HomeMy WebLinkAboutAmendment_2 WQC-2018-BremPW-00117AMENDMENT NO. 2
TO AGREEMENT NO. WQC-2018-BremPW-00117
BETWEEN
THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY
AND
City of Bremerton
PURPOSE: To amend the above-referenced agreement (AGREEMENT) between the state of Washington Department of
Ecology (ECOLOGY) and City of Bremerton (RECIPIENT) for the Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1
(PROJECT).
This amendment is needed to: 1) Extend the agreement to allow the installation of additional pumping equipment at the Oyster
Bay Inn; and 2) adjust the budget to move funds to cover the change in scope. The sewer flow at the hotel is nearly double
what was anticipated during design and will require two additional pumps and control panel in order to be converted from a
duplex to a quadplex grinder pump system.
1) The scope of work is changed to include two additional pumps and a control panel at the Oyster Bay Inn and the budget is
adjusted to move funding from under spent Tasks 3. Construction Management, and 6. Cultural Resources to Task 4.
Construction.
2) The total Loan (EL180442) funded amount of $7,000,419, remains the same.
3) The completion date is changed from December 31, 2022, to April 30, 2023. And the Initiation of Operation Date is
changed from June 30 ,2022, to April 30, 2023, based on this date, loan repayment will begin no later than April 30, 2024.
Five years from the publication date of the Final Offer list is February 2023, we are granting this extension into the sixth year
with assurances from the RECIPIENT and our confidence that the project will be successfully completed within this timeline.
4) Estimated Loan Repayment Schedule Number 333, created on April 26, 2021, is replaced with Estimated Loan
Repayment Schedule Number 638, created on February 27, 2023.
IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows:
Expiration Date:
Original: 12/31/2022 Amended: 04/30/2023
CHANGES TO THE BUDGET
Funding Distribution EL180442
Funding Title:SRF Loan
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 2 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Title:FY18 SRF (State)
Type:State
100%
The Clean Water Act (CWA) (33 U.S.C 1251-1387) established the State Revolving Fund
(SRF) low interest loans program (40. C.F.R. Part 31, 35 Sub Part K). Washington State
administers the program under Chapter 173-98 WAC. The portion of this project funded
with this funding distribution comes from non-federal source and are not subject to Federal
Funding Accountability and Transparency Act (FFATA) and Single Audit Act (SAA).
However, this project is subject to the federal requirements outlined in Section 4 and 5 of
agreement terms and conditions.
Funding Source %:
Description:
FD0727Fund:
Approved Indirect Costs Rate:
Recipient Match %:
InKind Interlocal Allowed:
InKind Other Allowed:
Is this Funding Distribution used to match a federal grant?
Approved State Indirect: 30%
0%
No
No
No
Effective Interest Rate: 1.5% Interest Rate: 0.5% Admin Charge: 1%
Terms:20 years
Project Start Date: 06/30/2018 Project Completion Date: 04/30/2023
Estimated Initiation of Operation date:
Loan Security:
Final Accrued Interest:
Final Loan Amount:
Repayment Schedule Number:
04/30/2023
Revenue Secure Lien Obligation of the Recipient
$
$
638
Funding Effective Date:
Funding Source:
Funding Expiration Date:06/30/2018 04/30/2023
Funding Type:Loan
SRF Loan Task Total
Project Administration/Management $50,000.00
Permitting & Design $860,000.00
Construction Management $420,000.00
Construction $5,248,690.00
Change Order Allowance $361,729.00
Cultural Resource Management/Monitoring $60,000.00
Total: 7,000,419.00$
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 3 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
CHANGES TO SCOPE OF WORK
Task Number:3 Task Cost: $420,000.00
Task Title:Construction Management
Task Description:
A. The RECIPIENT will provide adequate and competent construction management and inspection for the Project. This may
involve procuring the professional services. If professional services are procured, the RECIPIENT will procure them in
accordance with state law. The RECIPIENT will include ECOLOGY’s specification insert in the contract documents. The
RECIPIENT must submit all contracts for construction management services before ECOLOGY will provide reimbursement
for work performed under this task.
