HomeMy WebLinkAboutUntitled Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1 A830689
PUBLIC WORKS AGREEMENT
THIS AGREEMENT is entered into between the City of Bremerton, a Washington Municipal
Corporation ("City"), and Pape & Sons Construction, Inc ("Contractor"), whose mailing address is 9401
Bujacich Road, Ste 1A, Gig Harbor, WA 98332.
The parties agree as follows:
1. CONTRACTOR SERVICES. The Contractor shall perform the following services for
the City describe in the Bid Documents titled: Lewis Avenue Sewer Replacement
2. TIME OF COMPLETION. Contractor shall complete the work within 60 calendar days
from the date of issuance of the City's Notice to Proceed.
3. COMPENSATION. The City shall pay the Contractor the total amount of$308,974.85,
including Washington State Sales Tax, for the work and services contemplated in this agreement. The
Contractor shall invoice the City monthly. The City will pay for the portion of the work described in the
invoice that has been completed by the Contractor and approved by the City. The City payment shall not
constitute a waiver of the City's right to final inspection and acceptance of the project.
A. Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor shall provide
the City a performance bond for the full contract amount to be in effect until thirty
(30) days after the date of final acceptance, or until receipt of all necessary releases
from the State Department of Revenue and the State Department of Labor and
Industries and until settlement of any liens filed under Chapter 60.28 RCW,
whichever is later.
B. Retainage. The City shall hold back a retainage in the amount of five percent(5%)
of any and all payments made to contractor for a period of thirty (30) days after the
date of final acceptance, or until receipt of all necessary releases from the State
Department of Revenue and the State Department of Labor & Industries and until
settlement of any liens filed under Chapter 60.28 RCW, whichever is later.
C. Defective or Unauthorized Work. The City reserves its right to withhold payment
from Contractor for any defective or unauthorized work. Defective or unauthorized
work includes, without limitation: work and materials that do not conform to the
requirements of this agreement; and extra work and materials furnished without the
City's written approval. If Contractor is unable, for any reason, to satisfactorily
complete any portion of the work, the City may complete the work by contract or
otherwise, and Contractor shall be liable to the City for any additional costs
incurred by the City. "Additional costs" shall mean all reasonable costs, including
legal costs and attorney fees, incurred by the City beyond the maximum Contract
price specified above. The City further reserves its right to deduct the cost to
complete the Contract work, including any Additional Costs, from any and all
amounts due or to become due the Contractor.
D. Final Payment: Waiver of Claims. THE MAKING OF FINAL PAYMENT
(EXCLUDING WITHHELD RETAINAGE)SHALL PRECLUDE ALL CLAIMS,
EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED
Public Works Agreement(short form)
Rev. 04/2023
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1 A830689
BY CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL
PAYMENT IS MADE.
4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times acting as an
independent contractor and not as an employee of the City. The Contractor shall secure at its expense,
and shall be responsible for all payments of income tax, social security, state disability insurance
compensation, unemployment compensation, and all other payroll deductions for the Contractor, officer,
agents, employees and sub-contractors. The Contractor shall also secure all applicable business licenses,
if required, in connection with the contract services, including all required licenses for Contractor's
officers, agents, employees and sub-contractors.
5. TERMINATION. The City may terminate this agreement for good cause. "Good cause"
shall include, without limitation, any one or more of the following events:
A. The Contractor's refusal or failure to supply a sufficient number of properly skilled
workers or proper materials for completion of the Contract work.
B. The Contractor's failure to complete the work within the time specified in this
agreement.
C. The Contractor's failure to make full and prompt payment to sub-contractors or for
material or labor.
D. The Contractor's persistent disregard of federal, state or local laws, rules or
regulations.
E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt.
If the City terminates this agreement for good cause, the Contractor shall not receive any further
monies due under this agreement until the Contract work is completed.
6. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing
Wages"with the State of Washington Department of Labor&Industries prior to commencing the Contract
work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of
Washington, as well as any other applicable prevailing wage rate provisions. Contractor will be required
to pay Kitsap County Prevailing Wage Rates current on the bid opening date. The Kitsap County rates are
available at the Department of Labor and Industries website.
7. CHANGES. The City may issue a written work change directive for any change in the
Contract work during the performance of this agreement. If the Contractor determines, for any reason,
that a change order is necessary, Contractor must submit a written change order request to the City's
project manager within two (2) business days of the date the Contractor knew or should have known of
the facts and events giving rise to the requested change. If the City determines that the change increases
or decreases the Contractor's costs or time for performance, the City will make an equitable
adjustment. The City will attempt, in good faith,to reach agreement with the Contractor on all equitable
adjustments. However, if the parties are unable to agree,the City will determine the equitable adjustment
as it deems appropriate. The Contractor shall proceed with the change order work upon receiving a written
work change directive or change order from the City. If the Contractor fails to require a change order
within the time allowed, the Contractor waives its right to make any claim or submit subsequent change
Public Works Agreement(short form)
Rev. 04/2023
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1 A830689
order requests for that portion of the contract work. If the Contractor disagrees with the equitable
adjustment the Contractor must complete the change order work; however, the Contractor may elect to
protest the adjustment as provided below:
A. Procedure and Protest by the Contractor. If the Contractor disagrees with anything
required by a work change directive or change order, including any direction,
instruction, interpretation, or determination by the City, the Contractor shall:
1. Immediately give a signed written notice of protest to the City;
2. Supplement the written protest within fourteen (14) calendar days with a
written statement that provides the following information:
a. The date of the Contract's protest.
b. The nature and circumstances that caused the protest.
c. The provisions in this agreement that support the protest.
d. The estimated dollar cost, if any, of the protested work and how that
estimate was determined.
e. An analysis of the progress schedule showing the schedule change
or disruption if the Contractor is asserting a schedule change or
disruption.
The Contractor shall keep complete records of extra costs and time incurred
as a result of the protested work. The City shall have access to any of the
Contractor's records needed for evaluating the protest.
3. The City will evaluate all protests, provided the procedures in this section
are followed. If the City determines that a protest is valid, the City will
adjust payment for work or time by an equitable adjustment. No adjustment
will be made for an invalid protest.
B. Contractor's Duty to Complete Protested Work. In spite of any protest, the
Contractor shall proceed promptly with the work as the City has ordered.
C. Contractor's Acceptance of Changes. The Contractor accepts all requirements of a
change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not
protesting in the way this section provides. A change order that is accepted by
Contractor as provided in this section shall constitute full payment and final
settlement of all claims for contract time and for direct, indirect and consequential
costs, including costs of delays related to any work, either covered or affected by
the change.
D. Failure to Protest Constitutes Waiver. By not protesting as this section provides,
the Contractor also waives any additional entitlement and accepts from the City any
written order (including directions, instructions, interpretations, and
determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the
procedures of this section, the Contractor completely waives any claims for
Public Works Agreement(short form)
Rev. 04/2023
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1 A830689
protested work and accepts form the City any written order (including directions,
instructions, interpretations, and determination).
F. Liens. In the event that there are any liens on file against the City of Bremerton,the
City of Bremerton shall be entitled to withhold final or progress payments to the
extent deemed necessary by the City of Bremerton to properly protect the
outstanding lien claimants until proper releases have been filed with the City Clerk
8. CLAIMS. The Contractor shall give written notice to the City of all claims other than
change orders within fourteen (14) calendar days of the occurrence of the events giving rise to the claims.
Any claim for damages, additional payment for any reason, or extension of time, whether under this
agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a
timely written claim is made in strict accordance with the applicable provisions of this agreement; or, if
(and only if)no such provision is applicable, unless that claim is set forth in detail in writing and received
by the City within seven (7) calendar days from the date Contractor knew, or should have known, of the
facts giving rise to the claim. At a minimum, a Contractor's written claim must include the information
set forth regarding protests in Section 7.A.2.a.-e.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN
THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY
WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT
DELAY.
Contractor must, in any event,file any claim or bring any suit arising from or connected with this
agreement within 120 calendar days from the date the contract work is complete.
9. WARRANTY. The Contractor shall correct all defects in workmanship and materials
within one year from the date of the City's acceptance of the Contract work. When defects are corrected,
the warranty for that portion of the work shall extend for one year from the date such correction is
completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7)
calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish
the corrections within a reasonable time, the City may complete the corrections and the Contractor shall
pay all costs incurred by the City in order to accomplish the correction.
10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officer,
officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or
suits including all legal costs and attorney fees, arising out of or in connection with the performance of
this agreement, except for injuries and damages caused by the City's sole negligence.
The City's inspection or acceptance of any of Contractor's work when completed shall not be
grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115,
then, in the event of liability for damages arising out of bodily injury to persons or damages to property
caused by or resulting from the concurrent negligence of the Contractor and the City, its officials,
employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the
Contractor's negligence.
Public Works Agreement(short form)
Rev. 04/2023
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1 A830689
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
INDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER
INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS
INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this agreement.
11. INSURANCE. The Contractor shall procure and maintain for the duration of this
agreement insurance of the types and in the amounts described below against claims for injuries to persons
or damage to property which may arise from or in connection with the performance of the work by the
Contractor, its agents, representative, employees, sub-consultants or sub-contractors.
Before beginning work on the project described in this agreement, the Contractor shall provide a
Certificate of Insurance evidencing:
A. Automobile Liability insurance with limits no less than $1,000,000 combined
single limit per accident for bodily injury and property damage; and
B. Commercial General Liability insurance written on an occurrence basis with limits
no less than $1,000,000 combined single limit per occurrence and $2,000,000
general aggregate for personal injury, bodily injury and property damage.
Coverage shall include but not be limited to: blanket contractual;
products/completed operations/broad form property damage; explosion, collapse
and underground (XCU); and
C. Excess Liability insurance with limits not less than $1,000,000 per occurrence and
aggregate; and
D. Workers Compensation insurance as statutorily required by the Industrial Insurance
Act of the State of Washington, Title 51, Revised Code of Washington and
employer's liability with limits not less than $1,000,000.
Any payment of deductible or self-insured retention shall be the sole responsibility of the
Contractor.
The City, its officials, employees, agents and volunteers shall be named as an additional
insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy
of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance.
The Contractor's insurance shall contain a clause stating that coverage shall apply separately
to each insured against whom claim is made or suit is brought, except with respects to the limits of the
insurer's liability.
The Consultant's insurance shall be primary and non-contributory insurance as respects the City
and shall contain a waiver of subrogation against the City for claims arising out of any operations,
liabilities and obligations to which coverage applies. It shall be an affirmative obligation upon Consultant
to advise the City's Risk Manager by fax at(360) 473-5161, or by certified mail, return receipt requested
to City of Bremerton, attn: Risk Management, 345 6th Street, Suite 100, Bremerton, WA 98337 within
Public Works Agreement(short form)
Rev. 04/2023
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1 A830689
two days of the cancellation, suspension or substantive change of any insurance policy set out herein, and
failure to do so shall be construed to be a breach of this Agreement.
The City reserves the right to receive a certified copy of all the required insurance policies. In the
event that the Contractor employs other contractors (sub-contractors) as part of the work covered by this
Agreement, it shall be the Contractor's responsibility to require and confirm that each sub-contractor
meets the minimum insurance requirements specified above. The Contractor shall, upon demand of the
City, deliver to the City copies of such policy or policies of insurance and the receipts for payment of
premiums thereon.
12. MISCELLANEOUS.
A. Equal Employment Opportunity Statement. In the hiring of employees for the
performance of work under this Agreement, the Contractor, its subcontractors, or any person acting on
behalf of Contractor shall not discriminate in any employment practice on the basis of age (40+), sex,
race, creed, color, national origin, sexual orientation/gender identity, marital status, military status, or the
presence of any physical, mental or sensory disability.
B. ADA Statement. The City of Bremerton does not discriminate on the basis of
disability in programs and activities, which it operates pursuant to the requirements of the Americans with
Disabilities Act of 1990, and ADA Amendments Act. This policy extends to both employment and
admission to participation in the programs, services and activities of the City of Bremerton. Reasonable
accommodation for employees or applicants for employment will be provided.
C. Compliance with Laws. Contractor shall comply with all federal, state and local
laws, rules and regulations throughout every aspect in the performance of this agreement.
D. Work Performed at Contractor's Risk. Contractor shall take all precautions
necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the
performance of this agreement. All work shall be done at Contractor's own risk, and Contractor shall be
responsible for any loss of or damage to materials,tools, or other articles used or held for use in connection
with the work.
E. Nonwaiver of Breach. The failure of the City to insist upon strict performance of
any of the terms and rights contained herein, or to exercise any option herein conferred in one or more
instances, shall not be constructed to be a waiver or relinquishment of those terms and rights and they
shall remain in full force and effect
F. Governing Law. This agreement shall be governed and construed in accordance
with the laws of the State of Washington. If any dispute arises between the City and Contractor under any
of the provisions of this agreement, resolution of that dispute shall be available only through the
jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap County, Washington.
G. Attorney's Fees. To the extent not inconsistent with RCW 39.04.240, in any claim
or lawsuit for damages arising from the parties' performance of this agreement, each party shall be
responsible for payment of its own legal costs and attorney's fees incurred in defending or bringing such
claim or lawsuit; however, nothing in this subsection shall limit the City's right to indemnification under
Section 10 of this agreement.
