Loading...
HomeMy WebLinkAbout02/04/2026 3E AGENDA BILL CITY OF BREMERTON 3E CITY COUNCIL SUBJECT:Study SessionDate: January 28, 2026 Approve Easement Acquisition for Sewage COUNCIL MEETING Date: February 4, 2026 Pump Station EB-10 for the Tracyton Beach Department: Public Works & Utilities Road Sewer Improvements Project Presenter: David Powell Phone: (360) 473-5268 SUMMARY:This project will remedy an ongoing and challenging maintenance and environmental contamination concern for the sewer along TracytonBeach Road in East Bremerton by converting the existing gravity/pressure sewer to a new pressurized system. Two pump stations are required. One of the proposed pump stations will be located at 2806 Tracyton Beach Road NW. Staff have negotiated the terms and cost of the easement with the owner of the property with assistance from Kitsap County real estate staff. The terms include abandonment of the existing septic system, connection to the new sewer system, and cash for the estimated worth of the easement as determined by Kitsap County, and the final cost negotiated by the City, which was $21,760. Details are contained in the attached easement document and exhibits. ATTACHMENTS:1. Location Map; 2. Easement; 3. Valuation4. Power Point Presentation FISCAL IMPACTS(Include Budgeted Amount): The project is identified in the 2025-2030 Capital Improvement Program as CIP Project ID# WW00036 for $5.0M. This project is currently approved for a low interest State Revolving Fund loan (Agreement No. WQC-2023-BremPW-00148) through the Department of Ecology for $5.008M. The proposed easement will cost $21,760. STUDY SESSION ACTION:Consent Agenda General Business Public Hearing RECOMMENDED MOTION: Move to approve acquisition of an easement for Sewage Pump Station EB-10;and authorize the Mayor to sign the easement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 04/19/2024