HomeMy WebLinkAbout6741 Docusign Envelope ID:7097AC25-62DD-4B17-A6A3-26C269B75FC6 AGENDA BILL CITY OF BREMERTON 4 H CITY COUNCIL SUBJECT: Study Session Date: July 10, 2024 Contract with Redside Construction LLC for COUNCIL MEETING Date: July 17, 2024 Evergreen Rotary Park Boat Ramp Repair Department: Public Works & Utilities Project Presenter: David Dinkuhn Phone: (360) 473-5331 SUMMARY: This Contract provides for the repair of the boat ramp at Evergreen Rotary Park. Work includes installation of City-provided Ultrablock for retaining walls, pressure grouting voids under the existing ramp, backfill, and beach debris removal. Bid solicitations were sent to six construction firms listed on the MRSC Small Works Roster. A single bid was received on June 27, 2024 from Redside Construction for $184,887.61 (including sales tax). ATTACHMENTS: 1) Contract 2) Photographs FISCAL IMPACTS (Include Budgeted Amount): Project is funded by REET and bid amount is available in project budget. STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve the contract with Redside Construction, LLC in the amount of$184,887.61 (including sales tax) for the Evergreen Rotary Park Boat Ramp Repair project and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: ® Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/02/2018 Docusign Envelope ID:7097AC25-62DD-4B17-A6A3-26C269B75FC6 CONTRACT (Page 1 of 4) THIS AGREEMENT is dated the 26th day of July in the year 20 24 by and between the City of Bremerton (hereinafter called CITY) and Redside Construction, LLC (hereinafter called CONTRACTOR). CITY and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK. CONTRACTOR shall complete the WORK as specified or indicated in the CITY's Contract Documents entitled Evergreen Rotary Park Boat Ramp Repair. ARTICLE 2. CONTRACT TIMES. The WORK shall obtain Physical Completion within 30 working days after the commencement date stated in the Notice to Proceed. Time is of the essence as to each and every deadline set forth in this agreement. This provision has been specifically negotiated. ARTICLE 3. LIQUIDATED DAMAGES. CITY and the CONTRACTOR recognize that time is of the essence for this Agreement and that the CITY will suffer financial loss if the WORK is not completed within the time specified in Article 2 herein, plus any extensions thereof allowed in accordance with Section 1-08.8 of the Standard Specifications which may be modified by the Special Provisions. They also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by the CITY if the WORK is not completed on time. Accordingly, instead of requiring any such proof, the CONTRACTOR shall pay the CITY liquidated damages in accordance with Section 1-08.9 of the Special Provisions after the date of Physical Completion for each phase. ARTICLE 4. CONTRACT PRICE. CITY shall pay CONTRACTOR for completion of the WORK in accordance with the Contract Documents in the amount set forth in the Bid Proposal, which shall include sales tax as provided in Section 1-07.2 of the Special Provisions. ARTICLE 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Section 1-09.9 of the Standard Specifications which may be modified by the Special Provisions. Applications for Payment 8 processed by ENGINEER as provided in the Special Provisions Contractor Initials City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1-18 Contract Documents Docusign Envelope ID:7097AC25-62DD-4B17-A6A3-26C269B75FC6 CONTRACT (Page 2 of 4) ARTICLE 6. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between CITY and CONTRACTOR concerning the WORK consist of this Contract and the following attachments to this Contract: • Notice Inviting Bids, • Bidders Checklist, • Bid Proposal including the Proposal Forms, Information Required of Bidder, Bid Bond, and all required certificates and affidavits, • Performance Bond, • Payment Bond, • Standard Specifications, • Amendments to the Standard Specifications, • Special Provisions, • Appendices • Contract Plans, • Addenda numbers to , inclusive. • Change Orders which may be delivered or issued after Effective Date of the Agreement and are not attached hereto. There are no Contract Documents other than those listed in this Article 6. The Contract Documents may only be amended by Change Order as provided in Section 1-04.4 of the Standard Specifications which may be modified by the Special Provisions. ARTICLE 7. INDEMNIFICATION. The CONTRACTOR and CITY acknowledge and agree that they have negotiated the following in accordance with the requirements of RCW 4.24.115 and the CONTRACTOR specifically waives his immunity under industrial insurance under Title 51 RCW. To the fullest extent permitted by Laws and Regulations, the CONTRACTOR shall indemnify, defend, and hold harmless the CITY, ENGINEER, their consultants, subconsultants, and the officers, directors, employees, and agents of each and any of them, against and from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, all claims and liability arising under, by reason of, related, or incidental to the Contract Documents or any performance of the WORK, but not from the sole ne•Iigence or willful misconduct of the CITY and/or the ENGINEER as further defined in the So r ct Documents. The provisions of this section shall survive the termination of the contract. Contractor Initials City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1-19 Contract Documents Docusign Envelope ID:7097AC25-62DD-4B17-A6A3-26C269B75FC6 CONTRACT (Page 3 of 4) ARTICLE 8. ASSIGNMENT No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent(except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The CITY, in its sole discretion, may refuse to allow the CONTRACTOR to assign any or all of its duties, rights and/or responsibilities under the Agreement, except with regards to an assignment of funds for security purposes. In the case of an assignment for security purposes the CITY may condition its approval to the extent it deems necessary to assure that there will be adequate funds to complete the WORK and to pay a subcontractors and suppliers. ARTICLE 9. EQUAL EMPLOYMENT OPPORTUNITY STATEMENT In the hiring of employees for the performance of work under this Contract, the Contractor, its subcontractors, or any person acting on behalf of the Contractor shall not discriminate in any employment practice on the basis of age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital status, military status, or the presence of any physical, mental, or sensory disability. ARTICLE 10. ADA STATEMENT The City of Bremerton does not discriminate on the basis of disability in programs and activities, which it operates pursuant to the requirements of the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to both employment and admission to participation in the programs, services, and activities of the City of Bremerton. Reasonable accommodation for employees or applicants for employment will be provided. CITY and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. IN WITNESS WHEREOF, CITY and CONTRACTOR have caused this Agreement to be executed the day and year first above written. CITY : C atnartemerton CO c ;cgg Redside Construction, LLC s.am, fA4n ESE E3 6... By Greg wheeler, Mayor By Sam Berry, Owner Signed by: Attest ittA ,.t et tkeoNtr Attest 24tD5ED4E45C41 F... City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1-20 Contract Documents Docusign Envelope ID:7097AC25-62DD-4B17-A6A3-26C269B75FC6 Address for giving notices Address for giving notices City of Bremerton, 345 6th Street, 600 Winslow Way E, Suite 237 STE 100, Bremerton, WA 98337 BAINBRIDGE ISLAND, WA 98110 License No. REDSI CL925PU City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1-21 Contract Documents Docusign Envelope ID:7097AC25-62DD-4B17-A6A3-26C269B75FC6 CONTRACT (Page 4 of 4) A. :x.g;ive ,as to Form: 61 a' rfuitt Agent for service of process: (Signature) Sam Berry Mychael Raya, Assist. city Attorney 600 Winslow way E, Suite 237 BAINBRIDGE ISLAND, WA 98110 (Title) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1-22 Contract Documents Docusign Envelope ID:7097AC25-62DD-4B17-A6A3-26C269B75FC6 CONTRACT CERTIFICATE (if Limited Liability Company) STATE OF WA ) ss. COUNTY OF kITSAP ) I HEREBY CERTIFY that a meeting of the Members of the Redside Construction, LLC a Limited Liability Company existing under the laws of the State of Washington held on 7/29/24 , 2024 , the following resolution was duly passed and adopted: "RESOLVED, that Sam Berry and , as Members of this Limited Liability Company, be and are hereby authorized to execute the Agreement dated July 26 , 20 24, to the City of Bremerton by this Limited Liability Company and that their execution thereof shall be the official act and deed of this Limited Liability Company." I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this 29 , day of July , 20 24 Redside Construction , LLC vdliaiability Company S'e By: D798B62397BF476... Member By: Member (SEAL) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1-24 Contract Documents Docusign Envelope ID:7097AC25-62DD-4B17,46A3-26C269B75FC6 PERFORMANCE BOND (Page 1 of 2) Bond no. 30212489 KNOW ALL MEN BY THESE PRESENTS, That Redside Construction LLC as CONTRACTOR, and Western Surety Comoanv as Surety, are held and firmly bound unto City of Bremerton hereinafter called "OWNER,"in the sum of One Hundred Eiahty Four Thousand EiahtHundred Eighty Seven and 61/100th's $184.887.61 dollars, for the payment of which sum, well and truly to be made,we bind ourselves, our heirs, executors, administrators,successors,and assigns,jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH,that said CONTRACTOR has been awarded and is about to enter into the annexed Agreement with said OWNER to perform the WORK as specified or indicated in the Contract Documents entitled "Evergreen Rotary Park Boat Ramp Repair Project"; now, therefore, In the event CONTRACTOR fails to timely or properly perform any of the requirements of the Contract Documents at the times and in the manner contained therein, the Surety shall be liable under this bond up to the amount of the bond for the full amount of the OWNERS's expenses to construct or repair all work as well as all loss, cost, expense or damage suffered by the OWNER in excess of the Contract amount due to the CONTRACTOR'S failure to comply with any contract or permit conditions or other applicable laws and regulations. The Surety agrees that within 30 calendar days of receiving notice that the OWNER has declared a CONTRACTOR default and formally terminated the CONTRACTOR'S right to complete the Contract pursuant to its terms and conditions and that the CONTRACTOR has defaulted on all or part of the terms guaranteed by this bond, the Surety shall either: 1. Notify the OWNER in writing of its intent to cure the default itself within a reasonable period of time acceptable to the OWNER. The OWNER agrees to pay the balance of the Contract price to the Surety in accordance with the terms of the Contract,or 2. Tender to the OWNER the demanded sum, up to the amount of the bond. However, if the amount necessary for the OWNER to cure the default is less than the amount tendered, the OWNER will return, without interest, any overpayment to the Surety. PROVIDED, that any alterations in the WORK to be done or the materials to be furnished, or changes in the time of completion, which may be made pursuant to the terms of said Contract Documents, shall not in any way release said CONTRACTOR or said Surety hereunder, nor shall any extensions of time granted under the provisions of said Contract Documents, release either said CONTRACTOR or said Surety, and notice of such alterations or extensions of the Agreement is hereby waived by said Surety. City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1-27 Contract Documents Docusign Envelope ID:7097AC25-62DD-4B17,46A3-26C269B75FC6 PERFORMANCE BOND (Page 2 of 2) Bond no. 30212489 The obligation of the Surety shall include reimbursing the City for all costs and expenses, (including, but not limited to fees and charges of engineers, architects, attorneys,and other