Public Works Agreement(short form)
Rev. 04/2023
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1 A830689
H. Written Notice. All communications regarding this agreement shall be sent to the
parties at the addresses listed on the signature page of this agreement, unless otherwise notified. Any
written notice shall become effective upon delivery, but in any event three (3) calendar days after the date
of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee
at the address stated on this agreement.
L Assignment. Any assignment of this agreement by the Contractor without the
written consent of the City shall be void.
J. Modification. No waiver, alteration, or modification of any of the provisions of
this agreement shall be binding unless in writing and signed by a duly authorized representative of the
City and Contractor.
K. Severability. If any one or more sections, sub-sections, or sentences of this
agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the
remaining portion of this agreement and the remainder shall remain in full force and effect.
L. Entire Agreement. The written provisions and terms of this agreement, together
with any attached Exhibits, supersede all prior verbal statements by any representative of the City, and
those statements shall not be construed as forming a part of or altering in any manner this agreement. This
agreement and any attached Exhibits contain the entire agreement between the parties. Should any
language in any Exhibit to this agreement conflict with any language contained in this agreement, the
terms of this agreement shall prevail.
M. Mutually Bound. Contractor and Subcontractor are mutually bound by the terms
of this agreement. Terms of this agreement will apply to the work of any subcontractor. The Contractor
shall assume toward the subcontractor all obligations and responsibilities the Owner,under this agreement,
assumes toward the Contractor, and the Subcontractor shall assume toward the Contractor all obligations
and responsibilities which the Contractor, under this agreement, assumes towards the Owner.
N. Suspension & Debarment. For contracts involving Washington State and Federal
funding, Contractor hereby certifies, by signing this agreement, that neither it nor its principals are
presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded
from participation in this transaction by any State or Federal department or agency. Contractor shall
provide immediate written notice to the City if at any time it learns that it is or has become ineligible for
certification. Should Contractor enter into a covered transaction with another firm, Contractor agrees by
signing this agreement that it will verify that the firm with whom it intends to do business is not
debarred, suspended, ineligible, excluded or disqualified.
O. Solicitation of Minority Business. Per RCW 35.22.650, Contractor agrees that the
contractor shall actively solicit the employment of minority group members. Contractor further agrees that
the contractor shall actively solicit bids for the subcontracting of goods or services from qualified minority
businesses. Contractor shall furnish evidence of the contractor's compliance with these requirements of
minority employment and solicitation. Contractor further agrees to consider the grant of subcontracts to
said minority bidders on the basis of substantially equal proposals in the light most favorable to said
minority businesses. The contractor shall be required to submit evidence of compliance with this section
as part of the bid.
Public Works Agreement(short form)
Rev. 04/2023
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
IN WITNESS WHEREOF, the parties below have executed this agreement.
CONRACTOR THE CITY OF BREMERTON
acu igne by Signed by:
,sacs pap, ^
6E71,971Bb,1 412... ...
Print Name: James Pape Print laAF46095t8me: dreg Wheeler
Title: President Title: Mayor
DATE 9/2 5/2024 DATE 9/25/2024
Notices to be sent to: Notices to be sent to:
CONTRACTOR: CITY OF BREMERTON:
Brad Appleman Bill Davis
9401 Bujacich Road, Suite lA 345 6th Street, Suite 100
Gig Harbor, WA Bremerton, WA 98337
(253) 851-6040 (360) 473-2312
APPROVED AS TO FORM:
Signed by:
611-(166a Katt
Ky ieEinneil
Bremerton City Attorney
ATTEST:
Signed by:
AaNt r
24E ,ED E-41 F...
Angela Hoover, City Clerk
R:ALegal\Legal\Forms\FORMS ON COBWEB\Public Works Agreement(short form)Rev.04 2023.doc
Public Works Agreement(short form)
Rev. 04/2023
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
ACKNOWLEDGEMENT OF 1 ID
CITY OF BREMERTON-LEWIS AVENUE SEWER REPLACEMENT
This contract is being bid using the Small Works Roster. The Bidder shall fill out and submit electronically
the pages titled BID FORMS as their bid proposal.
The Bidder proposes and agrees,if this Bid is accepted,to execute the Public Works Agreement with the City
of Bremerton to perform the WORK as specified or indicated in said Request for Bids entitled "LEWIS
AVENUE SEWER REPLACEMENT".
The Bidder has familiarized itself with the nature and extent of the Bid Documents,the work sites,locality
where the WORK is to be performed,the legal requirements (federal,state and local laws,ordinances,rules,
and regulations),and the conditions affecting cost,progress or performance of the WORK and has made such
independent investigations as Bidder deems necessary.
Bidder agrees to all the foregoing,and including all Bid Forms contained in this Bid,and Bidder further agrees
to complete the WORK required under the Bid Documents within the Contract Time stipulated in said Bid
Documents,and to accept in full payment therefore the Contract Price based on the Total Bid Price.
The Bidder has examined copies of all the Bid Documents and accepts all of the terms and conditions of the
Bid Documents, including any addenda. Acknowledge the addenda by filling out the following with the
addendum number and the date
Addenda Acknowledgement
No. Date oI" 100U-
No. Date
No. - Date
own
Date: AUGUST 28, 2024 �S CONS i
c>
Company Name: PAPE & SONS CONSTRUCTION, INC off;'•G c�`••'�•2
By: JAM ES PAP = a' SEAL z
•
(Printed Nam ure) =*' ' •
''9`SHING:••
Title: PRESIDENT ��''�•,,, �� ����1978` 0.%`
��
Washington State Unified Business Identification (UBI) Number: 600 291 966
Washington State Contractor's Registration Number and Expiration Date:
PAPESI*204DE 4/8/2025
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 1 of 9
August 2024
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
BID SCHEDULE
LEWIS AVENUE SEWER REPLACEMENT
Following is the Bid Schedule for construction of this project in accordance with the Request for Bids documents.
The Bid Schedule must be completed by the Bidder by filling in each blank, using dollars and cents with numerals
only. Failure to fill out this form will render the bid non-responsive and will cause its rejection. In case of
discrepancy between the unit price and the total amount for an item, the unit price shall prevail. NOTE ON
SALES TAX: Washington State Department of Revenue Rule 170 applies to this project. Bids will be evaluated on
the basis of the TOTAL BID PRICE. Note: LS means Lump Sum.
Bid
lfem Spec Ref Description U it r Qty Untt Price{$} $ A Extend ttt
YMON
8 A . MSZOWSAMMiabai
1 SP 1-04 Minor Changes and Force EST -- --- 20,000.00
Account
2 SP 1-05 As-built Drawings and LS 1
Project Survey $3,000.00 $3,000.00
3 SP 1-07 TESC Plan LS 1 $1,500.00 $1,500.00
4 SP 1-09 Mobilization LS 1 $29,000.00 $29,000.00
5 SP 1-10 Project Temporary Traffic LS 1
Control $15,000.00 $15,000.00
6 SP 2-02 Sawcut for Pavement LF 700
Removal $3.00 $2,100.00
7 SP 2-02 Remove Existing Pavement SY 950 $16.00 $15,200.00
8 SP 2-04 Pothole Existing Utility Each 6 $950.00 $5,700.00
9 SP 2-09 Shoring or Extra Excavation LS 1
Class B $6,000.00 $6,000.00
10 SP 4-04 Crushed Surfacing Top TN 301
Course $70.00 $21,070.00
11 SP 5-04 Hot Mix Asphalt TN 230 $270.00 $62,100.00
12 SP 7-08 Imported Trench Backfill TN 642 $42.00 $26,964.00
13 SP 7-08 Unsuitable Pipe Foundation CY 20
Excavation $80.00 $1,600.00
14 SP 7-17 PVC Sewer Pipe 8-inch LF 293
Diameter $170.00 $49,810.00
15 SP 7-18 Side Sewer Connection EA 2 $4,200.00 $8,400.00
16 SP 8-04 Restoration of concrete LS 1
curb, gutter, and sidewalk $15,500.00 $15,500.00
BASE BID TOTAL $282,944.00
ESTIMATED SALES TAX(9.2%, dollars and cents) $26,030.85
r 1^
TQTA..BAD PRICE (Base B,!d Total plus Estimated Sales Tax,dollars and cents) 308 97 6
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 2 of 9
August 2024
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
BID BOND
KNOW ALL MEN BY THESE PRESENTS,
That PAPE & SONS CONSTRUCTION, INC. as Principal,and
Swiss RE Corporate Solutions America Insurance Corporation
as Surety,are
held and firmly bound unto City of Bremerton hereinafter called "OWNER," in the sum of
5% of amount bid dollars,
(not less than five percent(5%)of the total amount of the Bid)
for the payment of which sum,well and truly to be made,we bind ourselves,our heirs,executors,
administrators,successors,and assigns,jointly and severally,firmly by these presents.
WHEREAS,said Principal has submitted a Bid to said OWNER to perform the WORK required under the
bidding schedule(s) of the OWNER's Contract Documents entitled LEWIS AVENUE SEWER
REPLACEMENT.
If the Principal is awarded the Bid and,within 14 calendar days after receipt of the Contract Document
forms from the OWNER,fails to provide the OWNER with the duly executed Agreement; the duly executed
Certificates of Insurance,the duly executed Performance Bond and the duly executed Payment Bond,all as
specified in the Contract Documents,then the Surety shall,without condition and within 30 calendar days
from written demand from the OWNER,pay to the OWNER in U.S.funds,by certified or cashier's check,the
full amount of this Bid Bond.This Bond shall be irrevocable for 90 days after the bid opening,as defined in
the Contract Documents.
The Surety stipulates and agrees that the obligation of said Surety shall in no way be impaired or affected
by an extension of the time within which the OWNER may accept such bid and Surety further waives notice
of any such extension. In the event suit is brought upon this bond by said OWNER and OWNER prevails,
said Principal and Surety shall pay all costs incurred by said OWNER in such suit,including reasonable
attorney's fees and costs to be fixed by the court.
SIGNED AND SEALED,this day of August 28th 2024
Pape
& Sons Contruction '
as Hentschell, Attorney-in-Fact' � � ��� �%, (SEAL)
(Principal) •'GOR �Rq�ea. •Cj,'. (Surety)
-By: ' a s y TYc J
fieS aloe id/of 4 (Signa u }i. " _ _ (Signatut e)
;�syy/��,r�
(SEAL AND NOTARIAL ACKNOWLEDGIFNT OF:�t ETY
7978
�, � t����` 1436 S. Union Ave. Tacoma, WA 98405
Address of Surety to which all notices shall be sat!"
9401 BUJACICH ROAD,STE 1A,GIG HARBOR,WA 98332
Address for Service of Process (must be a physical address):
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 3 of 9
August 2024
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
SWISS RE CORPORATE SOLUTIONS
SWISS RE CORPORATE SOLUTIONS AMERICA INSURANCE CORPORATION("SRCSAIC")
SWISS RE CORPORATE SOLUTIONS PREMIER INSURANCE CORPORATION("SRCSPIC")
WESTPORT INSURANCE CORPORATION("WIC")
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS,THAT SRCSAIC,a corporation duly organized and existing under laws of the State of Missouri,and
having its principal office in the City of Kansas City,Missouri,and SRCSPIC,a corporation organized and existing under the laws of the State of
Missouri and having its principal office in the City of Kansas City,Missouri,and WIC,organized under the laws of the State of Missouri,and having its
principal office in the City of Kansas City,Missouri,each does hereby make,constitute and appoint:
THOMAS P.HENTSCHELL,BRADLEY A.ROBERTS,JULIE A.CRAKER,AND JOANNE REINKENSMEYER
JOINTLY OR SEVERALLY
Its true and lawful Attorney(s)-in-Fact,to make,execute,seal and deliver,for and on its behalf and as its act and deed,bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies,as surety,on contracts of suretyship as are or may be required or permitted by
law,regulation,contract or otherwise,provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of:
FIFTY MILLION($50,000,000.00)DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both SRCSAIC and SRCSPIC at meetings duly called and held on the 18th of November 2021 and WIC by written consent of its
Executive Committee dated July 18,2011.
"RESOLVED,that any two of the President,any Managing Director,any Senior Vice President,any Vice President,the Secretary or any Assistant
Secretary be,and each or any of them hereby is,authorized to execute a Power of Attorney qualifying the attorney named in the given Power of
Attorney to execute on behalf of the Corporation bonds,undertakings and all contracts of surety,and that each or any of them hereby is authorized to
attest to the execution of any such Power of Attorney and to attach therein the seal of the Corporation; and it is
FURTHER RESOLVED,that the signature of such officers and the seal of the Corporation may be affixed to any such Power of Attorney or to
any certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding noon the Corporation when so affixed and in the future with regard to any bond,undertaking or contract of surety to which it is attached."
