Loading...
HomeMy WebLinkAboutAmendment_2 WQC-2018-BremPW-00117AMENDMENT NO. 2 TO AGREEMENT NO. WQC-2018-BremPW-00117 BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND City of Bremerton PURPOSE: To amend the above-referenced agreement (AGREEMENT) between the state of Washington Department of Ecology (ECOLOGY) and City of Bremerton (RECIPIENT) for the Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 (PROJECT). This amendment is needed to: 1) Extend the agreement to allow the installation of additional pumping equipment at the Oyster Bay Inn; and 2) adjust the budget to move funds to cover the change in scope. The sewer flow at the hotel is nearly double what was anticipated during design and will require two additional pumps and control panel in order to be converted from a duplex to a quadplex grinder pump system. 1) The scope of work is changed to include two additional pumps and a control panel at the Oyster Bay Inn and the budget is adjusted to move funding from under spent Tasks 3. Construction Management, and 6. Cultural Resources to Task 4. Construction. 2) The total Loan (EL180442) funded amount of $7,000,419, remains the same. 3) The completion date is changed from December 31, 2022, to April 30, 2023. And the Initiation of Operation Date is changed from June 30 ,2022, to April 30, 2023, based on this date, loan repayment will begin no later than April 30, 2024. Five years from the publication date of the Final Offer list is February 2023, we are granting this extension into the sixth year with assurances from the RECIPIENT and our confidence that the project will be successfully completed within this timeline. 4) Estimated Loan Repayment Schedule Number 333, created on April 26, 2021, is replaced with Estimated Loan Repayment Schedule Number 638, created on February 27, 2023. IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows: Expiration Date: Original: 12/31/2022 Amended: 04/30/2023 CHANGES TO THE BUDGET Funding Distribution EL180442 Funding Title:SRF Loan Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 2 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Title:FY18 SRF (State) Type:State 100% The Clean Water Act (CWA) (33 U.S.C 1251-1387) established the State Revolving Fund (SRF) low interest loans program (40. C.F.R. Part 31, 35 Sub Part K). Washington State administers the program under Chapter 173-98 WAC. The portion of this project funded with this funding distribution comes from non-federal source and are not subject to Federal Funding Accountability and Transparency Act (FFATA) and Single Audit Act (SAA). However, this project is subject to the federal requirements outlined in Section 4 and 5 of agreement terms and conditions. Funding Source %: Description: FD0727Fund: Approved Indirect Costs Rate: Recipient Match %: InKind Interlocal Allowed: InKind Other Allowed: Is this Funding Distribution used to match a federal grant? Approved State Indirect: 30% 0% No No No Effective Interest Rate: 1.5% Interest Rate: 0.5% Admin Charge: 1% Terms:20 years Project Start Date: 06/30/2018 Project Completion Date: 04/30/2023 Estimated Initiation of Operation date: Loan Security: Final Accrued Interest: Final Loan Amount: Repayment Schedule Number: 04/30/2023 Revenue Secure Lien Obligation of the Recipient $ $ 638 Funding Effective Date: Funding Source: Funding Expiration Date:06/30/2018 04/30/2023 Funding Type:Loan SRF Loan Task Total Project Administration/Management $50,000.00 Permitting & Design $860,000.00 Construction Management $420,000.00 Construction $5,248,690.00 Change Order Allowance $361,729.00 Cultural Resource Management/Monitoring $60,000.00 Total: 7,000,419.00$ Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 3 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 CHANGES TO SCOPE OF WORK Task Number:3 Task Cost: $420,000.00 Task Title:Construction Management Task Description: A. The RECIPIENT will provide adequate and competent construction management and inspection for the Project. This may involve procuring the professional services. If professional services are procured, the RECIPIENT will procure them in accordance with state law. The RECIPIENT will include ECOLOGY’s specification insert in the contract documents. The RECIPIENT must submit all contracts for construction management services before ECOLOGY will provide reimbursement for work performed under this task. B. The RECIPIENT will develop a detailed Construction Quality Assurance Plan (WAC 173-240-075) and submit it to ECOLOGY for approval. This plan must describe the activities which the RECIPIENT will undertake to achieve adequate and competent oversight of all construction