professionals,and court costs if litigation is commenced)incurred by the OWNER in enforcing the provisions of this Bond. The CONTRACTOR hereby agrees that the CONTRACTOR'S obligation to perform the required work is not limited to the amount of funds held by the Surety. This bond is irrevocable and cannot be canceled by the Surety or the CONTRACTOR. This bond shall remain in full force and effect for a period of one(1)year following final acceptance of the project by the City,and until the bond is released in writing by the OWNER at the written request of the Surety or CONTRACTOR. IN WITNESS WHEREOF,we have hereunder set our hands and seals this 18th day of July , 2024. Bedside Construction LLC (SEAL) Western Surety Company (SEAL) (CONTRACTOR) (Surety) 7 By: u 4 By: z; v xc . `._,�� a - (Signature and SEAL) (Signature and SEAL) Roxana Palacios, Attorney-in-Fact (SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY) Address of Surety to which all notices shall be sent: 999 Third Avenue, Suite 2500 Seattle. WA 98104 Address of Surety for service of process: 999 Third Avenue. Suite 2500 (must be a physical address) Seattle, WA 98104 City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1-28 Contract Documents Docusign Envelope ID:7097AC25-62DD-4817,46A3-26C269875FC6 Payment Bond Bond no. 30212489 (Page 1 of 2) KNOW ALL MEN BY THESE PRESENTS, That Redside Construction LLC as CONTRACTOR, and Western Surety Company as Surety, are held and firmly bound unto City of Bremerton hereinafter called "OWNER," in the sum of One Hundred Eighty Four Thousand Fight Hundred Fighty Seven and 61/100th's $184.887.61--- dollars, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators,successors, and assigns,jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that said CONTRACTOR has been awarded and is about to enter into the annexed CONTRACT with said OWNER to perform the WORK as specified or indicated in the Contract Documents entitled"Evergreen Rotary Park Boat Ramp Repair Project"; now, therefore, If said CONTRACTOR,or subcontractor,fails to pay for any materials,equipment,or other supplies, or for rental of same, used in connection with the performance of work contracted to be done, or for amounts due under applicable State law for any work or labor thereon, said Surety will pay for the same in an amount not exceeding the sum specified above, and, in the event suit is brought upon this bond, reasonable attomey's fees to be fixed by the court. This bond shall inure to the benefit of any persons, companies, or corporations entitled to file claims under applicable State law so as to give a right of action to them or their assigns in any suit brought upon this bond. PROVIDED, that any alterations in the WORK to be done or the materials to be furnished, or changes in the time of completion, which may be made pursuant to the terms of said Contract Documents, shall not in any way release said CONTRACTOR or said Surety thereunder, nor shall any extensions of time granted under the provisions of said Contract Documents release either said CONTRACTOR or said Surety, and notice of such alterations or extensions of the CONTRACT is hereby waived by said Surety. The obligation of the Surety shall include reimbursing the City of all costs and expenses, (including, but not limited to fee and charges of engineers, architects, attorneys, and other professionals,and court costs if litigation is commenced) incurred by the OWNER in enforcing the provisions of this Bond. City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1.29 Contract Documents Docusign Envelope ID:7097AC25-62DD-4B17,46A3-26C269B75FC6 PAYMENT BOND Bond no. 30212489 (Page 2 of 2) IN WITNESS WHEREOF, we have hereunder set our hands and seals this 18th day of July , 2024. Bedside Construction LLC Western Surety Company (CONTRACTOR) (Surety) By: - - i Z , By: 1 (G_ ?A (Signature and SEAL) (Signature and SEAL) Roxana Palacios, Attorney-in-Fact (SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY) Address of Surety to which all notices shall be sent: 999 Third Avenue. Suite 2500 Seattle WA 98104 Address of Surety for service of process: 999 Third Avenue, Suite 2500 (must be a physical address) Seattle, WA 98104 END OF CONTRACT FORMS City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair Project 1-30 Contract Documents Docusign Envelope ID:7097AC 25-62D D-41317-ASA3-26C2691375F C6 Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IS-FA('T Know All Men By These Presents,Thai WESTERN SURETY COMPANY,a South Dakota corporation.is a duly°reaniz.d and existing corporation having its principal office in the City of Sioux Falls,and State of South Dakota,and that it does by virtue of the signature and seal herein affixed hereby make,constitute and appoint Kathleen M Mitchell,Roxana Palacios,Holly E Ulfers,Scott Alderman,Lori Stark,Debbie Lindstrom,Jamie Armfteld, Kathy Nye, Tara Koloski, Amber Engel, Tatiana Getter, Kristine Santamarla, Marina Matyunin, Kendall Young, Individually of Seattle.WA,its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign.seal and execute for and on its behalf bonds.undertakings and other obligatory instruments of similar nature - In Unlimited Amounts- and to bind it thereby as Polly and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney. pursuant to the authority hereby given,are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the Authorizing By-Laws and Resolutions printed at the bottom of this page,duly adopted.as indicated.by the shareholders of the corporation. In Witness Whereof,WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 30th day of May.2024. saac*Yc'+ WESTERN SURETY COMPANY ctir�np Larry Kasten.Vice President State of South Dakota ss County of Minnchalu On this 30th day of May.2024.before me personally came Larry Kasten,tome known.who,being by me duly sworn.did depose and say: that he resides in the City of Sioux Falls.State of South Dakota;that he is a Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument:that he knows the seal of said corporation:that the sal affixed to the said instrument is such corporate seal;that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority,and acknowledges same to be the act and deed off said corporation. My commission expires f ,M.BENT ...S /. .to car x March 2.2026 ivswunr aAKOTA M.Bent.Notary Public CERTIFICATE I.Paula Kolsnsd.Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabovc set forth is still in force,and further certify that the Bylaw and Resolutions of the corporation printed below this certificate are still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said corporation this lgthday of July.2024. asua`rveo WESTERN SURETY COMPANY .`Qs.et y tPa, �_ m Paula Kolsrud.Assistant Secretary �rM Authorizing By-Laws and Resolutions ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders of the Company. Section 7. All bonds,policies,undertakings.Powers of Attorney,or other obligations of the corporation shall be executed in the corporate name of ate Company by the President.Secretary,and Assistant Secretary.Treasurer,or any Vice President.or by such other officers as the Board of Directors may authorize. The President.any Vice President.Secretary,any Assistant Secretary,or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds;policies,or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds.policies,undertakings,Powers of Attorney of other nblibations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile. This Power of Attorney is signed by Larry Kasten.Vice President.who has been authorized pursuant to the above Bylaw to execute power ofaReiiniys owbchali of Western Surety Company. - _This Power of Attorney may be signed by digital signature and sealed by adigital or otherwise electronic-formatted corporate sal under and by the authority of the following Resolution adopted by the Board of Directors of the Company by unanimous written consent dated the 27'day of April.2022: "RESOLVED:That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify and confirm the use of a digital orothenvise electronic-formatted corporate seal,each to be considered the act and deed of the Company." Co to ww».cnasurctv.cont>Owner f Obligee Services>Validate Bond Coverage.if you want to verify bond authenticity. Fan',F428042023 Docusign Envelope ID:7097AC 25-62D D-4617-ASA3-26C269675F C6 CONTRACT RETAINAGE BOND BOND#: 30225474 DATE POSTED: KNOW ALL PERSONS BY THESE PRESENTS: That we Redside Construction LLC (hereinafter called "Principal") a corporation organized under the laws of the State of Washington , and registered to do business in the State of Washington as a contractor, as Principal, and Western Surety Company (hereinafter called "Surety"),a corporation organized under the laws of the State of SD and registered to transact business in the State of Washington as Surety, their heirs, executors, administrators, successors and assigns, are jointly and severally held and bound to the City of Bremerton, Washington,(hereinafter called"City"),and are similarly held and bound unto the beneficiaries of the trust fund created by RCW Chapter 60.28, in the sum of Eiaht Thousand Four Hundred Sixty Five&55/100th's— Dollars($ 8.465.55--- ), plus 5% of any increases in the contract amount that have occurred or may occur due to change orders, increases in the quantities or the addition of any new item of work,the payment of which, well and truly to be paid,we bind ourselves,our heirs,executors and successors,jointly and severally,formally by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT: WHEREAS,on 7/22/2024 ,the Principal executed a contract(the"Contract")with the City known as: Project Name: evergreen Rotary Park Boat Ramp Repair Contract Number: 59169 ;and WHEREAS, said Contract and RCW Chapter 60.28 require the City to withhold from monies earned by the Principal during the progress of the construction, hereinafter referred to as "earned retained funds";and WHEREAS, the Principal and Surety agree to be bound by the laws of the State of Washington;and WHEREAS, the Principal requested that the City release the earned retained funds, as allowed under RCW Chapter 60.28;NOW THEREFORE Contract Retainage Bond Rev.06/2022 Page 1 of 3 Docusign Envelope ID:7097AC25-62DD-4617-ASA3-26C269675FC6 The condition of this obligation is such that the Principal or Surety is held and bound to the City to compensate,defend and hold the City harmless from any and all loss,costs or damages that the City may sustain by reason of release of said earned retained funds to Principal,then this obligation to be null and void,otherwise to remain in full force and effect. PROVIDED, HOWEVER, it is expressly understood and agreed that: 1. Any suit or action under this bond must be instituted within the time period provided by applicable law. The bond shall be subject to all claims and liens provided for by law or Contract against the earned retained funds and in the same manner and priority as set forth for retained percentages in RCW Ch. 60.28 and the Contract. 2. The Surety hereby consents to and waives notice of any extension in the time for performance of the Contract,assignment of obligations under the Contract,or Contract alteration, termination,amendment or change order. 3. Until written release of this obligation by the City,this bond may not be terminated or canceled by the Principal or Surety for any reason. Any extension of time for the Principal's performance on the Contract,assignment of obligations under the Contract,or Contract alteration, amendment or change order shall not release the Surety from its obligation under this bond. 4. RCW Ch.60.28 authorizes the City to substitute a retainage bond in lieu of earned retained funds and the Surety hereby waives any defense that this bond is void or otherwise not authorized by law. 5. Any claim or suit against the City to foreclose the liens provided for by RCW Ch. 60.28 shall be effective against the Principal and Surety and any judgment under RCW Ch.60.28 against the City shall be conclusive against the Principal and the Surety. 