.`'OAS"E44444 ke'• ":,,OttS PREA/j
��co�GO�yPORtT�ys. `.`yO• OFtPORgF�tysG, By ,,
-a SEAL - "O S E A L Erik Janssens,Sen of V,ce&Seni nr of SRCSAIC&Senior Vice President ot �.f+"S�y
O C ;m❑ °g' O: of SRCSPIC&Senior ice President of WIC
•
sibs NO\Ls, %ss� .. os1�`' By *
,„ > ,,, '��S * N,ss' Gerald Jagrowski,Vice President of SRCSAIC&Vice President of SRCSPIC ,I
&Vice President of WIC
IN WITNESS WHEREOF,SRCSAIC,SRCSPIC,and WIC have caused their official seals to be hereunto affixed,and these presents to be signed by their
authorized officers
this 10 day of NOVEMBER 20 22
Swiss Re Corporate Solutions America Insurance Corporation
State of Illinois Swiss Re Corporate Solutions Premier Insurance Corporation
County of Cook ss Westport Insurance Corporation
On this 10 day of NOVEMBER 20 22 ,before me, a Notary Public personally appeared Erik Janssens, Senior Vice President of SRCSAIC
and Senior Vice President of SRCSPIC and Senior Vice President of WIC and Gerald Jagrowski,Vice President of SRCSAIC and Vice President of
SPCSPIC and Vice President of WIC,personally known to me,who being by me duly sworn,acknowledged that they signed the above Power of Attorney
as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies.
——OFFICIAL SEAL. —_
¢HRISTINA MAN1sc0
I,Jeffrey Goldberg the duly elected Senior Vice President and Assistant Secretary of SRCSAIC and SRCSPIC and WIC,do hereby certify that the above and
foregoing is a true and correct copy of a Power of Attorney given by said SRCSAIC and SRCSPIC and WIC,which is still in full force and effect.
IN WITNESS WHEREOF,I have set my hand and affixed the seals of the Companies this day of ,20 .
Jeffrey Goldberg,Senior Vice President&
Assistant Secretary of SRCSAIC and
SRCSPIC and WIC
Docusign Envelope ID:7876A5E2-E1A2-45A2-978C-CE8A1A830689
Swiss Re Corporate Solutions America Insurance Corporation
Electronic Corporate Seal
C,0112 Ti
s 116,
sx
O'r(I
p„
ci 1 07'1
.».4
• S
Please read through the below Usage Guidelines for our Electronic Corporate Seal:
1) This Electronic Corporate Seal has been provided for convenience. Swiss Re Corso cannot
provide assurance that specific obligees will, or will not, accept an Electronic Corporate Seal. The
preferred method remains a physically affixed seal. The Electronic Corporate Seal is used at the
discretion of your Agency or Brokerage, and Swiss Re Corso disclaims any liability if the use of the
Electronic Corporate Seal results in any instrument being rejected or challenged;
2) The Electronic Corporate Seal can only be used for electronically affixing a seal to a surety
bond, or related instrument, that has been authorized by Swiss Re Corso and is being executed
on behalf of Swiss Re Corso by your Agency or Brokerage pursuant to a valid Power of Attorney;
3) Your Agency or Brokerage may not transfer an Electronic Corporate Seal to any other entity or
person without the written consent of Swiss Re Corso;
4)Swiss Re Corso may revoke permission to use the Electronic Corporate Seal at any given time;
and
5)Any use of the Electronic Corporate Seal outside of the above described guidelines is not
authorized
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
NON-COLLUSION AFFIDAVIT
STATE OF WASHINGTON)
SS:
COUNTY OF KITSAP )
JAMES PAPE ,being first duly sworn,deposes and says that he or she
is of the party making the foregoing bid that the bid is not made in the interest of,or on behalf of,any
undisclosed person,partnership,company,association,organization,or corporation;that the bid is genuine
and not collusive or sham;that the bidder has not directly or indirectly induced or solicited any other
bidder to put in a false or sham bid,and has not directly or indirectly colluded,conspired,connived,or
agreed with any bidder or anyone else to put in a sham bid,or that anyone shall refrain from bidding;that
the bidder has not in any manner,directly or indirectly,sought by agreement,communication,or
conference with anyone to fix the bid price of the bidder or any other bidder,or to fix any overhead,profit,
or cost element of the bid price,or of that of any other bidder,or to secure any advantage against the public
body awarding the contract of anyone interested in the proposed contract;that all statements contained in
the bid are true;and further,that the bidder has not,directly or indirectly,submitted his or her bid price or
any breakdown thereof,or the contents thereof,or divulged information or data relative thereto,or paid,
and will not pay,any fee to any corporation,partnership,company association,organization,bid
depository,or to any member or agent thereof to effectuate a collusive or sham bid.
Sig E;--------..
JAMES PAPE-PRESIDENT
PAPE&SONS CONSTRUCTION,INC
Subscribed and sworn to before me this ,QP 1a day of
U�C�W�
, 2024
.
ii
\r;1
Notar • b ' in and for the
County of KITSAP
`\0%%%n 1111//,,,,
ca
`, `.•• P® ',ice
State of WASHINGTON co .,0 �T'•.
ttttllllqi o c %Z li
(SEAL) :::er j-� � Z % 1S'NIN ®�• :m
0 ��: 'Iiiiiio
%ii � �
0 •Pent 0`�Z
City of Bremerton 6 IVASHa�N-• Bid Forms
Lewis Avenue Sewer Replacement Page 4 of 9
August2024
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
REFERENCES
Provide three (3) references for related (e.g.cleaning,coating) or similar projects within the last 5 years
performed under the bidder's name as the prime (general) contractor.
REFERENCE #1
Project Name and/or
Description: SEE ATTACHMENT "A"
Agency or Owner: HIGHLIGHTED
Email Address of
Agency/Owner Contact:
Phone Number of
Agency/Owner Contact:
Project Cost:
Date Project Completed:
REFERENCE #2
Project Name and/or
Description:
Agency or Owner:
Email Address of
Agency/Owner Contact:
Phone Number of
Agency/Owner Contact:
Project Cost:
Date Project Completed:
REFERENCE #3
Project Name and/or
Description:
Agency or Owner:
Email Address of
Agency/Owner Contact:
Phone Number of
Agency/Owner Contact:
Project Cost:
Date Project Completed:
This information may be submitted within 24 hours after the bid opening.
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 5 of 9
August 2024
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
CERTIFICATION BY PROPOSED CONTRACTOR REGARDING EQUAL
EMPLOYMENT
In accordance with Chapter 56,Laws of 1975 1st Extraordinary Session, Certification regarding Equal
Opportunity is required of bidders or prospective contractors and their proposed subcontractors prior to
the award of contracts or subcontracts.
Name of Prime Contractor PAPE & SONS CONSTRUCTION, INC
Address 9401 BUJACICH ROAD, STE 1A, GIG HARBOR, WA 98332
Internal Revenue Service Employer Identification No. 91-1043352
a. Contractor has participated in a previous contract Yes V No
or subcontract subject to the Equal Opportunity Clause.
b. Compliance reports were required to be filed in Yes V No
connection with such contract/subcontract.
c. Contractor has filed all compliance reports required by Yes✓ No
Executive Orders 10925, 11114, 11246,or by regulations
of the Equal Opportunity Commission issued pursuant to
Title VII of the Civil Rights Act of 1964.
a. If answer to item 'c'is"no",please explain in detail in the space below.
N/A
CERTIFICATION: I,the undersigned, certify that the information above is true and complete to the best of
my knowledge and belief.
PAPE & SONS CONSTRUCTION, INC
Company Name
JAMES PAPE - PRESIDENT
Name and Title 'gner Pea c,W,w or print clearly)
rRUC '' AUGUST 28, 2024
re O:•VOP F'•.2= Date
•
•
�41" .� BYO.•City of Bid• *�~
v Bremerton •......
s
enueSewerRe lacemer =.,,1/n 19 ,o`%%``` Page6of p Lewis Avenue 9
irnUllN��
August 2024
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
CERTIFICATION OF NON-SEGREGATED FACILITIES
(Applicable to federally assisted construction contracts and related subcontracts exceeding$10,000 which
are not exempt from the Equal Opportunity clause.)
The federally assisted construction contractor certifies that he/she does not maintain or provide for
his/her employees any segregated facilities at any of his/her establishments,and that he/she does not
permit his/her employees to perform their services at any location,under his/her control,where
segregated facilities are maintained.The federally assisted construction contractor certified,further that
he/she will not maintain or provide for his/her employees any segregated facilities at any of his/her
establishments,and that he/she will not permit his/her employees to perform their services at any
location,under his/her control,where segregated facilities are maintained.The federally assisted
construction contractor agrees that a breach of this certification is a violation of the Equal Opportunity
clause in this contract.
As used in this certification,the term"segregated facilities"means any waiting rooms,work area,rest
rooms and wash rooms,restaurants and other eating areas,time clocks,locker rooms and other storage or
dressing areas,parking lots,drinking fountains,recreation or entertainment areas,transportation,and
housing facilities provided for employees which are segregated by explicit directive or area,in fact,
segregated on the basis of race,creed,color,or national origin,because of habit,local custom,or otherwise.
The federally assisted construction contractor agrees that(except where he/she has obtained identical
certifications from proposed contractors for specific time periods)he/she will obtain identical
certifications from proposed subcontractors prior to the award of subcontracts exceeding$10,000 which
are not exempt from the provisions of the Equal Opportunity clause,and that he/she will retain such,
certification in this file.
CERTIFICATION: I,the undersigned,certify that the information above is true and complete to the best of
my knowledge and belief.
PAPE & SONS CONSTRUCTION, INC
Company Name
JAMES PAPE - PRESIDEN►T ,�
Name and Title r '04` ekr;nt clearly)
�;•y c�` . 2; AUGUST 28, 2024
ure ;uj �� 2 Date
•
7.
54)
*'• qs p
NINE..•
1978 % %
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 7 of 9
August 2024
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
CERTIFICATION OF FEDERAL NON-DEBARMENT AND SUSPENSION
INSTRUCTIONS TO BIDDERS: THIS FORM SHALL BE EXECUTED BY THE CONTRACTOR AND SUBMITTED
WITH THE BID.
THE CONTRACTOR SHALL MAKE COPIES AND DISTRIBUTE THIS FORM TO ALL SUBCONTRACTORS.
SUBCONTRACTORS MUST SUBMIT THIS FORM TO THE CITY PRIOR TO PERFORMING ANY WORK ON THE
PROJECT.
As a prospective contractor for the City of Bremerton and as a requirement of your submittal,you are
required to provide debarment/suspension certification indicating that you are in compliance with the
below Federal Executive Order.
Debarment: Federal Executive Order(E.O.) 12549"Debarment and Suspension"requires that all
contractors receiving individual awards or using federal funds,and all sub-recipients certify that
the organization and its principals are not debarred,suspended,proposed for debarment, declared
ineligible,or voluntarily excluded by any Federal department or agency from doing business with
the Federal Government or from receiving Federally-assisted contracts.
Your signature certifies that neither you nor your principal is presently debarred,suspended,proposed for
debarment,declared ineligible, or voluntarily excluded from participation in this transaction by any federal
department or agency.If,at any time during the term of the contract,such condition occurs the Contractor
will notify the City without delay.
CERTIFICATION: I,the undersigned,certify that the information above is true and complete to the best of
my knowledge and belief.
PAPE & SONS CONSTRUCTION, INC
Company Name
JAMES PAPE - PRESIDENT
Name and Title of Signer P se type or print clearly)
``````�uruururrn,,��i
N AUGUST 28, 2024
re cer,•'•GORPO G Date
.!NG-c •
rrrrr97g
''`� r�u n u►����,`
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 8 of 9
August 2024
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES
The bidder hereby certifies that,within the three-year period immediately preceding the bid solicitation date
August 27, 2024, the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of
chapters 49.46,49.48,or 49.52 RCW, as determined by a final and binding citation and notice of assessment
issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited
or general jurisdiction.
I declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and
correct.
PAPE & SONS CONSTRUCTIQN',,"ms��,,
Bidder's Busine ame ��%
50 'pRP6 9G
Rqj •C'�s
S. ure of Authorized Official* _ AL •:F
JAMES PAPE
Printed Name
978
PRESIDENT
Title
8/28/2024 GIG HARBOR WASHINGTON
Date City State or Country
Check One:
Partnership ❑ Joint Venture ❑ Corporation V Partnership ❑ Sole Proprietorship ❑
State of Incorporation,or if not a corporation, State where business entity was formed:
WASHINGTON
If a co-partnership,give firm name under which business is transacted:
N/A
*If a corporation,proposal must be executed in the corporate name by the president or vice-president(or any
other corporate officer accompanied by evidence of authority to sign). If a co-partnership,proposal must be
executed by a partner.
END OF BID FORMS
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 9 of 9
August 2024
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
BOARD RESOLUTION OF PAPE & SONS CONSTRUCTION, INC. FOR
SIGNING AUTHORITY
DULY PASSED ON April 2,2021
RESOLVED, that the following shall having signing authority on behalf of the company,
subject to subsequent revocation or limitation by James Pape:
1. James Pape
2. Jeanette Pape
3. Chris Pape
4. Brad Appleman
5. Phil Sagen
It is hereby certified by the undersigned that the foregoing resolution was duly passed by
the Board of Directors of the above-named Company on the 2' day of April,2021, in
accordance with the Memorandum or By-Laws and Articles of Incorporation of the
Company and the laws and by-laws governing the Company and that the said resolution
has been duly recorded in the Minute Book and is in full force and effect.
f AMES PAPE-DIRECTOR
1
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
M
MINUTE °
SPECIAL MEETING F SHAREHOLDERS
OF
PAPE & SONS CONSTRUCTION, INC.
