HomeMy WebLinkAbout1_-_Original_Submission__Haddon_Park_CRC_monitoring_scope_amendment
PO BOX 4159 SEATTLE, WA 98194
PHONE 206 855-9020 - INFO@CRCWA.COM
Haddon Park Archaeological Monitoring
This scope amendment is for archaeological monitoring to be conducted by CRC during removal of
paving and deposi9on of fill at Haddon Park. Fill deposi9on will occur above the Haddon Park
Landfill, archaeological site 45KP348.
Task:
• Archaeological Monitoring: CRC will conduct up to two days of archaeological monitoring at
Haddon Park. A daily log will be completed for each day of monitoring. Results of archaeological
monitoring will be presented in a monitoring report to be prepared under a previously approved
scope of work.
Cost: $2,405
Project Schedule:
CRC will conduct archaeological monitoring at Haddon Park, with at least 72 hours no9ce of
proposed ground disturbance.
Prepared by Ian Kretzler and Margaret Berger, 9/9/2024
Docusign Envelope ID: 9F4D249E-FDA6-4073-AA21-9D055301969A