HomeMy WebLinkAbout1 - Original Submission_ 20240201_870_CO 2 Signed -TKCITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: Pine Road Basin Stormwater Improvements PROJECT NO: 870 CONTRACTOR: Active Construction Inc. ORIGINAL CONTRACT AMOUNT: $2,715,715.00 DAYS: 160 PREVIOUSLY APPROVED CHANGES: $78,823.16 DAYS: 13 THIS CHANGE: $10,500.80 DAYS: 0 REVISED CONTRACT AMOUNT: $2,805,038.96 DAYS: 173 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. Rule 170 Rule 171 DESCRIPTION OF CHANGES INCREASE IN CONTRACT AMOUNT ($) (DECREASE) IN CONTRACT AMOUNT ($) CONTRACT TIME EXTENSION (DAYS:) X RECONCILATION OF FINAL QUANTITIES Quantities shown in the Contract documents are estimates. Payment is made to the Contractor for the actual quantities of Work performed and accepted in conformance with the Contract. Final quantities and cost are shown in the attached table. $10,500.80 NET CHANGE IN CONTRACT AMOUNT INCREASE OR (DECREASE) $10,500.80 0 ESTIMATED SALES TAX AT 9.0% TOTAL INCLUDING SALES TAX $10,500.80 0 Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City’s right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. DocuSign Envelope ID: 396B31C0-E0A7-4BEE-9872-F6EBEB8220F9 CONTRACT CHANGE ORDER NO: _2_ PROJECT NAME: Pine Road Basin Stormwater Improvements Project Page 2 of 2 Change Order No. 2 Rev. 09/2021 This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. CONTRACTOR Approved: DATE: PROJECT MANAGER Recommended: DATE: DIVISION MANAGER Council action is required as project cost will exceed approved budget.  Yes ◼ No Council action is required as change exceeds Mayor’s authority per BMC 2.76.110.  Yes ◼ No Recommended: DATE: DIRECTOR OF PUBLIC WORKS AND UTILITIES Recommended: DATE: MAYOR Approved: DATE: APPROVED AS TO FORM: ATTEST: ___ KYLIE. J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk R:\Legal\Legal\Forms\FORMS ON COBWEB\Change Order Rev. 09 2021.docx Tyler Ceccanti Digitally signed by Tyler Ceccanti DN: C=US, E=Tylerc@activeconstruction.com, O=Active Construction Inc., CN=Tyler Ceccanti Date: 2024.01.31 17:09:29-08'00' Gunnar Fridriksson Digitally signed by Gunnar Fridriksson Date: 2024.02.01 07:00:07 -08'00' Ned Lever Digitally signed by Ned Lever DN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned Lever Date: 2024.02.01 11:20:11-08'00' Tom Knuckey Digitally signed by Tom Knuckey Date: 2024.02.01 12:59:26 -08'00' DocuSign Envelope ID: 396B31C0-E0A7-4BEE-9872-F6EBEB8220F9 2/7/2024