A special meeting of the Shareholders has been called. A quorum was present as all
shareholders were present. The purpose of said meeting was to conduct election of officers.
The majority of votes carried as follows.
It has been addressed, ordered and agreed as follows.
1. James Pape is elected as President.
2. Jeanette Pape is elected as Secretary/Treasurer.
3. Chris Pape is elected as Vice-President.
4. Brad Appleman is elected as Assistant Vice-President.
5. Phil Sagen is elected as Assistant Secretary.
Agreed and approved this 8th day of October,2020.
PAPE & SONS CONSTRUCTION, INC.
By: �=
J pe,President and Director and Majority Shareholder
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT"A"
Amount of Completion
Contract Project Manager Project Name Date Owner or Representative
$488,904.38 Brad Appleman HERONSWOOD GARDEN WATERMIAN EXTENSION Jun-24 PORT GAMBLE S'KLALLAM TRIBE
870 31912 LITTLE BOSTON RD NE
KINGSTON,WA 98346
MIKE ROREM 206-930-3229
$4,227,126.89 Brad Appleman SANITARY SEWER PUMP STATION&SANITARY SEWER May-01 MASON COUNTY PUBLIC WORKS
839 PO BOX 1850
SHELTON,WA 98584
RICHARD DICKINSON 360-427-9670
$1.568,805.91 Phil Sagen PAULSON RD POTABLE&RECYCLED WATER MAIN Apr-24 SILVERDALE WATER DISTRICT#16
860 PO BOX 493
SILVERDALE,WA 98383
MICHAEL PLEASANTS 360-447-3513
$6,750.00 Brad Appleman SPSCC INFRASTRUCTURE PUMP LIFT STATION Apr-24 ENTERPRISE SERVICES,WASH STATE DEPT
123-12 SUB TO SOURCE ELECTRIC PO BOX 41476
OLYMPIA,WA 98504
STACY SIMPSON 360-349-2341
$1.605,190.04 Phil Sagen SCHEDULE A DISTRIBUTION REPLACMENT Apr-24 WESTERN RANCHETTES INC
862 15914 748TH AVE CT E
PUYALLUP,WA 98375
RYAN FRANK 360-876-0958
$137,370.67 Brad Appleman ARDMORE WHITMAN WATERMAIN#879 Feb-24 LAKEWOOD WATER DISTRICT
868 PO BOX 99729
TACOMA,WA 98499
JAMES DEAN-253-588-4423
$442,682.70 Brad Appleman GLEN ALDER WATERMAIN REPLACEMENT Dec-23 THURSTON COUNTY PUD
850 1230 RUDDELL RD SE
LACEY,WA 98503
KIM GUBBE-360-357-8783 EXT125
$486,811.96 Brad Appleman LAKE JOSEPHINE COUNTRY CLUB WATERMAIN Nov-23 LAKE JOSEPHINE WATER DEPARTMENT
857 11016 COUNTRY CLUB DR
ANDERSON ISLAND,WA 98303
RUSS RODOCKER-253-884-4093
$132,412.43 Phil Sagen EVERGREEN SHORES WATERMAIN REPLACEMENT Oct-23 WASHINGTON WATER COMPANY
859 PO BOX 336
GIG HARBOR,WA 98335
JOHN PUCCINELLI,PE 360-437-2042
$1,440,519.01 Brad Appleman MANORWOOD WATER MAIN REPLAC.PHASE 2&3 Nov-23 CITY OF PUYALLUP
852 333 S.MERIDIAN
PUYALLUP,WA 98371
MICHELLE GEHRING 253-841-5579
$604,533.47 Phil Sagen CANYON RD E WATERMAIN REPLACEMENT Sep-23 WASHINGTON WATER COMPANY
854 PO BOX 336
GIG HARBOR,WA 98335
JOHN PUCCINELLI,PE 360-437-2042
$81,279.07 Brad Appleman WICKS LAKE RANCHES WATERMAIN RELOCATION Aug-23 WASHINGTON WATER COMPANY
851 PO BOX 336
GIG HARBOR,WA 98335
JOHN PUCCINELLI,PE 360-437-2042
$1,037,540.50 Phil Sagen KPUD LUD#40 BILL POINT WATER PART 1 Aug-23 Kilsap PUD#1
847 PO Box 1989
Poulsbo,WA 98370
PETER DRESSEL 360-626-7746
$188,612.86 Phil Sagen STORMWATER PRETREATMENT OUTFALL Jun-23 CITY OF FIRCREST
844 115 RAMSDELL ST
FIRCREST,WA 98466
TYLER BEMIS-253-238-4134
$41,450.90 Phil Sagen FIRCREST ROSE ST WATERMAIN Jun-23 CITY OF FIRCREST
855 115 RAMSDELL ST
FIRCREST,WA 98466
JEFF DAVIS-253-564-8900
$555,193.45 Phil Sagen KPUD LUD#40 BILL POINT WATER PART 2 May-23 Kilsap PUD#1
849 PO Box 1989
Poulsbo,WA 98370
PETER DRESSEL 360-626-7746
$4,080.00 Phil Sagen KPUD WATER SERVICE CONNECTIONS Apr-23 Kilsap PUD#1
123-16 PO Box 1989
Poulsbo,WA 98370
BILL WHITELEY-360-779-4078
$1,056,735.07 Brad Appleman NAOMILAWN NEWGROVE HIGHLAND WATERMAIN Mar-23 LAKEWOOD WATER DISTRICT
843 PO BOX 99729
TACOMA,WA 98499-0729
IAN BLACK-253-588-4423
$36,960.00 Phil Sagan REGENTS BLVD WATERMAIN Mar-23 CITY OF FIRCREST
848 115 RAMSDELL ST
FIRCREST,WA 98466
JEFF DAVIS-253-564-8900
$69,289.46 Brad Appleman ROBBINS RD STORM WATER IMPROVEMENTS Mar-23 ROBBINS RD IMPROV.&MAINT.ASSOC.
831 PO BOX 752
GRAPEVIEW,WA 98546
ROBERT ISBELL-360-229-2079
$74,553.65 Phil Sagen 2022 ANNUAL DRAINAGE PROJECT Mar-23 CITY OF BAINBRIDGE ISLAND
846 280 MADISON AVE N
BAINBRIDGE ISLAND,WA 98110-1812
JOEL CORLEW 206-348-2913
$153,434.13 Brad Appleman SOUTHWOOD PRV STATIONS Feb-23 WASHINGTON WATER CO.
845 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$890,647.56 Phil Sagen HOLIDAY VALLEY WATER MAIN REPLACEMENT Dec-22 HOLIDAY VALLEY WATER DISTRICT
838 3403 STEAMBOAT ISLAND RD PMB 334
OLYMPIA,WA 98502
JIM LOGAN-360-529-2947
$2,705,312.30 Phil Sagen FRUITLAND 2021 WATER MAIN Dec-22 FRUITLAND MUTUAL WATER CO
827 PO BOX 73759
PUYALLUP,WA 98373
TED HARDIMAN-253-848-5519
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT"A"
Amount of Completion
Contract Project Manager Project Name Date Owner or Representative
$302.391.52 Brad Appleman 55TH ST CT NW(REID DR)WATER MAIN Nov-22 CITY OF GIG HARBOR
841 3510 GRANDVIEW STREET
GIG HARBOR,WA 98335
MANDY CHAPMAN-253-853-7561
$158,549.53 Brad Appleman WATERMAIN EXTENSION QUISTORFF SWEDE HILL Oct-22 WASHINGTON WATER
842 PO BOX 336
GIG HARBOR,WA 98335
RYAN HASEMAN-877-408-4060
$656.318.01 Phil Sagen SUMMIT WATER MAIN Oct-22 CITY OF FIRCREST
840 115 RAMSDELL ST
FIRCREST,WA 98466
JEFF DAVIS-253-564-8900
$483,753.73 Phil Sagen EISENHOWER WATER MAIN REPLACEMENT Aug-22 WEST SOUND UTILITY DISTRICT#1
837 2924 SE LUND AVE
PORT ORCHARD,WA 98366
JOHN TAPIA 360-876-2545
61,436,262.54 Brad Appleman 2020 LIFT STATION UPGRADES PROJECT Jul-22 CITY OF ORTING
824 PO BOX 489
ORTING,WA 98360
APRIL WHITTAKER-253-604-6600
$1,042,182.11 Brad Appleman OYSTER BAY AVE FORCE MAIN REPLACEMENT Jul-22 CITY OF BREMERTON
836 239 4TH ST
BREMERTON,WA 98337
ROBERT ENDLSEY 360-473-2348
$1,826,469.86 Brad Appleman MARINE DRIVE WATER MAIN REPLACEMENT May-22 CITY OF BREMERTON
826 239 4TH ST
BREMERTON,WA 98337
ROBERT ENDLSEY 360-473-2348
$325,933.52 Brad Appleman 6th STREET SEWER REPLACEMENT May-22 CITY OF BREMERTON PUBLIC WORKS
822 3027 OLYMPUS DRIVE
BREMERTON,WA 98310
BILL DAVIS 360-473-5398
$211,411.27 Brad Appleman 2022 STORMWATER REPAIR PROJECT Apr-22 CITY OF LAKEWOOD
834 6000 MAIN STREET SW
LAKEWOOD,WA 98499
D'ANDRA BUCHANAN 253-983-7820
• $36,841.91 Brad Appleman BORGEN BLVD EMERGENCY PAVEMENT REPAIR Mar-22 CITY OF GIG HARBOR
835 3510 GRANDVIEW STREET
GIG HARBOR,WA 98335
TRENT WARD 253-851-6170
$456,793.50 Phil Sagen 224th 12 Inch WATER MAIN REPLACEMENT May-22 WASHINGTON WATER CO.
832 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$137,019.96 Brad Appleman SILVER CREEK BOOSTER STATION Apr-22 WASHINGTON WATER CO.
830 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$1,095,865.25 Phil Sagen WATER MAIN RENEWAL&REPLACEMENT Mar-22 SPANAWAY WATER COMPANY INC
829 PO BOX 1000
SPANAWAY,WA 98387-1000
TIM WELLS 253-531-9024
$118,544.19 Brad Appleman MINTERBROOK 82ND AVE MAINLINE EXTENTION Nov-21 WASHINGTON WATER CO.
828 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$643,981.00 Brad Appleman McCORMICK WEST DIVISION 11&12 Nov-21 MCCORMICK DEVELOPMENT CORP
821 PRIME-RV ASSOCIATES,INC
Subcontractor to RV Associates,Inc 1333 LLOYD PARKWAY,PORT ORCHARD.WA
360-876-9737
$372,678.73 Phil Sagan SILVER SPRINGS WATER SYSTEM MAINLINE Aug-21 WASHINGTON WATER CO.
825 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$978,962.40 Phil Sagen CARPENTER RD UTILITY IMPROVEMENTS Jul-21 CITY OF LACEY
820 PO BOX 3400
LACEY.WA 98509-3400
JUSTIN KNOX 360-491-5600
$3,310,427.98 Brad Appleman NBK REPAIR&REPLACE SEWER INFRASTRUCTURE Jun-21 MACNAK CONSTRUCTION.LLC
802 12802 BRIDGEPORT WAY SW
LAKEWOOD,WA 98499
CHESTER BERGNER 253-212-1378
$1,017,655.86 Phil Sagan 2019 WATER MAIN IMPROVEMENTS May-21 CITY OF YELM
819 PO BOX 479
YELM,WA 98597
DEREK M MCCOY,P.E.