B. The RECIPIENT will develop a detailed Construction Quality Assurance Plan (WAC 173-240-075) and submit it to
ECOLOGY for approval. This plan must describe the activities which the RECIPIENT will undertake to achieve adequate
and competent oversight of all construction work.
C. Upon completion of this construction, the RECIPIENT shall submit the Declaration of Construction Completion form to
ECOLOGY in accordance with WAC 173-240-090 and a set of "as-built" plans of the construction contract i.e., record
construction drawings which reflect changes, modifications, or other revisions made to the project during construction. The
form, when signed by a professional engineer, indicates that the project was completed in accordance with the plans and
specifications and major change orders approved by ECOLOGY, and is accurately shown on the as-built plans.
D. The RECIPIENT will provide a plan of interim operation for the facility while under construction.
E. The RECIPIENT will ensure construction progresses according to a timely schedule developed to meet completion dates
indicated in the construction contract. The RECIPIENT will revise or update the schedule whenever major changes occur and
resubmit to ECOLOGY. In the absence of any major changes, the RECIPIENT will describe progress of the construction in
the quarterly progress reports.
F. As a condition of receiving this funding, the RECIPIENT will prepare an asset management program (fiscal sustainability
plan). The RECIPIENT will certify that a plan that contains at least the minimum required elements listed above has been
developed and is being implemented. The plan must include the following elements:
1. An inventory of critical assets that belong to the utility.
2. An evaluation of the condition and performance of the critical assets.
3. A plan to maintain, repair, and replace the critical assets and to fund those activities.
4. A process to evaluate and implement water and energy conservation efforts as part of the plan.
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 4 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Task Goal Statement:
See Overall Goal.
Task Expected Outcome:
See Overall Goal.
Recipient Task Coordinator: William Davis
Deliverables
Due DateDescriptionNumber
3.1 Executed contract for construction management services.
3.2 Documentation of the RECIPIENT’s process for procuring engineering
services.
3.3 Construction Quality Assurance Plan.
3.4 Plan of interim operation of the facility while under construction.
3.5 Declaration of Construction completion (paper copy) and one electronic
copy of the Record Drawings. Submit the electronic copy in searchable
PDF format at minimum resolution of 300 dpi.
CHANGES TO SCOPE OF WORK
Task Number:4 Task Cost: $5,248,690.00
Task Title:Construction
Task Description:
A. The RECIPIENT shall include ECOLOGY’s specification insert in the bid documents. The RECIPIENT shall execute a
contract with the lowest responsive responsible bidder to construct the PROJECT. The RECIPIENT shall submit Bid Tabs,
the Notice of Award, and a copy of the executed contract before ECOLOGY shall provide reimbursement for work
performed under this task.
B. The RECIPIENT shall complete construction of the grinder pumps, pipelines, an upland 3 inch low pressure sewer (LPS)
main and an upland large diameter force main (12 inch diameter) in accordance with the plans and specifications approved by
ECOLOGY. In addition, the RECIPIENT will install two pumps and a control panel at the Oyster Bay Inn.
C. The RECIPIENT shall conduct a pre-construction conference and invite ECOLOGY staff.
Task Goal Statement:
See Overall Goal.
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 5 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Task Expected Outcome:
See Overall Goal.
Recipient Task Coordinator: William Davis
Deliverables
Due DateDescriptionNumber
4.1 Copy of the advertisement for bids with affidavit of publication, bid tabs
in Excel format, notice of award, notice to proceed, and a copy of the
executed construction contract.
4.2 Minutes of the pre-construction meeting.
4.3 Certification that the Financial Sustainability Plan has been developed and
is being implemented.
CHANGES TO SCOPE OF WORK
Task Number:6 Task Cost: $60,000.00
Task Title:Cultural Resource Management/Monitoring
Task Description:
A. The RECIPIENT will negotiate all change orders to the construction contract necessary for successful completion of the
project.
B. The RECIPIENT will submit the change orders to ECOLOGY for approval. Change orders that are a significant deviation
from the approved plans/specifications will be submitted for approval, prior to execution. All other change orders will be
submitted within 30 days after execution.
Task Goal Statement:
See Overall Goals.
Task Expected Outcome:
See Overall Goals.
