Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
09_07_2022 3D KPFF Eng
AGENDA BILL CITY OFBREMERTON 3DCITYCOUNCIL SUBJECT:Study SessionDate: August 24, 2022 Contract Modification Agreement No. 4with COUNCIL MEETING Date: September 7, 2022 KPFF Consulting Engineers forDesign of Department: PW&UEngineering ththeEast11Street & Perry Avenue Presenter: Vicki Grover Complete StreetsReconstruction Project Phone: (360) 473-2317 SUMMARY: thInApril2019, theCityexecuted acontractwithKPFFto designtheEast11Street andPerry AvenueReconstruction projectfor $534,002.58. Three supplement agreements havebeen executed: Supplement No. 1was inthe amount of $53,282.50foradditional designservices including water/sewer utilitydesignsupport, potholing, stormwater downstream impact analysis, utilitycoordination, andother engineering design supportservices. Theamendment alsoincreased thecontract timebyextending thetimethrough December 2021.Supplement No. 2wasin the amountof $156,631.65; theadditional designworkincludedright-of-wayacquisition services, formation ofsmallworks rostercontract forresidential electrical workrequired byPSEforoverhead electrical relocations, additional survey, anddesignofadditional watermain anddrainage improvements. SupplementNo. 3wasintheamount of $20,045.54andwas forsupport during the bidphase oftheproject. Theproposed Supplement No. 4increases thecontract valueby $88,795.97toanew totalof 852,758.24; thework includes construction engineering supportservices andextendsthe termof thecontract toDecember31,2023. ATTACHMENTS: 1)Contract Modification AgreementNo. 4withKPFF FISCAL IMPACTS(Include Budgeted Amount): Theproject isintheTransportation Capital Fund, nobudget adjustment isrequired. STUDY SESSION AGENDA: LimitedPresentationFull Presentation STUDY SESSION ACTION:Consent AgendaGeneral BusinessPublic Hearing RECOMMENDED MOTION: thMovetoapproveContractModificationAgreementNo. 4withKPFF, fortheEast11Street and Perry Avenue Reconstruction Project, inanamountnottoexceed $88,795.97foratotalamended contract amount of $852,758.24,andauthorize theMayor tofinalize andexecutetheagreement with substantially thesameterms andconditions aspresented. XCOUNCILACTION:Approve Deny Table Continue NoAction FormUpdated 11/09/2021 DocuSign Envelope ID: 9B7787BB-5F46-4420-BBE2-0461F7FD2286