6. The laws of the State of Washington shall apply to the determination of the rights and obligations of the parties hereunder.Jurisdiction and venue for any dispute or claim hereunder shall be the state courts of Washington in Kitsap County,Washington. IN WITNESS WHEREOF,we have hereunder set our hands and seals this 18th day of July ,20 24 , Redside Construction LLC (SEAL) Western Surety Company (SEAL) (CONTRACTOR) (SURETY) c (Signature and SEAL) (Signature and SEAL) _ _Roxana Palacios,Attorney-in-Fact Contract Retainage Bond Rev.06/2022 Page 2 of 3 Docusign Envelope ID:7097AC 25-62D D-4617-ASA3-26C269675F C6 (SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY) Address of Surety to which all notices shall be sent: 999 Third Avenue.Suite 2500 Seattle WA 9R1t14 Address of Surety for service of process: (Must be a physical address) 999 Third Avenue. Suite 2500 Seattle.WA 98104 R:\LcgaN.cgaPFomu1FORMS ON COB\VEB\Conin cl Raainagc Bond Rev.062022.doex Contract Retainage Bond Rev.06/2022 Page 3 of 3 Docusign Envelope ID:7097AC 25-62D D-4617-ASA3-26C269675F C6 Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know MI Men By These Presents,That WESTERN SURETY COMPANY,a South Dakota corporation.is a duly organized and existing corporation having its principal office in the City of Sioux Falls.and State of South Dakota.and that it does by virtue of the signature and seal herein affixed hereby make.constitute and appoint Kathleen M Mitchell,Roxana Palacios,Holly E Ulfers,Scott Alderman,Lori Stark,Debbie Lindstrom,Jamie Armfield, Kathy Nye, Tara Koloski, Amber Engel, Tatiana Gefter, Kristine Santamaria, Marina Matyunin, Kendall Young, Individually of Seattle.WA,its true and lawful Attomey(s)•in•Fact with MI power and authority hereby conferred to sign-seal and execute for and on its behalf bonds.undertakings and other obligatory instruments of similar nature -In Unlimited Amounts- and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney. pursuant to the authority hereby given.are hereby ratified and confirmed. This Power of Attorney is node and executed pursuant to and by authority of the Authorizing By-Laws and Resolutions printed at the bottom of this page,duly adopted-as indicated,by the shareholders of the corporation. In Witness Whereof.WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 30th day of May.2024. SaatTye WESTERN SURETY COMPANY IA((PPOAgT�o au. BIZ .4441/N--601 0406007 /7"tar Larry Kasten.Vice President State of South Dakota County of Minnehaha ss On this 30th day of May.2024.before me personally came Larry Kasten,to me known,who,being by me duly sworn.did depose and say: that he resides in the City of Sioux Falls,State of South Dakota:that he is a Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument;that he knows the seal of said corporation;that the seal affixed to the said instrument is such corporate seal:that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority,and acknowledges same to be the act and deed of said corporation. My commission expires J M.BENT ^ xoraxr J March 2.2026 soura ronK oaxoT>tBs�Js M.Bent.Notary Public CERTIFICATE I.Paula Kolsrud.Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force-and further certify that the By-Law and Resolutions of the corporation printed below this certificate arc still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said corporation this 18thday of July,2024. tsuntryco WESTERN SURETY COMPANY �X A Pauhs'Kolsrud.Assistant Secretary Authorizing By-Laws and Resolutions - ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders of the Company. Section 7. All bonds,policies,undertakings.Powers of Attorney.or other obligations of the corporation shall be executed in the corporate name of the Company by the President.Secretary,and Assistant Secretary,Treasurer,or any Vice President.or by such other officers as the Board of Directors may authorize. The President.any Vice President,Secretary.any Assistant Secretary.or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds.policies.or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds-policies-undertakings.Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile. This Power of Attorney is signed by Larry Kasten.Vice President.who has been authorized pursuant to the above Bylaw to execute power of attorneys on behalf of Western Surety Company. This Power of Attorney may be signed by digital signature and scaled by a digital or otherwise clectronic-fomuucd corporate seal under and by the authority of the following Resolution adopted by the Board of Directors of the Company by unanimous written consent dated the 27th day of April.2022: "RESOLVED That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify and confirm the use of a digital or otherwise electronic-formatted corporate seal,each to be considered the act and deed of the Company." Co to www.enasuretv.com>Owner!Obligee Services>Validate Bond Coverage,if you want to verify bond authenticity. Fqm F4213043-2023 SUBMIT THE ENCLOSED PROPOSAL BOND WITH YOUR PROPOSAL USE OF OTHER FORMS MAY SUBJECT YOUR BID TO REJECTION City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road !-5 Contract Documents Basin Storm water improvements Project PROPOSAL BOND KNOW ALL MEN BY THESE PRESENTS, That we, Redside Construction LLC of Bainbridge Island, WA as principal, and the Western Surety Company a corporation duly organized under the laws of the state of South Dakota and authorized to do business in the State of Washington, as surety, are held and firmly bound unto the City of Bremerton in the full sum of five (5) percent of the total amount of the bid proposal of said principal for the work hereinafter described, for the payment of which, well and truly to be made, we bind our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents. The condition of this bond is such, that whereas the principal herein is herewith submitting his or its sealed proposal for the following highway construction, to wit: Evergreen Rotary Park Boat Ramp Repair said bid and proposal, by reference thereto, being made a part hereof. NOW, THEREFORE, If the said proposed bid by said principal be accepted, and the Contract be awarded to said principal, and if said principal shall duly make and enter into and execute said Contract and shall furnish bond as required by the City of Bremerton within a period of five (5) days from and after said award, exclusive of the day of such award, then this obligation shall be null and void, otherwise it shall remain and be in full force and effect. IN TESTIMONY WHEREOF, The principal and surety have caused these presents to be signed and sealed this 14th day of June , 20 24 . Redside Construction LLC By: (Principal) Western Surety Company (Surety) j(- -,-.- P-64/ -? (Attorney-in-fact) Holly E. Ulfers City of Bremerton = _� = June 2024 Evergreen Rotary Park Boat Ramp RepairPin,9 toad -� I,fr' Contract Documents Basin Stormwater Improvements Project _ Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know All Men By These Presents,That WESTERN SURETY COMPANY,a South Dakota corporation,is a duly organized and existing corporation having its principal office in the City of Sioux Falls,and State of South Dakota,and that it does by virtue of the signature and seal herein affixed hereby make,constitute and appoint Kathleen M Mitchell,Roxana Palacios,Holly E Ulfers, Scott Alderman,Lori Stark,Debbie Lindstrom,Jamie Armfield, Kathy Nye, Tara Koloski, Amber Engel, Tatiana Gefter, Kristine Santamaria, Marina Matyunin, Kendall Young, Individually of Seattle,WA,its true and lawful Attorneys)-in-Fact with full power and authority hereby conferred to sign,seal and execute for and on its behalf bonds,undertakings and other obligatory instruments of similar nature -In Unlimited Amounts— and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given,are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the Authorizing By-Laws and Resolutions printed at the bottom of this page,duly adopted,as indicated,by the shareholders of the corporation. In Witness Whereof,WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 30th day of May,2024. WESTERN SURETY COMPANY S y.:OQQ RaithIltl Wy :=z t- /ill al+7 ,e/‘43 sy°�h j{pPKp" ', Larry Kasten,Vice President State of South Dakota County of Minnehaha I ss On this 30th day of May,2024,before me personally came Larry Kasten,to me known,who,being by me duly sworn,did depose and say: that he resides in the City of Sioux Falls,State of South Dakota;that he is a Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument;that he knows the seal of said corporation;that the seal affixed to the said instrument is such corporate seal;that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority,and acknowledges same to be the act and deed of said corporation. %4%SS44444S444Sgg4444454} My commission expires a M.BENT rsae NOTAttr PUBLIC r �r March 2,2026 SOUTHDAKOTAkSp.Jr /92 Igt.,/% 1L° +%4444bbb%bb4444SS44444%�' M.Bent,Notary Public CERTIFICATE I,Paula Kolsrud,Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force,and further certify that the By-Law and Resolutions of the corporation printed below this certificate are still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal,ofthe said corporation this 14th day of June,2024. eoRErim ma ' ..... o WESTERN SURETY COMPANY `. %.7%. V-)C" ^ s`` � � ppViakr, Paula Kolsrud,Assistant Secretary Authorizing By-Laws and Resolutions ADOPTED lY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders of the Company. Section 7. All bonds,policies,undertakings,Powers of Attorney,or other obligations of the corporation shall be executed in the corporate name of the Company by the President,Secretary,and Assistant Secretary,Treasurer,or any Vice President,or by such other officers as the Board of Directors may authorize. The President,any Vice President,Secretary,any Assistant Secretary,or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds,policies,or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds,policies,undertakings,Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile. This Power of Attorney is signed by Larry Kasten,Vice President,who has been authorized pursuant to the above Bylaw to execute power of attorneys on behalf of Western Surety Company. This Power of Attorney maybe signed by digital signature and sealed by a digital or otherwise electronic-formatted corporate seal under and by the authority of the following Resolution adopted by the Board of Directors of the Company by unanimous written consent dated the 27's day of April,2022: "RESOLVED:That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify and confirm the use of a digital or otherwise electronic-formatted corporate seal,each to be considered the act and deed of the Company." Go to www.cnasuretv.com>Owner/Obligee Services>Validate Bond Coverage,if you want to verify bond authenticity. Form F4280-6-2023 CONTRACTOR'S REGISTRATION Name: Redside Construction LLC Address: 600 Winslow Way E. Suite #237 Bainbridge island, WA 98110 Employer's Identification Number (Employer social security number, not your personal social security number): 26-3606305 Employment Security Department Number: 557492-008 Washington Industrial Insurance Number: 165,870-00 Washington State Excise Tax Registration Number: 602-874-073 Washington State Contractor's Registration Number/Expiration Date: REDSICL925PU 11/3/2024 City of Bremerton Business License Number: 37621 City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road 1-7 Contract Documents Basin Stormwater Improvements Project CITY OF BREMER i ON CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES The undersigned bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date for this Project, that the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. "I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct." Signature: Date: Print Name and Title: Location or Place executed: Sam Berry / Owner (City, State) Bainbridge Island, WA Check One: Individual ❑ Partnership ❑ Joint Venture ❑ Corporation V State of Incorporation, or if not a corporation, State where business entity was formed: Washington State If a co-partnership, give firm name under which business is transacted: 1-4Ire *If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road 1-8 Contract Documents Basin Stormwater Improvements Project Bid Proposal Evergreen Rotary Park Boat Ramp Repair Project No. 59169 BID TO: City of Bremerton (Washington) Department of Public Works and Utilities 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the CITY in the form included in the Contract Documents to perform the WORK as specified or indicated in said Contract Documents entitled Evergreen Rotary Park Boat Ramp Repair. 