HomeMy WebLinkAbout02/04/2026 3E
AGENDA BILL
CITY OF BREMERTON
3E
CITY COUNCIL
SUBJECT:Study SessionDate: January 28, 2026
Approve Easement Acquisition for Sewage COUNCIL MEETING Date: February 4, 2026
Pump Station EB-10 for the Tracyton Beach
Department: Public Works & Utilities
Road Sewer Improvements Project
Presenter: David Powell
Phone: (360) 473-5268
SUMMARY:This project will remedy an ongoing and challenging maintenance and environmental
contamination concern for the sewer along TracytonBeach Road in East Bremerton by converting
the existing gravity/pressure sewer to a new pressurized system. Two pump stations are required.
One of the proposed pump stations will be located at 2806 Tracyton Beach Road NW.
Staff have negotiated the terms and cost of the easement with the owner of the property with
assistance from Kitsap County real estate staff. The terms include abandonment of the existing
septic system, connection to the new sewer system, and cash for the estimated worth of the
easement as determined by Kitsap County, and the final cost negotiated by the City, which was
$21,760. Details are contained in the attached easement document and exhibits.
ATTACHMENTS:1. Location Map; 2. Easement; 3. Valuation4. Power Point Presentation
FISCAL IMPACTS(Include Budgeted Amount): The project is identified in the 2025-2030 Capital
Improvement Program as CIP Project ID# WW00036 for $5.0M. This project is currently approved for
a low interest State Revolving Fund loan (Agreement No. WQC-2023-BremPW-00148) through the
Department of Ecology for $5.008M. The proposed easement will cost $21,760.
STUDY SESSION ACTION:Consent Agenda General Business Public Hearing
RECOMMENDED MOTION:
Move to approve acquisition of an easement for Sewage Pump Station EB-10;and authorize the
Mayor to sign the easement with substantially the same terms and conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024