Loading...
HomeMy WebLinkAbout167883_887511-2018-00117-BremertonAmendment1FullySignedDocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 Template Version 10/30/2015 AMENDMENT NO. 1 TO AGREEMENT NO. WQC-2018-BremPW-00117 BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND City of Bremerton PURPOSE: To amend the above-referenced agreement (AGREEMENT) between the state of Washington Department of Ecology (ECOLOGY) and City of Bremerton (RECIPIENT) for the Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 (PROJECT). This amendment is needed to modify the scope of work and increase the loan to cover additional project costs as a result of market conditions, added scope of work, outsourcing construction management services, and additional cultural resource monitoring requirements. 1) The Scope of Work is changed: a. Task 4, Construction, is modified to include: An upland 3 inch low pressure sewer (LPS) main and an upland large diameter force main (12 inch diameter). b. Task 6, Cultural Resource Management/Monitoring, is added. 2) The total budget is increased in the amount of $3,200,419. Loan (EL180442) is increased from $3,800,000 to $7,000,419. a. Task 1, Project Administration/Management, is increased by $25,000, from $25,000 to $50,000. b. Task 2, Permitting and Design, is increased by $460,000, from $400,000 to $860,000. c. Task 3, Construction Management, is increased by $180,000, from $300,000 to $480,000. d. Task 4 budget by $1,500,960 to cover increased scope of work and $543,000 for cost overruns (10% of Engineers Estimate at the time of bid) resulting from higher than expected bids for a total increase of $2,043,690, from $3,075,000 to $5,118,690. e. Task 5, adds a Change Order Allowance (5% of low bid construction amount) in the amount of $361,729. f. Task 6, Cultural Resource Management/Monitoring, is added, increasing the budget by $130,000. 3) The Completion and Initiation of Operation Dates remain the same. 4) The Estimated Loan (EL180442) Repayment Schedule Number 2560, created on January 22, 2019, is replaced with Estimated Loan Repayment Schedule Number 0333, created on April 26, 2021. IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows: Total Cost: Original: 3,800,000.00 Amended: 7,500,000.00 DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 2 of 11 Template Version 10/30/2015 Total Eligible Cost: Original: 3,800,000.00 Amended: 7,000,419.00 CHANGES TO THE BUDGET Funding Distribution EL180442 Funding Title: SRF Loan Funding Type: Loan Funding Effective Date: Funding Source: 06/30/2018 Funding Expiration Date: 12/31/2022 Title: FY18 SRF (State) Fund: 727 Type: State Funding Source %: Description: Approved Indirect Costs Rate: Recipient Match %: InKind Interlocal Allowed: InKind Other Allowed: 100% The Clean Water Act (CWA) (33 U.S.C 1251-1387) established the State Revolving Fund (SRF) low interest loans program (40. C.F.R. Part 31, 35 Sub Part K). Washington State administers the program under Chapter 173-98 WAC. The portion of this project funded with this funding distribution comes from non-federal source and are not subject to Federal Funding Accountability and Transparency Act (FFATA) and Single Audit Act (SAA). However, this project is subject to the federal requirements outlined in Section 4 and 5 of agreement terms and conditions. Approved State Indirect: 30% 0% No No Is this Funding Distribution used to match a federal grant? No Effective Interest Rate: 1.5% Interest Rate: 0.5% Admin Charge: 1% Terms: 20 years Project Start Date: 06/30/2018 Project Completion Date: 12/31/2022 Estimated Initiation of Operation date: Loan Security: Final Accrued Interest: Final Loan Amount: Repayment Schedule Number: 06/30/2022 Revenue Secure Lien Obligation of the Recipient $ $ 333 SRF Loan Task Total Project Administration/Management $ 50,000.00 Permitting & Design $ 860,000.00 DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 3 of 11 Template Version 10/30/2015 Construction Management $ 480,000.00 Construction $ 5,118,690.00 Change Order Allowance $ 361,729.00 Cultural Resource Management/Monitoring $ 130,000.00 Total: $ 7,000,419.00 CHANGES TO SCOPE OF WORK Task Number: 1 Task Cost: $50,000.00 Task Title: Project Administration/Management Task Description: A. The RECIPIENT shall carry out all work necessary to meet ECOLOGY grant or loan administration requirements. Responsibilities include, but are not limited to: maintenance of project records; submittal of requests for reimbursement and corresponding backup documentation; progress reports; and a recipient closeout report (including photos). B. The RECIPIENT shall maintain documentation demonstrating compliance with applicable procurement, contracting, and interlocal agreement requirements; application for, receipt of, and compliance with all required permits, licenses, easements, or property rights necessary for the project; and submittal of required performance items. C. The RECIPIENT shall manage the project. Efforts include, but are not limited to: conducting, coordinating, and scheduling project activities and assuring quality control. Every effort will be made to maintain effective communication with the RECIPIENT's designees; ECOLOGY; all affected local, state, or federal jurisdictions; and any interested individuals or groups. The RECIPIENT shall carry out this project in accordance with any completion dates outlined in this agreement. Task Goal Statement: Properly managed and fully documented project that meets ECOLOGY’s grant or loan administrative requirements. Task Expected Outcome: * Timely and complete submittal of requests for reimbursement, quarterly progress reports, and RECIPIENT closeout report. * Properly maintained project documentation Recipient Task Coordinator: Linda Fulton Deliverables Number Description Due Date DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 