices for the work covered by this AGREEMENT exceeds the estimate of costs by more than
15 percent, the COUNTY shall have the option of directing the CITY to delete all or a portion of
the work covered by this AGREEMENT from the CITY's contract. Except, that this provision
shall be null and void ifthe COUNTY's portion of the work exceeds 20 percent ofthe actual
total contract bid price, or if the COUNTY is responsible for the costs under State law or the
Washington Administrative Code WAC 468-18-040(5)( d).
The COUNTY shall have five (5) working days from the date of written notification to inform
the CITY to delete the work. Should the COUNTY exercise its option to delete the work, the
COUNTY agrees, upon billing by the CITY, to reimburse the CITY for preliminary engineering
costs incurred by the CITY to include the work covered by this AGREEMENT in the CITY's
contract.
IV
EXTRA WORK
In the event unforeseen conditions require an increase in the cost of 25 percent or more from that
agreed to on Exhibit "A", this AGREEMENT will be modified by a supplement AGREEMENT
covering said increase.
In the event it is determined that any change from the description of work contained in the
AGREEMENT is required, approval must by secured from the COUNTY prior to the beginning
of such work. Where the change is substantial, written approval must be secured.
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
Reimbursement for increased work and/or a substantial change in the description of work shall
be limited to costs covered by a written modification, change order or extra work order approved
by the COUNTY.
V
RIGHT OF ENTRY
The COUNTY hereby grants and conveys to the CITY the right of entry upon all land which the
COUNTY has interest, within or adjacent to the right of way ofthe highway, for the purpose of
constructing said improvements.
VI
VENUE
In the event that any party deems it necessary to institute legal action or proceedings to enforce
any right of obligation under this AGREEMENT, the parties hereto agree that any ~uch action or
proceedings shall be brought in a court of competent jurisdiction situated in Kitsap County,
Washington.
vn
LEGAL RELATIONS
No liability shall attach to the CITY or the COUNTY by reason of entering into this
AGREEMENT except as expressly provided herein.
IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NUMBER !' as
ofthe day and year first above written.
c~~
Cary Bozeman, Mayor
~
7 h7 /07
Date I I
ATTEST:
r~~~~ A r
Paula Johnston, CIty CI~
Date ~/o 7
~TOFORM:
ger . ~viCh,! Aey
Date
City of Bremerton and Kitsap County
Amendment Number 4 to Interloeal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
'/~/Ol
Date
Phil Williams, Director ofP.W. & u.
/P//~/07
Date
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
BOARD OF COMMISSIONERS
KITSAP COUNTY, WASHINGTON
~ " ~...--
1 /~/07
Date
J~sSl-^^Ptj
7 / 1/ 0 7
, ,
Date
~j5~
Stephen Bauer, Commissioner
7 I If /07
Date
/)
7
Date
/ 1 /07
I ,
ATTEST:
Opal
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
CONSTRUCTION COSTS
eoatror utnlmum DNlan Caet 10, eun.nl DNlan
"r. ur ';;O~ UNIT eo8T QUANTITY TOTAl. COST QUANTITY TOTAl. COST
SPEC DESCRIPTION UNIT
WORKINIIDli IITATIiRlOllT OI'WAY
STORII BeWIlR
STO SOlID WNJ.. PVC STORM SEWER PIPE 12 IN, DWA. LF, $50.00 660 533 000.00 660 533000.00
8TD SOIJI) WAll. PVO STORM SEWER PIPE IB IN. DWA. LF. 180.00 "I 531 010.00 "I 131 OBO.00
8TD SOLID WAll. PVO STORM SEWER PlPl! 241M. DIAM, LF. $95.00 2.1, 124 605.00 m $21,605,00
8TD SOLIO WAll. PVO STORM SEWER PIPe 30 IN. DIAM. LF, SIOS.OO 4dO $41. 00.00 $0.00
8TD INSTNJ.. CITY llUPPUEO STORM SEWER PIPE 4t IN. OIAM. LF. SIOO,OO SO.OO 4dO $46.000.00
STO CONNeCTION TO CRAINAOE STRUCTURE EACH $400.00 2 Sloo.oo 2 Sloo.OO
STD CATCH BASIN TYPE I EACH SI.OOO.OO , S,ooo.oo 1 A.OOO.OO
STD CATCI-t BASIN TYPE 2 <laIN, DIAM. EACH 112.400.00 3 $7.200.00 I 52.400.00
8TD CATCI-t BASIN TYPE 2 54 IN. OIAM. EACH $4,500.00 1 $9000.00 $0.00
8TD CATCI-t BASIN TYPE 2 60 IN. DWA. EACH $4 100.00 2 SI.1JlO.OO 3 SIUOO.oo
STO CATCH BASIN TYPE 2 121M. DtAM. EACH $1400.00 $0.00 4 S29 600.00
STO TESTING STORM SEWER PIPE LF. SUO 1.197 SUI5.oo 1.197 $9 48S.oo
OTHER ITEMS
STRUCTURE EXCAVATION ClASS B 1NCl. HAUL C.Y. $2.l.oo I..... 536.315.00 I.m $43 075.00
SKORING 8.F. SI.OO 3.153 5) m.oo 3,853 53.8$3.00
GRAve. BACKFIU. FOR PIPE ZON!! BEDDING c.v. $20.00 100 nooo.oo 100 $2.000.00
BANK RUN GRAVEl FOR TRENCH BACKFILL o.y, 520.00 365 $7.265.00 431 58 615.00
PLUGGING ElCI8TING PIPE EACH Sloo.OO 3 $500.00 5 "00.00
CONTAMINATED GFIOUNOWATER DISPOSAL EST. SI.OO I $1.00 I $1.00
CONTMlINATED SOIL EXCAVATION INCL HAUL EST. $1.00 I $1.00 I $1.00
MINOR CHANGE CALC. 51.00 I SI.OO I $1.00
8uII~ $2.'lO 818.00 $285.318.00
_._1 8111e T_~ ~ $21 ID,18
Tatof , U77 .27S.11 .
WORK OUTSIDE STATE RIGHT OF WAY
STOllM 8EWElI
SID SOLIO WALL PVC STORM SEWER PIPE S IN. OIAM LF. $40.00 313 51 !.52O.00 m $12.$20.00
STD SOLID WALL PVC STORM seweR PIPE 12 IN. DIAM. LF. $50.00 I..... 561-000.00 I..... $61-000.00
STD SOLID WALL PVO STOllU seweR PIPE 15 IN. DIAM. LF. $55.00 114 SIO 120.00 50.00
8TD sou 0 WALL PVO STORM SEWER PIPE I8IN.DIAM. LF. $SO.oo m SI7 100.00 .... S21IMI.oo
8TD 8OUO WALL PVC STORf.lSEWEll PIPE 241M. DWA. LF. $95.00 171 $16.2.45,00 J7\ $16.245.00
STO SOLIO WAll. PVC STORM SEWER PIPE 30 IN. DlAM. LF. $105.00 357 531415.00 So.oo
STD SCHEDULE A STORM SEWER PIPE <la1N.lllAM. LF. $130.00 $0.00 357 $46 410.00
CONNECTlON TO DRAINAGE STRUlmJRE EACH $400.00 3 51.200.00 3 SUOO.OO
STD ~TCH BASIN TYPE 40 EACH 'IllOO.00 2 SI 100.00 2 $1 100.00
STO CATCH BASIN TYPE 1 EACI-t SI 000.00 17 $17 000.00 17 S17,OOO.00
STO CATCH BASIN TYPE 2 <laIN. DIAM. EACH $2AOO.OO 3 $7.200.00 3 $7.200.00
STD CATCH BASIN TYPE 2 54 IN. DIAM. EACH $4 500.00 3 513.soo.00 SO.OO
STD CATCH BASIN TYPE 2 60 IN. 0lAM. EACH 54100.00 I 54 100.00 $ 0.00
8TD CATCH BASIN TYPE 272 IN. DIAM. EACH $4 100.00 50.00 . SI6.4OO.00
STD TESTING STORM SEWER PIPE LF. 5~.00 2.SSO $12. 7jO.00 2,jSO SI2.7jO.00
OTHER IlEUS
STRUCTURE exCAVATION ClASS B 1NCl. HAUL c.Y. $2S,00 2.162 $$4 050.00 !,S34 $63 350.00
SHORING SoF. $1.00 3.597 53 597.00 3.597 53.597.00
GRAVEL BACKFILL FOR PIPE ZONE IlEDIlING C.V. $20.00 100 52.000.00 100 $2.000.00
ElAN)( R\JN GRAVEL FOR TRENCH BACKFill O.Y. S20.oo $41 $10,810.00 <34 $12.670.00
CONTAMINATED GROUNOWATE~ DIsPOSAL EST. 51.00 I $(.00 I $1.00
CONTAMINATED SOIL EXCAVATION INCL HAUL EST. $1.00 I 51.00 I SI.00
WOOD STAVE PIPEAEMOVAL LF. $2.00 600 $ 1 200.00 600 $\.200.00
MINOR CHANGE CALC. $1.00 r $1,00 I SI.OO
Subtotal $284 680.00 $304 485.00
ALTERNATE BID ITEMS
36 INCH OLITFALL REPAIRS AND LINIMG LS. $107400.00 1 5107400.00 I 5107,400.00
28 INCI-t OLITFAl\. ~EPAIRS AND LINING L8. $81 GOO.OO I S81 600.00 I $81 600.00
30 INCH OUTFAll REPAIRS AND LINING LS. 554.soo.00 1 S34 500.00 1 584.500.00
Solo ""loB Soli Tlx (U%) $23 521.00 5D 521.00
Sublolol S2,7 021.00 S297.021,00
TOTALS $581,T01.oo $801,51la.OO I
COUNTY SHARE . CURRENT - MINIMUM
5876,778.18
$832,140.08
$46,629.20
......,..".