$20,381-25 Brad Appleman POTHOLE BOX CULVERT EDDON BOAT PARK Apr-21 CITY OF GIG HARBOR
823 3510 GRANDVIEW STREET
GIG HARBOR,WA 98335
GEORGE FLANIGAN 253-377-6165
6377,800.20 Brad Appleman 2020 CDBG WATERMAIN REPLACEMENT Apr-21 TOWN OF BUCODA
818 PO BOX 10
BUCODA,WA 98530
STEVE WILLIE 360-352-9456
$24,538.94 Brad Appleman WATERMAIN&SERVICE to 2012 STATE GAME RD Jan-21 TORRE
817 4306 27TH AVE SE
PUYALLUP,WA 98374
LOUIS TORRE 253-845-3936
$1,234,299.05 Brad Appleman 39TH AVE WATER MAIN REPLACEMENT Jan-21 LAKEWOOD WATER DISTRICT
813 PO BOX 99729
TACOMA,WA 98499
RANDALL BLACK-253-588-4423
$79,047.10 Brad Appleman N WARNER STREET SEWER&STORM Dec-20 HENDRICKSON CONSTRUCTION CO
812 PO BOX 64370
UNIVERSITY PLACE,WA 98464-0370
RON HENDRICKSON 253-381-7486
Docusign Envelope ID:7B76A5E2-E1A2-45A2-978C-CE8A1A830689
PAPE RECENT PROJECTS COMPLETED/REFERENCES
,.`;'''
ATTACHMENT"A'
Amount of Completion
Contract Project Manager Project Name Date Owner or Representative
$1,279,235.21 Phil Sagan MAPLE AVE WATER MAIN IMPROVEMENT Dec-20 CITY OF PORT ORCHARD
811 216 PROSPECT ST
PORT ORCHARD,WA 98366
K.CHRIS HAMMER PE 360-876-4991
$14,416.18 Phil Sagan EMERGENCY MANHOLE REPLACEMENT Nov-20 CITY OF FIRCREST
816 115 RAMSDELL ST
FIRCREST,WA 98466
JEFF DAVIS-253-564-8900
$48,351.60 Brad Appleman ILLAHEE OYEHUT HYDRANT REPLACEMENT Nov-20 GRAYS HARBOR COUNTY
814 100 W BROADWAY,STE 2
MONTESANO,WA 98563
MARK COX 360-249-4222
$396,877.89 Brad Appleman BOND GUNDERSON WATER MAIN EXTENSION Sep-20 ARNESS TREE FARM
809 22777 INDIANOLA RD NE
POULSBO,WA 98370
LARRY TODD 360-692-6867
$39,991.01 Brad Appleman 120-KCSD7 REUSE WATER PUMP&MANHOLE Sep-20 KITSAP COUNTY SEWER DISTRICT#7
815 PO BOX 40088
BELLEVUE,WA 98015
RAOAN BLACKER 206-669-5723
$6,597.00 Brad Appleman PHASE 3 TELEMETRY UPGRADES Auq-20 CEDAR RIVER WATER/SEWER DISTRICT
120-CEDAR-SUB TO SOURCE ELECTRIC,LLC 18421 SE PETROVITSKY RD
RENTON,WA 98058
CHRIS ROBERTS 206-437-2878
$356.104.01 Phil Sagen WOODS ROAD WATER MAIN REPLACEMENT Auq-20 WEST SOUND UTILITY DISTRICT#1
808 2924 SE LUND AVE
PORT ORCHARD,WA 98366
JOHN TAPIA 360-876-2545
$9,385.99 Brad Appleman MINDER&SR 307 BORE EXCAVATION Jul-20 KITSAP COUNTY PUD#1
120-KCPUD#1 PO BOX1989
POULSBO,WA 98370
TODD SMITH 360-626-7751
$224,949.30 Phil Sagan JACKSON AVE WATER MAIN RELOCATION Jun-20 WEST SOUND UTILITY DISTRICT#1
810 2924 SE LUND AVE
PORT ORCHARD,WA 98366
JOHN TAPIA 360-876-2545
$399,899.41 Phil Sagen CAMP SEYMOUR YMCA WATER SYSTEM Jun-20 YMCA OF PIERCE&KITSAP COUNTIES
804 4717 5 19TH ST,STE 201
TACOMA,WA 98402
ED BRESSETTE 253-534-4738
5175,390.25 Phil Sagan AC WATER MAIN REPLACEMENT May-20 TIMBERLAKE COMMUNITY CLUB
807 2880 E.TIMBERLAKE WEST DRIVE
SHELTON,WA 98584
EVAN HENKE,PE 425-637-3693
$96,130.00 Phil Sagan RANCH ACRES MAIN REPLACEMENT May-20 WASHINGTON WATER SERVICE CO
805 PO BOX 336
GIG HARBOR,WA 98335
JOHN PUCCINELLI,PE 360-437-2042
$66,923.45 Phil Sawn WATER MAIN REPLACEMENT PROJ NO MRP2019-34 Apr-20 TACOMA PUBLIC UTILITIES
806 3628 S 35TH ST
TACOMA,WA 98409
TROY SAGHAFI PE 253-502-8746
$2,112,099.38 Brad Appleman 2019 SEWAGE PUMP STATION CW-4 REPLACEMENT Apr-20 CITY OF BREMERTON PUBLIC WORKS
797 3027 OLYMPUS DRIVE
BREMERTON,WA 98310
BILL DAVIS 360-473-2312
$4,950.00 Brad Appleman VWD BUTTES TELEMETRY Mar-20 VALLEY WATER DISTRICT
120-SUB TO SOURCE ELECTRIC 14501 PIONEER WAY E
PUYALLUP,WA 98372
SEAN VANCE 253-841-9698
$829,071.74 Phil Sagan MARINE DR STORMWATER LID RETROFIT Dec-19 CITY OF BREMERTON PUBLIC WORKS
799 3027 OLYMPUS DRIVE
BREMERTON,WA 98310
KATIE KETTERER 360-473-5334
$870,682.07 Phil Sagan LIDSTROM WATER MAIN REPLACEMENT Nov-19 WEST SOUND UTILITY DISTRICT#1
800 2924 SE LUND AVE
PORT ORCHARD,WA 98366
GLEN SCREWS 360-874-5004
$19,938.28 Phil Sagan PARKWOOD SEWER Oct-19 WEST SOUND UTILITY DISTRICT#1
803 2924 SE LUND AVE
PORT ORCHARD,WA 98366
JOHN TAPIA 360-876-2545
$1,031,235.05 Brad Appleman STINSON AVE WATER MAIN REPLACEMENT Oct-19 CITY OF GIG HARBOR
796 3510 GRANDVIEW STREET
GIG HARBOR,WA 98335
AARON HULST 253-853-7620
$105,622.66 Phil Sagan FARALLONE SANITARY SEWER Oct-19 CITY OF FIRCREST
801 115 RAMSDELL STREET
FIRCREST,WA 98466
JERRY WAKEFIELD 253-564-8900
$505,101.61 Phil Sagan 7TH ST IMPROVEMENTS WATERLINE REPLAC. Auq-19 CITY OF ELMA
798 1235 MONTE ELMA RD
ELMA,WA 98541
JIM STARKS 360-482-2212
$2,559,164.54 Brad Appleman LIFT STATION NO 2 PW 2017-07 Jul-19 CITY OF LACEY
771 PO BOX 3400
LACEY,WA 98509
KEVEN INMAN 360-436-2682
$289,977.51 Phil Sagan WATER MAIN REPLACEMENT MRP 2016-24 Jul-19 TACOMA PUBLIC UTILITIES
795 3628 S 35TH ST
TACOMA,WA 98409
GREG ARMSTRONG-253-502-8742
$1,197,859.21 Brad Appleman ARROWHEAD WATER MAIN REPLACEMENT PH 2 Jun-19 LAKEWOOD WATER DISTRICT -
791 PO BOX 99729
TACOMA,WA 98499
RANDALL BLACK-253-588-4423
LETTER OF TRANSMITTAL
PAPE & SONS CONSTRUCTION, INC.
9401 BUJACICH ROAD,STE 1A
GIG HARBOR,WA 98332
253-851-6040
fax 253-851-3290
TO:
CITY OF BREMERTON ATTN:
ATTN: CONTRACTS ADMINISTRATOR DATE: 8/29/2024
345 6TH STREET, SUITE#100 JOB NO.
BREMERTON, WA 98337 RE:
LEWIS AVE SEWER REPLACEMENT
WE ARE SENDING TO YOU THE FOLLOWING
COPIES DATE NO. DESCRIPTION
8/28/2024 COMPLETE ORIGINAL BID DOCUMENTS
17 PGS
COMMENTS:
ORIGINAL BID DOCUMENTS AS SUBMITTED VIA EMAIL
8/28/2024
2:00 PM
COPY TO: FILE SIGNED: I_(it'
C_.
ACKNOWLEDGEMENT OF BID
CITY OF BREMERTON-LEWIS AVENUE SEWER REPLACEMENT
This contract is being bid using the Small Works Roster. The Bidder shall fill out and submit electronically
the pages titled BID FORMS as their bid proposal.
The Bidder proposes and agrees,if this Bid is accepted,to execute the Public Works Agreement with the City
of Bremerton to perform the WORK as specified or indicated in said Request for Bids entitled "LEWIS
AVENUE SEWER REPLACEMENT".
The Bidder has familiarized itself with the nature and extent of the Bid Documents, the work sites, locality
where the WORK is to be performed,the legal requirements (federal,state and local laws,ordinances,rules,
and regulations),and the conditions affecting cost,progress or performance of the WORK and has made such
independent investigations as Bidder deems necessary.
Bidder agrees to all the foregoing,and including all Bid Forms contained in this Bid,and Bidder further agrees
to complete the WORK required under the Bid Documents within the Contract Time stipulated in said Bid
Documents,and to accept in full payment therefore the Contract Price based on the Total Bid Price.
The Bidder has examined copies of all the Bid Documents and accepts all of the terms and conditions of the
Bid Documents, including any addenda. Acknowledge the addenda by filling out the following with the
addendum number and the date
Addenda Acknowledgement
No. Date ?AA IlaO. -
No. Date
No. Date
`qu►wrrrrrgrr
Date: AUGUST 28, 2024 C0NSi ",,,
Company Name: PAPE & SONS CONSTRUCTION. INC ' co/C) re'•Z
By: JAMES PAP J �••. SEAL h
••
(Printed Nam ure) ��* 9•,9 NG��• *.%�
,Title: PRESIDENT %, 13.7S �,••`%‘�
111111110"
Washington State Unified Business Identification (UBI) Number: 600 291 966
Washington State Contractor's Registration Number and Expiration Date:
PAPESI*204DE 4/8/2025
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 1 of 9
August 2024
BID SCHEDULE
LEWIS AVENUE SEWER REPLACEMENT
Following is the Bid Schedule for construction of this project in accordance with the Request for Bids documents.
The Bid Schedule must be completed by the Bidder by filling in each blank, using dollars and cents with numerals
only. Failure to fill out this form will render the bid non-responsive and will cause its rejection. In case of
discrepancy between the unit price and the total amount for an item, the unit price shall prevail. NOTE ON
SALES TAX: Washington State Department of Revenue Rule 170 applies to this project. Bids will be evaluated on
the basis of the TOTAL BID PRICE. Note: LS means Lump Sum.
li Bid f I
Item Spec Ref. Description Unit Qty Unit Price ($) Extended Amt
No. ($�
,i- _� -- __ a.
1 SP 1-04 Minor Changes and Force EST -- --- 20,000.00
Account
2 SP 1-05 As-built Drawings and LS 1
Project Survey $3,000.00 $3,000.00
3 SP 1-07 TESC Plan LS 1 $1,500.00 $1,500.00
4 SP 1-09 Mobilization LS 1 $29,000.00 $29,000.00
5 SP 1-10 Project Temporary Traffic LS 1
Control $15,000.00 $15,000.00
6 SP 2-02 Sawcut for Pavement LF 700
Removal $3.00 $2,100.00
7 f SP 2-02 Remove Existing Pavement SY 950 $16.00 $15,200.00
8 SP 2-04 Pothole Existing Utility Each 6 $950.00 $5,700.00
9 SP 2-09 Shoring or Extra Excavation LS 1
Class B $6,000.00 $6,000.00
10 SP 4 04 Crushed Surfacing Top TN 301
Course $70.00 $21,070.00
11 SP 5-04 Hot Mix Asphalt TN 230 $270.00 $62,100.00
12 SP 7-08 Imported Trench Backfill TN 642 $42.00 $26,964.00
13 SP 7 08 Unsuitable Pipe Foundation CY 20
Excavation $80.00 $1,600.00
PVC Sewer Pipe 8-inch
14 SP 7-17 Diameter LF 293 $170.00 $49,810.00
15 SP 7-18 Side Sewer Connection EA 2 $4,200.00 $8,400.00
16 SP 8-04 Restoration of concrete LS 1 $15,500.00
curb, gutter, and sidewalk $15,500.00
BASE BID TOTAL $282,944.00
ESTIMATED SALES TAX(9.2%, dollars and cents) $26,030.85
L im4
TOTAL BID PRICE (Base Bid Total plus Estimated Sales Tax, dollars and cents} $308,974,85
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 2 of 9
August 2024
BID BOND
KNOW ALL MEN BY THESE PRESENTS,
That PAPE & SONS CONSTRUCTION, INC. as Principal,and
Swiss RE Corporate Solutions America Insurance Corporation
as Surety,are
held and firmly bound unto City of Bremerton hereinafter called"OWNER,"in the sum of
5% of amount bid dollars,
(not less than five percent(5%)of the total amount of the Bid)
for the payment of which sum,well and truly to be made,we bind ourselves,our heirs,executors,
administrators,successors,and assigns,jointly and severally,firmly by these presents.
WHEREAS,said Principal has submitted a Bid to said OWNER to perform the WORK required under the
bidding schedule(s) of the OWNER's Contract Documents entitled LEWIS AVENUE SEWER
REPLACEMENT.
If the Principal is awarded the Bid and,within 14 calendar days after receipt of the Contract Document
forms from the OWNER, fails to provide the OWNER with the duly executed Agreement;the duly executed
Certificates of Insurance,the duly executed Performance Bond and the duly executed Payment Bond,all as
specified in the Contract Documents,then the Surety shall,without condition and within 30 calendar days
from written demand from the OWNER,pay to the OWNER in U.S.funds,by certified or cashier's check,the
full amount of this Bid Bond.This Bond shall be irrevocable for 90 days after the bid opening,as defined in
the Contract Documents.
The Surety stipulates and agrees that the obligation of said Surety shall in no way be impaired or affected
by an extension of the time within which the OWNER may accept such bid and Surety further waives notice
of any such extension.In the event suit is brought upon this bond by said OWNER and OWNER prevails,
said Principal and Surety shall pay all costs incurred by said OWNER in such suit,including reasonable
attorney's fees and costs to be fixed by the court.
