HomeMy WebLinkAbout1 - Original Submission_ 20221012 Struck Environmental CN 6289 Contract ModificationPage 1 of 2 Contract Modification Rev. 09/2021
CONTRACT MODIFICATION AGREEMENT NO. 01 To City Contract #6289 BETWEEN THE CITY OF BREMERTON AND STRUCK ENVIRONMENTAL, INC. PROJECT: Stormwater Comprehensive Plan Preparation CONSULTANT: Struck Environmental, Inc.
DATE: October 12, 2022 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Stormwater Comprehensive Plan Preparation AGREEMENT (the "Contract") entered
into between the City of Bremerton and Struck Environmental, Inc. on October 8, 2021.
All provisions in the Contract shall remain in full force and effect except as expressly modified by this document.
For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows:
The Scope of the contract has not changed. Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by December 31, 2023.
Section III. Compensation , is modified as follows:
There is no change to the contract compensation. II.
Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected
by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification.
DocuSign Envelope ID: 13DCE64A-F7B3-459E-B78C-339DF9FC6354
Page 2 of 2 Contract Modification Rev. 09/2021
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above.
City Engineer / Public Works Director approved to process _________________________ (Initials and Date) CONSULTANT THE CITY OF BREMERTON
By: By: Print Name: Print Name: Thomas Knuckey Its: Its: Director of PW&U Date: Date:
APPROVED AS TO FORM: ATTEST:
By: By:
KYLIE J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
Mr. Phil Struck Mr. Gunnar Fridriksson
Struck Environmental, Inc. Project Manager PO Box 2168 City of Bremerton Engineering Dept. Poulsbo, WA 98370 345 6th Street, Suite 100
Phone: (360) 710-8661 Bremerton, WA 98337-1891
Phone: (360) 473-5758
R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 09 2021.docx
DocuSign Envelope ID: 13DCE64A-F7B3-459E-B78C-339DF9FC6354
10/31/2022
President
Phil Struck
10/31/2022 11/1/2022