C-~~bl"~p
SAJtU;Naryr.,Jltrr"",,~
1 of'
U.ll,JtJtn
EXHIBIT B
SCOPE OF WORK - STORM SYSTEM IN CHARLESTON BEACH ROAD
Work to be included into the Navy Yard Highway Phase of the SR3/SR304 T.I.P., is the upsizing
of the existing storm system within Charleston Beach Road to accommodate the storm flows
from the Navy Yard City Regional Stormwater Improvements Project (NYCRSIP). The upsizing
will require the use of 36 and 42 inch storm lines with 54 and 60 inch Type II catch basins from
the current design of 18 and 24 storm lines with Type I and 48 inch Type II catch basins. This
work is shown in greater detail on Pages PI through P15 ofthe Plan Set for the project.
Specifications are in accordance with the 2006 Washington State Department of Transportation
Standard Specifications for Road, Bridge and Municipal Construction, and as amended in the
Special Provisions section of the Contract Documents.
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
Vendor
Subject
Department
Status Code
Amount
Begin Date
End Date
Review Date
Insurance
Comments
Contract Number 3829
KITSAP CO PUBLIC WORKS
Funding - SR3/SR304 Transportation Improvement
Engineering
Gove File Class LEG 12-1
$290500.00
06/16/1997
06/15/2008
GL $
AL $
E&O $
Insurance Total $
Insurance Review Date
Completion or Funds Expended Amendment #1-3/01
#2-9/03 #3-5/07 #4-5/07 #5-5/07 #6-5/07
Review date for tracking purposes only
AMENDMENT NUMBER 6
INTERLOCAL AGREEMENT
Kitsap County Agreement No. KC105-97 F (6)
City Agreement No. 3829
THIS AMENDMENT NUMBER 6 to the Interlocal Agreement between the City of Bremerton,
(hereinafter referred to as "CITY") and Kitsap County (Hereinafter referred to as "COUNTY"),
made and entered into this I LIth day of~, 2007.
WHEREAS, the CITY and COUNTY entered into an Interlocal Agreement pursuant to Chapter
39.34 RCW (Interlocal Cooperation Act) on June, 16, 1997, to facilitate the development of
improved access between the Bremerton Ferry Terminal and Gorst as described in the Final
Environmental Impact Statement entitled, "SR3/304 Bremerton Ferry Terminal to the Vicinity of
Gorst Highway Improvement Project" (hereinafter referred to as "PROJECT"); and
WHEREAS, it is deemed to be in the best interest for the CITY to include items of work in the
CITY's construction contract proposed for the improvement of this section of the PROJECT, and
WHEREAS, the CITY is obligated for the cost of work described herein.
NOW THEREFORE, by virtue of Chapter 39.34 RCW (Interlocal Cooperation Act) and in
consideration of the terms, conditions, covenants, and performances contained herein, or
attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS
FOLLOWS:
I
GENERAL
The CITY, as agent acting for and on behalf of the COUNTY, agrees to perform the following
"Description of Work":
Plans, specifications and cost estimates shall be prepared by the CITY in accordance with the
current State of Washington Standard Specifications for Road, Bridge, and Municipal
Construction, and amendments thereto, and adopted design standards, unless otherwise noted for
the work. The CITY will incorporate the plans and specifications into the CITY's project and
thereafter advertise the resulting proj ect for bid and, assuming bids are received and contract is
awarded, administer the contract.
The COUNTY hereby approves the CITY incorporating this work into the plans and
specifications as described in Exhibit "A", attached hereto and by this reference made a part of
the AGREEMENT.
The COUNTY may, if it desires, furnish an inspector on the project. Any cost for such
inspection will be borne solely by the COUNTY. All contact between said inspector and the
CITY's contractor shall be through the CITY's representative.
City of Bremerton and KitsapCounty
Amendment Number 6 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
II
PAYMENT
All costs associated with the work, including design, inspection, installation and maintenance for
the project, shall be solely borne by the CITY.
Upon completion of the work outlined herein, all future operation and maintenance of the
improvements shall be at the sole cost of the CITY.
III
RIGHT OF ENTRY
The COUNTY hereby grants and conveys to the CITY the right of entry upon all land which the
COUNTY has interest, within or adjacent to the right of way of the highway, for the purpose of
constructing said improvements.
IV
VENUE
In the event that any party deems it necessary to institute legal action or proceedings to enforce
any right of obligation under this AGREEMENT, the parties hereto agree that any such action or
proceedings shall be brought in a court of competent jurisdiction situated in Kitsap County,
Washington.
V
LEGAL RELATIONS
No liability shall attach to the CITY or the COUNTY by reason of entering into this
AGREEMENT except as expressly provided herein.
City of Bremerton and Kitsap County
Amendment Number 6 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NUMBER 5 as
of the day and year first above written.
CITY OF BREMERTON:
~~
Cary Bozeman, Mayor
APPROVED AS TO FORM:
Phil Williams, Director ofP.W. & U.
City of Bremerton and Kitsap County
Amendment Number 6 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
----=>
~~ c:2 /-O?
,
Date
f-;2 /-07
Date
1-;<3-0 ;:>
Date
. "I-Z,,1-07
Date
,-//Z7/07
Date F .
BOARD OF COMMISSIONERS
~GTON ..
;/ 'A_____
// ~.
,~{ ,F -
COOS Endresen, Chair
(~
(
''-.
~ L. 77~
ATTEST:
City of Bremerton and Kitsap County
Amendment Number 6 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
S- /14 / 07
Date
S- / /if /0 7
Date
) II if / 0 1
Date
) /, &j I p 1
Date I
EXHIBIT A
SCOPE OF WORK - LANDSCAPING IMPROVEMENTS
The Navy Yard Highway Phase of the SR3/SR304 T.I.P. project, will be reconstructing
Charleston Beach Road with a new surface, curb and gutter, sidewalks and a retaining wall from
approximately Station 80+60 to 83+25. As part of this construction, the City will be restoring
the areas behind some of the sidewalks and all of the adjacent area to the retaining wall with
vegetation. This will be in addition to the landscaped areas previously constructed with the
Missouri Gate phase of the project.
As Navy Yard Highway phase and portions of the Missouri Gate phase are entirely within Kitsap
County jurisdiction, the City of Bremerton seeks to maintain these vegetated and landscaped
areas at City expense by City forces.
This work is shown in greater detail on Pages L 1 through L 3 of the Plan Set for the project.
Specifications are in accordance with the 2006 Washington State Department of Transportation
Standard Specifications for Road, Bridge and Municipal Construction, and as amended in the
Special Provisions section of the Contract Documents.
"
City of Bremerton and Kitsap County
Amendment Number 6 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
AMENDMENT NUMBE~ E (5)
mTERLOCALAGREEMENT
Kitsap County Agreement No. KC105-97E (5)
City Agreement No. 3829
THIS AMENDMENT NUMBER 5 to the Interlocal Agreement between the City of Bremerton,
(hereinafter referred to as "CITY") and Kitsap County (Hereinafter referred to as "COUNTY"),
made and entered into this 'L) Ih day of !VI 4J ' 2007.