work. C. Upon completion of this construction, the RECIPIENT shall submit the Declaration of Construction Completion form to ECOLOGY in accordance with WAC 173-240-090 and a set of "as-built" plans of the construction contract i.e., record construction drawings which reflect changes, modifications, or other revisions made to the project during construction. The form, when signed by a professional engineer, indicates that the project was completed in accordance with the plans and specifications and major change orders approved by ECOLOGY, and is accurately shown on the as-built plans. D. The RECIPIENT will provide a plan of interim operation for the facility while under construction. E. The RECIPIENT will ensure construction progresses according to a timely schedule developed to meet completion dates indicated in the construction contract. The RECIPIENT will revise or update the schedule whenever major changes occur and resubmit to ECOLOGY. In the absence of any major changes, the RECIPIENT will describe progress of the construction in the quarterly progress reports. F. As a condition of receiving this funding, the RECIPIENT will prepare an asset management program (fiscal sustainability plan). The RECIPIENT will certify that a plan that contains at least the minimum required elements listed above has been developed and is being implemented. The plan must include the following elements: 1. An inventory of critical assets that belong to the utility. 2. An evaluation of the condition and performance of the critical assets. 3. A plan to maintain, repair, and replace the critical assets and to fund those activities. 4. A process to evaluate and implement water and energy conservation efforts as part of the plan. Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 4 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Task Goal Statement: See Overall Goal. Task Expected Outcome: See Overall Goal. Recipient Task Coordinator: William Davis Deliverables Due DateDescriptionNumber 3.1 Executed contract for construction management services. 3.2 Documentation of the RECIPIENT’s process for procuring engineering services. 3.3 Construction Quality Assurance Plan. 3.4 Plan of interim operation of the facility while under construction. 3.5 Declaration of Construction completion (paper copy) and one electronic copy of the Record Drawings. Submit the electronic copy in searchable PDF format at minimum resolution of 300 dpi. CHANGES TO SCOPE OF WORK Task Number:4 Task Cost: $5,248,690.00 Task Title:Construction Task Description: A. The RECIPIENT shall include ECOLOGY’s specification insert in the bid documents. The RECIPIENT shall execute a contract with the lowest responsive responsible bidder to construct the PROJECT. The RECIPIENT shall submit Bid Tabs, the Notice of Award, and a copy of the executed contract before ECOLOGY shall provide reimbursement for work performed under this task. B. The RECIPIENT shall complete construction of the grinder pumps, pipelines, an upland 3 inch low pressure sewer (LPS) main and an upland large diameter force main (12 inch diameter) in accordance with the plans and specifications approved by ECOLOGY. In addition, the RECIPIENT will install two pumps and a control panel at the Oyster Bay Inn. C. The RECIPIENT shall conduct a pre-construction conference and invite ECOLOGY staff. Task Goal Statement: See Overall Goal. Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 5 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Task Expected Outcome: See Overall Goal. Recipient Task Coordinator: William Davis Deliverables Due DateDescriptionNumber 4.1 Copy of the advertisement for bids with affidavit of publication, bid tabs in Excel format, notice of award, notice to proceed, and a copy of the executed construction contract. 4.2 Minutes of the pre-construction meeting. 4.3 Certification that the Financial Sustainability Plan has been developed and is being implemented. CHANGES TO SCOPE OF WORK Task Number:6 Task Cost: $60,000.00 Task Title:Cultural Resource Management/Monitoring Task Description: A. The RECIPIENT will negotiate all change orders to the construction contract necessary for successful completion of the project. B. The RECIPIENT will submit the change orders to ECOLOGY for approval. Change orders that are a significant deviation from the approved plans/specifications will be submitted for approval, prior to execution. All other change orders will be submitted within 30 days after execution. Task Goal Statement: See Overall Goals. Task Expected Outcome: See Overall Goals. Deliverables Due DateDescriptionNumber 6.1 A copy of all change orders Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 