Deliverables
Due DateDescriptionNumber
6.1 A copy of all change orders
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 6 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 7 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Funding Distribution Summary
Recipient / Ecology Share
Funding Distribution Name Recipient Match %Recipient Share Ecology Share Total
SRF Loan 0 %$$$0.00 7,000,419.00 7,000,419.00
Total 0.00 7,000,419.00 7,000,419.00$$$
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 8 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Washington State
Department of Ecology
Date Date
Water Quality
Vincent McGowan, P.E.Greg Wheeler
City of Bremerton
AUTHORIZING SIGNATURES
All other terms and conditions of the original Agreement including any Amendments remain in full force and effect, except as
expressly provided by this Amendment.
The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective
organizations to this Amendment.
This amendment will be effective 12/31/2022.
IN WITNESS WHEREOF: the parties hereto, having read this Amendment in its entirety, including all attachments, do agree in
each and every particular and have thus set their hands hereunto.
Mayor
By:By:
Program Manager
Template Approved to Form by
Attorney General's Office
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
4/11/20234/11/2023
________________________________________________________________________________
Public Works & Utilities Ň345 6th Street, Suite 100, Bremerton, WA 98337 * Phone (360) 473-5270 * Fax (360) 473-5398
Working for and with our residents to establish Bremerton as Puget Sound’s most beautiful and livable waterfront city!
Executive Correspondence Routing Memo
Requires City Council Approval? Yes ܆܆ No ܈
Greensheet No. : 230100
Date: March 30, 2023
Subject: Amendment No. 2 for Agreement No. WQC-2018-BremPW-00117 for the Oyster Bay Beach
Sewer Upgrades (OB-2 to OB-1) project
Description: This amendment is needed to extend the Ecology CWSRF loan agreement for the Oyster
Bay Beach Sewer Upgrades (OB-2 to OB-1) project to install additional pumping equipment at the Oyster
Bay Inn (hotel) and close out the project. The expiration date of December 30, 2022 is changed to April
30, 2023. Additionally, unused funds totaling $130,000 are shifted from Cultural Resources
Management/Monitoring and Construction Management tasks to the Construction task.
Fiscal Impact: No change to loan amount.
Action Requested: Review and signature, return to Noreen Bolo.
Approval / Recommendation:
Managing Engineer: Initials/date _______________
City Engineer: Initials/date _______________
Public Works Director: Initials/date _______________
Contract Administrator: LASERFICHE
Finance: LASERFICHE
City Attorney: LASERFICHE
Mayor: DOCUSIGN (as initiated by Department of Ecology)
Department of Ecology: DOCUSIGN
Please advise Noreen Bolo / Bill Davis when executed. Thank you!
______________________________3/31/23
Ned Lever
Digitally signed by Ned LeverDN: E=Ned.Lever@ci.bremerton.wa.us, CN=Ned Lever, OU=PW Engineering, OU=Domain Users, DC=ci, DC=bremerton, DC=wa, DC=usReason: I am approving this documentDate: 2023.04.04 15:26:59-07'00'
Tom
Knuckey
Digitally signed by Tom
Knuckey
Date: 2023.04.05
13:32:48 -07'00'
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
2301003/14/23DOEAmendment #2 - Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 No changeExtended to 4/30/23Noreen/EngineeringX2323XMRR3.21.23DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
AMENDMENT NO. 2
TO AGREEMENT NO. WQC-2018-BremPW-00117
BETWEEN
THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY
AND
City of Bremerton
PURPOSE: To amend the above-referenced agreement (AGREEMENT) between the state of Washington Department of
Ecology (ECOLOGY) and City of Bremerton (RECIPIENT) for the Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1
(PROJECT).
This amendment is needed to: 1) Extend the agreement to allow the installation of additional pumping equipment at the Oyster
Bay Inn; and 2) adjust the budget to move funds to cover the change in scope. The sewer flow at the hotel is nearly double
what was anticipated during design and will require two additional pumps and control panel in order to be converted from a
duplex to a quadplex grinder pump system.
1) The scope of work is changed to include two additional pumps and a control panel at the Oyster Bay Inn and the budget is
adjusted to move funding from under spent Tasks 3. Construction Management, and 6. Cultural Resources to Task 4.
Construction.
2) The total Loan (EL180442) funded amount of $7,000,419, remains the same.