WHEREAS, the CITY and COUNTY entered into an Interlocal Agreement pursuant to Chapter
39.34 RCW (J.nterlocal Cooperation Act) on June, 16, 1997, to facilitate the development of
improved access between the Bremerton Ferry Terminal and Gorst as described in the Final
Environmental Impact Statement entitled, "SR3/304 Bremerton Ferry Terminal to the Vicinity of
Gorst Highway Improvement Project" (hereinafter referred to as "PROJECT"); and
WHEREAS, it is deemed to be in the best interest for the CITY to include items of work in the
. CITY's construction contract proposed for the improvement of this section of the PROJECT, and
WHEREAS, the CITY is obligated for the cost of work described herein.
NOW THEREFORE, by virtue of Chapter 39.34 RCW (Interlocal Cooperation Act) and in
consideration of the terms, conditions, covenants, and performances contained herein, or
attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS
FOLLOWS:
I
GENERAL
The CITY, as agent acting for and on behalf of the COUNTY, agrees to perform the following
"Description of Work":
Plans, specifications and cost estimates shall be prepared by the CITY in accordance with the
current State of Washington Standard Specifications for Road, Bridge, and Municipal
Construction, and amendments thereto, and adopted design standards, unless otherwise noted for
the work. The CITY will incorporate the plans and specifications into the CITY's project and
thereafter advertise the resulting project for bid and, assuming bids are received and contract is
awarded, administer the contract.
The COUNTY hereby approves the CITY incorporating this work into the plans and .
specifications as described in Exhibit "A", attached hereto and by this reference made a part of
the AGREEMENT.
The COUNTY may, if it desires, furnish an inspector on the project. Any cost for such
inspection will be borne solely by the COUNTY. All contact between said inspector and the
CITY's contractor shall be through the CITY's representative.
City of Bremerton and Kitsap County
Amendment Number 5 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
.)
II
PAYMENT
All costs associated with the work, including design, inspection, construction and maintenance
for the project, shall be solely borne by the City
Upon completion of the work outlined herein, all future operation and maintenance of the
improvements shall be at the sole cost ofthe CITY.
III
DELETION OF WORK
In the event the estimate of cost for the PROJECT exceeds current construction funding, the
CITY shall have the option of deleting all or a portion of the work covered by this
AGREEMENT from the CITY's contract. Deletion of the work from the CITY's contract shall
be at no cost to the COUNTY.
Should the CITY delete all of the work, responsibility for all future operation and maintenance of
the two existing/replacement standards at Webster and National Avenues, and all costs thereof,
shall return to the COUNTY.
IV
RIGHT OF ENTRY
The COUNTY hereby grants and conveys to the CITY the right of entry upon all land which the
COUNTY has interest, within or adjacent to the right of way of the highway, for the purpose of
constructing said improvements.
V
VENUE
In the event that any party deems it necessary to institute legal action or proceedings to enforce
any right of obligation under this AGREEMENT, the parties hereto agree that any such action or
proceedings shall be brought in a court of competent jurisdiction situated in Kitsap County,
Washington.
VI
LEGAL RELATIONS
No liability shall attach to the CITY or the COUNTY by reason of entering into this
AGREEMENT except as expressly provided herein.
City of Bremerton and Kitsap County
Amendment Number 5 to Inter/oeal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NUMBER 5 as
of the day and year first above written.
CITY OF BREMERTON:
~~
Cary Bozeman, Mayor
------
-----
~~
Phil Williams, Director ofP.W-:- & u.
City of Bremerton and Kitsap County
Amendment Number 5 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
~
t/--~7-{)7
Date
Y-~?-CJ7
Date
)1-;;(3-07
.
Date
'-1-1.1-07
Date
tfl7-7/~ 7
Date
BOARD OF COMMISSIONERS
KITSAP COUNTY, WASHINGTON
~
. : ~:~ese;: Chair. ~
r~,'~
City of Bremerton and Kitsap County
Amendment Number 5 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
Date
1) //'1 / 07
I
) //1./ / 07
f ,
Date
5' //'1/07
I .
Date
f/ll//'l
I
Date
EXHIBIT A
SCOPE OF WORK - LIGHTING SYSTEM ON CHARLESTON BEACH ROAD
Work to be included into the Navy Yard Highway Phase of the SR3/SR304 T.LP., is the
construction of a new lighting system along Charleston Beach Road (CBR). This will entail
running cable the length of the project (2600 feet), and installation of twelve (12) light standards
and luminaires.
This will be in addition to the two existing lighting standards to be replaced at the intersections
ofCBR and National Avenue, and CBR and Webster Avenue. The replacement ofthe two
existing standards is included as part of the project and are a separate contract item.
This work is shown in greater detail on Pages IlL 1 through IlL 3 of the Plan Set for the project.
Specifications are in accordance with the 2006 Washington State Department of Transportation
Standard Specifications for Road, Bridge and Municipal Construction, City of Bremerton
Lighting Standards and as amended in the Special Provisions section ofthe Contract Documents.
City of Bremerton and Kitsap County
Amendment Number 5 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
AMENDMENT NUMBER D (4)
INTERLOCAL AGREEMENT
County Agreement No. KC105-97D (4)
City Agreement No. 3829
THIS AMENDMENT NUMBER D (4) to the Interlocal Agreement between the City of
Bremerton, (hereinafter referred to as "CITY") and Kitsap County (Hereinafter referred to as
"COUNTY"), made and entered into this day of , 2007.
WHEREAS, the CITY and COUNTY entered into an Interlocal Agreement pursuant to Chapter
39.34 RCW (Interlocal Cooperation Act) on June, 16, 1997, to facilitate the development of
improved access between the Bremerton Ferry Terminal and Gorst as described in the Final
Environmental Impact Statement entitled, "SR3/304 Bremerton Ferry Terminal to the Vicinity of
Gorst Highway Improvement Project" (hereinafter referred to as "PROJECT"); and
WHEREAS, the CITY is planning the construction or improvement of a section of the Project
within the COUNTY, and in connection therewith, the COUNTY has requested that the CITY
perform certain work as herein described, and
WHEREAS. it is deemed to be in the best interest for the CITY to include the necessary items of
work in the CITY's construction contract proposed for the improvement of this section of the
PROJECT, and
WHEREAS, the COUNTY is obligated for the cost of work described herein.
NOW THEREFORE, by virtue of Chapter 39.34 RCW (Interlocal Cooperation Act) and in
consideration of the terms, conditions, covenants, and performances contained herein, or
attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS
FOLLOWS:
I
GENERAL
The CITY, as agent acting for and on behalf of the COUNTY, agrees to perform the following
"Description of Work":
Plans, specifications and cost estimates shall be prepared by the CITY in accordance with the
current State of Washington Standard Specifications for Road, Bridge, and Municipal
Construction, and amendments thereto, and adopted design standards, unless otherwise noted for
the street lighting work. The CITY will incorporate the plans and specifications into the CITY's
project and thereafter advertise the resulting project for bid and, assuming bids are received and
contract is awarded, administer the contract.
The COUNTY hereby approves the plans and specifications for the described work as shown on
Exhibits "B", attached hereto and by this reference made a part ofthe AGREEMENT.
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
The COUNTY may, if it desires, furnish an inspector on the project. Any cost for such
inspection will be borne solely by the COUNTY. All contact between said inspector and the
CITY's contractor shall be through the CITY's representative.
The COUNTY agrees, upon satisfactory completion of the work involved to deliver a letter of
acceptance to the CITY, which shall include a release and waiver of all future claims or demands
of any nature resulting from the performance of the work for the sanitary sewer work under the
AGREEMENT.
If a letter of acceptance is not received by the CITY within 90 days following completion of the
work, the work will be considered accepted by the COUNTY and shall release the CITY from all
future claims and demands of any nature resulting from the performance of-the work under this
AGREEMENT.
The COUNTY may withhold this acceptance for work by submitting written notification to the
CITY within the 90-day period. This notification shall include the reasons for withholding the
acceptance.
In the event that any damage is discovered or is incurred after acceptance of the work and to the
extent that such damage is to the COUNTY'S facilities or is alleged to be caused by the
COUNTY'S facilities under this AGREEMENT then the CITY agrees to execute a general
assignment of its claims against the project prime contractor so the COUNTY may pursue any
claims or causes of action the CITY may have against its prime contractor for the damages
mentioned herein.
The CITY shall ensure that all contracts related to the completion of this project include a
comprehensive indemnification clause holding harmless the CITY and COUNTY. The CITY
shall also ensure that liability related to its general contractor is appropriately covered by
insurance and that said insurance coverage include and name the COUNTY as an additional
insured.
