Loading...
HomeMy WebLinkAbout1 - Original Submission_ 231221_870_Contract Modification 4Page 1 of 2 Contract Modification No. 4 Pine Road Sub-Basin Stormwater Improvements CONTRACT MODIFICATION AGREEMENT NO. 4 to CITY CONTRACT NO. 5910 BETWEEN THE CITY OF BREMERTON AND HERRERA ENVIRONMENTAL CONSULTANTS PROJECT: PINE ROAD SUB-BASIN STORMWATER IMPROVEMENTS CONSULTANT: HERRERA ENVIRONMENTAL CONSULTANTS DATE: December 21, 2023 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services AGREEMENT (the "Contract") entered into between the City of Bremerton and Herrera Environmental Consultants on January 16, 2019. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by December 31, 2024. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant DocuSign Envelope ID: 22CABF5A-4346-43A4-9716-507308C265A3 Page 2 of 2 Contract Modification No. 4 Pine Road Sub-Basin Stormwater Improvements warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process _________________________ (Initials and Date) HERRERA ENVIRONMENTAL CONSULTANTS THE CITY OF BREMERTON By: By: Print Name: Print Name: Greg Wheeler Its: Its: Mayor Date: Date: APPROVED AS TO FORM: ATTEST: By: By: KYLIE FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Attn: Gunnar Fridriksson Attn: Matt Fontaine City of Bremerton Herrera Environmental Consultants 345 6th Street, Suite #100 Denny Building, Bremerton, WA 98337 2200 6th Avenue #1100 Seattle, WA 98121 R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 10 2019.docx Tom Knuckey Digitally signed by Tom Knuckey Date: 2024.01.05 08:09:29 -08'00' DocuSign Envelope ID: 22CABF5A-4346-43A4-9716-507308C265A3 Theresa M. Wood Vice President 1/17/2024 1/17/2024