HomeMy WebLinkAboutContract Modification#004Page 1 of 2 Contract Modification Rev. 09/2021 CONTRACT MODIFICATION AGREEMENT NO. 004 to City Contract # 6263 BETWEEN THE CITY OF BREMERTON AND SHEA, CARR & JEWELL, Inc. (dba SCJ Alliance) PROJECT Warren Avenue Bridge Pedestrian Improvements CONSULTANT Shea Carr & Jewell, Inc. (dba SCJ Alliance) DATE October 4, 2023 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services AGREEMENT (the "Contract") entered into between the City of Bremerton and Shea Carr & Jewell, Inc. (dba SCJ Alliance)on August 10, 2021, and as modified on September 1, 2022 on Contract Modification #001, again on January 30, 2023 on Contract Modification #002, and again on June 12, 2023 on Contract Modification #003. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I.Scope , is modified as follows: See Amended Scope of Work attached as Exhibit A. Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by December 31, 2024. Section III. Compensation , is modified as follows: The original contract amount was $ 255,435.38. The current contract amount, including all previous amendments is $ 404,660.80 The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed $ 15,011.12 for a total amended contract amount of $ 419,671.92 , including this Contract Modification. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. DocuSign Envelope ID: C6FF981A-BDD7-445E-AA7D-AAAD6F609233 Page 2 of 2 Contract Modification Rev. 09/2021 The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process _________________________ (Initials and Date) SHEA, CARR & JEWELL, Inc. THE CITY OF BREMERTON By: By: Print Name: Scott Sawyer Print Name: Greg Wheeler Its: Principal Its: Mayor Date: Date: APPROVED AS TO FORM: ATTEST: By: By: KYLIE J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Aaron Knight, P.E. Shane Weber, P.E. Project Manager Managing Engineer SCJ Alliance City of Bremerton Engineering Dept. 2727 Hollycroft Street, Suite 230 345 6th Street, Suite 100 Gig Harbor, WA 98335 Bremerton, WA 98337 R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 09 2021.docx Ned Lever Digitally signed by Ned LeverDN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned Lever Reason: I am approving this documentDate: 2023.10.13 09:56:52-07'00' DocuSign Envelope ID: C6FF981A-BDD7-445E-AA7D-AAAD6F609233 10/18/2023 10/18/2023 2727 Hollycroft Street, Suite 230  Gig Harbor, WA 98335  Office 253.201.0777  www.scjalliance.com CONTRACT AMENDMENT #4 SCOPE OF WORK AND FEE ESTIMATE for Warren Avenue Bridge Pedestrian Improvements Bremerton, WA Prepared For: Shane Weber, PE City of Bremerton 345 6th Street, Suite 100 Bremerton, WA 98337 Prepared By: Aaron Knight, PE, Project Manager Date Prepared: September 18, 2023 OVERVIEW The feasibility and alternatives analysis has concluded the evaluation of the alternatives identified by the City as included in the original scope of work and subsequent amendments. At the request of the City, changes occurred to the schedule and level of effort associated with open house #1 and briefings to City Council. This Contract Amendment adds the following work: 1. Added level of effort than previously scoped for preparation of materials of Open House #1 a. Open House #1 was originally scheduled for 12/15/2022, but was cancelled by the City three days before it was to occur. All presentation materials were completed and printed per the scope of work. b. The open house was rescheduled to 2/23/2023, but was cancelled that morning due to inclement weather. c. On March 17, 2023, Open House #1 was revised to an “online” open house by the City. Presentation materials were revised per City comments and formatted for publishing on the project website. d. The City requested that the online Open House include a public survey, which was not previously included in the scope of work. e. On April 5, 2023, Open House #1 was revised to be an “in-person” event by the City. Presentation materials were reformatted for printing as exhibit boards. 2. Added level of effort for a public survey that was not included in the scope of work. a. The public survey was prepared and posted on the website. It was open to the public from April 10 – 28, 2023. Following closure of the survey, review and summary of the data was required to prepare presentation graphics for subsequent outreach materials. y, / /d DocuSign Envelope ID: C6FF981A-BDD7-445E-AA7D-AAAD6F609233 City of Bremerton Warren Avenue Bridge Pedestrian Improvements Contract Amendment #4 September 18, 2023 Page ii 2727 Hollycroft Street, Suite 230  Gig Harbor, WA 98335  Office 253.201.0777  www.scjalliance.com 3. Added level of effort than previously scoped for presentations to City Council. a. The original scope of work included two presentations to City Council. These occurred on 10/12/2023 and 10/19/2023. b. On June 8, 2023 the City requested additional presentations to City council. The following presentations occurred: i. July 12, 2023: Council Study Session. This presentation used the presentation from Open House #2 with minimal revisions. ii. July 26, 2023: Council Study Session. This presentation was revised to provided a simplified version of the presentation given on 7/12/2023. iii. August 2, 2023: Council Meeting. This presentation was the same as the presentation given on 7/12/2023 at the Council Study Session. 4. Extension of the project duration from July 1, 2023 through October 30, 2023. 5. Renewal of the project website through September 21, 2024. All assumptions and deliverables included in the original scope of work shall still apply, unless modified herein. DocuSign Envelope ID: C6FF981A-BDD7-445E-AA7D-AAAD6F609233 City of Bremerton Warren Avenue Bridge Pedestrian Improvements Contract Amendment #4 September 18, 2023 Page 1 of 1 2727 Hollycroft Street, Suite 230  Gig Harbor, WA 98335  Office 253.201.0777  www.scjalliance.com Work Element 1: Project Management This Work Element includes tasks to plan, manage, and administer the work; attend project meetings; and coordinate with subconsultants. The level of effort included in the fee estimate assume four (4) additional months of duration. Task 1 Management Task 1.1 Management: Manage the project by directing and supervising staff and reviewing work for the duration of the project. This management is for the overall work rather than specific tasks. Task 2 Contract Administration Task 2.1 Progress Billings: Prepare a monthly progress invoice with a summary of work performed. Invoices will show staff hours for each Work Element (i.e., Work Element 1: Project Management). Task 3 Subconsultant Coordination No Changes Task 4 Project Coordination Meetings Task 4.1 Progress meetings with City and SCJ project managers. Assume one (1) Consultant staff member for four (4) additional virtual meetings. Understanding  Project management for the feasibility analysis will be provided through October 2023. Extension of the project timeframe will require a contract amendment. Deliverables  Monthly Progress billings submitted via email in PDF format. Assume four (4). Work Element 2: Public Involvement Task 1 Interactive Project Website Renew the project website for on (1) year, expiring on 9/21/2024. Task 2 Stakeholder Meetings for Feasibility Analysis No Changes Task 3 Public Meetings for Feasibility Analysis Task 3.1 Public Alternative Review Meeting and Online Open House: Added level of effort as described in the “Overview” section of this scope of work. Task 4 Council Briefings Task 4.1 Council Briefings: Attend and present at three (3) in-person briefings to the City Council as described in the “Overview” section of this scope of work. END OF SCOPE OF SERVICE DocuSign Envelope ID: C6FF981A-BDD7-445E-AA7D-AAAD6F609233 Exhibit C Contract Amendment #4 September 18, 2023 Consultant Labor Hour Estimate SCJ Alliance Client:City of Bremerton Project:Warren Avenue Bridge Pedestrian Improvements Job #:20-000248 Work Element & Task No.Project Manager Principal Planner Planner Project Accountant Total Labor Hours Total Cost $220.77 $218.23 $129.38 $116.36 WORK ELEMENT 01 Task 01 1 4.0 4.0 883.08$ Subtotal Hours: 4.0 0.0 0.0 0.0 4.0 Task 02 1 4.0 4.0 8.0 1,348.52$ Subtotal Hours: 4.0 0.0 0.0 4.0 8.0 Task 04 1 4.0 4.0 883.08$ Subtotal Hours: 4.0 0.0 0.0 0.0 4.0 Total Work Element Hours: 12.0 0.0 0.0 4.0 16.0 Total Work Element Labor:3,114.68$ WORK ELEMENT 03 Task 03 3.1.1 16.0 6.0 22.0 4,841.70$ 3.1.2 2.0 2.0 8.0 12.0 1,913.04$ Subtotal Hours: 18.0 8.0 8.0 0.0 34.0 Task 04 1 16.0 6.0 22.0 4,841.70$ Subtotal Hours: 16.0 6.0 0.0 0.0 22.0 Total Work Element Hours: 34.0 14.0 8.0 0.0 56.0 Total Work Element Labor:11,596.44$ Total Hours All Work Elements 46.0 14.0 8.0 4.0 72.0 Total Labor Estimate All Work Elements 14,711.12$ Indirect Costs Subconsultants: Subconsultant Total -$ Reimburseable Expenses: Website Renewal (through 9/21/24)300.00$ Expenses Total:300.00$ Total Indirect Costs:300.00$ Subtotal 15,011.12$ Additional Management Reserve: Total:15,011.12$ Open House #1 Survey Council Breifings Preferred Alternative Council Breifings Open House #1 Additional Effort Contract Administration Progress Billings (assume 4) Public Involvement Public Meetings for Feasibility Analysis Progress Meetings Progress Meetings Work Element & Task Title Management Management Project Management (4 Months) 9/18/2023 DocuSign Envelope ID: C6FF981A-BDD7-445E-AA7D-AAAD6F609233 Contract Amendment #4 September 18, 2023 Contract Amendment Summary Client: City of Bremerton Project: Warren Avenue Bridge Pedestrian Improvements Job #: 20-000248 Work Element #Phase Title Original Contract Management Reserve Request #1 Contract Amendment #1 Management Reserve Request #2 Contract Amendment #4 Total SCJ Labor 01 Project Management 25,633.32$ 19,046.77$ 24,827.48$ 23,451.04$ 3,114.68$ 96,073.29$ 03 Public Involvement 33,290.46$ -$ 27,461.44$ -$ 11,596.44$ 72,348.34$ 04 Feasibility and Alternatives Analysis 28,983.15$ -$ 23,193.32$ -$ -$ 52,176.47$ 06 Conceptual Designs for Feasibility Analysis 44,241.27$ -$ 35,491.78$ -$ -$ 79,733.05$ Subtotal $132,148.20 $19,046.77 $110,974.02 $23,451.04 $14,711.12 $300,331.15 Subconsultants 02 Survey and Right of Way Determination (by Mtn2Coast) 34,170.11$ -$ -$ -$ -$ 34,170.11$ 05 Structural Engineering (by Sargent Engineers) 59,487.51$ -$ 24,016.56$ -$ -$ 83,504.07$ 07 Multimodal Feasibility and Alternatives Analysis (by MacLeod Reckord) 5,890.16$ -$ (5,890.16)$ -$ -$ -$ Subtotal $99,547.78 $0.00 $18,126.40 $0.00 $0.00 $117,674.18 Reimbursable Expenses 99 Reimbursable Expenses 518.00$ 350.00$ 125.00$ -$ 300.00$ 1,293.00$ Subtotal $518.00 $350.00 $125.00 $0.00 $300.00 $1,293.00 Management Reserve Fund (MRF) 98 Management Reserve Fund 23,221.40$ -$19,396.77 $20,000.00 -$23,451.04 $0.00 $373.59 Subtotal $23,221.40 -$19,396.77 $20,000.00 -$23,451.04 $0.00 $373.59 Summary Total $255,435.38 $0.00 $149,225.42 $0.00 $15,011.12 $419,671.92 DocuSign Envelope ID: C6FF981A-BDD7-445E-AA7D-AAAD6F609233