II
PAYMENT
The COUNTY, in consideration of the faithful performance of the work to be done by the CITY,
agrees to reimburse the CITY for the actual direct and related indirect cost of the work.
An itemized estimate of cost for work to be performed by the CITY at the COUNTY's expense
is marked Exhibit "A", and is attached hereto and by this reference made a part of the
AGREEMENT.
Partial payments shall be made by the COUNTY, upon request of the CITY, to cover costs
incurred. These payments are not to be more frequent than one (1) per month. It is agreed that
any such partial payment will not constitute agreement as to the appropriateness of any item and
that, at the time of the final audit, all required adjustments will be made and reflected in a final
payment.
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
The' COUNTY agrees to make payment for the work to be done by the CITY within thirty (30)
days from receipt of billing from the CITY.
The COUNTY agrees that ifpayment for the storm sewer work is not made within ninety (90)
days after receipt of billing the CITY shall assess a penalty of 10% on all amounts outstanding
until payment for the work is received by the CITY.
The COUNTY agrees to pay the CITY an "Advance Payment Amount" of $10,000 within 20
days after the CITY submits its first partial payment request to the COUNTY. The advance
payment represents approximately twenty (20) percent of the estimate of cost and covers costs
incurred by the CITY in the initial stages of the project. The advance payment will be carried
throughout the life of the project with final adjustment made in the final payment.
Upon completion of the work outlined herein, all future operation and maintenance of the
COUNTY'sfacilities shall be at the sole cost of the COUNTY and without expense to the CITY.
III
DELETION OF WORK
In the event the estimate of cost, EXHIDIT "A", is in excess of $20,000 and the total actual bid
prices for the work covered by this AGREEMENT exceeds the estimate of costs by more than
15 percent, the COUNTY shall have the option of directing the CITY to delete all or a portion of
the work covered by this AGREEMENT from the CITY's contract. Except, that this provision
shall be null and void if the COUNTY's portion ofthe work exceeds 20 percent ofthe actual
total contract bid price, or if the COUNTY is responsible for the costs under State law or the
Washington Administrative Code WAC 468-18-040(5)(d). '
The COUNTY shall have five (5) working days from the date of written notification to inform
the CITY to delete the work. Should the COUNTY exercise its option to delete the work, the
COUNTY agrees, upon billing by the CITY, to reimburse the CITY for preliminary engineering
costs incurred by the CITY to include the work covered by this AGREEMENT in the CITY's
contract.
IV
EXTRA WORK
In the event unforeseen conditions require an increase in the cost of 25 percent or more from that
agreed to on Exhibit "A", this AGREEMENT will be modified by a supplement AGREEMENT
covering said increase.
In the event it is determined that any change from the description of work contained in the
AGREEMENT is required, approval must by secured from the COUNTY prior to the beginning
of such work. Where the change is substantial, written approval must be secured.
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
Reimbursement for increased work and/or a substantial change in the description of work shall
be limited to costs covered by a written modification, change order or extra work order approved
by the COUNTY.
V
RIGHT OF ENTRY
The COUNTY hereby grants and conveys to the CITY the right of entry upon all land which the
COUNTY has interest, within or adjacent to the right of way of the highway, for the purpose of
constructing said improvements.
VI
VENUE
In the event that any party deems it necessary to institute legal action or proceedings to enforce
any right of obligation under this AGREEMENT, the parties hereto agree that any such action or
proceedings shall be brought in a court of competent jurisdiction situated in Kitsap County,
Washington.
VII
LEGAL RELATIONS
No liability shall attach to the CITY or the COUNTY by reason of entering into this
AGREEMENT except as expressly provided herein.
IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NUMBER 4 as
ofthe day and year first above written.
CITY~~
Cary Bozeman, Mayor
---,
0--;27-07
Date
~-d7-07
Date
~--;(3-0 ')
Date
City of Bremertan itsap County
Amendment lfu er 4 to Interlaeal Agreement
SR3/SR30413remertan Ferry Terminal to Garst Vicinity TIP
ra Lyon, Finance
011 >>~
Phil William'S, Director ofP.W. & U.
..., ... z. 1-07
Date
'-1h-7 )07
Date
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
BOARD OF COMMISSIONERS
KITSAP COUNpY, W SHINGTON
y
~ L-.- ~ 17~
ATTEST:
City oj Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
5' //4 107
. ,
Date
... /Ilf / 0 7
)
. ,
Date
1i Ill! jfl]
Date' ,
ENGINEER'S ESTIMATE
EIUmale lor Minimum OMlgn EIUmale lor Current Dellon
rvPE OF ITEM
SPEC NO. DESCRIPTION UNIT UNIT COST QUANTITY TOT At COST QUANTITY TOT At COST
WORK INSIDE STATE RIOJfT OF WAY
.
STORM SEWER
STD SOLID WALL PVC STORM SEWER PIPE 12 IN. DIAM. l.F. $50.00 660 $33,000.00 660 $33,000.00
STD SOLID WALL PVC STORM SEWER PIPE 18 IN. DIAM. LF. $60.00 SI8 $31 080.00 518 $31 080.00
STD SOLID WALL PVC STORM SEWER PIPE 24 IN. DIAM. l.F. $80.00 259 $20,720.00 259 $20,720.00
STD SOLID WALL PVC STORM SEWER PIPE 30 IN. DIAM. L.F. $90.00 460 $41 400.00 $0.00
STD INSTALL CITY SUPPLIED STORM SEWER PIPE 421N. DIAM. L.F. $80.00 $0.00 460 $36,800.00
STD CONNECTION TO DRAINAGE STRUCTURE EACH $500.00 2 $1,000.00 2 $1,000.00
STD CATCH BASIN TYPE 1 EACH $1,000.00 9 $9000.00 8 $8 000.00
STD CATCH BASIN TYPE 2 48 IN. DIAM. EACH $3,000.00 3 $9,000.00 I $3,000.00
STD CATCH BASIN TYPE 2 54 IN. DIAM. EACH $4,500.00 2 $9,000.00 $0.00
STD CATCH BASIN TYPE 2 80 IN. DIAM. EACH $5,000.00 2 $10,000.00 J $15,000.00
STD CATCH BASIN TYPE 2 72 IN. DIAM. EACH $7,000.00 $0.00 4 $28,000.00
STD TESTING STORM SEWER PIPE L.F. $3.00 1,897 $5,691.00 1,897 $5,691.00
OTHER ITEMS
STRUCTURE EXCAVATION CLASS B INCL. HAUL C.Y. $15.00 1,453 $21,795.00 I,m $25,845.00
SHORING S.F. $2.00 3,8S3 $7,706.00 3,853 $7,706.00
GRAVEL BACKFill FOR PIPE ZONE BEDDING C.Y. $20.00 100 $2,000.00 100 $2,000.00
BANK RUN GRAVEL FOR TRENCH BACKFill C.Y. $15.00 363 $5448.75 431 $6461.25
PLUGGING EXISTING PIPE EACH $200.00 5 $1,000.00 5 $1,000.00
CONTAMINATED GROUNDWATER DISPOSAL EST. $1.00 1 $1.00 I $1.00
CONTAMINATED SOil EXCAVATION INCL. HAUL EST. $1.00 I $1.00 I $1.00
MINOR CHANGE CALC. $1.00 1 $1.00 I $1.00
Subtotal $207843,75 $225 306,25
stete Relall Sale TaxD (8.6% $17 874,$6 $19 378.34
Total $225 718.31. $244 882.59
WORK OUTSIDE STATE RIGHT OF WAY .
