CHANGE ORDER
CONTRACT CHANGE ORDER NO: 007
PROJECT NAME: East 11th Street and Perry Avenue Reconstruction Project
PROJECT NO: 315018 CONTRACTOR: Sound Pacific Construction
ORIGINAL CONTRACT AMOUNT: 5,575,580.40 DAYS: 210
PREVIOUSLY APPROVED CHANGES: 125,055.17 DAYS: 19
THIS CHANGE: 0.00 DAYS: 0
REVISED CONTRACT AMOUNT: 5,700,635.57 DAYS: 229
This Change Order covers changes to the subject contract as described herein. The Contractor shall
construct, furnish equipment and materials, and perform all work as necessary or required to
complete the Change Order Items. The increase or decrease in contract price shown below includes
any applicable taxes.
DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT
o r CONTRACT CONTRACT TIME
r r AMOUNT AMOUNT EXTENSION
3 3 ($) ($) (DAYS)
During the course of this project certain bid items have been $0.00 0.00
reduced in quantity or not needed due to existing conditions.
The City of Bremerton and the Contractor have agreed to move
monies associated with the below bid items into Minor Change
in order to replenish the Minor Change funds to account for
other added work not associated with bid items and potential
future needs.
The below bid items will be reduced to actual used quantities or
zero and the remaining dollar amounts added to bid item#01
Minor Change. This will result in a Net Zero change to the
overall Contract amount but replenish Minor Change.
B.I. 11 —Construction Sign Class A—Original Bid Item
quantity was 200 SF only 105 sf was used. Difference of 95 sf*
$38.00 per sf= $3,610.00 moved to Minor Change
B.I. 17— Property Conformance Plan —2207 E 11th St. —This
Lump Sum item was not used. Full L.S. item of$5,000.00
moved to Minor Change
B.I. 42—HMA CL. % IN. PG 58H-22—Original Bid Item quantity
was 3740 Tons only 3622.02 Tons were used. Difference of
117.98 Tons *$132.00 = $15,573.36 moved to Minor Change
B.I. 48—High-Density Polyethylene (HDPE) Pipe 18 IN.
Diam. —Original Bid Item quantity was 280 LF only 126 LF was
used. Difference of 154 LF *$125.00 per LF= $19,250.00
moved to Minor Change
Docusign Envelope ID:4D03502A-9FCD-4F7B-B905-3DE238DC33CD
CONTRACT CHANGE ORDER NO: 7
PROJECT NAME: East 11tt' Street and Perry Avenue Reconstruction Project
B.I. 49—Temporary Storm Sewer Bypass—Original Bid Item
Quantity was 3 Each only 1 was used. Difference of 2 EA*
$12,000.00 = $24,000.00 moved to Minor Change
Total moved from bid items above to A01 —Minor Change per
this change order is $67,433.36. Previous change order#003
had moved$72,755.00 into Minor Change. New Total of Minor
Change below:
BI A01 MINOR CHANGE
Original Bid Item= $200,000.00
C.O. #003 added= $72,755.00
C.O. #007 adds = $67,433.36
New Total = $340,188.36
NET CHANGE IN CONTRACT AMOUNT $0.00 0.00
INCREASE OR (DECREASE)
ESTIMATED SALES TAX AT 9.4% N/A
TOTAL INCLUDING SALES TAX $0.00 0.00
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims
of any kind or nature arising from or connected with any work either covered or affected by this
Change Order, including, without limitation, claims related to contract time, on-site or home office
overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for
past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item, including any and all supervision costs and other miscellaneous
costs relating to the change in work, and as to the extension of time allowed, if any, for completion of
the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is
understood that this Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order
that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform
the surety of this change, and shall take appropriate action to modify any bonds required under the
contract to address this change.
CONTRACTOR
Accepted: DATE: 9-23-24
PROJECT MANAGER
Digitally signed by Vicki Grover
Vicki Grover DPl:°=USring,Oi.grover�c Worl<s,CN icki Gr
O=Engineering,ck g ove1ic Works,CN=Vicki Grover
Recommended: Date °2 °9.23'°4,,5_°''°°' DATE:
Page 2 of 3
Docusign Envelope ID:4D03502A-9FCD-4F7B-B905-3DE238DC33CD
CONTRACT CHANGE ORDER NO: 7
PROJECT NAME: East 11tt' Street and Perry Avenue Reconstruction Project
CITY ENGINEER
Council action is required as project cost will exceed approved budget. 0 Yes V No
Council action is required as change exceeds Mayors authority per BMC 2.76.110. 0 Yes VNo
Digitally signed b'Ned Lever
ON:C=US,
Ned Lever E=nad.lever@ci.6remertonwa.us,
O=City of Bremerton,OU=Engineering,
CN=Ned Lever
Recommended: Date:2024.10.04 14:46:14-07'00' DATE:
DIRECTOR OF PUBLIC WORKS AND UTILITIES
Tom Digitally signed by Torn
Knuckey
Knuckey Date:2024.10.09
Recommended: 12:59:03-07'00' DATE:
MAYOR
Sig ned by:
Approved: Lz Auleti DATE:10/15/2024
BAF46095E8E747B...
