Pump Station 14 Relocation March 2024 Contract Modification Agreement No. 2
CONTRACT MODIFICATION AGREEMENT NO. 2 BETWEEN THE CITY OF BREMERTON AND CONSOR NORTH AMERICA, INC. (FORMERLY KNOWN AS MURRAYSMITH, INC.)
PROJECT: Pump Station 14 Relocation
CONSULTANT: CONSOR North America, Inc. (formerly Murraysmith Inc.)
DATE: March 14, 2024
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
PROFESSIONAL SERVICES AGREEMENT (the "Contract") entered into between the City of Bremerton and CONSOR North America, Inc. (formerly Murraysmith Inc.) on July 10th, 2019 and amended on November 22, 2022.
All provisions in the Contract shall remain in full force and effect except as expressly modified
by this document.
For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I.
Section I. Scope , is modified as follows:
No change in Scope.
Section II. Term , is modified as follows:
The contract expiration is amended to September 30, 2024.
Section III. Compensation , is modified as follows: No change in Compensation.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification.
DocuSign Envelope ID: 1FE309FA-D5DB-42D3-ACBE-880E7F6D3C7E
Page 2 of 2
Pump Station 14 Relocation March 2024 Contract Modification Agreement No. 2
This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above.
City Engineer / Public Works Director approved to process _________________________ (Initials and Date)
CONSOR NORTH AMERICA, INC. THE CITY OF BREMERTON
By: By:
Print Name: Print Name: Its: Its: Date: Date:
APPROVED AS TO FORM: ATTEST:
By: By:
KYLIE J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
Attn: Nathan Rostad Attn: Angela Hoover CONSOR North America, Inc. City of Bremerton 1102 Broadway Plaza, Suite 401 345 6th Street, Suite 100 Tacoma, WA 98402 Bremerton, WA 98337
Greg Wheeler
Mayor
Nathan Rostad
Senior Engineer
Ned Lever
Digitally signed by Ned LeverDN: E=Ned.Lever@ci.bremerton.wa.us, CN=Ned Lever, OU=PW Engineering,
OU=Domain Users, DC=ci, DC=bremerton, DC=wa, DC=usReason: I am approving this document
Date: 2024.03.28 14:30:00-07'00'
DocuSign Envelope ID: 1FE309FA-D5DB-42D3-ACBE-880E7F6D3C7E
4/11/2024 4/11/2024