SIGNED AND SEALED,this day of August 28th _ 2024
`,11�1111111///•
Pape & Sons Contruction, llN,4 Vmas Hentschell, Attorney-in-Fact(SEAL)
I � SEALS
(Principal) •'GORPORgj�`C'�:� (Surety)
co'By:. S y:• ��tccsT. G '�� �,° ——
eS are - rdjo1-(Signa 1..i. ;2 (Signature)
•:�s,yy'� o+•••r)
(SEAL AND NOTARIAL ACKNOWLEDGI NT OF: ETYt
7978
''�'�///,// moo 1436 S. Union Ave.Tacoma, WA 98405
Address of Surety to which all notices shall be sellt.i
9401 BUJACICH ROAD,STE 1A,GIG HARBOR,WA 98332
Address for Service of Process (must be a physical address):
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 3 of 9
August 2024
SWISS RE CORPORATE SOLUTIONS
SWISS RE CORPORATE SOLUTIONS AMERICA INSURANCE CORPORATION("SRCSAIC")
SWISS RE CORPORATE SOLUTIONS PREMIER INSURANCE CORPORATION("SRCSPIC")
WESTPORT INSURANCE CORPORATION("WIC")
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS,THAT SRCSAIC,a corporation duly organized and existing under laws of the State of Missouri,and
having its principal office in the City of Kansas City,Missouri,and SRCSPIC,a corporation organized and existing under the laws of the State of
Missouri and having its principal office in the City of Kansas City,Missouri,and WIC,organized under the laws of the State of Missouri,and having its
principal office in the City of Kansas City,Missouri,each does hereby make,constitute and appoint:
THOMAS P.HENTSCHELL,BRADLEY A.ROBERTS,JULIE A.CRAKER,AND JOANNE REINKENSMEYER
JOINTLY OR SEVERALLY
Its true and lawful Attorney(s)-in-Fact,to make,execute,seal and deliver,for and on its behalf and as its act and deed,bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies,as surety,on contracts of suretyship as are or may be required or permitted by
law,regulation,contract or otherwise,provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of:
FIFTY MILLION($50,000,000.00)DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both SRCSAIC and SRCSPIC at meetings duly called and held on the 18th of November 2021 and WIC by written consent of its
Executive Committee dated July 18,2011.
"RESOLVED,that any two of the President,any Managing Director,any Senior Vice President,any Vice President,the Secretary or any Assistant
Secretary be,and each or any of them hereby is,authorized to execute a Power of Attorney qualifying the attorney named in the given Power of
Attorney to execute on behalf of the Corporation bonds,undertakings and all contracts of surety,and that each or any of them hereby is authorized to
attest to the execution of any such Power of Attorney and to attach therein the seal of the Corporation; and it is
FURTHER RESOLVED,that the signature of such officers and the seal of the Corporation may be affixed to any such Power of Attorney or to
any certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
bindine upon the Corporation when so affixed and in the future with reeard to any bond,undertaking or contract of surety to which it is attached."
.`sVatlSAAfERic:'",ems 0\0`.4 PRFM/r•,,e
= ��o•GOpPORg•T�t-c..17 =.oa.;OCsPO&/.•4k,% By �'� �'" _
S E A L . _ G : Erik Janssens,Senior Vice President of SRCSAIC&Senior Vice President
`��
g• Al� sg; SEAL :rn ef SRCSPIC&Senior Vice President of WIC =
s.,ss .sso.:•yap, : *is ke';iti)
,, �s,, ••.,s,; so, s By
•cc" �,�s*i,N..N'� �!� Ssss�*,s�Os'°' Gerald Jagrowsld,Vice President of SRCSAIC&Vice President of SRCSPIC
&Vice President of WIC
IN WITNESS WHEREOF,SRCSAIC,SRCSPIC,and WIC have caused their official seals to be hereunto affixed,and these presents to be signed by their
authorized officers
this 10 day of NOVEMBER 20 22
Swiss Re Corporate Solutions America Insurance Corporation
State of Illinois Swiss Re Corporate Solutions Premier Insurance Corporation
County of Cook SS Westport Insurance Corporation
On this 10 day of NOVEMBER 20 22 ,before me,a Notary Public personally appeared Erik Janssens , Senior Vice President of SRCSAIC
and Senior Vice President of SRCSPIC and Senior Vice President of WIC and Gerald Jagrowski,Vice President of SRCSAIC and Vice President of
SPCSPIC and Vice President of WIC,personally known to me,who being by me duly sworn,acknowledged that they signed the above Power of Attorney
as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies.
ICATION,SEAL,
CHRISTINANANIlSCO
•NOTIO WHIIC.BTATE co ais)os p rn
I,Jeffrey Goldberg,the duly elected Senior Vice President and Assistant Secretary of SRCSAIC and SRCSPIC and WIC,do hereby certify that the above and
foregoing is a true and correct copy of a Power of Attorney given by said SRCSAIC and SRCSPIC and WIC,which is still in full force and effect.
IN WITNESS WHEREOF,I have set my hand and affixed the seals of the Companies this day of ,20 .
•
Jeffrey Goldberg,Senior Vice President&
Assistant Secretary of SRCSAIC and
SRCSPIC and WIC
Swiss Re Corporate Solutions America Insurance Corporation
Electronic Corporate Seal
N.
O • •fly ORq:T s-1.•
tO• •n=
SEAL :
•
• ¶973 .�
,s,!If.,sso o set ,,,
Please read through the below Usage Guidelines for our Electronic Corporate Seal:
1) This Electronic Corporate Seal has been provided for convenience. Swiss Re Corso cannot
provide assurance that specific obligees will, or will not, accept an Electronic Corporate Seal. The
preferred method remains a physically affixed seal. The Electronic Corporate Seal is used at the
discretion of your Agency or Brokerage, and Swiss Re Corso disclaims any liability if the use of the
Electronic Corporate Seal results in any instrument being rejected or challenged;
2) The Electronic Corporate Seal can only be used for electronically affixing a seal to a surety
bond, or related instrument, that has been authorized by Swiss Re Corso and is being executed
on behalf of Swiss Re Corso by your Agency or Brokerage pursuant to a valid Power of Attorney;
3)Your Agency or Brokerage may not transfer on Electronic Corporate Seal to any other entity or
person without the written consent of Swiss Re Corso;
4)Swiss Re Corso may revoke permission to use the Electronic Corporate Seal at any given time;
and
5)Any use of the Electronic Corporate Seal outside of the above described guidelines is not
authorized
NON-COLLUSION AFFIDAVIT
STATE OF WASHINGTON)
SS:
COUNTY OF KITSAP )
JAMES PAPE .being first duly sworn,deposes and says that he or she
is of the party making the foregoing bid that the bid is not made in the interest of,or on behalf of,any
undisclosed person,partnership,company,association,organization,or corporation;that the bid is genuine
and not collusive or sham;that the bidder has not directly or indirectly induced or solicited any other
bidder to put in a false or sham bid,and has not directly or indirectly colluded, conspired,connived,or
agreed with any bidder or anyone else to put in a sham bid,or that anyone shall refrain from bidding;that
the bidder has not in any manner,directly or indirectly,sought by agreement,communication,or
conference with anyone to fix the bid price of the bidder or any other bidder,or to fix any overhead,profit,
or cost element of the bid price, or of that of any other bidder,or to secure any advantage against the public
body awarding the contract of anyone interested in the proposed contract;that all statements contained in
the bid are true;and further,that the bidder has not,directly or indirectly,submitted his or her bid price or
any breakdown thereof, or the contents thereof, or divulged information or data relative thereto,or paid,
and will not pay,any fee to any corporation,partnership,company association, organization,bid
depository,or to any member or agent thereof to effectuate a collusive or sham bid.
Sig
JAMES PAPE-PRESIDENT
PAPE&SONS CONSTRUCTION, INC
Subscribed and sworn to before me this r P) day of
Ps L .2024
4
Notar ' b in and for the
County of KITSAP
State of WASHINGTON Off• 9.PO/ ‘�Co ;G0 Tom•, i
• O
♦♦♦�PZNeN SEAL •
Ni- cp64.
(SEAL) 4411
Al 'f qt * •:/,9 IN6(0?•
At/b._ '01.
_ 1978
am.4 aSip
City of Bremerton �i;;ASH;N,: Bid Forms
Lewis Avenue Sewer Replacement Page 4 of 9
August 2024
REFERENCES
Provide three (3) references for related (e.g.cleaning,coating) or similar projects within the last 5 years
performed under the bidder's name as the prime (general) contractor.
REFERENCE #1
•
Project Name and/or
Description: SEE ATTACHMENT "A"
Agency or Owner: HIGHLIGHTED
•
Email Address of
Agency/Owner Contact:
Phone Number of
Agency/Owner Contact:
Project Cost:
Date Project Completed:
REFERENCE #2
Project Name and/or
Description:
Agency or Owner:
Email Address of
Agency/Owner Contact:
Phone Number of
Agency/Owner Contact:
Project Cost:
Date Project Completed:
REFERENCE #3
Project Name and/or
Description:
Agency or Owner:
Email Address of
Agency/Owner Contact:
Phone Number of
Agency/Owner Contact:
Project Cost:
Date Project Completed:
This information may be submitted within 24 hours after the bid opening.
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 5 of 9
August 2024
CERTIFICATION BY PROPOSED CONTRACTOR REGARDING EQUAL
EMPLOYMENT
In accordance with Chapter 56,Laws of 1975 1st Extraordinary Session,Certification regarding Equal
Opportunity is required of bidders or prospective contractors and their proposed subcontractors prior to
the award of contracts or subcontracts.
Name of Prime Contractor PAPE & SONS CONSTRUCTION. INC
Address 9401 BUJACICH ROAD, STE IA. GIG HARBOR. WA 98332
Internal Revenue Service Employer Identification No. 91-1043352
a. Contractor has participated in a previous contract Yes V No
or subcontract subject to the Equal Opportunity Clause.
b. Compliance reports were required to be filed in Yes V No_
connection with such contract/subcontract.
c. Contractor has filed all compliance reports required by Yes V No_
Executive Orders 10925, 11114, 11246,or by regulations
of the Equal Opportunity Commission issued pursuant to
Title VII of the Civil Rights Act of 1964.
a. If answer to item 'c'is"no",please explain in detail in the space below.
N/A
CERTIFICATION: I,the undersigned,certify that the information above is true and complete to the best of
my knowledge and belief.
PAPE & SONS CONSTRUCTION, INC _
Company Name
JAMES PAPE - PRESIDENT
Name and Title •gner P eat R,;ylg�or print clearly)
rR
UCl ' AUGUST 28, 2024
re p:�0 y Date
ce) •
rv- 1.
:c�
City of
Bid Forms
Lewis A Bremerton ue Sewer Replaceme f<,,,,ir, 19•$�.%`�,``` Page 6 of 9
r:o i
August 2024
CERTIFICATION OF NON-SEGREGATED FACILITIES
(Applicable to federally assisted construction contracts and related subcontracts exceeding$10,000 which
are not exempt from the Equal Opportunity clause.)
The federally assisted construction contractor certifies that he/she does not maintain or provide for
his/her employees any segregated facilities at any of his/her establishments,and that he/she does not
permit his/her employees to perform their services at any location,under his/her control,where
segregated facilities are maintained.The federally assisted construction contractor certified,further that
he/she will not maintain or provide for his/her employees any segregated facilities at any of his/her
establishments,and that he/she will not permit his/her employees to perform their services at any
location,under his/her control,where segregated facilities are maintained.The federally assisted
construction contractor agrees that a breach of this certification is a violation of the Equal Opportunity
clause in this contract.
As used in this certification,the term "segregated facilities"means any waiting rooms,work area,rest
rooms and wash rooms,restaurants and other eating areas,time clocks,locker rooms and other storage or
dressing areas,parking lots,drinking fountains,recreation or entertainment areas,transportation,and
housing facilities provided for employees which are segregated by explicit directive or area,in fact,
segregated on the basis of race,creed,color,or national origin,because of habit,local custom,or otherwise.
The federally assisted construction contractor agrees that(except where he/she has obtained identical
certifications from proposed contractors for specific time periods)he/she will obtain identical
certifications from proposed subcontractors prior to the award of subcontracts exceeding$10,000 which
are not exempt from the provisions of the Equal Opportunity clause,and that he/she will retain such,
certification in this file.
CERTIFICATION: I,the undersigned,certify that the information above is true and complete to the best of
my knowledge and belief.
PAPE & SONS CONSTRUCTION: INC
Company Name
JAMES PAPE - PRESIDEN,T,,,,,,‘iKticri,«
��n Name and Title r S . !' t clearly)
Pal�y�FC��o ': AUGUST 28. 2024
ure : SEAL z Date
. HIN
I�'''ff 1'97a,,►t�``''`
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 7 of 9
August 2024
CERTIFICATION OF FEDERAL NON-DEBARMENT AND SUSPENSION
INSTRUCTIONS TO BIDDERS: THIS FORM SHALL BE EXECUTED BY THE CONTRACTOR AND SUBMITTED
WITH THE BID.
THE CONTRACTOR SHALL MAKE COPIES AND DISTRIBUTE THIS FORM TO ALL SUBCONTRACTORS.
SUBCONTRACTORS MUST SUBMIT THIS FORM TO THE CITY PRIOR TO PERFORMING ANY WORK ON THE
PROJECT.
As a prospective contractor for the City of Bremerton and as a requirement of your submittal,you are
required to provide debarment/suspension certification indicating that you are in compliance with the
below Federal Executive Order.