6 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 7 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Funding Distribution Summary Recipient / Ecology Share Funding Distribution Name Recipient Match %Recipient Share Ecology Share Total SRF Loan 0 %$$$0.00 7,000,419.00 7,000,419.00 Total 0.00 7,000,419.00 7,000,419.00$$$ Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 8 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Washington State Department of Ecology Date Date Water Quality Vincent McGowan, P.E.Greg Wheeler City of Bremerton AUTHORIZING SIGNATURES All other terms and conditions of the original Agreement including any Amendments remain in full force and effect, except as expressly provided by this Amendment. The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective organizations to this Amendment. This amendment will be effective 12/31/2022. IN WITNESS WHEREOF: the parties hereto, having read this Amendment in its entirety, including all attachments, do agree in each and every particular and have thus set their hands hereunto. Mayor By:By: Program Manager Template Approved to Form by Attorney General's Office Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 4/11/20234/11/2023 ________________________________________________________________________________ Public Works & Utilities Ň345 6th Street, Suite 100, Bremerton, WA 98337 * Phone (360) 473-5270 * Fax (360) 473-5398 Working for and with our residents to establish Bremerton as Puget Sound’s most beautiful and livable waterfront city! Executive Correspondence Routing Memo Requires City Council Approval? Yes ܆܆ No ܈ Greensheet No. : 230100 Date: March 30, 2023 Subject: Amendment No. 2 for Agreement No. WQC-2018-BremPW-00117 for the Oyster Bay Beach Sewer Upgrades (OB-2 to OB-1) project Description: This amendment is needed to extend the Ecology CWSRF loan agreement for the Oyster Bay Beach Sewer Upgrades (OB-2 to OB-1) project to install additional pumping equipment at the Oyster Bay Inn (hotel) and close out the project. The expiration date of December 30, 2022 is changed to April 30, 2023. Additionally, unused funds totaling $130,000 are shifted from Cultural Resources Management/Monitoring and Construction Management tasks to the Construction task. Fiscal Impact: No change to loan amount. Action Requested: Review and signature, return to Noreen Bolo. Approval / Recommendation: Managing Engineer: Initials/date _______________ City Engineer: Initials/date _______________ Public Works Director: Initials/date _______________ Contract Administrator: LASERFICHE Finance: LASERFICHE City Attorney: LASERFICHE Mayor: DOCUSIGN (as initiated by Department of Ecology) Department of Ecology: DOCUSIGN Please advise Noreen Bolo / Bill Davis when executed. Thank you! ______________________________3/31/23 Ned Lever Digitally signed by Ned LeverDN: E=Ned.Lever@ci.bremerton.wa.us, CN=Ned Lever, OU=PW Engineering, OU=Domain Users, DC=ci, DC=bremerton, DC=wa, DC=usReason: I am approving this documentDate: 2023.04.04 15:26:59-07'00' Tom Knuckey Digitally signed by Tom Knuckey Date: 2023.04.05 13:32:48 -07'00' DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 2301003/14/23DOEAmendment #2 - Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 No changeExtended to 4/30/23Noreen/EngineeringX2323XMRR3.21.23DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 AMENDMENT NO. 2 TO AGREEMENT NO. WQC-2018-BremPW-00117 BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND City of Bremerton PURPOSE: To amend the above-referenced agreement (AGREEMENT) between the state of Washington Department of Ecology (ECOLOGY) and City of Bremerton (RECIPIENT) for the Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 (PROJECT). This amendment is needed to: 1) Extend the agreement to allow the installation of additional pumping equipment at the Oyster Bay Inn; and 2) adjust the budget to move funds to cover the change in scope. The sewer flow at the hotel is nearly double what was anticipated during design and will require two additional pumps and control panel in order to be converted from a duplex to a quadplex grinder pump system. 1) The scope of work is changed to include two additional pumps and a control panel at the Oyster Bay Inn and the budget is adjusted to move funding from under spent Tasks 3. Construction Management, and 6. Cultural Resources to Task 4. Construction. 