2. Bidder accepts all of the terms and conditions of the Contract Documents, including without limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the disposition of the Bid security. 3. This Bid will remain open for the period stated in the "Notice Inviting Bids" unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the "Notice Inviting Bids" and will furnish the insurance certificates, Payment Bond, and Performance Bond required by the Contract Documents. 4. Bidder has examined copies of all the Contract Documents including the following addenda (receipt of all of which is hereby acknowledged): Number Date Failure to acknowledge all addenda shall render the bid non-responsive and shall be cause for its rejection. 5. Bidder has familiarized itself with the nature and extent of the Contract Documents, WORK, site, locality where the WORK is to be performed, the legal requirements (federal, state and local laws, ordinances, rules, and regulations), and the conditions affecting cost, progress or performance of the WORK and has made such independent investigations as Bidder deems necessary. To all the foregoing, and including all Proposal Forms contained in this Bid, said Bidder further agrees to complete the WORK required under the Contract Documents within the Contract Time stipulated in said Contract Documents, and to accept in full payment therefore the Contract Price based on the Total Bid Price(s) named in the aforementioned Proposal Forms. NOTE: Prices for all items, all extensions and total amount of bid must be shown in the Proposal Forms. Show prices in figures. Dated: chiw Z`1 Bidder: Redside Construction LLC By: (Signature) Title: Owner/President City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road 1-9 Contract Documents Basin Stormwater Improvements Project PROPOSAL FORM EVERGREEN ROTARY PARK BOAT RAMP REPAIR Sales Tax—Sales tax shall be paid in accordance with Special Provisions Section 1-07.2(2) State Sales Tax Rule 170. Date: June 27 , 2024 Item Spec Est. Unit No. Section Description of Item Qty. Unit Price Amount 1 1-04 Minor Change 1 Est. $15,000 $15,000 2 1-07 SPCC Plan 1 LS $500.00 $500.00 3 SP 1-09 Mobilization 1 LS $37,500.00 $37,500.00 4 SP 1-10 Project Temporary Traffic Control 1 LS $4,500.00 $4,500.00 5 SP 2-02 Removal of Structures and Obstructions 1 L.S. $7,800.00 $7,800.00 6 SP 2-02 Remove Beach Debris Incl. Haul 200 Ton $75.00 $15,000.00 7 2-03 Unsuitable Foundation Excavation Incl. 10 CY $ $ Haul 36.00 360.00 8 SP 2-09 Shoring or Extra Excavation CL. A 1 L.S. $1.00 $1.00 9 SP 8-01 Erosion/Water Pollution Control 1 L.S. $ $ 3,800.00 3,800.00 10 SP 8-33 Installation of Ultrablock for Retaining 650 SF Wall (Ultrablock City supplied) $65.00 $42,250.00 11 SP8-34 High Strength Grout 17 CY $2,400.00 $40,800.00 12 SP 8-35 Sika Seal 1 LS $1,800.00 $1,800.00 Sales Tax(9.2%) $15,576.61 TOTAL (BID ITEMS 1-12 plus Sales Tax): $184,887.61 END OF PROPOSAL FORM City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road 1-10 Contract Documents Basin Stormwater Improvements Project BID CERTIFICATE (if Corporation) STATE OF WA ) ) ss. COUNTY OF Kitsap ) I HEREBY CERTIFY that a meeting of the Board of Directors of the Redside Construction LLC a corporation existing under the laws of the State of Washington held on June 20 , 2024 , the following resolution was duly passed and adopted: "RESOLVED, that Sam Berry , as President of this Corporation, be and is hereby authorized to execute the Bid dated June 27 , 2024 , to the City of Bremerton by this Corporation and that his/her execution thereof, attested by the Secretary of this Corporation, and with the Corporate Seal affixed, shall be the official act and deed of this Corporation." I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this 10 , day of .} r%•1' 2019. ( ecretary) (SEAL) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road 1-11 Contract Documents Basin Stormwater Improvements Project BID CERTIFICATE (if Limited Liability Company) STATE OF \ ) COUNTY OFY-' 5dr') ss. I HEREBY CERTIFY that a meeting of the Members of the Redside Construction LLC a Limited Liability Company existing under the laws of the State of Washington held on Juine 20 , 2024 , the following resolution was duly passed and adopted: "RESOLVED, that Sam Berry and , as Members of this Limited Liability Company, be and are hereby authorized to execute the Bid dated June 27 , 2024 , to the City of Bremerton by this Limited Liability Company and that their execution thereof shall be the official act and deed of this Limited Liability Company." I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this 2°1'; day of J0'‘51 - , 20 2j. Redside Construction LLC A Limited Liability Company By Member ' By: Member (SEAL) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road 1-12 Contract Documents Basin Storm water Improvements Project BID CERTIFICATE (if Partnership) STATE OF ) ) ss. COUNTY OF ) I HEREBY CERTIFY that a meeting of the Partners of the M R a partnership existing under the laws of the State of , held on , 20_, the following resolution was duly passed and adopted: "RESOLVED, that , as General Partner of the Partnership, be and is hereby authorized to execute the Bid dated , 20_, to the City of Bremerton by this Partnership and that his/her execution thereof attested by the General Partner shall be the official act and deed of this Partnership." I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this , day of , 20_ General Partner (SEAL) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road I-13 Contract Documents Basin Stormwater Improvements Project BID CERTIFICATE (if Joint Venture) STATE OF ) ) ss. COUNTY OF I HEREBY CERTIFY that a meeting of the Principals of the IA\VA/ a joint venture existing under the laws of the State of , held on , 20_, the following resolution was duly passed and adopted: "RESOLVED, that , as of the Joint Venture, be and is hereby authorized to execute the Bid dated , 20 , to the City of Bremerton by this Joint Venture and that his/her execution thereof attested by the shall be the official act and deed of this Joint Venture." I further certify that said resolution is now in full force and effect IN WITNESS WHEREOF, I have hereunto set my hand this_, day of , 20_ Managing Partner (SEAL) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road 1-14 Contract Documents Basin Storrnwatcr Improvements Project INFORMATION REQUIRED OF BIDDER The Bidder shall furnish the following information.Additional sheets shall be attached as required. Failure to complete these items will cause the Bid to be non-responsive and may cause its rejection. In any event, no award will be made until all of the Bidder's General Information is delivered to the CITY. (1) CONTRACTOR's Name and Address: Redside Construction LLC 600 Winslow Way E. Suite#237 Bainbridge Island, WA 98110 (2) CONTRACTOR's Telephone No.: 206-317-6400 CONTRACTOR's Fax No.: 360-343-0944 (3) CONTRACTOR's License: Primary Classification Marine & Hevy Civil Construction State License No. and Expiration Date: REDSICL925PU 11/3/2024 Specialty Classifications Held (if any): n/a Name of Licensee, if different n/a from (1) above: (4) Name, address, and telephone number USI Kibble & Prentice dba USI Insurance Services of surety company and agent who will provide the required bonds on this POC: Holly Ulfers 206-660-0163 contract: 601 Union Street, Ste#1000 Seattle, WA 98101 (5) Name and position of person(s) who None attended the pre-bid visit to the work site (if any): City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road 1-15 Contract Documents Basin Stormwater Improvements Project (6) ATTACH TO THIS BID a list of three (3) projects completed by the Contractor, that are similar to Evergreen Rotary Park Boat Ramp Repair in nature, value and complexity of work. The three (3) projects must have been completed under the bidder's name as the prime (general) contractor within the last 5 years. The list shall include the following information as a minimum: • Names, address, and telephone number of owner. • Name of project. • Location of project. • Brief description of the work involved. • Contract amount. • Date of completion of contract. • Name, address, and telephone number of architect or engineer. • Name of owner's project engineer. • Years in business under current name. • Contracts now in hand, gross amount. City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road 1-16 Contract Documents Basin Stormwater Improvements Project CURRENT / PAST PROJECTS REFERENCE LIST Estimated Point of Contact POC Telephone Company Company/Client Name Project Title Contract# Contract Value im Description of Scopes of Work Type of Contract Performing Completion Date (POC) # Work GC/CM for major Pipelin Project,incl construction of 3 ea 60"x JUB Enginereering and Simplot Legrow Pipeline Project EE$14,972,200 30001f long Intake Pipes in Columbia Rver,Flexi Float Barges,Pile Private CURRENT,2023 Gary Weatherly 509 783 2144.C BEDSIDE Driving from Barges,Pump Plant,and Existing Pipelines&Pump 509 737 7320 CONSTR. Plant Demolitions This project will demo the existing 1 MG reservoir and construct a BEDSIDE City of Bainbridge Island Winslow Water Tank Replacement $16,197,199.00 new 2 MG elevated tank reservoir just north of the existing reservoir Public Works CURRENT,2025 Chris Munter 206-842-2016 CONSTR. site.All site work,appurtenances,etc. Replacement of the stormwater energy dissipator structure,beach restoration,and landscape and pavement restoration.Work includes Pine Road Basin Stormwater installation and maintenance of erosion and sediment controls;flow CURRENT, REDSIDE City of Bremerton 870 $883,910.00 Public WorksDavid Dinkuhn 360-473-5331 Improvements Marine Impact Basin bypassing;marine water management;excavation and temporary 10/2024 CONSTR. shoring;sawcutting,removal,repair,and installation of asphalt pavements;planting;and temporary traffic control Army Corps of Engineers LWSC Spillway Safety Barrier W912DW24P0016 $268,500.00 Replace the Spillway Safety Barrier at Lake Washington Ship Canal Federal CURRENT, Slava Govorushkin 206-764-6748 BEDSIDE (LWSC) 11/2024 CONSTR. Improvement of the Southworth Ferry Terminal in Kitsap County,to remove timber decking that is covered in Asphalt or Southworth Ferry Timber Deck& concrete and replace with steel pan decking and cast-in-place CURRENT, REDSIDE WSDOT XE3522 $409,854.00 Public Works Tom Castor 206-515-3727 Roof Repair concrete.Additionally,the single ply roofing of the terminal 07/2024 CONSTR. building will be replaced with a new single-ply roof membrane and other work. Removal of the existing concrete deck and replacing with light- penetrating grated decking supported on new steel girders,replacing of Renton Gene Coulon Memorial Park North CAG-22-014 picnic floats,replacing grated gangways and timber step runs with REDSIDE City Water Walk $4,232,000.00 light-penetrating grated decking,replacing all treated timber Public Works 8/7/2023 Betsy Severtsen 425-757-6657 CONSTR. components with recycled plastic lumber,wrapping piles for corrosion protection,minor repairs to existing pile caps,and related site work.. Procurement of the float modules,steel access bridge,crane,new 206-523-0024 ext REDSIDE University of Washington APL Floating Dock Restoration $2,697,000.00 concrete abutment Design and engineering Public Works 11/7/2023 Steve Robert 138 CONSTR. The project will consist of demolishing and wastehauling of the BEDSIDE Port Gamble S'Kallam Tribe South Boat Ramp Replacement G&O 