Loading...
HomeMy WebLinkAbout1 - Original Submission_ 20240313 870 Amendment 5 SOW1 APPENDIX A SCOPE OF WORK FOR MODIFICATION NO. 5 TO CITY CONTACT NO. 5910 PINE ROAD SUB-BASIN STORMWATER IMPROVEMENTS Herrera Environmental Consultants (Herrera) is assisting the City of Bremerton (City) with work on the Pine Road Basin Stormwater Improvements Project. As the work of the project team has evolved, some aspects of it are beyond what was originally scoped and budgeted for. This memorandum describes additional project scope and budget for work performed by the Consultant Team (Herrera, Stantec, CRC, AESI, PSM, and AES Consultants, Inc.), supporting a request for additional funds. Issues that necessitated the changes in scope are: •Value Engineering of Outfall Design – During 2023 the temporary vertical shoring was identified as a high-cost item. Herrera supported the City in evaluating an alternative construction method that substitutes the vertical shoring with open cut excavation, and is supporting the City with related design revisions. This value engineering work increases the level of effort for design, by requiring revision to engineering and landscape plans, specifications, and estimate. The intent of this work is to simplify construction and reduce construction cost. TASK 16– MARINE OUTFALL – BID PACKAGE Herrera revised the 100% design package to accommodate open cut excavation including the following: •In coordination with geotechnical engineer, Herrera defined anticipated extents of over- excavation to evaluate feasibility and risks associated with open-cut excavation when compared to vertical shoring. •Revised design plans and sections to include open-cut excavation including updates to the plan, sections, and profiles •Revised roadway restoration plan, including proposed pavement section, pavement markings, and guard rail construction. •Revised landscape plans for new project footprint and plant palette. •Designed for support of existing utilities during excavation. •Designed additional permanent erosion control measures, including geocell soil containment along the marine shoreline and plant palette. •Reviewed and incorporated new City special provisions template. •Revised special provisions, including new special provisions for traffic control, utility support, pavement markings, permanent signing, and geocell. Exhibit ADocuSign Envelope ID: A2FCBAD4-50FE-42C8-A155-65940D379984 2 •Revised/replaced/added items to cost estimate and bid table to address above revisions. •Additional QAQC for design revisions. Deliverables •100% and Bid Plans, Technical Specifications, Cost Estimate. BUDGET Total Modification 5 Budget: $19,817 See attached budget spreadsheet DocuSign Envelope ID: A2FCBAD4-50FE-42C8-A155-65940D379984 Cost Estimate for Pine Road Basin Stormwater Improvement Project Herrera Project No. 18-06910-000 3/7/2024 Task No.16 Herrera Labor based on:Burdened Labor Rates Marine Impact Basin - Bid Package Staff Labor Category 2023 Burdened Labor Rates Webb, Christopher Engineer VII $302.83 1 1 Fontaine, Matthew Engineer V $259.16 16 16 Gray, Shannon Engineer IV $221.91 8 8 Dhital, Satya Engineer II $163.59 40 40 Taylor, Randall Landscape Architect III $154.89 16 16 Mirabile, Tina Scientist IV $216.56 1 1 Waggoner, Jonathan Engineer III $199.75 3 3 Esteban, Jimmy Engineer II $156.43 24 24 Total Hours per Task 109 109 Subtotal Labor $19,817 $19,817 Subtotal Herrera Labor $19,817 $19,817 Grand Subtotal $19,817 $19,817 Grand Total $19,817 Total DocuSign Envelope ID: A2FCBAD4-50FE-42C8-A155-65940D379984