CHANGE ORDER
CONTRACT CHANGE ORDER NO: 2
PROJECT NAME: Pump Station 14 Relocation
PROJECT NO: 4545 CONTRACTOR: Prospect Construction, Inc.
ORIGINAL CONTRACT AMOUNT: $2,694,200.96 DAYS: 540
PREVIOUSLY APPROVED
CHANGES:
N/A DAYS: 52
THIS CHANGE: N/A DAYS: 62
REVISED CONTRACT AMOUNT: N/A DAYS: 654
This Change Order covers changes to the subject contract as described herein. The Contractor shall
construct, furnish equipment and materials, and perform all work as necessary or required to complete
the Change Order Items. The increase or decrease in contract price shown below includes any
applicable taxes.
________________________________________________________________________________
Rule 170 Rule 171 DESCRIPTION OF CHANGES INCREASE IN
CONTRACT
AMOUNT
($)
(DECREASE) IN
CONTRACT AMOUNT
($)
Due to delays associated with power installation affecting the
startup and testing, 62 calendar days are added to the
contract. Contract calendar days are increased from 592 to
654 days. The Substantial Completion date is revised from
June 30, 2024 to August 31, 2024.
0 0
NET CHANGE IN CONTRACT AMOUNT
INCREASE OR (DECREASE)
0 0
ESTIMATED SALES TAX AT 9.2% 0 0
TOTAL INCLUDING SALES TAX 0 0
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims
of any kind or nature arising from or connected with any work either covered or affected by this Change
Docusign Envelope ID: 1FB92576-A21E-4299-A9EF-8C17B6778947
CONTRACT CHANGE ORDER NO: _2_
PROJECT NAME: Pump Station 14 Relocation
Page 2 of 2
Order, including, without limitation, claims related to contract time, on-site or home office overhead, or
lost profits. Nothing in this Change Order shall limit the City’s right to bring a claim for past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item, including any and all supervision costs and other miscellaneous
costs relating to the change in work, and as to the extension of time allowed, if any, for completion of
the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is
understood that this Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order
that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform
the surety of this change, and shall take appropriate action to modify any bonds required under the
contract to address this change.
CONTRACTOR
Accepted: DATE:
PROJECT MANAGER
Recommended: DATE:
CITY ENGINEER
Council action is required as project cost will exceed approved budget. Yes No
Council action is required as change exceeds Mayors authority per BMC 2.76.110. Yes
No
Recommended: DATE:
DIRECTOR OF PUBLIC WORKS AND UTILITIES
Recommended: DATE:
MAYOR
Approved: DATE:
APPROVED AS TO FORM: ATTEST:
Bremerton City Attorney City Clerk
Seth Crites
Digitally signed by Seth CritesDN: C=US, E=scrites@prospectconst.com,O=Prospect Construction, OU=Project Manager, CN=Seth CritesDate: 2024.06.19 09:44:16-07'00'
6/20/24
Ned Lever
Digitally signed by Ned Lever
DN: C=US, E=ned.lever@ci.bremerton.wa.us,
O=City of Bremerton, OU=Engineering, CN=Ned
Lever
Date: 2024.06.26 07:36:55-07'00'
Tom Knuckey Digitally signed by Tom Knuckey
Date: 2024.06.26 08:13:09 -07'00'
Docusign Envelope ID: 1FB92576-A21E-4299-A9EF-8C17B6778947
7/17/2024