15614.01 $3,534,000.00 e:.;isting boat ramp and construction a pile supproted dual lane ramp Public Works 11/10/2022 Barry Baker 360-454-5490 CONSTR. with center floating dock Furnishing all labor,equipment and materials necessary for installing Wilson new 18-inch diameter HDPE pipe via directional drilling and 360-733-6100 REDSIDE Town of Friday Harbor Sewer Outfall Replacement $3,131,563.00 Public Works 3/17/2022 Michael Matches engineering placement on sea bed,connecting upland end to existing sewer outfall Ext.1235 CONSTR. piping,and related work Replacement of the Boat Launch Ramp,repair of the dock bulkhead, Port of Poulsbo Boat Launch $595,821.25 replacement of the boardingfloat and piling, / / John cast in place abutment Public Works 7 30 2021 Piccone 360-337-0029 REDSIDE Port of Poulsbo P Replacementand stairs,and stomiwater/upland improvements CONSTR. Demolition of the existing fender systems including the precast concrete,fender piles,steel walers,chains,cables,and arch fenders. Port of Tacoma WUT Fender System Replacement 71421REDSIDE ys ep $1,711,100.00 Installation of new fender systems that include cone fenders,UHMW- Public Works 11/17/2021 Elly Bulega 253-428-8638 CONSTR. PE faced steel fender panels,chains,and anchorages.Repairing damaged concrete bullrail and water vault. The Dickman Mill Park Expansion and Head Saw Project consists of driving 52 steel piling,demo,new upland pile supported wood decking plazas;grated ramps to the upland plaza;additional guard Metro Parks Tacoma Dickman Mill Expansion and Head 202071J $1,611,124.00 railings;restoration ofthe historic mill pulley on placed wood decking Public Works 7/1/2021 Kr st Evans 253-305-1054 REDSIDE Saw restoration of the historicmill head saw placed on a new base and CONSTR. supported on steel piles;restoration of the historic mill log carriage on existing in-water foundations and steel piles;a grated overwater walkway andoverwater view point with wood decking;etc. Washington State Parks and Recreation Wave Attenuator Emergency SW-DA951 $130,115.37 Emergency Repairs to floating Wave Attenuator. Public Works 5/4/2021 Larry Matto 360-725-9758 BEDSIDE Repairs CONSTR. Allis Seawall/Coastal Erosion W912DW-19-C- The work includes construction of a new soldier pile and precast REDSIDE Army Corps of Engineers $3,198,600.00 concrete seawall watexvvard of the existing seawall,including work Federal 3/15/2021 Jenna Cunningham 253-363-0721 Control Project 0033 CONSTR. around an existing 54"outfall pipe owned by King County Chelan County PUD#1 Park Moorage Dock Replacement 20-04 $721,525.00 Replace Moorage docks at three parks on the Columbia river. New Public Works 2/28/2021 Court Hill 509-661-4143 BEDSIDE docks and pile driving CONSTR. All Labor,Material and Equipment for a complete installation of shoreline remedy repairs. Includes all marine equipment and BFHF7M Shoreline Remedy Repairs BEDSIDE PME/Department of the Navy at BNC Bremerton Naval Complex 8004 $292,650.00 transportation;including but not limited to a crane barge,a deck barge Federal 1/1/2021 Seth Tinkham 360-598-9310 CONSTR. and marine tug support as necessary for transport&installation of 300 tons small anno,filter&rat rock for shoreline rock Demolition of existing pump station; Demolition on an existing building; Excavation and installation of new gravity sewer,deep manholes,and.force main under artesian conditions;Installation of City of Bellevue Midlakes Pump Station Capacity 19022 $5,772,179.00 new pump station,wet well,valve vault meter vault(under artesian Public Works 1/1/2021 Vanaja Rajah 425-452-5286 REDSIDE Improvements aquifer conditions)control building,standby gene rator,RTU CONSTR. equipment,electrical and mechanical components;Groundwater Control during construction using dewatering. Demolition and disposal of existing approximately 3250 sq.ft.wharf Boat Street Marina Boat Street Marina Phase II REDSIDE $336,850.95 including the removal of 41 piles. Construction of new 725 sq.ft Public Works 3/15/2021 Steven Agnew 206-634 2050 CONSTR. grated pier including the installation of 16 steel piles. The project generally consists of the removal and replacement of the existing concrete boat launch,pier renovations,and upland Port of Keyport Port of Keyport Boat Launch $536,346.49 improvements.Upland improvements generally include but are not Public Works 3/27/2020 John Piccone 360-337-0029 REDSIDE Reconstruction Project limited to new concrete slabs,demolition of the existing abandoned CONSTR. pump house,installation of a new low-pressure sanitary sewer service, and asphalt resurfacing. Demolition and removal of the existing derrick crane,will require cutting the boom,mast,and stifflegs into easilyhandled sections for transport and disposal.These components are coated with paint that Army Corps of Engineers LWSC ECS Crane Replacement W912DW-17-C- $5,225,820.00 contains lead.The Contractor shall cut the crane components into Federal 3/30/2020 Michael Bandar 206-764-3533 BEDSIDE 0008 sections utilizing a combination of flame cutting and mechanical CONSTR. cutting tools.The crane is centered 12 feet from the waterway. Conduct activities in a manner to preclude lead from escaping the control area and entering waterway. This project consists of the following elements of work: Removal and replacement of existing Combined Sewer Overflow (CSO)Outfall;Removal and replacement of existing timber pier.; City of Seattle SCWQP-Ballard Early Work 2017-026 $7,540,809.00 Remediation of contaminated site soils,including shoring,dewatering, Public Works 1/17/2020 Cynthia Blazing 206-684 5080 REDSIDE Package soil excavation,transport,and disposal.;Installation of temporary CONSTR. electrical services for future project.; Relocation of existing water lines and other utilities to support outfall removal,temporary electrical service installation,and soil remediation. The project entails complete recanting the 1.5 MG and 3.0 MG welded steel reservoirs and seismic upgrades to the 1.5 MG reservoir.Related work includes installation of overflow piping with air gap structure,roof vent hood assembly repl acement BEDSIDE City of Edmonds Five Comers Reservoir Recoating ESKA/c473 $2,822,374.00 ladder fall protection systems,manway retr ofits and cathodic Public Works 5/1/2019 Henry Schoder 425-771-0220 CONSTR. protection(as an additive alternate)for both reservoirs;roof access hatch and landing for the 1.5 MG reservoir,and miscellaneous yard piping Construction of bridge improvements including,without limitation, demolition of the existing bridge decking,railings,and lighting,and City of Bainbridge Island Waterfront Park Bridge Repair $141,536.50 replacement with new decking,railings,and lighting.Work includes: Public Works 3/1/2019 Mark Epstein 206-780-3721 BEDSIDE demolition,including debris containment and removal;installation of CONSTR. new decking,guardrails,and\lighting;and associated work. construction include:Pump station rehabilitations including new; submersible wastewater pumps,wet wells,valve/meter vaults, and onsite piping at three existing pump station sites.New MCC and main control panels at all three pump stations.New standby Kitsap County Public Works Manchester Pump Stations and KC-496-165,268,656.39 generators at all three pump stations.Elevated concrete slabs, Public Works 9/24/2018 Floyd Bayless 360-337-5631 REDSIDE Wastewater Division Beach Lines Rehabilitation steps and handrails at all three pump stations.Associated site CONSTR. work and surface restoration at all three sites.Decommissioning and removal of three existing pump stations.Shoreline stabilization at two sites.Cured-in-place pipe(CIPP)beach line sewer rehabilitation and Coating.. Demolition of existing timber piers 23,24,25,and 26 and Shipway north of the Inner Harbor Line.This includes the demolition of creosote piles to the mud line,timber deck,miscellaneous abandoned Port of Seattle Terminal 5 Pile Removal& $2,679,000.00 utility lines,and miscellaneous steel items:saddles,tie straps,latter Public Works 2/15/2018 John H.Van Deursen 206-384-0613 REDSIDE Disposal CONSTR. sect.Other work includes the demolition of existing steel sheet pile wall to the existing mud line.Regrade the site behind the demolished wall and installation of rip-rap along the slope. Construction of dock improvements including,without limitation, demolition of the existing city dock and pilings,and replacement with City of Bainbridge Island City Dock Improvements $2,033,771.05 new pilings,floats,utilities,and amenities.Work includes demolition, Public Works 3/31/2018 Mark Epstein 206-780-3721 BEDSIDE including underwater debris removal;installation of new floats;water, CONSTR. fire,sewer,and electrical lines;concrete launch ramp extension;gate and fencing dock appurtenances;and associated work This contract provides for the improvement of NE West Kingston Road by constructing a Bridge over Carpenter Creek in the Kingston vicinity of northern Kitsap County.The work proposed consists of three schedules,Roadway Improvements,Sanitary Sewer and Water Main Schedule A,Roadway Improvements consists of Preparation, Kitsap County Public Works Roads NE West Kingston Road Carpenter KC-461-16 $3,697,426.44 Grading,Drainage,Storm Sewer,Surfacing,Cement Concrete Bridge Public Works 4/30/2018 Floyd Bayless 360-337-5631 REDSIDE Division Creek Culver Replacement Structure,Coating,HMA Pavement,Erosion\Water Pollution CONSTR. Control,Traffic Safety and Control,Cement Concrete Traffic Curb and Gutter and Sidewalks,Gravity Block Wall and other work Schedule B Sanitary Sewer consists of HDPE Sewer Pipe and Pipe Casing.Schedule C-Water Main consists of HDPE Pipe for Water Main Removal of corrosion prevention coating on portions of the radial gates;Handling and disposing of the removed coating;Removal of steel expanded metal and angle supports at top of radial gates lthrough 5;Removal of the ports installed in radial gate 1;Surface preparation of portions of the gates,prior to welding Furnishing and Bureau of Reclamation Cle Elum Radial Gate Modification R15PC00143 $2,343,818.00 installing fabricated metal components on five radial gates;Furnishing Federal 3/31/2017 Veiamin(Ben) 208-378-5116 BEDSIDE and installing fabricated metal components to fill temporary ports in Radchuk CONSTR. radial gate 1;Furnishing and installing aluminum skin plate on downstream side of five radial gates;Replacing rubber side seals on fp,t radial gates; Spot repair coatings on five radial gates;Coating new metalwork on the radial gates;Overcoating existing metal handrails and hoist mounts. A very complex Project requiring removal of a 600 ton floating caisson from the water,demolition and disposal of all existing internal mechanical piping,installation of all new mechanical internal piping systems including large valves and valve stems for internal piping system,demo and replacement of major internal structural steel members,installation of a very large temp work platform structure including a fully contained shrink wrap system and environmental controls to facilitate lead&PCB abatement work,surface prep&re- coating of the caisson with high performance coatings including tenting the caisson&all necessary environmental controls,and then safely& efficiently re-launching of the caisson back into the Rocky Reach Dam Steel Floating Columbia River. REDSIDE Chelan County PUD#1 Caission Rehabilitation 1463 $856,250.00 Public Works 5/29/2015 Scott Tidd 509-661-4050 CONSTR. Construction of park improvements including,selective tree removal pruning,clearing and grubbing,grading,concrete paths and walls, rockeries, City of Bainbridge Island Eagle Harbor Waterfront Park $1,610,411.15 decomposed granite plaza, pavers,asphalt parking lot, REDSIDE Public Works 3/15/2017 Mark Epstein 206-780-3721 sidewalks,stomnwater systems and rain gardens,water and electrical CONSTR. services,lighting,planting,site furnishings,and other related ancillary items. Intertidal Replacement of Tacoma Power's Potlatch Transmission Lines North Bay Crossing with a new foundation,structure, conductors,and capping.Work included heavy pile driving