Loading...
HomeMy WebLinkAbout1 - Original Submission_ 02_17_2021 3HActive ConstructionAGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Contract with Active Construction, Inc. for the Kitsap Way (Ostrich Creek) Culvert Replacement Project SUMMARY: Study Session Date: COUNCIL MEETING Date: Department: Presenter: February 10, 2021 February 17, 2021 PW&U - Engineering Gunnar Fridriksson Phone: (360) 473-5758 The existing 1927 vintage 3-foot concrete box culvert crossing Kitsap Way is undersized and a listed fish barrier. This project will replace this existing culvert with a new three -sided box culvert with a 17- foot clear span and 8-foot height. Bids were opened for the project on January 26, 2021 and 12 Bids were received. Active Construction, Inc., (ACI) is the lowest responsive, responsible bidder with their base bid totaling $1,725,725.00, including sales tax. Staff recommends award of the Kitsap Way Ostrich Creek) Culvert Replacement Construction Contract to ACI., Inc. ATTACHMENTS: 1) Site Plan; 2) Bid Tabulation; 3) Contract FISCAL IMPACTS (Include Budgeted Amount): The Kitsap Way Culvert Replacement Project # 869 is funded by a Public Works Trust Fund Loan 4,687,968) to the Stormwater Fund. The remainder of the loan amount is funding the culvert replacements at Price and Brentwood Roads which will be bid for construction in 2022. STUDY SESSION AGENDA: x Limited Presentation Full Presentation STUDY SESSION ACTION: x Consent Agenda ElGeneral Business Public Hearing RECOMMENDED MOTION: Move to award the contract to ACI for the Kitsap Way Culvert Replacement Project, in the amount of 1,725,725.00, and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Form Updated 01/02/2018 Deny Table Continue No Action DocuSign Envelope ID: 68CFECC3-6265-4EA0-9548-C6411FA29BB7