STORM SEWER
STD SOLID WALL PVC STORM SEWER PIPE 8 IN. DIAM. L.F. $35.00 313 $10,955.00 JI3 $10,955.00
STD SOLID WALL PVC STORM SEWER PIPE 12 IN. DIAM. LF. $50.00 1.240 $62000.00 1,240 $62,000.00
STD SOLID WALL PVC STORM SEWER PIPE 16 IN. DIAM. LF. $55.00 184 $10,120.00 $0.00
STD SOLID WALL PVC STORM SEWER PIPE 18 IN. DIAM. L.F. $60.00 285 $17,100.00 469 $28,140.00
STD SOLID WALL PVC STORM SEWER PIPE 24 IN. DIAM. l.F. $80.00 171 $13,680.00 171 $13,680.00
STD SOLID WALL PVC STORM SEWER PIPE 30 IN. OIAM. L.F. $90.00 J57 $32,130.00 $0.00
STD INSTALL CITY SUPPLIED STORM SEWER PIPE 42 IN. DIAM. LF. $80.00 $0.00 J57 $28,560.00
CONNECTION TO DRAINAGE STRUCTURE EACH $500.00 3 $1500.00 3 $1 500.00
STD CATCH BASIN TYPE 40 EACH $600.00 . 2 $1,200.00 2 $1 200.00
STD CATCH BASIN TYPE 1 EACH $1,000.00 . 17 $17 000.00 17 $17000.00
STD CATCH BASIN TYPE 2 48 IN. DIAM. EACH $3,000.00 J $9,000.00 3 $9,000.00
STD CATCH BASIN TYPE 2 54 IN. DIAM. EACH $4,500.00 3 $13,500.00 $0.00
STD CATCH BASIN TYPE 2 80 IN. DIAM. EACH $5,000.00 1 $5 000.00 $0.00
STD CATCH BASIN TYPE 2 72 IN. DIAM. EACH $7,000.00 $0.00 4 $28,000.00
STD TESTING STORM SEWER PIPE l.F. $2.00 2,550 $5,100.00 2,550 $5,100.00
OTHER ITEMS
STRUCTURE EXCA V A nON CLASS B INCL. HAUL C.Y. $15.00 2,162 $32,430.00 2.534 $38010.00
SHORING S.F. $2.00 3.597 $7,194.00 3,597 $7,194.00
GRAVEL BACKFill FOR PIPE ZONE BEDDING C.Y. $20.00 100 $2,000.00 100 $2000.00
BANK RUN GRAVEL FOR TRENCH BACKFill C.Y. $15.00 541 $8,107.50 634 $9,502.50
CONTAMINATED GROUNDWATER DISPOSAL. EST. $1.00 1 $1.00 I $1.00
CONTAMINATED SOil EXCAVATION INCL HAUL EST. $1.00 I $1.00 I $1.00
WOOD STAVE PIPE REMOVAL L.F. $10.00 600 $6,000.00 600 $6,000.00
MINOR CHANGE CALC. $1.00 I $1.00 I $1.00
Subtolel $254,019.50 $267,844.50
ALTERNATE BID ITEMS .
36 INCH OLITFAll REPAIRS AND LINING L.S. $65,000.00 1 $65,000.00 1 $65,000.00
28 INCH OUTFALL REPAIRS AND LINING L.S. $100,000.00 1 $100000.00 1 SlOG 000.00
30 INCH OUTFAll REPAIRS AND LINING L.S. $45,000.00 1 $45,000.00 I $45,000.00
. 5ale Retail Sale,Tax (8.6%) $18060.00 $18060.00
Subtotal $228,060.00 $228,060.00
TOTALS $482,079.50 $495,904.50 I
COUNTY SHARE c CURRENT. MINIMUM
$740,587.09
$707,797.81
$32,789.28
Exhibit A
Cfty,,!B__Qfwl
60n CJQIIfIl &fin,,:f.!fJfMlrlfrmlllf I'WIlU Cumml SI01frl sp""
$RJfH: Na,?,Y"."/Hfr/twayPII_
10/'
EXHIBIT B
SCOPE OF WORK - STORM SYSTEM IN CHARLESTON BEACH ROAD
Work to be included into the Navy Yard Highway Phase of the SR3/SR304 T.LP., is the up sizing
ofthe existing storm system within Charleston Beach Road to accommodate the storm flows
from the Navy Yard City Regional Stormwater Improvements Project (NYCRSIP). The
up sizing will require the use of 36 and 42 inch storm lines with 54 and 60 inch Type II catch
basins from the current design of 18 and 24 storm lines with Type I and 48 inch Type II catch
basins. This work is shown in greater detail on Pages PI through PIS of the Plan Set for the
proj ect.
Specifications are in accordance with the 2006 Washington State Department of Transportation
Standard Specifications for Road, Bridge and Municipal Construction, and as amended in the
Special Provisions section of the Contract Documents.
City of Bremerton and Kitsap County
Amendment Number 4 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
AMENDMENT NUMBER C (3)
INTERLOCAL AGREEMENT
Kitsap County Agreement No. KC105-97
City Agreement No. 3829
THIS AMENDMENT NUMBER C (3) to the Interlocal Agreement between the City of
Bremerton, (hereinafter referred to as "CITY") and Kitsap County (Hereinafter referred to as
"COUNTY"), made and entered into this 14111 day of M IWJ ,2007.
WHEREAS, the CITY and COUNTY entered into an Interlocal Agreement pursuant to Chapter
39.34 RCW (Interlocal Cooperation Act) on June, 16, 1997, to facilitate the development of
improved access between the Bremerton Ferry Terminal and Gorst as described in the Final
Environmental Impact Statement entitled, "SR3/304 Bremerton Ferry Terminal to the Vicinity of
Gorst Highway Improvement Project" (hereinafter referred to as "PROJECT"); and
WHEREAS, the CITY is planning the construction or improvement of a section of SR 304, and
in connection therewith, the COUNTY has requested that the CITY perform certain work as
herein described, and
WHEREAS, it is deemed to be in the best interest for the CITY to include the necessary items of
work in the CITY's construction contract proposed for the improvement of this section of the
PROJECT, and
WHEREAS, the COUNTY is obligated for the cost of work described herein.
NOW THEREFORE, by virtue of Chapter 39.34 RCW (lnterlocal Cooperation Act) and in
consideration of the terms, conditions, covenants, and performances contained herein, or
attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS
FOLLOWS:
I
GENERAL
The CITY, as agent acting for and on behalf of the COUNTY, agrees to perform the following
"Description of Work";
Plans, specifications and cost estimates shall be prepared by the COUNTY in accordance with
the current State of Washington Standard Specifications for Road, Bridge, and Municipal
Construction, and amendments thereto, and adopted design standards, unless otherwise noted for
the sanitary sewer work. The CITY will incorporate the plans and specifications into the CITY's
project and thereafter advertise the resulting project for bid and, assuming bids are received and
contract is awarded, administer the contract. A scope of work is included as Exhibit "B".
The COUNTY may, ifit desires, furnish an inspector on the project. Any cost for such
inspection will be borne solely by the COUNTY. All contact between said inspector and the
CITY's contractor shall be through the CITY's representative.
City of Bremerton and Kitsap County
Amendment Number 3 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
i\ ,
The COUNTY agrees, upon satisfactory completion of the work involved, to deliver a letter of
acceptance to the CITY, which shall include a release and waiver of all future claims or demands
of any nature resulting from the performance of the work for the sanitary sewer work under this
AGREEMENT.
If a letter of acceptance is not received by the CITY within 90 days following completion ofthe
sanitary sewer work, the work will be considered accepted by the COUNTY and shall release the
CITY from all future claims and demands of any nature resulting from the performance of the
work under this AGREEMENT.
The COUNTY may withhold this acceptance of sanitary sewer work by submitting written
notification to the CITY within the 90-day period. This notification shall include the reasons for
withholding the acceptance.
In the event that any damage is discovered or is incurred after acceptance ofthe work and to the
extent that such damage is to the COUNTY'S facilities or is alleged to be caused by the
COUNTY'S facilities under this AGREEMENT, then the CITY agrees to execute a general
assignment of its claims against he project prime contractor so that the COUNTY may pursue
any claims or causes of action that the CITY may have against its prime contractor for the
damages mentioned herein.
The CITY shall ensure that all contracts related to the completion of this project include a
comprehensive indemnification clause holding harmless the CITY and COUNTY. The CITY
shall also ensure that liability related to its general contractor is appropriately covered by
insurance and that said insurance coverage include and name the COUNTY as an additional
insured.
II
PAYMENT
The COUNTY, in consideration of the faithful performance of the work to be done by the CITY,
agrees to reimburse the CITY for the actual direct and related indirect cost of the work.
An itemized estimate of cost for work to be performed by the CITY at the COUNTY's expense
is marked Exhibit "A", and is attached hereto and by this reference made a part of the
AGREEMENT.
Partial payments shall be made by the COUNTY, upon request of the CITY, to cover costs
incurred. These payments are not to be more frequent than one (1) per month. It is agreed that
any such partial payment will not constitute agreement as to the appropriateness of any item and
that, at the time of the final audit, all required adjustments will be made and reflected in a final
payment.
The COUNTY agrees to make payment for the sanitary sewer work to be done by the CITY
within thirty (30) days from receipt of billing from the CITY.