4 of 11 Template Version 10/30/2015 1.1 Quarterly Progress Reports 1.2 Recipient Closeout Report 1.3 Project Outcome Summary Report CHANGES TO SCOPE OF WORK Task Number: 2 Task Cost: $860,000.00 Task Title: Permitting & Design Task Description: A. The RECIPIENT shall obtain necessary permits required for the project. B. The RECIPIENT shall procure engineering services in accordance with state law. The RECIPIENT must include ECOLOGY’s specification insert in the contract documents for design. The RECIPIENT shall submit all contracts for engineering services before ECOLOGY shall provide reimbursement for work performed under this task. The engineering consultant firm shall complete the final design and permitting for the project under the management and oversight of the RECIPIENT. C. The RECIPIENT shall design the grinder pumps and conveyance pipelines. Plans and specifications developed by the RECIPIENT shall be consistent with the requirements of Chapter 173-240 WAC. D. The plans and specifications, construction contract documents, and addenda shall be approved by the RECIPIENT prior to submittal for ECOLOGY review. All construction plans submitted to ECOLOGY for review and approval shall be reduced to no larger than 11" x 17" in size. All reduced drawings shall be completely legible. The project manager may request plans be submitted in either PDF or AutoCAD electronic format, and specifications in a searchable PDF or Microsoft Word electronic file. A current construction cost estimate shall be submitted along with each plan/specification submittal. The project manager may request a spreadsheet of the costs in electronic file format. E. The RECIPIENT shall complete the facility design within 24 months after the execution of this AGREEMENT. The RECIPIENT has requested an additional 12 month extension to the standard 12 month design completion requirement for Step 4 design construct projects due to the size and difficulty of a project of this kind. Ecology will review progress after 12 months to ensure sufficient progress has been made. If it is determined that sufficient progress has not been made toward the completion of design, this agreement may be amended to include design only, de-obligating construction funding for use on other projects. F. Investment Grade Efficiency Audit. The RECIPIENT shall procure a third party analysis of potential energy and water efficiency measures for incorporation into the design of any wastewater facilities. The analysis shall identify potential efficiency measures, provide cost estimates, and evaluate their cost effectiveness. If the RECIPIENT has obtained either a preliminary or investment grade energy audit of the utility in the last 5 years, documentation of that audit can be submitted instead. G. The RECIPIENT's construction management staff shall provide a constructability review and quality assurance check of the DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 5 of 11 Template Version 10/30/2015 project drawing and specification package, and general requirements of the construction bid documents at the 60 percent and 90 percent stages. Task Goal Statement: See Overall Goal. Task Expected Outcome: See Overall Goal. Recipient Task Coordinator: Bill Davis Deliverables Number Description Due Date 2.1 Documentation of local, state and federal permitting. 2.2 Executed contracts for engineering services and affidavit of publication. 2.3 Documentation of the RECIPIENT’s process for procuring engineering services, and affidavit of publications. 2.4 Documentation of opinions of probable construction costs for the pumps and conveyance system improvements. 2.5 Final bid documents for the RECIPIENT's use in soliciting bids from Contractors to construct the improvements. 2.6 Documentation of quality assurance and quality control reviews throughout the design phase. 2.7 Two copies of the final design with detailed cost estimate and specifications. 2.8 Investment Grade Efficiency Audit documentation. CHANGES TO SCOPE OF WORK Task Number: 3 Task Cost: $480,000.00 Task Title: Construction Management Task Description: A. The RECIPIENT will provide adequate and competent construction management and inspection for the Project. This may involve procuring the professional services. If professional services are procured, the RECIPIENT will procure them in accordance with state law. The RECIPIENT will include ECOLOGY’s specification insert in the contract documents. The RECIPIENT must submit all contracts for construction management services before ECOLOGY will provide reimbursement for work performed under this task. DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 6 of 11 Template Version 10/30/2015 B. The RECIPIENT will develop a detailed Construction Quality Assurance Plan (WAC 173-240-075) and submit it to ECOLOGY for approval. This plan must describe the activities which the RECIPIENT will undertake to achieve adequate and competent oversight of all construction work. C. Upon completion of this construction, the RECIPIENT shall submit the Declaration of Construction Completion form to ECOLOGY in accordance with WAC 173-240-090 and a set of "as-built" plans of the construction contract i.e., record construction drawings which reflect changes, modifications, or other revisions made to the project during construction. The form, when signed by a professional engineer, indicates that the project was completed in accordance with the plans and specifications and major change orders approved by ECOLOGY, and is accurately shown on the as-built plans. D. The RECIPIENT will provide a plan of interim operation for the facility while under construction. E. The RECIPIENT will ensure construction progresses according to a timely schedule developed to meet completion dates indicated in the construction contract. The RECIPIENT will revise or update the schedule whenever major changes occur and resubmit to ECOLOGY. In the absence of any major changes, the RECIPIENT will describe progress of the construction in the quarterly progress reports. F. As a condition of receiving this funding, the RECIPIENT will prepare an asset management program (fiscal sustainability plan). The RECIPIENT will certify that a plan that contains at least the minimum required elements listed above has been developed and is being implemented. The plan must include the following elements: 1. An inventory of critical assets that belong to the utility. 