Loading...
HomeMy WebLinkAbout1 - Original Submission_ Contract Modification_1 Aspect_Water Right Change ROEPage 1 of 3 Contract Modification Rev. 09/2021 CONTRACT MODIFICATION AGREEMENT NO. 1 BETWEEN THE CITY OF BREMERTON AND ASPECT CONSULTING, LLC PROJECT Well 1R Water Right Change Application Report of Examination CONSULTANT Aspect Consulting, LLC DATE September 26, 2022 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE PROFESSIONAL SERVICES AGREEMENT (the "Contract") entered into between the City of Bremerton and Aspect Consulting, LLC on March 14, 2022. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows: See Amended Scope of Work attached as Exhibit A. Section III. Compensation , is modified as follows: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $22,500. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. DocuSign Envelope ID: 2680B03F-14C0-4241-9EA5-9AECCE8E7095 Page 2 of 3 Contract Modification Rev. 09/2021 This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process _________________________ (Initials and Date) CONSULTANT THE CITY OF BREMERTON By: By: Print Name: Jill Van Hulle Print Name: Thomas Knuckey Its: Sr. Associate Water Rights Specialist Its: Director of Public Works & Utilities Date: Date: APPROVED AS TO FORM: ATTEST: By: By: KYLIE J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Trish Klimek Cami Apfelbeck Aspect Consulting, LLC City of Bremerton 350 Madison Ave North 100 Oyster Bay Ave N Bainbridge Island, WA 98110 Bremerton, WA 98312 R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 09 2021.docx DocuSign Envelope ID: 2680B03F-14C0-4241-9EA5-9AECCE8E7095 10/18/2022 10/18/2022 Page 3 of 3 Contract Modification Rev. 09/2021 EXHIBIT A SCOPE OF WORK February 22, 2022 PROJECT BACKGROUND The City of Bremerton (City) has filed an Application for Change of Water Right with Washington State Department of Ecology to change the point of withdrawal designated by Water Right Claim 116705, from the originally designated Well 1 to replacement Well 1R. The application is being processed through a Streamlined Cost Reimbursement Agreement (CRA) under which the City will contract directly with Aspect Consulting, LLC (Aspect) to process the application. PROJECT SCOPE OF WORK TASK 1. Initial Application Processing (up to 12 hours, $2,500) Aspect will review the pending application and assist the City with Ecology’s CRA contracting process. Aspect will lead a consultation meeting with Ecology’s Northwest Regional Office to discuss permitting approach and verify CRA status. With Ecology’s concurrency, Aspect will prepare and publish legal notices, and conduct outreach to the Department of Fish and Wildlife and other stakeholders as needed. TASK 2. Hydrogeological Assessment (up to 36 hours, $6,500) Former Well 1 and replacement Well 1R are both located in the City’s Anderson Creek wellfield in Kitsap County parcel 332401-3-023-2005. Aspect will review the technical information provided by the City in support of this application for change, including previously conducted assessments, to determine if the change in point of withdrawal has the potential to impact other water users or instream flows in regulated water bodies. Aspect’s review will address the nature of surface and groundwater interactions, and aquifer completion considerations including same body of groundwater. Aspect will incorporate its findings directly in the Report of Examination (Task 3 deliverable). It is assumed that previous studies, including recent groundwater modeling and consultant reports will provide sufficient supporting documentation. TASK 3. Drafting of Report of Examination (up to 46 hours, $11,000) Aspect will prepare a record of its permitting recommendation in the form of a Report of Examination (ROE) for review by Ecology’s Northwest Regional Office. The ROE will address legal standing of the water right proposed for change, potential for impairment resulting from the change, and address hydrogeological considerations as needed to support the requested change. A site visit will be conducted as needed. TASK 4. Project Management (12 hours, $2,500) Project Management includes invoicing, technical edits, internal meetings, and client communication. DocuSign Envelope ID: 2680B03F-14C0-4241-9EA5-9AECCE8E7095