from Potlatch Transmission Lines North crane barge,technical marine demolition&disposal by barge of 6 BEDSIDE City of Tacoma Bay Crossing Rebuild 4600009345 $1,934,000.00 marine foundations contaminated with lead paint in the middle of the Public Works 10/18/2014 James Blessing 253-502-8045 CONSTR. bay,assembly and erection of a 165'tubular steel double circuit structure,forming and pouring major over water pile supported concrete cap usign barges/spud barges working around fluctating tides. Work included Marine capping&placement of 33,000 tons of shoreline restoration aggregates/sand under water along to create remediate a polluted shallow water habitat at Boeings Renton Plant. All work performed from multiple spud&deck barges using precision WA State Department of Natural GPS Dredgepack Systems amd long reach excavators.Marine BEDSIDE South Lake Shoreline Restoration DNA 13-E09 $2,397,400.00 demolition including removal of PCB laden dredge spoils,dangerous Public Works 9/1/2015 Monica Shoemaker 206-799-2949 Resources CONSTR. waste/creosote,2 derelict marine outfalls,removal of 1,00 feet of outer abandoned marine flume sheet pile walls,retoration 2.9 acres of wetland,removal of nonnative invasive plants from the 3 acre upland property,furnish and install 2 large marine outfalls,diving,tugboating, with fluctuating water levels. Site Demolition and Construction of Roadways,Parking Lob, Guardrails,Permanent Signage,Stonnwater Detention Ponds, Restrooms,Boat Launch,New Boat Ramp,handling floats,concrete Construct Carpenter Island Public BEDSIDE abutments,steel pile driving and navigation channel dredging Douglas County PUD Boat Launch — 14-12-W $2,396,400.00 Public Works 5/31/2016 Shane Phillips 425-778-5763 CONSTR. Marine Dredging and Marine OutFall Installation from Spud Barge. Work included underwater placement of fish mix,pipe bedding, aggregrtte underwater while workign from Spud Barges. Sedeminent Remediation,removal,&export of invasive species laden marine sediment was all performed via barges to facilitate upland landfill of disposal of sedimante/spoils. Work also included Diving and Henderson CSO underwater Survey.All of the aggregate material was purchase from Cal Portland REDSIDE Hoffman Construction/City of Seattle Pipeline Construction PW#212-010AC $778,000.00 Public Works 12/18/2015 Tony Kidd 206-793-5519 CONSTR. Spud Barge&deck barge project.Removing and Disposing of cl:isting docks and wood piles,furnishing and installing new docks, gangways,and new steel piles.Technical Marine logistically Lincoln Rock&Daroga State Park challenging project in non-navigable waters with fluctuating water REDSIDE Chelan County PUD#1 Dock and Pile Replacement 1451 $1,099,144.00 levels Public Works 12/16/2014 Court Hill 509-661-4143 CONSTR. Heavy Civil Spud barge/Crane Barge Project. Remove 6 ea existing 20 ton spillway tainter gates,trunnions,and anchor bolts using spud barge.Fabricate new trunnions,pions,recoating,repair concrete over water LWSC Tainter Gates&Trunnion W912DW-14-P- with environmental controls, install 6 new gates and anchorages from REDSIDE Army Corps of Engineers Replacement 0010 $637,000.00 spud barge in fluctuating water levels. Public Works 8/14/2014 Peter Krembs (425)649-7242 CONSTR. Work required barge import and in water placement of 26 million pounds of restoration aggregates under water in teh spillway using GPS/precision long reach excavators working from spud barges round fluctuating tides day and night. The project was to remediate excessive environmental scour below the spillway and the Ballard Locks monolith to protect against future environmental scour damage &seismic events.The work also included technical diving,furnishing LWSC Monolith Erosion&Scour W912DW-12-C- and driving underwater sheet Piles by barge,underwater concrete REDSIDE Army Corps of Engineers Repair 0002 $1,558,000.00 placement,environmental controls,and multi-beam survey. Federal 3/16/2012 Peter Krembs 206.400.7408 CONSTR. Major spud barge/crane barge project removing the 400ton upstream service gates at the Ballard Locks for ACOE. Prep Ballard W912DW-12-C- Lock Gates for removal including diving,coating,transport to 10/31/11-12/22- REDSIDE Army Corps of Engineers LWSC Pintle Bearing Repair 0001 $409,138.00 drydock for repair and re-install gates and pintles Federal 11 Peter Krembs 206.400.7408 CONSTR. MTCA cleanup action project dredging,disposing,and capping of 12,500 tons of extremely contaminated sediment and sand blast grit in Northlake Shipyard,Seattle. Arsenic,Heavy Metals,PCB,Heavy Environmental Pollution. Work site was 2.5 acres of undewater lake bottom at Northlake Shipyard. All sediment remediation work and marine cap material placement peformed using deck barges and spud barges,dredging machines using RTK positioning,multi-beam bathymetric survey controls,water quality monitoring with telemetry, Cat345CL long reach excavator and crane barge. Water levels Northlake Shipyard Sandblast Grit fluctuated during construction. REDSIDE Department of Ecology Interim Removal C1400116 $1,519,571.00 Public Works 5/14/2014 Libby Goldstein (425)649-7242 CONSTR. Marine Shoreline Restoration Project to remediate a large slide into the intertidal area of Bainbridge Island. Construction,Installation 350 feet soldier pile wall in intertidal zone including Drilled Shafts& Soldier pile on beach, Work included beach nourishment and Rockaway Beach Dam Termpary remediation mateiral placed in teh intertidal,intertidal Wet BEDSIDE City of Bainbridge Island $1,056,432.00 Excavation,Beach Nourishment Sand Installation,Dewatering, Public Works 6/12/2014 Chris Hammer 206-780-3740 Service Gate Rehabilitation CONSTR. Intertidal CIP concrete placement,intertidal rock placement& geowall,precast concrete panels for marine seawall. Work occured 24hrs days and nights and Labor Day working around tides. Project successfully performed on extremely tight 5 week schedule to meet a fisheries closure. Large Marine Outfall w/Concrete Anchors Installation in Puget Sound.All work performed using multiple Spud&deck barges. Also Big Gulch WWTF Outfall included multi-beam hydrographic surveying support,technical REDSIDE Mukilteo Water&Wastewater District Replacement 8586 $615,393.00 diving,working around tides/fluctuating water levels. Public Works 8/1/2013 Harry Seller 206-284-0860 CONSTR. 36"dia Marine Outfall w/Concrete Anchors Installation in Puget Sound using Barges&Divers.Work required precision GPS locating from barges,contaminated materials removal and disposal of old WWTF Outfall Diffuser marine piping(lead),intertidal material placement,hydrographic REDSIDE City of Lynnwood Replacement 2040 $390,630.00 surveying Public Works 9/20/2011 Brian Delp 425-670-5224 CONSTR. Spud barge/barge project Demo and Disposal of existing timber floats,floatation;Furnishing and installing new timber floats and pile REDSIDE University of Washington WAC Float Replacement 203205 $333,000.00 hoops Public Works 8/1/2013 Don Romain 206-221-4396 CONSTR. 50,000cl s dredging&dewatering of a major boat basin using multiple pump,construction of new pile breakwaters at marina entrance Hat Island Community Hat Island Marina Expansion $2,800,000.00 channel with steel pipe&sheet piles,new rock jetties,new concrete Private 3/1/2013 Chuck Matson 360-444-6611 BEDSIDE boat ramp&bulkhead,maintenance and repair of rock breakwater CONSTR. and bulkhead,maintenance dredging of marina basin and entrance channel. Multiple crane barges and 5 excavators used for the work. a.Spud barge project in a freshwater lake.New Main Pier/Ramp/Dock-The removal of the existing Main pier,ramp and dock together with associated support piles and the replacement with new piles,pier,ramp,and dock. b.West Launch Pier/Ramp/Dock-The shortening of the existing BEDSIDE Western Washington University Lakewood Dock Replacement $366,351.00 West Launch pier together with the removal of four timber piles and Public Works 3/31/2013 Mike DiSpigno 253-383-2740 CONSTR. the installation of new pier decking,ramp,dock and associated piles. c.East Launch Pier/Ramp/Dock-The repair of four existing East Launch ramp/dock timber piles(steel sleeve);and the repair of two existing east launch pier timber piles(fiberglass jacket). Girl Scouts Camp Pile Removal and Puget Sound Project working in fluctuating water levels,intertidal REDSIDE Marine Floats Corporation Pile Driving $52,175.00 areas,included Pile Removal,Disposal,and Pile Driving Private 2/7/2013 Logan Brown 253-383-2740 CONSTR. Pleasant Harbor Marina Pile Puget Sound Project working in fluctuating water levels,intertidal REDSIDE Marine Floats Corporation Removal and Pile Driving $77,600.00 areas,included Pile Removal,Disposal,and Pile Driving Private 1/21/2013 Logan Brown 253-383-2740 CONSTR. Demolition of existing creosote timber pier,and replace with a new fixed timber pier supported by steel pipe piles,A new timber float, BEDSIDE City of Gig Harbor Maritime Pier,Ramp and Float $534,677.00 anchored with steel pipe piles;Installation of a new aluminum Public Works 10/15/2012 Marcos McGraw 253-853-2647 CONSTR. gangway from the end of the fixed pier to a new timber float,HDPE utilities,and signage. 1 Work included demolition and removal of mulitiple bridges in intertidal and replacement of a timber bridge at the mouth of Tumwater Creek where it meets Port Angeles Harbor.Work will include driving steel piles,replacing sheet pile wall with rip rap,and Tumwater Creek Bridge installation of a sheet pile wall behind an existing sheet pile wall that REDSIDE Port of Port Angeles Replacement $828,696.00 would then be removed. Public Works 5/16/2012 Chris 360/417-3446 CONSTR. Bridge replacement in Stavis Bay.Work Included Rivirine Excavation, In-water Excavation and fish mix placement on shoriline,dewatering, driving Steel Piling,installation of ELJ's in intertidal, Fumishing,Installing and Grouting Prestressed Concrete Voided Slabs,Surfacing,various Concretes Class 4000,various HMA Pavements,Erosion Control and Planting,Traffic Safety and Control REDSIDE Kitsap County Public Works NW Stavis Bay Bridge Replacement 3640 $721,048.00 and related work. Public Works 12/19/2011 Jacques Dean 360-337-4693 CONSTR. Spud barge project 25 miles up Lake Chelan. Technical Marine 25 Mile Creek Guard Station Dock Logistics,included Pile Driving of 24"steel pile,Installation of 8/16/2010- P)208-689-3248 REDSIDE HDB Marine &Boathouse $183,000.00 Boathouses and Pier Subcontract 9/30/2010 Martin McDonald F)208-689-3636 CONSTR. Spud Barge Project /technical marine project using barges in high current and fluctuating water level area of the Columbia River. Work inlcuded very technical in-river Marine Rock Drilling,Tugboat Support,Design/Engineer/Build Boarding Float System Complete, Install Elevated Steel Transition platform&2 ea 6'x80'design/build Gary Owen(PM),Carl 509-888-3204 Wenatchee Day Use Moorage /engineer gangways,electrical,landscaping,signage,irrigation& McNabb(PND Gary,206-624- REDSIDE City of Wenatchee Facility Design/Build Project 804 $641,252.00 paving Public Works 7/09-12/09 Engineer) 1387 Carl CONSTR. Removed and dispose of 2 ea major creosote treated piers,pilings, dolphins,and associated structures at two intertidal locations in Puget (206)799-2949 Department of Natural Resources Marine Station and Squaxin Island Sound. Work inlcuded removal and remediation of underwater monica.shoemake REDSIDE (WSDNR) Dock Removals 10-E39 $233,000.00 pollution and marine sediments including diving. Public Works 2/7/11-3/14/11 Monica Shoemaker r@ dnr.wa.gov CONSTR. WSDOT SR-285 George Sellar Spud barge project. Barge,Tugboat,&Marine Installation of Main 10/10/19- Michael Grimes/Kevin REDSIDE Max Kuney Construction Bridge 7677 $42,000.00 Steel Bridge Beams under Major Bridge Subcontract 11/15/09 Carroll 509-535-0651 CONSTR. Spud barge project,included working around tides in intertidal zone Bremerton Ferry Terminal Slip 1 to install a seismic retrofit&new fenderign of the Slip bridge seat at REDSIDE WSDOT Seismic Retrofit 00-0844 $60,270.00 the Bremerton Ferry Terminal,and other work Public Works 5/11/2011 Mike Morrow 206-515-3944 CONSTR. Shoreline Remediation Project performed using spud barges and deck barges. Included shoreline excavation&in-water Excavation and new P)360-412-0808 South Puget Sound Salmon beach nourishment material placement in the intertidal using ext 2 F)360-412. REDSIDE Enhancement Group(SPSSE) Squaxin Island Bulkhead Removal $81,869.00 excavators and barges. Public Works 3/16/11-3/29/11 Brim Combs 0809 CONSTR. Marine Project in Major River in Urban Area similar to Duwamish location. Marina Dock Float Renovation&Repairs,Electrical,& REDSIDE City of Portland Bureau of Purchases Riverplace Breakwater Dock Repair 110221 $377,242.00 Marine HDPE Utilities Public Works 5/09-10/09 Susan Watt 503-823-5593 CONSTR. Spud barge project,intertidal project working in Puget Sound Jones and Sucia Islands State Parks- flucturating water levels,included major demolition and disposal of ADA Moorage:In-water existing pier/creaosote structures,Pile Driving,Installation of Floats P)360-755-5262 REDSIDE Washington State Parks and Recreation Improvements NW-C3805 $371,360.22 and Gangways,constructing new concrete abutments Public Works 9/11-1/11 Phillip Jensen F)360-428-1094 CONSTR. PSE Project Marine Mob/Demo Technical Marine Mobilization/Demobilization of Spud Barge,and REDSIDE Triton Logging Inc Logistical Support Services $49,650.00 Marine Support Private Contract 11/10-12/10 Andrew Walker P)604-414-7888 CONSTR. 