Loading...
HomeMy WebLinkAbout1 - Original Submission_ BREMERTON 8-2-152(028)-1 Bid Awd UCETransportation Improvement Board Updated Cost Estimate Agency TIB Project No Project Name Design Engineering Right of Way Construction Engineering Construction Other Contract Amount 939,738 0 6,314,416 Phase Total 7,254,154 7,254,154 Engineering Over 20 Percent Other Noneligible Cost Total Landscaping Cost Allowable Landscaping Noneligible Landscaping Total Noneligible Cost 0 1,064,912 60,734 262,475 0 1,064,912 6,189,242 Change in Eligible Total Project Cost (Total Eligible Project Cost - Previous Phase Eligible Cost)420,899 1,742,143 127,119 1,869,262 DETERMINATION OF ELIGIBLE COST Based on the cost information shown above, the agency requests a TIB fund increase in the amount of $127,119 For all increase requests, please contact your TIB Engineer BID OPENING Include a cost breakdown for Construction Other TOTAL COST ESTIMATE AT BID OPENING Enter explanation for the change in Total Project Cost in the space below Calculated Total TIB funds The maximum allowable TIB administrative increase can not exceed $127,119 Requested Change Requested Total TIB funds Refer to "Attachment A" Table 2 Submit form PRIOR to award of contract Include a cost breakdown of Other Noneligible costs Form generated on 27 Apr 2023 8-2-152(028)-1 Washington Avenue / 11th Street - Pacific Ave to Manette Bridge 1,742,143$ Enter the current estimated totals for Landscaping and Other Noneligible Cost Phase Total Total Eligible Project Cost D E S I G N P H A S E Total Project Cost BREMERTON Current TIB Commitment C O N S T R U C T I O N P H A S E N/A See attached Attachment A . Bid opening was held on 6/1/23 - 5 bids were received with the lowest responsive/responsible bidder (Northwest Cascade Inc) having a bid amount approximately $300,000 (5.7%) above our engineer's estimate for eligible TIB contract costs. Construction engineering costs include contractor CE bid items, construction engineering performed by Skillings (separate contract), construction management performed by SCJ Alliance (separate contract), and City/WSDOT construction engineering costs. Page 1 of 2 TIB UCE Form - Revised March 2016 Generated by TIB Project Tracking System - 101173ChrisLanghoff04272023101005 DocuSign Envelope ID: 453DD193-5A9D-4194-8097-34AE605A2ECC 8-2-152(028)-1 Previous Commitment Current Participation 1,742,143 1,869,262 610,000 1,730,266 0 0 3,654,600 3,654,626 0 0 0 0 0 0 0 $6,006,743 $7,254,154 REQUIRED ATTACHMENTS Printed or Typed Name REGISTERED ENGINEER I certify the bid tabulations are accurate and correct. Nick Ataie, PE Signature & Date AGENCY OFFICIAL By my signature below, I certify the costs shown are true and correct and I am authorized to financially indebt the agency. Greg Wheeler Printed or Typed Name Mayor City of Bremerton Title Signature & Date ► Submit BID TABULATIONS with Updated Cost Estimate ► Include a cost breakdown of Other Noneligible costs in cell B24 ► Enter justification for COST INCREASE in cell B32 Funding Partner Total is Correct Update Funding Partner(s) and their current participation TOTALS Federal STP BREMERTON TIB WSDOT Funding Partners FUNDING PARTNER PARTICIPATION Bid Award Updated Cost Estimate TIB Project Number Page 2 of 2 TIB UCE Form - Revised March 2016 Generated by TIB Project Tracking System - 101173ChrisLanghoff04272023101005 Nick Ataie Digitally signed by Nick Ataie DN: E=Nick.Ataie@ci.bremerton.wa.us, CN=Nick Ataie, OU=PW Engineering, OU=Domain Users, DC=ci, DC=bremerton, DC=wa, DC=us Date: 2023.06.07 14:06:00-07'00'6/7/2023 DocuSign Envelope ID: 453DD193-5A9D-4194-8097-34AE605A2ECC 6/16/2023 Agency:BREMERTON TIB Project No:8-2-152(028)-1 Project Name:Washington Avenue / 11th Street - Pacific to Manette Bridge Construction Engineering (CE) Construction Other (CO) Contract Amount TOTAL Contractor (NWC)92,135$ -$ 6,313,781$ 6,405,916$ CE for schedule, survey, record drawing bid items CE (Skillings)45,299$ -$ -$ 45,299$ Actual overall contract amount CM (SCJ Alliance)715,439$ -$ -$ 715,439$ Actual overall contract amount Bremerton 77,500$ -$ -$ 77,500$ City CE costs (staff time + expenses) WSDOT 10,000$ -$ -$ 10,000$ WSDOT administrative construction costs TOTALS 940,373$ -$ 6,313,781$ 7,254,154$ Construction Engineering (CE) Construction Other (CO) Contract Amount TOTAL Contractor (NWC)20,135$ -$ 947,659$ 967,794$ All costs in Schedules B & C + Schedule A minor change/force account CE (Skillings)5,783$ -$ -$ 5,783$ $45,299.30 contract amount x 12.8% non-eligible CM (SCJ Alliance)91,335$ -$ -$ 91,335$ $715,438.85 contract amount x 12.8% non-eligible Bremerton -$ -$ -$ -$ WSDOT -$ -$ -$ -$ TOTALS 117,253$ -$ 947,659$ 1,064,912$ Construction Engineering (CE) Construction Other (CO) Contract Amount TOTAL Contractor (NWC)72,000$ -$ 5,366,122$ 5,438,122$ CE (Skillings)39,516$ -$ -$ 39,516$ CM (SCJ Alliance)624,104$ -$ -$ 624,104$ Bremerton 77,500$ -$ -$ 77,500$ WSDOT 10,000$ -$ -$ 10,000$ TOTALS 823,121$ -$ 5,366,122$ 6,189,243$ PROJECT CONSTRUCTION PHASE COSTS NON ELIGIBLE CONSTRUCTION PHASE COSTS ELIGIBLE CONSTRUCTION COSTS (TABLE 1 - TABLE 2) BID AWARD UCE - ATTACHMENT A TABLE 1 TABLE 2 DocuSign Envelope ID: 453DD193-5A9D-4194-8097-34AE605A2ECC