2. An evaluation of the condition and performance of the critical assets. 3. A plan to maintain, repair, and replace the critical assets and to fund those activities. 4. A process to evaluate and implement water and energy conservation efforts as part of the plan. Task Goal Statement: See Overall Goal. Task Expected Outcome: See Overall Goal. Recipient Task Coordinator: William Davis Deliverables Number Description Due Date 3.1 Executed contract for construction management services. 3.2 Documentation of the RECIPIENT’s process for procuring engineering services. 3.3 Construction Quality Assurance Plan. DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 7 of 11 Template Version 10/30/2015 3.4 Plan of interim operation of the facility while under construction. 3.5 Declaration of Construction completion (paper copy) and one electronic copy of the Record Drawings. Submit the electronic copy in searchable PDF format at minimum resolution of 300 dpi. CHANGES TO SCOPE OF WORK Task Number: 4 Task Cost: $5,118,690.00 Task Title: Construction Task Description: A. The RECIPIENT shall include ECOLOGY’s specification insert in the bid documents. The RECIPIENT shall execute a contract with the lowest responsive responsible bidder to construct the PROJECT. The RECIPIENT shall submit Bid Tabs, the Notice of Award, and a copy of the executed contract before ECOLOGY shall provide reimbursement for work performed under this task. B. The RECIPIENT shall complete construction of the grinder pumps, pipelines, an upland 3 inch low pressure sewer (LPS) main and an upland large diameter force main (12 inch diameter) in accordance with the plans and specifications approved by ECOLOGY. C. The RECIPIENT shall conduct a pre-construction conference and invite ECOLOGY staff. Task Goal Statement: See Overall Goal. Task Expected Outcome: See Overall Goal. Recipient Task Coordinator: William Davis Deliverables Number Description Due Date 4.1 Copy of the advertisement for bids with affidavit of publication, bid tabs in Excel format, notice of award, notice to proceed, and a copy of the executed construction contract. 4.2 Minutes of the pre-construction meeting. 4.3 Certification that the Financial Sustainability Plan has been developed and is being implemented. DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 8 of 11 Template Version 10/30/2015 CHANGES TO SCOPE OF WORK Task Number: 5 Task Cost: $361,729.00 Task Title: Change Order Allowance Task Description: A. The RECIPIENT shall negotiate all change orders to the construction contract necessary for successful completion of the project. B. The RECIPIENT shall submit the change orders to ECOLOGY for approval. Change orders that are a significant deviation from the approved plans/specifications must be submitted for approval, prior to execution. All other change orders must be submitted within 30 days after execution. Task Goal Statement: See Overall Goal. Task Expected Outcome: See Overall Goal. Recipient Task Coordinator: William Davis Deliverables Number Description Due Date 5.1 Change Order Justifications if needed. 5.2 Executed change orders with backup documentation and professional engineer seal and signature. CHANGES TO SCOPE OF WORK Task Number: 6 Task Cost: $130,000.00 Task Title: Cultural Resource Management/Monitoring Task Description: A. The RECIPIENT will negotiate all change orders to the construction contract necessary for successful completion of the project. B. The RECIPIENT will submit the change orders to ECOLOGY for approval. Change orders that are a significant deviation from the approved plans/specifications will be submitted for approval, prior to execution. All other change orders will be submitted within 30 days after execution. DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 9 of 11 Template Version 10/30/2015 Task Goal Statement: See Overall Goals. Task Expected Outcome: See Overall Goals. Deliverables Number Description Due Date 6.1 A copy of all change orders DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 10 of 11 Template Version 10/30/2015 Funding Distribution Summary Recipient / Ecology Share Funding Distribution Name Recipient Match % Recipient Share Ecology Share Total SRF Loan 0 % $ 0.00 $ 7,000,419.00 $ 7,000,419.00 Total $ 0.00 $ 7,000,419.00 $ 7,000,419.00 DocuSign Envelope ID: A645475C-D86A-4212-90B4-5FCC223AF034 State of Washington Department of Ecology City of Bremerton Oyster Bay Beach Sewer Upgrades - OB-2 to OB-1 Project Agreement No. WQC-2018-BremPW-00117 Page 11 of 11 Template Version 10/30/2015 AUTHORIZING SIGNATURES All other terms and conditions of the original Agreement including any Amendments remain in full force and effect , except as expressly provided by this Amendment. The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective organizations to this Amendment. This amendment will be effective 04/30/2021. IN WITNESS WHEREOF: the parties hereto, having read this Amendment in its entirety, including all attachments, do agree in each and every particular and have thus set their hands hereunto. Washington State Department of Ecology City of Bremerton By: Vincent McGowan, P.E. Water Quality Program Manager Template Approved to Form by Attorney General's Office Date Greg Wheeler Mayor Date By: 7/19/2021 08/03/2021