Loading...
HomeMy WebLinkAbout1 - Original Submission_ 2021513_325011_CM No. 2 with HDR (003)Page 1 of 2 Wastewater Salinity Impact Study May 2021 Contract Modification No. 2 CONTRACT MODIFICATION AGREEMENT NO. 2 BETWEEN THE CITY OF BREMERTON AND HDR ENGINEERING, INC PROJECT: Wastewater Salinity Impact Study CONSULTANT: HDR Engineering, Inc. DATE: May 13, 2021 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Oyster Bay Beach Sewer Upgrades AGREEMENT (the "Contract") entered into between the City of Bremerton and HDR Engineering, Inc. on September 5, 2019 and as modified on September 1, 2020. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I.Scope , is modified as follows: No change to the Scope of Work. Section II. Term , is modified as follows: The contract end date is extended to April 30, 2022. Section III. Compensation , is modified as follows: No change to the contract compensation. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. DocuSign Envelope ID: D7F1CC58-5C8C-4EA5-A12A-3CBD27AA4C1D Page 2 of 2 Wastewater Salinity Impact Study May 2021 Contract Modification No. 2 This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process _____________________ (Initials and Date) HDR ENGINEERING, INC, By: Print Name: Its: Date: APPROVED AS TO FORM: By: ROGER A. LUBOVICH, Bremerton City Attorney NOTICES TO BE SENT TO: HDR Engineering, Inc Attn: Jeremy Hollingsworth 929 108th Avenue NE, Suite 1300 Bellevue, WA 98004 THE CITY OF BREMERTON By: Print Name: Greg Wheeler Its: Mayor Date: ATTEST: By: ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: Attn: Angela Hoover City of Bremerton 345 6th Street, Suite 100 Bremerton, WA 98337-1891 R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 10 2019.docx Ned Lever Digitally signed by Ned Lever DN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned Lever Date: 2021.05.13 10:23:08-07'00' DocuSign Envelope ID: D7F1CC58-5C8C-4EA5-A12A-3CBD27AA4C1D Rob Berman 5/14/2021 Senior Vice President 5/17/2021