Loading...
HomeMy WebLinkAbout1 - Original Submission_ 20220114_5827_Exec Correspondence Routing Memo_CO#1_NL_____________________________________________________________________________ Public Works & Utilities │ 100 Oyster Bay Ave. N., Bremerton, WA 98312 * Phone (360) 473-5315 * Fax (360) 473-5018 24 Executive Correspondence Routing Memo (For electronic routing only) Date: January 14, 2022 Description: Execute Change Order No. 1 with Active Construction, Inc. for the Oyster Bay Beach Sewer Upgrades project. This change order will increase the contract amount by $187,317.59. The work includes the addition of roadway, excavation and grinding along Shorewood Drive, additional sawcutting, and two additional grinder pumps systems. Fiscal Impact: This project is included in the 2022 Wastewater Capital Budget. This change order may be administratively approved by the Mayor per BMC 2.76.110 and does not require City Council approval. Action Requested: Review and signature and e-mail back to Noreen Bolo. This contract is being routed electronically only. Approval / Recommendation: Managing Engineer: Recommended Initials/date _______________ City Engineer: Recommended Initials/date _______________ Contract Administrator: LASERFICHE Finance: LASERFICHE City Attorney: LASERFICHE/DOCUSIGN Public Works Director: LASERFICHE/DOCUSIGN City Clerk: LASERFICHE/DOCUSIGN Please advise Noreen Bolo/Bill Davis when executed. Thank you. 1/14/22 Ned Lever Digitally signed by Ned Lever DN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned LeverDate: 2022.01.20 08:02:55-08'00' DocuSign Envelope ID: AAD9182E-9416-42F4-9401-4C61CF41CB7F