Debarment: Federal Executive Order(E.O.) 12549"Debarment and Suspension"requires that all
contractors receiving individual awards or using federal funds,and all sub-recipients certify that
the organization and its principals are not debarred,suspended,proposed for debarment,declared
ineligible,or voluntarily excluded by any Federal department or agency from doing business with
the Federal Government or from receiving Federally-assisted contracts.
Your signature certifies that neither you nor your principal is presently debarred, suspended,proposed for
debarment,declared ineligible,or voluntarily excluded from participation in this transaction by any federal
department or agency.If,at any time during the term of the contract,such condition occurs the Contractor
will notify the City without delay.
CERTIFICATION: I,the undersigned,certify that the information above is true and complete to the best of
my knowledge and belief.
PAPE & SONS CONSTRUCTION, INC
Company Name
JAMES PAPE - PRESIDENT
Name and Title of Signer se type or print clearly)
00111111111114,
`,`
AUGUST 28, 2024
Sj re ,�•�� .•••GORPO,q•� (i Date
a/978
i�rljr/rlunut1111��
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 8 of 9
August 2024
CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES
The bidder hereby certifies that,within the three-year period immediately preceding the bid solicitation date
August 27, 2024, the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of
chapters 49.46,49.48,or 49.52 RCW,as determined by a final and binding citation and notice of assessment
issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited
or general jurisdiction.
I declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and
correct.
PAPE & SONS CONSTRUCTI ,N,"L1W' ST,,��
Bidder's Busine ame *
ctri
S.fgrrarre of Authorized Official* •
JAMES PAPE �
Printed Name . .••
PRESIDENT '''%, rg78„''�����‘�`N
Title
8/28/2024 GIG HARBOR WASHINGTON
Date City State or Country
Check One:
Partnership ❑ Joint Venture ❑ Corporation 151 Partnership ❑ Sole Proprietorship ❑
State of Incorporation,or if not a corporation,State where business entity was formed:
WASHINGTON
If a co-partnership,give firm name under which business is transacted:
N/A
*If a corporation,proposal must be executed in the corporate name by the president or vice-president(or any
other corporate officer accompanied by evidence of authority to sign).If a co-partnership, proposal must be
executed by a partner.
END OF BID FORMS
City of Bremerton Bid Forms
Lewis Avenue Sewer Replacement Page 9 of 9
August 2024
BOARD RESOLUTION OF PAPE & SONS CONSTRUCTION, INC. FOR
SIGNING AUTHORITY
DULY PASSED ON April 2,2021
RESOLVED,that the following shall having signing authority on behalf of the company,
subject to subsequent revocation or limitation by James Pape: F.
1. James Pape
2. Jeanette Pape
3. Chris Pape
4. Brad Appleman
5. Phil Sagen
It is hereby certified by the undersigned that the foregoing resolution was duly passed by
the Board of Directors of the above-named Company on the 2nd day of April,2021, in
accordance with the Memorandum or By-Laws and Articles of Incorporation of the
Company and the laws and by-laws governing the Company and that the said resolution
has been duly recorded in the Minute Book and is in full force and effect.
t AMES PAPE-DIRECTOR
2
MINUTE RE:
SPECIAL MEETING OF SHAREHOLDERS
OF
PAPE & SONS CONSTRUCTION, INC.
A special meeting of the Shareholders has been called. A quorum was present as all
shareholders were present. The purpose of said meeting was to conduct election of officers.
The majority of votes carried as follows.
It has been addressed, ordered and agreed as follows.
1. James Pape is elected as President.
2. Jeanette Pape is elected as Secretary/Treasurer.
3. Chris Pape is elected as Vice-President.
4. Brad Appleman is elected as Assistant Vice-President.
5. Phil Sagen is elected as Assistant Secretary.
Agreed and approved this 8th day of October, 2020.
PAPE& SONS CONSTRUCTION,INC.
By:
J pe,President and Director and Majority Shareholder
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT"A"
Amount of Completion
Contract Project Manager Project Name Date Owner or Representative
$488,904.38 Brad Appleman HERONSWOOD GARDEN WATERMIAN EXTENSION Jun-24 PORT GAMBLE S'KLALLAM TRIBE
870 31912 LITTLE BOSTON RD NE
KINGSTON,WA 98346
MIKE ROREM 206-930-3229
$4.227.126.89 Brad Appleman SANITARY SEWER PUMP STATION&SANITARY SEWER May-01 MASON COUNTY PUBLIC WORKS
839 PO BOX 1850
SHELTON,WA 98584
RICHARD DICKINSON 360-427-9670
$1,568,805.91 Phil Sagen PAULSON RD POTABLE&RECYCLED WATER MAIN Apr-24 SILVERDALE WATER DISTRICT#16
860 PO BOX 493
SILVERDALE,WA 98383
MICHAEL PLEASANTS 360-447-3513
$6,750.00 Brad Appleman SPSCC INFRASTRUCTURE PUMP LIFT STATION Apr-24 ENTERPRISE SERVICES,WASH STATE DEPT
123-12 SUB TO SOURCE ELECTRIC PO BOX 41476
OLYMPIA,WA 98504
STACY SIMPSON 360-349-2341
$1,605,190.04 Phil Sagen SCHEDULE A DISTRIBUTION REPLACMENT Apr-24 WESTERN RANCHETTES INC
862 15914 748TH AVE CT E
PUYALLUP,WA 98375
RYAN FRANK 360-876-0958
$137,370.67 Brad Appleman ARDMORE WHITMAN WATERMAIN#879 Feb-24 LAKEWOOD WATER DISTRICT
868 PO BOX 99729
TACOMA,WA 98499
JAMES DEAN-253-588-4423
$442,682.70 Brad Appleman GLEN ALDER WATERMAIN REPLACEMENT Dec-23 THURSTON COUNTY PUD
850 1230 RUDDELL RD SE
LACEY,WA 98503
KIM GUBBE-360-357-8783 EXT125
$486,811.96 Brad Appleman LAKE JOSEPHINE COUNTRY CLUB WATERMAIN Nov-23 LAKE JOSEPHINE WATER DEPARTMENT
857 11016 COUNTRY CLUB DR
ANDERSON ISLAND,WA 98303
RUSS RODOCKER-253-884-4093
$132,412.43 Phil Sagen EVERGREEN SHORES WATERMAIN REPLACEMENT Oct-23 WASHINGTON WATER COMPANY
859 PO BOX 336
GIG HARBOR.WA 98335
JOHN PUCCINELLI,PE 360-437-2042
$1,440,519.01 Brad Appleman MANORWOOD WATER MAIN REPLAC.PHASE 2&3 Nov-23 CITY OF PUYALLUP
852 333 S.MERIDIAN
PUYALLUP,WA 98371
MICHELLE GEHRING 253-841-5579
$604,533.47 Phil Sagen CANYON RD E WATERMAIN REPLACEMENT Sep-23 WASHINGTON WATER COMPANY
854 PO BOX 336
GIG HARBOR,WA 98335
JOHN PUCCINELLI.PE 360-437-2042
$81,279.07 Brad Appleman WICKS LAKE RANCHES WATERMAIN RELOCATION Aug-23 WASHINGTON WATER COMPANY
851 PO BOX 336
GIG HARBOR.WA 98335
JOHN PUCCINELLI.PE 360-437-2042
$1,037,540.50 Phil Sagen KPUD LUD#40 BILL POINT WATER PART 1 Aug-23 Kitsap PUD#1
847 PO Box 1989
Poulsbo,WA 98370
PETER DRESSEL 360-626-7746
$188,612.86 Phil Sagen STORMWATER PRETREATMENT OUTFALL Jun-23 CITY OF FIRCREST
844 115 RAMSDELL ST
FIRCREST,WA 98466
TYLER BEMIS-253-238-4134
$41,450.90 Phil Sagen FIRCREST ROSE ST WATERMAIN Jun-23 CITY OF FIRCREST
855 115 RAMSDELL ST
FIRCREST,WA 98466
JEFF DAVIS-253-564-8900
$555,193.45 Phil Sagen KPUD LUD#40 BILL POINT WATER PART 2 May-23 Kitsap PUD#1
849 PO Box 1989
Poulsbo,WA 98370
PETER DRESSEL 360-626-7746
$4,080.00 Phil Sagen KPUD WATER SERVICE CONNECTIONS Apr-23 Kitsap PUD#1
123-16 PO Box 1989
Poulsbo,WA 98370
_ BILL WHITELEY-360-779-4078
$1,056,735.07 Brad Appleman NAOMILAWN NEWGROVE HIGHLAND WATERMAIN Mar-23 LAKEWOOD WATER DISTRICT
843 PO BOX 99729
TACOMA.WA 98499-0729
IAN BLACK-253-588-4423
$36,960.00 Phil Sagen REGENTS BLVD WATERMAIN Mar-23 CITY OF FIRCREST
848 115 RAMSDELL ST
FIRCREST,WA 98466
JEFF DAVIS-253-564-8900
$69,289.46 Brad Appleman ROBBINS RD STORM WATER IMPROVEMENTS Mar-23 ROBBINS RD IMPROV.&MAINT.ASSOC.
831 PO BOX 752
GRAPEVIEW,WA 98546
ROBERT ISBELL-360-229-2079
$74,553.65 Phil Sagen 2022 ANNUAL DRAINAGE PROJECT Mar-23 CITY OF BAINBRIDGE ISLAND
846 280 MADISON AVE N
BAINBRIDGE ISLAND.WA 98110-1812
JOEL CORLEW 206-348-2913
$153,434.13 Brad Appleman SOUTHWOOD PRV STATIONS Feb-23 WASHINGTON WATER CO.
845 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$890,647.56 Phil Sagen HOLIDAY VALLEY WATER MAIN REPLACEMENT Dec-22 HOLIDAY VALLEY WATER DISTRICT
838 3403 STEAMBOAT ISLAND RD PMB 334
OLYMPIA,WA 98502
JIM LOGAN-360-529-2947
$2,705,312.30 Phil Sagen FRUITLAND 2021 WATER MAIN Dec-22 FRUITLAND MUTUAL WATER CO
827 PO BOX 73759
PUYALLUP,WA 98373
TED HARDIMAN-253-848-5519
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT"A"
Amount of Completion
Contract Project Manager Project Name Date Owner or Representative
$302,391.52 Brad Appleman 55TH ST CT NW(REID DR)WATER MAIN Nov-22 CITY OF GIG HARBOR
841 3510 GRANDVIEW STREET
GIG HARBOR,WA 98335
_ MANDY CHAPMAN-253-853-7561
$158,549.53 Brad Appleman WATERMAIN EXTENSION QUISTORFF SWEDE HILL Oct-22 WASHINGTON WATER
842 PO BOX 336
GIG HARBOR.WA 98335
RYAN HASEMAN-877-408-4060
$656,318.01 Phil Sagan SUMMIT WATER MAIN Oct-22 CITY OF FIRCREST
840 115 RAMSDELL ST
FIRCREST,WA 98466
JEFF DAVIS-253-564-8900
$483.753.73 Phil Sagan EISENHOWER WATER MAIN REPLACEMENT Aug-22 WEST SOUND UTILITY DISTRICT#1
837 2924 SE LUND AVE
PORT ORCHARD,WA 98366
JOHN TAPIA 360-876-2545
$1,436,262.54 Brad Appleman 2020 LIFT STATION UPGRADES PROJECT Jul-22 CITY OF ORTING
824 PO BOX 489
ORTING,WA 98360
APRIL WHITTAKER-253-604-6600
$1,042,182.11 Brad Appleman OYSTER BAY AVE FORCE MAIN REPLACEMENT Jul-22 CITY OF BREMERTON
888 239 4TH ST
BREMERTON,WA 98337
ROBERT ENDLSEY 360-473-2348
$1,826,469.86 Brad Appleman MARINE DRIVE WATER MAIN REPLACEMENT May-22 CITY OF BREMERTON
826 239 4TH ST
BREMERTON,WA 98337
ROBERT ENDLSEY 360-473-2348
$325,933.52 Brad Appleman 6th STREET SEWER REPLACEMENT May-22 CITY OF BREMERTON PUBLIC WORKS
623 3027 OLYMPUS DRIVE
BREMERTON,WA 98310
BILL DAVIS 360-473-5398
$211,411.27 Brad Appleman 2022 STORMWATER REPAIR PROJECT Apr-22 CITY OF LAKEWOOD
834 6000 MAIN STREET SW
LAKEWOOD,WA 98499
D'ANDRA BUCHANAN 253-983-7820
$36,841.91 Brad Appleman BORGEN BLVD EMERGENCY PAVEMENT REPAIR Mar-22 CITY OF GIG HARBOR
835 3510 GRANDVIEW STREET
GIG HARBOR,WA 98335
TRENT WARD 253-851-6170
$456,793.50 Phil Sapen 224th 12 Inch WATER MAIN REPLACEMENT May-22 WASHINGTON WATER CO.
832 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$137,019.96 Brad Appleman SILVER CREEK BOOSTER STATION Apr-22 WASHINGTON WATER CO.