3) The completion date is changed from December 31, 2022, to April 30, 2023. And the Initiation of Operation Date is
changed from June 30 ,2022, to April 30, 2023, based on this date, loan repayment will begin no later than April 30, 2024.
Five years from the publication date of the Final Offer list is February 2023, we are granting this extension into the sixth year
with assurances from the RECIPIENT and our confidence that the project will be successfully completed within this timeline.
4) Estimated Loan Repayment Schedule Number 333, created on April 26, 2021, is replaced with Estimated Loan
Repayment Schedule Number 638, created on February 27, 2023.
IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows:
Expiration Date:
Original: 12/31/2022 Amended: 04/30/2023
CHANGES TO THE BUDGET
Funding Distribution EL180442
Funding Title:SRF Loan
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 2 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Title:FY18 SRF (State)
Type:State
100%
The Clean Water Act (CWA) (33 U.S.C 1251-1387) established the State Revolving Fund
(SRF) low interest loans program (40. C.F.R. Part 31, 35 Sub Part K). Washington State
administers the program under Chapter 173-98 WAC. The portion of this project funded
with this funding distribution comes from non-federal source and are not subject to Federal
Funding Accountability and Transparency Act (FFATA) and Single Audit Act (SAA).
However, this project is subject to the federal requirements outlined in Section 4 and 5 of
agreement terms and conditions.
Funding Source %:
Description:
FD0727Fund:
Approved Indirect Costs Rate:
Recipient Match %:
InKind Interlocal Allowed:
InKind Other Allowed:
Is this Funding Distribution used to match a federal grant?
Approved State Indirect: 30%
0%
No
No
No
Effective Interest Rate: 1.5% Interest Rate: 0.5% Admin Charge: 1%
Terms:20 years
Project Start Date: 06/30/2018 Project Completion Date: 04/30/2023
Estimated Initiation of Operation date:
Loan Security:
Final Accrued Interest:
Final Loan Amount:
Repayment Schedule Number:
04/30/2023
Revenue Secure Lien Obligation of the Recipient
$
$
638
Funding Effective Date:
Funding Source:
Funding Expiration Date:06/30/2018 04/30/2023
Funding Type:Loan
SRF Loan Task Total
Project Administration/Management $50,000.00
Permitting & Design $860,000.00
Construction Management $420,000.00
Construction $5,248,690.00
Change Order Allowance $361,729.00
Cultural Resource Management/Monitoring $60,000.00
Total: 7,000,419.00$
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 3 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
CHANGES TO SCOPE OF WORK
Task Number:3 Task Cost: $420,000.00
Task Title:Construction Management
Task Description:
A. The RECIPIENT will provide adequate and competent construction management and inspection for the Project. This may
involve procuring the professional services. If professional services are procured, the RECIPIENT will procure them in
accordance with state law. The RECIPIENT will include ECOLOGY’s specification insert in the contract documents. The
RECIPIENT must submit all contracts for construction management services before ECOLOGY will provide reimbursement
for work performed under this task.
B. The RECIPIENT will develop a detailed Construction Quality Assurance Plan (WAC 173-240-075) and submit it to
ECOLOGY for approval. This plan must describe the activities which the RECIPIENT will undertake to achieve adequate
and competent oversight of all construction work.
C. Upon completion of this construction, the RECIPIENT shall submit the Declaration of Construction Completion form to
ECOLOGY in accordance with WAC 173-240-090 and a set of "as-built" plans of the construction contract i.e., record
construction drawings which reflect changes, modifications, or other revisions made to the project during construction. The
form, when signed by a professional engineer, indicates that the project was completed in accordance with the plans and
specifications and major change orders approved by ECOLOGY, and is accurately shown on the as-built plans.
D. The RECIPIENT will provide a plan of interim operation for the facility while under construction.
E. The RECIPIENT will ensure construction progresses according to a timely schedule developed to meet completion dates
indicated in the construction contract. The RECIPIENT will revise or update the schedule whenever major changes occur and
resubmit to ECOLOGY. In the absence of any major changes, the RECIPIENT will describe progress of the construction in
the quarterly progress reports.