2) The total Loan (EL180442) funded amount of $7,000,419, remains the same. 3) The completion date is changed from December 31, 2022, to April 30, 2023. And the Initiation of Operation Date is changed from June 30 ,2022, to April 30, 2023, based on this date, loan repayment will begin no later than April 30, 2024. Five years from the publication date of the Final Offer list is February 2023, we are granting this extension into the sixth year with assurances from the RECIPIENT and our confidence that the project will be successfully completed within this timeline. 4) Estimated Loan Repayment Schedule Number 333, created on April 26, 2021, is replaced with Estimated Loan Repayment Schedule Number 638, created on February 27, 2023. IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows: Expiration Date: Original: 12/31/2022 Amended: 04/30/2023 CHANGES TO THE BUDGET Funding Distribution EL180442 Funding Title:SRF Loan Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 2 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Title:FY18 SRF (State) Type:State 100% The Clean Water Act (CWA) (33 U.S.C 1251-1387) established the State Revolving Fund (SRF) low interest loans program (40. C.F.R. Part 31, 35 Sub Part K). Washington State administers the program under Chapter 173-98 WAC. The portion of this project funded with this funding distribution comes from non-federal source and are not subject to Federal Funding Accountability and Transparency Act (FFATA) and Single Audit Act (SAA). However, this project is subject to the federal requirements outlined in Section 4 and 5 of agreement terms and conditions. Funding Source %: Description: FD0727Fund: Approved Indirect Costs Rate: Recipient Match %: InKind Interlocal Allowed: InKind Other Allowed: Is this Funding Distribution used to match a federal grant? Approved State Indirect: 30% 0% No No No Effective Interest Rate: 1.5% Interest Rate: 0.5% Admin Charge: 1% Terms:20 years Project Start Date: 06/30/2018 Project Completion Date: 04/30/2023 Estimated Initiation of Operation date: Loan Security: Final Accrued Interest: Final Loan Amount: Repayment Schedule Number: 04/30/2023 Revenue Secure Lien Obligation of the Recipient $ $ 638 Funding Effective Date: Funding Source: Funding Expiration Date:06/30/2018 04/30/2023 Funding Type:Loan SRF Loan Task Total Project Administration/Management $50,000.00 Permitting & Design $860,000.00 Construction Management $420,000.00 Construction $5,248,690.00 Change Order Allowance $361,729.00 Cultural Resource Management/Monitoring $60,000.00 Total: 7,000,419.00$ Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 3 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 CHANGES TO SCOPE OF WORK Task Number:3 Task Cost: $420,000.00 Task Title:Construction Management Task Description: A. The RECIPIENT will provide adequate and competent construction management and inspection for the Project. This may involve procuring the professional services. If professional services are procured, the RECIPIENT will procure them in accordance with state law. The RECIPIENT will include ECOLOGY’s specification insert in the contract documents. The RECIPIENT must submit all contracts for construction management services before ECOLOGY will provide reimbursement for work performed under this task. B. The RECIPIENT will develop a detailed Construction Quality Assurance Plan (WAC 173-240-075) and submit it to ECOLOGY for approval. This plan must describe the activities which the RECIPIENT will undertake to achieve adequate and competent oversight of all construction work. C. Upon completion of this construction, the RECIPIENT shall submit the Declaration of Construction Completion form to ECOLOGY in accordance with WAC 173-240-090 and a set of "as-built" plans of the construction contract i.e., record construction drawings which reflect changes, modifications, or other revisions made to the project during construction. The form, when signed by a professional engineer, indicates that the project was completed in accordance with the plans and specifications and major change orders approved by ECOLOGY, and is accurately shown on the as-built plans. D. The RECIPIENT will provide a plan of interim operation for the facility while under construction. E. The RECIPIENT will ensure construction progresses according to a timely schedule developed to meet completion dates indicated in the construction contract. The RECIPIENT will revise or update the schedule whenever major changes occur and resubmit to ECOLOGY. In the absence of any major changes, the RECIPIENT will describe progress of the construction in the quarterly progress reports. F. As a condition of receiving this funding, the RECIPIENT will prepare an asset management program (fiscal sustainability plan). The RECIPIENT will certify that a plan that contains at least the minimum required elements listed above has been developed and is being implemented. The plan must include the following elements: 1. An inventory of critical assets that belong to the utility. 