APPROVED AS TO FORM: ATTEST:
Signed by��: Signed by:
LIMA/
LG�au;Et-601 nBru,... LdElt3EtiV nMe IF...
Bremerton City Attorney City Clerk
Page 3 of 3
Docusign Envelope ID:8510A790-BF54-4935-8DC5-FBA1F91056EC
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO: 006
PROJECT NAME: East 11th Street and Perry Avenue Reconstruction Project
PROJECT NO: 315018 CONTRACTOR: Sound Pacific Construction
ORIGINAL CONTRACT AMOUNT: 5,575,580.40 DAYS: 210
PREVIOUSLY APPROVED CHANGES: 95,198.00 DAYS: 19
THIS CHANGE: 29,857.17 DAYS: 0
REVISED CONTRACT AMOUNT: 5,700,635.57 DAYS: 229
This Change Order covers changes to the subject contract as described herein. The Contractor shall
construct, furnish equipment and materials, and perform all work as necessary or required to
complete the Change Order Items. The increase or decrease in contract price shown below includes
any applicable taxes.
DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT
o r CONTRACT CONTRACT TIME
r r AMOUNT AMOUNT EXTENSION
3 3 ($) ($) (DAYS)
This change order is being written to extend Lump Sum bid 29,857.17 0.00
items to match added time granted through previous change
orders. Lump Sum bid items affected by extensions of time
include Traffic Control and Erosion Control. Approved extension
of time through previous change orders did not account for
these two bid items as daily expenses for the Contractor to
maintain both traffic control and erosion control on site. Added
Working Days approved is nineteen (19) and the below
calculations show equitable compensation to the Contractor.
A10—Traffic Control —Original Bid = $285,000.00/210
Working Days= $1,357.14 per day x 19 added days =
$25,785.66
A63—Erosion Control —Original Bid = $45,000.00/210
Working Days= $214.29 per day x 19 added days= $4,071.51
Total This C.O. - $25,785.66 + $4,071.51 = $29,857.17
NET CHANGE IN CONTRACT AMOUNT $29,857.17 0.00
INCREASE OR (DECREASE)
ESTIMATED SALES TAX AT 9.2% N/A
TOTAL INCLUDING SALES TAX $29,857.17 0.00
Docusign Envelope ID:8510A790-BF54-4935-8DC5-FBA1F91056EC
CONTRACT CHANGE ORDER NO: 6
PROJECT NAME: East 11tt' Street and Perry Avenue Reconstruction Project
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims
of any kind or nature arising from or connected with any work either covered or affected by this
Change Order, including, without limitation, claims related to contract time, on-site or home office
overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for
past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item, including any and all supervision costs and other miscellaneous
costs relating to the change in work, and as to the extension of time allowed, if any, for completion of
the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is
understood that this Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order
that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform
the surety of this change, and shall take appropriate action to modify any bonds required under the
contract to address this change.
CONTRACTOR
Accepted: DATE: 2/13/24
PROJECT MANAGt
Digitally signed byVicki Grover
V i c ki •
G rove r O=DN C=US,E=vicki.grove cWorks,CN=Vicki
Grover
Recommended: O=Engineering,OU=Public W orks,CN=Vicki Grover DATE:Date:202a.02.15 08 59:53-OB'00'
CITY ENGINEER
Council action is required as project cost will exceed approved budget. 0 Yes V No
Council action is required as change exceeds Mayors authority per BMC 2.76.110. 0 Yes VNo
Digitally signed by Ned Lever
Ned Lever DN C=US,E=ned lever@ci bremerton wa.us,
O=City of Bremerton,OU=Engineering,CN=Ned
Lever
Recommended: Date:2024.07,12 07:32:50-07'00' DATE:
DIRECTOR OF PUBLIC WORKS AND UTILITIES
Tom Kn u c ke Digitally signed by Tom Knuckey
Date:2024.07.16 10:25:38 -Ob'O9'
Recommended: A E:
MAYOR
r DocuSigned by:
Approved: DATE: 7/16/2024
`—bAl4bU btbL(4(b...
APPROVED AS TO FORM: ATTEST:
DocuSigned by: DocuSigned by:
LIYAAa
aGAC'6t$3 I 462 £BSE&4E4CC44f...
Bremerton airy Attorney •
City Clerk
Page 2 of 2