830 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$1,095,865.25 Phil Sagan WATER MAIN RENEWAL&REPLACEMENT Mar-22 SPANAWAY WATER COMPANY INC
829 PO BOX 1000
SPANAWAY,WA 98387-1000
TIM WELLS 253-531-9024
$118,544.19 Brad Appleman MINTERBROOK 82ND AVE MAINLINE EXTENTION Nov-21 WASHINGTON WATER CO.
828 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$643,981.00 Brad Appleman McCORMICK WEST DIVISION 11&12 Nov-21 MCCORMICK DEVELOPMENT CORP
821 PRIME-RV ASSOCIATES.INC
Subcontractor to RV Associates,Inc 1333 LLOYD PARKWAY,PORT ORCHARD,WA
360-876-9737
$372,678.73 Phil Sagan SILVER SPRINGS WATER SYSTEM MAINLINE Aug-21 WASHINGTON WATER CO.
825 14519 PEACOCK HILL AVE NW
GIG HARBOR,WA 98332
JOHN PUCINNELLI 253-320-1631
$978,962.40 Phil Sager) CARPENTER RD UTILITY IMPROVEMENTS Jul-21 CITY OF LACEY
820 PO BOX 3400
LACEY,WA 98509-3400
JUSTIN KNOX 360-491-5600
$3,310,427.98 Brad Appleman NBK REPAIR&REPLACE SEWER INFRASTRUCTURE Jun-21 MACNAK CONSTRUCTION,LLC
802 12802 BRIDGEPORT WAY SW
LAKEWOOD.WA 98499
CHESTER BERGNER 253-212-1378
$1,017.655.86 Phil Sagen 2019 WATER MAIN IMPROVEMENTS May-21 CITY OF YELM
819 PO BOX 479
YELM,WA 98597
DEREK M MCCOY.P.E.
$20,381.25 Brad Appleman POTHOLE BOX CULVERT EDDON BOAT PARK Apr-21 CITY OF GIG HARBOR
823 3510 GRANDVIEW STREET
GIG HARBOR,WA 98335
GEORGE FLANIGAN 253-377-6165
$377,800.20 Brad Appleman 2020 CDBG WATERMAIN REPLACEMENT Apr-21 TOWN OF BUCODA
818 PO BOXI0
BUCODA,WA 98530
STEVE WILLIE 360-352-9456
624.538.94 Brad Appleman WATERMAIN&SERVICE to 2012 STATE GAME RD Jan-21 TORRE
817 4306 27TH AVE SE
PUYALLUP,WA 98374
LOUIS TORRE 253-845-3936
$1,234,299.05 Brad Appleman 39TH AVE WATER MAIN REPLACEMENT Jan-21 LAKEWOOD WATER DISTRICT
813 PO BOX 99729
TACOMA,WA 98499
RANDALL BLACK-253-588-4423
$79,047.10 Brad Appleman N WARNER STREET SEWER&STORM Dec-20 HENDRICKSON CONSTRUCTION CO
812 PO BOX 64370
UNIVERSITY PLACE.WA 98464-0370
RON HENDRICKSON 253-381-7486
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT"A"
Amount of Completion
Contract Project Manager Project Name Date Owner or Representative
$1.279,235.21 Phil Sagen MAPLE AVE WATER MAIN IMPROVEMENT Dec-20 CITY OF PORT ORCHARD
811 216 PROSPECT ST
PORT ORCHARD,WA 98366
K.CHRIS HAMMER PE 360-876-4991
$14,416.18 Phil Sagen EMERGENCY MANHOLE REPLACEMENT Nov-20 CITY OF FIRCREST
816 115 RAMSDELL ST
FIRCREST,WA 98466
JEFF DAVIS-253-564-8900
$48,351.60 Brad Appleman ILLAHEE OYEHUT HYDRANT REPLACEMENT Nov-20 GRAYS HARBOR COUNTY
814 100 W BROADWAY,STE 2
MONTESANO,WA 98563
MARK COX 360-249-4222
$396,877.89 Brad Appleman BOND GUNDERSON WATER MAIN EXTENSION Sep-20 ARNESS TREE FARM
809 22777 INDIANOLA RD NE
POULSBO,WA 98370
LARRY TODD 360-692-6867
$39,991.01 Brad Appleman 120-KCSD7 REUSE WATER PUMP&MANHOLE Sep-20 KITSAP COUNTY SEWER DISTRICT#7
815 PO BOX 40088
BELLEVUE,WA 98015
RAOAN BLACKER 206-669-5723
$6,597.00 Brad Appleman PHASE 3 TELEMETRY UPGRADES Aug-20 CEDAR RIVER WATER/SEWER DISTRICT
120-CEDAR-SUB TO SOURCE ELECTRIC,LLC 18421 SE PETROVITSKY RD
RENTON,WA 98058
CHRIS ROBERTS 206-437-2878
$356,104.01 Phil Sages WOODS ROAD WATER MAIN REPLACEMENT Aug-20 WEST SOUND UTILITY DISTRICT#1
808 2924 SE LUND AVE
PORT ORCHARD,WA 98366
JOHN TAPIA 360-876-2545
$9,385.99 Brad Appleman MINDER&SR 307 BORE EXCAVATION Jul-20 KITSAP COUNTY PUD#1
120-KCPUD#1 PO BOX1989
POULSBO,WA 98370
TODD SMITH 360-626-7751
$224,949.30 Phil Sagen JACKSON AVE WATER MAIN RELOCATION Jun-20 WEST SOUND UTILITY DISTRICT#1
810 2924 SE LUND AVE
PORT ORCHARD,WA 98366
JOHN TAPIA 360-876-2545
$399,899.41 Phil Sagan CAMP SEYMOUR YMCA WATER SYSTEM Jun-20 YMCA OF PIERCE&KITSAP COUNTIES
804 4717 S 19TH ST,STE 201
TACOMA,WA 98402
ED BRESSETTE 253-534-4738
$175,390.25 Phil Sagen AC WATER MAIN REPLACEMENT May-20 TIMBERLAKE COMMUNITY CLUB
807 2880 E.TIMBERLAKE WEST DRIVE
SHELTON,WA 98584
EVAN HENKE.PE 425-637-3693
$96,130.00 Phil Sagen RANCH ACRES MAIN REPLACEMENT May-20 WASHINGTON WATER SERVICE CO
805 PO BOX 336
GIG HARBOR,WA 98335
JOHN PUCCINELLI.PE 360-437-2042
$66,923.45 Phil Sagan WATER MAIN REPLACEMENT PROJ NO MRP2019-34 Apr-20 TACOMA PUBLIC UTILITIES
806 3628 S 35TH ST
TACOMA,WA 98409
TROY SAGHAFI PE 253-502-8746
$2,112,099.38 Brad Appleman 2019 SEWAGE PUMP STATION CW4 REPLACEMENT Apr-20 CITY OF BREMERTON PUBLIC WORKS
797 3027 OLYMPUS DRIVE
BREMERTON,WA 98310
BILL DAVIS 360-473-2312
$4,950.00 Brad Appleman VWD BUTTES TELEMETRY Mar-20 VALLEY WATER DISTRICT
120-SUB TO SOURCE ELECTRIC 14501 PIONEER WAY E
PUYALLUP,WA 98372
SEAN VANCE 253-841-9698
$829,071.74 Phil Sagen MARINE DR STORMWATER LID RETROFIT Dec-19 CITY OF BREMERTON PUBLIC WORKS
799 3027 OLYMPUS DRIVE
BREMERTON,WA 98310
KATIE KETTERER 360-473-5334
$870,682.07 Phil Sagen LIDSTROM WATER MAIN REPLACEMENT Nov-19 WEST SOUND UTILITY DISTRICT#1
800 2924 SE LUND AVE
PORT ORCHARD,WA 98366
GLEN SCREWS 360-874-5004
$19,938.28 Phil Sagan PARKWOOD SEWER Oct-19 WEST SOUND UTILITY DISTRICT#1
803 2924 SE LUND AVE
PORT ORCHARD,WA 98366
JOHN TAPIA 360-876-2545
$1.031,235.05 Brad Appleman STINSON AVE WATER MAIN REPLACEMENT Oct-19 CITY OF GIG HARBOR
796 3510 GRANDVIEW STREET
GIG HARBOR,WA 98335
AARON HULST 253-853-7620
$105,622.66 Phil Sagen FARALLONE SANITARY SEWER Oct-19 CITY OF FIRCREST
801 115 RAMSDELL STREET
FIRCREST,WA 98466
JERRY WAKEFIELD 253-564-8900
$505,101.61 Phil Sagan 7TH ST IMPROVEMENTS WATERLINE REPLAC. Aug-19 CITY OF ELMA
798 1235 MONTE ELMA RD
ELMA,WA 98541
JIM STARKS 360-482-2212
$2,559,164.54 Brad Appleman LIFT STATION NO 2 PW 2017-07 Jul-19 CITY OF LACEY
771 PO BOX 3400
LACEY,WA 98509
KEVEN INMAN 360-438-2682
$289,977.51 Phil Sagan WATER MAIN REPLACEMENT MRP 2016-24 Jul-19 TACOMA PUBLIC UTILITIES
795 3628 S 35TH ST
TACOMA,WA 98409
GREG ARMSTRONG-253-502-8742
$1,197,859.21 Brad Appleman ARROWHEAD WATER MAIN REPLACEMENT PH 2 Jun-19 LAKEWOOD WATER DISTRICT
791 PO BOX 99729
TACOMA,WA 98499
RANDALL BLACK-253-588-4423
0111
Department of Labor and Industries PO Box 41450 PAPE& SONS CONSTRUCTION, INC
Olympia, WA 98504-4450 Reg: CC PAPESI*204DE
in UB1: 600-291-966
IP
Registered as provided by Law as:
410
Construction Contractor
(CCOt)- GENERAL
PAPE & SONS CONSTRUCTION, INC Eicctive Date 3/5/1980
9401 BUJACICH ROAD NW STE IA Expiration Date: 4/8/2025
GIG HARBOR WA 98332
PAPFR.RO.n1 AMORI FV
CERTIFICATE OF LIABILITY INSURANCE
DATE 2/231202YY)
12/23/2024
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Northwest Partners Insurance Services, LLC
19401 40th Ave W, Suite 440
Lynnwood, WA 98036
CONTACT Jenni Mosley
NAMAcrisure
PHONE , Ext>: (800 442-1281 FAX 425 291-5100
) (A/C, No):( )
ADDRIESS:jmosley@acrisure.com
INSURERS AFFORDING COVERAGE
NAIC #
INSURER A: Selective Casualty Insurance Company
14376
INSURED
INSURER B :
Pape & Sons Construction, Inc.
9401 Bujacich Road
INSURER C
Suite 1A
INSURER D :
INSURER E :
Gig Harbor, WA 98332
INSURER F :
COVFRAnFR CFRTIFICATF NIIMRFR- RFVISION NIIMRFP-
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
TYPE OF INSURANCE
ADDL
SUBR
D
POLICY NUMBER
POLICY EFF
DD
POLICY EXP
D
LIMITS
A
X
COMMERCIAL GENERAL LIABILITY
EACH OCCURRENCE
$ 1,000,000
CLAIMS -MADE [X] OCCUR
X
X
S 2567868
12/31/2024
12/31/2025
DDAMAGETO a oocurrDence
$ 300,000
MED EXP (Any oneperson)
$ 10,000
PERSONAL & ADV INJURY
1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY ❑ JEo LOC
GENERAL AGGREGATE
2,000,000
PRODUCTS - COMP/OP AGG
2,000,000
OTHER:
A
AUTOMOBILE
LIABILITY
COMBINED SINGLE LIMIT
Ea accident
1,000,000
$
BODILY INJURY Per person)$
X
ANY AUTO
X
X
S 2567868
12/3112024
12/31/2025
OWNED SCHEDULED
AUTOS ONLY AUTOS
BODILY INJURY Per accident
$
Pe�acctlent AMAGE
$
AUTOS ONLY A� OS ONLY
A
UMBRELLA LIAB
X
OCCUR
EACH OCCURRENCE
$ 5,000,000
AGGREGATE
X
EXCESS LIAB
CLAIMS -MADE
X
X
S 2567868
12/31/2024
12/31/2025
DED I X I RETENTION$ 10,000
AGG
5,000,000
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y / N
PER
I ER
ANY PROPRIETOR/PARTNER/EXECUTIVE ❑
FFICER/MEMBER EXCLUDE(?
Mandatory In NH)
NIA
E.L. EACH ACCIDENT
$
E.L. DISEASE - EA EMPLOYE
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE - POLICY LIMIT
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space Is required)
PROJECT: 881 - Bremerton Lewis Sewer Replacement
Certificate Holder is included in Blanket Additional Insured as required by written contract or agreement as attached forms listed below:
CG 79 88 10 23, CG 73 00 10 23
#881 Lewis Ave Sewer - The City, its officials, employees, agents and volunteers are included as additional insureds
Blanket Primary Non -Contributory Additional Insured, including completed operations and Blanket Waiver of Subrogation applies in favor of any person or
organization if called for by written contract or agreement, per policy forms and conditions;
Belfair Water District #1 is included as additional insured
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
City
City of Bremerton
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
Sixth Street
DEC 3 0 2.G `f
ACCORDANCE WITH THE POLICY PROVISIONS.
Suite 100
AUTHORIZED REPRESENTATIVE
Bremerton, WA 98337
City o, Creme'
ACORD 25 (2016/03) @ 1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD