CONTRACT MODIFICATION AGREEMENT NO. 005
to City Contract # 6263
BETWEEN THE CITY OF BREMERTON AND
SHEA, CARR & JEWELL, Inc. (dba SCJ Alliance)
PROJECT Warren Avenue Bridge Pedestrian Improvements
CONSULTANT Shea Carr & Jewell, Inc. (dba SCJ Alliance)
DATE January 16, 2024
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Professional Services AGREEMENT (the "Contract") entered into between the City of
Bremerton and Shea Carr & Jewell, Inc. (dba SCJ Alliance)on August 10, 2021, and as
modified on September 1, 2022 on Contract Modification #001, again on January 30, 2023
on Contract Modification #002, and again on June 12, 2023 on Contract Modification #003,
and again on October 18, 2023 on Contract Modification #004 .
All provisions in the Contract shall remain in full force and effect except as expressly modified
by this document.
For valuable consideration and by mutual consent of the parties, the modifications to the
Contract are as follows:
I.
Section I. Scope , is modified as follows:
See Amended Scope of Work attached as Exhibit A.
Section II. Term , is modified as follows:
The Consultant shall complete the work described in this Contract Modification Agreement by
December 31, 2024.
Section III. Compensation , is modified as follows:
The original contract amount was $ 255,435.38. The current contract amount, including all
previous amendments is $ 419,671.92 The City shall pay the Consultant for the additional work
described above, based on time and materials, an amount not to exceed $ 34,788.90 for a total
amended contract amount of $ 454,460.82, including this Contract Modification.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below.
Consultant further agrees that this Contract Modification constitutes full and final
settlement of all of the Consultant’s claims for contract time and for all costs of any kind,
including without limitation, costs of delays related to any work either covered or affected
by this Contract Modification, claims related to on-site or home office overhead, or lost
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
Page 2 of 2
Contract Modification
Rev. 09/2021
profits. This Contract Modification does not limit the City’s right to bring a claim for past
performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs
and other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work due to said Contract Modification.
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
City Engineer / Public Works Director approved to process _________________________ (Initials and Date)
SHEA, CARR & JEWELL, Inc. THE CITY OF BREMERTON
By: By:
Print Name: Scott Sawyer Print Name: Greg Wheeler
Its: Principal Its: Mayor
Date: Date:
APPROVED AS TO FORM: ATTEST:
By: By:
KYLIE J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
Aaron Knight, P.E. Shane Weber, P.E.
Project Manager Managing Engineer
SCJ Alliance City of Bremerton Engineering Dept.
2727 Hollycroft Street, Suite 230 345 6th Street, Suite 100
Gig Harbor, WA 98335 Bremerton, WA 98337
R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 09 2021.docx
Ned Lever
Digitally signed by Ned LeverDN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned LeverReason: I am approving this documentDate: 2024.01.18 12:52:33-08'00'
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
1/19/2024 1/19/2024
___________________
Stephanie Olson
2727 Hollycroft Street, Suite 230 Gig Harbor, WA 98335 Office 253.201.0777 www.scjalliance.com
CONTRACT AMENDMENT #5
SCOPE OF WORK AND FEE ESTIMATE
for
Warren Avenue Bridge Pedestrian Improvements
Bremerton, WA
Prepared For: Shane Weber, PE
City of Bremerton
345 6th Street, Suite 100
Bremerton, WA 98337
Prepared By: Aaron Knight, PE, Project Manager
Date Prepared: January 16, 2024
OVERVIEW
The feasibility and alternatives analysis concluded in August of 2023 with the recommendation of a preferred
alternative, “Alternative 2,” to Bremerton City Council. The City Council introduced and approved a new bridge
widening configuration that was not evaluated in the feasibility analysis. The new configuration has been
referred to as “Alternative X” and was approved by City Council via Resolution 3363 on August 2nd, 2023.
On October 23rd, 2023, WSDOT held a field test to evaluate the capabilities (and limitations) of their existing
UBIT on the Warren Avenue Bridge. As a result of WSDOT’s evaluation, it was concluded that WSDOT’s A62
model UBIT was more limited than previously stated by WSDOT and as documented in the feasibility analysis. It
was also determined that several of the alternatives reviewed in the feasibility study, and of the approved
“Alternative X”, would need to have modification to existing catwalks and addition of new catwalks to the bridge
to meet WSDOT’s inspection requirements.
The feasibility and alternatives analysis draft final report was completed in September 2023 and reviewed by the
City with no comments. The City has requested that a memorandum be prepared to addend the feasibility and
analysis report to address the addition of Alternative X by City Council, and the new information provided by
WSDOT’s field test evaluation. The memo will also document the conversations with WSDOT for assumptions in
bridge loading criteria.
EXHIBIT ADocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
City of Bremerton
Warren Avenue Bridge Pedestrian Improvements
Contract Amendment #5
January 16, 2024
Page 2 of 4
2727 Hollycroft Street, Suite 230 Gig Harbor, WA 98335 Office 253.201.0777 www.scjalliance.com
This Contract Amendment adds the following work:
1. Preparation of a framing plan and cost estimates for Alternative X, as approved by the City Council.
a. Alternative X includes a 12-foot clear width path on the east side of the bridge, and an 8-foot
clear width path on the west side of the bridge, including the option for overlooks as listed in
the resolution.
2. Preparation of a conceptual layout (not including framing plan or structural analysis) and cost estimates
for WSDOT-required catwalks along the under-side of the steel span sections of the bridge.
a. Catwalk design will include modifications to existing catwalks and addition of one new catwalk
along the center of the bridge.
3. Preparation of a summary memorandum including new framing plans, cost estimates, and written
summary of the project developments between August 2023 and January 2024.
4. The work in this amendment is assumed to be complete by March 1, 2024. This anticipated completion
date shall not be interpreted as adding a time is of the essence clause to the contract.
All assumptions and deliverables included in the original scope of work shall still apply, unless modified herein.
Work Element 1: Project Management
This Work Element includes tasks to plan, manage, and administer the work; attend project meetings; and
coordinate with subconsultants. The level of effort included in the fee estimate assume two (2) additional
months of duration (January -February 2024).
Task 1 Management Task 1.1 Management: Manage the project by directing and supervising staff and reviewing work for
the duration of the project. This management is for the overall work rather than specific tasks.
Task 2 Contract Administration Task 2.1 Progress Billings: Prepare a monthly progress invoice with a summary of work performed.
Invoices will show staff hours for each Work Element (i.e., Work Element 1: Project Management).
Task 4 Project Coordination Meetings
Task 4.1 Progress meetings with City and SCJ project manager. Assume one (1) Consultant staff
member for two (2) additional virtual meetings.
Task 4.2 WSDOT Meetings to finalize maintenance related assumptions. Assume one (1) Consultant
staff member for two (2) virtual meetings.
Understanding
Project management for the feasibility analysis will be provided through February 2024.
Deliverables
Monthly Progress billings submitted via email in PDF format. Assume two (2).
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
City of Bremerton
Warren Avenue Bridge Pedestrian Improvements
Contract Amendment #5
January 16, 2024
Page 3 of 4
2727 Hollycroft Street, Suite 230 Gig Harbor, WA 98335 Office 253.201.0777 www.scjalliance.com
Work Element 4: Feasibility and Alternatives Analysis
Task 4 Alternatives Analysis Report Supplemental Memo Prepare a summary memorandum including new framing plans, cost estimates, and written summary of
the project developments between August 2023 and January 2024, and will include the following items:
1. Supplements the Alternatives Analysis Report;
2. Define and discuss Alternative X as approved by City Council resolution including typical cross
section and cost estimate.
a. Overlooks costs to be split out separately
3. Summarize and document the new information from the WSDOT field study and required
inspection mitigation;
4. Explains the changes in assumptions for the alternatives considered and revises information as it
relates to UBIT and catwalks
5. Updates the summary table and costs associated with all alternatives, including inspection
mitigation required by WSDOT
6. Discusses the existing catwalks and modifications necessary for each alternative, including
design criteria provided by WSDOT
7. Recommends whether the catwalk cost are contingency or added costs
8. Discusses bridge load rating and loading configuration verified by WSDOT
9. Add discussion about operations and safety of pathway clear widths of 8-ft, 10-ft and 12-ft.
A draft memo will be provided to the City for review and comment.
Deliverables
Draft Alternatives Analysis Report Supplemental Memo
Final Alternatives Analysis Report Supplemental Memo
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
City of Bremerton
Warren Avenue Bridge Pedestrian Improvements
Contract Amendment #5
January 16, 2024
Page 4 of 4
2727 Hollycroft Street, Suite 230 Gig Harbor, WA 98335 Office 253.201.0777 www.scjalliance.com
Work Element 5: Structural Engineering (by Sargent Engineers)
The level of effort included in the fee estimate accounts for additional work required for the preparation of a
feasibility analysis for expansion of the existing bridge catwalk system, and of sidewalk Alternative ‘X’.
Task 4 Catwalk Modifications The Consultant will prepare a concept-level layout of structural framing for an expansion of the existing
under-deck catwalk system of the Warren Avenue Bridge, using the existing catwalk framing as a guide.
The catwalk concepts will be evaluated to determine if seismic retrofit or bridge load rating reduction
thresholds will be exceeded. A conceptual structural cross section will be prepared showing the framing
configuration. A planning level cost estimate will also be prepared.
Task 5 Alternative “X” Sidewalk Modifications
The Consultant will prepare a concept-level layout and determination of appropriate structural framing
for (1) additional sidewalk widening option, known as “Alternative ‘X’”. The sidewalk alternative will be
evaluated to determine if seismic retrofit or bridge load rating reduction thresholds will be exceeded. A
conceptual structural cross section will be prepared, showing how the concept would be configured
across the three different span types (concrete T-beam, concrete box girder, and steel plate girder). A
planning level cost estimate will also be prepared.
Deliverables
Structural cross sections in PDF.
Conceptual cost estimates in PDF and Excel.
END OF SCOPE OF SERVICE
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
Exhibit C Contract Amendment #5
January 15, 2024
Consultant Labor Hour Estimate
SCJ Alliance
Client:City of Bremerton
Project:Warren Avenue Bridge Pedestrian Improvements
Job #:20-000248
Work Element
& Task No.Project Manager Design Engineer Senior Planner Planner Project Accountant
Total Labor
Hours Total Cost
$231.81 $117.78 $163.25 $129.38 $116.36
WORK ELEMENT 01
Task 01
1 4.0 4.0 927.24$
Subtotal Hours: 4.0 0.0 0.0 0.0 0.0 4.0
Task 02
1 2.0 4.0 6.0 929.06$
Subtotal Hours: 2.0 0.0 0.0 0.0 4.0 6.0
Task 04
1 3.0 3.0 695.43$
1 4.0 4.0 471.12$
Subtotal Hours: 3.0 4.0 0.0 0.0 0.0 7.0
Total Work Element Hours: 9.0 4.0 0.0 0.0 4.0 17.0
Total Work Element Labor:3,022.85$
WORK
ELEMENT 04
Task 04
1 30.0 36.0 66.0 11,194.38$
2 Operation and Safety Graphics and Reporting 8.0 8.0 12.0 28.0 4,713.04$
Subtotal Hours: 38.0 36.0 8.0 12.0 0.0 94.0
Total Work Element Hours: 38.0 36.0 8.0 12.0 0.0 94.0
Total Work Element Labor:15,907.42$
Total Hours All Work Elements 47.0 40.0 8.0 12.0 4.0 111.0
Total Labor Estimate All Work Elements 18,930.27$
Indirect Costs
Subconsultants:
Sargent Engineers 12,696.00$
Subconsultant Total 12,696.00$
Reimburseable Expenses:
Expenses Total:-$
Total Indirect Costs:12,696.00$
Subtotal 31,626.27$
Additional Management Reserve:3,162.63$
Total:34,788.90$
Alternatives Analysis Report Supplemental Memo
Contract Administration
Progress Billings (assume 2)
Feasibility and Alternatives Analysis
Alternatives Analysis Report Supplemental Memo
Progress Meetings
Progress Meetings
WSDOT Meetings
Work Element & Task Title
Management
Management
Project Management (2 Months)
1/16/2024
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
Principal
Sen. Project
Engineer
Project
Engineer
Design
Engineer Task Cost
Total Labor Rate: $219.65 $173.24 $154.68 $117.56
Structural Feasibility - Catwalk Modifications
Catwalk Framing Layout 4 8 $2,116
Catwalk Weight Analysis 2 4 $1,058
Catwalk Cost Estimate 2 4 $1,058
Catwalk Framing Figure 4 8 $2,116
Subtotal 12 0 24 0 $6,348
Structural Feasibility - Alternative 'X' Sidewalk Modifications
Sidewalk Framing Layout 4 8 $2,116
Sidewalk Weight Analysis 2 4 $1,058
Sidewalk Cost Estimate 2 4 $1,058
Bridge Cross Sections 4 8 $2,116
Subtotal 12 0 24 0 $6,348
Direct Salary $71.00 $56.00 $50.00 $38.00
Overhead (180.36%) $128.06 $101.00 $90.18 $68.54
Profit (29%) $20.59 $16.24 $14.50 $11.02
Total Labor Rate: $219.65 $173.24 $154.68 $117.56
Total Labor Cost $5,271 $0 $7,425 $0 $12,696
Direct Costs
Mileage (No additional mileage) $0.00 $0
$0
Total for Structural Feasibility - Catwalk Modifications & Alternative 'X' Framing $12,696
Warren Ave Bridge Sidewalks - Structural Feasibility & Alternatives Analysis
Prepared by: JSS Page 1 1/15/2024
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
Contract Amendment #5
January 16, 2024
Contract Amendment Summary
Client: City of Bremerton
Project: Warren Avenue Bridge Pedestrian Improvements
Job #: 20-000248
Work
Element #Phase Title
Original
Contract
Management
Reserve
Request #1
Contract
Amendment #1
Management
Reserve
Request #2
Contract
Amendment #4
Contract
Amendment #5 Total
SCJ Labor
01 Project Management 25,633.32$ 19,046.77$ 24,827.48$ 23,451.04$ 3,114.68$ 3,022.85$ 99,096.14$
03 Public Involvement 33,290.46$ -$ 27,461.44$ -$ 11,596.44$ -$ 72,348.34$
04 Feasibility and Alternatives Analysis 28,983.15$ -$ 23,193.32$ -$ -$ 15,907.42$ 68,083.89$
06 Conceptual Designs for Feasibility Analysis 44,241.27$ -$ 35,491.78$ -$ -$ -$ 79,733.05$
Subtotal $132,148.20 $19,046.77 $110,974.02 $23,451.04 $14,711.12 $18,930.27 $319,261.42
Subconsultants
02 Survey and Right of Way Determination (by Mtn2Coast) 34,170.11$ -$ -$ -$ -$ -$ 34,170.11$
05 Structural Engineering (by Sargent Engineers) 59,487.51$ -$ 24,016.56$ -$ -$ 12,696.00$ 96,200.07$
07 Multimodal Feasibility and Alternatives Analysis (by MacLeod Reckord) 5,890.16$ -$ (5,890.16)$ -$ -$ -$ -$
Subtotal $99,547.78 $0.00 $18,126.40 $0.00 $0.00 $12,696.00 $130,370.18
Reimbursable Expenses
99 Reimbursable Expenses 518.00$ 350.00$ 125.00$ -$ 300.00$ -$ 1,293.00$
Subtotal $518.00 $350.00 $125.00 $0.00 $300.00 $0.00 $1,293.00
Management Reserve Fund (MRF)
98 Management Reserve Fund 23,221.40$ -$19,396.77 $20,000.00 -$23,451.04 $0.00 $3,162.63 $3,536.22
Subtotal $23,221.40 -$19,396.77 $20,000.00 -$23,451.04 $0.00 $3,162.63 $3,536.22
Summary
Total $255,435.38 $0.00 $149,225.42 $0.00 $15,011.12 $34,788.90 $454,460.82
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
SCJ Alliance
Client: City of Bremerton
Project:Warren Avenue Bridge Pedestrian Improvements
Job #: 20-000248
Direct Labor Overhead Fee Total Hourly
Rate Ranges 166.19% 29.00% Billing Rates NTE NTE NTE NTE
1 Principal $132.15 $219.63 $38.32 $390.11
2 Senior Consultant $105.92 $176.02 $30.72 $312.65
3 Senior Project Manager $92.11 $153.08 $26.71 $271.90
4 PM3 Project Manager $77.00 $127.97 $22.33 $227.30
5 PM2 Project Manager $70.00 $116.33 $20.30 $206.63
6 PM1 Project Manager $52.00 $86.42 $15.08 $153.50
7 Senior Engineer $64.29 $106.84 $18.64 $189.78
8 E4 Engineer $60.00 $99.71 $17.40 $177.11
9 E3 Engineer $56.68 $94.20 $16.44 $167.31
10 E2 Engineer $49.47 $82.21 $14.35 $146.03
11 E1 Engineer $39.12 $65.01 $11.34 $115.48
12 Senior Landscape Architect $61.79 $102.69 $17.92 $182.40
13 L4 Landscape $53.08 $88.21 $15.39 $156.69
14 L3 Landscape $45.00 $74.79 $13.05 $132.84
15 L2 Landscape $41.14 $68.37 $11.93 $121.44
16 L1 Landscape $34.00 $56.50 $9.86 $100.36
17 Senior Planner $71.00 $117.99 $20.59 $209.58
18 P4 Planner $52.17 $86.70 $15.13 $154.00
19 P3 Planner $45.00 $74.79 $13.05 $132.84
20 P2 Planner $39.48 $65.61 $11.45 $116.54
21 P1 Planner $36.30 $60.33 $10.53 $107.15
22 Senior Technician $53.00 $88.08 $15.37 $156.45
23 T4 Technician $48.26 $80.20 $14.00 $142.46
24 T3 Technician $40.62 $67.51 $11.78 $119.91
25 T2 Technician $36.00 $59.83 $10.44 $106.27
26 T1 Technician $34.34 $57.07 $9.96 $101.37
32 Construction Inspector $33.17 $55.13 $9.62 $97.91
35 CI 4 Construction Inspector $72.97 $121.27 $21.16 $215.40
38 Graphic Designer $46.00 $76.45 $13.34 $135.79
39 PC 2 Project Coordinator $45.85 $76.20 $13.30 $135.34
40 PC 1 Project Coordinator $36.35 $60.41 $10.54 $107.30
41 Project Accountant $66.00 $109.69 $19.14 $194.83
42 IT Specialist $60.93 $101.26 $17.67 $179.86
43 Senior Marketing Coordinator $57.00 $94.73 $16.53 $168.26
44 Marketing Coordinator $41.02 $68.17 $11.90 $121.09
45 Communications Manager $57.00 $94.73 $16.53 $168.26
46 Information Services Manager $72.12 $119.86 $20.91 $212.89
Invoiced hourly billing rates may be less than the rate shown per job classification, but may not exceed the NTE rate.
LAG Agreement
Actuals Not To Exceed Billing Rate Table (ANTE)
Effective July 1, 2023 to June 30, 2024
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
From:Shane Weber
To:Cathy Bonsell
Subject:FW: Warren Ave Bridge - Amend 5 - Memo & Catwalks
Date:Wednesday, January 17, 2024 3:40:08 PM
Attachments:2024-0117 Bremerton WAB_ICR Letter.pdf
2024-0117 Bremerton WAB_ANTE Table.pdf
From: Aaron Knight <aaron.knight@scjalliance.com>
Sent: Wednesday, January 17, 2024 1:51 PM
To: Shane Weber <Shane.Weber@ci.bremerton.wa.us>
Subject: RE: Warren Ave Bridge - Amend 5 - Memo & Catwalks
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
Shane,
Please see the updated ICR letter and ANTE table to go along with the amendment.
Since this was not a LAG contract we didn’t use the same titles as the LAG ANTE table. The titles in
the fee estimate correspond to the following LAG labor categories:
Project Manager = Principal
Design Engineer = E3 Engineer
Senior Planner = Senior Planner
Planner = P3 Planner
Project Accountant = Project Accountant
Aaron Knight, PE
SCJ Alliance
Associate Principal
o. 253.201.0777, ext. 293
m. 253.365.1862
www.scjalliance.com
From: Aaron Knight <aaron.knight@scjalliance.com>
Sent: Tuesday, January 16, 2024 4:53 PM
To: 'Shane Weber' <Shane.Weber@ci.bremerton.wa.us>
Subject: RE: Warren Ave Bridge - Amend 5 - Memo & Catwalks
Revised scope and budget is attached, along with the word file showing my minor edits.
Aaron Knight, PE
SCJ Alliance
Associate Principal
o. 253.201.0777, ext. 293
m. 253.365.1862
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
July 6, 2023
Shea, Carr & Jewell, Inc. (dba SCJ Alliance)
8370 Tallon Lane NE, Suite 200
Lacey, WA 98516-6642
Subject: Acceptance FYE 2022 ICR – CPA Report
Dear Heather Seago:
We have accepted your firms FYE 2022 Indirect Cost Rate (ICR) of 166.19% of direct
labor (rate includes 0.28% Facilities Capital Cost of Money) based on the “Independent
CPA Report,” prepared by Stambaugh Ness. This rate will be applicable for WSDOT
Agreements and Local Agency Contracts in Washington only. This rate may be subject
to additional review if considered necessary by WSDOT. Your ICR must be updated on
an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with the firm is
responsible for determining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 704-6397 or via email
consultantrates@wsdot.wa.gov.
Regards;
SCHATZIE HARVEY, CPA
Contract Services Manager
SH:BJO
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9
DocuSign Envelope ID: 25244AD8-BEEA-4F7B-A29D-4B7209328DA9