City of Bremerton and Kitsap County
Amendment Number 3 to lnterlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
The COUNTY agrees that if payment for the sanitary sewer work is not made within ninety (90)
days after receipt of billing the CITY shall assess a penalty of 10% on all amounts outstanding
until payment for the work is received by the CITY.
The COUNTY agrees to pay the CITY an "Advance Payment Amount" of $80,000 within 20
days after th-e CITY submits its first partial payment request to the COUNTY. The advance
payment represents approximately fifteen (15) percent of the estimate of cost and covers costs
incurred by the CITY in the initial stages of the project. The advance payment will be carried
throughout the life ofthe project with final adjustment made in the final payment.
Upon completion of the work outlined herein, all future operation and maintenance of the
COUNTY's facilities shall be at the sole cost of the COUNTY and without expense to the CITY.
III
DELETION OF WORK
In the event the estimate of cost, EXHIBIT "A", is in excess of $20,000 and the total actual bid
prices for the work covered by this AGREEMENT exceeds the estimate of costs by more than
15 percent, the COUNTY shall have the option of directing the CITY to delete all or a portion of
the work covered by this AGREEMENT from the CITY's contract. Except, that this provision
shall be null and void if the COUNTY's portion of the work exceeds 20 percent of the actual
total contract bid price, or if the COUNTY is responsible for the costs under State law or the
Washington Administrative Code WAC 468-18-040(5)(d).
The COUNTY shall have five (5) working days from the date of written notification to inform
the CITY to delete the work. Should the COUNTY exercise its option to delete the work, the
COUNTY agrees, upon billing by the CITY, to reimburse the CITY for preliminary engineering
costs incurred by the CITY to include the work covered by this AGREEMENT in the CITY's
contract.
IV
EXTRA WORK
In the event unforeseen conditions require an increase in the cost of 25 percent or more from that
agreed to on Exhibit "A", this AGREEMENT will be modified by a supplement AGREEMENT
covering said increase.
In the event it is determined that any change from the description of work contained in the
AGREEMENT is required, approval must by secured from the COUNTY prior to the beginning
of such work. Where the change is substantial, written approval must be secured.
Reimbursement for increased work and/or a substantial change in the description of work shall
be limited to costs covered by a written modification, change order or extra work order approved
by the COUNTY.
City of Bremerton and Kitsap County
Amendment Number 3 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
V
RIGHT OF ENTRY
The COUNTY hereby grants and conveys to the CITY the right of entry upon all land which the
COUNTY has interest, within or adjacent to the right of way of the highway, for the purpose of
constructing said improvements.
VI
VENUE
In the event that any party deems it necessary to institute legal action or proceedings to enforce
any right of obligation under this AGREEMENT, the parties hereto agree that any such action or
proceedings shall be brought in a court of competent jurisdiction situated in Kitsap County,
Washington.
VII
LEGAL RELATIONS
No liability shall attach to the CITY or the COUNTY by reason of entering into this
AGREEMENT except as expressly provided herein.
IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NUMBER 3 as
of the day and year first above written.
c~iJ#2
Cary Bozeman, Mayor .
Roge Lubovich, City Attorney
Phil Williams, Director ofP.W. & u.
City of Bremerton and Kitsap County
Amendment Number 3 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Term{nal to Gorst Vicinity TIP
0-~7-0 7
Date
f-;( )-07
Date
1--;(3-D7
Date
1/"'J.3-07
Date
cf /2- 71 (j 7
Date
BOARD OF COMMISSIONERS
KlTSAP COUN!1' ASHINGTON
_....-/
l---. ~
ATTEST:
Iv0 A
City of Bremerton and Kitsap County
Amendment Number 3 to lnterlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
~/I~/d7
Date
5 /li/ /0 7
Date
'5/14/6 }
,
Date
5 11'1/0]
Date I '
ENGINEER'S ESTIMATE
SANITARY SEWER WORK FOR KITSAP COUNTY
SANITARY SEWER'
MOBILIZATION L.S. 1 $ 60,420.00 $60,420.00
PVC SANITARY SEWER PIPE 8-in DIAM. L.F. 1.193 $ 53.00 $63 229.00
PVC SANITARY SEWER PIPE 12-in DIAM. L.F. 1.475 $ 80.00 $118000.00
PVC SANITARY SEWER PIPE 18-in DIAM. L.F. 103 $ 95.00 $9 785.00
SIDE SEWER CONNECTION. 6-in PVC, BETWEEN MAIN AND PROPE L.F. 494 $ 42.00 $20 748.00
, SIDE SEWER CONNECTION. 8-in PVC BETWEEN MAIN AND PROPE L.F. 33 $ 42.00 $1 386.00
SIDE SEWER CONNECTION. 4-in PVC OPEN TRENCH ON PRIVATE L.F. 110 $ 32.00 $3 520.00
TESTING SEWER PIPE L.F. 3389 $ 2.00 $6 778.00
POTHOLE SIDE SEWER EACH 46 $ 150.00 $6900.00
SEWER CLEANOUT EACH 26 $ 250.00 $6.500.00
TEMPORARY SEWAGE BYPASS PUMPING L.S. 1 $ 5000.00 $5.000.00
MANHOLE 48 IN. DIAM. TYPE 3 EACH 11 $ 3.000.00 $33000.00
STRUCTURE EXCA VA TION CLASS B C.Y. 3.250 $ 10.00 $32500.00
STRUCTURE EXCA VA TION CLASS B INCL. HAUL C.Y. 500 $ 20.00 $10.000.00
SHORING OR EXTRA EXCAVATION CLASS B S.F. 25 523 $ 2.00 $51 046.00
BANK RUN GRAVEL FOR TRENCH BACKFILL C.Y. 257 $ 20.00 $5 140.00
PLUG EXISTING PIPE EACH 20 $ 50.00 $1 000.00
UNSUITABLE FOUNDATION EXCAVATION INCL. HAUL C.Y. 51 $ 20.00 $1 020.00
ADJUST EXISTING MANHOLE EACH 1 $ 350.00 $350.00
ADJUST EXISTING MANHOLE - NON-STANDARD EACH 1 $ 500.00 $500.00
REMOVE EXISTING MANHOLE EACH 16 $ 900.00 $14400.00
WOOD STAVE PIPE REMOVAL L.F. 600 $ 20.00 $12,000.00
Subtotal $463,222
State Retail Sale Tax (8.6%) $39,837
Sub-Total $503,059
Desian Continaencv 5% $25,153
II
Grand Total $528,212 II
Kitsap County
100% Design Estimatefor Sanitary Work
Navy Yard Highway Phase
EXHIBIT A
3/20/2007
~.. '
.'
EXHIBIT B
SCOPE OF WORK - SANITARY SYSTEM IN CHARLESTON BEACH ROAD
Work to be included into the Navy Yard Highway Phase of the SR3/SR304 T.I.P., is the
replacement of an existing 8-inch sanitary main located in Charleston Beach Road. The
replacement would consist of placing approximately 93 feet of new 18-inch and 2,658 feet of
new 8-inch sanitary main, 11 manholes, repairing/replacing the lateral connections and
abandoning the existing 8-inch main. This work is shown in greater detail on Pages S I through
S9 ofthe Plan Set for the project.
Specifications are in accordance with the 2006 Washington State Department of Transportation
Standard Specifications for Road, Bridge and Municipal Construction, and as amended in the
Special Provisions section of the Contract Documents.
City of Bremerton and Kitsap County
Amendment Number 3 to Inter/ocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Garst Vicinity TIP
~Enter Search Criteria, Press Eec Key to Transmit
Press Del Key to Terminate Delete Mode
CHANGE Contract Transactions
Contract Number 3829
Vendor Name KITSAP CO PUBLIC WORKS
~Subject FUNDING - SR3/SR304 TRANSPORTATION IMPROVEMENT
Department ENGINEERING
Status Code Gev Amount $290500.00
Begin Date 06/16/1997
Insurance End Date
Type Amount Review Date 06/15/2005 ~
Insurance ?oral $0.00
Insurance Review Date
Comments COMPLETION OR FUNDS EXPENDED AMENDED-#1 3/01 #2 9/03
REVIEW DATE FOR TRACKING PURPOSES ONLY
+
AMENDMENT NUMBER 2
INTERLOCAL AGREEMENT
County Agreement No. KC105-97
City Agreement No. 3829
TI-IlS AMENDMENT NLrMBER 2 to the Interlocal Agreement between the City of Bremerton,
(hereinafter referred to as "CITY") and Kitsap County (Hereinafter referred to as "COUNTY"),
made and entered into this g {'k day of $ t,., ?t .2003.
