Wastewater Salinity Impact Study May 2021
Contract Modification No. 2
CONTRACT MODIFICATION AGREEMENT NO. 2
BETWEEN THE CITY OF BREMERTON AND HDR ENGINEERING, INC
PROJECT: Wastewater Salinity Impact Study
CONSULTANT: HDR Engineering, Inc.
DATE: May 13, 2021
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Oyster Bay Beach Sewer Upgrades AGREEMENT (the "Contract") entered into between
the City of Bremerton and HDR Engineering, Inc. on September 5, 2019 and as modified
on September 1, 2020.
All provisions in the Contract shall remain in full force and effect except as expressly modified
by this document.
For valuable consideration and by mutual consent of the parties, the modifications to the
Contract are as follows:
I.
Section I.Scope , is modified as follows:
No change to the Scope of Work.
Section II. Term , is modified as follows:
The contract end date is extended to April 30, 2022.
Section III. Compensation , is modified as follows:
No change to the contract compensation.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below.
Consultant further agrees that this Contract Modification constitutes full and final
settlement of all of the Consultant’s claims for contract time and for all costs of any kind,
including without limitation, costs of delays related to any work either covered or affected
by this Contract Modification, claims related to on-site or home office overhead, or lost
profits. This Contract Modification does not limit the City’s right to bring a claim for past
performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs
and other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work due to said Contract Modification.
DocuSign Envelope ID: D7F1CC58-5C8C-4EA5-A12A-3CBD27AA4C1D
Page 2 of 2
Wastewater Salinity Impact Study May 2021
Contract Modification No. 2
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
City Engineer / Public Works Director approved to process _____________________ (Initials and Date)
HDR ENGINEERING, INC,
By:
Print Name:
Its:
Date:
APPROVED AS TO FORM:
By:
ROGER A. LUBOVICH, Bremerton City Attorney
NOTICES TO BE SENT TO:
HDR Engineering, Inc
Attn: Jeremy Hollingsworth
929 108th Avenue NE, Suite 1300
Bellevue, WA 98004
THE CITY OF BREMERTON
By:
Print Name: Greg Wheeler
Its: Mayor
Date:
ATTEST:
By:
ANGELA HOOVER, City Clerk
NOTICES TO BE SENT TO:
Attn: Angela Hoover
City of Bremerton
345 6th Street, Suite 100
Bremerton, WA 98337-1891
R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 10 2019.docx
Ned Lever
Digitally signed by Ned Lever
DN: C=US,
E=ned.lever@ci.bremerton.wa.us, O=City
of Bremerton, OU=Engineering, CN=Ned
Lever
Date: 2021.05.13 10:23:08-07'00'
DocuSign Envelope ID: D7F1CC58-5C8C-4EA5-A12A-3CBD27AA4C1D
Rob Berman
5/14/2021
Senior Vice President
5/17/2021