360-385-1177 manager@ REDSIDE Cape George Colony Club George Marina Pile Sleeving $28,394.00 Dredging,Sleeving&Grouting MarinaPiling in interdidal zone Private 2/1/11-2/11/11 Art Burke capegeorge.Org CONSTR. Anacortes/Guemes Island Pile Intertidal project working in Puget Sound flucturating water levels P)360-319-5739 REDSIDE Razz Construction,Inc Driving $35,390.00 buiding a new ferry terminal,Pile Driving from spud barges. Subcontract 1/27/11-2/3/11 Dave Rasmussen F)360-752-0099 CONSTR. Interdidal project requiring relocation of an existing Marine Outfall, New pipe anchor system using driven steel piles on the beach in intertidal zone,30"HDPE Outfall Repair and Demolition of Ex'g Concrete Anchoring System,New Metal Fabrications,Earthwork, Bea von Tobel,Port 360-376-5285 Bea North Outfall Drainage Storm Drainage Utilities. Work included fish mix placement on beach manager David 425-951-4876 REDSIDE Port of Orcas Improvements $150,649.00 in intertidal for shoreline rehabilitation. Public Works 1/1/2010 Williams,Engineer David Williams CONSTR. Steve Slaton(Owner), 360-674-2381 Spud barge project Intertidal pier rehabilitation project working from David Pierce(PND Steve,206-624- REDSIDE Port of Bremerton Port Orchard Building Pile Repair $97,733.00 I barges in Puget Sound flucturating water levels. Public Works 8/09-10/09 Engineer) 1387 David CONSTR. Intetidal Wall Project and sediment remediation to repair an environmental slope failure on to Puget Sound Beaches. Intertidal/ marine Installation of Soldier Piling&Precast Concrete Panel Wall, Marine Drilled Concrete Shafts Install,Intertidal Excavation,Barge Transport&Marine Placement for Slope Stabilization,HDPE REDSIDE Riptide Condominium Riptide II Slope Stabilization Project $363,972.00 Utilities,Drainage Correction Private 2/09-4/09 Sharon Schrader 360-373-9608 CONSTR. Marina Renovation&Waler Marina Refurbishment Contract,Waler Replacement,Float Utilities, REDSIDE Driftwood Key Club Replacement Project $202,000.00 Float Misc Structural Steel,Marina Floats Refurbishment Private 1/09-4/09 Bill Buegel 360-638-2077 CONSTR. Sediment Dredging and barge Disposal of 3,500cy of Sediment using a 62'long reach excavator w/built-in GPSspud working from spud barge using deck barges for material export. Work included in-water placement of new marine sediment/rock to stabilize wing walls at 7/15/2010- REDSIDE Port of Port Townsend Quilcene Marina Dredging Project $178,850.00 marina entrance. Work included hydrograhic surveying. Small Works 8/7/2010 Jim Pivarnik 360-385-0656 CONSTR. Long reach excavator in-water dredging from a spud barge to remediate a blocked exit channel for SPU Utilities. Project required precision GPS dredging,bathymetric survey,spud barges,extremely Chester Morse Lake Outlet Channel high level environmental controls because Chester Morse watershed 7/15/2010- REDSIDE City of Seattle Deepening O&M PW#2010-041R $235,607.00 provided drinking water to 3million people in King County. Public Works 8/15/2010 John Summers 206-684-5074 CONSTR. Installation of Soldier Piling&Structural Precast Concrete Panel Wall, Drilled Concrete Shafts Install,CIP Concrete,Erosion Control Structures,Earthwork,CB's&Stormwater Utilities,curb and REDSIDE City of Seattle Wheeler/Nob Hill Erosion Repair 2009-038 $132,087.00 sidewalk,8"HDPE pipe Outfall System Public Works 6/09-10/09 Joe Carter 206-684-5070 CONSTR. Intertidal Marine Construction using spud barges and excavators to perform interdidal shoreline restroatio. Mobilized Rock to Island for Marine Bulkhead Restoration- Bulkhead repair,TESC,Sewer Force Main on beach&Utilities REDSIDE King County Bunker Trail Vashon Island C00358C09 $50,788.00 protection&Environmental protection Public Works 8/1/09-8/15/09 Derren Chemick 206-263-9321 CONSTR. Intertidal project. Spud Barge Project.1100ft 12"HDPE Outfall Eastsound Outfall Emergency Pipe,Concrete Anchoring System Diffuser Outlets,Excavation and REDSIDE Port of Orcas Repair Project Appx.$250,000 upland 12"Steel Stormwater Piping Public Works Roy Light 360-376-2720 CONSTR. *NOTE:THE FOLLOWING PROJECTS WERE PERFORMED UNDER OTHER CORPORATE ENTITY TITLES AND WERE MANAGED BY THE FAMILY TEAM OF SAM BERRY,PRESIDENT OF REDSIDE CONSTRUCTION.LLC AND FATHER DAVID BERRY*NOTE:NOT ALL PROJECTS ARE LISTED,ADDITIONAL PROJECTS LISTS AVAILABLE UPON REQUEST: SAM BERRY AND DAVID BERRY(FATHER&SON)HAVE PERFORMED OVER 550 PUBLIC WORKS CONSTRUCTION CONTRACTS AND HUNDREDS OF PRIVATE CONSTRUCTION PROJECTS UNDER VARIOUS COMPANY ENTITY^S SINCE 1984. Period of Company/Client Nark Project Title Contract Value Description of Work Performance I Weston Solutions,Inc. MEC Laboratory&outfall repair $880,000.00 HDPE Seawater Intake and Outfall 2006/2007 36"dia Marine HUPE pipe in place Connection to existing Southwest Suburban Sewer District Miller Creek Outfall $750,000.00 outfall 2003 11/1/07- Driftwood Key Club Driftwood Key Club Maintenance Dredging $877,200.00 Install 12"Steel Piling Intertidal Maintenance Dredging 2/14/08 Bridgehaven Community Club Association Bridgehaven Dredging $230,757.00 Intertidal Maintenance Dredging 10/1/08-12/09 7/5/2008- Hat Island Community Association Hat Island Dredging $42,000.00 Intertidal Maintenance Dredging 9/20/08 Arrowhead Pt.Sewer Main North Shore Utility District Arrowhead Sewer Replacement $880,000.00 HDPE Sewer force main in lake 2002 Construction of Campus tor lmmunex Lorporation,including Central Utility Plant,Utilidor,Bridge and Seven Multi-Story Immunex-Amgen Immunex-Amgen Campus Project $750,000,000.00 Campus Buildings 2000-2002 Complete Construction of Elementary School and School Mukilteo School District Odyssey Elementary School $13,000,000.00 Campus 2002 24"X 200'Long Steel Piling Installation,Temporary Shoring, 6/24/05- Sound Transit/PCL Construction Central Link Light Rail C755 $6,300,000.00 Repar&Concrete 3/31/06 Marine Construction including Timber Pile Driving, US Army Corps of Engineers Ballard Locks Renovation $1,714,738.00 Replacement of Treated Timber Pier Faces,Demolition 1998-2000 US Army Corps of Engineers Snohomish Sheet Pile/Ebey Slough $705,176.00 Installation of Sheet piling at Dike District#2 2000 Marine Construction including suspension bridge cabling and US Army Corps of Engineers Deep Water Slough $400,000.00 piling,design/build bridge,15k tons rock transport across river 1998-1999 7/24/08- City and Borough of Yakutat City and Borough of Yakutat HDPE Fuel Float Dock $352,750.00 Furnish/Install Floating Fuel Dock 10/23/08 Marine Demolition,Install 12"-14"dia Steel Piling,Marina 9/1/07- University of Washington Board of Regents Boat Street Marina Reconstruction $2million Floats,HDPE Utilities,Sitework 10/1/08 Pile Stubbing,Marine Structural Retrofit,Pile Driving,Heavy Washington State Department of Transportation/Mowat Construction Eagle Harbor Maintenance Facility $721,810.50 Civil 12/08-12/09 Design/Build Pile Supported Net Pen Anchoring System& 7/1/2009- Pacific Seafoods New Pen Anchor System Design/Build/Construct Project $185,000.00 Pile Driving in Columbia River 10/1/09 U. .Coast Guard Dock Design/Build/l;ngineer 6'x6'x1UU'Concrete Float for U SC "Usprey" USCG Moorage $350,000.00 Replacemeit of USCG Concrete Float Dock 5/07-10/07 6/25/07- City of Medina Medina Beach Park Shoreline Restoration $580,000.00 8"Dia Piling,Pier,Rock Bulkhead&Shoreline Restoration 11/15/07 3/1/07- Department of Natural Resources Port Townsend Waterfront/Pile Demolition $200,000.00 Demolish&Dispose Creosote Structures&Piling 4/15/07 Shoreline Excavation&Reconstruction,Hazmat Remediation 6/26/06- Washington State Department of Transportation Eagle Harbor Seep Remediation Project $145,479.00 of Beach Sediments 12/15/06 10/31/03- NW Maritime Center Northwest Maritime Center Dock $1,400,000.00 New 24"Piling,Construct New Pier&Floats 4/30/04 11/1/04- Aqua Express Kingston Passenger Only Ferry Terminal $535,000.00 24"-36"Steel Piling and Passenger Terminal&Walkway 2/15/05 Marina Demolition,24"Pile Installation,New Floats&new Huffaker Management Group Port Orchard Marina $490,000.00 HDPE Fire&Water Utilities 7/1/2006 Island Construction Port Townsend Plaza $162,800.00 New Sea Wall Construction&Sheet Pile Driving 7/2006-9/2006 24"dia Auger Cast Concrete Piling,Bridge,Foundations,Park 2005 THRU City of Seattle Washington Park Arboretum Project $950,000.00 Improvements 2006 THRU City of Seattle Luna Park Seawall $842,112.00 Steel Piling,Elevated Pre-cast Concrete Pier 12/1/04 Queen City Yacht Club Queen City Yacht Club $45,000.00 New 12"Steel Piling 2003-2004 City of Marysville Lagoon Partitions $1,800,000.00 Partition Piling/Pre-cast Concrete Panels 2002 2002 THRU City of Seattle Magnolia Park Slide Repair/Retaining Wall $500,000.00 Soldier Pile Retaining Wall,Lagging,Drilled Shafts 2003 University of Washington Board of Regents Old Oceanography Dock Repair $450,000.00 Remove&Replace Existing Dock 10/23/03-2004 Central Kitsap School District Central Kitsap High School Facade Renovation $700,000.00 Drilled Shaft/Foundation Underpinning,Facade Renovation 1999-2001 02-08-01 Port of Seattle T-91 Test Pile Installation $167,786.99 Furnish/Install Steel Test Piling THRU STEEL PILING,PIER FOR CAISSON TO TRIDENT US Navy Caisson Mooring-Bangor Naval Base $1,200,000.00 SUBMARINE DRYDOCK 1997 City of Seattle Fire Station#5,Pier 51 $520,000.00 DRILLED SHAFT STEEL PILING FOR FIRE BOAT 1997 City of Seattle Fire Station#5,Pier 51 $680,000.00 DRILLED SHAFT CONCRETE PILE UNDER PIER 1996 PSNS Inactive Submerging Mooring Facility $875,000.00 MOORING DOLPHINS 1996 Port of Kalama Lay Berth Facility $1,800,000.00 MOORING PILE/DOLPHINS FOR ASIAN FREIGHTERS DATED .....and many more.... *NOTE:NOT ALL PROJECTS ARE LISTED,ADDITIONAL PROJECTS LISTS AVAILABLE UPON REQUEST: Parker, Smith & Feek Insurance, LLC. 2233 112th Avenue NE Bellevue, WA 98004 City of Bremerton 345 6th Street, Suite 100 Bremerton, WA 98337 1 of 18 (HIS00) THIS PAGE INTENTIONALLY LEFT BLANK 2 of 18 (HIS00) AcoRO° CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YWY)07/19/2024 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Parker,Smith&Feek Insurance, LLC. PHONE 253-359-9700 FAX 1707 Dock Street (A/c,No,Ext): (A/C,No): E-MAIL Tacoma,WA 98402 ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# INSURER A: New York Marine&General Ins. INSURED INSURER B: Redside Construction, LLC 600 Winslow Way E#237 INSURER C: Bainbridge Island,WA 98110 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTRINSR ADDL I SR SUBR WVD POLICY NUMBERPOLICY EFF POLICY EXP LIMITS TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) A GENERAL LIABILITY ML202300002492 10/31/2023 10/31/2024 EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED 100,000 K COMMERCIAL GENERAL LIABILITY X X PREMISES(Ea occurrence) $ CLAIMS-MADE K OCCUR MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 K POLICY JE LOC Stop Gap $ 1,000,000 A AUTOMOBILE LIABILITY AU202300019544 10/31/2023 10/31/2024 OaaBcideD)INGLE LIMIT $ 1,000,000 K ANY AUTO X BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE K HIRED AUTOS K AUTOS (Per accident) A UMBRELLA LIAB K OCCUR ML202300002493 10/31/2023 10/31/2024 EACH OCCURRENCE $ 3,000,000 K EXCESS LIAB CLAIMS-MADE X X AGGREGATE $ 3,000,000 DED RETENTION$ $ WORKERS COMPENSATION WC STATU- OTH- AND EMPLOYERS'LIABILITY Y/N TORY LIMITS ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) Exhibit of Insurance City of Bremerton... (See Attached Description) CERTIFICATE HOLDER CANCELLATION City of Bremerton SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 345 6th Street, Suite 100 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Bremerton,WA 98337 4///� ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD 3 of 18 (HIS00) THIS PAGE INTENTIONALLY LEFT BLANK 4 of 18 (HIS00) DESCRIPTIONS (Continued from Page 1 ) is an additional insured on the general liability, automobile,and excess liability policies per the attached endorsementslforms. Coverage is primary and non-contributory on the general liability policy per the attached endorsementlform. Waiver of subrogation applies on the general liability and excess liability policies per the attached endorsementslforms. 