WHEREAS, the CITY and COUNTY entered into an Interlocal Agreement pursuant to Chapter
39.34 RCW (Interlocal Cooperation Act) on June 16, 1997, to facilitate the development of
improved access between the Bremerton Ferry Terminal and Gorst as described in the Final
Environmental Impact Statement entitled, "SR3/304 Bremerton Ferry Terminal to the Vicinity of
Gorst Highway Improvement Project" (hereinafter referred to as "PROJECT"); and
WHEREAS, the CITY is planning the construction or improvement of a section of SR 304, and
in connection therewith, the COUNTY has requested that the CITY perform certain work as
herein described, and
WHEREAS, it is deemed to be in the best interest for the CITY to include the necessary items of
work in the CITY's construction contract proposed for the improvement of this section of SR
304, and
WHEREAS, the COUNTY is obligated for the cost of work described herein.
NOW THEREFORE, by virtue of Chapter 39.34 RCW (Interlocal Cooperation Act) and in
consideration of the terms, conditions, covenants, and performances contained herein, or attached
and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS:
I
GENERAL
The CITY, as agent acting for and on behalf of the COUNTY, agrees to perform the following
"Description of Work":
Plans, specifications and cost estimates shall be prepared by the CITY in accordance with the
current State of Washington Standard Specifications for Road, Bridge, and Municipal
Construction, and amendments thereto, and adopted design standards, unless otherwise noted.
The CITY will incorporate the plans and specifications into the CITY's project and thereafter
advertise the resulting project for bid and, assuming bids are received and a contract is awarded,
administer the contract.
The COUNTY hereby approves the plans and specifications for the described work as shown on
Exhibit "B", attached hereto and by this reference made a part of this AGREEMENT.
Page 2 of 8
City of Bremerton and Kitsap County
Amendment Number 2 to lntedocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
m
DELETION OF WORK
In the event the estimate of cost, EXHIBIT "A", is in excess of $10,000 and the total actual bid
prices for the work covered by this AGREEMENT exceeds the estimate of costs by more than 15
percent, the COUNTY shall have the option of directing the CITY to delete all or a portion of the
work covered by this AGREEMENT from the CITY's contract. Except, that this provision shall
be null and void if the COUNTY's portion of the work exceeds 20 percent of the actual total
contract bid price, or if the COUNTY is responsible for the costs under State law or the
Washington Administrative Code WAC 468-18-040(5)(d).
The COUNTY shall have five (5) working days from the date of written notification to inform
the CITY to delete the work. Should the COUNTY exercise its option to delete the work, the
COUNTY agrees, upon billing by the CITY, to reimburse the CITY for preliminary engineering
costs incurred by the CITY to include the work covered by this AGREEMENT in the CYI'Y's
contract.
IV
EXTRA WORK
In the event unforeseen conditions require an increase in the cost of 25 percent or more from that
agreed to on Exhibit "A", this AGREEMENT will be modified by a supplement AGREEMENT
covering said increase.
In the event it is determined that any change from the description of work contained in the
AGREEMENT is required, approval must be secured from the COUNTY prior to the beginning
of such work. Where the change is substantial, written approval must be secured.
Reimbursement for increased work and/or a substantial change in the description of work shall
be limited to costs covered by a written modification, change order or extra work order approved
by the COUNTY.
V
RIGHT OF ENTRY
The COUNTY hereby grants and conveys to the CITY the right of entry upon all land which the
COUNTY has interest, within or adjacent to the right of way of the highway, for the purpose of
constructing said improvements.
Upon completion of the work outlined herein, all future operation and maintenance of the
COUNTY's facilities shall be at the sole cost of the COUNTY and without expense to the CITY.
Page 4 of 8
City of Bremerton and Kitsap County
Amendment Number 2 to lnterlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
BOARD OF COMMISSIONERS
KITSAP COUNTY, WASHINGTON
Jan An~l, Cll~r'~ (~ Date
'~ Chris Endresen, Commissioner Date
Patty Lent, .C~'n~fiss(oner x.... Date
b'
ATTEST:
{)~, ~c /,- r/, ~0~,~ ~t
Opai~Robertson, Clerk of the Board Date
Page 6 of 8
City of Bremerton and Kitsap County
Amendment Number 2 to lnterlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
EXHIBIT B
SCOPE OF WORK
Work to be included into the Missouri Gate Phase of the SR3/SR304 T.I.P., is the replacement of
an existing 8 inch sanitary main located in Charleston Beach Road. The replacement would
consist of placing approximately 510 feet of new 8 inch sanitary main, 5 manholes,
repairing/replacing the lateral connections and abandoning the existing 8 inch main. This work is
shown in greater detail on Sheets 25 and 26 of the Plan Set for the project (Pages SS 1 and SS2).
Specifications are in accordance with the 2002 Washington State Department of Transportation
Standard Specifications for Road, Bridge and Municipal Construction, and as amended in the
Special Provisions Section of the Contract Documents.
Page 8 of 8
City of Bremerton and Kitsap County
Amendment Number 2 to lnterlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
+Browse: Next Previous First Last Update Delete Restart X - Exit +
+Retrieve the Next record +
+Found: 4 Record(s) MAINTAIN Contract Transactions +
+ Contract Number 3829 +
+ +
+Vendor Name KITSAP CO PUBLIC WORKS +
+Subject FUNDING - SR3/SR304 TP3%NSPORTATION IMPROVEMENT +
+Department ENGINEERING +
+Status Code GOV +
+ Amount $290500.00 +
+ Be~in Date 06/16/1997 +
+ Insurance End Date +
+ Type Amount Review Date 06/15/2003 +
+ +
+ +
+ +
+ Insurance Total $0.00 +
+ Insurance Review Date +
+ +
+ Comments PROJECT COMPLETION OR FUNDS EXPENDED/AMENDED 3/19/2001 +
+ REVIEW DATE FOR TRACKING PURPOSES ONLY +
+ +
AMENDMENT NUMBER 1
TO THE INTERLOCAL AGREEMENT
Between The City Of Bremerton and Kitsap County
County Agreement No. KC105-97
City Agreement No. 3829
Regarding the Design, Right-of-Way Acquisition and
Construction of the SR304 portion of the SR3/SR304
Bremerton Ferry Terminal to Gorst Vicinity Transportation
Improvement Project.
THIS AMENDMENT NUMBER 1 to the Interlocal Agreement between the City of
Bremerto. n~[n~ Kitsa~l County dated June 16, 1997, is made and entered into this /~'
day of ~, 2001, by and between the City of Bremerton (hereinafter
referred to as 'CITY"), and Kitsap County (hereinafter referred to as "COUNTY").
WHEREAS, the CITY and COUNTY entered into an Interiocal Agreement
pursuant to Chapter 39.34 RCW (Interlocal Cooperation Act) on June 16, 1997, to
facilitate the development of improved access between the Bremerton Ferry Terminal
and Gorst as described in the Final Environmental Impact Statement entitled, "SR3/304
Bremerton Ferry Terminal to the Vicinity of Gorst Highway Improvement Project"
(hereinafter referred to as "PROJECT"); and
WHEREAS, the COUNTY has committed to provide $500,000 as their share for
preparation of the Environmental Impact Statement, design, right-of-way acquisition and
construction of the PROJECT; and
WHEREAS, the COUNTY has expended $156,000 to date for their share of the
costs to develop the Environmental Impact Statement for the PROJECT; and
WHEREAS, the expenditure of COUNTY funds on specific grants has not
occurred as anticipated in the Interlocal Agreement due to the state and federal funding
agency's desire to expend their funds first; and
WHEREAS, the project design, right-of-way and construction activities on SR304
will soon occur on properties and right-of-way within the jurisdiction of the COUNTY;
city of Bremerton and Kitsap County Page 1 of 4
Amendment Number 1 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
NOW THEREFORE, the parties through their respective legislative bodies in
consideration for the mutual covenants contained herein do agree to modify the
Interlocal Agreement as follows:
Delete Item Number 2. "Responsibilities of the Parties" in its entirety and replace
with the following:
2. RESPONSIBILITIES OF THE PARTIES
(a) The COUNTY shall contribute $500,000 towards the Environmental
Impact Statement, design, right-of-way acquisition and construction of the PROJECT.'
As of the date of this Amendment the COUNTY has expended $156,000 of their sharo
of the costs for the PROJECT.
(b) The COUNTY authorizes the CITY to designate expenditure of COUNTY
funds to match funds received from other agencies or for direct costs associated with
completion of the PROJECT.