2. An evaluation of the condition and performance of the critical assets. 3. A plan to maintain, repair, and replace the critical assets and to fund those activities. 4. A process to evaluate and implement water and energy conservation efforts as part of the plan. Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 4 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Task Goal Statement: See Overall Goal. Task Expected Outcome: See Overall Goal. Recipient Task Coordinator: William Davis Deliverables Due DateDescriptionNumber 3.1 Executed contract for construction management services. 3.2 Documentation of the RECIPIENT’s process for procuring engineering services. 3.3 Construction Quality Assurance Plan. 3.4 Plan of interim operation of the facility while under construction. 3.5 Declaration of Construction completion (paper copy) and one electronic copy of the Record Drawings. Submit the electronic copy in searchable PDF format at minimum resolution of 300 dpi. CHANGES TO SCOPE OF WORK Task Number:4 Task Cost: $5,248,690.00 Task Title:Construction Task Description: A. The RECIPIENT shall include ECOLOGY’s specification insert in the bid documents. The RECIPIENT shall execute a contract with the lowest responsive responsible bidder to construct the PROJECT. The RECIPIENT shall submit Bid Tabs, the Notice of Award, and a copy of the executed contract before ECOLOGY shall provide reimbursement for work performed under this task. B. The RECIPIENT shall complete construction of the grinder pumps, pipelines, an upland 3 inch low pressure sewer (LPS) main and an upland large diameter force main (12 inch diameter) in accordance with the plans and specifications approved by ECOLOGY. In addition, the RECIPIENT will install two pumps and a control panel at the Oyster Bay Inn. C. The RECIPIENT shall conduct a pre-construction conference and invite ECOLOGY staff. Task Goal Statement: See Overall Goal. Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 5 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Task Expected Outcome: See Overall Goal. Recipient Task Coordinator: William Davis Deliverables Due DateDescriptionNumber 4.1 Copy of the advertisement for bids with affidavit of publication, bid tabs in Excel format, notice of award, notice to proceed, and a copy of the executed construction contract. 4.2 Minutes of the pre-construction meeting. 4.3 Certification that the Financial Sustainability Plan has been developed and is being implemented. CHANGES TO SCOPE OF WORK Task Number:6 Task Cost: $60,000.00 Task Title:Cultural Resource Management/Monitoring Task Description: A. The RECIPIENT will negotiate all change orders to the construction contract necessary for successful completion of the project. B. The RECIPIENT will submit the change orders to ECOLOGY for approval. Change orders that are a significant deviation from the approved plans/specifications will be submitted for approval, prior to execution. All other change orders will be submitted within 30 days after execution. Task Goal Statement: See Overall Goals. Task Expected Outcome: See Overall Goals. Deliverables Due DateDescriptionNumber 6.1 A copy of all change orders Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 6 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 7 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Funding Distribution Summary Recipient / Ecology Share Funding Distribution Name Recipient Match %Recipient Share Ecology Share Total SRF Loan 0 %$$$0.00 7,000,419.00 7,000,419.00 Total 0.00 7,000,419.00 7,000,419.00$$$ Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 Page 8 of 8State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Washington State Department of Ecology Date Date Water Quality Vincent McGowan, P.E.Greg Wheeler City of Bremerton AUTHORIZING SIGNATURES All other terms and conditions of the original Agreement including any Amendments remain in full force and effect, except as expressly provided by this Amendment. The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective organizations to this Amendment. This amendment will be effective 12/31/2022. IN WITNESS WHEREOF: the parties hereto, having read this Amendment in its entirety, including all attachments, do agree in each and every particular and have thus set their hands hereunto. Mayor By:By: Program Manager Template Approved to Form by Attorney General's Office Template Version 10/30/2015 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93 DocuSign Envelope ID: 0414B465-7505-4FA7-A36B-52945CDC2B93