5 of 18 (HIS00) THIS PAGE INTENTIONALLY LEFT BLANK 6 of 18 (HIS00) 12. BLANKET WAIVER OF SUBROGATION It is agreed that the company waives any rights of subrogation to which it may be entitled if prior to loss the Insured has agreed to such waiver in writing, but only to the extent required by said written agreement. OM DS 01 1120 Includes copyrighted material of Insurance Services Office, Inc.,with its permission Page 34 of 56 7 of 18 (HIS00) THIS PAGE INTENTIONALLY LEFT BLANK 8 of 18 (HIS00) ENDORSEMENT #2 ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: MARINE GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Blanket when required by written contract. A. "Who Is An Insured" under the Marine General Liability section of the Longshore+ Marine Package Policy is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for"bodily injury" or "property damage"caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products-completed operations hazard'. However: 1.The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations ALL OTHER TERMS AND CONDITIONS REMAINING UNCHANGED OM 1027 1022 ©2022 Coaction Specialty Insurance Group, Inc. Page 50 of 56 Includes copyrighted material of Insurance Services Office, Inc.,with its permission 9 of 18 (HIS00) THIS PAGE INTENTIONALLY LEFT BLANK 10 of 18 (HIS00) ENDORSEMENT #9 BLANKETADDITIONALINSURED f FOLLOW-FORM LIMITATION) It is agreed that this Policy shall include as Additional Insureds any person or organization to whom the Named Insured has agreed by written contract to provide coverage, but only with respect to operations performed by or on behalf of the Named Insured and only with respect to occurrences subsequent to the making of such written contract. It is further agreed that there shall be no coverage for any liability arising under this endorsement unless such liability is covered by valid and collectible underlying insurance as listed in the Schedule of Underlying Insurance, for the full limit shown therein, and then only for such hazards for which coverage is afforded under said underlying insurance. ALL OTHER TERMS AND CONDITIONS REMAINING UNCHANGED. 39 M-4B-1110 11 of 18 (HIS00) THIS PAGE INTENTIONALLY LEFT BLANK 12 of 18 (HIS00) ENDORSEMENT #10 BLANKET WAIVER OF SUBROGATION IFOLLOW-FORM LIMITATION) It is agreed that the Company waives any rights of subrogation to which it may be entitled if prior to loss the Insured has agreed to such waiver in writing, but only to the extent required by said written agreement. It is further agreed that there shall be no coverage for any liability arising under this endorsement unless such liability is covered by valid and collectible underlying insurance as listed in the Schedule of Underlying Insurance, for the full limit shown therein, and then only for such hazards for which coverage is afforded under said underlying insurance. ALL OTHER TERMS AND CONDITIONS REMAINING UNCHANGED. 40 M-5B-1 1 10 13 of 18 (HIS00) THIS PAGE INTENTIONALLY LEFT BLANK 14 of 18 (HIS00) In the event of cancellation by the insured, the revised Deposit Premium will be calculated by subtracting the "short-rate return premium" due from the Deposit Premium. In such event, unless modified by specific endorsement, the revised Minimum Premium will be the same as the revised Deposit Premium. 2. Blanket Waiver Of Subrogation It is agreed that the company waives any rights of subrogation to which it may be entitled if prior to loss the Insured has agreed to such waiver in writing, but only to the extent required by said written agreement. 3. Primary and Non-Contributory By Written Contract Where required by written contract, it is agreed that this policy shall be primary to any insurance carried by an additional insured, and any insurance carried by such additional insured shall not be called upon to contribute to any claim covered under this policy, provided that the claim arises directly from work performed by the Named Insured or others working directly on behalf of the Named Insured and provided further that the 'occurrence" that gives rise to such claim happened subsequent to the execution of the written contract. 4. Premium Adjustment and Reporting The premium charged for this policy has been calculated at the rate of per policy Declarations, per $100.00 of gross receipts during the Policy Period. On or before the 30th day following the expiration of this policy, the insured agrees to submit a report to us containing gross receipts during the Policy Period. Earned Premium will be calculated at the above rate, and any premium in excess of the Deposit Premium shall be immediately due and payable upon furnishing the aforesaid report. In the event that the Earned Premium is less than the Deposit Premium but more than the Minimum Premium, the company will return the difference between the Deposit Premium and the Earned Premium. In the event that the Earned Premium is less than the Minimum Premium, the Minimum Premium will apply and the company will return the difference (if any) between the Deposit Premium and the Minimum Premium. 5. Sub-Contractor Condition In consideration of the premium charged, it is hereby a condition of this policy and the Named Insured agrees that in the event that the Named Insured hires any subcontractors that the Named Insured will obtain a Certificate of Insurance from each subcontractor evidencing valid and collectible Comprehensive General Liability Insurance in an amount of not less than $1,000,000 any one occurrence subject to aggregate limits only where customary. OM DS 01 1120 Includes copyrighted material of Insurance Services Office, Inc.,with its permission Page 21 of 56 15 of 18 (HIS00) THIS PAGE INTENTIONALLY LEFT BLANK 16 of 18 (HIS00) If there is other coverage provided by this policy for audio, visual and data electronic equipment, the coverage provided here is excess. However, you may elect to apply the limit, or any portion thereof, of coverage provided in this policy to pay any deductibles that is applicable under the provisions of the other coverage. C. BLANKET ADDITIONAL INSURED COVERAGE—REQUIRED BY CONTRACT Paragraph A.1. Who Is An Insured of SECTION II —COVERED AUTOS LIABILITY COVERAGE, is amended by the addition of the following: 1. Any person or organization with respect to the operation, maintenance, or use, of a covered auto, provided that you and such person or organization have agreed under an expressed provision in a written contract or written agreement or a written permit issued to you by a governmental or public authority, to add such person, organization, or governmental or public authority to this policy as an insured. However, such person or organization is an insured: a. Only with respect to the operation, maintenance, or use, of a covered auto; and b. Caused in whole or part by your acts or omissions or the acts or omissions of those acting on your behalf. c. Only for, bodily injury or property damage caused by an accident which takes place after: (1) You executed the "insured contract" or written agreement; or (2) The permit has been issued to you. D. BLANKET WAIVER OF SUBROGATION Paragraph A.5. Transfer Of Rights Of Recovery Against Others To Us of SECTION IV—BUSINESS AUTO CONDITIONS is amended by the addition of the following: We waive any right of recovery we may have against any person or organization to the extent required of you by a written contract executed prior to any "accident" because of payments we make for damages under this coverage from. E. BROADENED NAMED INSURED Paragraph A.1. Who Is An Insured of SECTION II —COVERED AUTOS LIABILITY COVERAGE is amended by the addition of the following: Any organization you own as of the inception date of the policy, or any organization that you newly acquire or form during the policy period, other than a partnership, joint venture, or limited liability company, and over which you maintain ownership or majority (more than 50%) interest during the policy period, will qualify as a Named Insured if: 1. There is no other similar insurance available to that organization; and 2. The first Named Insured shown in the Declarations of this policy has the responsibility of placing insurance for that organization; and 3. The organization is incorporated or organized under the laws of the United States of America. Coverage under this provision is effective on the acquisition or formation date, and is afforded only until the end of the policy period of this coverage, or the next anniversary of its inception date, whichever is earlier. However, coverage under this provision does not apply to: 1. "Bodily injury" or "property damage" that results from an "accident" that occurred before you acquired or formed the organization; and 2. Any person or organization with respect to any current or past partnership, or joint venture that is not shown as a Named Insured in the Declarations; and 3. Any organization that is covered as an "insured" under any other automobile liability insurance policy, or would be an "insured" under such policy but for the termination of such policy, or the exhaustion of such policy's limits of insurance or the insolvency of the insurer. F. DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS Paragraph A.2.a. of the Loss Conditions provision of SECTION IV — BUSINESS AUTO CONDITIONS is deleted and replaced by the following: AU 0113 1114 Includes copyrighted material of Insurance Services Office, Inc., Page 3 of 7 with its permission 17 of 18 (HIS00) THIS PAGE INTENTIONALLY LEFT BLANK 18 of 18 (HIS00) STALE OF WASHINGTON Daparmwrn of tabor&Industries Certificate of Workers' Compensation Coverage July 29, 2024 WAUBI No. 602 874 073 L&I Account ID 165870-00 Legal Business Name RED SIDE CONSTRUCTION LLC Doing Business As RED SIDE CONSTRUCTION LLC Workers'Comp Premium Status: Account is current. Estimated Workers Reported Quarter2 of Year 2024 '7 to 10 Workers" (See Description Below) Account Representative Employer Services Help Line,(360)902-4817 Licensed Contractor? Yes License No. REDSICL925PU License Expiration 11,932024 What does 'Estimated Workers Reported` mean? Estimated workers reported represents the number of full time position requiring at least 480 hours of work per calendar quarter. Asingle 480 hour position may be filled by one person, or several part time workers. Industrial Insurance Information Employers report and pay premiums each quarter based on hours of employee work already performed, and are liable for premiums found later to be due. Industrial Insurance accounts haw no policy periods, cancsllatIon dates,IlmttatIons of coverage or walvr of subrogation (See RCW 51.12.050 and 51.16.190).