(c) The COUNTY authorizes the CITY to be the lead agency for the design,
right-of-way acquisition, structure demolition and construction of the PROJECT within
the COUNTY jurisdiction.
(d) The COUNTY will consider any requests by the CITY to vacate portions of
excess county right-of-way in the PROJECT area to the adjoining property owners.
(e) The COUNTY will assist and support the CITY and State on issues of
condemnation.
(f) The COUNTY will assist and support the CITY and State in identifying and
issuing any County permits necessary to construct the PROJECT.
(g) The CITY as Project Manager shall be responsible for making
disbursements to City staff and to consultants hired to complete the PROJECT and for
monitoring the PROJECT budget.
(h) The CITY will invoice the COUNTY for its prorata share of the City Staff
and consultant costs as costs occur on a monthly basis, unless a mutually agreeable
alternative arrangement is made in writing.
No other changes to the Interlocal Agreement are made by this Amendment.
City of Bremerton and Kitsap County Page 2 of 4
Amendment Number 1 to Intedocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
This Amendment Number I is approved and entered into by the undersigned
local government units the day and year first wdtten above.
ClTY OFBREMERTON
LYNN'. HORTON, Mayor
ATTEST:
~ Clerk
KATiL~EN Mc~ City
APPROVED AS TO FORM:
DAVID ST. PIERRE, Assistant City Attorney
DEPARTMENTAL APPROVAL:
W. E Director of Public Works and Utilities
City of Bremerton and Kitsap County Page 3 of 4
Amendment Number 1 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
BOARD OF COMMISSIONERS
KITSAP COUNTY, WASHINGTON
(~CHRIS ENDRESEN, Chair
TIM BOTKIN, Commissioner
ATTEST:
HOLLY %ERSON, Clerk of the Boam
ab, Interlocal Agreements, Amend No 1, SR3 SR304
City of Bremerton and Kitsap County Page 4 of 4
Amendment Number 1 to Interlocal Agreement
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity TIP
INTERLOCAL AGREEMENT
Between the City of Bremerton and Kitsap County
Regarding thc Design and Right-of-Way Acquisition for the S1~304 portion of the
SR3/SR304 Bremerton Ferry Terminal to Gorst Vicinity Transportation Improvement Project.
THIS INTERLOCAL AGREE .M. ENT is made and entered into pursuant to the
provisions of Chapter 39.34 RCW, this ~ day of .~k.~3.~_,~, 1997, by and between the
City of Bremerton (hcreinaflcr referred to as "CITY"), and KJtsap County (hereinafter referred to
as "COUNTY").
WHEREAS, Chapter 39.34 RCW (Interlocal Cooperation Act) permits local government
units to make the most efficient use of their power by enabling them to cooperate with other
localities on a basis of mutual advantage and thereby to provide services and facilities in a
manner l~ursuant to fo:~ms of govcrnmenta! organization that w~]l accord be~t with geographic,
economic, population and other factors influencing the needs and development of local
communities, and
WHEREAS, both parties share responsibility to promote thc development of public
transportation in Kitsap County, and
WHEREAS, both parties desire to facilitate the development of improved access
between thc Bremerton Ferry Terminal and Gorst as described in thc Final Enviromncntal Impact
Statement entitled "SR3/SR304 Brcmerton Ferry Terminal to thc Vicinity of Gorst Highway
Improvement Project" (hereinafter referred to as "PROJECT"), and
WHEREAS, both parties participate in an agency partnership which also includes Kitsap
County, Washington State Department of Transportation, Washington Transportation
Improvement Board, Puget Sound Naval Shipyard, and the Federal Highway Administration that
provides oversight and funding for the PROJECT, and
WHEREAS, the CITY received grant funding for design of the transportation
improvements and right-of-way acquisition on the SR304 portion of the PROJECT on which
COUNTY participated as a funding partner and provided matching funds, and
WHEREAS, both parties desire to obligate funds associated with thc successful grants;
~'~ NOW THEREFORE, the parties through their respective legislative bodies in
consideration of thc mutual covenants contained herein, do agree as follows:
1. PURPOSE
Thc purpose of this Agreement is to allocate COUNTY funds for thc design of thc
transportation improvements and right-of-way acquisition on PP, OJECT to the CITY. Thc funds
arc the COUNTY match for grant funds received for the PROJECT.
City & Kitsap County
Interlocal Agreement on Funding SR304 Improvements -l-
2. RESPONSIBILITIES OF THE PARTIES
(a) COUNTY shall contribute $187,500.00 towards the design of the PROJECT as
COUNTY match for the STP competitive grant (FY93-94).
(b) COUNTY shall contribute $23,000.00 toward the right-of-way acquisition of' the
PROJECT as COUNTY match for countywide ISTEA grant (FY95).
(c) COUNTY shall contribute $80,000.00 towards the right-of-way acquisition on the
PROJECT as COUNTY match for the STP competitive grant (FY97).
(d) The CITY as Project Manager shall be responsible for making disbursements to
City staff and consultants hired to complete the PROJECT and for monitoring the PROJECT
budget.
(e) The CiTY will invoice COUNTY for its prorata share of the city staff and
consultant costs as costs occur on a monthly basis unless a mutually agreeable alternative
arrangement is made in writing.
3. ADMINISTRATION
This Agreement shall be administered by the CITY. The Project Manager for this
PROJECT shall be the City Engineer.
4. TERM
This Agreement shall take effect upon execution of the agreement by both CITY and
COUNTY and shall continue until the SR304 portion of the PROJECT is completed or all funds
referred to in this agreement are expended, whichever occurs first.
5. ENTIRE AGREEMENT
This Agreement constitutes the entire agreement between the parties and both parties
acknowledge that there are no other agreements, written or oral, that have not been fully set forth
in the text of this Agreement.
6. AMENDMENTS
The parties hereby further agree that this Agreement cannot be amended or modified
without the written concurrence of both parties.
7. NOTICES
Any notices required to be given by the CITY to COUNTY or by COUNTY to the CITY
shall be in writing and delivered to the parties at the following addresses:
City of Bremerton Kitsap County
City Clerk Department of Public Works
239 Fourth St. 614 Division St. MS26
Bremerton, WA 98337 Port Orchard, WA 98366-4686
City & Kitsap County
[merlocal Agreement on Funding SR304 Improvements -2-
8. DISPOSITION OF PROPERTY
No personal property is expected to be acquired as part of this agreement. However, any
personal property acquired using the funds identified in the Agreement shall become the property
of CITY or COUNTY as mutually agreed upon at time of acquisition.
9. APPLICABLE LAW
a. VENUE
This Agreement shall be constructed and interpreted in accordance with the laws
of the State of Washington.
b. DISPUTES
In the event that a dispute arises under this Agreement, it shall be resolved in the
following manner: CITY and COUNTY shall each individually appoint one
member to a Dispute Board and jointly appoint a third member. The Dispute
Board shall evaluate the dispute and make a determination of the dispute. The
determination of the Dispute Board shall be final and binding on the parties
hereto. Each party shall pay costs of it's appointee and share costs of the joint
appointee.
10. ORDER OF PRECEDENCE
In the event of an inconsistency in this Agreement, unless otherwise provided herein, the
inconsistency shall be resolved by giving precedence in the following order:
a. Applicable state statues and regulations;
b. This Agreement, including any other express provisions of this Agreement
whether incorporated by reference or otherwise; and
c. The terms and conditions of the Grant funds being distributed.
11. INDEMNIFICATION
~" Each party shall defend, protect and hold harmless the other party from and against all
claims, suits and/or other actions arising from any negligent or intentional act or omission of that
party's employees, agents and/or authorized subcontractor(s) while performing this contract.
12. VALIDITY
If any section of this Agreement is adjudicated to be invalid, such action shall not affect
the validity of any section not so adjudged.
City & Kitsap County
Intcrlocal Agreement on Funding SR304 Improvements -3-
This Agreement approved and entered into by the undersigned local government units the
day and year first above written.
CITY OF BREME~q
L~Xl-N HORTON, Mayor
ATTEST:
KATHLEEN McCLUSKEY, Clerk
DEP~ROVAL
W. EUGEBIE SA LE~p,.~rector Public Works/Utilities
BOARD OF COMMISSIONERS
KITS~. ~~. TY, SHINGTON
PHIL BEST, Chairman
~~~~;missioner
~ 7CHRIS ENDRESEN, CommisSioner
ATTEST:
CLERK$'~ THE BOARD
97133\bk
City & Kitsap County
Interlocal Agreement on Funding SR304 Improvements