Loading...
HomeMy WebLinkAbout1_-_Original_Submission__Haddon_Park_CRC_monitoring_scope_amendment PO BOX 4159 SEATTLE, WA 98194 PHONE 206 855-9020 - INFO@CRCWA.COM Haddon Park Archaeological Monitoring This scope amendment is for archaeological monitoring to be conducted by CRC during removal of paving and deposi9on of fill at Haddon Park. Fill deposi9on will occur above the Haddon Park Landfill, archaeological site 45KP348. Task: • Archaeological Monitoring: CRC will conduct up to two days of archaeological monitoring at Haddon Park. A daily log will be completed for each day of monitoring. Results of archaeological monitoring will be presented in a monitoring report to be prepared under a previously approved scope of work. Cost: $2,405 Project Schedule: CRC will conduct archaeological monitoring at Haddon Park, with at least 72 hours no9ce of proposed ground disturbance. Prepared by Ian Kretzler and Margaret Berger, 9/9/2024 Docusign Envelope ID: 9F4D249E-FDA6-4073-AA21-9D055301969A