F. As a condition of receiving this funding, the RECIPIENT will prepare an asset management program (fiscal sustainability
plan). The RECIPIENT will certify that a plan that contains at least the minimum required elements listed above has been
developed and is being implemented. The plan must include the following elements:
1. An inventory of critical assets that belong to the utility.
2. An evaluation of the condition and performance of the critical assets.
3. A plan to maintain, repair, and replace the critical assets and to fund those activities.
4. A process to evaluate and implement water and energy conservation efforts as part of the plan.
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 4 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Task Goal Statement:
See Overall Goal.
Task Expected Outcome:
See Overall Goal.
Recipient Task Coordinator: William Davis
Deliverables
Due DateDescriptionNumber
3.1 Executed contract for construction management services.
3.2 Documentation of the RECIPIENT’s process for procuring engineering
services.
3.3 Construction Quality Assurance Plan.
3.4 Plan of interim operation of the facility while under construction.
3.5 Declaration of Construction completion (paper copy) and one electronic
copy of the Record Drawings. Submit the electronic copy in searchable
PDF format at minimum resolution of 300 dpi.
CHANGES TO SCOPE OF WORK
Task Number:4 Task Cost: $5,248,690.00
Task Title:Construction
Task Description:
A. The RECIPIENT shall include ECOLOGY’s specification insert in the bid documents. The RECIPIENT shall execute a
contract with the lowest responsive responsible bidder to construct the PROJECT. The RECIPIENT shall submit Bid Tabs,
the Notice of Award, and a copy of the executed contract before ECOLOGY shall provide reimbursement for work
performed under this task.
B. The RECIPIENT shall complete construction of the grinder pumps, pipelines, an upland 3 inch low pressure sewer (LPS)
main and an upland large diameter force main (12 inch diameter) in accordance with the plans and specifications approved by
ECOLOGY. In addition, the RECIPIENT will install two pumps and a control panel at the Oyster Bay Inn.
C. The RECIPIENT shall conduct a pre-construction conference and invite ECOLOGY staff.
Task Goal Statement:
See Overall Goal.
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 5 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Task Expected Outcome:
See Overall Goal.
Recipient Task Coordinator: William Davis
Deliverables
Due DateDescriptionNumber
4.1 Copy of the advertisement for bids with affidavit of publication, bid tabs
in Excel format, notice of award, notice to proceed, and a copy of the
executed construction contract.
4.2 Minutes of the pre-construction meeting.
4.3 Certification that the Financial Sustainability Plan has been developed and
is being implemented.
CHANGES TO SCOPE OF WORK
Task Number:6 Task Cost: $60,000.00
Task Title:Cultural Resource Management/Monitoring
Task Description:
A. The RECIPIENT will negotiate all change orders to the construction contract necessary for successful completion of the
project.
B. The RECIPIENT will submit the change orders to ECOLOGY for approval. Change orders that are a significant deviation
from the approved plans/specifications will be submitted for approval, prior to execution. All other change orders will be
submitted within 30 days after execution.
Task Goal Statement:
See Overall Goals.
Task Expected Outcome:
See Overall Goals.
Deliverables
Due DateDescriptionNumber
6.1 A copy of all change orders
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 6 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 7 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Funding Distribution Summary
Recipient / Ecology Share
Funding Distribution Name Recipient Match %Recipient Share Ecology Share Total
SRF Loan 0 %$$$0.00 7,000,419.00 7,000,419.00
Total 0.00 7,000,419.00 7,000,419.00$$$
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
Page 8 of 8State of Washington Department of Ecology
City of Bremerton
Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project
Agreement No. WQC-2018-BremPW-00117
Washington State
Department of Ecology
Date Date
Water Quality
Vincent McGowan, P.E.Greg Wheeler
City of Bremerton
AUTHORIZING SIGNATURES
All other terms and conditions of the original Agreement including any Amendments remain in full force and effect, except as
expressly provided by this Amendment.
The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective
organizations to this Amendment.
This amendment will be effective 12/31/2022.
IN WITNESS WHEREOF: the parties hereto, having read this Amendment in its entirety, including all attachments, do agree in
each and every particular and have thus set their hands hereunto.
Mayor
By:By:
Program Manager
Template Approved to Form by
Attorney General's Office
Template Version 10/30/2015
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93
DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93